Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- DEPARTMENT OF THE NAVY FISCAL YEAR 2025 BUDGET REQUEST FOR SEAPOWER AND PROJECTION FORCES [House Hearing, 118 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 118-77] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2025 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS SECOND SESSION __________ SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES HEARING ON DEPARTMENT OF THE NAVY FISCAL YEAR 2025 BUDGET REQUEST FOR SEAPOWER AND PROJECTION FORCES __________ HEARING HELD APRIL 17, 2024 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 56-053 WASHINGTON : 2025 ----------------------------------------------------------------------------------- SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES TRENT KELLY, Mississippi, Chairman ROBERT J. WITTMAN, Virginia JOE COURTNEY, Connecticut SCOTT DesJARLAIS, Tennessee JOHN GARAMENDI, California MIKE GALLAGHER, Wisconsin DONALD NORCROSS, New Jersey JACK BERGMAN, Michigan JARED F. GOLDEN, Maine RONNY JACKSON, Texas SARA JACOBS, California NANCY MACE, South Carolina CHRISTOPHER R. DELUZIO, JENNIFER A. KIGGANS, Virginia Pennsylvania MARK ALFORD, Missouri JENNIFER L. McCLELLAN, Virginia NICK LaLOTA, New York JIMMY PANETTA, California Ian Bennitt, Professional Staff Member Phil MacNaughton, Professional Staff Member Ethan Pelissier, Research Assistant C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Courtney, Hon. Joe, a Representative from Connecticut, Ranking Member, Subcommittee on Seapower and Projection Forces......... 2 Kelly, Hon. Trent, a Representative from Mississippi, Chairman, Subcommittee on Seapower and Projection Forces................. 1 WITNESSES Guertin, Nickolas H., Assistant Secretary of the Navy for Research, Development, and Acquisition......................... 5 Heckl, LtGen Karsten S., USMC, Commanding General, Marine Corps Combat Development Command..................................... 5 Pitts, VADM James, USN, Deputy Chief of Naval Operations for Warfighting Requirements and Capabilities...................... 5 APPENDIX Prepared Statements: Mr. Courtney................................................. 36 Joint Statement of Guertin, Nickolas H.; Pitts, VADM James; and Heckl, LtGen Karsten S. Marine Corps Combat Development Command.................................................... 41 Mr. Kelly.................................................... 31 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: [There were no Questions submitted during the hearing.] Questions Submitted by Members Post Hearing: Mr. Garamendi................................................ 93 Mr. LaLota................................................... 93 Mr. Golden................................................... 94 Mr. Jackson.................................................. 94 DEPARTMENT OF THE NAVY FISCAL YEAR 2025 BUDGET REQUEST FOR SEAPOWER AND PROJECTION FORCES House of Representatives, Committee on Armed Services, Subcommittee on Seapower and Projection Forces, Washington, DC, Wednesday, April 17, 2024. The subcommittee met, pursuant to call, at 3:00 p.m., in room 2212, Rayburn House Office Building, Hon. Trent Kelly [chairman of the subcommittee] presiding. OPENING STATEMENT OF HON. TRENT KELLY, A REPRESENTATIVE FROM MISSISSIPPI, CHAIRMAN, SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES Mr. Kelly. The subcommittee will come to order. I ask unanimous consent that the chair be authorized to declare a recess at any time. Without objection, so ordered. Thank you to our three witnesses for being here today to discuss the Navy's fiscal year 2025 budget request for seapower and projection forces. I would like to also thank the members of the subcommittee for their hard work on this year's NDAA [National Defense Authorization Act] and our staffs on both sides of the aisle. Today we face an increasingly assertive and powerful China. To maintain America's command of the world's ocean, we must expand our Navy and its capabilities in order to deter and defeat the adversaries. We have heard the CNO [Chief of Naval Operations] talk about keeping more players on the field, yet this President's budget request sends a different signal, seeking to divest 19 ships, including 10 that haven't reached their expected service life, and purchasing only 6. A diminished Navy emboldens Beijing and undermines America's position as a global maritime leader. As our subcommittee grapples with critical challenges and strategic decisions in this year's NDAA, our goal remains clear: to ensure our Navy and Marine Corps team is equipped, ready, and capable of defending freedom in the world's ocean. The Navy recently undertook a 45-day review of its major shipbuilding programs. To be frank, it is unclear exactly what has been achieved. What is clear is that we need a deeper level of self-reflection from the Navy. Today I hope to better understand your strategies for improvement and how you plan to recover schedules with industry. We continue to face production challenges with our submarines. The decision to include only one Virginia-class submarine in the budget request does not align with the two- plus-one cadence that was predicated under the AUKUS [Australia-United Kingdom-United States] agreement. Sending a strong demand signal is essential for maintaining industrial capabilities and international confidence in our naval production. Reducing our order from two boats to one in this year's budget does not inspire confidence, nor does it forecast stability to our industry partners or allies. Turning to surface vessels, the Constellation-class frigates have not been spared from setbacks. Originally slated for delivery in September of 2026, the first ship's arrival has now been pushed to December of 2027, with subsequent ships on an equally tentative schedule. This delay represents a broader trend of inefficiencies that we must address. This year's 30-year shipbuilding plan presented two, rather than three, future pathways, a step in the right direction, but it is still sure to confuse our industry partners. If I were industry, I would be scratching my head trying to decipher these changing plans. It is critical that the Navy provide a coherent strategy and clear headlights that industry can align with and invest with confidence. I am pleased to see the inclusion of LPD-33 in the budget request, adhering to the 31 amphibious ship requirement mandated by the NDAA. This is a positive step, and I hope the Navy and Marine Corps can use block/buy authority provided by Congress for the acquisition of future amphibs [amphibious ships]. I would also like to restate that the future LSMs [Landing Ship Medium] must be affordable and producible. We must also be cautious about the tendency to pile on requirements in ship design and production. History has shown us that this often leads to increased cost and extended delivery timelines. In closing, I look forward to transparency today, addressing recent setbacks, and outlining proactive steps to overcome them. Our national security and the lethality of our naval forces depend on your commitment to resolving these issues promptly. And, with that, I turn it over to my good friend and ranking member, Joe Courtney, for his opening remarks. [The prepared statement of Mr. Kelly can be found in the Appendix on page 31.] STATEMENT OF HON. JOE COURTNEY, A REPRESENTATIVE FROM CONNECTICUT, RANKING MEMBER, SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES Mr. Courtney. Well, thank you, Chairman Kelly. Again, I want to thank the witnesses, Assistant Secretary Guertin, Vice Admiral Pitts, and Lieutenant General Heckl for being with us today. We had an opportunity to speak together last week, and I thank you for your engagement ahead of today's hearing. The Fiscal Responsibility Act, which passed in May 2023 to avert a default on the full faith and credit of our Nation's currency and bonds, mandated a 1 percent increase in the Department of Defense budget request for fiscal year 2025. Given what is going on in the world, this is a very tight cap, and it has created tremendous downward pressure on all of the services, including the Navy and Marine Corps. At a time when there is strong consensus about the need to strengthen our maritime and expeditionary forces, our subcommittee has perhaps its most difficult task in years. It is important to note, however, at the outset of this hearing that the Navy's shipbuilding and conversion request cuts even deeper than the FRA's [Fiscal Responsibility Act] mandated budget cap. To be clear, the Navy's shipbuilding procurement request is not for only a 1 percent increase. Rather, it decreases that line item by 3.4 percent from the fiscal year 2024 enacted level that President Biden just signed into law last month. This request includes six battle force ships, a sharp deviation from last year's Future Years Defense Plan and 30- year shipbuilding plan. At the same time, 19 battle force ships are being decommissioned, as Chairman Kelly just noted. Of particular note, it seeks to reduce procurement of the Virginia-class submarine program from 13 consecutive years of steady two-per-year cadence down to just one submarine in fiscal year 2025. This decision to cut procurement in the Virginia program contradicts our own combatant commanders that have emphasized the need for more attack submarines to deter the intensifying threats in the undersea domain. During our posture hearings in the last month, we have consistently heard from combatant commanders from INDOPACOM [U.S. Indo-Pacific Command], EUCOM [U.S. European Command], and NORTHCOM [U.S. Northern Command], Admiral Aquilino, General Cavoli, General Guillot, that their requirements for attack submarines are far higher beyond the number of boats in the Navy's inventory. Equally concerning is that Congress has already appropriated in the last 2 years nearly $1 billion in advance procurement for the second submarine that the Navy now seeks to eliminate. This unexpected change in demand signal has and will cause serious reverberations throughout the industrial base in friends overseas who, based on my conversations in those arenas, are, frankly, incredulous. I have already shared those concerns with you, and we will explore that in further depth today. The Navy's public justification for dropping a submarine is that the sizeable investments in the submarine industrial base, known as the SIB [Submarine Industrial Base] in the budget, will offset its cut in procurement and fleet size. As a member who has secured congressional increases in the SIB starting in 2018, I wholly support the Navy's embrace of that effort. However, I reject the ivory tower theory that SIB investment is a substitute for a consistent demand signal for orders and business. The two enterprises have to occur in tandem. Over the Easter break, I had the opportunity to meet with several supply chain companies, and the message was clear. Submarine industrial base investments, as welcome as they are, don't pay the bills, and particularly for these firms that doesn't -- particularly for those firms that don't qualify for SIB assistance. It is important to remember that cutting procurement going back to the 1990s is precisely the reason why the submarine industrial base has eroded over the last 30 years. Indeed, Undersecretary Robert LaPlante testified to that point before the House Armed Services Committee a few weeks ago. The decades of financial trauma the industrial base has experienced due to the Navy's consistently inconsistent procurement profiles is still deeply seared in the supply chain companies and metal trades unions that represent the welders, electricians, machinists, and pipefitters that are hard at work today as we sit here in this committee room. Mr. Chair, I request unanimous consent to enter into the record two letters from the International Association of Machinists and the Metal Trades Department of the AFL-CIO [American Federation of Labor and Congress of Industrial Organizations] that was addressed to President Biden, urging sustainment of the two-per-year procurement of the Virginia- class submarine program. Mr. Kelly. Without objection, they are admitted. Mr. Courtney. Mr. Chairman, I will end my remarks on a positive note, which is that as someone who visits the shipyards on a frequent basis, who goes to the job training programs, who goes to the trade schools, who goes to the comprehensive high schools that are expanding career pathways in the metal trades, that goes to the job fairs, to me what I see is that our industrial base is recovering from COVID, that the numbers are going up, the retention is going up, and the output is going up. Again, this chart, which I brought with me, which I apologize are a bit of a distance away, but it shows that four Virginia-class submarines have been delivered in the last -- in over a 14-month period, starting last year with Rickover, Mr. Norcross' USS New Jersey, the Iowa, and the Massachusetts by the end of this calendar year. And the USS Idaho was just commissioned a few weeks ago, which Mr. Guertin was present for that. This is not a stagnating industrial base. It is an industrial base which took a big hit during COVID, like all of shipbuilding, but it is not stagnating. It is recovering, and the hiring and the quality of the deliveries in terms of both Rickover in New Jersey were almost at the highest level over the whole course of the Virginia program. So, again, I think, you know, we should be looking forward and not dwelling too much on the past in terms of what is needed, which our combatant commanders have articulated to us. And, again, we look forward to working with the witnesses over the coming days and weeks to get a good mark, so that we can allow that positive momentum to proceed further. Again, I just would also associate my remarks with Mr. Kelly regarding the other platforms. I have talked too long already. But, with that, I yield back. [The prepared statement of Mr. Courtney can be found in the Appendix on page 36.] Mr. Kelly. Well, I forgot to congratulate my battle buddy on being another year older a couple of weeks ago, and also on the UConn victory for the national championship. I now recognize today's witnesses. We have the Honorable Nickolas Guertin, who is the Assistant Secretary of the Navy for Research, Development and Acquisition. We have Vice Admiral James Pitts, the Deputy Chief of Naval Operations for Warfighting Requirements and Capabilities, the N9, Office of the Chief of Naval Operations. And Lieutenant General Karsten Heckl, who serves as the Commanding General, Marine Corps Combat Development Command, and the Deputy Commandant for the Combat Development and Integration. And, with that, it is my understanding there is just one statement. I recognize Secretary Guertin. STATEMENT OF THE HONORABLE NICKOLAS H. GUERTIN, ASSISTANT SECRETARY OF THE NAVY FOR RESEARCH, DEVELOPMENT AND ACQUISITION, DEPARTMENT OF THE NAVY; JOINT WITH VICE ADMIRAL PITTS AND LIEUTENANT GENERAL HECKL Mr. Guertin. Good afternoon. Thank you, Chairman Kelly, Ranking Member Courtney, and the distinguished members of the subcommittee. On behalf of myself, Vice Admiral Pitts, and Lieutenant General Heckl, thank you for the opportunity to appear before you today to address the Department of the Navy's fiscal year 2025 budget request for seapower capabilities. We would like to thank this subcommittee for your leadership and support of the shipbuilding, naval aviation, and ground programs that maintain maritime superiority and the defense of our Nation. As the actions over the weekend have shown, support of our allies remains reliant on a superior naval force strategically postured to adapt to constantly evolving geopolitical challenges and threats. USS Arleigh Burke and USS Carney currently assigned to the European Command area of responsibility successfully engaged and destroyed more than 80 one-way attack unmanned air vehicles and at least 6 ballistic missiles intended to strike Israel from Iran and Yemen. We are grateful for the professionalism and skill of our sailors and marines and mindful of their sacrifices of their families at home. The investments that Congress made in previous budgets enable our success. As we look forward to fiscal year 2025, the actions of the Navy and Marine Corps team reassures international allies and partners, deters potential adversaries, and responds to those who threaten the lives of our sailors, marines, and civilian merchant mariners engaged in lawful international commercial activities. The Department of the Navy remains focused on the pacing challenge of managing strategic competition with the People's Republic of China, Russia's illegal war of invasion of Ukraine, the Houthi strikes of the Red Sea, and Iranian aggression toward our allies. The President's fiscal year 2025 budget provides the resources necessary for the Navy and Marine Corps to continue to implement the 2022 National Defense Strategy. This request builds and sustains the right mix of capabilities to keep the sea lanes open and free, deter conflict, and defend against current and future threats. It aligns with the Secretary of the Navy's priorities. The budget request enables a One Navy-Marine Corps team to continue strengthening our maritime dominance, building on our culture of warfighting excellence, and enhancing our strategic partnerships. Thank you for the opportunity to appear before your subcommittee today. Our mission begins and ends with providing the best possible capabilities to the sailors and marines of the fleet, and we look forward to answering your questions. [The prepared joint statement of Mr. Guertin, Vice Admiral Pitts, and Lieutenant General Heckl can be found in the Appendix on page 41.] Mr. Kelly. I now recognize myself for questions, and this is for all of the witnesses. Each or all of you can, or just one of you can answer for all. Considering the cumulative delays the Navy announced in its 45-day review across several shipbuilding programs, what strategies is the Navy employing to mitigate delays broadly? And are these strategies tailored to address unique challenges of each class of ships, including supply chain issues and workforce attrition? Mr. Guertin. So I would like to start with that one, if you don't mind, Chairman. So having led the 45-day study, along with the commander of Naval Sea Systems Command, Vice Admiral James Downey, we built a big team, brought in independent people to make sure we weren't drinking our own Kool-Aid, and really dug deep into where we were, so we could better inform what we need to do differently. Out of that 45-day study, we identified several areas that we need to improve on, together with our partners in industry. So we looked at things like the national design and engineering workforce, the Navy employees, who understand marine engineering and naval architecture, how we have let that capability for intellectual capacity slide. And I signed out several memos today directing action against several of these things I am going to talk to you today, and that was the first one. We need to get into a better place, so we can understand how to interact fluidly, flexibly, and efficiently with industry, so we do a better job of building these ships. The next is refine the acquisition and contract strategies. Some of our contracts didn't provide the right balance of risk and reward to industry and balance that with the needs of the government. So I have asked my contracting officers to take a hard look at the mechanisms we are using for incentive clauses to better match what motivates their behavior and what balances our risk between the two sides of that business agreement between industry and government. Another action memo I signed out today was to examine the shipyard skilled labor, and think about it as a national asset. These welders, pipefitters, electricians -- pipefitters, they are vital to our ability to provide the resources the Navy and Marine Corps are going to use to defend the Nation. We need to stop thinking of them as fungible and think of them as strategic assets. And we are going to be working with industry closely to develop the pipelines and think about how we do that work more artfully. Then, the Navy's workforce posture, besides marine engineering and naval architects, we also need to think more seriously about things like contract officers. We don't have nearly enough of them for the kinds of work we need to do. We need a depth of experience and more players on that field to mention some other aspects of the technical teams we need to be able to do this work artfully. And the last one that I signed out today was to look for different ways of investments for improving performance and minimize delays. Certainly, the shipbuilding industrial base funding and some of the other resources that have been made available by Congress that we are working with industry to improve how we do that work has paid great dividends, but we need to think deeper and harder about how we apply those resources. Mr. Kelly. Mr. Secretary, you did such a good job of answering that question you answered my second part of my question, so I thank you for that. We also met in my office and talked a little bit with all of you guys about the great job the men and women, and the buy-in they have, of being such a great partner with our armed forces and cooperating to make sure that they get to see the final product of the warships that we produce and to see the sailors and marines who are using those and are on the using end of that to take more pride. And if you can just -- do away with the rest of that question, but if you can just talk a little bit about what we are doing on the PR side to let these men and women who build our Nation's warships, how valuable they are to this Nation. Mr. Guertin. Chairman Kelly, that was a particularly interesting and for me exciting conversation. And I can't make any promises about which ships and where, but I am going to be talking to the Secretary of the Navy about how we can take better advantage of things, like when we do Fleet weeks, how else or where else we might send those ships when they are on those kinds of helping the community, helping the country better understand that these sailors and marines on these ships that are built by American hands are there to defend the Nation and do a better job of helping the American people and the people turning the wrenches and running the weld beads and pulling the cables, so they can see the fruits of their labors in actions with real warfighters. That was a great idea. Mr. Kelly. Thank you, Mr. Secretary. My next question and final question is, the 30-year shipbuilding plan includes an assumption that the shipbuilders will produce future ships on time and within budget. Yet as we have discussed, history has shown that Navy ships routinely cost more and take longer to build than expected. What is the basis for the Navy's assumption that the industrial base can reverse these entrenched trends, and what are the consequences to the battle force if they are not successful? What do you realistically think it will take to ensure the Navy has the industrial base, including the workforce, it needs to execute its existing programs? Mr. Guertin. I will turn a little bit that over to my partners here. But I do want to talk about the challenge we have with getting the blue collar trade craft people out on the waterfront building these ships, and in the second-tier supplier shops, with also noting that we have loss of skills, of working hands and minds in the engineering trades for building the work products that these people need to do that work. Honestly, we are not over the hump on that, but we have made some serious and effective investments in things like workforce training, working with industry to help them see where they need to invest their own resources to improve the quality of work, so they can retain those workers. We are still losing more people than is healthy on a year-by-year basis. So though we have seen some moderation in the loss of workforce, and I am hopeful for the future, but getting players on the field at the waterfront with trade craft folk is a very important part of making sure we get into a healthier place, so we can stay on time and on budget. We are not all the way there yet, but we have made some very good progress in that direction. Mr. Kelly. And, Mr. Secretary, just a final comment. I have been on the receiving end of parades after being downrange, and also on the receiving end, and to just see how much America appreciates our warriors when they go downrange and serve, I feel like those warriors have the same amount of respect for those people who are turning wrenches and bending pipes and doing all those things back here, our workforce, I just got -- we have got to figure out how to show them -- we would not have won World War II without Rosie the Riveters, which we recognize. And so I will tell you, our warriors appreciate our industrial base. I just think we, as Americans, have to make sure that we tap into that patriotism, that the job they are doing is just as important as the end user. And, with that, I yield to my friend, Ranking Member Courtney. Mr. Courtney. Thank you. Thank you, Mr. Chairman. And I know we have a lot of members here today, so I will try to move quickly. Secretary Guertin, as I said in my opening statements, in fiscal year 2023 and 2024, Congress provided funding for long lead time material through advance procurement for two boats, and that should have, you know, been fully funded in fiscal year 2025. And in your 2025 budget, you again have more AP [advanced procurement] money. And, again, the theory, as it has been explained to our office and to the professional staff is that this is to sort of help the supply chain companies. So I think you know that not every supply chain company that feeds into the submarine program is an AP -- is an advance procurement long lead supply company. I mean, a lot of the other pieces of the submarine that are funded through just the full funding of any vessel, you know, may not be in that bucket of advance procurement. So can you explain what happens to those guys who are not AP supply chain companies when you have cut the hull from this -- in this year's budget? Because there is going -- there is going to be some people left out based on I think even a cursory review of what was sent over. Mr. Guertin. Chairman, there were some very difficult trades that had to be made in putting together a budget. Again, Admiral Pitts may be able to provide some more illumination. But to your point, we are able to lay in money for advance procurement, and it is critically important that we send a strong advance signal and keep it as strong as we possibly can. The supply chain actors that are perhaps not in that same category, we will have to take a closer look at that one and see what we can do to help that aspect of the industry as well. Mr. Courtney. Well, again, that is not a very encouraging answer for that cohort of folks that -- I guess the other question that I think sort of screams out for an answer is just, what happens to all of that spending -- sunk costs I would describe -- that the taxpayer has already put into that second boat? I mean, it is my understanding that a reactor would be included in that -- in the long lead items and other ship set. I mean, what I think people are trying to figure out, is this just going to get sort of consumed by a future hull? Is it going to be used for spare parts? Is it going to get sold on eBay? I mean, no one seems to be able to answer that question. Mr. Guertin. So, Senator, the intention is that they would be used in future boats, so -- to keep that pipeline going. To be honest, our shipbuilders are a fair bit behind We haven't even gotten to the point yet where we are back to building two per year, and we have been buying more than that since. So we have a long ways to go to take advantage of that material in future ship procurements. Mr. Courtney. So, but again -- Mr. Guertin. The millennia -- Mr. Courtney. -- for someone listening to this exchange, who is, you know, supposedly one of the ones benefitting from the Navy's plan here, I mean, what that says is that, okay, so in fiscal year 2025, you know, they are going to have work. But if you are going to fold it into a future hull, then, you know, basically they are -- it is like they are just going to fall off a cliff in terms of the work is going to stop, whether it is, you know, 2027, 2028, when you decide to have that work consumed -- or that material consumed in a future hull. So, you know, I appreciate the intent in terms of trying to, you know, protect these folks, but I think the -- what I think the people who, you know, have to analyze this as businesspeople in terms of making investments. That is really not the most encouraging reply. So one last question to Admiral Pitts. You know, we have known each other since you served up in Groton at the Undersea Warfare Development Center, and I know submariners who have the highest respect for you as a leader. You know, in my comments regarding the testimony of the combatant commanders this past week in terms of the fact that - - what they are up against right now, particularly as Russia is now deploying more cyber defense submarines, China is just continuing, you know, its output there. I mean, their characterization that their requirements for attack submarines extend beyond the availability in the inventory, I mean, that has been a refrain for many years. But, I mean, if anything, it is almost getting more acute. Isn't that correct? Admiral Pitts. Congressman Courtney, thank you for the question. Yes. The demand from our COCOMs [Combatant Commands] is always consistent and is getting even more strident for the need for our submarines as our submarines provide an asymmetric advantage that we will take full advantage of from our Navy, both peacetime and should crisis arise. Right now we have a requirement for 66 submarines. And in order to achieve those 66 submarines, we need to work with our industry partners to be able to produce two submarines a year. That is really the only way to achieve an ultimate outcome of 66 submarines, and then our continued maintenance work to get our submarines in and out of maintenance, so that we improve our availability of the ones that we have, is another aspect of getting more players on the field. Yes, sir. Thank you. Mr. Courtney. All right. Thank you. And, again, for the record, we are hovering right now slightly above 50 in terms of the fleet. With that, I yield back, Mr. Chair. Mr. Kelly. I thank the ranking member. I now recognize the gentleman from New York, Mr. LaLota. Mr. LaLota. Thank you, Chairman. Thank you for convening today's hearing to discuss the Department of the Navy's fiscal year 2025 budget request. Today I want to focus on two areas, the submarine industrial base and our amphibious ship programs. I am particularly concerned with the resilience of our submarine industrial base. Despite recent expansions and workforce growth, it faces a significant uncertainty from proposed budget cuts to the Virginia-class submarines. In parallel, our amphibious ship programs, including the LCU-1700 and medium landing ship programs, are facing significant challenges due to strategic reassessments and delays. While our Nation tries to deter conflict with China, or when it -- should it be necessary, these programs are essential for our ability to project power and to support marine operations globally. Additionally, Chairman, I will be submitting questions for the record to ensure my district's contributions to national defense are addressed. I think it is crucial that our local industries and workforce are recognized for their role in fortifying our national security. Assistant Secretary Guertin, good to be with you, sir. Recently, as you heard from my good friend, Rep. Courtney from across the aisle and across the Long Island Sound, he released a memorandum on the status of the submarine industrial base, and that memorandum included many things, including three good high points: one, the upward trends on shipyard capacity; two, upward trends in workforce and supplier development; and, three, the negative consequences of cutting a Virginia-class submarine from the budget. Sir, are you familiar with this memo? And either way, do you agree with these assertions? Mr. Guertin. I am certainly very familiar with all three aspects of this and deeply, having been in this business for a while, as well as studying it intensely through this 45-day review I mentioned earlier. We have actually made some significant improvements in capacity. We are not there yet. We need to get back to two boats per year for submarines, and then even get past that up to 2-1/3 boards, so we can honor our commitments with our AUKUS partners. So we are making very good strides in that direction. The improvements we are making to the ship industrial base, including workforce training and investments in capacity, have been bearing fruit, but we have a long ways to go. As far as workforce, there is some really impressive work going on in dedicated workforce training areas as well as work that has been done with junior colleges and technical colleges that are making -- Mr. LaLota. I need to cut you off real quick, because I only have about 2-1/2 minutes left. Mr. Guertin. Thank you. Mr. LaLota. That is a great start to the conversation. I am a ship guy to your sides as a helo guy and a submarine guy, but I think it works in all of our fields. When you take power off, it takes a lot more power to get back to where you were. And I think that is the overall concern. The overall concern is it seems like we, as a Nation, have made investment into that industrial base, but now we think -- Mr. Courtney and I certainly think -- now is not the right time to take the power off, because to get back to the power level that we are at will take much, much more. I want to switch gears in my two or so minutes remaining and ask the general a little more about amphibs. General, can you discuss how the delays and cost challenges in the shipbuilding program, especially in the LCU-1700 program and the medium landing ship program, which is critical but facing schedule challenges, are affecting the Marine Corps' operational strategies, sir. General Heckl. Sir, thanks for the question. The bottom line is that the LCU-1700 is going to be a vital intra-theater connector. It has been a workhorse in the Marine Corps for decades and decades. And we have just visited -- I was down for the start of new construction on LCU-1710 at Austal. We are excited about that, and we are confident -- obviously, we had some issues with the previous vendor, and I am confident, though, that we are on the right track here, and ASN RDA has been working that hard for us. So, and as far as the LSM, the medium landing ship, absolutely vital to our intra-theater mobility and maneuver, particularly for the standing force within the Indo-Pacific. And that is going to be an absolute workhorse. So we are not -- right now, you know, we are delayed, but we are building a littoral maneuver bridging solution that I am confident will address the shortfalls. But we are getting the requirement right. Sir, as you know, we have chartered a couple of civilian industry standard ships that we are experimenting with, and then we will move out. But bottom line is, sir, once we make the decision, we need to do -- we need to keep those -- the LSMs producing on schedule. Mr. LaLota. Thanks, General. We have heard the Marine Corps' feedback. We take it seriously. We want to get this right. General Heckl. Sir, thank you. Mr. LaLota. Chairman, I yield back. Mr. Kelly. And with his time, I will just say there are no strategic policies or pumping the brakes in shipbuilding. I agree with both Mr. Courtney and Mr. LaLota on that. With that, I recognize the gentleman from New Jersey, Mr. Norcross. Mr. Norcross. Thank you, Chairman. And thank the witnesses for being with us today. I can't tell you how happy I am to hear about the workforce coming from the chairman and ranking member, because as we all talk about getting the equipment in at the right time, and the longest lead item is the human, right? To get a skilled individual. One of the things that we have known for quite a few years, the impact on the retention issue are the ebbs and flows that go in some of these programs, particularly with shipbuilding. So any pause in that gives us reason for the workers to go somewhere else if they might get laid off. That is something that we all understand. In addition to those men and women who actually build and construct these ships, these war boats, they have to build them somewhere. So we know that private yards in Newport News, up in Connecticut and Maine, some of them are in pretty good shape. But the vast majority of them are from years gone by, some upwards to 100 years old. I live right across from the Philadelphia Yard and see the challenges that they are facing with where they can build and repair ships. So we have a Shipyard Infrastructure Optimization Program, the SIOP. The one that -- the cost estimate for Pearl Harbor went from 6 billion to 16 billion. Maybe they expanded the scope or maybe they found conditions, but that is a tremendous amount of money, but we need it. We have to put those in. So, Mr. Guertin, if you could give us a -- sort of an overall status of the shipyard conditions, and is it ready for -- in the event that we do have an exchange, are they able to repair ships? I mean, I know we have a tough time just doing regular maintenance. And if they are coming back because they are damaged, what is the condition of our yards? Mr. Guertin. So the challenges we face with keeping the ships we have at sea on the schedules we need, and using the repair capability we have, is paramount to the work that we do. The Secretary of the Navy is genuinely concerned with whether or not we have sufficient capacity for ship construction and repair in this country. His initiatives associated with maritime statescraft, thinking about how do we improve our position for being able to build not just naval ships but commercial ships as well, is an important part of elevating the overall capacity of this Nation to build ships and have those skilled trade craft. Particularly important. Just a second on improving the resources we have with our public shipyards. The SIOP Program is doing some amazing work of taking care of some old infrastructure as well as modernizing some capabilities and providing better throughput that will improve our ability to repair and produce those ships. Mr. Norcross. So if you were to look at the conditions that we have today, and you gave it a grade just like you used to get in elementary school, what would you give our ability to build these war machines from a shipyard perspective? Mr. Guertin. The ability to build is in the public -- is in the private yards, and their abilities are challenged for the work that we have in hand, although I think we have some great opportunities to improve that capability through both public and private investments. But in terms of -- Mr. Norcross. So I misspoke. Mr. Guertin. Yeah. Mr. Norcross. When I say build, maintenance, the things that we are so challenged on, and if we were to have an exchange. What condition would you put our public yards in? Mr. Guertin. To be perfectly frank, I am not sure I would give us a great grade to be able to do more than the ship maintenance that we have today. We are looking at how to improve that capacity, but it is -- Mr. Norcross. Go back to elementary school. You got an A, a B, C, D, and F. Where would you put us? Mr. Guertin. Probably a C-plus. Mr. Norcross. Thank you. I yield back. Mr. Kelly. Now, from Texas, I recognize Dr. Jackson. Dr. Jackson of Texas. Thank you, Mr. Chairman. And to our witnesses, thank you for your dedicated service and focus on providing our Navy and Marine Corps with the tools needed to project our military across the globe. I applaud your investments into aviation, surface, and subsurface forces in the industrial bases which support these areas. The Department of the Navy must be armed to bring the fight and to be postured to deliver lethal blows at a moment's notice. We must get the right forces on, under, and over the sea to compete in the vast distances of INDOPACOM, to patrol and show force in EUCOM, and to thwart Iranian proxy instigations in CENTCOM [U.S. Central Command]. Recently it was reported that the Navy's fleet of CMV-22 aircraft were having issues with the ice protection systems. The reality is is that we need these aircraft in the air because they provide capabilities that we can't afford to be without in future conflict. We need the V-22 aircraft to be able to successfully operate in permissive -- in a permissive threat environment at all times day and -- day or night and in all weather conditions. When the aircraft is flying to an aircraft carrier in the middle of the ocean, the reality is there is nowhere else you can divert to. You really need 100 percent mission success. Admiral Pitts, how is the Navy addressing the issues with the CMV-22 ice protection systems? And what upgrades will be provided to address this issue? Is there any -- and is there any additional authority or resources that this committee can provide to ensure that these aircraft are upgraded appropriately? Admiral Pitts. Congressman Jackson, thank you for the question. I know we have an excellent modernization plan to execute as we get more and more of the MV-22s into inventory. What I don't know exactly is the specifics to your question, and I would request to take that as a question for the record. Dr. Jackson of Texas. Thank you, sir. And that kind of leads me to my second question, actually. As we all know, the Marines fly the MV-22 variant, and the aircraft is, I believe as you put it before, General Heckl, a game changer for our military. Even our most capable aircraft still need to be upgraded, however, and the MV-22 is no exception. Since their initial design we have found numerous ways to increase the capability and readiness of the aircraft, whether it be through things like the nacelle improvement program or the Osprey drive system and health information upgrades. General, can you talk about the upgrades and safety enhancements that are being budgeted for this year for the MV- 22 fleet and how important it is that we invest in upgrades like the nacelle improvement program and the Osprey drive system and health information upgrades. General Heckl. Yes, sir. Thanks for the question, sir. You know, I will tell you that you have cited most of them, but we are also looking at possible property gearbox redesign in Inpoquil. We are looking at property gearbox material component upgrades as well. I would really defer the question to the Deputy Commandant for Aviation, but as a V-22 guy, I know a little bit about it. But I will simply say, sir, that to your point about how vital this aircraft is, I say it all the time, what other aircraft can fly 1,000 nautical miles at about a 250-mile stop and land without a runway? That is a big deal. And if you put a Herc out in front of me, I am unlimited, right? So, and I will tell you, sir, the V-22 that I took to combat in 2008 in Iraq, the one we are flying today is leaps and bounds ahead of what I had in 2008. So your point is well taken. We continue to upgrade. The Marine Corps and particularly the Deputy Commandant for Aviation will continue to focus on that. Whether it is safety initiatives or operational capability initiatives, sir, we will continue to upgrade. I don't know if that gets the answer, sir, but -- Dr. Jackson of Texas. No, sir. That is great. I appreciate your comment on that. Thank you. And, with that, I yield back. Thank you. Mr. Kelly. Now from the Commonwealth of Virginia, I recognize Ms. McClellan. Ms. McClellan. Thank you, Mr. Chair. Mr. Secretary and Admiral Pitts, I have a question about advance procurement, which, as you know, is a critical tool that shipbuilders use to maintain steady supplies of needed parts and equipment and to ensure the stability in the industrial base. And with that in mind, I have been deeply concerned with the decision by the Navy to delay AP for the Ford-class aircraft carrier, CVN-82, until 2027. I believe this could severely disrupt the shipbuilding planning and construction process and destabilize part of the aircraft carrier industrial base. Can you elaborate on why the Navy chose to delay AP and how the Navy expects to support the industrial base through the planned delay? Mr. Guertin. So the point you are making about advance procurement is critically important for us all to think about. One of the things we also found in the 45-day study is that the nature of the supply chain is substantially changed. The level of time that we needed in the past has actually expanded, and we need to think about how we do advanced procurement over a longer period, say 3 years, in order to position ourselves to be able to execute effectively when it comes to doing new construction. Admiral Pitts, do you have anything you want to add in on that? Admiral Pitts. Secretary Guertin, my addition would be we - - I agree with Secretary Guertin that we have found that we need 3 years of AP for our aircraft carrier advance procurement, and our aircraft carrier is our most potent, flexible flying airfield that we have in our inventory. So thank you. Ms. McClellan. Well, I will just add that in a recent meeting that I had with the president of Newport News Shipyard, she is pretty concerned about this decision and the impact it will have on their planning ability and workforce. So I continue to have that concern. It was recently reported that the Navy has spent $1 billion in operations in the Middle East to ensure the safety of navigation in the Red Sea and disrupt Houthi attacks. Can you explain how the Navy is looking to replenish weapons stocks and elaborate on the importance of additional funding from the national security supplemental that we will hopefully vote on no later than Saturday for replenishing these stocks? Mr. Guertin. I would like to thank Congress for getting to that vote on Saturday. We desperately need that supplemental. We have been doing the Nation's work and expending those munitions, and we need to put them back where we found them. There is other things going on in the supplemental that are particularly vital to some of these other conversations we have been having around improving the industrial base and getting after how to improve our repair and construction capacity. Admiral Pitts, anything else to add on that one? Admiral Pitts. Yes, sir, Mr. Secretary. We need to replenish our stocks, and we need to build our production to refill our overall most critical weapons. What our teams did over the weekend was incredible. They did a terrific job, and it shows that the investments that we have made over the last 10 years have paid off, both in weapons and in training. And there is three ways that we are going to refill these stocks. One is the supplemental that the secretary asked for to give us funding, so that we can start procuring. And we can start recertifying some weapons that are just not useable today and turn them into combat-useable weapons. And that will return back to the fleet in a much shorter time period than the actual production procurement itself. But we need both. Ms. McClellan. Thank you. Admiral Pitts. Yes, ma'am. Ms. McClellan. The recent efforts to limit the impact of Houthi attacks on marine routes illustrate a glaring mismatch in our capabilities versus some of those of our adversaries. Can you, in the 36 seconds left, tell us how the Department is working to develop cheaper and more efficient systems that can successfully deliver a defense at more sustainable and affordable cost? Admiral Pitts. Yes, ma'am. We are examining multiple options. In the near term, it is kinetic options that we could fit into this layered defense system. It won't replace our longer range missiles, but it could fit into a layered defense system to turn that cost curve, and longer term we are looking at directed energy options. Thank you. Ms. McClellan. Thank you, Mr. Chair. I yield back. Mr. Kelly. Now, also from the Commonwealth of Virginia and former chairman of this subcommittee, Mr. Wittman. Mr. Wittman. Well, thank you, Mr. Chairman. I would like to thank our witnesses for joining us today. Secretary Guertin, I would like to follow up a little bit more, too, on the thought process about the 45-day review of shipbuilding. We saw the extended delays there. But I also want to point to a letter from Secretary Del Toro from March 1, 2024, where he said, "The acquisition strategy of buying two aircraft carriers at a time has a significant utility, both in cost and with learning curve and skill development, and that with going to a 6-year center," he said, "invariably costs more as far as learning for the labor force, and it also costs more." So let me get your perspective. In the proposal to go from 4-year centers to 6-year centers, give us what is the cost of that. What is the additional cost in going to 6-year centers? And how is this going to help us face the challenges that we are facing with rebuilding a workforce in the shipbuilding realm, especially when it is incredibly important for them to develop skill sets that are pretty advanced. And if you put them on a roller coaster ride, and you tell the folks that are there now, "Sorry you are gone," and then, "By the way, come back in 2 years, so you can build more aircraft carriers," they are gone forever, and then you are back with new workforce individuals that have to develop that skill set again. Mr. Guertin. So I will ask Admiral Pitts later to weigh in on the challenges we face in terms of laying out the budget and living underneath the Fiscal Responsibility Act. But to your point, you know, stretching out those centers actually lays into Representative Courtney's point about, you know, if we stretch things out too far, then you end up with another valley that you have to climb your way out of, particularly concerning as we are going through this point now where we are trying to get back to where we should be where the 45-day study illuminated where we were, and we don't want to make it any worse. So very challenging environment in terms of getting to the build centers we need, but sometimes we don't get everything we want. So, Admiral Pitts, any other thoughts on that? Admiral Pitts. Mr. Secretary, the only additional thought is, given the resources that we were allocated, tough choices had to be made, and that carrier was pushed out to fiscal year 2030. We still need the 3 years' AP, and our shipbuilding plan, both the main plan and the alternate, still pick up either a 5- year center in the alternate plan or 4-1/2-year centers theoretically to be able to do two ship buys on the main shipbuilding plan. Mr. Wittman. Listen, I understand the difficult decisions that you all face, but they seem to be counter to the rules of math. And the way I understand them is you cannot do addition by subtraction. So building 6, retiring 19, that doesn't get us to 355. Extending build centers on aircraft carrier spends more money, doesn't spend less money, makes it more difficult to maintain a workforce, doesn't make it easier to maintain a workforce, again, all things that are counterintuitive. Secretary Guertin, I want to continue on the theme of multi-year procurement for shipbuilding. We know multi-year procurement for amphibious war ships was passed by this Congress and the committee. We know the Department's shipbuilding plan has one LHA and three LPDs. Can you give us an idea about, what would the cost savings be with that commitment to buy in a four-ship block those amphibious ships? Mr. Guertin. That is a great question. And thank you, also, to Congress for giving us those authorities. We have been doing very well with them in the places we have been able to use it. We want to make sure we preserve that for the places that it makes good financial sense as well as good operational sense. We definitely have shown cost savings when we have done multi-year procurements. Actually, we don't get into multi-year procurements unless we can show cost savings. So that is a powerful tool, and we use it to the maximum extent possible. Mr. Wittman. Well, in this case, do you have a figure on what the cost savings would be with the execution of this multi-ship year buy? Mr. Guertin. That was in my workups for this meeting, but I don't want to give you a number off the top of my head and end up getting it wrong. I think I will have to take that one for the record. Mr. Wittman. Well, assuming it would be significant savings, I think it is going to be around $900 million, close to $1 billion. It seems like to me that that would be incentive itself to get this agreement executed as quickly as possible if we are looking at making sure we are saving money and building the ships that we need as a navy. So I would hope that you would keep that at the top of your list of priorities in executing this multi-ship year agreement. Lieutenant General Heckl, I wanted to ask about the right mix of the different characteristics that are needed in our ships, and those are survivability, susceptibility, and reliability of a vessel. And as you spoke about a little bit earlier, LSM is in that place as you going through determining what are the requirements, what do they need to be, how do we make sure this is the right balance there. All of those things are a challenge going forward. You said you are having conversations with folks on the industry side. Obviously, there has been conversations within the navy, also, too, within the Department of Defense, within CAPE [Office of Cost Assessment and Program Evaluation]. Give me your perspective about how close we are to getting to that point where we are going to determine exactly what is the right mix. And do you believe that where we are or where we will end up is going to be the right place for the LSM? General Heckl. Sir, thanks. I am aware we are over time, Mr. Chairman, so I will be quick. First, I think amphibs are kind of my bailiwick. I think what we heard from Ingalls was about 914 on the multi-ship, just so you know. Second, sir, you know, we have talked. I believe that we -- the work that we have done with ASN RDA [Assistant Secretary of the Navy for Research, Development and Acquisition] on the medium landing ship, on the LSM, we have incorporated several vulnerability and recoverability functions into that, so it is very favorable. I am very, very happy with where we are. I know there is a CBO [congressional budget office] report out. I don't necessarily agree with the numbers they have quoted in there, and I think that the estimates we have coming out of ASN RDA and DASN [Deputy Assistant Secretary of the Navy] ship are going to be good, and we are pretty happy with it. So let's remember, we have got to have a combination of LSM and amphibs, right, to really be forward, campaigning, deterring. Presence is deterrence. You can't deter virtually. You have to be there. And the LSM and the amphibs are going to be key components to that, sir. And I will yield. I will stop. Mr. Wittman. Thank you, Mr. Chairman. I apologize about going over. Mr. Kelly. His time has expired. I now recognize from California Ms. Jacobs. Ms. Jacobs. I think you mean the great State of California. Mr. Kelly. The great State of California, Ms. -- or is it the great Ms. Jacobs from the great State of California? [Laughter.] Ms. Jacobs. Thank you, Mr. Chairman. Thank you so much for being here. I represent San Diego, so everything we are talking about today is very relevant to my constituents. I wanted to first ask, the fiscal year 2025 Navy budget continues to allocate significant funds towards some legacy platforms, like the Arleigh Burke-class destroyers, despite the fact that, you know, publicly there are known vulnerabilities to sophisticated missile threats from adversaries like China. In contrast, we know that Constellation-class frigates are equipped with the Mark 41 vertical launch system, which means they can, you know, carry long-range Tomahawks and multi-role SM-6s, which, you know, gives us the ability to go beyond the reach of the Chinese defenses. Given the strategic value of these capabilities encountering China's advanced military technologies, I was wondering, Secretary Guertin, if you could talk about why there isn't a more pronounced shift in the budget to expedite the deployment of Constellation-class frigates, which I think are, you know, better equipped to ensure our operational flexibility and survivability. Mr. Guertin. So thank you very much for the question. The Constellation is going to be a great ship. But as you might have heard about when we did the 45-day study, we are behind on getting that ship out. I was just up in Marinette, Wisconsin, last week where we did the keeling for that ship, and it is going to be a great one. However, one of the things we have done with the Arleigh Burke-class destroyers is we have been modifying them and improving them as a part of their life cycle. In fact, that is one of the things I hope to bring to my role as the Navy acquisition executive is getting into a closer cadence for incrementally and iteratively improving capability in those big investments in those ships, so that we keep them viable, warfighting capability for a very long time. It takes a long time to build a ship, but it doesn't take very long to upgrade software or load a new missile. So even though the Arleigh Burke we have had -- we started building them a long time ago, they are still viable. In fact, the Arleigh Burke herself, even though she has got an older version of AEGIS out in the Eastern Mediterranean, was firing missiles and doing a great job. So keeping those -- that big investment and building those ships viable by improving them over time is a big part of the portfolio, and I am excited by Congress' ability to give us the resources necessary to improve that capability over time. Ms. Jacobs. Got you. Admiral Pitts, anything you wanted to add about the operational capabilities? Admiral Pitts. Yes, ma'am. Thank you. I would just say and echo Secretary Guertin's comments that our Arleigh Burke destroyers have incredible capability and are performing beautifully on a day-to-day basis as we evidenced in the Red Sea. And, in fact, we like their capabilities so much we are looking at even the Flight 1s, of extending them, which is another one of our keeping more players on the field and near- term readiness and near-term capability of the fleet. We have identified five Flight 1 DDGs [guided-missile destroyer] that we are going to extend to get a few more years of service life out of them, and we think it is -- that is a tremendous return on investment. Ms. Jacobs. Thank you. I also wanted to ask -- I know my colleague, Ms. McClellan, talked about munitions. I wanted to talk about rearming ships at sea. Obviously, we know this is going to be a crucial capability, and, you know, we need to avoid strategic bottleneck of having to return to port for munitions. Can you talk about how the budget enhances these essential logistics and munitions capabilities, ensuring the ships can be rearmed quickly and remain engaged in operational theaters? And do you feel like there is an adequate focus on these critical areas that could decisively influence the outcome of potential conflicts? Mr. Guertin. Yes. Great question. Actually, rearming at sea is a particularly interesting problem for my boss, the Secretary of the Navy, and something he has been focused on in helping us rediscover some earlier investments in how to do that. And we are going to be testing that out later this year. But, Admiral Pitts, do you have any other points on the conversation related to investments in that area? Admiral Pitts. No, sir. Mr. Guertin. Okay. So, anyway, we are rekindling our need to be able to do that functionality and are going to be experimenting with it this year and making sure we can do that fluidly. Ms. Jacobs. Great. And with my last 20 seconds, I will just make a note that I am excited that the Navy's fiscal year 2025 budget request includes the request for additional O&M funding for your child and youth development programs to fund a childcare workforce initiative. This is huge for my constituents in San Diego. We have had childcare wait lists of over 4,000 spots long just recently, so I appreciate that you all are putting some resources toward that. Mr. Chairman, I yield back. Mr. Kelly. I thank the gentlelady. I now recognize for the last time on this subcommittee, but someone who served on both Armed Services with me and Intelligence with me, has been the China Committee chairman, who has been such a great member to this body. This is probably the last time I am going to have you in a hearing, but I am going to tell you, Mike Gallagher was a great Marine, he is a great member of Congress, and I don't know what he is, but I will bet he will still be defending this Nation in whatever capacity he leads. And, with that, I recognize the gentleman from Wisconsin, Mr. Gallagher. Mr. Gallagher. Wow. Thank you, Mr. Chairman. It always pains me to give credit to an Army officer, but I have truly enjoyed our collaborations through the years. And my time on the Armed Services Committee has been the most rewarding of my years in Congress. It has really, you know, been the focus. I guess the China Committee has taken precedence in the last year, but the stuff we have done on this committee has been incredible and, really, bipartisan. I want to recognize a proud Gallagher alum, Major Tom Lacey, in the audience there. Congratulations on your forthcoming deployment. Despite the fact that the Navy is failing to fund nearly 5.7 billion in INDOPACOM requirements, deterrence may actually be enhanced by your arrival in theater, Tom. You are such a great Marine. General Heckl, this will be your last appearance before Congress. Thank you for your service to this country. Thank you for stepping up most recently when the commandant had a bit of a health issue, but we appreciate it. I have always appreciated our interactions, and you are a great leader. I hope we get a chance to work together in the future and wish your luck in your next endeavors. We have been -- I think in last year's NDAA we stood up a commission on the future of the Navy. But despite the fact that it has been statutorily authorized, and some commissioners have been appointed, we still haven't -- this thing still hasn't gotten to work. Do you know how many days -- I guess, Secretary Guertin, are you aware of the future of the Navy commission? Do you know how many days it has been since that commission was set to be established by law? Mr. Guertin. No, Congressman. I am not familiar with that one. Mr. Gallagher. It has been 391 days. That is 391 lost opportunities to get to work. And I get that there is mixed views on the nature of outside commissions. I will tell you, I got to work on one with Senator King related to cyber security that was incredibly productive, that produced a lot of recommendations that went directly into the National Defense Authorization Act. And I would suggest in light of the revelations of the 45- day review, you know, with 36-month delays on Constellation, 18 month on Virginia, 12 to 16 on Columbia, 12 month on CVN [aircraft carrier], I think it further underscores the need for an outside look at the future of the Navy. This isn't a fault of the executive branch. It is actually a fault of Congress right now. We have two commissioners that haven't been appointed by the SASC [Senate Armed Services Committee] chairman, by the minority leader, and I don't know what the heck is going on. But we have got some good people that are ready to take an outside look at the future of the Navy and I think would actually provide some good supporting fires. So I just would ask from your positions, whenever asked about it, I get there might be skepticism and antibodies in the building, but there is a reason we do commissions like this from time to time. It is when, quite frankly, Congress is exasperated, and we have had a series of choose-your-own- adventure 30-year shipbuilding plans, we have had revelations about delays, we have had the 45-day review, constantly changing numbers. We just feel like more needs to be done to map out the future of the Navy. And I would just hope that the building, even with the current composition of commissioners, even though it is not at full strength, the Pentagon can still support the effort, and I just would ask that you do. And I will be encouraging my colleagues to do more. Given that you referenced that you were just in the 8th District of Wisconsin, in Marinette, and in light of the frigate delays, I think what has troubled most of us who lived through the LCS [littoral combat ship] experience and, you know, were very -- remain very excited about the Constellation- class frigate is the fact that at one point the Constellation design shared about 85 percent commonality with the original Italian FREMM design. Indeed, that was part of the reason that Thinkentary won the award where the idea was to leverage a proven design. But the alterations have brought that commonality down under 15 percent. Can you just explain to us how something like that happens and what could be done to fix it? Mr. Guertin. Senator, you are right. The Constellation is going to be a great ship. We did start out with a handful of government-furnished equipment that would go into that, things that we have known, we have worked on, we have invested in. So the capabilities that will come out of that ship will be especially useful to the fleet and be a real workhorse. As far as commonality of the original Italian design, we had to look at that through the lens of what it was going to be to be a U.S. Navy warfighting ship, including things like managing vital power, egress, and that other aspects of the minimal amounts of change that we were going to need in order for it to be able to carry the warfighting capability we were going to need for our Nation. Mr. Gallagher. Minimal amount of change is an over 70 percent change from the Navy's perspective. Mr. Guertin. We did our best to minimize the changes in that FREMM design, but we did have to make sure that we were attending to the needs of the United States Navy as a part of that design. Mr. Gallagher. Okay. Well, this is obviously going to be an issue we are going to have to continue to tackle. I mean, the frigate is designed to be the workhorse of the future fleet. We need to be getting, I would say, not just a 2 year, but eventually 4 in two different yards. That is the only way to grow the size of the Navy. And so I guess I will throw that hot potato to you, General Kelly. Just another thing you can fix in my absence. But hopefully I can continue to provide some supporting fires from wherever I land. Mr. Kelly. I thank the gentleman. And now from the great State of Maine, Mr. Golden. Mr. Golden. Thank you, Mr. Chair. And, of course, thanks to my fellow Marine, Mr. Gallagher. I look forward to working with you right down to the very end here. Mr. Secretary, before Congress passed the fiscal year 2024 Approps bill, the Administration requested two DDG-51s in the PBR for fiscal year 2025. But now that the fiscal year 2024 Approps process is done, and Congress included 1.357 billion in AP for a third DDG, how much additional funding would be needed to fund a third DDG in fiscal year 2025 and get more flight- through ships out to the fleet? Mr. Guertin. I am not certain I have an exact number with me. Admiral Pitts, do you have anything that can illuminate the discussion? Admiral Pitts. No, sir. I don't have a number. Mr. Guertin. We will have to take that one for the record. Mr. Golden. For the record, please. I think we are well over halfway there, just my kind of back-of-hand analysis. But I guess this one is for the admiral. How many flight- through ships have been delivered to the fleet to date? Admiral Pitts. Congressman, I believe it is one, the Jack Lucas. Mr. Golden. One. And how important is it to field more flight-through ships, given the radar technologies, the upgrade there, particularly in light of some of the testimony from the secretary in recent world events? Admiral Pitts. Yes, sir, it is very important. We are going to be -- relying on the additional SPY-6 radar and our AEGIS Baseline 10 brings tremendous capability to our destroyer fleet. Mr. Golden. Thank you. I guess following up on the questioning from Mr. Wittman, I am also interested in talking about multi-year procurement for amphibs. I have seen this with the DDG program and appreciated the stability and lower costs that that type of an approach has given the Navy, as well as -- as well as the Congress. You know, in light of what I was just asking about, like what would it take us to get to a third DDG, it is not quite like a dollar-for-dollar tradeoff. Like my staff had about a 900 to 1 billion savings if we were doing a multi-year procurement on amphibs. So pretty close to the other half of that DDG, not to mention that I think this committee has essentially a missing sub that we have to find a way to put back into this budget. You know, given all of that, not to mention the stability that it could provide to do a multi-year procurement, both -- just certainty for the Marines, for the Navy, for the people that are going to be building those, I guess I am curious, what is the hesitancy to issue an MYP? And, I mean, it is not like you have to expend any kind of capital here in front of Congress. We have already given you the authorization to do it. Mr. Guertin. Mr. Congressman, we will -- we use multi-year procurement as often as possible in places where we can show a financial benefit. As the general said, you know, right, it is about $900 million. All told, it happens over the course of multiple years, and so we need to package that up and utilize those resources, in complete transparency with Congress where we have those savings, those benefits, and then we will have a dialogue about where the best place is to apply them as we put our budget submission together and have that back and forth with you going forward. Mr. Golden. Sure. I appreciate that. Just from my perspective, sir, and I know, you know, there is more that goes into it, but those lost savings just make our job harder here, as you are looking for more subs, more destroyers, more amphibs, not to mention I am leaving other ships out. So hopefully the Navy will give that a good, hard look. I don't have any more. Thank you. Mr. Kelly. I would just say that the multi-year procurement doesn't just add finances, it adds time, and time is more precious than finances sometimes. And, with that, I recognize the gentleman from Missouri, Mr. Alford. Mr. Alford. Thank you, Mr. Chair, and Ranking Member Courtney, and thank you for our witnesses being here today. I really appreciate it. The pace at which the CCP-led People's Republic of China's military has grown over the last few years. It has been shocking. I know I am not telling you anything you don't know on that front. They have outpaced our shipbuilding capacity by a great magnitude. And while I certainly believe our ships are more technologically advanced, quantity often becomes a quality of its own. I know that there are DoD programs such as the Replicator and Hellscape aimed at addressing the relatively numerical advantages competitors may have in regions such as the Indo- Pacific. However, this does not mean we should not fight to fix our industrial base issues, specifically in shipbuilding and submarine building. Ranking Member Courtney, thank you for providing your empirical data about the submarine industrial base to committee members. It is great to hear that General Dynamics Electric Boat hired more than 5,000 new workers in fiscal year 2023, and it is on track on exceed 5,000 this year. I am also pleased to see they have increased their yearly production to 1.4 boats, up from 1.2, although that is still not good enough. We must do more across the entire industrial base to provide the right number of ships, planes, missiles, and munitions to establish credible deterrence against hostile competitors. This really boils down to what Chairman Mike Rogers said yesterday in the Army budget hearing. We capped defense spending at 1 percent in the FRA, forcing the DoD to make cuts. This cap is why the Navy chose to only ask for one Virginia-class sub this year and why the Air Force asked for fewer F-35s. The DoD is faced with tough choices and is robbing Peter to pay Paul as they attempt to modernize, maintain readiness, improve quality of life, on a 1 percent defense budget increase. With that, I move into my questions. First, for Mr. Guertin, according to the Navy's website, at the end of World War II, we had more than 800 surface warships and more than 200 submarines. During President Reagan's term, we had over 220 surface vessels, over 100 subs, and close to 600 ships across the total Navy. This is at the height of the Cold War when the U.S. had only one power to deter. The fiscal year 2025 President's budget asked for funds to field a fleet of 113 surface combatant ships, 12 aircraft carriers, and 67 submarines. Mr. Guertin, is 293 total ships enough to meet all the demands of the Navy at a time when we must deter now two great powers and keep sea lanes open while under attacks from terrorists such as the Houthis in the Red Sea? Mr. Guertin. Thank you for the question. I will defer to my uniformed colleagues here about whether or not it is enough ships, but I suspect they will say no. Certainly, the combatant commanders have been asking us for resources, and we deliver them as much as we can. Getting back to your point about the number of ships that we had, say, during the Reagan era, we also had many more shipyards, both public and private. And that is one of the problems that we face together, Congress and Government, about getting the laydown of capacity, that we need to have a strong military in the field, and especially ships at sea. One of the reasons I am particularly interested in more fully exploring the maritime statescraft strategy to increase the Nation's capacity for building ships in general, so that I can be in a better position to provide the military with the men of war that we are going to need to do the Nation's work. So, General or Admiral, do you have any other points to make on that? Mr. Alford. Admiral? Admiral Pitts. Sir, thank you. The other point I would make is, our most recent battle force ship assessment and requirement report clearly states that we need 381 ships. So the answer to the question is, no, we don't have enough at 291. And that assessment was based on the defense planning scenarios from our defense planning guidance and it aligns to the National Defense Strategy. Mr. Alford. If you did have the funding, I assume you would ask for two Virginia-class attack subs in fiscal year 2025? Admiral Pitts. Yes, sir. I believe that we would take the two Virginia-class submarines. As we were building the budget, we thought it was more important to spend most of our money on the submarine industrial base, so that we ultimately achieve one-plus-two production, and then one-plus-2.33 production, to support both our requirements and our AUKUS commitments. Mr. Alford. Thank you. Thank you, gentlemen. I yield back. Mr. Kelly. I now recognize the gentleman from the great State of Pennsylvania, Mr. Deluzio. Mr. Deluzio. Mr. Chairman, thank you. Gentlemen, thank you. I think I am -- Mr. Alford. Are you a Commonwealth, too? Mr. Deluzio. I am a Commonwealth. Mr. Kelly. I am sorry. I correct myself. The Commonwealth of Pennsylvania. Mr. Deluzio. I am a Commonwealth. Very proud of that. Number one, Mr. Guertin, I very much appreciate the good point on shipyards in this conversation. It is a major piece of us confronting our maritime strategy, so I appreciate the attention and the investment that we need to be making. I want to talk a bit about some of the supply chain, in particular additive manufacturing. I am going to pull out a quote the joint testimony here. The quote starts, "The Navy has seen significant benefit for investments made to date, including installation of multiple additively manufactured components on in-service submarines." My district has a resilient manufacturing ecosystem at Neighborhood 91. It is a fully integrated campus around additive manufacturing production. That is contributing to this effort. So my question, either for Admiral Pitts or Mr. Guertin, tell us a bit more about what those successes are that the Navy has seen, how additive manufacturing can play into bolstering competition, and the supply chain building more resilience, and the like. Mr. Guertin. Additive manufacturing is a big part of how our future can be shaped by being more competitive, because the opportunities for building systems and components across a wider market looms large. We have been challenged to make sure that the components meet the right physical properties when they are built in a different way, but I think we have made some great strides in our technical authorities for understanding what those challenges are and how to make sure that those additive manufacturing processes can attend to those stringent physical requirements. There are some other things that we need to think about how we could take advantage of the technology to build some other components that we currently have that are a big challenge and being able to do here in this country, forgings, for instance, and castings. Additive manufacturing at the right scale can be a big help in that area. Mr. Deluzio. Is the Navy driving this? Is it coming from the contractor? Is it a mix of both? I am curious how much the Navy is pushing for not just investment but to see more of the supply chain embrace things like additive manufacturing. Mr. Guertin. Ships are big, and sometimes they need big parts. Mr. Deluzio. Sure. Mr. Guertin. And those require those large-scale structural mechanisms for fabrication. However, with the limited amount of available manufacturers to do that kind of work in this country, we need to either rebuild that infrastructure or turn to a different approach. And that is what -- we are trying to do both of those things to see which one will get us the best bang for the buck in that area. Mr. Deluzio. Admiral, anything you want to add? Okay. I will make one final point and question, I suppose. Shipbuilding, in general, of course that doesn't happen without workers. And we are seeing, you know, in the skilled trades pretty similar dynamics play out, not just in shipbuilding where, you know, struggling to find newer folks going into these apprenticeship programs and the rest. How does the Navy view that challenge? How are we meeting it? How are we working with industry to make sure we have got the workforce to do this work? Mr. Guertin. We have been working both with industry and with local communities, especially colleges that are helping with people learning trades. I was at an opening of a training center up in York County in Maine. There is some other interesting work going on there to help improve the throughput of people learning those trade craft skills, so that they can get out to our shipyards and have those great jobs that have great career opportunities that are opportunities to also be a part of something bigger than themselves, be a part of building this great Nation's weapons of war. I am very excited about the opportunity, but I will say that one of the things we have been asking our industry partners to do is to think more seriously about how they improve their workers in their companies and to invest more in getting their environments to be more enjoyable places to work as well as greater throughput in people getting out to the work that we need for them to do, that we contract with them to do. Mr. Deluzio. Good. Thank you. Mr. Chairman, I will yield back. Mr. Kelly. I would like to thank all of our witnesses here today. Just as a final thought, I think we have the greatest shipbuilders and repairers and maintainers in the world. But we have to send them the right signal all the time. We have to give them predictable schedules of both repair and building. We can't send them mixed signals, and we can't tell them to pause or put on the brakes or take a strategic pause. And we have to use multi-year buys, understanding that it is always not financial benefits that we gain, but sometimes it is the benefit in time, to produce more in a short time, which in and of itself is a financial benefit. And, finally, Lieutenant General Heckl, I have been blessed with the opportunity to travel with you multiple times, to be engaged with you, and I thank you for your service to our Nation in many, many roles. And like Mr. Gallagher over here, I look forward to you continuing to do great things for this Nation in a life past the Marine Corps. And, with that, this meeting is adjourned. [Whereupon, at 4:17 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X April 17, 2024 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD April 17, 2024 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING April 17, 2024 ======================================================================= QUESTIONS SUBMITTED BY MR. GARAMENDI Mr. Garamendi. For years, I had to push the Navy to finalize a rule on procurements within the NTIB. It seems very often the Navy is seeking loopholes and waivers to try and evade Buy-America requirements, so I am glad to see that the Navy has finally implemented the NDAA section requiring auxiliary ship components be procured from a manufacturer in the NTIB. Why did it take so long? Can you ensure me that the Navy is working to grow its purchases of American parts and goods and not just look for cheap discounts elsewhere? Mr. Guertin. The Navy's ability to build and maintain the fleet is dependent on a healthy and resilient domestic defense industrial base. In this vein, the Navy complies with all relevant domestic sourcing and Buy American laws to leverage the use of U.S. manufacturers. Components purchased by the Navy and its prime contractors from non-domestic sources account for a small percentage (10% or less) of the cost of a Navy ship. The limited use of global suppliers in naval shipbuilding programs is beneficial, often allowing the Navy to leverage leading commercial technologies and economies of scale, resulting in more buying power and a more capable fleet. The Navy is in compliance with 10 U.S. Code 4864, "Miscellaneous Limitations on the Procurement of Goods other than United States Goods", which limits procurement of certain components for naval and auxiliary vessels to the National Technology and Industrial Base (NTIB), consisting of the U.S., United Kingdom, Australia, New Zealand, and Canada. Furthermore, the Navy is compliant with domestic sourcing restrictions that impact the T-AO, FFG, AS(X), T-ARC, and T-AGOS class and remains committed to maintaining a healthy and resilient shipbuilding industrial base. Mr. Garamendi. 10 USC 4851 requires that the Department of Defense "consider the effects of such existing or proposed memorandum of understanding or related agreement on the defense technology and industrial base of the United State". Given that RDP Agreements recently noticed in the Federal register include agreements with countries that have a large, shipbuilding industry, has the Navy been consulted about the impact that Reciprocal Defense Procurement Agreements with partners would have on the shipbuilding industrial base of the United States? If so, how has the Navy assessed the impact of such agreements on domestic shipbuilders and suppliers? If the United States signed a Reciprocal Defense Procurement Agreement with a major partner or ally, would the Navy use that authorization to grow its purchases of foreign components as a `qualifying nation'? Mr. Guertin. The Navy recognizes health and competition in our domestic shipbuilding industrial base and supply chain are vital to meeting our National Defense Strategy. As noted, the U.S. is - and will continue to be - party to various international agreements and reciprocal purchase agreements. The limited use of global suppliers in naval shipbuilding programs is beneficial, often allowing the Navy to leverage leading commercial technologies and economies of scale, resulting in more buying power and a more capable fleet. Additionally, these international agreements allow our domestic suppliers to sell internationally to foreign partners, thereby strengthening our industrial base. ______ RESPONSE TO QUESTIONS SUBMITTED BY MR. LALOTA Mr. LaLota. Increasingly, there are reports of adversaries threatening US allies through the use of sea and/or ocean-bottom mines. This is certainly the case in the Black Sea where Russia has employed mines along the Ukrainian coast. It is also expected that sea mines would be a component of Chinese military plans should that country attack Taiwan and Iranian-aligned groups looking to disrupt trade in the Rea Sea or Persian Gulf. Does the US Navy anticipate employing mine countermeasure (MCM) assets either during a hot conflict or post conflict in these areas? If so, does the Navy currently have sufficient organic assets to adequately service multiple areas simultaneously? It is also my understanding that, based on Navy documentation, this gap is to be addressed in part by using "Vessels of Opportunity" equipped with mobile mission modules, in effect, using VOOs as a fleet multiplier. Can you explain for the Committee the Vessels of Opportunity concept and what capability is needed to make these non-combat platforms mission viable? Admiral Pitts. 1) Navy anticipates most MCM operations would take place once air and sea control of an area has been established, allowing for permissive operations of manned and unmanned systems deployed from a host MCM platform. This is consistent with existing MCM CONOPS and Fleet planning. MCM operations in a conflict is possible, however, it would be a risk decision that joint and maritime task force commanders would make. In such a scenario, platforms and remote systems would most likely be assigned dedicated protection. 2) Navy can conduct MCM operations in multiple areas around the world today by employing currently forward-deployed legacy MCM platforms and Expeditionary MCM companies. Additionally, if necessary, combatant commanders could surge assigned forces from adjacent geographic command areas of operation to provide additional capacity in a needed location. Navy procurement and deployment plans for the MCM MP comply with NDAA direction to provide replacement capability and capacity before retiring the legacy MCM platforms, which are currently forward-deployed to multiple combatant commands. Navy procurement plans also project the fielding of additional MCM MP onboard Independence LCS platforms, providing the Joint Force additional capacity to support homeland and other geographic areas. Plans also include a future quantity of expeditionary MCM MPs that could be deployed from any shore location or vessel of opportunity equipped with the correct logistical support. The exact total quantity is pre-decisional but will result in additional capacity to support several simultaneous MCM clearance tasks. 3) Navy has employed the Vessels of Opportunity (VoO) concept for MCM operations for decades - from various US Navy Afloat Forward Staging Bases (AFSB), from Bay-class dock landing ships built for the British Royal Fleet Auxiliary (RFA), as well as from other platforms. Both components of the Navy's Modular MCM force (the ExMCM companies and MCM Mission Package) have shown the ability to be employed from VoO and ashore, consistent with the Fleet's released Non-traditional MCM CONOPS. The flexibility of the modular MCM force to be employed from multiple ship types or from ashore enables rapid MCM response to maritime mining events in many areas. There is no correlation between non-combat status and ability for a platform to be employed as a VoO. ______ RESPONSE TO QUESTIONS SUBMITTED BY MR. GOLDEN Mr. Golden. Provide the amount of additional funding needed to procure a third DDG in FY25. Mr. Guertin. In order to procure a third DDG-51 FLT III ship in FY25, the Navy would require an additional $1,431M FY25 Full Funding to exercise a FY25 Option Ship. A third FY25 ship would require $2,789M, but the Navy has already received FY24 Advance Procurement (AP) funds of $1,357M for a third FY25 ship ($77.3M re-aligned FY23 AP funds and $1.28B Congressionally added FY24 AP funds). ______ RESPONSE TO QUESTIONS SUBMITTED BY MR. JACKSON Mr. Jackson. What are the Navy's efforts to address CMV-22 ice protection system material challenges and what upgrades will be incorporated into this system? Mr. Guertin. The Navy has been actively addressing the challenges identified with the CMV-22's Ice Protection System (IPS) through a series of mitigations and modifications. These efforts are aimed at improving the system's reliability and performance. One of the key issues identified in the Operational Test Readiness Review was the unacceptable rotor damage caused by the IPS heater blanket and solder tab failures. These components have been identified as the top contributors to arcing and burning damage to the rotor blades and spinner panels. To address these issues, several mitigations and modifications were implemented: 1) Spinner Dome: A solder joint reinforcement repair/modification for all fleet aircraft was successfully verified in September 2021. An engineering change proposal was signed off to move the solder joint location to a low-strain area. A stiffener fastener and edge sealant were added to prevent stiffener disbonding. The retrofit will occur via attrition of the component with an expected completion in 2QFY29. Spinner Dome supply improvement efforts involving both the vendor and depot have also been completed. 2) Rotor Blades: In 2022, changes were incorporated into the blade repair procedures via an Engineering Change Procedure. This was done to enhance the reliability and effectiveness of the blade repairs, which included reflowing and adding solder over a larger area for strength, as well as the option to apply a braid to the wiring. 3) Software Fixes: Improvements have been made to the IPS health check to reduce component burn-through. This is now part of the baseline CMV-22 software. Another software fix, IPS 123, was released in January 2021 and has reduced false alarms and improved fault isolation and detection. Additional software changes are in work to allow the operator to isolate specific Ice Protection Sub-System tests to avoid system failures while conducting pre-flight built-in tests. 4) Naval Air Training and Operating Procedures (NATOPS) Operational Procedure Update: An update to the ice protection system limitations was incorporated into NATOPS in January 2021 which provided clarification for partial mission capable systems and the associated weather limitations. Additionally, changes to the Mission Essential Subsystems Matrix were incorporated to separate Ice Protection core/ critical, de-ice, and anti-ice components to allow increased fault fidelity, inform go/no-go decisions, and increase operational flexibility. [all]