DEPARTMENT OF DEFENSE AUTHORIZATION REQUEST FOR APPROPRIATIONS FOR FISCAL YEAR 2024 AND THE FUTURE YEARS DEFENSE PROGRAM

Committee on Armed Services Senate April 19, 2023

Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.

- Finally, the transformational Blended Wing Body project aims to accelerate the next generation of large aircraft with a solution that reduces energy demand by 30 percent or more compared to current tube- and-wing configurations, significantly reducing fuel logistics risk, and increasing range and capability. readiness and environmental protection integration program 17. Senator Hirono. Secretary Owens, when can we expect corrective action to occur on the findings of DOD IG report 2023-061? Secretary Owens. Consistent with my office's response to the DODIG on this report, we are creating guidance to incorporate installation climate resilience plans and developing new Integrated Installation Resilience policy to integrate energy, water, climate, mission assurance and cybersecurity resilience across our installations. Both efforts are well underway and are expected to be completed in fiscal year 2024.

[Senate Hearing 118-625, Part 3]
[From the U.S. Government Publishing Office]

 ------ 
 S. Hrg. 118-625, Pt. 3

 . DEPARTMENT OF DEFENSE AUTHORIZATION 
 REQUEST FOR APPROPRIATIONS FOR FISCAL YEAR 2024 AND THE FUTURE YEARS 
 DEFENSE PROGRAM

=======================================================================

 HEARING

 before the

 COMMITTEE ON ARMED SERVICES
 UNITED STATES SENATE

 ONE HUNDRED EIGHTEENTH CONGRESS

 FIRST SESSION

 ON

 S. 2226

 TO AUTHORIZE APPROPRIATIONS FOR FISCAL YEAR 2024 FOR MILITARY 
ACTIVITIES OF THE DEPARTMENT OF DEFENSE, FOR MILITARY CONSTRUCTION, AND 
 FOR DEFENDSE ACTIVITIES OF THE DEPARTMENT OF ENERGY. TO PRESCRIBE 
 MILITARY PERSONNEL STRENGTHS FOR SUCH FISCAL YEAR, AND FOR OTHER 
 PURPOSES

 ---------- 

 PART 3

 READINESS AND MANAGEMENT SUPPORT

 ---------- 

 APRIL 19, 2023
 
 GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT
 
 

 Printed for the use of the Committee on Armed Services

 DEPARTMENT OF DEFENSE AUTHORIZATION REQUEST FOR APPROPRIATIONS FOR 
 FISCAL YEAR 2024 AND THE FUTURE YEARS DEFENSE PROGRAM--Part 3
 

 READINESS AND MANAGEMENT SUPPORT
 
 
 
 

 ______

 S. Hrg. 118-625, Pt. 3
 
 

 DEPARTMENT OF DEFENSE AUTHORIZATION 
 REQUEST FOR APPROPRIATIONS FOR FISCAL YEAR 2024 AND THE FUTURE YEARS 
 DEFENSE PROGRAM

=======================================================================

 HEARING

 before the

 COMMITTEE ON ARMED SERVICES
 UNITED STATES SENATE

 ONE HUNDRED EIGHTEENTH CONGRESS

 FIRST SESSION

 ON

 S. 2226

 TO AUTHORIZE APPROPRIATIONS FOR FISCAL YEAR 2024 FOR MILITARY 
ACTIVITIES OF THE DEPARTMENT OF DEFENSE, FOR MILITARY CONSTRUCTION, AND 
 FOR DEFENDSE ACTIVITIES OF THE DEPARTMENT OF ENERGY. TO PRESCRIBE 
 MILITARY PERSONNEL STRENGTHS FOR SUCH FISCAL YEAR, AND FOR OTHER 
 PURPOSES

 __________

 PART 3

 READINESS AND MANAGEMENT SUPPORT

 __________

 APRIL 19, 2023

 __________

 Printed for the use of the Committee on Armed Services
 
 GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT

 

 Available via: http://www.govinfo.gov
 
 ______
 
 U.S. GOVERNMENT PUBLISHING OFFICE 
 60-097 PDF WASHINGTON : 2025
 
 
 

 COMMITTEE ON ARMED SERVICES

 JACK REED, Rhode Island, Chairman ROGER F. WICKER, Mississippi
JEANNE SHAHEEN, New Hampshire DEB FISCHER, Nebraska
KIRSTEN E. GILLIBRAND, New York TOM COTTON, Arkansas
RICHARD BLUMENTHAL, Connecticut MIKE ROUNDS, South Dakota
MAZIE K. HIRONO, Hawaii JONI ERNST, Iowa
TIM KAINE, Virginia DAN SULLIVAN, Alaska
ANGUS S. KING, Jr., Maine KEVIN CRAMER, North Dakota
ELIZABETH WARREN, Massachusetts RICK SCOTT, Florida
GARY C. PETERS, Michigan TOMMY TUBERVILLE, Alabama
JOE MANCHIN III, West Virginia MARKWAYNE MULLIN, Oklahoma
TAMMY DUCKWORTH, Illinois TED BUDD, North Carolina
JACKY ROSEN, Nevada ERIC SCHMITT, Missouri
MARK KELLY, Arizona 
 
 
 

 Elizabeth L. King, Staff Director
 John P. Keast, Minority Staff 
 Director

 Subcommittee on Readiness and Management Support

MAZIE K. HIRONO, Hawaii, Chair
JEANNE SHAHEEN, New Hampshire
RICHARD BLUMENTHAL, Connecticut
TIM KAINE, Virginia
TAMMY DUCKWORTH, Illinois
MARK KELLY, Arizona DAN SULLIVAN, Alaska
 DEB FISCHER, Nebraska
 KEVIN CRAMER, North Dakota
 TOMMY TUBERVILLE, Alabama
 MARKWAYNE MULLIN, Oklahoma

 (ii)

 

 C O N T E N T S

_____

 april 19, 2023

 Page

Military Construction, Energy, Installations, Environmental, and 1
 Base Closure Programs.

 Member Statements

Statement of Mazie Hirono........................................ 1

 Witness Statements

Owens, The Honorable Brendan M., Assistant Secretary of Defense 3
 for Energy, Installations, and Environment.

Jacobson, The Honorable Rachel L., Assistant Secretary of the 18
 Army for Installations, Energy, and Environment.

Berger, The Honorable Meredith A., Assistant Secretary of the 29
 Navy for Energy, Installations, and Environment.

Chaudhary, The Honorable Ravi I., Assistant Secretary of the Air 37
 Force for Energy, Installations, and Environment.

Field, Elizabeth A., Director of Defense Capabilities and 51
 Management, Government Accountability Office.

Questions for the Record......................................... 93

 (iii)

 DEPARTMENT OF DEFENSE AUTHORIZATION REQUEST FOR APPROPRIATIONS FOR 
 FISCAL YEAR 2024 AND THE FUTURE YEARS DEFENSE PROGRAM

 ---------- 

 WEDNESDAY, APRIL 19, 2023

 United States Senate, 
 Subcommittee on Readiness and
 Management Support,
 Committee on Armed Services,
 Washington, DC.

 MILITARY CONSTRUCTION, ENERGY, INSTALLATIONS, ENVIRONMENTAL, AND BASE 
 CLOSURE PROGRAMS

 The Subcommittee met, pursuant to notice, at 1:31 p.m., in 
room 232A, Russell Senate Office Building, Senator Mazie Hirono 
(Chairman of the Subcommittee) presiding.
 Subcommittee Members present: Senators Hirono, Shaheen, 
Kaine, Kelly, Sullivan, Fischer, and Mullin.

 OPENING STATEMENT OF SENATOR MAZIE HIRONO

 Senator Hirono. I would like to begin by thanking our 
witnesses for your service and for your testimony today. We 
will try not to beat you up too much, and I thank Ranking 
Member Sullivan, who will be arriving shortly for his continued 
bipartisan cooperation.
 Today, we will hear about the Defense Department and the 
service's commitment to our servicemembers and their families, 
as well as how our military installations project power around 
the world.
 These priorities are vital to our readiness, but I do worry 
that the Department's actions are not in line with its stated 
goals. So, funding for our installations and facilities rarely 
receive the commitment in funding or resources from the 
Department when compared to other accounts like procurement and 
R&D [research and development].
 This disparity has only grown in recent years, further 
exacerbating our construction and maintenance backlogs. 
Facility funding backlogs are compounding every year, with 
communities in Hawaii and across the country paying the price.
 When our installations don't get the funding they need, we 
end up facing crises like the fuel spill at Red Hill and 
Haleakala, the power outages at Schofield Barracks, the 
wastewater spills into Pearl Harbor, and the list goes on for 
facilities around the country and indeed the world.
 Not only do these failures damage our forces readiness, 
they undermine the trust and faith of the surrounding 
community. Our servicemembers and our communities deserve 
better. Further, while we repeatedly hear the Department talk 
about keeping up with the pacing threat of China in the Indo-
Pacific, we have yet to see the Department make the facility 
investments necessary to do so.
 Instead, this Committee has had to significantly increase 
the number of military construction projects above what has 
come over in recent budget requests. In addition to failing to 
invest in new projects, we are also failing to maintain 
existing facilities. The deferred maintenance backlog for DOD 
[Department of Defense] facilities is significant and grows 
each year.
 While the Department's stated goal is to meet 90 percent of 
the existing requirements, it has recently only budgeted up to 
80 percent, requiring Congress to step in and raise questions 
about the Department's commitment to addressing the backlog. 
The Department must get serious with the facilities plan, a 
maintenance plan, backed by adequate resources to make it 
achievable.
 Elsewhere on our installations, the hazards of privatized 
housing remain persistent. The Department must step up its 
oversight and vastly improve the quality of its Government-
owned enlisted barracks as well. Today, we will focus on the 
challenges that still remain and what DOD can do to address 
them.
 I want to especially thank Elizabeth Field with the GAO 
[Government Accountability Office] for her ongoing work on 
barracks improvements, and I look forward to her testimony on 
her findings. Finally, I look forward to hearing more about how 
the Department is investing in operational energy to improve 
combat capability for our troops.
 I would like to know how the Department is planning for 
more resilient designs in our military construction projects, 
under what specific timelines DOD will update its guidance, and 
what resources are needed to accomplish this.
 I look forward to hearing from our witnesses on these 
important issues, and what more this Committee and the 
Department can do to strengthen our military installations in 
Hawaii and around the world. When Senator Sullivan arrives, he 
can put a statement into the record. So today we are joined by 
Hon. Brendan Owens, who is Assistant Secretary of Defense for 
Energy, Installations and Environment.
 The Honorable Rachel Jacobson, Assistant Secretary of the 
Army for Energy, Installations and Environment. The Honorable 
Meredith Berger, Assistant Secretary of the Navy for Energy, 
Installations and Environment. The Honorable Ravi Chaudhary, 
Assistant Secretary of the Air Force for Energy, Installations 
and Environment.
 We have not only the DOD, but all of the services present 
today. Thank you, and then Elizabeth Field, Director of Defense 
Capabilities and Management, GAO. We will start with Secretary 
Owens.

 STATEMENT OF THE HONORABLE BRENDAN M. OWENS, ASSISTANT 
SECRETARY OF DEFENSE FOR ENERGY, INSTALLATIONS, AND ENVIRONMENT

 Mr. Owens. Thank you, Chairman Hirono, and Ranking Member 
Sullivan, when you get here. Distinguished Members of the 
Subcommittee, on behalf of myself and my Military Department 
colleagues, thank you for the opportunity to discuss the 
President's Fiscal Year 2024 Budget for the Department's 
Energy, Installations and Environment programs.
 I look forward to working with you in the coming months to 
continue aligning our policies and resources to support the 
National Defense Strategy (NDS). The 2022 NDS is clear, we are 
operating in an increasingly complex global threat environment 
characterized by significant geopolitical, technological, 
economic, and environmental challenge.
 The People's Republic of China (PRC) remains the 
Department's pacing challenge, with its increasingly aggressive 
efforts to undermine United States alliances and security 
partnerships in the Indo-Pacific region. We also face threats 
from actors like Russia, North Korea, and Iran, as well as 
climate change and other transboundary challenges.
 Together, these threats not only pressure the Joint Force's 
power projection and maneuver capabilities, but also put the 
safety and security of the Homeland at risk. Countering these 
threats requires a resilient Joint Force and defense ecosystem 
that can operate in contested environments at home and abroad.
 As such, we are ensuring that our installations and 
infrastructure are resilient to a wide range of challenges by 
implementing policy updates, innovation in how we plan, design, 
and build, and deployment of technology to counter the 
diversifying threats we face.
 In the Indo-Pacific specifically, there are two key 
priorities that will be critical to the success of this effort, 
retaining vital mission capabilities in the State of Hawaii----
 Senator Hirono. Mr. Secretary, I am sorry to interrupt. I 
should have mentioned that we are needing to observe some time 
constraint, and so I would appreciate it if all of you could do 
your remarks in 3 minutes instead of the usual five. I would 
appreciate that very much.
 Mr. Owens. Thank you.
 Senator Hirono. Please continue.
 Mr. Owens. So, my countdown clock is now 2 minutes. So, 
when 3 minutes left, I will be done, or work to do it. Thank 
you. So, Indo-Pacific, specifically in Hawaii and Guam and the 
Commonwealth of the Northern Mariana Islands, so that they 
remain on track by extending the exemption of the H-2B visa 
temporary need requirement through 2029.
 More broadly, we are requesting $14.7 billion in the budget 
for military construction across the Department, which is an 
increase of 44 percent from last year's request. In addition, 
we are requesting $3.5 billion for installation energy and $3.3 
billion for operational energy to enhance resilience and reduce 
demand to improve joint lethality, support distributed 
operations, and reduce sustainment risks in contested 
environments.
 We are also improving our approach to facility management 
to increase the efficacy of the $20 billion we are requesting 
for sustainment restoration and modernization investments. 
These efforts will enhance our facilities, direct mission 
support capabilities.
 They will also enhance the health, well-being, and 
readiness of our servicemembers and their families. We remain 
committed to maintaining a robust environmental cleanup 
program, improving the safety and efficiency of our facilities, 
and improving the quality of life for our military personnel 
and their families by ensuring access to safe, quality, and 
affordable housing.
 So, while we implement new technology to avert future risk, 
we are requesting $1.5 billion to support clean-up efforts 
intended to safeguard the health and well-being of our people. 
Finally, the Department continues to focus on ensuring that 
servicemembers have access to safe, quality, affordable family 
and unaccompanied housing.
 We are requesting $1.9 billion for family housing to 
sustain our increased focused on ensuring the delivery and 
maintenance of quality housing for military families. An 
additional $463 million to modernize unaccompanied personnel 
housing, to improve privacy and provide greater amenities.
 Nothing is more important than our people, our soldiers, 
sailors, airmen, and marines, guardians, and their families. 
The investments we make to improve the built and natural 
environments where they live and work are our investments that 
pay off by improving their health and well-being. We appreciate 
Congress's and the Subcommittee's continued support for these 
efforts, and we look forward to your questions.
 [The prepared statement of The Honorable Brendan Owens 
follows:]

 Prepared Statement by Statement of The Honorable Brendan Owens
 introduction
 Chairwoman Hirono, Ranking Member Sullivan, and distinguished 
members of the Subcommittee: Thank you for the opportunity to discuss 
the President's Fiscal Year (FY) 2024 budget request for the Department 
of Defense's (DOD) energy, installations, and environment programs. As 
the newly confirmed Assistant Secretary of Defense for Energy, 
Installations & Environment (EI&E), I am grateful to be able to serve 
the people who safeguard this Nation and ensure they have safe, 
healthy, efficient, and resilient places to live and work. Our 
installations are the foundations of our national security posture, and 
I look forward with this committee in the coming months to continue 
aligning our policies and resources to support the National Defense 
Strategy.
 supporting the national defense strategy
 The 2022 National Defense Strategy (NDS) is built to respond to the 
increasing complexity of the global threat environment is becoming 
increasingly complex, characterized by significant geopolitical, 
technological, economic, and environmental change. The People's 
Republic of China (PRC) remains the Department's pacing challenge with 
its increasingly aggressive efforts to undermine U.S. alliances and 
security partnerships in the Indo-Pacific region. However, we also face 
threats from actors like Russia, North Korea, and Iran, as well as 
climate change and other transboundary challenges. Together, these 
threats not only pressure the Joint Force's power projection and 
maneuver capabilities, but also put the safety and security of the 
Homeland at risk.
 To address these challenges, the NDS identifies four top-level 
defense priorities: defend the Homeland; deter strategic attacks 
against the United States, our Allies, and our partners; deter 
aggression and be prepared to prevail in conflict when necessary; and 
build a resilient Joint Force and defense ecosystem.
 Each mission within our energy, installations, and environmental 
portfolio is directly engaged in the successful execution of this 
strategy. Our over 500 bases, posts, camps, stations, yards, and 
centers around the world are the vital network of mission support 
capabilities that form the backbone of an integrated deterrence posture 
that is both resilient enough to withstand, fight through, and recover 
quickly from disruption, and adaptable enough to apply deterrence 
approaches that can be tailored to address specific challenges. We 
continue to ensure that the missions being conducted under the 
Department's campaigning initiatives are supported by reliable and 
secure fuel and energy, whether they are out in the field or on base. 
Finally, by effectively managing both the built and natural environment 
and ensuring that our warfighters have access to the land, water, and 
airspace they need to maintain their readiness, while also protecting 
their health and safety, we are building the enduring advantage needed 
to advance our defense and security goals.
 The continued support of Congress, and in particular, this 
subcommittee, has allowed the Department to enhance the agility, 
resilience, readiness, and lethality of our forces around the world. 
There are several key priorities and progress updates that I would like 
to focus on today, including our ongoing efforts to optimize our 
posture in the Indo-Pacific region, the progress we've made to improve 
the resilience of our Joint Force, and the updates on our environmental 
cleanup and housing programs.
 supporting the department's posture in the indo-pacific region
 As noted in the 2022 National Defense Strategy, the PRC is ``the 
most comprehensive and serious challenge to U.S. national security'' 
and that meeting this challenge will require a holistic response 
centered on an integrated deterrence posture in the Indo-Pacific 
region. The Department continues to strengthen and sustain the 
distributed, resilient capabilities needed to achieve this posture and 
counter the PRC's increasingly coercive and aggressive actions in the 
Indo-Pacific. We recognize that this must be done in close cooperation 
with our allies, partners, and other stakeholders. As such, EI&E is 
focusing on two critical priorities that will be critical to our Indo-
Pacific posture: retaining access to training lands in Hawaii and 
addressing workforce challenges affecting the military construction 
work in Guam and the Commonwealth of the Northern Mariana Islands 
(CNMI). We look forward to working with the State of Hawaii, Guam, the 
CNMI, and our DOD and other Federal partners to ensure that these 
priorities can be addressed.
Retention of Critical Training Land in Hawaii
 The relationship between the U.S. Military and Hawaii has been a 
critical piece of U.S. military and diplomatic strategy for over 125 
years. Hawaii's strategic location in the Pacific, its unique training 
and port areas, and its support for critical defense missions makes it 
a cornerstone of our posture in the Indo-Pacific region. In support of 
this vital defense mission, the Military Departments lease 
approximately 72,000 acres of land across five islands in the chain. 
These lands, which are adjacent to U.S.-owned installations, provide 
ideal locations for specialized defense capabilities, multi-domain 
operating areas to generate future force readiness, and training ranges 
that our Joint Force leverages along with allies and partners.
 The Department recognizes that recent incidents, particularly the 
fuel and concentrated Aqueous Film Forming Foam (AFFF) spills at Red 
Hill and the diesel spill at the Maui Space Surveillance Complex, have 
resulted in a severe and worsening loss of public trust between the DOD 
and Hawaii's people. This situation presents extremely challenging 
conditions for DOD negotiations with the State to retain use of these 
leased lands, and it is anticipated that senior DOD leadership will 
need to engage consistently, respectfully, and transparently to repair 
relationships and build back trust. The Department is working 
diligently to improve relationships and communicate effectively with 
stakeholders (State and local government, Native Hawaiian 
organizations, and other interest groups). Joint Task Force Red Hill is 
on plan to deliver on Secretary Austin's commitment to defuel and close 
the Red Hill Bulk Fuel Storage Facility and we hope that the execution 
on this promise ushers in a new era of cooperation between the people 
of Hawaii and DOD.
 The partnerships and relationships that enable the continuation of 
the critical military missions in Hawaii are vital to the U.S. military 
strategy in the Pacific and our national strategy to promote stability 
in the region. The leases for approximately 44,000 acres of State land 
will expire within 10 years. The Military Departments are seeking to 
negotiate new property agreements for 22 separate parcels, including 
training areas, main cantonments and support areas, and easements 
(including ocean area) prior to their expiration in 2028, 2029, and 
2030. The expected timeline for reaching new property agreements, which 
will require lengthy and robust environmental compliance and real 
estate due diligence is 5-7 years. Through consistent, public actions 
that support and benefit both the military and State of Hawaii, the 
Department will endeavor to build relationships and set the right 
conditions today to enable productive future negotiations.
Construction Workforce Issues in the Indo-Pacific Region
 The Department has several upcoming key posture actions in Guam and 
the CNMI that will require historic levels of military construction, 
including the relocation of marines from Okinawa, Missile Defense 
Agency Defense of Guam, and Polaris Point expansion. However, while 
Guam ranks 3d highest nationally in construction workforce per capita, 
the current military construction demands require a workforce more than 
twice as large as the local construction workforce (currently ?4,400 
people). The anticipated levels of future military construction will 
further exacerbate consistent labor shortages that have already left 
private construction projects unable to meet their baseline needs. To 
deliver these critical military construction projects on time, the 
local workforce must be augmented. Despite concerted and sustained 
efforts by the Guam Department of Labor and DOD, construction 
opportunities in this region have never been able to attract a 
sufficient number of U.S. workers to Guam and the CNMI to support 
construction requirements. The only reliable mechanism available to DOD 
to sufficiently augment the construction workforce on Guam and CNMI is 
the H-2B visa program.
 To ensure that DOD construction contractors have a stable H-2B visa 
workforce for the military realignment projects described above, DOD 
requires relief through December 31, 2029, from the H-2B visa temporary 
need requirement. While we appreciate the 1-year extension in the 
Fiscal Year 2023 National Defense Authorization Act (NDAA) that pushed 
the expiration date to December 31, 2024, the longer-term extension is 
needed to meet DOD's construction requirements.
 Labor market uncertainty will, at a minimum, significantly delay or 
even derail DOD's ability to meet force posture requirements in Guam 
and the CNMI. Current construction cost estimates and schedule 
commitments in Guam and the CNMI are based on and require a stable 
labor market throughout construction. The construction contracts are 
typically over 2 years in duration and in certain cases are much 
longer. These contracts are typically firm-fixed price contracts which 
require the contractor to make assumptions based on availability of 
resources (labor, construction materials, etc.). Contractors may choose 
not to even compete for these critical projects if the risk or 
uncertainty surrounding the labor market is too high for them to have 
the confidence necessary to complete a project. Continued short-term 
exemption extensions of exemption from the temporary need requirement 
for a H-2B visa does not resolve the uncertainty around the 
availability of labor and leaves the risk of annual labor market 
disruption intact. Heightened contractor risk will drive bid and cost 
increases and result in schedule delays. The Department looks forward 
to working with Congress to prevent this contingency and keep currently 
programmed and near-term planned projects on track.
 improving mission resilience
 A key pillar of the National Defense Strategy is to build a 
resilient Joint Force and defense ecosystem that can operate in a 
contested environment at home and abroad. As such, we must work to 
ensure our energy, installations, and infrastructure are resilient to a 
wide range of challenges, to include weather, climate, natural events, 
disruptions to energy or water supplies, and physical or cyber attacks. 
The Department requires a multi-faceted approach consisting of policy 
adjustments; better planning, design, and construction; and innovative 
technology to counter such a diverse set of threats.
Infrastructure Resilience
 The Department is improving mission resilience at the building and 
installation level by developing policy that establishes stringent 
energy performance goals in new and existing buildings and enables them 
to run on electricity. My office is working with DOD components to 
leverage the Department's facility data to inform infrastructure 
recapitalization decisions and ensure Components have the tools 
necessary to prioritize building upgrades for a secure energy future. 
We are updating all Unified Facilities Criteria to dramatically improve 
the energy performance of newly constructed buildings, support electric 
building systems and components to increase mission resilience and 
integrate effectively within an installation micro-grid. These actions 
add capability, ensuring installations can operate under all conditions 
and expanding options for providing support to civilian authorities and 
local communities. Finally, the Department is pursuing a comprehensive 
plan and associated investments to deploy the charging infrastructure 
essential to transition our non-tactical vehicle fleet to electric 
power enabling installations to utilize the storage capacity of 
electric vehicles and add capability that furthers our investments in 
micro-grids. The Department aims to make 100 percent of its annual 
vehicle acquisitions Zero-Emission Vehicles (ZEV) by 2035.
 Military Construction
 Infrastructure resilience is integrated into the military 
construction (MILCON) program, where we continue to focus on critical 
mission requirements as well as life, health, and safety concerns. We 
are requesting $14.7 billion in the budget for Military Construction 
across the Department, an increase of 44 percent from last year's 
request, primarily due to infrastructure requirements for the Pacific 
Deterrence Initiative ($2.0 billion), investments in the Shipyard 
Infrastructure Optimization Program ($2.3 billion), quality of life 
facilities (including child development centers, barracks and dining 
facilities, dormitories, and schools--$0.81 billion), new aircraft 
beddown (B-21, KC-46A, F-35,T-7A--$725 million), European Deterrence 
Initiative and NATO Security Investment Program (NSIP) ($590 million), 
hospital and medical facilities ($444 million), projects in support of 
the modernization efforts in support of Sentinel Ground Based Strategic 
Deterrent program ($140 million), and construction projects in support 
of special warfare operators ($287 million).
 This request also includes $2.556 billion for the Defense-Wide 
Components, including:

 $281 million for dependent educational facilities;

 $275 million for incremental funding of fuel 
infrastructure;

 $185 million for a Defense Intelligence Agency 
Headquarters Annex (NIP-funded)

 $148 million for a Missile Defense Agency Ground Test 
Facility Infrastructure project;

 $485 million for recapitalization of National Security 
Agency facilities (NIP-funded);

 $287 million to address, force structure growth 
disconnects, and antiquated infrastructure for Special Operations 
Forces;

 $31 million for Washington Headquarters Services 
facilities;

 $548 million for the Energy Resilience and Conservation 
Investment Program; and

 $301 million for exercise related construction, 
unspecific minor construction, and planning and design for defense-wide 
future year projects.

 In addition, the Defense-Wide request contains $444 million for 
medical facility recapitalization including $102 million for the 
seventh increment (of a $695 million project) for the Walter Reed 
Medical Center Addition/Alteration at Naval Support Activity Bethesda, 
Maryland; $77 million for the eleventh increment (of a $1.59 billion 
project) for the Medical Center Replacement at Rhine Ordnance Barracks, 
Germany; $60 million for the first increment (of a $257 million 
project) for an Ambulatory Care Center at Guantanamo Bay, Cuba, $103 
million for an Ambulatory Care Center-Dental Clinic Addition/Alteration 
at Miramar, California, and $102 million for an Ambulatory Care Center-
Dental Clinic Replacement at San Diego, California. These projects are 
critical for our continued delivery of the quality health care that our 
servicemembers and their families deserve.
 Our focus continues to be on developing projects that are 
appropriately scoped and priced to ensure execution is on-time and 
within cost. The primary emphasis of the Department's Military 
Construction Reform initiative is on early involvement between project 
sponsors and the DOD Construction Agents (DCAs) responsible for 
executing the projects. In addition, we are working with the DCAs and 
industry to introduce their knowledge and expertise earlier into our 
project planning and design activities to ensure executable projects. 
We are close to finalizing a comprehensive policy associated with the 
planning and design of military construction projects. This policy will 
ensure that all DOD Components clearly understand the difference 
between planning activities and design activities to consistently apply 
the appropriate funding to each task. Additionally, DOD is focusing on 
sharing information between key project stakeholders, ensuring that 
critical details such as project requirements, acquisition timelines, 
and construction status inform proactive decisions on projects. This 
enhanced information sharing will allow project stakeholders to manage 
scope and cost changes with minimal impact to project delivery.
 The Department recognizes the challenges associated with estimating 
and awarding military construction projects on budget, particularly 
given recent supply chain tightening and significant material price 
increases. We appreciate the additional support Congress has provided 
over the last few fiscal years to ensure that authorized project costs 
are better positioned based on market realities. However, the 
Department acknowledges that it has work to do to ensure that estimates 
result in executable projects. This year we are also making sure an 
appropriate level of resourcing is provided to the DCAs so they can 
provide improved oversight of our construction contracts.
 Facilities Sustainment, Restoration, and Modernization
 The Department's inventory of buildings and structures is the 
largest within the Federal portfolio. Facilities Sustainment provides 
for the regularly scheduled maintenance, repair, or replacement of 
facility components and directly influences the condition of our 
facilities. These investments must be made throughout the service life 
of a facility to optimize its performance and support the safety, 
productivity, and quality of life of our personnel, while also reducing 
avoidable costs associated with premature deterioration. In addition to 
facilities sustainment funding, the Department relies upon its 
Restoration and Modernization program funding to provide ongoing 
support to reduce our maintenance and repair backlog and to modify our 
facilities to support improvements in our technologically driven 
functions.
 The Department's fiscal year 2024 budget request includes $13.8 
billion of sustainment funding for the Military Services and the major 
Defense-Wide organizations. This represents a $1.2 billion increase 
from the $12.6 billion in the fiscal year 2023 budget request that will 
achieve an average of 88 percent, excluding the Marine Corps from the 
overall calculation (the goal is 90 percent) of the Department's annual 
requirement for facilities sustainment, and a 3 percent increase from 
85 percent in the fiscal year 2023 request. Within the budget request, 
each Military Component and Agency, excluding the Marine Corps, Air 
Force Reserve and the Air National Guard, is funded to at least 85 
percent of the modeled requirement. We are working with the Marine 
Corps to pilot a comprehensive model that would optimize FSRM and 
MilCon facility investments across their real property portfolio.
 In addition to facilities sustainment funding, the Department 
relies upon its Restoration and Modernization (R&M) program funding to 
provide ongoing support to assigned missions by countering obsolescence 
and reversing degraded conditions of existing facilities. The fiscal 
year 2024 budget request includes $6.2 billion in Operations and 
Maintenance appropriations for facilities R&M, a 14 percent increase 
compared to our $5.4 billion fiscal year 2023 budget request.
 Currently, the Department has managed the budgeting for sustainment 
of assets at the portfolio level with a sustainment model. This model, 
however, relies on an inventory approach to requirements development, 
which does not directly align asset investment requirements to 
expenditures. In implementing its Sustainment Management System (SMS), 
the Department has moved closer toward instituting an asset management 
approach to facility management. Our next step will be to improve data 
driven asset management by developing a facility investment 
optimization model for the Department that will optimize the allocation 
of facility repair funding to maximize the condition of our facilities. 
This initiative is just beginning, but we anticipate the tool will be 
able to promote more efficient facility investments and detail the 
mission benefits achieved based on the investments. Unlike our current 
sustainment model, this tool will consider the asset's condition, the 
asset's individual system components, and the mission contribution of 
the asset. This initiative is guiding our transition into an asset 
management approach for budgeting and managing the Department's 
inventory more holistically. It will also provide much needed data in 
the building component systems and their maintenance and 
recapitalization schedules to properly conduct sustainment, which will 
reduce energy demand. The additional data will also allow the 
Department to better plan electrification of existing projects, 
consistent with our energy resilience goals.
 Energy Resilience and Conservation Investment Program (ERCIP)
 In 2021, the ERCIP program became a specified MILCON program 
focused on improving the energy resilience of our installations with an 
emphasis on critical missions. Today, ERCIP is the backbone of our 
energy and water resilience investments. We are requesting $634.3 
million to prioritize energy project investments where they best 
support the defense posture, with a focus on microgrids, backup 
generation, and energy storage. In addition, ERCIP will continue to 
support a range of technologies and efforts, including renewable 
energy, energy storage, geothermal, accelerated deployment of air and 
ground source heat pumps, and infrastructure projects directly 
supporting distribution infrastructure for electrical vehicle charging 
stations. The Department appreciates the support Congress has provided 
to the ERCIP as it evolved from a conservation-focused program to one 
that emphasizes resilience.
Energy Resilience
 Reliable, flexible, and resilient energy access remains essential 
to military capability and readiness. The Department depends on energy-
resilient forces, weapon systems, installations, and infrastructure to 
achieve its mission, at home and abroad. While our installations 
utilize commercial, municipal, and host nation power and energy grids 
for day-to-day operations (including command and control systems, 
communications, lighting, heating, and cooling), as a readiness matter, 
we also must have credible and resilient localized installation energy 
capabilities that can deter, defend against, and help defeat 
adversarial actions. Similarly, for operational energy uses--most 
notably combat platforms--the Department relies on organic capabilities 
as well as commercial partners to provide fuel and energy to globally 
deployed forces. Our potential adversaries understand the essential 
nature of energy, and seek to degrade, delay, or deny the Department's 
ability to access energy at-will, reducing our readiness and deterrence 
posture. In response to these threats and in alignment with statute, 
the Department shall ``ensure readiness of the armed forces for their 
military missions by pursuing energy security and energy resilience'' 
(10 U.S.C. Sec. 2911) and ``ensure the types, availability, and use of 
operational energy promote the readiness of the armed forces'' (10 
U.S.C. Sec. 2926).
 The President and the Secretary of Defense have directed the 
Department to ensure installations and forces are resilient to all 
hazards--kinetic, cyber, and natural--and that the use of energy 
promotes the readiness of the armed forces for their military missions. 
In response, the Department is making significant energy investments in 
both operational energy (the energy required for training, moving, and 
sustaining military forces and weapons platforms for military 
operations) and installation energy (the energy used to power permanent 
installations and non-tactical fleet vehicles), reflected in our fiscal 
year 2024 requests of $3.5 billion for operational energy and $3.3 
billion for installation energy. Enhancing energy resilience and 
reducing energy demand are essential to achieving Joint lethality, 
supporting distributed operations, and reducing risks to sustainment in 
contested environments.
 The Department continues to invest resources in planning, research 
and technology development, and acquisition to promote and improve the 
readiness of our armed forces against pacing threats through energy 
awareness, energy demand reduction, energy security, and energy 
resilience. In doing so, the Department often engages with local 
communities to gain synergies across connected systems, whether energy, 
water, transportation or communications.
 The Department is also adapting its capability development 
processes to better align with the challenges of contested logistics 
and distributed, austere operations. In April 2022, the Deputy 
Secretary of Defense directed that the ``Department's capability 
development activities, from requirements to acquisition to 
sustainment, must increase energy supportability and must reduce energy 
demand across all capability solutions.'' In response, the Military 
Departments and USD(A&S) are adapting decision making to ensure that 
requirements for new capabilities are informed by contested logistics 
and that these requirements are supported in program decision making 
and acquisitions.
Innovation
 Making the right investments in energy and environment innovations 
expands the Department's operational energy capabilities, reduces fuel 
burden in an era of contested logistics, keeps trust with the American 
people and preserves vital training lands. The Department runs two, 
related innovation programs. For installations, the Strategic 
Environmental Research and Development Program (SERDP) is requesting 
$60.4 million and the Environmental Security Technology Certification 
Program (ESTCP) is requesting $117.2 million for needed investments in 
land and species conservation to preserve access to training areas, 
cleaning up past hazards such as munitions and PFAS, and developing 
energy efficiency and energy resilience solutions for DOD 
installations. The Operational Energy Capability Improvement Fund 
(OECIF), and the Operational Energy Prototyping Fund (OEPF) are the 
Department's only joint research efforts dedicated to developing 
operational energy solutions for the joint force. Our $171.7 million 
request for OECIF and $53.7 million request for OEPF will allow these 
programs to invest in a range of technologies, from hybrid electric 
tactical vehicles that provide silent over watch and low heat-signature 
capabilities, to blended wing body aircraft that have a fuel savings 
improvement of over 30 percent as compared to traditional aircraft and 
highly efficient solar cells to extend the flight time of UAVs.
Environmental Resilience
 The reality of a changing climate poses a range of risks to 
Department readiness and threatens installation resilience through 
drought, dangerous heat, flooding, wildland fire, and extreme weather. 
These conditions adversely impact training, soldier welfare, equipment 
performance and place and added strain on the Department's resources. 
The 2022 National Security Strategy recognizes climate change as a 
strategic challenge that is transforming the context in which the 
Department operates. To that end, DOD is requesting $5.1 billion in 
Department-wide capability-and resilience-enhancing climate-related 
efforts, including $25.7 million of OSD funding for EI&E climate 
resilience efforts, which will continue to support a range of climate 
measures as part of an ``all-hazards'' approach to installation 
planning. Using the DOD Climate Assessment Tool, as required in 
multiple NDAAs, we identify actions needed to ensure the continuity of 
missions at (or deploying from) our installations and incorporate those 
actions into installation master plans, installation resilience plans, 
installation energy and water plans, and construction projects. These 
assessment processes have now expanded to inform Department operational 
planning considerations for forces and equipment and war gaming 
scenarios. Additionally, DOD's approach to climate risk assessment has 
been shared with, and is being utilized by Federal interagency 
partners, as well as allied nations.
 The Department is undertaking a range of measures that both improve 
and expand operational capabilities and resilience while also reducing 
greenhouse gas emissions (GHG). These efforts include a range of 
efficiency measures that reduce energy demand for operational platforms 
and installations such as winglets on large aircraft and highly 
efficient heat pumps in buildings. The Department is also deploying a 
range of flexible and alternative fuels technologies and electrifying 
tactical and non-tactical mobile platforms to reduce costs and add 
capability. Specific attention is being given to deploying 
installation-scale micro-grids and tactical micro-grids at the 
operational level to add resilience to key mission requirements and 
enhance mission assurance. The Department, in concert with other 
agencies such as DoE, continues to invest in researching new 
technologies that promise to reduce vulnerabilities, expand 
environmental protections, add operational capabilities, and reduce GHG 
emissions.
 Environmental Conservation and Compatible Development
 DOD lands contain significant resources supporting our Nation's 
natural and cultural heritage, including resources important to 
American Indian, Alaskan Natives, and Native Hawaiian Organizations. 
DOD lands provide habitats for over 500 plant and animal species that 
are federally protected under the Endangered Species Act and contain 
over 130,000 recorded archaeological sites, and 45 National Historic 
Landmarks. We are requesting $687 million in conservation funding, 
which will allow us to manage these resources in compliance with 
applicable Federal statutes and manage for healthy and resilient 
natural landscapes to reduce climate driven risks such as flooding and 
wildfire.
 DOD has a long track record of balancing conservation of threatened 
and endangered species while continuing to support evolving mission 
needs requiring optimal use of our existing ranges and training areas 
and developing other supporting infrastructure. DOD investments in 
conservation are making significant progress toward alleviating these 
restrictions by promoting species recovery. Through the Recovery and 
Sustainment Partnership (RASP) with the Department of the Interior 
(DOI) and the U.S. Fish and Wildlife Service, DOD has worked to 
identify priority species and conservation actions, resulting in 
significant improvements to species recovery and conservation, 
regulatory efficiencies, and mission flexibility. In recognition of the 
Department's commitment to conservation, five species occurring on San 
Clemente Island, CA were removed from the protections of the Endangered 
Species Act on January 24 of this year due to the successes of the US 
Navy recovering these species from the brink of extinction. This is a 
win for both the Navy and species, and other such successes are on the 
horizon. We will continue to work with our Federal, State and non-
governmental partners through the DOD Legacy Resource Management 
Program to build on these successes and contribute, as appropriate, to 
the priorities of the Administration's America the Beautiful 
Initiative.
 In the next 2 decades, approximately 80 percent of the current DOD 
building inventory will reach 50 years of age and need to be evaluated 
for listing on the National Register of Historic Places. To manage the 
aging real property assets on installations, DOD is engaging with the 
Advisory Council on Historic Preservation to develop new nationwide 
programmatic solutions to streamline compliance responsibilities for 
specific categories of buildings. Such programmatic agreements reduce 
the time and cost of consultation as well as costs for repairs, 
renovations, and demolition of buildings (if needed). Absent such 
agreements, the Department's managerial and financial costs of 
complying with a variety of preservation laws will increase 
exponentially, diverting funds from base operations and MILCON.
 Continued investments in conservation will maximize our flexibility 
to use our land, water, and airspace for military purposes and to 
address incompatible land uses beyond our fence lines and will ensure 
that our military and civilian personnel have the access they need to 
conduct mission-essential activities. Strategies to address these 
conservation and climate adaptation priorities can be most effective 
through landscape-scale initiatives to better capitalize on both our 
on-installation conservation programs and our off-installation 
conservation partnerships through the Readiness and Environmental 
Protection Integration (REPI) Program.
 Readiness and Environmental Protection Integration (REPI) Program
 The REPI Program safeguards military missions by improving 
installation resilience to extreme weather events and climactic 
changes, promoting compatible land use, and preserving critical 
habitats and natural resources near DOD installations and ranges. REPI 
is uniquely positioned to support DOD's ability to operate seamlessly 
across domains by stimulating mutually beneficial and cost-effective 
partnerships between local communities, Federal and State agencies, and 
non-governmental organizations.
 Our fiscal year 2024 budget request for REPI is $178.8 million, 
which is a $10 million increase over fiscal year 2023. The increase 
will fund an additional two to three projects to support strategic 
priorities in the Pacific, focused on State partnerships with the 
Hawaiian Department of Agriculture and Department of Land and Natural 
Resources and local partnerships with counties, non-governmental 
organizations, and Native Hawaiian Organizations.
 Through fiscal year 2022, the REPI Program has helped attract over 
$1.1 billion in non-DOD partner contributions--nearly doubling DOD's 
investment--to protect over 1.1 million acres of land that is 
sustaining military mission at 120 installations in 35 states and 
territories. Over the past year, the REPI Program has expanded project 
planning capacity and execution of projects in the Indo-Pacific region 
that promote installation resilience and is expanding innovative 
partnerships that support mission capabilities and enhance resource 
conservation and community benefits. For example, in Hawaii, the REPI 
Program invested over $21 million in fiscal year 2022 to address 
watershed health, mitigate climate risks, and preserve agriculture and 
culturally significant parcels, and will invest over $26 million on 
similar Hawaiian partnership efforts in fiscal year 2023.
 The REPI Program also continues to support the interagency Sentinel 
Landscapes Partnership between DOD, the U.S. Department of Agriculture 
(USDA), and the DOI. The Partnership promotes shared land use 
priorities and works to advance conservation outcomes in landscapes 
across the country where national defense, sustainable agriculture and 
forestry, and community resilience to climate change intersect. Through 
fiscal year 2021, DOD has led collaborative efforts with Federal, 
State, local, and private partners across ten Sentinel Landscapes to 
permanently protect over 610,000 acres of land and implement 
sustainable management practices on an additional 3.1 million acres. 
DOD continues to support the designation of new Sentinel Landscapes. 
For example, the REPI Program has joined with the Trust for Public Land 
in Hawaii to support a potential future Hawaii Sentinel Landscape 
designation.
 The REPI Program has been identified in DOD's Climate Adaptation 
Plan as one of the key tools the Department will use to create 
resilient natural infrastructure solutions near installations and 
enhance climate adaptation. Through the National Fish and Wildlife 
Foundation's 2022 National Coastal Resilience Fund, the REPI Program 
contributed $15 million to advance seven natural infrastructure 
projects that benefit DOD installations and ranges. These projects 
leverage significant additional funding from the National Oceanic and 
Atmospheric Administration and other partners to accelerate project 
outcomes that defend national security, maximize taxpayer benefits, and 
support sustainable land management practices.
 In addition to enhancing critical mission capabilities and 
promoting resilience, many REPI projects support community-based 
conservation, recreation, and other quality of life programs. For 
example, Fort Harrison in Montana has partnered with the Prickly Pear 
Land Trust to expand the nationally recognized Peaks to Creeks 
Initiative, a community-driven effort to expand public access to the 
region's waterways, open spaces, and trail networks. DOD plans to 
expand these types of opportunities in fiscal year 2023 by partnering 
with the National Parks Service Land and Water Conservation Fund on a 
new notice of funding opportunity to conserve lands that increase 
public access and recreation while promoting compatible land uses 
aligned with local military missions and requirements.
 taking care of our people
 The Department of Defense's people are its greatest strength, and 
we are committed to ensuring that they have safe, healthy, efficient, 
and resilient places to live and work. These places should enhance the 
health, well-being, and readiness of our Servicemembers, their 
families, and the communities that support them. We recognize that this 
requires us to be good stewards of the environment and good neighbors 
and partners with the communities that support our installations. As 
such, the Department must ensure that it has a robust environmental 
cleanup program to address the effects of releases of hazardous 
substances, pollutants, or contaminants into the environment. The 
Department must also maintain safe and efficient facilities and improve 
the quality of life for our military personnel and their families by 
ensuring access to safe, quality, and affordable housing.
Defense Environmental Restoration Program
 The Department must take deliberate and sustained action to address 
risks to human health and the environment resulting from DOD 
activities. Our environmental cleanup program includes the Installation 
Restoration Program (IRP) and Military Munitions Response Program 
(MMRP). The IRP is focused on cleanup of hazardous substances, 
pollutants, and contaminants, while the MMRP is focused on responding 
to unexploded ordnance and munition constituents at former military 
ranges. These programs encompass active installations, Formerly Used 
Defense Sites (FUDS--sites that DOD transferred to other Federal 
agencies, states, local governments, or private landowners before 
October 17, 1986), and sites DOD transferred to other entities as part 
of its Base Realignment and Closure (BRAC) activities. We are 
requesting nearly $1.5 billion for these programs, including $1.1 
billion for environmental restoration on our active installations and 
FUDS properties and $365 million for BRAC environmental.
 Progress Toward Cleanup Goals
 To date, the Department, in cooperation with State agencies and the 
U.S. Environmental Protection Agency (EPA), has completed cleanup 
activities at 87 percent of Active and BRAC IRP and MMRP sites, and 
FUDS IRP sites, and is now monitoring the results. During fiscal year 
2022 alone, the Department completed cleanup at 192 sites. Of the 
roughly 40,300 restoration sites, more than 34,200 are now in 
monitoring status or have completed cleanup.
 Our focus remains on continuous improvement in the restoration 
program: minimizing overhead, adopting new technologies to reduce cost 
and accelerate cleanup, refining and standardizing our cost estimating, 
and improving our relationships with State regulators and affected 
communities through increased dialog. These initiatives help ensure 
that we make the best use of our available resources to complete 
cleanup.
 While the Department continues to make progress on completing 
cleanups, the remaining sites are some of the most complex cleanup 
sites. Chemicals of Emerging Concern and others like per-and 
polyfluoroalkyl substances (PFAS) continue to pose challenges for DOD's 
cleanup programs as new science requires reconsideration of previous 
decisions and more expensive solutions to protect our Servicemembers, 
their families, communities, and the environment. Additionally, some 
complex sites have no feasible solution for cleanup and, as a result, 
the Department is making significant investments in environmental 
technology to identify new potential remediation methods.
Per-and Polyfluoroalkyl Substances
 The presence of PFAS in the environment is a national issue due to 
its wide-spread use in many industrial and consumer products. The 
Department recognizes the importance of this issue and is committed to 
addressing PFAS in a deliberative, holistic, and transparent manner, 
supported by $415 million across multiple appropriations. The 
Department established a PFAS Task Force in July 2019, and Congress 
codified it in statute last year. We are providing quarterly reports to 
you on the Task Force's activities. The Task Force continues to provide 
strategic leadership and direction on DOD-wide efforts, while focusing 
on four main goals:

 Mitigating and eliminating the use of the current aqueous 
film forming foam (AFFF);

 Fulfilling our cleanup responsibilities;

 Understanding the impacts of PFAS on human health; and

 Expanding PFAS-related public outreach.

 In addition to these four focus areas, the Task Force has and 
continues to support substantial research efforts relating to PFAS and 
is establishing practices to ensure timely and complete dissemination 
of research findings and related data to the public.
 Over the last year, the Department has made notable progress. For 
example:

 DOD has completed over half of its initial cleanup 
investigations for installations identified by the Department as 
locations where PFAS may have been used or potentially released.

 DOD has hosted several virtual PFAS public outreach 
meetings and is planning additional senior leader engagements, as well 
as site visits to impacted communities to gather input for more 
effective future outreach.

 DOD launched a new website that includes PFAS sampling 
results for drinking water taken in communities surrounding DOD 
installations.

 DOD's research and development efforts contributed to the 
development of a new Military Specification for a fluorine-free 
replacement to AFFF and have led to a total of 50 PFAS treatment 
technologies that have passed proof of concept and are further in 
development or the demonstration phase.

 The Military Departments are developing comprehensive 
plans for the transition to PFAS-free alternatives to AFFF and are 
evaluating available technologies, in addition to alternative foams, to 
replace AFFF systems in facilities.

 AFFF Replacement Progress
 Over the past few years, the Department has undertaken an 
aggressive initiative to develop and demonstrate PFAS-free alternatives 
for AFFF. A number of commercially available and developmental PFAS-
free alternative formulations have been demonstrated to achieve 
acceptable fire extinguishment performance. DOD has completed 
evaluations of the shelf life, materials compatibility, and general 
toxicity of these formulations and the Navy used these results to 
develop a new Military Specification--published January 12, 2023. The 
Military Departments are also evaluating available technologies, in 
addition to alternative foams, to replace current AFFF systems in 
facilities as part of the development of comprehensive plans detailing 
the transition to AFFF alternatives in both facilities and vehicles.
 PFAS Cleanup and Drinking Water Mitigation
 DOD follows the Comprehensive Environmental Response, Compensation, 
and Liability Act (CERCLA) and the long-standing EPA regulations for 
all chemicals in our cleanup program, including PFAS. The Defense 
Environmental Restoration Program statute provides authorities to DOD 
to perform and fund cleanup actions and requires they be carried out in 
accordance with CERCLA.
 As of December 31, 2022, the Department has completed the initial 
assessment at 405 (of 706) installations and of those, 101 were found 
to require no further action, while 304 are proceeding to the next step 
in the CERCLA process. During these initial assessments, DOD evaluates 
both groundwater and drinking water. If DOD identifies PFOS and/or PFOA 
from DOD activities in off-base drinking water above 70 parts per 
trillion, we quickly take action (i.e., a CERCLA removal action) to 
provide treatment or an alternative water source.
 While the Department is making significant progress toward 
completing these initial assessments by December 2023, some additional 
work may be required as science develops and recommendations from our 
Federal partners evolve. For example, in May 2022, EPA released new 
regional screening levels for certain PFAS. DOD is currently 
reevaluating several completed PA/SIs to assess if additional work is 
necessary based on these new values. These reevaluations could affect 
DOD's timeline for completion.
 In March 2023, EPA proposed a National Primary Drinking Water 
Regulation (NPDWR) for six PFAS under the Safe Drinking Water Act. The 
Department looks forward to the clarity the NPDWR for six PFAS in 
drinking water, when finalized, will provide. In anticipation of a 
final EPA NPDWR, and to account for emerging science that shows 
potential health effects from PFOS and PFOA at levels lower than 70 
parts per trillion (ppt), the Department is evaluating its efforts to 
address PFAS in drinking water. This includes assessing what actions 
DOD can take to be prepared to incorporate EPA's future regulatory 
standard into our current cleanup process, such as reviewing our 
existing data and conducting additional sampling where necessary. In 
addition, DOD will incorporate nationwide PFAS cleanup guidance, issued 
by EPA and applicable to all owners and operators under CERCLA, as to 
when to provide alternate water when PFAS are present.
 In addition, as part of our normal operations, the Department has 
sampled over 500 on-base DOD drinking water systems worldwide. Of 
those, we identified 37 with PFOS and/or PFOA above 70 ppt and took 
quick action to bring those systems below 70 ppt. Where DOD is the 
known source of PFOS and/or PFOA in drinking water, DOD has taken steps 
to ensure that no one is drinking water above 70 ppt.
 PFAS Public Outreach
 The Department is committed to expanding our outreach efforts as we 
continue to address PFAS. As the Chair of the PFAS Task Force, I will 
ensure that I am actively engaged in these efforts. DOD is developing 
an overarching PFAS communication strategy to include communication 
products that will explain DOD's cleanup activities in a comprehensible 
and transparent manner. These efforts will ensure a cohesive and 
collaborative approach to communication and messaging across DOD and 
drive consistent messaging across all communication platforms. DOD will 
also conduct community interviews and is finalizing locations to be 
visited this spring and summer.
 Chemicals in the Defense Supply Chain
 The pressure from expanding international and domestic emerging 
chemical regulations places an unknown risk to the Department's 
readiness. These new and evolving regulatory requirements, which can 
prohibit the manufacture and use of chemicals, may result in the loss 
of access to mission critical products. There are numerous chemicals 
under increased oversight including, but not limited to, 
hydrofluorocarbons (HFC), chlorinated solvents, and PFAS. As an 
example, some PFAS compounds are critical to the safe and effective 
operation of a range of military items from radars to missile guidance 
systems, medical devices, and jet engines. The full effects of any ban, 
whether required by law or a voluntary business decision, are not yet 
known, but could be both costly to address and likely to leave the 
Department dependent on supplies from countries like India and China. 
Building on past successes the Department is working with regulatory 
agencies and private industry to develop strategies to address these 
concerns, starting with identifying PFAS products essential to national 
security and developing mitigation plans.
 housing
 Family and Unaccompanied Housing
 As the Department's Chief Housing Officer, I recognize that the 
environment in which our Servicemembers live impacts their quality of 
life, their ability to do their job, and our ability to recruit and 
retain the force. I am committed to ensuring that all DOD housing for 
our members--whether it is Government-owned, Government-leased, or 
privatized--meets life, health, and safety requirements and provides a 
positive living experience for military personnel and their families.
 The Military Departments have privatized 99 percent (approximately 
205,000 units) of their U.S. family housing inventory, as well as 4,700 
unaccompanied housing (UH) apartment units (8,500 bedspaces) on their 
installations in the U.S. The Department also owns, operates, and 
maintains approximately 35,000 family housing units, most of which are 
on enduring bases in overseas locations, and leases about 5,600 family 
housing units where Government-owned or privatized housing is 
unavailable. The Department's housing inventory also includes 
approximately 523,000 Government-owned permanent party unaccompanied 
housing (UH) bed spaces, and more than 2,000 Government-leased UH bed 
spaces.
 The Department appreciates Congress' support of DOD's family and 
unaccompanied housing programs, to include the additional housing 
funding included in our fiscal year 2023 enacted budget. The fiscal 
year 2023 Omnibus bill added $321.7 million and $18.1 million, 
respectively, from Army and Air Force Family Housing Construction 
Unfunded Priority Lists (UPLs), and $30 million for Family Housing 
Operations and Maintenance in support of housing oversight. The fiscal 
year 2023 Omnibus bill also added $662 million from Military Department 
UPLs for unaccompanied housing construction, including funding to 
complete ongoing projects. The Department is using these fiscal year 
2023 enacted funds to execute family and unaccompanied housing projects 
that will enhance the quality of life for military personnel and their 
families who live on our installations.
 The Department's fiscal year 2024 Family Housing budget request 
includes $1.9 billion to fund construction, operation, and maintenance 
of Government-owned and leased family housing worldwide; invest in 
select military family housing privatization projects and provide 
oversight of private housing and lodging projects; and provide housing 
referral services to assist military members in renting or buying 
private sector housing. While fiscal year 2024 request is $15.6 million 
lower than the fiscal year 2023 request, and $386.1 million lower than 
the fiscal year 2023 enacted amount, this funding level will sustain 
our increased focus on ensuring the delivery and maintenance of quality 
housing for military families. The fiscal year 2024 request includes 
$382.4 million for construction to ensure quality family housing for 
military personnel and their families, to include Army family housing 
construction projects at Kwajalein Atoll ($98.6 million) and 
Baumholder, Germany ($78.7 million), and two Navy family housing 
construction projects at Joint Region Marianas--Andersen AFB, Guam 
($205 million); $320 million for prioritized investments in three 
Department of the Air Force (DAF) and two Department of the Army (Army) 
Military Housing Privatization Initiative projects to improve the 
safety, quality, habitability and/or long-term financial viability of 
those projects; and $190.6 million for privatized housing support and 
oversight, to include the one-time inspections of DOD's privatized 
housing and Government-owned family housing as required by Section 3051 
of the fiscal year 2020 National Defense Authorization Act, as amended. 
The Department's fiscal year 2024 budget request of $1.1 billion for 
Family Housing Operations and Maintenance represents a $95.5 million 
decrease compared to the fiscal year 2023 request, and a $125.5 million 
from the fiscal year 2023 enacted amount, but will continue to ensure 
that U.S. military personnel and their families have suitable housing 
choices.
 The Department's fiscal year 2024 budget request includes $469.3 
million for six (6) construction projects that will improve living 
conditions for permanent party personnel. This funding level is $36.7 
million lower than our fiscal year 2023 budget request ($506 million), 
and $698.7 million lower than the fiscal year 2023 enacted total ($1.17 
billion) but maintains our commitment to modernize Unaccompanied 
Personnel Housing to improve privacy and provide greater amenities. The 
fiscal year 2024 budget request includes $135 million for two Army 
barracks projects at Fort Bragg, NC, to include an $85 million 
prototype decarbonization barracks project; $131.8 million for a marine 
bachelor enlisted quarters and support facility in Washington, DC; and 
$50 million for a DAF Surety Dormitory at Royal Air Force Lakenheath, 
UK.
 Going forward, the Department will invest in DOD's Government-owned 
and Government-leased housing based on the need to support mission 
requirements, address health and safety concerns, and modernize 
unaccompanied personnel housing to provide improved privacy and greater 
amenities for junior personnel. We will continue to fund the 
Department's oversight to ensure that privatized housing projects 
deliver safe, high-quality housing, to include continued funding for 
more than 600 additional Government housing personnel hired since 
Fiscal Year 2019. Finally, we will make investments to support the 
necessary restructure of financially challenged Military Housing 
Privatization Initiative (MHPI) projects to ensure that they can meet 
sustainment needs and deliver quality housing over the long-term.
 Military Housing Privatization Initiative (MHPI)
 The Department has made significant progress implementing actions 
to enhance the MHPI program and our oversight of the private sector 
MHPI companies that own and operate MHPI housing projects. Key among 
these actions is the establishment and promulgation of the MHPI Tenant 
Bill of Rights (TBoR). As Congress has recognized, applying many of the 
Tenant rights at existing MHPI housing projects requires voluntary 
agreement by the MHPI companies; the Department cannot unilaterally 
change the terms of the public-private partnerships that established 
the MHPI housing projects. Nevertheless, as a result of our 
collaboration with the MHPI companies, all 18 rights set out in the 
TBoR are fully available at all but three of the nearly 200 
installations with privatized housing, representing approximately 97 
percent of military families residing in MHPI housing. The remaining 
three installations provide 16 of the 18 rights as of March 1, 2023, 
but do not yet provide the MHPI Tenant Rights to dispute resolution or 
rent segregation. The MHPI companies on these installations remain 
fully compliant with their MHPI project legal agreements with the 
Department of the Air Force and associated State and local landlord 
requirements. The Department of the Air Force continues to seek 
voluntary agreement of the remaining three MHPI companies by working to 
resolve their remaining concerns and achieve full implementation of the 
18 Tenant Rights. Based on commitments from two of the remaining MHPI 
companies, we expect all 18 Tenant Rights to be available at all but 
one of DOD's installations with MHPI housing by the end of fiscal year 
2023. We will continue our efforts to educate and engage Service 
Members and their families to ensure they are aware of and take full 
advantage of the TBoR.
 The Tenant Bill of Rights is one of DOD's most visible improvements 
to enhance the MHPI program, rebuild trust, and reinvigorate DOD 
oversight, but we have also implemented numerous policies, guidance, 
and procedures to enhance the Department's oversight of the MHPI 
program, to include:

 Establishing quarterly programmatic reviews with each of 
the Military Departments;

 Uniform housing standards and inspection requirements; 
and

 Improved metrics to gauge performance by the MHPI 
companies.

 Further, the Military Departments have also implemented several 
measures to strengthen their oversight and hold privatized housing 
companies accountable, to include:

 Reinforcing installation commander responsibility for 
day-to-day oversight of housing quality and service provided by the 
MHPI projects;

 Improving training for commanders and housing staff at 
all levels of the organization;

 Hiring more than 600 additional Government housing-
related staff and establishing housing councils and resident advocates;

 Reviewing project business practices to identify and 
pursue needed corrective actions;

 Working with MHPI companies to revise project performance 
incentive fee metrics;

 Establishing housing standards and inspection 
requirements, to include installation inspection and approve of all 
MHPI housing units before each change of occupancy;

 Improving communication with residents and the annual 
tenant satisfaction survey;

 Requiring MHPI projects to implement electronic work 
order systems to increase transparency and reporting of maintenance and 
repair work orders;

 Establishing policies and procedures for health hazard 
assessments and mitigation; and

 Refining internal departmental oversight practices.

 We will continue to prioritize implementation of key MHPI reforms 
that improve the safety, quality, and maintenance of privatized 
housing. We will also continue to ensure accountability at all levels 
within DOD and the MHPI companies as necessary to enforce performance 
standards, deliver a positive living experience for Servicemembers and 
their families, and ensure the long-term success of the MHPI projects 
and program. This includes taking appropriate action to hold MHPI 
companies accountable for project performance, problems with property 
management, or inappropriate business practices.
 The Department of Defense is committed to working closely with you 
and the committee staff to ensure the long-term success of the MHPI 
program and we will remain diligent in our oversight to ensure DOD's 
privatized housing projects deliver quality housing and a positive 
living experience for military personnel and their families.
Environmental Justice
 The Department recognizes the importance of environmental 
stewardship as well as the disproportionate burden that pollution 
places on certain communities, including low-income communities and 
communities of color. Indeed, our initial analysis of DOD installations 
using the Climate and Justice Screening Tool identified that 39 percent 
are located in or adjacent to communities with environmental justice 
concerns, these being communities that face disproportionate burdens of 
pollution and environmental degradation. These communities are where 
our Servicemembers live, relax, and send their children to school. 
Since 1994, the Department has implemented an Environmental Justice 
Strategy that address enhancements to community engagement and Tribal 
consultation, environmental planning, and implementation processes 
including clean-up and restoration activities. The Military Departments 
have revised their respective policies and guidance to improve early 
engagement with overburdened communities and consultation with Tribal 
Nations as a result of Federal actions. In partnership with the Council 
on Environmental Quality, the Environmental Protection Agency, and 
other Federal agencies, we continue to develop tools to enhance our 
mapping and analysis of potential environmental and climate change 
impacts to communities. The Department is fully prepared to continue to 
address Environmental Justice by ensuring equality in our investments 
in military communities, implementing top-down training for 
Servicemembers and civilian specialists in Environmental Justice 
literacy, strengthening Government-to-Government relations with Tribal 
Nations, and by leveraging existing public-private partnerships to 
support infrastructure and environmental enhancements in communities 
adjacent to the Department's installations. The Department believes 
that to sustain the defense mission we must work in concert with local 
communities and build trust through partnerships that safeguard 
healthy, secure, and vibrant natural and human environments for our 
neighbors, our Servicemembers, and their families.
 other programs
The Office of Local Defense Community Cooperation
 The Office of Local Defense Community Cooperation (OLDCC), in 
coordination with the other Federal agencies, delivers a program of 
technical and financial assistance to enable states, territories, and 
communities to plan and carry out civilian responses to workforce, 
business, and community needs arising from Defense actions; cooperate 
with their military installations and leverage public and private 
capabilities to deliver public infrastructure and services to enhance 
the military mission; achieve facility and infrastructure savings, as 
well as reduced operating costs; increase military, civilian, and 
industrial readiness and resilience; and support military families.
 OLDCC's program portfolio is presently comprised of approximately 
300 separate obligations, exceeding $1.8 billion and represents 
partnerships between the Department and most states, territories and 
communities that host Department of Defense installations.
 The OLDCC Installation Resilience Program assists states, 
territories, and communities to respond to man-made or natural threats 
as ``one community,'' taking care to remain compliant with the 
consultation requirement between communities and their local 
installations as set forth in section 2801 of the Fiscal Year 2020 
National Defense Authorization Act. This effort includes tabletop 
exercises to model out threats to gauge civilian and uniformed first 
responders alike to enhance the public and private infrastructure and 
services necessary to sustain our installations and communities. This 
program necessarily also looks at housing and its resilience for 
Servicemembers and their dependents through targeted business-case 
studies and planning activities.
 The Diversification and Modernization Program provides states, 
territories, and communities the ability to review local industrial 
base and installation defense dependencies, seeking to deliver results 
when needed for the Department at the speed of relevancy. This program 
enables an assessment of community, workforce, and business 
capabilities, and then an assessment of options to deliver workforce 
development/training, transportation, and other infrastructure 
investments to address future needs of installations and the industrial 
base, education system improvements, and housing availability in tandem 
with emerging defense priorities.
 The Defense Community Infrastructure Pilot Program responds to 
deficiencies in community infrastructure around military installations. 
This program aims to enhance military value, cadet training at covered 
educational institutions, installation resilience, and military family 
quality of life. OLDCC expects to seamlessly incorporate program 
changes from the Fiscal Year 2023 National Defense Authorization Act, 
posting a notice for funding opportunity shortly, and hosting webinars 
to help communities to better understand and navigate these program 
changes.
Military Aviation and Installation Assurance Siting Clearinghouse
 The Military Aviation and Installation Assurance Siting 
Clearinghouse continues to protect the Department's ability to train, 
test, and operate as the Nation expands its renewable and other 
commercial energy and power transmission capacity. Among these energy 
projects, commercial wind development typically poses the greatest 
compatibility challenge to DOD due to physical obstruction of low-level 
flight routes and electromagnetic interference with DOD radar systems. 
DOD resolves project concerns though collaboration between the 
Clearinghouse, the Military Departments, local communities, states, and 
energy developers, thereby maintaining the Department's ability to 
train, test, and operate while enabling development of alternative 
energy resources. The Clearinghouse negotiates Mitigation Agreements 
with wind energy developers to minimize the impacts from proposed 
projects on DOD missions.
 The Department works with the DOI, the Bureau of Ocean Energy 
Management (BOEM) and states to create plans that support aggressive 
new offshore energy development goals. The Department works with its 
Federal, State and industry partners at every stage of planning, 
permitting, and development. DOD has worked on a solution that allows 
BOEM to plan toward 3GW of wind generation off the coast of Central 
California. While this development will constrain some DOD operations, 
the White House Climate Office, DOI and California agreed to find a 
balanced solution that allows this Central Coast wind development, 
while also providing long-term protections for military testing, 
training, and operations. DOD and BOEM will work together to ensure 
long-term protection of military testing, training and operations, 
while pursuing new domestic clean energy resources. This compromise 
supports domestic renewable energy goals while providing long-term 
protections for military operations. DOD has also collaborated in 
offshore development planning throughout the Atlantic, Pacific, and 
Gulf of Mexico. In each case, the Department collaborates to protect 
national security while allowing compatible development.
 The Department is actively implementing new approaches to protect 
DOD missions. The Clearinghouse intensified efforts to advocate for 
state-level legislation to protect military installations and 
operations from incompatible wind energy development. Oklahoma, 
Indiana, Wyoming, and Alabama have passed protections for military 
missions in wind turbine permitting. Although DOD and developers have 
had success resolving issues related to incompatible energy 
development, State support is invaluable in the rare cases where 
developers choose not to voluntarily coordinate with DOD.
Native American Lands Environmental Mitigation Program
 The Native American Lands Environmental Mitigation Program 
(NALEMP), codified under the fiscal year 2021 NDAA, addresses 
environmental effects of Department actions on Indian lands and on 
other locations where the Department, an Indian tribe, and the current 
landowner agree that such mitigation is appropriate. NALEMP is 
requesting $12.5 million to mitigate these environmental effects, which 
are typically associated with hazardous materials, munitions debris, 
underground fuel storage tanks, unsafe buildings, lead-based paint, 
asbestos, and abandoned equipment. Most Indian lands are located in 
rural and remote areas with low population densities; thus, they might 
not qualify as high priority sites under the Department's more limited 
environmental restoration programs. The NALEMP seeks to bridge the gap 
between Tribal needs and these traditional risk-based environmental 
restoration programs and incorporate Tribal priorities to address 
potential impacts to Indian lands.
 To date, over one-hundred sites in the lower 48 states and Alaska 
have been fully mitigated. Ninety-five percent of the 1,158 potential 
Tribal impacts reported to the Department have been assessed and 158 
have been found eligible for NALEMP and 138 impacts are under review. 
In fiscal year 2022, the Department executed a total of 13 NALEMP 
cooperative agreements (CA), of which 10 CAs were with Alaska Native 
tribes and three with American Indian tribes in the lower 48. By the 
end of fiscal year 2023, the Department will execute an additional 14 
CAs, of which nine CAs will be with Alaska Native tribes and five 
American Indian tribes in the lower 48 states.
 conclusion
 Thank you for the opportunity to discuss DOD's programs supporting 
energy, installations, and environment. We appreciate Congress' 
continued support for our enterprise and look forward to working with 
you.

 Senator Hirono. Thank you very much. Secretary Jacobson.

 STATEMENT OF THE HONORABLE RACHEL L. JACOBSON, ASSISTANT 
 SECRETARY OF THE ARMY FOR INSTALLATIONS, ENERGY, AND 
 ENVIRONMENT

 Ms. Jacobson. Chairman Hirono, and Ranking Member Sullivan 
as he arrives, and the distinguished Members of the 
Subcommittee, thank you for the opportunity to testify on Army 
readiness. I am grateful to the Committee for its continued 
support and for its commitment to Army soldiers, families, 
civilians, and Soldiers For life. Installations are at the 
epicenter of everything we do in the Army.
 They are the core of our Army readiness. To realize the 
Army's 2030 readiness goals, the future of installations must 
be now. Installations are where we train, work, learn, and 
live. To strengthen Army's readiness and build the force of the 
future, we must be laser focused on providing state-of-the-art 
resilient installations.
 We must keep moving forward. The focus on readiness is 
reflected in our budget request for fiscal year 2024. 
Significantly, our budget request plus future planned funding 
includes critical investments in the Indo-Pacific region.
 Quality barracks and housing are essential to readiness. I 
am pleased to report that with the help of Congress, we are 
continuing our investments in barracks with over $1 billion a 
year planned over in the next decade.
 We are building on congressional directives to deliver high 
quality family housing and strengthen our oversight of the 
private housing providers. We are conducting comprehensive 
inspections of 100 percent of privatized housing, and we are 
conducting financial audits of the entire program.
 Most important, we are making sure residents' concerns are 
heard and responded to promptly, and we are mindful of the 
recommendations in the recent GAO report and we will address 
them expeditiously. A key component of readiness is improving 
our infrastructure and tackling our deferred maintenance 
backlog. These challenges require strategic spending to slow 
the progression of deteriorating facilities.
 We are grateful to Congress for increasing funding for 
facilities' sustainment, restoration, and modernization in 
fiscal year 2023. This funding will slow the facility--pace of 
facility degradation. Our fiscal year 2024 budget request seeks 
to continue this momentum. Resilient installations foster ready 
soldiers, beginning with reliable access to energy.
 We have all witnessed threats to the electric grid, whether 
from cyber-attacks, physical attacks, or severe weather events. 
Installations can't afford to lose power when the commercial 
grid goes down. That is why we are developing onsite carbon 
free power generation, battery storage, and a microgrid to 
support critical missions at all Army installations.
 Thanks to congressional authorities, we are collaborating 
with third parties to guarantee energy resilience without the 
need for upfront expenditures by the Army. The Army bears 
responsibility for cleaning up pollution at current and former 
Army sites. We are taking our obligations to address PFAS [Per- 
and Polyfluoroalkyl substances] seriously and in a transparent 
manner.
 We appreciate the certainty that will result from EPA's 
[Environmental Protection Agency] ongoing Safe Drinking Water 
Act rulemaking, and the Army will be ready to comply once the 
regulation is final. As we invest in installations to support 
the army of the future, we must use cutting edge technologies, 
innovative public private partnership, and streamlined 
processes to accelerate results.
 Each of these investments will help us recruit and retain 
soldiers and families, and importantly, these investments will 
improve the quality of life which will pay future dividends in 
immeasurable ways. Thank you for your continued support of our 
soldiers, families, civilians, and Soldiers For Life. I look 
forward to your questions.
 [The prepared statement of The Honorable Rachel Jacobson 
follows:]

 Prepared Statement by The Honorable Rachel Jacobson
 introduction
 Chairwoman Hirono, Ranking Member Sullivan, and distinguished 
Members of the Subcommittee, thank you for this opportunity to present 
the State of Army's readiness, and for your continued support and 
commitment to the Army's soldiers, families, civilians, and soldiers 
for life. The committee's leadership has been invaluable in our shared 
pledge to successfully defend our Nation and its interests as we work 
to improve our installations and support the Army now and in the 
future.
 As old threats evolve and new ones emerge, especially in the Indo-
Pacific region, the Army is making decisions and prioritizing 
investments that not only contribute to current readiness, as reflected 
Army's Fiscal Year (FY) 2024 budget request, but will also pay 
dividends on the battlefields of 2030 and beyond. The Army's bedrock 
priorities of people, readiness and modernization guide our strategies 
and investments. For the Army, people are at the core of everything we 
do and installations are the foundational support for people, 
especially when it comes to soldier readiness. Installations are where 
we train, work, learn and live. Therefore, as we build the Army of the 
future, we must make strategic investments in our installations, making 
the best use of innovative technologies, and applying streamlined 
processes to accelerate improvements and promote readiness. The future 
of installations is now.
 putting ``people first''
 Providing high quality housing, barracks, and Child Development 
Centers (CDCs) for soldiers and families is essential to readiness. 
Modern amenities in housing and barracks and access to high quality 
childcare helps us attract recruits and retain soldiers and their 
families. We are demonstrating our commitment to achieve these quality 
of life goals in a number of ways, as reflected in our fiscal year 2024 
budget request. For example, we currently plan to invest over $11 
billion in the next decade to improve barracks across the Army. We are 
committed to ensuring the availability of quality childcare by planning 
for construction of new childcare centers in multiple locations. We are 
holding private housing providers accountable for delivering high 
quality housing to soldiers and families. While we can't deliver the 
full returns on these investments overnight, we can provide consistent 
and enduring resources to continuously improve the quality of life for 
soldiers and families, caregivers, and survivors.
 army infrastructure investments
 The Army remains committed to improving our infrastructure and 
addressing deferred maintenance needs. We are grateful to Congress for 
funding Facilities Sustainment, Restoration, and Modernization (FSRM) 
and Military Construction (MILCON) in the fiscal year 2023 National 
Defense Authorization Act (NDAA) and Omnibus Appropriations 
legislation. The FSRM funding will enable the Army to increase 
sustainment to 92 percent of its requirement for fiscal year 2023, 
thereby slowing the pace of facility degradation. There is a direct 
correlation between the condition of facilities and readiness. As such, 
the importance of continually investing in facilities cannot be 
overstated.
 The fiscal year 2023 Omnibus Appropriations legislation also added 
critical MILCON construction funding for barracks and other 
construction priorities. This funding will advance new projects and 
address project cost overruns resulting from increases in the costs of 
building materials. Though inflation rates are leveling off, 
construction industry costs continue to out-pace core inflation. If 
Army MILCON construction projects end up costing more than the amount 
authorized and appropriated for fiscal year 2024, the Army will adjust 
project scope, reprogram savings from other projects if available, or 
program the costs-to-complete in future years programs.
 The Army incorporates the latest advances in sustainable and 
electrified building practices to enhance facility resilience and to 
reduce our carbon emissions footprint. We are developing pilot projects 
to explore the feasibility of incorporating low embodied carbon 
materials, including mass timber, green steel and concrete, to curb CO2 
emissions from buildings, and minimize lifecycle maintenance costs and 
utility bills. Also, in accordance with Administration and Department 
of Defense (DOD) directives, we are beginning to upgrade existing 
buildings for electrification and planning for construction of new 
fully electrified buildings. These buildings are expected to result in 
lower total energy demand and reduced energy costs by incorporating new 
and more efficient technologies and design strategies. Because of the 
authorities given to us by Congress, the realized savings from these 
improvements can then be directed to people and readiness programs.
 army housing
 The Army continues to focus on the oversight of our private housing 
providers to ensure quality services are delivered, consistent with 
congressional guidance and authorities. We are addressing the remaining 
elements of the fiscal year 2020 NDAA's Military Housing Privatization 
Reform and, with respect to Army-owned housing, we are implementing the 
fiscal year 2021 NDAA's extension of these reforms to government-owned 
housing. We are also developing policies to address the fiscal year 
2023 NDAA's housing-related directives. Specifically, we will review 
the Housing Requirements Market Analyses processes, brief Congress on 
any ground lease extensions (GLEs) and consult as the law requires on 
demolition of homes at Fort McNair.
 With the help of Congress, we are making great strides in improving 
the Army-owned housing inventory (located primarily overseas). MILCON 
housing projects are awarded and in progress in Baumholder and Vilseck, 
Germany; Vicenza, Italy; Camps Humphreys and Walker, Korea; Kwajalein 
Atoll; and Fort Buchanan, Puerto Rico. All of these projects will 
significantly improve the quality of life for our soldiers and families 
in these locations.
 privatized housing update
 Ground leases are the foundational legal documents governing the 
obligations of private housing providers who own and manage family 
housing on leased lands. The Army recently developed revised ground 
lease language that specifically outlines the consequences of non-
compliance by project companies. The new language reinforces the 
premise that project companies are charged at all times with having 
full knowledge, along with the obligation, to comply with all of the 
requirements of the ground lease and the associated Property Management 
Agreement for keeping homes properly maintained, and to correct any 
non-compliance expeditiously. Additional changes to the ground lease 
language include the application of Davis-Bacon Act wages, as required 
by Department of Labor regulations, the Code of Federal Regulations, 
applicable Executive Orders, and Federal Acquisition Regulations.
 Additional financing through third-party investment helps establish 
a more secure operational footprint for privatized housing projects to 
remain financially viable. The Army is exploring the use of GLEs and 
project refinancing as tools to facilitate the private housing 
providers' recapitalization of housing inventory and infrastructure 
where the Army deems it necessary and appropriate to do so. The Army 
will use new reporting requirements detailed in the fiscal year 2023 
NDAA to brief Congress before proceeding with GLEs. For two 
installations where the private housing provider does not have adequate 
reserves or opportunities to obtain third-party financing, the Army is 
seeking in our fiscal year 2024 budget request MILCON appropriations to 
meet immediate housing improvement needs. As we assess our future needs 
within the privatized housing portfolio, additional equity 
contributions may be programmed in future years.
 When it comes to privatized housing oversight, the Army conducts 
quality assurance inspections for all changes of occupancy, and to 
confirm that all life, health, and safety maintenance work orders have 
been completed satisfactorily. Also, with the help of third-party 
inspectors, the Army is fulfilling the fiscal year 2020 NDAA mandate to 
conduct comprehensive inspections of 100 percent of the privatized 
housing inventory. Third-party comprehensive housing inspections were 
completed at Fort Meade, Maryland in August 2022 as the Army's second 
installation in the 100 percent inspection pilot program. As with 
Army's first pilot inspection at Fort Belvoir, Virginia, Fort Meade's 
overall housing inventory was rated in good to excellent condition. The 
100 percent inspection program continued in April 2023 with Fort 
Gordon, Georgia as the next installation to go through the 
comprehensive inspection process. Additionally, in fiscal year 2023, 
the Army is continuing to conduct financial audits of privatized 
housing programs with independent third-party experts. To date, the 
Army has completed 21 reviews of 34 projects, with six additional 
reviews ongoing.
 Implementation of the Tenant Bill of Rights, set forth in the 
fiscal year 2020 NDAA, is improving service delivery and restoring 
trust between private housing companies and residents by clarifying 
rights and responsibilities and giving residents a more powerful voice. 
We have worked hard to ensure that residents know where to turn for 
assistance and how best to engage Installation leadership and Army 
housing offices to advocate on their behalf. Of the 37 disputes that 
were initiated since the Army created the Tenant Bill of Rights dispute 
resolution process, 33 were resolved informally and only four required 
formal adjudication under the process.
 As part of the Army's commitment to oversight and accountability, 
the Commanding General of the Army Installation Management Command 
holds weekly meetings with private housing companies and stakeholders 
throughout the installations community to review the physical and 
financial conditions of privatized housing and to receive updates on 
the status of any displaced families. The Army has standardized the 
metrics in its Incentive Performance Management Plans and will deny 
payment of fees if standards are not met. The Plans contain maintenance 
management metrics used to assess and to reward improved work order 
response times and achieve better quality, thereby increasing resident 
satisfaction. Metrics are reviewed and updated annually to ensure it is 
achieving desired outcomes. The Army's fiscal year 2024 budget request 
includes funding to continue rigorous oversight of private housing 
providers.
 barracks / unaccompanied housing
 The Army is planning to invest over $1 billion per year in FSRM and 
MILCON for Unaccompanied Housing across all components--the Active 
Army, Army National Guard and Army Reserve--as reflected in the fiscal 
year 2024 budget and the Future Years Defense Program (FYDP). The Army 
continues to implement solutions to ensure every soldier is afforded 
the opportunity to live in a safe and high quality environment. These 
solutions include increasing investments across the FYDP; addressing 
deficits through MILCON; prioritizing restoration and modernization 
projects at installations with the greatest need; maximizing 
sustainment funding to address accelerated facility deterioration; 
managing room assignments to inventory; and evaluating privatization 
opportunities at select installations. To obtain soldiers' perspectives 
of barracks conditions, the Army conducted a survey of 40,000 soldiers 
residing in Permanent Party Barracks across five installations. The 
results of this survey will inform future decisions on improving 
soldiers' living conditions.
 Innovation and modernization are at the forefront of the Army 
barracks construction program. The Army is using new construction 
standards for barracks to enhance quality of life for soldiers. For 
grades E1 to E4, the barracks standard includes a four-bedroom, two-
bathroom module with a living room, full kitchen, and easy access to 
laundry facilities. For E5-E6, the barracks standard includes a two-
bedroom, one bathroom module with a living room, full kitchen, and easy 
access to laundry facilities. Several barracks pilot projects are 
currently scheduled for construction and renovation to reflect these 
new building efficiencies.
 army lodging
 The Army's privatized lodging inventory consists of 12,275 rooms 
across 40 installations. Over the past 13 years, nearly $1.2 billion in 
private sector capital has been invested to recapitalize these 
facilities, with one out of three rooms having been newly built. In 
November 2022, a new 69-room hotel opened its doors at Aberdeen Proving 
Ground, Maryland. New hotels for Fort Bragg, North Carolina and Joint 
Base San Antonio-Fort Sam Houston, Texas are currently in design. The 
Army is assessing ways to accelerate the construction of additional 
hotels.
 Guest satisfaction scores at privatized hotels increased for the 
ninth straight year. The program continues to meet the Army's mission 
by providing safe, affordable, and high-quality on-post lodging for 
Army soldiers and their families.
 The Army's overseas direct-run lodging inventory consists of 1,857 
rooms across 11 installations. Six Army Lodging projects for overseas 
bases, totaling over $311 million are in design or construction. 
Specifically, new facilities are planned for Camp Walker, Korea; 
Baumholder, Germany; Camp Humphreys, Korea; Hohenfels, Germany; and 
Camp Zama, Japan; with an additional 71 rooms slated for renovation at 
Camp Humphreys.
 delivering on child care
 Another important part of taking care of people is providing access 
to affordable quality childcare, particularly in communities where 
availability of off-post care is limited. The Army's child care 
strategy includes: increasing and sustaining child care infrastructure, 
recruiting and retaining additional quality child care providers, 
sustaining off-post care options, and exploring new initiatives and 
partnerships. However, ongoing staffing challenges related to 
recruitment and retention continue to limit child care availability at 
some locations, despite recent Army pay increases starting at $17.39 
per hour, plus bonuses and other incentives.
 The Army appreciates the committee's support of CDCs by funding 
seven new CDCs in fiscal year 2021-2023 and providing additional 
funding for planning and design for future construction.
 army historic housing
 The Army continues to work with the Advisory Council on Historic 
Preservation (ACHP) to manage our inventory of historic homes in 
accordance with the National Historic Preservation Act of 1966 (NHPA). 
The Army successfully worked with the ACHP to complete the 2020 ``Army 
Program Comment for Inter-War Era Historic Housing, Associated 
Buildings and Structures, and Landscape Features (1919-1940).'' This 
landmark agreement allows Army to undertake improvements to more than 
3,200 inter-war era historic homes in cost effective ways, such as 
through the use of imitative substitute building materials.
 The Army also worked successfully with the ACHP to develop a 
similar Program Comment for Vietnam War era housing (1963-1975), 
approved by the ACHP on March 17, 2023. Thanks to excellent 
collaboration between the Army and the historic preservation community, 
the Army now has a programmatic solution in place for 95 percent of our 
historic homes. Programmatic solutions save the Army millions of 
dollars by streamlining the NHPA compliance process, delivering 
consistent preservation outcomes, and providing the flexibility to 
improve the quality of life, health, and safety of Army families. The 
Army Program Comments provide flexible management options that ensure 
the long-term preservation of historic Army housing while maintaining 
these structures as functional real property assets.
 safety and occupational health
 Ensuring our soldiers and civilians are ready to support the Army 
mission requires continual investment in proactive injury and illness 
prevention. The Army's Safety and Occupational Health Management System 
moves us from a reactive to a proactive approach to safety.
 This innovative safety management system will include comprehensive 
oversight of each command's and installation's safety and occupational 
health programs. We are also evaluating the entire Army safety 
enterprise to best support the Army of 2030.
 To ensure facilities are safe and healthy for use by our workforce 
and military families, Army commanders are evaluating facilities with a 
specific focus on health and safety of housing and CDCs. The Army is 
inspecting all Army CDCs to identify any safety issues, including the 
presence of lead, asbestos, and mold, that adversely impact health. The 
Army is improving training of our safety and health professional 
workforce to ensure they retain and enhance technical competencies to 
better inform commanders of health and safety risks and to provide 
recommendations for mitigating those risks.
 building a resilient force through partnerships
 To support our ``People First'' strategy, the Army is focused on 
promoting resilience across the Army enterprise, beginning with our 
installations. This will ensure that Army facilities and the people 
working on them can adapt to new threats in a contested, multi-domain 
environment. Building resilience across the force requires 
collaboration with defense communities to identify common challenges 
that exist both inside and outside the fence line, and to work with 
third parties to develop solutions.
 The Army continually advances new technologies by engaging with 
Federal and private-sector research and development communities. For 
example, over thirty active technology demonstrations are underway at 
Army installations through the DOD's Environmental Security Technology 
Certification Program, and Army installations are also participating in 
pilot energy resilience projects with the Department of Energy. 
Congressional funding for Army research labs has also benefited 
installations' ability to test and leverage resilient technologies. For 
example, in fiscal year 2021, Congress funded the U.S. Army Corps of 
Engineers' Engineering Research and Development Center to facilitate 
the demonstration of a ``flow battery'' at Fort Carson, Colorado, in 
partnership with industry and the local Colorado Springs Utility. 
Potential benefits of flow batteries include low projected lifecycle 
costs, long duration discharge with daily discharge capability, 
multiple times longer life-span compared to lithium-ion storage, easier 
material sourcing, and improved safety. The battery will be 
commissioned later this year and tested through 2026.
 We are also working with the Defense Innovation Unit (DIU) to 
utilize Other Transaction Authority to test energy technology 
prototypes on Army installations and more rapidly adopt those which are 
ultimately successful. In fiscal year 2023, DIU issued an ``area of 
interest'' call to seek industry participation in developing large-
scale geothermal electricity generation plants at installations which 
may have favorable geological conditions, such as Fort Wainwright and 
Fort Irwin. Geothermal energy could provide thermal and electric 
carbon-free, continuous, reliable, and resilient power, regardless of 
weather conditions.
 army climate strategy implementation
 The Army's mission to fight and win our Nation's wars remains 
unchanged. Climate change makes this mission more challenging. The Army 
must proactively address climate risks to maintain our strategic edge 
in a climate-altered world. The Army Climate Strategy will put us on a 
path toward building a more modern, resilient and capable force of the 
future. By reducing our reliance on fuel, the Climate Strategy also 
minimizes the vulnerability of our soldiers, our physical assets, and 
operational supply lines. Nothing we are doing to address climate risks 
comes at the expense of readiness. To the contrary, climate resilience 
is a key part of readiness.
 Microgrids are a central feature of Army's resilience planning. 
Microgrids, which can include onsite power generation, controllable 
distribution systems and energy storage, promote resilience by 
islanding on-base power in the event of an off-base power interruption. 
We plan to install microgrids on every installation by 2035, with a 
goal of combining these systems with enough carbon-free energy 
generation and battery storage to self-sustain critical missions at all 
Army installations by 2040. Currently, the Army has 28 operational 
microgrids, with nine under construction and 18 in design.
 To help inform how our installations and facilities will 
specifically mitigate or adapt to the effects of climate change, the 
Army is moving forward on Installation Climate Resilience Plans (ICRP) 
as required by Title 10 U.S. Code Sec. 2864. ICRPs incorporate data 
from the Defense Climate Assessment Tool (originally developed by Army) 
among other relevant data sources to identify a specific installation's 
vulnerability to climate change impacts based on the geographic region 
where that installation is located. The ICRPs are valuable tools to 
inform installation leaders and planners about location-specific short-
and long-term climate impacts. This information helps us better 
understand risk and identify mitigation actions that will protect the 
Army's ability to train and deploy under climate-altered conditions. 
The Army has completed ICRPs for Fort Carson, Colorado, and Anniston 
Army Depot, Alabama, and has ICRPs underway for Forts Greely and 
Wainwright, Alaska, Fort Bragg, North Carolina, and Fort Bliss, Texas. 
ICRPs will be initiated in fiscal year 2023 for Fort Hood, Texas, and 
Fort Stewart, Georgia.
 When it comes to the operational force, we are examining how a 
reduction in energy usage can enhance warfighting capability. Working 
closely with industry partners, the Army is engineering and testing 
anti-idle retrofit kits for all tactical wheeled vehicles, with 
procurement beginning in fiscal year 2025. Intelligent anti-idle 
controls reduce engine run-times by up to 50 percent, reduce fuel 
consumption by up to 30 percent, improve silent watch capability, and 
reduce maintenance costs. The Army is also developing and testing 
technologies for hybrid-electric tactical vehicles, with a goal to 
field hybrid drive tactical vehicles by 2035 and fully electric 
tactical vehicles by 2050. These efforts will enhance operational 
capability and mitigate risks to soldiers through reduced acoustic and 
thermal signature, silent mobility, increased sprint speed, extended 
range, and lower fuel consumption, resulting in significantly reduced 
supply line vulnerabilities. Early technology demonstrators of hybrid-
electric vehicles are in the testing stages.
 Battlefield charging remains a challenge and we will not advance 
any technologies that put the mission or our soldiers' safety at risk 
by having insufficient power to operate equipment or vehicles. To 
address this challenge, a coordinated, Army-wide effort led by Army 
Futures Command in collaboration with industry is developing 
technologies for efficient and effective battlefield charging 
capabilities. In the meantime, the Army is exploring opportunities to 
use the single charge of electric tactical vehicles for discrete 
missions so that we can better understand the observed operational 
benefits.
 In the realm of more energy efficient aircraft, the Army's UH-60 
Blackhawk, AH-64 Apache, and the Future Attack Reconnaissance Aircraft 
will be retrofitted with the T901 Improved Turbine Engine (ITE). The 
ITE is expected to reduce fuel consumption by 13 percent to 25 percent, 
decrease maintenance by 30 percent, and provide 50 percent increased 
shaft horsepower. This will enable full-payload aircraft to fly higher, 
in hotter temperatures, and for extended ranges. In March 2022, the 
first engine began testing.
 The Army is partnering with the Joint Force to develop and 
standardize advanced high-performance, high-capacity batteries to power 
vehicle, aircraft, weapons, and soldier systems. Army-led efforts to 
create a family of advanced standard batteries is intended to simplify 
supply chain issues and address obsolescence in legacy systems. To 
reduce reliance on foreign battery material supplies, the Army is 
participating in a Government-wide effort to strengthen domestic supply 
chains and mitigate critical materials vulnerability. This includes 
maximizing the authorities and funding under Title III of the Defense 
Production Act where possible. We are also exploring opportunities to 
develop substitutions for these critical elements, including by 
partnering with industry as battery technologies advance at a rapid 
pace.
 installation energy and water resilience
 Army installations and the critical missions they support--power 
projection, force mobilization, and command and control--rely 
predominantly on commercial utilities for energy and water. Energy and 
water supporting our installations must be readily available, and the 
sources and methods of delivery must be able to withstand attack--
whether from grid or equipment failures, cyber attacks, or extreme 
weather events and natural disasters--and recover from interruption to 
ensure seamless mission execution. Resilience requires coordinated 
action and planning to anticipate, prepare for, and adapt to changing 
conditions.
 The Army's Installation Energy and Water Resilience Policy empowers 
installation senior commanders to set energy and water requirements to 
support the critical missions on their bases. Through development of 
Installation Energy and Water Plans (IEWPs), the Army assesses risks 
and opportunities, generates risk mitigation options, and implements 
prioritized resilience and efficiency solutions at all installations. 
The Army has completed 148 of the 189 IEWPs that are expected to be 
completed, and is on track to complete the remaining plans in fiscal 
year 2023.
 Resilience capabilities must be validated at Army installations 
through semi-annual routine and annual full-scale testing of all backup 
systems that support critical missions. The Army conducts Black Start 
Exercises to test installations' ability to respond to and restore 
power upon an electric grid outage. These exercises have been completed 
at six bases and planning is underway to execute these exercises at 
five additional locations in fiscal year 2023: Fort Carson, Colorado; 
Fort Drum, New York; Fort Campbell, Kentucky; Fort Riley, Kansas; and 
U.S. Army Garrison Bavaria, Europe. These exercises are the best way to 
test the inter-relationships of systems across an installation and 
determine how well they function in the event of an outage. These 
exercises are invaluable for identifying and resolving previously 
undetected problems such as generator circuit connection gaps, or 
malfunctioning equipment.
 The Army is also promoting energy efficiency through the Resilient 
Energy Funding for Readiness and Modernization, or REFoRM, program, 
authorized by Congress in Title 10 U.S. Code Sec. 2912, Availability 
and Use of Energy Cost Savings. REFoRM allows the Army to direct energy 
cost savings back to the installations to reinvest in energy programs 
and a variety of quality of life programs. Army has realized over $100 
million in energy cost savings since REFoRM's inception.
 Water plays an essential role in Army missions such as industrial 
base manufacturing, equipment maintenance and operations, facility 
heating and cooling, firefighting, and training land management. In 
fiscal year 2022, Army installations used over 37 billion gallons of 
water. This number is down from previous years, reflecting a deliberate 
water conservation effort. The Army continues to protect water from 
ever-increasing man-made and natural threats, such as drought. Many 
Army installations lead the way in water sustainability and resilience. 
For example, in fiscal year 2022, the Army preserved drinking water by 
capturing, treating, and re-utilizing nearly 690 million gallons from 
alternative sources such as rainwater harvesting systems at Fort 
Buchanan, Puerto Rico, and re-treated wash water at Fort Leonard Wood, 
Missouri. However, as environmental stresses worsen, the Army must 
continuously consider and improve how installations access, use, and 
re-use water, in partnership with utilities, communities, regional 
partners, industry, academia, and research institutions.
 alternative financing
 As the Army looks at ways to mitigate vulnerabilities, we must 
consider the full suite of resourcing and acquisition authorities. This 
includes utilizing all available appropriated fund programs, such as 
Operations and Maintenance, MILCON, and the specific subset of MILCON, 
the Energy Resilience Conservation and Investment Program. The threats 
which necessitate resilience planning do not start or stop at the fence 
line and we must partner with communities, utilities, energy service 
companies and State and local governments to address these threats. 
Therefore, in addition to appropriated funds, third-party financing 
resources are also a critical component for addressing vulnerabilities. 
This approach, which includes real estate out grants, energy savings 
performance contracts (ESPCs), utility energy savings contracts 
(UESCs), utilities infrastructure privatization and power purchase 
agreements, is invaluable to help the Army address utility 
vulnerabilities and resilience.
 In fiscal year 2022, the Army updated its ESPC and UESC policy to 
maximize use of these contracts as a part of an overall strategic 
approach to sustain, restore, and modernize facilities, to address the 
facilities maintenance backlog, and to achieve efficiency and 
resilience objectives. In fiscal year 2022, the Army awarded four ESPCs 
and five UESC projects totaling $230 million, delivering the Army 2.234 
megawatts of onsite carbon-free energy generation. The Army is working 
to award over a dozen ESPCs and UESCs in fiscal year 2023, with more to 
follow in fiscal year 2024 and beyond.
 The Army's Office of Energy Initiatives (OEI) is currently working 
with nearly thirty installations to rapidly develop large-scale, 
privately financed energy generation and storage projects, many of 
which include microgrid configurations. OEI collaborates with industry 
and other private investors to identify mutual needs and leverages 
those opportunities to meet the Army's requirements. To date, 11 
installations host OEI-developed projects, providing a combined 325 
megawatts of energy production capacity, secured through $627 million 
of private sector investment, with anticipated life-cycle operations 
and maintenance values of $603 million. In addition, the Army has 
entered into real estate agreements for two projects that will begin 
construction in fiscal year 2023, and we are in the final stages of 
negotiations for three additional projects.
 The Defense Community Infrastructure Pilot Program (DCIP) has been 
an invaluable tool to facilitate meaningful infrastructure planning 
between installations and defense communities. DCIP funds community 
resilience projects such as the fiscal year 2022 $14.9 million grant 
awarded to the city of Boiling Springs Lake, North Carolina to restore 
four dams damaged by 2018 Hurricane Florence. This project will 
mitigate flood risks to the community and to the Military Ocean 
Terminal Sunny Point, providing win-win benefits. Similarly, a $12.8 
million grant to the Alaska Energy Authority to extend electric 
transmission lines will help offset the cost of expanding electricity 
access to Alaskans, while also making Fort Wainwright's Black Rapids 
Training Site less reliant on standalone diesel generators, thereby 
reducing fuel consumption and associated emissions.
 In fiscal year 2022, installations partnered with local communities 
and the Office of Local Defense Cooperation Communities on approved 
grants totaling $1.6 million for Military Installation Resilience 
projects at Fort Knox, Kentucky; Fort Drum, New York; Fort Bliss, 
Texas; and Camp Atterbury, Indiana. Projects range from addressing 
potential encroachment, physical assessments of critical defects in 
water lines, and other resiliency and design studies for water, 
wastewater and storm water infrastructure as well as energy systems.
 The Army will continue to explore beneficial partnerships to 
strengthen installation resilience. On March 15, 2023, we signed a 
Memorandum of Understanding with the Edison Electric Institute as a 
framework to exchange information with utilities, and implement best 
practices to ensure a secure and reliable energy supply for military 
installations, as well as surrounding communities.
 intergovernmental support agreements to enhance readiness
 The Army is aggressively using Intergovernmental Support Agreements 
(IGSAs) to obtain municipal services, resulting in cost and manpower 
savings to the Army. The Army currently has 122 IGSAs in place, 
including agreements for environmental services, firefighting services, 
waste management, and dozens of other contracts to procure local 
government support. Most recently, the Army joined with its sister 
services to sign the first-of-its-kind state-wide IGSA with the Texas 
Department of Transportation to provide operation and maintenance 
support for on-base roads, storm water drainage, traffic lights, and 
bulk materials purchases. The 10-year IGSA contract includes Forts Hood 
and Bliss and is expected to save the Army over $3.78 million per year.
 environmental stewardship
 The Army's Environmental Program helps maintain access to testing 
and training lands in a variety of ways. Army biologists have been 
managing installation land and natural habitats for 50 years in with no 
impact on mission, while at the same time protecting species where 
possible. Part of this success is attributable to the Army's Compatible 
Use Buffer Program (ACUB), which is marking its 20th anniversary, and 
the related Office of the Secretary of Defense (OSD) Readiness and 
Environmental Protection Integration Program. These programs authorize 
Army to use innovative tools to provide flexibility for training and 
testing while carefully managing endangered species and other natural 
resources, in partnership with State and Federal agencies and private 
landowners. One major success story is the progress toward recovery of 
the endangered red-cockaded woodpecker in the Southeastern U.S. Based 
on the Army's careful management practices, the red-cockaded woodpecker 
is being proposed by the U.S. Fish and Wildlife Service for down 
listing from endangered to threatened.
 ACUB is also a critical tool to protect Army lands from nearby 
encroachment. To date, the Army, through ACUB, has preserved over 
760,000 acres in 28 states. Leveraging generous partner funding, Army 
has invested over $1.2 billion to support the protection of natural 
resources. These investments help the Army remain well-positioned to 
protect the mission by deconflicting potential regulatory or 
encroachment impediments.
 The Army recognizes that external pressures threaten long-term 
viability of our training ranges and lands. To help mitigate this 
threat, the Army participates in the Sentinel Landscapes Partnership. 
This coalition of Federal agencies, State and local governments, and 
non-governmental organizations works with private landowners to advance 
sustainable land management practices in the vicinity of military 
installations and ranges. This program encourages Federal agencies to 
combine resources and authorities to address regional natural resource 
challenges, and helps the Army strengthen military readiness. 
Participating in the Sentinel Landscapes Partnership over the last 10 
years has improved resilience at Army installations and the surrounding 
communities.
 remediate contaminants
 The Army is committed to full compliance with environmental laws 
such as the Clean Air Act and the Clean Water Act, as well as our 
ongoing environmental restoration activities. The Army currently 
manages close to 5,000 environmental permits, and conducts our cleanup 
program in accordance with the Comprehensive Environmental Response, 
Compensation, and Liability Act (CERCLA) using Defense Environmental 
Restoration Program authorities and funding. The Army has completed 
response actions at over 90 percent of the 12,000 sites in our 
restoration inventory. Our remediation work includes reducing risks 
posed by munitions resulting from historic training activities that may 
remain at some of our installations. The Army continues to rigorously 
address cleanup actions to ensure protection of the health of our 
soldiers, their families and the communities surrounding our 
installations, as well as the environment.
 Following OSD guidelines, the Army has been taking actions to 
address per-and polyfluoroalkyl substances (PFAS) since 2016, using a 
three-pronged approach focused on identifying and cleaning up past 
releases, testing for, and mitigating risks from PFAS in drinking 
water, and mitigating the use of aqueous film-forming foam (AFFF). The 
Army is currently conducting PFAS investigations at 341 installations 
in the United States and its territories. The Army is discontinuing the 
use of AFFF in accordance with legal requirements, and our current use 
of AFFF is limited to fire emergencies. Moreover, in accordance with 
the fiscal year 2020 NDAA requirements, we have developed an AFFF 
transition plan, which will commence when qualified fluorine-free 
products become available in late 2023.
 Of the 341 facilities identified as requiring PFAS investigation, 
the Army has completed the first phase of investigations at 180 
facilities, with investigations underway at the remaining 161 
facilities. Ninety facilities have already moved to the next phase of 
investigation. Using the CERCLA process, the Army identifies impacts to 
drinking water outside installations, and has completed removal actions 
to cutoff exposure through measures such as: provision of bottled 
water, links to municipal water connections, or installation of 
treatment technologies. The Army is fully transparent about our PFAS 
activities, and PFAS-related drinking water and cleanup information is 
available to the public via the Army's and DOD's websites that are 
updated regularly.
 In sum, the Army is committed to fulfilling our cleanup 
responsibilities and will remain transparent about our progress with 
both Congress and the public. We will continue to engage in robust 
community outreach efforts to inform stakeholders and solicit feedback.
 fiscal year 2024 budget request for installation infrastructure
 The Army's requested investments for installation infrastructure 
underpin the critical importance of our installations both at home and 
abroad, including the INDOPACIFIC region. These investments are 
intended to achieve three purposes: (1) support our Army's continued 
focus on improving quality of life for our people; (2) ensure our 
ability to achieve installation resilience and supporting capabilities 
at pace with our modernization strategy; and (3) enable our soldiers' 
ability to train, mobilize and project force from our installations to 
achieve national defense priorities.
Military Construction
 The Army's fiscal year 2024 MILCON and Family Housing request for 
$2.8 billion will improve installation readiness, industrial base 
readiness, and soldier and family quality of life, as more fully 
described below.
 The breakdown of $2.8 billion request by component is as follows: 
$2.16 billion for the Active Component; $340 million for the Army 
National Guard (ARNG); $107 million for the U.S. Army Reserve (USAR); 
and $150.6 million in the Base Closure Account for environmental 
remediation, caretaker services, and program management costs at Base 
Realignment and Closure (BRAC) sites.
 Military Construction, Army (MCA). Included in the Active Army's 
$1.47 billion request is $1.027 billion supporting installation and 
soldier readiness, broken down as follows: $288 million for permanent 
party barracks, $286 million for range and training facilities, $105 
million for maintenance facilities, $274 million for the industrial 
base and $74 million for a power projection project.
 Military Construction, Army Reserve (MCAR). The fiscal year 2024 
MCAR budget request supports two major construction projects: The USAR 
Center at Birmingham, Alabama, ($57 million) and an Area Maintenance 
Support Activity at Phoenix, Arizona, ($12 million).
 Military Construction, Army National Guard (MCNG). The ARNG request 
supports readiness by funding $140 million for seven readiness centers, 
$7.9 million for a training range, and $75 million for five maintenance 
facilities.
 Minor Construction/Planning & Design. All three components have 
requested a combined $154 million for Unspecified Minor Construction 
and $354 million for planning and design for future MILCON projects.
 Army Family Housing (AFH). The Army's request for $305 million in 
construction funding supports two new/replacement projects providing 70 
new homes in Baumholder, Germany; 20 new homes at Kwajalein Atoll; and 
equity investments for improved homes at Fort Gordon, Georgia and Fort 
Leonard Wood, Missouri.
 The Army's request for $385 million in Family Housing Operations 
funding provides for Army Family Housing operations, maintenance and 
repair, utilities, and management of the privatized housing Residential 
Communities Initiative.
 BRAC. The Army's request for $151 million includes $8 million for 
continuing caretaker and program management requirements at remaining 
BRAC installations closed or realigned under the five previous BRAC 
rounds (1988, 1991, 1993, 1995, and 2005) and $143 million for 
environmental cleanup requirements at BRAC sites. The Army continues to 
work with Federal and State regulators to resolve complex environmental 
issues that exist on the Army's BRAC sites so that each property can be 
conveyed and used for a beneficial non-military purpose.
Operation and Maintenance of Facilities
 Facilities Sustainment, Restoration, and Modernization (FSRM). The 
Army is requesting $7.1 billion in FSRM as set forth below to address 
our backlog of facilities maintenance, provide sustainment to slow 
degradation of facilities and for demolition of facilities as 
appropriate ($166 million). The Army is working with OSD to develop a 
comprehensive facility asset management approach to optimize 
sustainment, restoration, and modernization, demolition and MILCON 
funding to meet requirements. The emphasis of the approach is to 
enhance the accuracy of Army's building condition indices generated 
from BUILDER to maximize our return on investment.
 Army Sustainment. The Army's fiscal year 2024 FSRM request includes 
$4.5 billion in Facilities Sustainment, which will provide 89 percent 
of the Facility Sustainment Model requirements for all components.
 Restoration and Modernization (R&M), Active Army. The fiscal year 
2024 FSRM request includes $1.98 billion in R&M funding for the Active 
Army, which will fund restoration projects for quality of life 
facilities, including barracks and CDCs, as well as readiness and power 
projection facilities, including airfields and utilities at key 
installations.
 Restoration and Modernization (R&M), Army Reserve. The fiscal year 
2024 FSRM request includes $157 million in R&M for the USAR. This 
funding will fund restoration projects for barracks, maintenance 
activities, and reserve centers.
 Restoration and Modernization (R&M), Army National Guard. The 
fiscal year 2024 FSRM request includes $246 million in R&M for the 
ARNG, which will fund restoration projects for collective training 
barracks, Reserve component readiness facilities, and recapitalization 
of training facilities.
Investments in the Indo-Pacific Region
 The importance of investing in requirements in the Indo-Pacific 
Region cannot be over-stated. The Army's fiscal year 2024-2028 Future 
Years Defense Plan contains over $2 billion in Military Construction 
investments in this Region (Guam, Japan, Hawaii, Kwajalein and Alaska). 
We expect this figure to increase in future years as stationing 
decisions are concluded.
 conclusion
 Building the Army of 2030 begins on our installations. We need 
ready and resilient installations to ensure our soldiers are properly 
trained and can deploy anywhere in the world to fight and win our 
Nation's wars. For installations, the future is now. Your continued 
support helps us realize these important goals.
 Thank you for the opportunity to present this testimony and for 
your continued support of our soldiers, civilians, soldiers for life, 
and their families, caregivers, and survivors.

 [Technical problems]

 STATEMENT OF THE HONORABLE MEREDITH A. BERGER, ASSISTANT 
 SECRETARY OF THE NAVY FOR ENERGY, INSTALLATIONS, AND 
 ENVIRONMENT

 Ms. Berger. Chairman Hirono, Ranking Member Sullivan, and 
distinguished Members, thank you for the opportunity today, and 
thank you for the inclusion of the Fallon Range Training 
modernization in the National Defense Authorization Act (NDAA) 
in 2023. We remain committed to the important commitment that 
you have made there.
 I will return to Fallon this weekend to celebrate Earth Day 
with our tribal partners as we approach our first milestone 
under the modernization. Thank you for your attention to Red 
Hill for ensuring drinking water continues to be safe, and once 
the Joint Task Force certifies that it has been de-fueled, the 
Navy is prepared to execute the permanent closure of that 
facility.
 I will return to Hawaii next week to continue my focus on 
the health and safety of the people, environment, and 
communities in Oahu. In my portfolio, my work spans three 
cross-cutting areas, critical infrastructure, communities, and 
climate action.
 Critical infrastructure, as you noted, Madam Chairman, is 
the means to our end. Worldwide, Navy and Marine Corps 
installations are power projection platforms from which naval 
forces train, deploy, and maintain our forward presence. They 
are also where our people recover, resupply and rest.
 They are home to servicemembers and their families. 
Historically, the Department has accepted significant risk in 
the resourcing of naval installations. This year's budget 
represents a first step in fundamentally changing that 
approach.
 We are developing a 30-year infrastructure plan that will 
design and deliver the requirements and resources to support 
the missions at of our naval installations, warfighting, 
readiness, and quality of life. This budget request supports 
new platforms and weapons systems, modernizes aging utilities, 
demolishes obsolete facilities, and enhances the quality of 
life for sailors and marines.
 Additionally, you will see our commitment to the shipyard 
infrastructure optimization program, SIOP, and our focus in the 
Indo-Pacific region, and the commitments that we have made 
there. To keep these commitments, the Department of Defense 
does need a stable workforce in Guam through long term relief 
from the H-2B visa requirement through at least 2029.
 Next, communities, where people come together. Your 
districts are installations and the environment, economy, and 
people that connect us. This budget request sustains our 
enhanced oversight of privatized housing and continues our 
proactive environmental stewardship of installations and 
ranges.
 It supports the Department of Defense's comprehensive 
approach to address PFAS and other emerging chemicals of 
concern. The Department of the Navy protects our communities 
and critical infrastructure with a third C-climate action.
 No matter what we call it, extreme weather, temperatures, a 
rising sea and depleting water sources are threatening our 
installations and the infrastructure that supports our critical 
missions.
 This budget request makes Navy and Marine Corps 
installations our power to projection platforms more resilient 
and survivable, and it makes our forward deployed forces have 
the operational advantage by untethering them from long and 
contested logistics tails.
 I would like to thank this Committee for your steadfast 
commitment to our sailors, marines, civilians, and their 
families, and I look forward to continuing to work with you to 
make our Marine Corps and Navy the world's greatest maritime 
fighting force. Thank you.
 [The prepared statement of The Honorable Meredith Berger 
follows:]

 Prepared Statement by The Honorable Meredith Berger
 introduction
 Chairwoman Hirono, Ranking Member Sullivan, and distinguished 
Members of the Subcommittee, thank you for the opportunity to testify 
on the Department of the Navy's (DON) Fiscal Year (FY) 2024 budget 
request. The DON's Energy, Installations, and Environment portfolio is 
foundational to making sure that our sailors, marines, and civilians 
are ready--able to do all that our Nation asks them to do.
 current context
 A ready Navy and Marine Corps responds whenever the Nation calls. 
Around the globe, around the clock, the Navy and Marine Corps are where 
they need to be, when they need to be there. They are able to do that 
because of the critical readiness enablers across the EI&E portfolio. 
Since we last met we have achieved some significant achievements across 
the portfolio that have happened because of partnerships across the 
Federal family and among the communities and State and local partners 
that share in the places that we live, work, and train.
 I would like to thank this committee for your support of the 
modernization of the Fallon Range Training Complex in Nevada, which 
will ensure that Naval Aviators and Navy SEALs have training ranges and 
facilities that provide them a realistic environment to train like they 
fight. Due to incredible efforts and commitment over many years across 
Congress, the Department of Interior, tribal, and State and local 
stakeholders, the Department of the Navy will increase the readiness of 
our warfighters while also prioritizing the stewardship and safety of 
the sacred environmental and cultural resources, and the health of the 
local economy. As we modernize the range in the coming years, in 
partnership with Congress, the DON will continue to meet its 
obligations as part of the community, while enabling the warfighting 
mission.
 We will continue this effort in other critical regions as well. 
When I last testified on the DON's budget request, we were months into 
our response to the November 2021 spill of fuel at the Red Hill Bulk 
Fuel Storage Facility (Red Hill) in Hawaii. A year later, we have made 
significant progress as a Department of Defense (DOD), with the 
Secretary of Defense standing up the Red Hill Joint Task Force (JTF) to 
oversee the defueling of the Red Hill and charging the
 DON with the closure of the facility. The DON is grateful for the 
attention and urgency that Congress provided as we responded to the 
contamination at Red Hill and as we continue our work. The DOD 
delivered its defueling plan July 1, 2022, and the DON delivered its 
closure plan November 1, 2022. As the JTF focuses on the safe and 
expeditious defueling of the Red Hill facility, DON is preparing for a 
similarly safe and expeditious closure of the Red Hill facility. 
Throughout this process, the DON is working closely with the JTF to 
ensure complementary actions and continuity of these intimately related 
efforts and to provide constant, clear communication with the community 
and other stakeholders. As the DON moves forward to permanently close 
Red Hill, we will remediate the remaining fuel contamination, conduct 
long-term monitoring to ensure that the water remains safe, and work 
with the Environmental Protection Agency and the Hawaii Department of 
Health. Additionally, we will engage with the local community to 
solicit input on the opportunities for non-fuel beneficial reuse of the 
Red Hill facility. With every action, we are prioritizing the health 
and safety of the people, environment, and communities in Oahu and look 
forward to continued productive and collaborative relationships with 
all stakeholders.
 strategic priorities
 Secretary Del Toro set forth guiding principles for the DON team to 
strengthen maritime dominance, build a culture of warfighting 
excellence, and enhance our strategic partnerships. These objectives 
support our National Defense Strategy and are the drivers of all that 
we do. In my capacity as the Assistant Secretary of the Navy for 
Energy, Installations, and Environment, I support Secretary Del Toro's 
guidance by focusing on three cross-cutting areas: Critical 
Infrastructure, Communities, and Climate Action. Across all three of 
these areas, Safety provides the foundation for all of our work. As the 
DON's Designated Agency Safety and Health Official, I am focused on 
reducing and eliminating occupational and off-duty accidents, injuries 
and illnesses while cultivating a learning culture that anticipates 
needs and enhances our safety culture, highlights programmatic 
shortfalls, and manages risk at the proper level. The DON is committed 
to sustaining a comprehensive safety and occupational health program 
that addresses a wide range of functions and missions in various 
complex environments.
 critical infrastructure
 Navy and Marine Corps installations are power projection platforms 
from which naval forces train, deploy, and maintain forward presence to 
enable geographic Combatant Commanders to meet operational 
requirements. Historically, the DON has accepted a significant level of 
risk in the resourcing of our installations; as a result, the DON 
infrastructure portfolio carries known, aggregated risk from many years 
of underinvestment in the sustainment and recapitalization of our 
facilities, structures, and utilities infrastructure. We assess that 
the DON's current facilities maintenance backlog currently stands as at 
nearly $33.7 billion. To reduce this backlog, we are recalibrating our 
investment prioritization in a way that clearly values, links, and 
acknowledges the essential warfighting, readiness, and Quality of Life 
support that naval facilities provide. Simultaneously, we are 
consolidating functions and divesting infrastructure that is in poor 
condition or duplicative to ensure existing funding is focused in the 
most efficient, impactful way possible. This budget request represents 
an important first step in the DON's commitment to develop a 30-year 
infrastructure plan that anticipates and plans toward the needs, 
requirements, sustainment, and the future of these key platforms in our 
enterprise and the missions we support. This plan will incorporate many 
of our ongoing infrastructure initiatives across the organic industrial 
base and key and fleet concentration areas.
 Facilities Sustainment, Restoration, and Modernization (FSRM). Our 
fiscal year 2024 request begins to demonstrate our commitment to long-
term infrastructure investment. Fiscal year 2024 includes $4.5 billion 
in FSRM funding for the Navy and $1.2 billion for the Marine Corps to 
maintain the working order of our facilities and utility systems and 
prevent the premature degradation of mission-critical facilities. This 
year's budget request includes the replacement of the Halawa and Lehua 
Ave. waterlines at Joint Base Pearl Harbor-Hickam, replacement of the 
Turner Road, Sumay Road, and Barrida water lines at Naval Base Guam, 
and sewer line repairs at MCAS Cherry Point. We are prioritizing our 
FSRM investments to maximize effectiveness and mission readiness. The 
Marine Corps' Facilities Investment Strategy leverages a newly 
developed Readiness Maximization Tool to promote a tier-based readiness 
approach to lifecycle management that reduces footprint while 
prioritizing investments for the most important facilities. After a 
period of analysis, this pathfinder program began in earnest at the 
start of fiscal year 2023, and we will use the results of this 
initiative to inform a model for broader application.
 Within our FSRM funding, our fiscal year 2024 budget request 
includes $228 million for the Navy and $112 million for the Marine 
Corps to demolish obsolete infrastructure and reduce our current 
footprint, which will enable the DON to better prioritize existing our 
facilities sustainment funding across our most critical facilities. 
This budget also includes $165 million for the Navy and $201 million 
for the Marine Corps to repair and renovate housing for our 
unaccompanied sailors and marines at several installations.
 Shipyard Infrastructure Optimization Program (SIOP). As part of our 
long-range vision, our fiscal year 2024 budget request underscores our 
commitment to improving and optimizing the DON's organic depots, which 
includes our four public shipyards, Fleet Readiness Centers supporting 
the Naval Aviation Enterprise, and Marine Corps Depots and Support 
Facilities. Under the Shipyard Infrastructure Optimization Program 
(SIOP) we are committed to modernizing the Navy's four public shipyards 
to generate Fleet readiness and strengthen our Nation's security; we 
will construct and recapitalize dry docks to reconfigure infrastructure 
using industrial modeling and simulation, detailed engineering studies, 
and master planning, and modernize industrial plant equipment. In 
fiscal year 2024, the Navy has budgeted $209 million in Facilities 
Restoration & Modernization funds to execute eight projects directly 
supporting the SIOP program, including structural and facility repairs 
at Puget Sound Naval Shipyard, electrical and compressed air system 
repairs at Norfolk Naval Shipyard, and feeder cable replacement at 
Portsmouth Naval Shipyard. The President's Budget 2024 budget also 
includes approximately $2.3 billion for SIOP military construction 
projects, including one new-start project to build the Electrical 
Backbone at Puget Sound Naval Shipyard, and incremental funding for a 
Dry Dock Saltwater System at Norfolk Naval Shipyard, a Multi-Mission 
Drydock Extension at Portsmouth Naval Shipyard, and Dry Dock 3 at Pearl 
Harbor Naval Shipyard. The request also includes $145 million in MILCON 
planning and design funds for future SIOP projects.
 Military Construction. In total, the DON's fiscal year 2024 budget 
request includes $6 billion for 33 military construction projects for 
the Navy and Marine Corps. Through this request, the DON is investing 
in new platforms and technologies such as Aircraft Development and 
Maintenance Facilities at Naval Air Station Patuxent River, Maintenance 
Facility and Marine Air Group Headquarters at Cherry Point, Weapons 
Magazines at Naval Weapons Station Yorktown, an Aircraft Maintenance 
Hangar at Cherry Point, and a Communications Towers at Twenty-Nine 
Palms. We recognize that critical infrastructure at installations is 
more than the piers, hangars, runways, training and support facilities 
where our people work, train and live. It is also the energy, water, 
and utility systems that serve as the backbone of our operations. Our 
fiscal year 2024 budget request includes a new water treatment plant at 
Marine Corps Base Quantico and a new electrical backbone at Puget Sound 
Naval Shipyard.
 Focus on the Indo-Pacific Region. The DON is prioritizing China as 
our pacing challenge, and we are focusing our infrastructure 
investments on this threat. Our fiscal year 2024 budget request 
reflects the importance of the Indo-Pacific Region with laydown of 
Marine Corps forces in under the Guam Defense Policy Review Initiative 
(DPRI), new Marine Corps infrastructure in Australia, and Navy 
communication and missile integration facilities in Naval Base Guam. 
DPRI construction projects on Guam provide facilities to meet current 
and future training requirements. Our fiscal year 2024 military 
construction request funds to construct Artillery Battery Facilities, a 
Recreation Center, Religious Ministry Services Facility, a Child 
Development Center, Training Center, a Consolidated Marine 
Expeditionary Brigade Headquarters, and the 9th Engineer Support 
Battalion Training Complex Finegayan, Guam. The fiscal year 2024 
request also includes $26 million in MILCON Planning and Design in 
support of future construction requirements in Guam.
 In addition to the DON's infrastructure investments in Guam, the 
Department of Defense (DOD) has several upcoming key posture actions in 
Guam and the CNMI that will require historic levels of military 
construction, and the DOD's military construction demands require a 
workforce more than twice as large as the local construction workforce 
in Guam. Our planned future military construction investments will 
further exacerbate labor shortages and pose serious challenges to our 
Indo-Pacific posture. To ensure that construction contractors have a 
stable H-2B visa workforce for current and future military construction 
projects in Guam, the DOD requires relief through at least December 31, 
2029, from the H-2B visa temporary need requirement. While we 
appreciate the 1-year extension in the Fiscal Year 2023 NDAA that 
pushed the expiration date to December 31, 2024, the longer-term 
extension is needed to meet DOD's construction requirements.
 In January 2023, I joined the Commandant of the Marine Corps for 
the reactivation ceremony of Marine Corps Base (MCB) Camp Blaz in Guam. 
Camp Blaz, the first newly constructed Marine Corps base in 70 years, 
will serve as a strategic hub in the Pacific and will promote regional 
security. Camp Blaz is a pointed example of how an installation enables 
warfighting readiness while supporting the local economy, preserving 
cultural heritage, enabling environmental resilience, and working 
together with the local community to achieve shared goals. Together 
with the government of Guam, the DON has modernized water treatment 
systems, improved roadways and bridges, upgraded power systems, studied 
the CHamoru culture, and enhanced natural habitats to protect 
endangered and threated species.
 Quality of Life Investments. Our fiscal year 2024 budget request 
also builds new facilities to enhance the quality of life for our 
sailors and marines, including new Child Development Centers at Joint 
Expeditionary Base Little Creek and Naval Station Norfolk, and Bachelor 
Enlisted Quarters and Support Facility for our unaccompanied marines 
stationed in Washington, DC. To support our military families, our 
fiscal year 2024 budget request of $641 million funds the operation and 
maintenance of 8,528 Government-owned units and 1,666 leased units 
worldwide. It also supports the continued construction of 103 homes for 
Navy and Marine Corps families in Guam, revitalizes and modernizes 53 
enlisted homes at USFA Yokosuka, and funds needed repairs to historic 
homes at Marine Barracks Washington, DC.
 Housing for our Sailors, Marines and Families. Unaccompanied and 
family housing units--both Government-owned and privatized--are 
critical to the health and safety of our sailors, marines and their 
families. The DON is grateful for Congress's support for the Military 
Housing Privatization Initiative (MHPI) program to increase Government 
personnel to oversee privatized housing projects. We have implemented 
all features of the Tenant Bill of Rights and continue to work with DOD 
and the other Services to implement more oversight improvements. As 
recommended by the Government Accountability Office's recently released 
report, Military Housing: DOD Can Further Strengthen Oversight of Its 
Privatized Housing Program, the DON is collaborating with the other 
military departments to implement recommendations in the report, to 
include focusing on the formal dispute resolution process, supplemental 
training, updating policy and informational documents on the specific 
roles and responsibilities of the tenant advocates, among others. The 
DON is also working to complete workforce studies to determine the 
number of positions needed to oversee privatized military housing.
 We are committed to maintaining resident trust, reinforcing DON 
oversight, and exercising active leadership and advocacy for our 
sailors, marines and their families. Over the past year, the DON 
Housing team has made great strides in moving the privatized housing 
program into the next phase of sustained oversight and dynamic 
leadership involvement. We are using the tools we have developed to 
perform better analysis of our processes, policies, and overall program 
to ensure higher levels of service and resident satisfaction. Lessons 
learned are also being applied to the DON's Government-owned homes. We 
continue to review the current financial State of our privatization 
projects and their ability to sustain themselves in the future, and we 
believe that privatization continues to be an option to provide our 
families affordable and safe housing where demand is high and on-base 
housing shortfalls exist. Currently, the Navy is considering two 
additional MHPI family housing phases in these type of areas including 
in the Everett, Washington area and remote areas of Naval Air Station 
Fallon and Naval Air Weapons Station China Lake.
 communities
 As we demonstrated with the reactivation of Camp Blaz, when the 
Navy and Marine Corps create an installation, facility, base or 
station, our sailors, marines, and families call it home. We recognize 
and take seriously that this is a shared home with those outside the 
fence line, which include residents, businesses, and the environment. 
As our people live, train, work, and operate, we form a connection and 
an opportunity to strengthen the resources and resilience for the 
entire community.
 Readiness and Environmental Protection Integration Program (REPI). 
The DON continues to leverage the Department of Defense Readiness and 
Environmental Protection Integration Program (REPI) to partner with 
local governments and non-governmental organizations to preserve our 
national defense capabilities while simultaneously advancing the goals 
and objectives of partner organizations and leveraging shared 
resources. We are increasingly utilizing REPI for projects with climate 
resilience benefits, while continuing to address traditional 
encroachment pressures, such as incompatible development and species 
and habitat concerns. DON's REPI efforts led to the execution of over 
$24 million awarded in support of natural resources management 
utilizing the Sikes Act authority and helped secure an additional 
investment of $21.5 million from the National Coastal Resilience Fund 
to support DON installation resilience. These proactive, collaborative 
partnerships will help improve installation and community resilience 
and reduce future regulatory constraints by supporting species recovery 
efforts and are expected to alleviate or reduce impacts to 
construction, training, modernization efforts, and operations. The 
DOD's recently announced 2023 REPI Challenge includes several projects 
that near DON installations, to include: shoreline stabilization near 
Marine Corps Base Quantico, Virginia; invasive specifies management and 
reef preservation near Pacific Missile Range Facility Barking Sands and 
Marine Corps Base Hawaii; and habitat improvement and species 
management at Marine Corps Base Camp Pendleton, Naval Base Coronado, 
Naval Base Ventura County Point Mugu, Naval Weapons Station Seal Beach 
in California.
 Partnering with the Local Community. Outside of our fence lines, 
the communities that host our Navy and Marine Corps installations 
continue to utilize the Defense Community Infrastructure Pilot (DCIP) 
program to fund community infrastructure projects that benefit local 
installations, enable the DON's warfighting mission, and provide 
support to our servicemembers, and their families. Using 2022 DCIP 
grant funds, Onslow County in North Carolina will upgrade a runway at a 
local airport to benefit travel in southeastern North Carolina, 
including Marine Corps Base Camp Lejeune, Marine Corps Air Station New 
River, and Marine Corps Air Station Cherry Point. In Florida, a new 
water main will improve capacity and pressure for not only for Naval 
Station Mayport, but also the surrounding community where many of our 
sailors, marines, civilians and their families live. Finally, the city 
of Newport News in Virginia will undertake a $15 million project at the 
Harwood's Mill Reservoir Dam to increase flood protection for the 
entire community and ensure a reliable water supply to Naval Weapons 
Station Yorktown. In addition to supporting our communities to compete 
for DCIP grants, Navy and Marine Corps installations continue to look 
for ways to leverage the authorities granted by Congress. The DON 
continues to leverage Intergovernmental Support Agreements (IGSAs) to 
partner with a State or local government to obtain installation support 
services, which often generates considerable savings for our 
installations. In January 2023, the Department of the Navy, along with 
the Department of the Army and Department of the Air Force, came 
together under a state-wide IGSA for the Texas Department of 
Transportation to provide operation and maintenance support military 
bases across the State, generating an overall estimated cost savings of 
25 percent for the Department of Defense. The Navy and Marine Corps 
currently have 57 IGSAs in place, and we are on track to sign an 
additional 15 to 20 over the next year.
 Environment and Mission Readiness. The DON is taking action at our 
installations and ranges across the world as we protect the environment 
as a strategic asset that supports our National Defense. Our fiscal 
year 2024 budget request includes more than $1 billion to fund 
environmental compliance environmental laws and regulations afloat and 
ashore; conserve and manage natural, cultural, and marine resources on 
our installations and ranges; conduct environmental planning and 
environmental consultation and permitting; continue investigations and 
cleanup on installations; implement the DON's ongoing per-and 
polyfluoroalkyl substances (PFAS) response strategy; sustainably manage 
and modernize our ranges and mitigate compatibility risks; and build 
environmental resiliency into our planning, operations, acquisitions, 
and installation management.
 Through proactive environmental stewardship of installations and 
ranges, the DON delivers modern, agile, resilient, and sustainable 
training, testing, and operational capabilities. It is through our 
sustained efforts that the U.S. Fish and Wildlife Service announced in 
January 2023 that--after decades of collaborative conservation 
efforts--five species living on the Navy's San Clemente Island off the 
coast of California are now fully recovered and no longer require 
Endangered Species Act protection. This milestone serves as a tangible 
example of how the DON's responsible management of natural resources 
can preserve, protect, and conserve the natural environment while 
simultaneously reducing costs to the DON and enhancing our national 
security mission.
 Chemicals of Emerging Concern. Together with our partners, the 
Department is working hard to protect our people and communities from 
chemicals of emerging concern, such as PFAS. The DON's fiscal year 2024 
request includes $134 million to implement a comprehensive strategy to 
prevent, manage and address known or potential releases of PFAS at Navy 
and Marine Corps installations. This includes testing drinking water 
and identifying, evaluating, and addressing PFAS releases resulting 
from DON activities and replacing AFFF in our facilities and mobile 
assets. The DON, along with all of DOD, supports EPA's recent actions 
to propose a regulatory drinking water standard for PFAS that will 
apply to all public water systems once final. We understand that there 
is currently a public comment process on this proposed nationwide 
drinking water rule, and we look forward to the clarity that a final 
regulatory drinking water standard for PFAS will provide. In the 
interim, we are assessing the actions we can take to be prepared to 
incorporate EPA's final regulatory standard into our drinking water and 
cleanup programs, such as reviewing our existing data and conducting 
additional sampling where necessary. We understand that EPA expects to 
publish the final standard by the end of 2023. The Navy and Marine 
Corps are developing AFFF replacement plans that provide information on 
the locations and amounts of AFFF that will need to be replaced in 
facilities and mobile assets, as well as the contract vehicles that 
will be used, costs and schedules.
 climate action
 Scientists indicate that this is a decisive decade for climate 
action--indeed, it is a decisive decade for our military as well we 
face the pacing challenge of China and the dangerous transboundary 
threat of climate change. Climate change makes the world a more 
volatile place: it brings extreme weather events, more humanitarian 
crises, and heightened friction around essential natural resources. A 
more volatile world calls on the United States Navy and Marine Corps. 
These calls increase demands on our forces while simultaneously 
impacting the capacity to respond to those demands. This threat impacts 
not only where they are needed, but how and what drives the demand for 
operations. It is impacting the way our sailors and marines train, 
equip, and deter aggression. If they are called to do so, it will 
change how they fight and win.
 Climate Action 2030. For the Navy and Marine Corps, climate 
readiness is mission readiness. The DON is operating under Climate 
Action 2030 to create a force that can operate and succeed in any 
environment. We are focused on building resilience and reducing the 
national security threat of climate change, and we view climate 
readiness as a tactical, operational, and strategic enabler for our 
sailors and marines. To create a warfighting advantage, we are 
increasing the resilience of our bases and making our logistics chains, 
structures, power grids, fuel distribution systems and water lines more 
survivable. We are also leveraging science to seek innovative 
solutions, partnering with industry and other government entities, and 
investing responsibly to achieve mission readiness, jointly with our 
partners in Congress.
 Installation Resilience. Navy and Marine Corps installations are 
constantly challenged by natural hazards like extreme rainfall, 
drought, and coastal erosion. As directed by the Fiscal Year 2020 
National Defense Authorization Act, the Navy and Marine Corps are 
adding a resilience component to the master plans of major 
installations, leveraging the lessons learned from Parris Island and 
San Diego. The DON has also completed resilience studies on smaller 
installations such as the United States Naval Academy, where impacts 
from storm surges and high-tide flooding affect daily operations 
through closures of flooded roads, sidewalks, and building entry 
points. Because many naval installations are coastal by the nature of 
our service, sea level rise and extreme weather events have a direct 
and forceful impact on the Navy's and Marine Corps' infrastructure and 
installation operations. We are focused on applying updated standards 
in the Unified Facilities Criteria to our infrastructure, conducting 
training exercises and planning processes that harden and support quick 
recovery for our installations and facilities extreme weather events 
and energy disruptions.
 The DON's fiscal year 2024 budget request will increase the energy 
resilience of our installations by modernizing energy infrastructure, 
deploying microgrids, supporting electrification and the transition to 
zero-emission vehicles, increasing third-party financing capabilities, 
and making energy systems cyber-secure. The Navy and Marine Corps 
continue to leverage the Title 10 authorities granted by Congress to 
increase the energy and water reliability and resilience of our 
installations. We currently have $3.6 billion in awarded third-party 
financing contracts and ongoing efforts to replace and modernize 
failing critical infrastructure through third-party financing. By 
investing in state-of-the-art systems and modern infrastructure, the 
DON is positioning our installations to prevent, recover, and survive a 
prolonged loss of electrical service from natural or manmade events. We 
continue to test the energy security of our installations through 
Energy Resilience Readiness Exercises (ERREs), with six conducted in 
2022 at Naval Station Rota; Naval Air Station Kingsville, Naval Air 
Station Corpus Christi, Joint Base Charleston, Naval Magazine Indian 
Island and Marine Corps Air Station Miramar. Our fiscal year 2024 
budget includes funding to conduct at least five EREEs at installations 
across the world.
 We are also partnering with communities and State entities to 
reduce our climate impact and make our installations more climate-
resilient. In January 2023, the California Energy Commission approved 
nearly $2 million in funding for Navy Electric Vehicle Pilot Program 
and the Electrification Blueprint Studies for three Navy and three 
Marine Corps installations in California, which will generate cost 
savings, and mission and community success. In September 2022, Navy 
Region Southwest and the Port of San Diego signed an IGSA memorializing 
a first-of-its-kind partnership that will provide millions of dollars 
for further electrification efforts for both Naval Base San Diego and 
the Port of San Diego, and improve air quality and public health on and 
around the San Diego Bay Working Waterfront. As other states join 
California in adopting Low-Carbon Fuel Standards and other policies to 
transition to cleaner energy sources and reduce greenhouse gas, the 
Navy and Marine Corps will look for more opportunities to collaborate 
and work together to enhance our energy resilience as one community.
 Contested Logistics. Operating in a contested environment requires 
our shore installations and logistics enterprise to be completely 
integrated into the fight: a battlespace with persistent, agile, and 
flexible naval combatants. The Marine Corps' recently published 
Installation and Logistics 2030 is looking at sustaining the force in 
the 21st century, recognizing that the operating environment is 
contested across all domains and at global scale every day. The Marine 
Corps is making changes across the tactical, operational, and strategic 
levels, and we are also making installations ready for the contested 
environment with a focus on energy, utility, and climate resiliency, 
and the ability to recover rapidly after attack. The Navy continues to 
employ the principles of the Chief of Naval Operations' Navigation Plan 
2022, the Transforming Naval Logistics for Great Power Competition 
strategy and the Navy Global Strategy Ashore to enable and improve 
Fleet readiness, to transform logistics to better sustain the Fleet, 
and to sustain the momentum for evolving wartime support across the 
sustainment kill-chain, from the industrial base, the inter-theater, 
the intra-theater, and to the point of need.
 Operational Energy. Our Navy and Marine Corps operational forces 
need resilient and reliable energy in order to perform their mission. 
The DON's fiscal year 2024 budget continues DON's operational energy 
investments to target greater combat efficacy, Integrated Power/
Propulsion and energy storage, unmanned systems endurance and payload, 
and fuel distribution capabilities to support the operational 
requirements of Contested Logistics, Expeditionary Advanced Base 
Operations and Distributed Maritime Operations. Reflecting the 
challenges of contested logistics and guidance from the National 
Defense Strategy, the DON will ensure rigorous energy-informed 
requirements for new capabilities and then sustain those requirements 
throughout our acquisition decision-making. To make our operational 
forces more lethal and more effective, we are focused on extending the 
operational reach of current and future weapons systems through more-
effective use of energy; reducing energy consumption and external 
energy logistics requirements to forward deployed strike groups and 
expeditionary units; increasing energy resilience of forward bases, 
supply depots, and cooperative security locations; increasing the 
effective use, conversion, storage, distribution, and control of energy 
of our of future weapons and sensors onto platforms; and fostering an 
energy culture in our sailors and marines through policy, training, and 
education.
 DON's budget request invests more than $100 million on improving 
the energy efficiency of our existing operational platforms and 
propulsion systems, and this funding is targeted to gain capability and 
reduce logistics supply requirements for deployed forces through 
digital flight planning tools, aircraft drag reduction technologies and 
hybrid propulsion. We are also upgrading the fuel efficiency of the 
Marine Corps Medium Tactical Vehicle Replacement (MTVR) fleet, which 
will produce significant cost savings over the life of the MTVRs and 
improve combat effectiveness by reducing logistics requirements, 
increasing expeditionary capability and extending operational range. 
The fiscal year 2024 budget request also funds efforts to improve 
integration of weather and ocean forecasts into ship routing, ship 
response and propulsion efficiency planning, and Refueling at Sea 
logistics planning, as well as prediction of hazardous and extreme 
weather events and trends for climate adaptation, resilience, and 
mitigation.
 With an eye toward future operations, our fiscal year 2024 request 
supports the advanced mobility fuels program, which is responsible for 
the development and sustainment of qualification protocols, fuel 
testing, analysis and coordination between Navy, other DOD entities, 
industry, and international partners to qualify the use of Low Carbon 
Tactical Fuels for Navy aircraft and ships. This effort will position 
the Navy to procure low carbon tactical fuels, ensure operational 
flexibility, and take advantage of reductions in life-cycle greenhouse 
gas emissions without impacting platform performance or durability. The 
Navy is also funding the assessment, development, maturation, and 
transition of batteries and fuel cells, thermal management, and engine 
and airframe efficiency technologies to increase the mission capability 
of Naval aircraft; increasing range and payload capacity of unmanned 
aerial vehicles (UAVs) , significantly reduce time and cost to optimize 
power and thermal solutions to current aircraft, increase emergency 
capability, reduce total ownership costs and future non-recurring 
engineering costs for aircraft batteries, and increase aircraft range 
and time on station.
 Nature-Based Solutions and Sustainability. Together with new 
technology, we recognize the opportunity for nature-based solutions to 
enhance our resilience and mission readiness for training and 
operations. Our fiscal year 2024 budget request supports the 
development, planning, design, and execution of future environmental 
resilience projects including shoreline stabilization and erosion 
mitigations. As we pursue natural resources-based solutions to increase 
carbon sequestration, we are looking to address erosion and sea level 
rise through riverine and coastal shoreline restoration, to decrease 
wildland fire through habitat management and fuels reduction; and to 
increase water retention through vegetation enhancement/restoration and 
soil management conservation. The DON is also supporting the 
development of offshore wind energy, and we are committed finding 
solutions that support clean, efficient energy development for the 
community in a manner that is compatible with national defense 
requirements. To date, the DON has collaborated with BOEM and industry 
to advance offshore wind leases in support of potential renewable 
energy generation.
 As required by the Fiscal Year 2022 National Defense Authorization 
Act, the DON is conducting a pilot program to evaluate the use of 
sustainable building materials in military construction. Our fiscal 
year 2024 budget includes two net-zero building pilot projects, 
construction of a Child Development Center at Joint Expeditionary Base, 
Little Creek-Fort Story, and planning and design for the F-35 depot 
maintenance facility at Marine Corps Air Station Cherry Point. We have 
partnered with the other Services to develop consistent program 
criteria and evaluate state-of-the-art sustainable building material 
technologies and approaches for their implementation. We remain 
committed to achieving the best value for the taxpayer and see the use 
of sustainable building materials as a pathway to maximize resilience 
and cost-effectiveness.
 conclusion
 Thank you for your steadfast commitment to our sailors, marines, 
civilians and their families and for your purposeful focus on our 
fiscal year 2024 budget request. I look forward to our continued 
partnership and dialog as we work together to ensure the Navy and 
Marine Corps remain the world's greatest maritime fighting force.

 Senator Hirono. Thank you, Madam Secretary. Secretary 
Chaudhary. Am I pronouncing your name correctly?
 Dr. Chaudhary. Absolutely, Chairman.
 Senator Hirono. Thank you. Please proceed.

 STATEMENT OF THE HONORABLE RAVI I. CHAUDHARY, ASSISTANT 
 SECRETARY OF THE AIR FORCE FOR ENERGY, INSTALLATIONS, AND 
 ENVIRONMENT

 Dr. Chaudhary. Absolutely. Chairman Hirono, Ranking Member 
Sullivan, and distinguished Members of the Subcommittee, thank 
you for the opportunity to discuss the Department of the Air 
Force's Energy, Installations and Environment programs.
 In just the opening week since coming on board at the 
Department, I have seen countless examples of the dedication 
and devotion of our airmen and guardians, and I remain clear 
eyed on their support and devotion, and their families, and the 
critical missions they execute.
 In the Department of the Air Force, our installations are 
the platforms from which we project combat power. Nearly every 
DAF [Department of the Air Force] mission starts and ends on an 
installation. DAF installations also serve as key nodes in a 
global network that ensures Joint Force mission success around 
the world.
 For nearly 80 years, we have operated our installations 
with unprecedented freedom of action, yet our Nation faces 
complex security challenges, most notably the rise of great 
power competition with China and Russia. Today's reality is 
that our installations are no longer a sanctuary.
 We must ensure they are resilient and ready to deter 
aggression, and if that fails, be prepared to win decisively. 
In the face of these challenges, we prioritized our effort to 
deter aggressive competitors and their intent on shaping the 
security environment.
 To accomplish this, the DAF remains focused on seven 
operational imperatives, which includes ensuring resilient 
forward basing and bed down of critical weapons systems. In 
support of these imperatives, the DAF military construction 
program continues to prioritize our nuclear triad and combatant 
command infrastructure, including one of the largest 
investments in the Indo-Pacific and in Europe in 20 years.
 Furthermore, we remain ever committed to the quality of 
life of our servicemembers and their families through 
investments in housing, dormitories, and child development 
centers. Nothing is more important than the health and safety 
of our servicemembers and their families.
 As a former military member, myself, no issue is more 
personal than this one. My lived experiences on our 
installations over the course of 2 decades have served as 
anchors to my passion and commitment in this arena.
 On this month of the military child, I am committed to 
having our families' backs just as they have ours, with the 
largest investment in dormitories in over a decade, with more 
oversight in prioritized housing, and elimination of our 
backlog on CDC [child development center] projects, with 11 
more designs in the works.
 But there is more work to be done. We also fund highly 
innovative operational installation energy initiatives which 
increase our readiness and provide more combat capability as 
multiple energy sources that ruggedize our bases and reduce 
vulnerabilities.
 As a former Air Force pilot, I spent most of my career 
understanding one thing, energy is life. Learning to manage, 
conserve, and discharge energy in order to be decisive is 
critical to ensuring victory when needed.
 In this vein, I remain committed to accelerating our power 
projection capabilities and delivering operational energy at 
the point of effect for theater commanders. Like many of our 
airmen and guardians, I believe that operational and 
installation energy could prove to be the margin of victory in 
the Pacific if needed.
 In the DAF, we can no longer afford to move at the speed of 
Government. Rather, our airmen and guardians are moving at the 
speed of imagination with game changing technologies that will 
shape this decade and beyond. In the midst of great power 
competition, we recognize that this is an endeavor in which we 
dare not come in second place.
 As such, we appreciate the continued partnership and 
leadership from Congress to ensure Air and Space Forces are 
ready to deter aggression, and if called upon fly, fight, and 
win decisively. Thank you, and I look forward to your 
questions.
 [The prepared statement of Dr. Ravi I. Chaudhary follows:]

 Prepared Statement by Dr. Ravi I. Chaudhary
 introduction
 Chair Hirono, Ranking Member Sullivan, and distinguished Members of 
the Subcommittee, thank you for the opportunity to discuss Department 
of the Air Force (DAF) energy, installations, and environment programs.
 Our installations remain the platforms from which we enable and 
project combat power in and through the air and space domain. Every DAF 
mission starts and ends on an installation. We train and equip for 
joint operations, generate readiness, test new weapon systems, control 
and sustain air and space weapon systems, and provide safe, healthy 
communities for our airmen, guardians, and their families at our Air 
and Space Force installations. DAF installations also serve as key 
nodes in a global network of operating locations enabling Joint Force 
mission success around the world. Hence, the readiness, resiliency, and 
sustainability of installations are matters of strategic importance.
 For nearly 80 years, we have operated our installations with nearly 
unprecedented freedom of action. However, as the National Defense 
Strategy (NDS) clearly describes, the scope and scale of threats to the 
Homeland have fundamentally changed. Our Nation faces the nexus of 
complex challenges: the People's Republican of China's (PRC) 
increasingly aggressive endeavor to refashion on the Indo-Pacific and 
the international system; the acute threat posed by Russia; persistent 
threats such as North Korea, Iran, and VEOS; rapidly evolving domains 
and technologies that create complex escalating dynamics; competitor 
gray zone activities; and climate change and other transboundary 
challenges. We must ensure our installations are resilient, optimized, 
and operationally efficient to successfully defend the Homeland, paced 
to the growing multi-domain threat posed by the PRC; deter strategic 
attacks against the United States, our Allies, and our partners; deter 
aggression and be prepared to prevail in conflict when necessary; and 
build a resilient Joint Force and defense ecosystem. We recognize the 
foundational capability our installations provide in advancing these 
priorities through integrated deterrence, campaigning and building 
enduring advantages.
 In the face of these challenges, we made hard choices to prioritize 
efforts focused on integrated deterrence in an environment of shrinking 
advantage against aggressive competitors, operating in an evolving 
security environment. Last year, we began the transition required to 
meet our pacing challenge through a focus on seven operational 
imperatives. This year's budget reflects continued modernization 
efforts in a resilient, effective space order of battle; operationally 
optimized Advanced Battle Management System; achieving Moving Target 
Indication at scale; development and fielding of a Next Generation Air 
Dominance] family of-systems; cost-effective, resilient forward basing; 
global strike capabilities built around the B-21 Raider; and 
expeditious transition to a wartime posture.
 In support of these imperatives, the DAF Military Construction 
(MILCON) program continues to prioritize nuclear enterprise 
modernization and Combatant Command (CCMD) infrastructure support with 
an emphasis on the European and Pacific theaters. The Facilities 
Sustainment, Restoration and Modernization (FSRM) portfolio remains 
focused on sustaining our existing infrastructure. Furthermore, we 
preserve the well-being and quality of life of our servicemembers and 
their families through investments in housing, dormitories, and child 
development centers (CDCs). We also fund high return-on-investment 
operational energy initiatives, which increase our readiness and 
provide more combat capability for every gallon of fuel consumed--
``lethality per gallon.'' We remain committed to sustaining the DAF's 
power projection, enabling platforms, and searching for operational 
energy improvements to increase range and operational capability. We 
appreciate the continued partnership with Congress to ensure Air and 
Space Forces are well-postured to compete, deter, and win.
 operational energy
 We are pursuing policies, investments, and activities that increase 
our agility and ``lethality-per-gallon,'' while improving our ability 
to field and sustain a combat-credible force now and in the future. By 
reducing the energy demand of our aircraft, we can increase our range 
and time on-station, improve our fuel-offload capability, and boost 
engine performance. Diversifying energy sources also increases our 
capability. Current events in Ukraine highlight how energy can be used 
as a weapon and present significant logistical risk to the warfighter.
 As a critical enabler to our global mission, operational energy 
(aviation fuel) comprises over 80 percent of the $6 billion annual DAF 
energy bill. To remain ahead of our adversaries in a complex and ever-
changing battlespace, we continue to develop a more agile and optimized 
approach to generating sorties and providing airmen with fuel when and 
where they need it. Our fiscal year 2023 enacted budget provided $181 
million in funding for the research, development, acquisition, and 
operation of modern technologies, data analysis, and innovative process 
improvements that will enhance our combat capability and mitigate 
operational risk to the warfighter.
Optimal Operations Planning and Data Collection
 We continue to collaborate with stakeholders across the DOD and 
industry to implement efficiency best practices, support modernized 
information systems and software applications, and collect and analyze 
data to optimize mission planning and execution, enable decision 
advantage, and maximize combat capability. Our data analysis 
capabilities and technologies facilitate greater visibility into Air 
Force aviation fuel use, increase stakeholder collaboration, and have 
uncovered numerous opportunities to optimize aircraft operations. We 
can now assess how energy optimization affects combat capability in 
warfighting scenarios. We have demonstrated that employing more 
efficient air refueling assets not only decreases fuel demand and 
sortie requirements, but also enables greater fuel offload. In some 
cases, the benefit to the warfighter overall may even double the 
efficiency improvement to tankers operations and enable greater 
mobility capacity to support force generation and critical deployment 
timelines.
 We invested in 21st century planning software to optimize how we 
schedule aircrew to optimize readiness and allocate aircraft to best 
accomplish mission requirements. Puckboard, a real-time collaborative 
squadron operations platform, provides scheduling capability to aircrew 
anywhere in the world, on or off the DOD network, and is now available 
to over 24,000 servicemembers and 550 organizations, and counting. 
Puckboard integrates digital forms with programs of record and aims to 
increase training events accomplished per sortie through its AI Solver. 
Additionally, we continue to enhance the tanker planning tool Jigsaw 
with optimization and auto-planning features, further streamlining 
aerial refueling schedules and reducing planning process times for the 
Air & Space Operations Center weapon system. The automation capability 
will reduce planning time to seconds or minutes rather than hours and 
increase scheduling efficiency by at least 10 percent over the 
baseline. This is equivalent to supplying fuel to approximately 250 
aircraft with 5 fewer tankers, enabling crew reallocation and saving 
approximately 400,000 gallons of fuel per week.
 We are also working to optimize cargo loading and planning of 
global airlift missions with partners in Air Mobility Command and the 
Air Force Institute of Technology. By better utilizing allowable cargo 
space, the DAF can use fewer aircraft, and therefore use less fuel, to 
accomplish the same mission. For example, we are working with Air Force 
Research Laboratory's Future Force Energy and Power Office to build and 
test the Vertical Stacking Pallet prototype, an airmen-developed 
technology that allows cargo to be stacked vertically within mobility 
aircraft, enabling more efficient use of cargo space. The DAF is also 
funding Aerial Port of the Future, a suite of mobile applications and 
technology improvements to legacy systems supporting aerial ports and 
the Global Air Mission Support System.
 Furthermore, as part of our effort to streamline operations and 
increase aircraft range and capability, Air Mobility Command 
Headquarters launched the Mission Execution Excellence Program (MEEP), 
a pilot program to incentivize optimized flying on the largest fuel 
consumers in the Air Force, heavy mobility aircraft. MEEP encourages 
airmen to increase their use of efficient flying best practices through 
direct and indirect incentives--and importantly, does not negatively 
impact mission and training requirements. In fact, initial estimates 
show that employing MEEP can improve energy intensity--or the mission 
effectiveness per gallon of fuel--by 3 percent. Based on performance 
during the 2022 pilot phase, the two participating MEEP C-17 wings are 
on track to reduce fuel consumption by over one million gallons per 
year.
 Finally, under the authority provided by Congress in Title 10 USC 
2912, the DAF is implementing the Operational Energy Savings Account 
(OESA) program to further incentivize energy-aware behavior and 
processes. By documenting fuel savings from previous operational energy 
initiatives, the OESA program allows those funds to be re-invested in 
other optimization efforts making it a self-sustaining program. In 2021 
and 2022, we recovered $24 million in fuel cost savings derived from C-
17 and C-5 operational efficiencies and tanker planning in the 
USCENTCOM AOR. We fully implemented the OESA program in 2022, funding a 
multiple-MAJCOM virtual reality aircraft maintenance training effort 
and delivering electric aircraft positioners to support Air Force 
Special Operations Command operations.
Weapon System Sustainment
 We depend on the readiness of our weapon systems to maintain global 
reach and power. Through partnerships with the aviation and commercial 
industries, we identify innovative solutions to modernize legacy 
aircraft and weapon systems while maintaining our lethality. By 
leveraging infrared imaging and laser scanning methods of engine 
compressor blades for the inspection and rework of engine components, 
paired with innovative coatings of engine compressor blades, we are 
ensuring overhauled legacy engines deliver optimized engine performance 
for the DAF. The commercial aviation industry is realizing fuel savings 
of 2 to 4 percent for the combined execution of these processes. Our 
updated nucleated foam engine washing pilot programs provide 
significant operational impacts and energy consumption efficiencies.
 Specifically, the Air Force Special Operations Command CV-22 and 
AC-130J programs return impressive benefits including longer engine 
life, improved performance, and decreased maintenance requirements. We 
are expanding this pilot program to KC-135s and C-17s to explore added 
benefits to the DOD's two largest aviation fuel consumers. 
Additionally, we added detergent to our existing engine water wash 
contracts for B-52, C-5, E-3, and KC-135 fleets with additional 
analysis needed to compare the multiple programs to inform future 
decisions.
Fuel Logistics and Alternative Fuels
 We remain engaged with commercial stakeholders such as the 
Commercial Aviation Alternative Fuels Initiative, International Civil 
Aviation Organization, our Operational Equipment Manufacturer (OEM), 
and other government agencies, to maintain awareness of the research, 
development, testing, certification, and commercialization of ``drop-
in'' alternative aviation fuel in the ASTM International approval 
process. We continue to team with DOD and Air Force stakeholders, such 
as the Defense Logistics Agency-Energy, Air Force Petroleum Office, Air 
Force Research Laboratory, and Air Staff, as well as international 
allies and partners, to monitor alternative fuel production, pricing, 
and commercial use to better position the DAF to support changes in the 
defense alternative fuels strategy and provide operational flexibility 
based on fuel availability in specific regions and circumstances. 
Additionally, we leverage our research and analysis to better identify 
logistical gaps and propose resiliency improvements to the jet fuel 
supply chain in energy-constrained environments.
Energy-Informed Wargaming
 Through wargaming and analysis, we analyze how fuels and energy 
logistics support requirements could affect combat operations in an 
evolving threat environment. Realistically addressing operational 
energy challenges helps inform leadership decisions essential to 
achieving desired levels of lethality, readiness, and interoperability. 
Results from the Air Force's Global Engagement and Long Duration 
Logistics Wargames and Joint Forces Energy Wargame highlighted the 
criticality of energy distribution infrastructure and the necessity for 
energy planning across all phases of an operation. Joint-service 
wargames such as these allow participants to analyze the jet fuel 
supply network in an energy-constrained environment and reduce 
operational risk to joint logistics.
 Through modeling and simulation tools, we increased our awareness 
of future energy requirements and the potential for fuel supply gaps, 
disruptions, and adversarial threats. We continue to develop methods to 
analyze our strategic energy posture and the unique challenges in the 
Western Pacific and European theaters to inform infrastructure and 
capability investments to enhance operational readiness.
Acquisitions and Capability Development
 We work closely with the Air Force Research Laboratory and Defense 
Innovation Unit to push the technology envelope and help advance key 
disruptive technologies to maximize operational energy efficiency and 
outpace our competitors. We help guide acquisition policy to address 
operational energy requirements associated with new platforms and major 
modification programs through the Energy Key Performance Parameter and 
Energy Supportability Analysis. We also play an active role in the 
capability development process, which helps ensure future systems will 
not only be optimized for energy considerations, but also will be 
sustainable in their intended operational environments.
 We have invested in and advocated for several technologies and 
platforms that increase range or endurance and optimize fuel use for 
numerous critical missions. For example, drag reduction initiatives on 
legacy aircraft include C-17 Microvanes, KC-135 Vertical Wipers, C-17 
and KC-135 Active Winglets, and C-17 Engine Pylon Fairings, among 
others. Together, these technologies equate to improved aircraft range 
and capability, reduced greenhouse gas emissions, and tens of millions 
of dollars' worth of fuel cost savings.
 One of the most impactful projects the DAF is exploring is the 
transformational design of blended wing body (BWB) aircraft, which is 
expected to increase fuel efficiency of large aircraft by 30 percent 
(with today's engines). For an aerial tanker, this can equate to nearly 
a doubling of mission radius at a given fuel offload, or a doubling of 
offload at a given radius. This platform demonstration project aims to 
accelerate future flexibility for tanker, cargo, and bomber fleets 
while leveraging significant private capital to maximize DOD return on 
investment. The project aims to complete the first flight of a full-
scale BWB aircraft by December 2026 and completion of initial flight 
testing by September 2027.
 space force
 We established the United States Space Force as a lean, agile, and 
mission-focused military Service, relying on the United States Air 
Force for infrastructure, logistics, security, medical services, and a 
host of other support functions at our Space Force installations. 
Formal agreements, directives and instructions codify stakeholder roles 
and responsibilities for support to the mission, and to the guardians, 
airmen, civilians, and their families that work and live on Space Force 
installations.
 Most of the combat-ready space forces that we field are ``Deployed-
in-Place'', meaning they execute Combatant Command missions from their 
home station. Mission-ready, resilient installations and facilities are 
absolutely integral to our readiness and effectiveness.
 In fiscal year 2022, the Space Force received, prioritized, and 
obligated our first independent appropriation for Facility, 
Sustainment, Restoration and Modernization (FSRM) funding. The 
Department of the Air Force provides an allotment of military 
Construction (MILCON) funding to the Space Force based on the Space 
Force's portion of the total plant replacement value. This approach 
provides flexibility to resolve resource challenges due to the Space 
Force's prioritization of requirements as a new, independent Service. 
We prioritize projects to reduce risk to mission by addressing energy 
redundancy and resilience, physical security, and risk to force through 
quality-of-life requirements such as dormitories and child development 
centers.
 installations
 We advance our commitment to optimizing installation investment 
through implementing the Infrastructure Investment Strategy (I2S), 
increasing senior leader oversight of the portfolio, and pursuing 
reforms within our MILCON program. First introduced in 2019, the I2S is 
the Department's long-term strategy to cost-effectively modernize and 
restore infrastructure readiness, improve the resiliency of mission-
critical nodes, and drive innovative installation management practices. 
We are refining and refreshing our strategy and expect to complete an 
update by late 2023.
 We oversee I2S implementation efforts through recurring 
Infrastructure Councils and Infrastructure Program Management Reviews 
to assess resourcing and asset management practices on infrastructure 
readiness. The Council developed a series of metrics that quantify the 
impact of I2S policies and investment decisions on infrastructure 
condition, facility space use, and MILCON cost growth. Regular 
assessments of the I2S allow senior leaders to make timely decisions, 
which affect program execution and future budget decisions.
Military Construction
 The DAF's $3.08 billion fiscal year 2024 MILCON program request 
supports the National Defense Strategy's investment priorities by 
focusing on our pacing competitor in the Indo-Pacific theater, the 
acute threat posed by Russia, as well as new weapon system beddowns, 
and taking care of our airmen, guardians, and their families, 
caregivers, and survivors. Approximately 36 percent of the program, 
$1.08 billion, directly supports combatant commanders and their most 
critical requirements and aligns with the National Defense Strategy to 
Build a More Lethal Force, while directly Prioritizing Preparedness for 
War. These funds will be used for airfield and maintenance capability 
expansion projects in Guam, the Philippines, Australia, Tinian, Japan, 
and Alaska, munitions and equipment storage in Norway, Spain, and the 
United Kingdom, Weapons Generation Facilities in Louisiana and South 
Dakota, and a space communications facility in Florida. Approximately 
34 percent of the program, $1.05 billion, supports New Weapon Systems 
to ensure the DAF remains the world's premier Air and Space Force. 
These systems include the Sentinel Ground Based Strategic Deterrent, B-
21 bomber, KC-46 refueler, F-35 fighter, T-7A training aircraft, and 
the E-11A Battlefield Airborne Communications Node aircraft.
 Balanced with combatant command priorities and new mission 
beddowns, our MILCON program also recapitalizes facilities that have 
outlived their useable life or no longer meet mission requirements. 
Approximately 10 percent of the request, $320 million, funds current 
mission projects, focusing on the most critical recapitalization of 
existing infrastructure. The funding request includes a new dormitory 
in the United Kingdom, Child Development Centers in Massachusetts and 
Texas, installation gate projects in Florida, and a variety of others 
in Guam, Arizona, Colorado, Indiana, Oregon, and Texas.
 Planning and Design (P&D) remains a central focus of the DAF 
program to reinforce program stability and consistency. Sufficient P&D 
enables projects to progress rapidly through design and meet maturity 
criteria for admissibility into the program, provides more accurate 
cost estimates, and maximizes the opportunity to award projects in the 
year of appropriation. Without sufficient P&D, the Air Force must award 
designs by design phase, adding risk associated with costs and timely 
delivery of design. The fiscal year 2024 P&D request is $482.7 million, 
which is larger than normal in order to develop a robust Space Force 
P&D program ($90.3 million of the request) and includes weapons system 
specific P&D supporting B-21, Over the Horizon Radar, Sentinel, and 
other programs. Finally, the request includes $137.8 million for 
Unspecified Minor Military Construction projects to allow us to address 
lower cost and emergent requirements.
Sentinel Program
 The Minuteman III intercontinental ballistic missile (ICBM), first 
deployed in 1970, is the world's oldest land-based strategic missile 
system. The Sentinel program will recapitalize the Minuteman III ICBM 
system to ensure the continued safety, security, and reliability of 
Nation's ICBM force for the foreseeable future. We are investing in 
facilities supporting 450 missile Launch Facilities and supporting 
infrastructure across three Wings in five states. The Minuteman III-to-
Sentinel conversion must occur on a precise timeline to maintain the 
operational readiness of the nuclear deterrent and deliver Full 
Operational Capability to the warfighter in the 2030's. The fiscal year 
2024 budget request continues to support the Sentinel program to ensure 
construction remains on schedule and aligned with weapons system 
deployment milestones. The request includes $140 million in funding for 
projects at F.E. Warren AFB, Wyoming.
Natural Disaster Recovery Efforts
 The Natural Disaster Recovery (NDR) program Planning and Design 
(P&D) efforts are substantially complete and by the end of September 
2023 it will have awarded and started construction on most projects 
included in the program. The DAF will make use of the $360 million 
Congress provided in fiscal year 2023 to address inflationary and 
supply chain cost increases in our NDR program. In calendar year 2022, 
we awarded 28 projects, totaling $2 billion. To date, we awarded 84 
percent of the NDR program, totaling over $3 billion of investments to 
improve mission readiness, resilience, and efficiency at Tyndall AFB, 
FL and Offutt AFB, NE.
Facility Sustainment, Restoration, and Modernization (FSRM)
 We view the FSRM and MILCON programs as interdependent; together, 
these two funding streams serve as the foundation of sustainable DAF 
installations. FSRM provides a non-MILCON pathway to repair facilities 
and infrastructure, maximizing their lifespan. The fiscal year 2024 
request includes $5.37 billion in FSRM funding. Of that $5.37 billion, 
the Space Force requested $679 million. The large increase in fiscal 
year 2024 will fund the repair of a Pittufik SpaceBase (formerly Thule 
Air Base) that powers the Missile Warning and Missile Defense weapons 
systems and electrical distribution projects supporting both the 
Eastern and Western Space launch ranges.
 Our priority for FSRM continues to be sustaining our existing 
infrastructure with increased emphasis on quality-of-life projects 
(i.e. dormitories, CDCs) and our operational and training 
infrastructure. In order to maximize the near-term impact of current 
funding levels, the Air Force continues to assess mission threat 
vulnerabilities and prioritize infrastructure repair requirements which 
directly affect an installation's primary mission. Our I2S drove 
changes in how we execute FSRM funding distributed directly to 
installations (considered decentralized FSRM), empowering Commanders to 
make the right local investment decisions, including day-to-day 
maintenance and smaller scale repair and sustainment projects, based on 
mission requirements and I2S guidance.
Child Development Centers and Dorms
 We strive to provide a high quality of life for our members and 
their families, and at the heart of that goal is affordable, accessible 
childcare for our airmen and guardians and safe, high-quality dorms for 
our unaccompanied members. The DAF is using a two-prong programmatic 
approach to improve CDCs: targeted investments in FSRM to address 
facility condition concerns and posturing MILCON projects to increase 
capacity. In fiscal year 2023, we are spending $7.6 million in FSRM 
funding on four CDC projects, and in fiscal year 2024 we intend to 
commit $44 million in FRSM funds for CDC requirements. The fiscal year 
2024 MILCON program request includes $37 million for the CDC at Hanscom 
AFB and a $20 million to complete the CDC at Joint Base San Antonio-
Lackland. Generous congressional support in fiscal year 2022 and fiscal 
year 2023 funded all CDC MILCON projects currently at an executable 
design stage, and the DAF is actively working the design of additional 
CDC projects for inclusion in future President's Budget requests. The 
Child and Youth Facility Master Plan facilitates project advocacy by 
identifying CDC MILCON and FSRM projects that address child and youth 
facility condition and capacity challenges. The 21 projects currently 
in work (9 funded for construction, and 12 funded for planning and 
design) will increase capacity by approximately 2,500.
 Equally important to us is providing unaccompanied servicemembers 
high quality housing in our dormitory campuses. Commanders' 
responsibilities include protecting the health and safety of 
unaccompanied airmen and guardians. It is their responsibility to 
enforce inspection criteria to identify and report conditions requiring 
immediate and future maintenance. Funded from the DAF FSRM account, the 
investment strategy for dormitories focuses on sustainment, 
restoration, and modernization of these facilities. While 99.6 percent 
of permanent party beds assessed as ``adequate'' in fiscal year 2023, 
the DAF has planned $342 million for 53 projects in fiscal year 2023 
and $368 million for 39 projects in fiscal year 2024 to repair and 
improve dormitory facilities. This level of investment is a significant 
increase of over dormitory investments in recent years. The DAF 
investment strategy for unaccompanied housing focuses on restoration 
and modernization of dorms in their existing configurations with FSRM 
funds, which allows MILCON funds to address capacity shortfalls and 
facility recapitalization. The fiscal year 2024 MILCON request also 
includes $50 million for a new dorm at RAF Lakenheath in the United 
Kingdom.
DAF Basing
 Our strategic basing process integrates strategic planning, 
resource allocation, and installation platforms to optimize basing of 
individual missions while ensuring overall strategic posture for 
readiness and power projection. Total Force synchronization enhances 
posture in basing of flying and non-flying missions while guaranteeing 
training, readiness, and operational capabilities to COCOMs. With 
tiered authorities, DAF leadership is engaged at key decision nodes to 
align actions with the NDS, while notifying Congress at significant 
decision points.
 We appreciate congressional interest and legislative language 
supporting Military Family Readiness, to include the fiscal year 2023 
additions of healthcare and housing, alongside the existing licensure 
portability in making certain basing decisions. This focus affirms the 
central importance of families and caregivers as a key aspect in 
recruitment and retention, as they reside in the very same communities 
which support our installations. Additional engagement by states and 
localities continues to be a critical facet for providing adequate and 
accessible healthcare and housing, while also bolstering against 
encroachment around installations, airfields, and ranges.
Housing, Construction, Operation and Maintenance
 The DAF Housing program provides for housing construction, planning 
and design, and operations and maintenance (O&M) while focusing on 
eliminating inadequate housing from the DAF inventory and correcting 
health and safety deficiencies. In addition to enabling planning 
studies, design for future construction projects, renovation of 
existing DAF-owned homes, the military family housing construction 
program also supports the restructure of privatized housing projects.
 Our military family housing O&M program sustains, improves, and 
modernizes our inventory of approximately 15,200 DAF-owned family 
housing units and provides enhanced oversight of over 52,000 privatized 
homes. However, the high cost of construction requires solutions within 
the DAF family housing construction program to achieve the full scope 
of other projects. Combined, the family housing O&M and construction 
programs will ensure continued support for the housing needs of airmen, 
guardians, their families and caregivers, as well as our Army, Navy, 
and Marine Corps teammates living in DAF-owned and privatized family 
housing.
Privatized Family Housing
 Quality, affordable housing has a direct correlation to 
recruitment, retention, and readiness. Hence, we remain focused on 
improved oversight, long-term financial health, and sustainment of the 
housing inventory. We are committed to ensuring Military Housing 
Privatization Initiative (MHPI) projects provide safe, quality, and 
well-maintained housing where military members and their families and 
caregivers will want and choose to live.
 We continue our efforts to improve our privatized housing portfolio 
and address the remaining elements of the MHPI reforms set out in the 
fiscal year 2020-23 National Defense Authorization Acts (NDAA). We made 
significant progress to implement reforms to enhance our oversight of 
privatized housing and hold MHPI companies accountable for providing 
quality housing. Specifically, several congressionally mandated NDAA 
provisions were implemented throughout various DAF housing programs 
including:

 Fiscal Year 2020 NDAA Section 3011: We collaborated with 
the private-sector MHPI companies to universally agree to adopt 18 
rights set out in the MHPI Tenant Bill of Rights. All but two companies 
have either implemented or agreed to implement all 18 of these rights. 
While the remaining two companies do not yet provide the MHPI Tenant 
Rights to dispute resolution, or rent segregation, these projects 
remain fully compliant with their project legal agreements with the 
DAF. As Congress has recognized, applying many of the Tenant Rights at 
existing MHPI housing projects requires voluntary agreement by the MHPI 
companies. The DAF continues to seek voluntary agreement of the 
remaining two MHPI companies by working to resolve their remaining 
concerns and achieve their full implementation of all 18 Tenant Rights 
at their MHPI projects at the following installations: Joint Base 
Elmendorf Richardson, Alaska and Wright Patterson AFB, Ohio.

 Fiscal Year 2020 NDAA Section 3036: We implemented the 
amended section 606 payments to MHPI Projects to focus on the most 
urgent needs of underfunded MHPI projects and ensure the projects 
invest these funds appropriately to safeguard long-term project 
viability.

 Fiscal Year 2020 NDAA Section 3051: We began the process 
to complete standardized privatized housing and Government-owned 
housing inspections and assessments at all locations, using DOD's 
uniform housing standards, completing inspections at 15 installations 
in calendar year 2022.

 Fiscal Year 2022 NDAA Section 2813: We verified the 
appropriate application of Disability Laws and Collection of 
Modification Costs requirements are documented in existing MHPI 
projects' transaction documents. These requirements ensure the projects 
make reasonable accommodations for any resident with a disability.

 In 2020, we added 218 Government positions across the privatized 
housing program, increased inspections, provided additional training to 
housing personnel, and revamped housing governance. We continue to 
maintain Resident Councils for two-way communication between the 
residents and installation and project owner leadership. We then 
utilize feedback from tenant satisfaction surveys to develop action 
plans for improving the residents' experiences and encourage our airmen 
and guardians, and their families to engage with Resident Advocates to 
help resolve any disputes and improve communications among all relevant 
DAF stakeholders.
 We also expanded our metrics for assessing the health of the 
privatized housing portfolio, particularly with regards to resident 
satisfaction, maintenance quality and responsiveness, and property 
management operations. Most of our private partners meet or exceed DAF 
standards as prescribed in our metrics. However, when we identify 
concerns with operational performance, we have placed a small number of 
private partners on Community Action Plans, or if more systemic, on 
Performance Improvement Plans with milestones and schedules. The goal 
is to remedy deficiencies and ensure our military families receive 
quality service and housing.
 Some privatized housing projects require financial restructuring to 
remain financially stable and market-comparable. The restructure goals 
are to ensure the projects can fully fund operational expenses, debt 
servicing, and sustainment of the homes for the life of the lease as 
well as fund reinvestment needs during the mid-term reinvestment 
period. The Fiscal Year 2024 President's Budget includes $220.0 million 
to financially restructure three MHPI projects, spanning 11 project 
locations (Air Force).
Community Partnerships as a Solution for Infrastructure Divestment and 
 Management
 We apply commercial best practices and innovative solutions to base 
infrastructure asset management through creative partnerships that (1) 
monetize underutilized/non-excess land and buildings; (2) enable 
proactive divestment and disposition strategies to offset required 
recapitalization of mission critical assets; and, (3) decrease or 
eliminate the risk and total cost of ownership of asset classes that 
are common to defense communities, State and local government, or 
private industry. Noteworthy examples of this capital investment 
strategy are:

 Edwards Air Force Base Solar Enhanced Use Lease: Out-
leased 2,600 acres of underutilized/non-excess land, providing 464 
megawatts (MW) of energy to the California Grid, 3,287 MWh of battery 
storage capability, 320,000 tons per year of CO2 reduction, and 
generating $75.8 million in In-Kind consideration for the base to 
offset unfunded operational and capital requirements.

 Fairchild Air Force Base Joint Use Indoor Firing Range: 
Entered into a historic first-of-its-kind IGSA with Spokane County, WA 
to obtain exclusive access to a new state-of-the-art firing range 
funded, constructed, owned, and operated by the county. This enables 
active, reserve, and guard forces at Fairchild to complete small arms 
training, qualification and proficiency firing requirements at an 
average estimated annual savings of $1 million over a 10-year contract.

 Joint Base Cape Cod Water/Wastewater Utility Systems 
Exchange. We executed a first-of-its-kind exchange agreement which will 
divest water and wastewater utility systems owned by the Air Force and 
operated by the Massachusetts Air National Guard, 102d Intelligence 
Wing (102d IW) to a private utility operator in exchange for 
construction of facilities of equal or greater value than the FMV of 
the divested assets. This innovative approach will support missions on 
the base more affordably with long-term price certainty and provide the 
102d IW with up to $60 million of cost avoidance of future capital 
investment.

 One of the most cost-effective partnership programs for encouraging 
compatible use around our installations, airfields and ranges is the 
Office of the Secretary of Defense managed Readiness Environmental 
Protection Integration (REPI). Program. The Department of the Air Force 
has used REPI effectively to safeguard our missions by improving 
installation resilience to extreme weather events and climactic 
changes, promoting compatible land use, and preserving critical 
habitats and natural resources near our installations and ranges. For 
every dollar committed by the REPI program outside partners provide a 
nearly equal match. Since fiscal year 2002, the REPI program has 
contributed $105 million, the Department of Air Force $30 million and 
partners $138 million to protect 134,000 acres outside of our 
Department of Air Force installations and ranges.
Installation Resilience
 Our Installation Energy Program focuses on ensuring Air and Space 
Force installations are truly resilient to the broad range of threats 
from adversaries, changing climate, and cyber-attacks. We define 
resilience within the ``5 Rs'' of robustness, redundancy, 
resourcefulness, response, and recovery. Installation Energy Plans 
apply the ``5Rs'' to assess gaps and prioritize energy, water, and 
climate projects to ensure mission readiness. The ``5Rs'' help describe 
how a system is prepared for crises using the preventative attributes 
of robustness, redundancy, and resourcefulness, as well as how the 
system functions during crises using the performance attributes of 
response and recovery.
 Adversarial threats and natural hazards pose a growing risk for 
prolonged power outages for installations. Using a mission thread 
perspective, we are working to identify key nodes on and off 
installations that, in a denial-of-service scenario, may result in a 
significant impact on our ability to deliver key capabilities. A 
comprehensive understanding of mission requirements, current system 
operations, accurate reporting, and historical outage data assist in 
identifying possible service vulnerabilities. We strive to mitigate 
operational impacts from disruptions to energy and water through 
increasing investment in and improving maintenance of energy systems.
Enhancing Energy and Water Resilience
 Reliable access to sufficient, quality power and water enables our 
operational and training missions. We view energy and water as 
essential and linked resources; our energy initiatives consider both. 
Our vision of ``Mission Assurance through Energy and Water Assurance'' 
focuses on sustaining warfighting capabilities, while simultaneously 
optimizing resource use through enhanced planning, technology, and 
process improvements. We assess near and long-term energy and water 
needs based on resilience, cost considerations, and the opportunity to 
leverage clean sources.
 We conduct Energy Resilience Readiness Exercises (ERREs) to help 
installations assess mission readiness during a controlled denial of 
service. Under an ERRE, also referred to as ``pull-the-plug'' or 
``black start'' exercise, an installation intentionally shuts down its 
primary power for 8 to 12 hours to test its onsite backup power systems 
and identify how infrastructure and mission interdependencies might 
play out during a denial of service. ERREs serve as a cornerstone of 
both mission and energy assurance efforts across the DAF by actively 
testing key enabling systems under ``blue sky'' conditions to identify 
gaps in energy, water, and mission capabilities. In 2022, we conducted 
ERREs at seven installations, including its largest regional exercise, 
to bring the total number of ERREs conducted to 13. This large-scale 
regional exercise was conducted at three Space Force installations in 
Colorado. It uncovered valuable lessons learned for each individual 
installation as well as insights regarding inter-installation 
capabilities for USSF. Looking ahead, we will continue to execute five 
ERREs per fiscal year through at least fiscal year 2027.
 Our installations are increasingly automated with interconnected 
control systems that, when vulnerable, open our multi-domain operations 
to adversarial cyber threats. In compliance with the fiscal year 2017 
NDAA Section 1650, we completed assessments of DAF critical 
infrastructure to identify vulnerabilities. These assessments exposed 
risks to missions we unknowingly accepted, and validated the mitigation 
measures we are already pursuing to increase control systems' 
cybersecurity and resiliency. In March 2021, we published our DAF 
Strategic Plan for Control Systems detailing a unified and enduring 
approach to protecting and defending these control systems which assure 
our critical infrastructure and mission capabilities.
 Per the Fiscal Year 2022 NDAA (Section 2833), we completed the 
military installation resilience component of a master plan, known as 
an Installation Climate Resilience Plan, at two installations in 
calendar year 2022: Vandenberg Space Force Base and Joint Base Langley-
Eustis.
Managing Water Resources
 We are placing greater emphasis on water resilience, recognizing 
that water resources are finite, yet essential to sustained mission 
capabilities. Water availability faces many threats, including aging 
infrastructure, scarcity, malicious attacks, natural hazards, changes 
in climate, rising costs of supply, quality issues, and encroachment. 
We take a risk-based approach to water management and links water 
security directly to mission assurance.
 Current water initiatives include increasing transparency into 
mission needs and readiness, comprehensively identifying and assessing 
water risks, expanding external stakeholder engagement, analyzing 
capability gaps, and developing mitigation strategies. We created an 
Installation Water Dashboard, an interactive data repository for all 
installations including Active, Guard, and Reserve to streamline water 
data and reporting to support our goal of determining water 
vulnerabilities and aid future water resilience planning. The Dashboard 
enhances our efforts to support mission assurance for all 
installations.
Conducting Installation Energy and Water Planning
 Installation Energy Plans (IEPs) utilize a standardized framework 
based on the ``5Rs'' to integrate strategic guidance, plans, and 
policies into a holistic roadmap for each installation to advance 
mission critical energy and water goals. Through 2022, we completed 70 
Installation Energy Plans, including 49 at our priority installations 
and the top 75 percent of energy-consuming installations. These plans 
resulted in developing over 150 resilience initiatives to address 
installation energy and water vulnerabilities identified through ERREs, 
and mission thread analyses. By June 2023, we will complete IEPs at all 
U.S. priority installations and the top 75 percent of energy-consuming 
installations. The IEPs will result in improved installation energy and 
water resilience.
Financing Energy and Water Infrastructure
 The DAF Installation Energy Program does not have a dedicated 
budget line; rather, it relies on direct investment, third-party 
financing, and innovative funding solutions. Direct investment 
typically comes from FSRM, MILCON, or the Energy Resilience and 
Conservation Investment Fund (ERCIP). Third-party financing and other 
contracts include vehicles such as Energy Savings Performance Contracts 
(ESPCs), Utility Energy Service Contracts (UESCs), and Utilities 
Privatization contracts (UP).
 We shifted the focus of our installation energy program from being 
solely concentrated on conservation to incorporating solutions for 
achieving resilience. This mission-focused, climate-informed approach 
is evident in our efforts to leverage the authorities provided by 
Congress to use ERCIP funds on third-party financed projects. For 
example, we are using ERCIP funds at Vandenberg Space Force Base to 
develop a microgrid with battery storage. The energy will be provided 
through a solar power purchase agreement and the commercial grid.
Resilient, Innovative Infrastructure
 We are implementing innovative solutions to build energy efficient 
and resilient systems for the installations of the future. These 
efforts include pilots to accomplish 100 percent carbon-pollution free 
electricity and 100 percent zero emission non-tactical vehicles by 
fiscal years 2030 and 2035, respectively; exploring alternative energy 
opportunities through nuclear, geothermal, and solar energy means; and 
changing the overall DAF approach for future energy initiatives. We are 
exploring pilot projects that will utilize new or non-traditional 
design and construction practices to construct hyper-efficient 
facilities. Efficient design and construction practices include passive 
heating and cooling, super-efficient HVAC systems, air and ground 
source heat pumps, tight and efficient building envelopes. These 
initiatives will reduce energy consumption and free up resources for 
operational imperatives.
 Additionally, we identified Eielson Air Force Base, AK as the 
preferred location for our first nuclear micro-reactor pilot site due 
to the base's existing infrastructure, arctic location, and critical 
mission resilience requirement. We are working with DLA-Energy to 
execute a firm-fixed price power purchase agreement under 10 U.S.C 
2922a with a third-party developer. The developer will own, operate, 
and maintain the microreactor and deliver zero emission electricity on 
Air Force property in exchange for long-term purchase of the generated 
energy. The DAF and DLA released a formal request for proposal in 
September 2022 to attract the best possible commercial partner for this 
project. Once completed, the first of its kind micro-reactor at Eielson 
AFB is expected to produce 1 to 5 MWs of energy to supplement current 
installation energy sources as a redundant resilience measure, which 
will help ensure mission critical infrastructure is protected against 
physical and cyber security threats. We work closely with Alaskan 
State, local and Tribal Nation leaders as it aims to reach full 
operational capability by 2027.
 We seek to leverage geothermal technological innovation from the 
industry to meet installation electricity needs at Mountain Home AFB in 
southwest Idaho and Joint Base San Antonio in southcentral Texas. We 
are working with the Defense Innovation Unit to administer a 
competitive down-selection process for a geothermal pilot under a sole-
source, follow-on contract vehicle to support our intent to implement 
the technology at other locations across the enterprise.
 Finally, with more than 60,000 vehicular assets across 
installations, we need to be prepared for changes in the direction of 
the commercial market to ensure we continue to have access to the tools 
and equipment we need for our mission. As the industry transitions to 
electric vehicles, we look at fleet electrification as an opportunity 
to improve resiliency, decrease operation and maintenance costs, and 
embrace cutting edge technologies. In 2021, we identified Joint Base 
Andrews and Joint Base McGuire-Dix-Lakehurst as pilots for the use of 
electric vehicle technology. In 2022, we identified an additional 16 
installations for the next phase of the pilot. We are incorporating 
lessons learned from different geographies, utility partners, 
acquisition pathways, mission type, and weather into a comprehensive 
planning guidance that will provide a step-by-step process to 
incorporate vehicles into existing fleets. This will include a catalog 
of acquisition pathways to secure charging infrastructure.
 environmental stewardship
 The safety and health of the airmen and guardians who work and live 
on our installations, their families, and the surrounding communities 
are among our highest priorities. We greatly appreciate congressional 
support for our efforts to address per-and polyfluoroalkyl substances 
(PFAS) and facilitate Environmental Restoration Program progress.
Environmental Restoration
 We remain focused on meeting our cleanup obligations under the 
Comprehensive Environmental Response, Compensation and Liability Act 
(CERCLA) and the Resource Conservation and Recovery Act (RCRA). 
Investigation objectives and environmental response actions performed 
under these statutes aim to reduce risk to human health and the 
environment in a risk-based, prioritized manner at the approximately 
13,000 restoration sites at our active and closed installations. 
Currently, much of our restoration program focus is on chemicals of 
emerging concern, most notably, PFAS.
 Our PFAS strategy uses CERCLA to investigate, define, and, as 
necessary, remediate groundwater, surface water, sediment, and soil 
impacted by DAF activities. We also conduct a robust effort to 
communicate and collaborate with local communities, State and Federal 
agencies, and elected officials at all levels. The DAF PFAS response 
framework is built on three themes: (1) protect human health; (2) 
prevent future releases; and (3) promote meaningful communication and 
collaboration with communities.
 The primary source of PFAS compounds from DAF activities is aqueous 
film forming foam (AFFF). The two main PFAS compounds in AFFF are 
perfluorooctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA), 
although a number of additional PFAS can be found in these mixtures. 
While AFFF is the primary source of DAF-related PFAS impacts, there are 
other minor DAF sources such as electroplating and photofinishing. We 
are committed to addressing all of these sources under Federal CERCLA 
cleanup law and meet the requirements in Section 341 of the 2022 NDAA 
and Section 346 of the 2023 NDAA.
 EPA proposed a national primary drinking water regulation for six 
PFAS in March 2023, and we remain committed to align our PFAS research 
and remediation efforts with the scientific progress and State and 
Federal regulatory frameworks. Scientific progress and the State and 
Federal regulatory framework surrounding PFAS are rapidly evolving as 
we investigate and remediate PFAS impacts, and these developments can 
increase our scope and extend our implementation schedules. For 
example, in June 2022, the U.S. Environmental Protection Agency (EPA) 
published more stringent Regional Screening Levels (RSLs) that we now 
use to delineate or define the extent of PFAS impacts during CERLCA 
investigations. This required the DAF to review sites to determine if 
additional work is necessary. This work is ongoing and could result in 
the need for additional sampling, thereby affecting the project 
schedule. In addition, several states have promulgated drinking water 
standards and the EPA is committed to establishing a national primary 
drinking water regulation for certain PFAS.
 We look forward to the clarity that national drinking water 
regulation will provide. In the interim, DOD is continuing to use 
exceedances of 70 parts per trillion (ppt) to trigger the provision of 
alternate drinking water under our CERCLA removal authority until EPA 
establishes a nationwide, enforceable drinking water standard. Pursuant 
to DOD policy, once initiation of a CERCLA Removal Action is triggered, 
we may use a more stringent promulgated State drinking water standard 
for PFAS cleanup instead of 70 ppt.
 In anticipation of this EPA drinking water regulation and to 
account for emerging science that shows potential health effects of 
PFOS and PFOA at levels lower than 70 ppt, we, in coordination with 
DOD, are evaluating our efforts to address PFAS in drinking water at 
DAF sites, and what actions we can take to be prepared to incorporate 
this standard, such as reviewing our current data and additional 
sampling where necessary. We remain committed to fulfilling our cleanup 
responsibilities, operating within the law and authorities provided by 
Federal cleanup laws, and clearly communicating and engaging with 
communities.
 In prioritizing CERCLA environmental response actions, we use a 
risk-based decision-making framework with protection of human health 
and the environment as the highest priority. Action is prioritized on a 
``worst first'' basis, meaning sites that pose a greater potential risk 
to human health and the environment are addressed before sites posing a 
lesser risk. Although the Department does not program environmental 
restoration funds by chemical, as of January 2023 we obligated $1.34 
billion to identify, investigate, prevent, and respond to PFAS 
releases. Drinking water response actions are complete at nine Base 
Realignment and Closure (BRAC) installations and 39 DAF Active, Reserve 
and Air National Guard (ANG) installations. Implemented response 
actions include supplying bottled water, installing point-of-use 
filtration, whole-house filtration, and connecting residents to 
municipal water supplies.
 The fiscal year 2023 appropriations provided $216.4 million above 
the budget request, of which $68 million is allotted to address PFAS at 
BRAC installations. As of January 2023, we completed initial PFAS 
CERCLA Site Inspections at 149 installations and initiated CERCLA 
Remedial Investigations for 111 DAF installations, 14 of which are BRAC 
installations. While we take prompt actions under CERCLA to address 
drinking water impacts, the remaining response efforts are primarily 
intended to address PFAS in groundwater and soil, which can be 
technically complex and lengthy to complete. The fiscal year 2024 
budget request will include $187.6 million to continue these PFAS 
efforts, including $48.2 million designated to efforts at BRAC 
installations.
 The evolving regulatory environment and complex nature of the 
challenges posed by PFAS remediation require the use of a collaborative 
and cohesive team effort. In 2019, the DOD PFAS Task Force was 
developed to meet this need, and we are an active member. This PFAS 
Task Force is focused on addressing and eliminating the use of AFFF as 
currently formulated, understanding the impacts of PFAS on human 
health, and ensuring we fulfill our cleanup responsibilities related to 
PFAS. We are working with the PFAS Task Force Working Group to develop 
and implement the NDAA data reporting requirements.
 We proactively engage with community members who are concerned 
about the possible environmental and health effects from PFAS impacts 
resulting from DAF activities to support our Restoration Advisory 
Boards (RABs) as we constantly strive to improve our community outreach 
programs to be more inclusive and responsive. By using Technical 
Assistance for Public Participation (TAPP) grants, we can provide 
communities with independent technical assistance to improve their 
understanding of highly technical cleanup information and provide 
advice to decision-makers. This year, we supported the Barnes Air 
National Guard Base community in Westfield, MA through TAPP grant 
assistance for their RAB.
 We are also working with community members at several bases to seek 
their input on distribution of RAB community interest surveys. We are 
looking beyond Federal regulatory public outreach programs to identify 
other means to expand community engagement. For example, we held a 
treatment plant tour and technical workshop at the former Wurtsmith Air 
Force Base in October 2022 to further the community's technical 
understanding of our cleanup processes and progress. We are also 
participating with EPA in an environmental justice pilot at Dover AFB.
Environmental Quality
 We ensure resilient natural infrastructure and maintain sound 
environmental stewardship by implementing compliance programs which 
adhere with applicable environmental laws and regulations. Our 
environmental compliance programs focus on multiple environmental media 
and encompass efforts to identify and minimize or eliminate 
environmental impacts from DAF activities. Specific efforts to ensure 
compliance include detailed air quality assessments, management and 
inspection of underground and above ground storage tanks, hazardous and 
solid waste management and disposal, and environmental planning and 
permitting procedures. Additionally, we operate a forward leaning 
pollution prevention program that includes maximizing the diversion of 
solid waste from landfills to reduce the volume and cost of solid waste 
disposal. We recycle batteries, used oil, fluorescent light bulbs, and 
spent solvents; and support our hazardous materials pharmacies to 
effectively reduce, track for reporting, and safely manage the use of 
hazardous materials. Through these compliance programs, we continue to 
protect the health of our airmen, guardians, and the environment by 
making investments to meet regulatory requirements and promote efforts 
to prevent non-compliance through pollution prevention programs and 
routine inspections.
 We remain firmly committed to a robust program of integrated 
conservation management covering a full suite of environmental, 
natural, and cultural resources. Conservation funding has allowed us to 
invest in natural and cultural activities on and around our 
installations and training ranges that provide direct support to 
mission readiness. The conservation program in fiscal year 2023 
supports ongoing habitat and species management for 123 threatened and 
endangered species found across 54 DAF installations and provides for 
continued cooperation and collaboration with the other military 
Services, Federal Government agencies such as the United States Fish 
and Wildlife Service, and applicable State fish and game agencies. The 
DAF Cultural Resources Program supports mission needs through 
maintaining our Integrated Cultural Resources Management Plans. These 
117 plans work to preserve 6,141 historic buildings and structures and 
20,669 archaeological sites.
 We also executed a National Historic Preservation Act Programmatic 
Agreement for decommissioning the Minuteman III intercontinental 
ballistic missile weapon system and replacing it with the Sentinel 
program. This Programmatic Agreement will serve as a roadmap on how 
historic properties will be identified, how adverse effects to those 
properties will be resolved, and the way consultation will occur over 
the course of the program. Parties to the agreement include seven State 
Historic Preservation Offices, one Tribal Historic Preservation Office, 
the National Park Services, the Advisory Council on Historic 
Preservation, 57 Tribal governments, nine other Federal Agencies, 11 
State agencies and local governments, and 5 historical resource focused 
non-governmental organizations.
 Recent efforts carried out at Eglin AFB, FL exemplify integrated 
conservation management. Archaeologists at Eglin teamed with biologists 
and conservationists from the Choctawhatchee Basin Alliance to 
construct a series of ``Living Shorelines'' to protect sensitive 
archaeological sites from shoreline erosion while also enhancing 
natural habitat and water quality. Partnerships like these help us 
preserve cultural resources and provide effective ecosystem and habitat 
management, including wildland fire and invasive species management. 
These partnerships also support ongoing natural resource management 
efforts that focus on addressing imperiled and invasive species, 
critical habitats, and other key natural resources on installations to 
avoid or minimize mission impacts. Through the DOD Recovery and 
Sustainment Partnership, we collaborated with the United States Fish 
and Wildlife Service to enhance mission operations and increased range 
access while protecting at-risk species. This successfully resulted in 
the proposed down-listing of the red-cockaded woodpecker from 
Endangered to Threatened status and the delisting of the Okaloosa 
Darter.
 We remain committed to responsible environmental stewardship. As 
trustee for more than 8.3 million acres of land including forests, 
prairies, deserts, wetlands, and coastal habitats, we understand the 
important role natural resources play in maintaining our mission 
capability. To maintain military readiness, we need realistic test and 
training environments, which themselves are ecosystems. Quite simply, 
if we do not maintain the ecosystems we rely upon to continue our test 
and training mission, and cleanup the impacts of past mission 
activities, we will not be able to achieve or maintain military 
readiness.
Base Realignment and Closure (BRAC)
 The fiscal year 2024 request for BRAC cleanup and property transfer 
is $124 million.. This funding will facilitate environmental 
restoration and property transfer activities at 34 former DAF 
installations closed through prior BRAC law and keep us on-track to 
transfer the remaining 1,651 acres at five former installations by 
2027.
 conclusion
 Our fiscal year 2023 budget balanced risk between maintaining 
current readiness in support of combatant commanders today, while 
investing in the force infrastructure we need for the future. The seven 
operational imperatives, aligned to the NDS, served as our ``north 
star'' in guiding this transformation and continue to serve as our 
guide in the fiscal year 2024 budget. We remain committed to ensuring 
resilient, optimized installations and operational energy for effective 
mission execution to deliver the foundational capabilities resident in 
a changing operating environment. While we remain extremely capable, we 
cannot deliver these capabilities alone. We must operate as One Team--
within our Department, across the Joint Force and interagency, and in 
lockstep with our allies and partners. Only through true partnership 
can we successfully compete, deter, and if necessary, win our One Fight 
against the PRC pacing challenge and the acute threat posted by Russia. 
With congressional support, I am confident we can preserve the 
platforms necessary to enable and project combat power in Air and 
Space; deliver right-sized and sustainable built and natural 
infrastructure; and provide energy resilience and increased ``lethality 
per gallon.''
 Thank you for the opportunity to discuss our programs supporting 
energy, installations, and environment. We appreciate Congress' 
continued support for our enterprise and look forward to working with 
you.

 STATEMENT OF ELIZABETH A. FIELD, DIRECTOR OF DEFENSE 
 CAPABILITIES AND MANAGEMENT, GOVERNMENT ACCOUNTABILITY OFFICE

 Ms. Field. Chairwoman Hirono, Ranking Member Sullivan, 
Senators Shaheen and Kaine, and other distinguished Members and 
staff of the Subcommittee, thank you for the opportunity to 
testify today on GAO's work regarding DOD's management of its 
infrastructure and environmental challenges.
 I would like to briefly offer three points. First, the 
significant challenges that DOD faces in this area require 
urgent attention because they are in many, if not most cases, 
on track to worsen in coming years. Chairwoman Hirono, you 
eloquently spoke about the deferred maintenance backlog of $137 
billion, which is only compounding, so I won't belabor that 
point.
 GAO has made a number of recommendations to address DOD's 
infrastructure and environmental challenges, including for the 
Department to improve data reliability, strengthen internal 
oversight, and report more transparent information to Congress 
and the public.
 Implementing these recommendations should make tackling 
these challenges easier, but by no means does that mean it will 
be easy, which brings me to my second point. Improving DOD's 
financial management practices should be part of this 
conversation.
 DOD's deferred maintenance backlog equates to roughly a 
seventh of its total budget. Department officials responsible 
for reducing the backlog will point to limited resources as one 
of the biggest problems they face. That is absolutely a fair 
point, and it is a challenge that is not easily addressed.
 But some relief could come through better management of 
resources. GAO has found that each year, DOD doesn't obligate 
and eventually returns to the U.S. Treasury billions of dollars 
in operation and maintenance funding. The same type of funding 
that can be used to fund facilities' sustainment.
 By improving its financial management practices, including 
by continuing to work toward achieving a clean opinion on the 
financial audit, DOD can better budget for and use its 
resources where they are needed.
 My third and final point is simply to underscore what I 
think we all agree on and have said today, which is that the 
resource needs and challenges we are talking about are 
fundamentally about people.
 When we conducted our review of DOD's deferred maintenance 
backlog, we found that the facilities that are so often the 
first to lose out on funding are the ones most directly tied to 
quality of life, barracks where junior enlisted servicemembers 
live, for example, or childcare centers.
 The effects of this are clear. In discussion groups we have 
held in military installations around the country, 
servicemembers have consistently told us that the condition of 
their housing, whether Government owned or privatized, impacts 
their perception of the military and in some cases their 
decision on whether to re-enlist.
 As one young soldier said to us, if we get the bare minimum 
in the barracks, the Army will get the bare minimum from us. 
The readiness implications of this problem are, I think, 
obvious. That concludes my statement, and I look forward to 
your questions.
 [The prepared statement of Ms. Field follows:]
 
 
 
 
GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT
 
 
 Senator Hirono. Thank you very much. I will start the 
questioning. For all of our witnesses, the Department of 
Defense has a troubling pattern of not adequately funding 
modernization and required infrastructure, as noted.
 The results of this continued negligence are broken water 
pipes, electric grid outages, hazardous spills, and damage to 
the environment. By the way, what happened at Red Hill impacted 
over 90,000 people--90,000.
 That is a lot of people. Thousands of them had to be moved 
outside of military housing, Navy housing, and into hotels and 
other places. So, over the last few years, Hawaii in particular 
has borne the brunt of the impact of this underinvestment, in 
my view. So, for the panel, how do each of you plan to invest 
in the DOD's often forgotten infrastructure?
 As noted by Ms. Field, there are others--yes, you can point 
to scarce resources, but she actually noted, that it is the use 
of the resources--you can better manage the resources you 
currently have.
 So, for each of you, what can you do better with what you 
have that will address the deferred maintenance issues? We will 
start with Mr. Owens--Secretary Owens.
 Mr. Owens. Thank you, Senator Hirono, and thank you for 
linking underinvestment in infrastructure to concrete examples 
of the risks that we take when we do that. We are in the 
beginning of a transition to a new way to address FSRM 
[Facilities, Sustainment, Restoration and Modernization].
 We have requested funding to accelerate the implementation 
of an enterprise sustainment management system that is going to 
give us the ability to change the way that we manage facilities 
going forward.
 What I mean by that is, we have taken an approach that the 
way that we sustain our facilities is by calculating the total 
number of dollars that is required based on a percentage of the 
plant replacement value. That, while it might have served DOD 
in the past, I don't think that is a way ahead that is 
sustainable.
 We have got a backlog that is paralyzing large and we have 
a method of calculating funding that is not aligned with the 
way that buildings fail. Because buildings don't fail linearly. 
They fail in sort of episodic functions over the course of time 
in a downward degradation.
 If you allow that degradation to begin, you never get those 
buildings back up to what they were or what they should have 
been again without a major recapitalization. That is not a 
linear thing. It is a capital reinvestment strategy.
 The sustainment management system that we are developing 
and will be implementing is something that I think the marines 
have done a very good job of understanding, that facilities 
optimization is not a total pounds of dollars game.
 It is much more about how we look at recapitalization over 
time, and then at a high level making sure that we have the 
sustainment of facilities so that the degradation doesn't 
begin.
 Senator Hirono. Does the rest of you agree with Secretary 
Owen's description of how the approach should be changed so 
that you are able to address this huge backlog, ever growing 
backlog? Secretary Jacobson. Well, I would like each of you to 
respond briefly as you can if you are changing the way you are 
doing things.
 Ms. Jacobson. Senator Hirono, the question is an excellent 
one. I agree with what Secretary Owens just said. What we have 
to do is improve our planning and improve our assessment of the 
need.
 It is not just necessarily the age of the building, is what 
are the facilities within that building? What is their 
condition? What is the use of that building right now, and are 
we making the best use of it?
 We have to make sure we are planning and making sure that 
those plans reflect accurately our assessment of need. We have 
so many facilities and buildings within the Army, that it is a 
very hard thing to get a hold of, but we are trying--we are 
improving our facilities investment planning, which then in 
turn helps us understand better how to rank our projects and 
our needs.
 But we also, sustainment is so important to prevent the 
degradation, and we are making the best use of those 
sustainment dollars----
 Senator Hirono. I am running out of time, excuse me.
 Ms. Jacobson. I am sorry.
 Senator Hirono. So, for--particularly for Secretary Field, 
the DOD is--well, the Marine Corps, I should say, is only 
requesting funding for 54 percent of its FSRM program, and that 
is this year, and it was just 56 percent last year.
 It seems like the Department is playing a game of chicken, 
hoping that Congress will correct the issue. How can you 
justify such a shortfall in this funding? Now, that is to Ms. 
Berger.
 Before we get to Secretary Chaudhary, I would like to ask 
Ms. Field that as we are sitting here being told that they are 
going to change how they use the resources, I would ask the GAO 
to--the word monitor comes to mind, to tell us if you actually 
see improvements to how they are managing their resources.
 So. Ms. Berger, and then we will go to Mr. Chaudhary.
 Ms. Berger. Chairwoman, to your point on the Marine Corps, 
I will pick up where Secretary Owens made a quick reference to 
the Marine Corps approach, and it is different, and it does 
result in some lower sustainment percentages than you would be 
used to seeing.
 This is something called the readiness maximization tool. 
It is a deviation from the traditional percentage that you 
would see things funded toward.
 But what it does is it looks at the whole pile of the FSRM 
money that is there and allows--puts a little money toward 
sustainment where it will actually sustain, allowing more money 
to go toward the restoration and modernization parts of that 
pile of funding so that there is more good money going toward 
good, so toward the facilities that count more, as my 
colleagues were talking about.
 This is a tool that we are looking at, learning from it. It 
is a tool that informs the way the decisions are made, but it 
will help us as we think about the 30-year infrastructure plan 
that I mentioned in my opening to make sure that we are 
aligning the best dollars in the best places.
 So, we are putting those appropriate dollars where they 
count, and then aligning risk, mission assurance, all of the 
other considerations so that we have a holistic approach that 
anticipates what we need in this, like we would fund another 
platform.
 Senator Hirono. So, are you saying that while the 
percentage looks really low, that you are addressing the needs 
in a more critical or as you say, holistic way and that should 
give you better results? So that is the Navy. Air Force?
 Dr. Chaudhary. Thank you, Chair Hirono. I could sum it up 
in three words strategy, strategy, strategy. We have launched 
an installation investment plan, installation investment 
strategy, which launched in 2019, and we are getting ready to 
refresh that.
 What that does is going to take a look at what our right 
size is going to be and what type of facilities need to go way 
to scale and start getting at this maintenance issue. One of 
the areas that I want to focus in on and I can give you an 
example of is in our unaccompanied housing, and we have had a 
lot of discussion on that. But currently we have launched a 
dormitory master plan to take a look at what our program 
schedule is going to be to do that.
 What we found when we did that is that we need to invest a 
lot more. Not hard to discern, but right now we are targeting 
to correct that $1.7 billion in FSRM from fiscal year 2022 to 
2026, and that is a fourfold increase.
 So, we have identified it, characterized it, and now we are 
putting in the right investments to get us to where we need to 
be.
 Senator Hirono. Thank you. Ms. Field, just very briefly, 
since the services are making these kinds of changes, and I 
hope as I said, that you will be able to assess whether or not 
they are better utilizing the resources that they have been 
provided. Senator Sullivan.
 Senator Sullivan. Thank you, Madam Chair. Assistant 
Secretary Berger, I am concerned about the priorities that the 
Navy has right now. With all due respect to the obsession on 
climate change, the Secretary had a disastrous hearing in front 
of the full Committee yesterday, disastrous.
 So, he goes to the Bahamas and makes it that--states to the 
world, climate change is one of his top priorities and it 
clearly seems to be his climate action plan was released before 
his 30-year shipbuilding plan. Yesterday, I took him and so did 
several other Senators to task for not even producing a plan to 
produce 31 amphib ships, which is required by law.
 He looked at the Armed Services Committee and said, 
essentially, he is not going to do it. That is not going to 
fly. Let him know that, by the way, not going to fly.
 The U.S. Congress told him the number of ships he has to 
maintain and produce, that is in our Constitutional 
responsibilities right here in the Senate.
 He was ignoring us, right? But he sure does a lot on 
climate change. It is a real, real unbelievable focus in the 
wrong area. The Chinese military is not worried about climate 
change. It is worrying about ship building, hypersonics, and 
conducting a successful military invasion of Taiwan.
 Russia is not worried about climate change, is worried 
about pushing its aggression deeper into Ukraine, and yet we 
have a Secretary who is releasing his climate action plan 
before he does anything on shipping. It is remarkable. It is 
outrageous. The only one who is excited about it is Xi Jinping 
and Vladimir Putin. Let me go into some of your climate change 
action plan.
 You are going to get to 100 percent zero emission vehicles 
by 2035, including 100 percent zero emission light duty vehicle 
acquisition by 2027. Is that including the Marine Corps? Is 
that remotely possible? I am pretty sure the answer is no, but 
that is in your plan. Can you speak to that?
 Ms. Berger. Senator Sullivan, climate change is a threat to 
our installations and the investments that we make.
 Senator Sullivan. Do you think it was smart to get the 
climate action plan out before the 30-year shipbuilding plan 
out for the U.S. Navy? Was that a good use of priorities?
 Ms. Berger. One of the primary responses that amphibious 
ships provide are humanitarian assistance and disaster relief.
 Senator Sullivan. But you didn't answer my question. Answer 
my question, respectfully. Did it make sense from the priority 
of the U.S. Navy to get your climate action plan out before you 
got your 30-year shipbuilding plan out? Is that a good 
prioritization of what the Navy stands for and our national 
defense?
 Ms. Berger. Ranking Member Sullivan, my responsibilities 
center on this portfolio, which does not include shipbuilding, 
and so, I would leave that to the Secretary's response.
 Senator Sullivan. Okay, that is an Okay response.
 Ms. Berger. But where I do focus in on the mission is 
readiness of our sailors and marines, and so, I do think that 
climate change is a threat that we need to be ready for. That 
includes threats to our energy infrastructure, as you noted.
 Senator Sullivan. Okay, what about my question on 2027 for 
vehicles in the Marine Corps? Is that remotely doable?
 Ms. Berger. We are on track to make sure that we are 
acquiring vehicles, and the reason that we are doing that is to 
be untethered from logistics tails. You noted Russia. Russia 
uses energy as both a tool and----
 Senator Sullivan. But is that remotely doable? Four years 
from now?
 Ms. Berger. We are on a track and we are working along with 
our sister services to make sure that we are acquiring electric 
vehicles that are able to support all of our mission sets, and 
so, through a partnership, yes, sir, I think that we are on 
track.
 Senator Sullivan. Another thing in your climate plan is to 
have the entire Navy achieve net zero emissions by 2050. What 
is the statutory basis of that rule?
 Ms. Berger. We have set a goal. I don't think there needs 
to be a statutory basis.
 Senator Sullivan. There is none, by the way, just for 
everybody's--there is no statutory basis in any law to achieve 
net zero by 2050. Let me turn to you, Assistant Secretary 
Chaudhary.
 We have a significant buildup of the Air Force and the Army 
in Alaska, 100 fighters, 5th-generation fighters at Eielson and 
JBER [Joint Base Elmendorf-Richardson], the new--this is for 
Assistant Secretary Jacobson as well, the new 11th Airborne 
Division throughout the State. It gets very cold in Alaska and 
we are going to need significant supplies of energy.
 Can you commit to me and this Committee to work with me on 
different opportunities for energy to power these bases, 
including natural gas, including our abundance of oil that can 
turn into jet fuel, which we need very significantly with 
regard to the energy needs in Alaska.
 Dr. Chaudhary. Ranking Member Sullivan, I can commit to you 
to do that. I think we need to work together to come up with a 
diverse set of options to make sure we are meeting our 
operational needs in the Pacific.
 The strategic importance of JBER is--it goes without 
saying, it is that critical. So having a diverse capability of 
energy supplies is going to be critical. More broadly, I think 
redundancy is going to be key as well, because as we understand 
what the challenges are in this region. There are a number of 
logistic areas that we need to address.
 So absolutely, and I know we have committed to working on 
more innovative solutions than what you just described, 
including microgrids and opportunities at Eielson for nuclear 
and things like that of that sort.
 So, yes, I commit to you. I raised that in an Senate 
Environmental and Public Works Committee (EPW) hearing today 
with the Nuclear Regulatory Commission, all the commissioners, 
on what is happening at Eielson. I think it is exciting. 
Assistant Secretary Jacobson, do you want to add as well?
 Army is expanding in Alaska, 11th Airborne is doing great 
work, fantastic work. But we need energy. It gets very cold. 
You know, Eielson gets 40, 50 below zero in the winter.
 Ms. Jacobson. Ranking Member Sullivan, it is nice to see 
you again----
 Senator Sullivan. Nice to see you.
 Ms. Jacobson. Thank you for all of your support, and we are 
making significant investments in Alaska. Notably to your 
point, we right now have the draft Environmental Impact 
Statements (EIS) to replace our coal fired power plant at 
Wainwright with a gas plant--a gas plant.
 I have expressed an enormous interest in exploring a 
nuclear energy in Alaska, and we are going to be watching very 
carefully what is happening at Eielson, because I believe it is 
a good option for us in Alaska and elsewhere. I want to look at 
small micro-nuclear reactors to power bases wherever.
 It makes sense, particularly in remote locations where the 
energy challenges are as they are. I will be visiting Alaska in 
about 2 weeks, and I hope some of your staff and maybe you will 
be there and we can----
 Senator Sullivan. Great. We will coordinate. Good. I am 
glad you are coming. Thank you. Thank you, Madam Chair.
 Ms. Jacobson. Thank you.
 Senator Hirono. Senator Shaheen.
 Senator Shaheen. Thank you all for being here. Ms. Field, 
over the past several years, Congress has appropriated over $1 
billion in funding for PFAS related activities, including 
testing and remediation at more than 100 contaminated military 
sites across the country, including in New Hampshire at the 
former Pease Air Force Base, which is now a National Guard 
base.
 But from the perspective of oversight, do you think it 
would be helpful for the Department to consolidate all of their 
PFAS related funding requests into a single budget item to be 
submitted as part of the annual appropriations process?
 Ms. Field. Based on the work that we have done at GAO, I 
think we always welcome any way for the Department to provide 
more transparent information about the total cost associated 
with PFAS cleanup.
 We conducted a review just a few years ago of anticipated 
costs associated with PFAS in groundwater, soil, and drinking 
water at or near current and former installations. At the time, 
the estimated cost of clean-up was around $1 or $2 billion.
 It has since gone up to $6 billion, and so that is quite 
possible that that could provide greater transparency. I think 
the key question that we are focused on is how the Department 
is thinking about the EPA's proposed rule that would lower the 
threshold for PFAS from 70 parts per trillion down to 4 parts 
per trillion for PFOA [Perfluorooctanoic Acid] and PFAS [Per- 
and Polyfluoroalkyl Substances].
 In the past, DOD cleaned up, even when there was just an 
advisory. I am not sure now that the Department is preparing to 
clean up or is currently taking action to clean up, even though 
now there is a proposed rule.
 Senator Shaheen. Well, as you point out, the longer we 
delay, the more expensive this becomes. So, Secretary Owens, I 
actually have a question related to PFAS for you, and probably 
for Secretary Chaudhary, because it has to do with the former 
Pease Air Force Base, which is now the National Guard site in 
New Hampshire.
 I should say at the outset that the Air Force has been very 
helpful over the years since we first discovered PFAS in 2013 
at working with the community on the clean-up. However, we now 
have an issue that has come up, and I am extremely concerned, 
Secretary Owens, with the Department's interpretation of 
Section 345(a) of the Fiscal Year 2022 NDAA. It is a provision 
that was designed to increase transparency for PFAS testing 
with affected communities.
 Instead, the Department has interpreted that provision as 
one that requires that they curtail data sharing. We worked, 
some of you may remember, in the last NDAA we worked to try and 
address this. We had an--I had an amendment that was sponsored 
by the committee, which I was assured by DOD officials that 
that issue would be fixed as the result of that amendment.
 However, what we have seen in the last year that DOD has 
walked back those assurances, that issue remains unchanged. It 
has become a real concern not just for members living in the 
community who feel like they don't have access to information 
now, but also to the regulatory bodies in New Hampshire who 
don't have the information that they need.
 Do you have an update or can you give us an update on this 
Committee of what the Department is planning to do to address 
this transparency issue?
 Mr. Owens. Senator Shaheen, I will get you an update. I 
don't have one right now.

 Mr. Owens and Secretary Chaudhary. The Department of the 
Air Force (DAF) is complying with Department of Defense 
guidance and the requirements of Fiscal Year 2022 NDAA Section 
345(a)(2) and submits our installation level data to OSD to be 
posted on their website without PII or location data.
 The DAF is collaborating with the Office of the Secretary 
of Defense (OSD) as OSD develops guidance that takes multiple 
competing factors into consideration. The policy/guidance will 
balance the need for transparency with the need to protect the 
Personally Identifiable Information (PII) and potentially 
property values unless explicit consent has been obtained. It 
will also address the way we visually represent off-base/
community information. In the meantime, our Environmental 
Program managers are proactively engaging with the affected 
property owners and including requests to these owners to share 
data along with their access agreements.

 Senator Shaheen. Okay. I hope the update comes with a 
commitment to work with us to address the underlying concern, 
because I see this as ongoing, and as we know with over 700 
sites around the country, this is an issue not just in New 
Hampshire, but it is going to be an issue everywhere.
 Mr. Owens. I agree, and I think that the proposed 
regulatory action that EPA has put out is the type of forcing 
function that requires DOD to rethink what we have been doing.
 We are taking steps in preparation for understanding that 
that reduced level is coming, and in the process of doing that, 
we can also address the transparency questions that you have.
 Senator Shaheen. Thank you. I appreciate that. I also want 
to go back to Senator Sullivan's questions about the climate 
initiative and whether it is within the Navy, or the Army, or 
the Air Force, and I certainly support those initiatives.
 But I was talking with the National Guard Association in 
New Hampshire on Saturday, and one of the concerns that was 
raised to me by a member of the association was that he was 
worried that the effort to get us off of fossil fuels, we are 
going to leave some of our men and women in the military 
without the energy support they might need in case of conflict 
or other situations.
 Now, I tried to reassure him that there was nobody on the 
Armed Services Committee who was going to see that as a viable 
option. But can any of you address that concern? How should we 
respond to people who raise that concern?
 Dr. Chaudhary. Senator Shaheen, I will take that since it 
is National Guard, please tell your constituent, I am not 
trading an ounce of thrust to sacrifice our national security. 
That being said, on the issue of what we need to do to make 
sure we are more resilient when we are making sure that we are 
taking care of our operational capabilities, demand reduction 
is going to be important going forward.
 We have got logistical challenges that are in the Pacific 
that we have got to address, and to me, I view this in the same 
light as I do any operational situation. As a former pilot, 
before you go fly, what is the first thing you do? You check 
the weather and make sure that you can adapt to any environment 
that you are in.
 So, we have got to learn to adapt to this new environment, 
and please share and hopefully give some comfort to your 
constituent to let them know that we are going to stay focused 
on and be clear-eyed on our national security responsibilities.
 Senator Shaheen. Thank you very much. Thank you, Madam 
Chair.
 Senator Hirono. Senator Kaine.
 Senator Kaine. I will just followup and say I am also a 
huge supporter of the military's efforts to combat climate 
change, both to make us more resilient, but also to deal with 
challenges I am seeing in my own State. So, the Hampton Roads 
area is next to New Orleans, second most vulnerable to sea 
level rise.
 We can't fix that immediately, but we can be part of a 
solution. The resilience investments we are going to have to 
put in, just like raising roads to get into the base so that 
there can be access are really expensive.
 I am a supporter of the mission that you are embracing with 
respect to climate change. I will, though, weigh in with 
Senator Sullivan on the shipbuilding plan. I have an assessment 
of what is going on, but I am not happy with it----
 Senator Sullivan. Or the amphibs----
 Senator Kaine. Yes, and I will use the amphibs as an 
example. We had sea power hearing here on the 28th of March. It 
was noticed well in advance. We were told we get the 
shipbuilding plan before we hauld all the brass up there to ask 
them questions about it.
 But we didn't have the plan, so we couldn't ask them 
questions about it, which was kind of a waste. We told them it 
would come in a day or two and it didn't, and we got it 24 
hours before the hearing with the Commandant, Chief Naval 
Officer (CNO), and the Secretary of the Navy (SECNAV), which 
means most of us didn't really have a chance to look at it.
 I can tell you why it was late. It was late because those 
parties who were going to deliver to us didn't like what was in 
it. It is the President's Budget, not the SECNAV's budget, and 
at the end of the day, the shipbuilding plan, I don't think is 
really a reflection of what either the Secretary or the 
Commandant or the CNO want, because they have testified to us 
unequivocally, 31 amphibs is the number.
 We said 31 amphibs is the number, but Commandant Berger, 
yesterday, he said in this budget, in this shipbuilding plan, 
there is no way to get to 31. He mentioned something else to 
me, which he didn't mention in the hearing. He said the only 
reason that we would be within sight of 31 has been Congress, 
because successive administrations have not asked for amphibs 
and then Congress has added them in.
 He was like, thank God for Congress because we would be at 
like 10 or 12 right now if it hadn't been for Congress doing 
this. So, I think that the delay in getting us the shipbuilding 
plan, the inadequacy of the budget, is that a number of levels 
above the even the high-ranking officials that we had us there 
yesterday.
 This is either at the Secretary of Defense (SecDef) level 
or in the White House and Office of Management and Budget 
(OMB), and Congress is going to do in the NDAA what we always 
do, which is if they are not asking for what we really believe 
is needed, then we do have the opportunity to fix it. We were 
disappointed in that, and particularly for us, if we are 
supposed to have a hearing.
 This is our one chance to talk to the CNO and the 
Commandant of the SECNAV until the next year in a hearing, and 
the important component is the shipbuilding plan. One of my 
staffers got it before anybody else and had to share it with 
everybody.
 Nobody had a chance to really review it and then 
meaningfully use our 5 minutes of questions time to get what we 
needed. So that sends a message that is not a respect, one, to 
Committee Members.
 That is not on you all, but a lot of you folks are 
listening to us and I hope that you may take this back. I would 
like to ask you, Secretary Owens, just on my Hampton Roads 
challenge, this sea level rise challenged.
 The good news in Hampton Roads is stakeholders, whether it 
is the different service branches or the Army Corps of 
Engineers or the local government, State Governments report 
there is a pretty good stakeholder group trying to work at this 
and figure out how to make investments so that we are not 
reducing our capacity of the largest Navy base in the world.
 Talk a little bit about how you think about that challenge 
and ways we can work together to address it, and like 
challenges.
 Mr. Owens. Thank you for your question, Senator Kaine. 
Thanks for the focus on Hampton Roads in particular, but then 
on resilience to changing weather patterns and more extreme 
weather in general.
 From my perspective, from an OSD [Office of the Secretary 
of Defense] perspective, this starts with enabling the defense 
climate assessment tool as a tool that Military Departments can 
use to identify what their risks are.
 The DCAT [Department of Defense Climate Assessment Tool] 
allows for Navy, Army, Air Force, Space Force, Marines to put 
in--to use the GIS [Geographic Information System] based system 
to be able to say, this is what is happening, these are the 
projections that we see under high, medium, and low conditions 
under this scenario, under this scenario, and under this 
scenario, and then plan accordingly.
 I think that one of the things that has been great about 
the partnership around DCAT is that it has had tangible 
changes. It has produced tangible results, particularly in the 
Hampton Roads area, that the Navy has implemented.
 Beyond that, Office of Local Defense Community Cooperation 
is another program that reports up through the EI&E [Energy, 
Installations and Environment] office, and they have the 
ability to resource resilience projects outside defense line.
 So, understanding that there is a critical interdependence 
between our ability to complete the mission inside defense, and 
our reliance on all of the activities that happen outside 
defense. DCIP [defense critical infrastructure programs], 
through all DCC [direct commercial contracts], gives us the 
ability to address some of those challenges.
 Senator Kaine. Very important. I used to feel really 
nervous about the sea level rise issue in Hampton Roads because 
I thought, well, if there is ever another BRAC [base 
realignment and closure] round, you know, this is going to be 
really tough for us.
 It could be. But I mentioned it once to Secretary Gertz, 
who was the Secretary in the previous Administration, 
acquisition and installations. He did a very good job and he 
said, look, you are not the only one. Imagine being a base in 
an area that is subject to drought.
 Sea level rise is bad, but you have 50,000, 60,000 people a 
day on a base living there, working there, contractors in an 
area where there is persistent drought and challenges with not 
enough water.
 That is not an easy one to solve either. There is a lot of 
challenges that we have in this space, so we have got to be 
creative. There is not enough resources to do it as fast as we 
want. We got to be creative in dealing with it. So, thank you.
 Mr. Owens. I agree, and I would be remiss if I didn't 
mention wildfire as well, as another challenge. A significant 
and growing challenge for all of our installations.
 Senator Kaine. Yes.
 Senator Hirono. Thank you. I am going to begin the second 
round. Just as the members of SASC [the Senate Armed Services 
Committee] have been very concerned about our ability to meet 
the shipbuilding, authorized ships, number of ships authorized, 
there are a lot of us who are also concerned about the state of 
our shipyards because of--it is one thing to build new ships, 
it is another to make sure that we can maintain and repair the 
ships we already have.
 This is directed to Secretary Berger and also Secretary 
Owens, that in light of the ongoing concerns that we have about 
the need to modernize our shipyards, for public shipyards, 
including, of course, a dry dock replacement, especially in my 
case at Pearl Harbor. We want to make sure that the Navy can 
ensure that the shipyard infrastructure optimization program, 
SIOP, is going to be continue to be pushed and funded.
 This is something that we have been continuing to push, and 
I just want to note this rather than asking a question about 
it. I just want the continuing commitment that that is going to 
happen. Here is a question for all of the witnesses.
 The safe and timely removal of unexploded ordnance, or UXO, 
is critical not only for the safe repurposing of land for new 
military purposes, as we are seeing in locations like Guam, but 
also for the communities impacted by these sites.
 It is critical that the DOD take all steps necessary to 
responsibly turn over land like at the Waikoloa Maneuver Area, 
WMA, where families continue to wait to build on Hawaiian 
Homelands for the Department to slowly clear the land. It is my 
understanding is that UXO removal is not just a matter of 
funding.
 I would like to ask whoever wants to take--wants to comment 
first, what steps do you need to take to resolve this complex 
cleanup effort? When can we expect a resolution on returning 
specifically the Waikoloa Maneuver Area land to the native 
Hawaiians? Who wants to take this?
 Ms. Jacobson. Chairman Hirono, I would be happy on behalf 
of the Army to at least start the response to that question 
with some very good news. Literally, on Tuesday, April 11th, by 
General Spellman, who is the Chief Engineer for Army Corps of 
Engineers, sent me a note with good news that the Pacific Ocean 
Division of the Army Corps has completed the remedial 
investigation for the critical area there at Waikoloa with 
11,000 acres where these are intended to be returned as 
Hawaiian Homelands.
 The completion of that has been submitted to the Hawaii 
Department of Health for approval and for comment. I believe, 
on the initial comments, there has been some interaction back 
and forth with the Hawaii Department of Health.
 Now that the formal remedial investigation and responses 
have been submitted, the State has 30 days, we hope to issue no 
further action, which will then enable HUD to allow the area to 
be eligible for mortgages so it can finally be used by the 
people of Hawaii. So, I do have some good news on that front. I 
know it has been a long haul.
 Senator Hirono. Does that mean that for all of you that you 
are developing some kind of way to really move things along on 
UXO removal? Because the need is great.
 I mean, there is like billions and billions, so there needs 
to be a much more critical way that you assess how you can meet 
the needs of the community in terms of this kind of removal. 
Did you come up with some new way to do this so we can move 
things along in Waikoloa, for which I am happy to hear the 
news, by the way.
 Ms. Jacobson. One thing that is important for us as we 
engage in the UXO removal, particularly in Hawaii, is we want 
to make sure we are engaging the local communities so that we 
are prioritizing the areas that are of most cultural value and 
otherwise.
 We also want local, the local community, to be hired as 
part of the teams to participate in the UXO removals. This 
takes a little bit of extra training. Obviously, it is highly 
skilled training in this regard.
 We also have some new technology, some new equipment, and 
we will possibly be using drones and other new equipment where 
we can identify where that UXO is and then more quickly resolve 
it.
 But this is one of our top priorities, as we look broadly 
at all of the potential suite of projects that we can 
accomplish in Hawaii generally, in furtherance hopefully of our 
land retention leases that are expiring in 2029. UXO removal is 
one of the critical top priorities, and the Army Corps of 
Engineers is very focused on it.
 Ms. Field. Madam Chairman, may I----
 Senator Hirono. Any of you want to add? Yes----
 Ms. Field. If I may offer, we released a report just 
recently looking at environmental cleanup at formerly used 
defense sites. To give you a sense, there are about a quarter 
of the costs associated with environmental cleanup at FUDS 
[formerly used defense sites] are related to environmental 
contaminants like PFAS.
 About three-quarters are related to munitions to include 
unexploded ordnance, and what we found is that DOD has cleaned 
up only about 45 percent of FUD sites contaminated with 
military munitions, compared to 85 percent of the FUD sites 
with hazardous substances and contaminants.
 We have a recommendation to the Department to set a target 
for FUD sites with military munitions to try to get that 
momentum that you are talking about.
 Senator Hirono. Thank you. I will be very interested in the 
progress made in this regard. Any of the rest of you want to 
add to this?
 Dr. Chaudhary. Chair Hirono, the only thing I would like to 
add is this is top priority. As I get briefed on it, I am 
actually coming to Hawaii in the next 9 days, and I would love 
to meet with community leaders and discuss this in depth.
 Senator Hirono. Thank you.
 Senator Sullivan. Assistant Secretary Chaudhary, I want to 
followup on Senator Shaheen's point and then make another 
point. What was the phrase that you used? Not one ounce of 
trust or--unpack that a little bit for me because I think I 
agreed wholeheartedly with you, but I don't exactly understand 
what you are saying. What did you say again?
 Dr. Chaudhary. Senator Sullivan, we have got priorities 
that we need to meet, National Security priorities. When it 
comes to operational energy, our goal is to reduce demand, to 
increase agility, to be more agile in the theater.
 If we can build that agility through drag reduction, 
through innovations in advanced coatings of engine design, 
through really leading-edge innovations like blended wing body 
that increase our range, we meet the pacing threat. That is my 
goal. That is my number one priority.
 Now, if we get benefits from it as the largest producer or 
largest user of fossil fuels, that is fantastic. That is great 
for the climate. We want to support that. But I am clear, I 
know what my priorities are, and to me, if I am given the 
choice between clearing the trees as an aircraft is taking off 
and the climate, I am going to take clearing the trees because 
I know what the crews are going through every single day.
 I am going to support them in that endeavor and make sure 
that as we go through, there is a lot of puts and takes in 
this, but we have got to make sure that we have got those 
priorities set appropriately.
 But demand reduction is going to be very, very helpful to 
us with logistics challenges, and we are trying to stretch 
every mission capability we can in order to improve that.
 Senator Sullivan. Okay, I appreciate that. Assistant 
Secretary Berger, related to that, I just want you guys to be 
clear, right, where you are talking about these very aggressive 
zero emission, light duty, that means electric vehicles for 
marines.
 Are you familiar with the chosen reservoir battle in the 
Korean War? Okay, so it got down to like 30 below zero. I want 
to make sure that you guys think through all of these kind of 
battles. First Marine Division surrounded by 120,000 communist 
Chinese, 30 below zero. Marines did remarkably well, Okay.
 What I want to make sure is we are not doing some kind of 
innovation that sounds good in your 2030 climate strategy that 
ends up hurting the force, that ends up having marines fighting 
maybe the North Koreans in 30 below zero and their vehicles 
don't work because they are EVs [electric vehicles] and nobody 
thought about it.
 Can you make sure you commit that to me? The year 2027 is 
right around the corner, and I got really nervous when you get 
some of the climate zealots who care more about climate action, 
like the Secretary of the Navy, than warfighting and keeping 
marines and sailors and airmen safe, lethal, and ready to win 
wars.
 That is what you guys are all about, winning wars, not net 
zero 2050 emissions. It has nothing to do with winning wars. 
So, can you make that commitment to me?
 Ms. Berger. Senator Sullivan, absolutely, mission comes 
first, and I will share----
 Senator Sullivan. Mission, not emissions, right? Mission?
 Ms. Berger. Yes, Ranking Member, mission comes first. But I 
will share with you just a quick story, because the marines are 
actually leading in this in quite an impressive way, because, 
as you noted, it is critically important to make sure that they 
are always going to win.
 I went up to General Motors with the Commandant just at the 
end of last year, and this is the conversation that we had with 
clarity, with focus, that was every question that we had.
 We have continued that conversation with industry leaders 
who are thinking about this that understand what it means to be 
forward deployed, competing, and that this is where we gain 
that advantage.
 Senator Sullivan. And lethal--and lethal, right?
 Ms. Berger. Yes, sir.
 Senator Sullivan. That is your mission, lethality.
 Ms. Berger. Yes, sir.
 Senator Sullivan. Lethality. That is every one of your 
missions, correct?
 Ms. Berger. I will borrow a phrase that my colleague here 
uses, but it applies no matter where we are when we are talking 
about operationally energy, and its lethality per gallon. So, 
no matter where we are, how are we getting the most out of 
every gallon that we are using of whatever it is.
 Then as we look at other options, it is mission assurance, 
and that lethality as well, per megawatt hour, per any way that 
you are measuring energy, because we want to create that unfair 
advantage, any time a marine, any time a sailor--and I am 
confident speaking for my colleagues here for their services, 
encounters an enemy.
 It is our job to think about every way to create that 
competitive advantage, to make it unfair so that we are winning 
every time.
 Senator Sullivan. Okay. So, Secretary Chaudhary and 
Assistant Secretary Jacobson, I just want a commitment from 
both of you. You know, we have had this buildup of the Army and 
particularly the Air Force, particularly in interior Alaska, 
with the two squadrons, F-35.
 We have had some housing challenges that I know I have 
spoken to you about, and those are important. There is a lot of 
kind of--I don't know, I don't say blame, but there is a lot 
of--we weren't fully ready in interior Alaska to fully house 
the new airmen coming with those two squadrons, and their 
families, very importantly.
 The Air Force and the Army both have certain statutory 
authorities that they can use with regard to housing. We are 
still dealing with this. We are still struggling with it a 
little bit, particularly in interior Alaska. We want to make 
sure the airmen coming up to Eielson are able to bring their 
families.
 That is really, really important to have a good experience. 
So, can I get your commitment to work with me in this Committee 
on using your existing authorities that you have and helping us 
work through some of the housing challenges, both of you?
 It is more of the Air Force issue in interior Alaska, but 
it is a bit of an Army issue at JBER, and an interior, Fort 
Wainwright as well. Can I get both of your commitments to work 
on base and off base?
 You have authorities and we need to get on this. We don't 
want--the Air Force, as you know, is contemplating 1-year 
unaccompanied tours for the F-35 contingent, and I think we can 
all agree that would be a disaster.
 We don't want that, and they don't want that. It is just 
the challenge of the housing. Can I get your commitment on 
that?
 Dr. Chaudhary. Senator Sullivan, I have been to Eielson a 
long time ago as a cadet. I know what it is like there. It is 
an interior Alaska, one of the most beautiful places on earth. 
But it is a great place to have a family.
 You have my commitment to make sure that we work through 
this together, to come up with the right solution. To me, I err 
toward accompanied because it is something that I have lived 
through.
 Being accompanied with your family is--it impacts the 
mission every single day. Executing that mission is dependent--
and a lot of times great that you can come home and spend time 
with your family rather than being far away, which can wear on 
the mission.
 So, you have my commitment to work through that and use our 
existing authorities.
 Senator Sullivan. Great. Assistant Secretary Jacobson?
 Ms. Jacobson. Senator Sullivan, as I say, I will be there 
with in the next couple of weeks and I will make sure I get a 
full assessment of the housing needs. Also, of the barracks 
needs. We are investing in fiscal year 2024 in barracks, but 
that too, and many other investments in Alaska infrastructure, 
but I will specifically ask about family housing.
 Senator Sullivan. Madam Chair, do I have time for one more 
question?
 Senator Hirono. I am going to ask one more question, so go 
ahead----
 Senator Sullivan. My final one, and it is related to the--
so in the Army, as you know in Alaska, we have had this really 
horrendous surge in servicemember suicides. It is just 
heartbreaking, and it is still continuing.
 I think the leadership from Secretary Austin, General 
McConville, the leadership in Alaska are very focused on it. 
These are, I think, in some ways generational challenges with 
this generation of men and women serving, way beyond our 
military's capability.
 But there is still a lot we can do. I think the Army is 
doing a lot on quality-of-life issues, in places like Eielson 
that can be very remote and dark in the winter and stuff. Can 
you just touch on both again, the Army, in terms of Assistant 
Secretary Jacobson and Assistant Secretary Chaudhary, what you 
are doing on some of the installation elements of building out 
morale, welfare centers, childcare centers.
 Are you coordinating all with mental health providers on 
what those kind of facilities can do to address what is 
actually a real severe crisis in the Army in Alaska right now 
with regard to suicide?
 Ms. Jacobson. Senator Sullivan, suicide is really such a 
major concern for Army senior leadership, as you know, across 
the board, and particularly in Alaska, because of some of those 
isolated conditions and otherwise. We recognize fully the 
connection between quality of life and morale.
 We are very focused on that particular issue in, as you 
say, these quality-of-life facilities, fitness centers, 
recreation centers, child development centers to make sure that 
they accommodate not just the physical need, but the emotional, 
spiritual, and mental needs of soldiers and families.
 Senator Sullivan. Thank you. Assistant Secretary Chaudhary, 
do you have anything to add to that?
 Dr. Chaudhary. Senator Sullivan, all I can say is this is 
personal to me. I lost wingman over this issue, and so, I take 
it very, very seriously. In fact, there is--one of my 
classmates from the academy who works in the petroleum industry 
North of Eielson, and so he tells me a little bit about what it 
is like up there.
 So, making sure we have those facilities taken care of. If 
I could, I would like to make sure I stay focused on this issue 
by taking this back and working with my manpower reserve 
affairs counterpart to make sure we address Eielson 
specifically.
 Because having visited there a long time ago as a cadet, I 
know exactly what you are talking about and I want to address 
it.
 Senator Sullivan. Great. Thank you very much. Thank you, 
Madam Chair.
 Senator Hirono. Thank you for raising the issue of 
suicides. I just have one question that I would like to ask--
Secretary Owens, the military installations face increasing 
threats from extreme weather and climate change.
 Hurricane Michael in 2018 devastated Tyndall Air Force 
Base, costing billions to rebuild and continues to impact the 
readiness of our forces there. In 2019, the GAO found that the 
DOD was not taking extreme weather projections into account 
when designing resilient construction projects.
 Last month, DOD's Inspector General found that DOD does not 
require resilience consideration in its construction design 
criteria. Recently this Committee received notification that 
the scope of Army barracks in Alaska needed revision because it 
did not take into account unique considerations for a facility 
being located in Arctic conditions. How do you like that?
 Senator Sullivan. Well, I go back to the focus of the Navy, 
right. The Navy should be focused on shipbuilding, warfighting. 
I think it is outrageous--the Secretary of the Navy came to the 
hearing yesterday totally unprepared. This is----
 Senator Hirono. How about livable conditions?
 Senator Sullivan. It is his climate action plan out before 
anything else. It was pathetic, and it is not what the Navy 
needs. So, that is my point, Madam Chair. You can raise all the 
points you want.
 Senator Hirono. Okay, that is----
 [Laughter.]
 Senator Hirono. Yes, Senator, I will. Well, I think it is 
taken in totality because it is not either or, and so, the 
conditions in which our servicemembers live and they operate 
are very important.
 I tell you, with all of the huge climate change issues 
facing us, you would think that our military in designing 
installations would not put installations where there is going 
to be a tsunami, et cetera.
 So, this is something that I would ask all of you to 
include in your design. Is that what you are--is that what is 
happening, Secretary Owens?
 Mr. Owens. Chairman Hirono, so I mentioned the defense 
climate assessment tool earlier, and that is a primary source 
of data that will allow for the type of resilience planning 
that you are talking about.
 But we are developing policy that addresses integrated 
installation resilience, and we will be getting that out. That 
is not to say that it is not happening organically already 
based on the use of DCAT by the Military Departments, but we 
can certainly do better and be more specific in terms of 
accountability.
 Senator Hirono. Yes, Secretary Jacobson.
 Ms. Jacobson. Chairman Hirono, that was a big mistake, that 
we didn't plan for our conditions in the design.
 Thankfully, we hadn't started building the place yet, in 
those barracks. Part of our fiscal year 2024 budget is because 
we have to increase the cost because we had not planned for 
that. Big mistake.
 Terrible, horrible mistake. On my watch, it won't happen 
again. But I will tell you, what we are doing is we are mindful 
of--we have just delivered a report to Congress as required by 
the Fiscal Year 2023 NDAA on installation resilience including, 
and we are using installation climate resilience plans design 
climate resilience, whatever the climate happens to be, to make 
sure that whatever we are building is going to be able to 
withstand those conditions.
 We have completed them at Carson and Anniston. But for 
fiscal year 2023, Wainwright and Greeley are part of that 
climate resilience planning, and we are going to do that 
everywhere, among many other planning tools that we are going 
to insist go into all construction design.
 Senator Hirono. Is there that kind of attention and 
emphasis in the Army, than--yes, the Army, the Navy, the Air 
Force, are you going to design for resilience?
 Ms. Berger. Yes, Senator Hirono. We have two examples that 
were NDAA mandated. So, both San Diego and Parris Island were 
identified as bases that we were concerned about resilience on 
and have incorporated planning there.
 Specifically, as Senator Kaine raised earlier, flooding is 
a problem in Virginia. So, as we focus on our building up our 
public shipyard there and doing that recapitalization, we are 
actually building to a 300-year flood plain level, versus a 
100-year flood plain level.
 Then I will note that as we go toward the uniform facility 
criteria that set that into the standards, as the Chief 
Sustainability Officer for the Department of the Navy, I have 
issued several memos that help to bridge that and make sure 
that we are including and contemplating these pieces so that 
not only are we using materials and planning that is 
sustainable, but also that when we put that dollar down, it 
counts for what we are making it for.
 Senator Hirono. Secretary Chaudhary.
 Dr. Chaudhary. Chairman Hirono, two examples that come to 
mind are areas where we have incorporated UFC [unified 
facilities criteria]. One is Tyndall, of course, you just 
mentioned, and also, if you look at Offutt where we made sure 
that the runway is built above where it needed to be.
 But more importantly, as I mentioned earlier, strategy, 
strategy, strategy. In our installation investment strategy, we 
are going to codify that and make sure that we have the right 
injects, so that when we do this across the board, it is 
institutionalized.
 Senator Hirono. Thank you. Thank you, Ranking Member. Well, 
this hearing is adjourned. Thank you, each of you, for being 
here.
 [Whereupon, at 2:46 p.m., the Committee adjourned.]

 [Questions for the record with answers supplied follow:]

 Questions Submitted by Senator Mazie Hirono
 training for military installation resilience planning
 1. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, developing the required military 
installation resilience component of installation master plans requires 
some very specific technical knowledge and abilities not typically 
within the training and experience of current installation master 
planning staffs. What specific steps have you taken to provide the 
necessary training to installation master planners?
 Secretary Owens. The Office of the Secretary of Defense has 
existing policy in place requiring DOD components to provide master 
planning training for key personnel using curricula developed either 
in-house or through the Army's Master Planning Institute, toward a goal 
of at least 4 hours of training for installation commanders and 32 
hours of training biennially for installation master planners. I defer 
to my colleagues on the specific curriculum the Military Departments 
are using to train planners.
 Secretary Jacobson. Preparing the workforce to operate in a climate 
altered environment is a specific action within the Army's Climate 
Strategy (ACS) Line of Effort (LOE) 3: Training. Climate 101 training 
is available for installation personnel and garrison commanders from 
the Army Materiel Command. This training introduces climate impacts to 
natural resources and other post infrastructure and operations.
 The U.S. Army Corps of Engineers offers courses that can enhance 
the skillsets of installation master planners (along with the entire 
Army workforce). USACE provides a suite of online and in-person 
training courses that includes master planning principles as a 
prerequisite to advanced courses in area development planning, energy, 
sustainability, resiliency, and practices for managing master planning 
programs. These courses evolve to address requirements of the NDAA, DOD 
policy and certain industry standards, such as those published by 
American Society of Heating, Refrigerating and Air-Conditioning 
Engineers. USACE will continue to offer these courses with respect to 
installation resilience planning. USACE is beginning work on a new 
sustainable building training program that should be offered within the 
next year.
 The Army issued Installation Climate Resilience Plan (ICRP) 
guidance in November 2022 which directed the use of climate-related 
data and climate resilience indicators to align installation planning 
functions to address risks and climate resiliency goals. The Army is 
using contractors to develop the ICRPs. The contractors facilitate 
onsite workshops, and installation master planners build their 
knowledge and expertise as they coordinate ICRP activities and 
integrate input from the full range of installation stakeholders 
including community partners.
 The Army ICRP process is providing critical on the job training for 
installation master planners who have a crucial role to integrate input 
from installation stakeholders including community partners. 
Contractors supporting the Army's initial ICRP efforts are providing a 
model that can be followed by installation master planners in the 
conduct of future workshops. The master planners, along with all 
participants in the ICRP process, provide active input and comments to 
the resulting ICRP documents. Army lessons learned will improve 
processes as it continues to improve installation resilience.
 Finally, Army training is evolving to build climate literacy. An 
Army Climate Strategy working group is developing implementation plans 
for training objectives to capture lessons learned, best practices for 
climate adaptation and mitigation, and inculcation of climate literacy 
into leader development and workforce training curricula.
 Secretary Berger. To meet the resilience requirements of the Fiscal 
Year 2023 Nation Defense Authorization Act, the Department of the Navy 
developed a new, comprehensive 5-day course for installation master 
planners that incorporates master planning, resilience, and relevant 
areas of the Naval Facilities Engineering Systems Command Climate 
Change Planning Handbook. To date, this course has been offered to 
installation master planning staff in Naval Base San Diego and 
Commander, Fleet Activities Yokosuka, and is planned to be fully 
implemented across the Department through fiscal year 2024. We have 
also issued standard operating procedures to ensure installation master 
planners know how to create installation resilience components 
consistently and effectively. This guidance identifies and leverages 
tools and data from subject matter experts internal to the Department 
as well as from other Federal, regional, State and local agencies.
 Secretary Chaudhary. The Department of the Air Force (DAF) 
developed the Severe Weather and Climate Hazard Screening and Risk 
Assessment (SWCH) Playbook to guide installations through hazard 
identification/assessment and provide instructions to apply the 
information to inform installation planning decisions and project 
development/prioritization. As part of the assessment, the SWCH 
recommends installations develop a working group composed of various 
technical experts, including civil engineers, climate scientists, 
meteorologists, etc.
 Additionally, the Air Force's Civil Engineering Center (AFCEC) 
provides monthly training designed to develop skills among our 
installation master planning community. These training opportunities 
include how to complete the new Installation Climate Resilience Plan 
(ICRP) template integrated into the Comprehensive Planning Platform 
(CPP), how to execute the SWCH Playbook, awareness of Office of Local 
Defense Community Cooperation (OLDCC) resilience programs, etc.
 Last, the DAF encourages participation in training events on 
resilience and climate adaptation. The DOD Resilience Workshop is an 
event focused on the topic and the American Planning Association's 
Federal Planning Division (FPD) Training Workshop features several 
resilience sessions. DAF strongly encourages membership in such 
professional organizations because they are training providers on a 
broad range of topics.

 2. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, does the on-line and in-person 
training program for installation planners administered by United 
States Army Corps of Engineers (USACE) include courses in this regard? 
If not, what measures are being taken to expand these training 
opportunities?
 Secretary Owens. I defer to Secretary Jacobson to characterize what 
type of training is offered by USACE.
 Secretary Jacobson. USACE provides a suite of online and in-person 
training courses for installation planners that includes master 
planning principles as a prerequisite to advanced courses in area 
development planning, energy, sustainability, resiliency, and practices 
for managing master planning programs. These courses evolve to address 
requirements of the NDAA, DOD policy and certain industry standards, 
such as those published by American Society of Heating, Refrigerating 
and Air-Conditioning Engineers. USACE will continue to offer these 
courses with respect to installation resilience planning. USACE is 
beginning work on a new sustainable building training program that 
should be offered within the next year.
 Climate 101 training is available for installation personnel and 
garrison commanders from the Army Materiel Command. This training 
introduces climate impacts to natural resources and other post 
infrastructure and operations. Courses on sustainability, resilience, 
and energy are provided through USACE and enhance the skillsets of 
installation master planners (along with the entire Army workforce).
 An Army Climate Strategy working group is developing implementation 
plans for training objectives to capture lessons learned, best 
practices for climate adaptation and mitigation, and inculcation of 
climate literacy into leader development and workforce training 
curricula.
 The Army ICRP process is providing critical on the job training for 
installation master planners who have a crucial role to integrate input 
from installation stakeholders including community partners. 
Contractors supporting the Army's initial ICRP efforts are providing a 
model that can be followed by installation master planners in the 
conduct of future workshops. The master planners, along with all 
participants in the ICRP process, provide active input and comments to 
the resulting ICRP documents.
 Secretary Berger. The Department of the Navy defers to the 
Department of the Army to address the USACE curriculum. The Department 
of the Navy encourages all of our installation professionals to enroll 
in professional development training offered by DOD and the private 
sector to advance their knowledge and skills. Navy and Marine Corps 
installation planners are encouraged to enroll in the Navy's new 5-day 
course to learn standard operating procedures for Navy and Marine Corps 
installations and area development plans, and to learn more about DON 
installation climate resilience plans and relevant areas of the Naval 
Facilities Engineering Systems Command Climate Change Planning 
Handbook.
 Secretary Chaudhary. The Department of the Air Force (DAF) provides 
training for installation master planners through the Air Force 
Institute of Technology (AFIT) and other venues. For example, AFIT has 
both a basic course in installation planning (Installation Planning 
Principles), an advanced course (Comprehensive Planning and 
Development) and an entire curriculum on Environmental Management. The 
Interservice Environmental Education Review Board promotes quality 
education and consistent approaches across all Services by identifying 
courses that fulfill common needs. USACE courses are among those 
listed.
 climate change assessments and adaptation plans
 3. Senator Hirono. Secretary Owens, developing the required 
assessment of the climate vulnerabilities of essential supporting 
civilian infrastructure in defense communities and development of a 
plan to address those vulnerabilities in the military installation 
resilience component of installation master plans requires consistent 
Department of Defense-wide criteria for determining which of such 
supporting civilian infrastructure is essential, and how to assess the 
vulnerability of such essential infrastructure. What guidance, if any, 
have you provided in those two regards?
 Secretary Owens. My office is creating guidance to incorporate 
installation climate resilience plans and developing new Integrated 
Installation Resilience policy to integrate energy, water, climate, 
mission assurance and cybersecurity resilience across our 
installations. Both efforts are well underway and are expected to be 
completed in fiscal year 2024.
 Where there is mission essential infrastructure off base, my office 
is working with the Assistant Secretary of Defense for Homeland Defense 
and Hemispheric Affairs on how to prioritize military installation 
resilience issues with allies and partners as well as State, regional, 
and local agencies and communities.

 4. Senator Hirono. Secretary Owens, Office of the Inspector General 
(OIG) Report DODIG-2023-061, ``Audit of Military Department Climate 
Change Assessments and Adaptation Plans in the Southeastern Continental 
United States'', dated March 23, 2023 found, among other matters, that 
DOD Instruction 4165.70 does not contain language requiring all 
installations to include climate resilience in their Master Plans and 
that United Facilities Criteria 2-100-01 does not provide sufficient 
guidance to standardize climate risk assessments. Which official 
specifically within your office is responsible for correcting each of 
these deficiencies, and when do you anticipate that each of these 
required corrective actions will be completed?
 Secretary Owens. I am the entity responsible for addressing 
recommendations from the DOD Inspector General Audit. Within my office, 
we are updating guidance to incorporate installation climate resilience 
plans and we are developing new Integrated Installation Resilience 
policy to integrate energy, water, climate, mission assurance and 
cybersecurity resilience across our installations. Both efforts are 
well underway and are expected to be completed in fiscal year 2024.

 5. Senator Hirono. Secretary Owens, 10 U.S. Code 2285(e) requires 
that the Secretary of Defense shall develop, within existing frameworks 
for collaborative activities between military installations and State 
and local communities, and in addition to the requirements of section 
2864(c) of this title (the requirement to include a military 
installation resilience component in installation master plans) a 
framework that authorizes and directs installation commanders to engage 
with State, regional, and local agencies, and with local communities, 
on planning for climate resilience, to enhance efficient response to 
impacts of extreme weather and secure collaborative investment in 
infrastructure that is resilient to the current and projected impacts 
of extreme weather. What is the status of your actions to develop the 
required framework?
 Secretary Owens. The Services have existing frameworks for 
installations to work closely with State and local communities on areas 
of mutual interest. As we are developing policy updates and new policy 
for Integrated Installation Resilience, we will update these 
frameworks.

 6. Senator Hirono. Secretary Owens, when do you anticipate that 
this framework will be completed and communicated to the Military 
Departments?
 Secretary Owens. These policy updates are well underway and are 
expected to be completed in fiscal year 2024.

 7. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, coordination of the military 
installation resilience component of installation master plans with 
defense communities and state/regional resilience entities would 
logically seem to require full participation by representatives of 
those entities in the process of developing this component of 
installation master plans. If that is correct, what guidance will you 
provide (for the) (within your) Military Department(s) with regard to 
providing such access?
 Secretary Owens. The master planning guidance already contains the 
requirement to coordinate master plans with local municipalities for 
the purpose of promoting installation and community resilience. I defer 
to the Military Departments on the implementation of this guidance.
 Secretary Jacobson. The Army's ICRP process has strived for full 
stakeholder participation across all installation functions and service 
areas, as well as Army tenants, other DOD tenants and community 
governmental organizations, such as Regional Councils of Government. 
Off--installation infrastructure capacity and conditions are included 
in the ICRPs when available and vulnerable assets are identified by 
local governments. Furthermore, the ICRPs provide strategies for 
strengthening (or establishing) community partnerships and associated 
administrative actions for adaptation and mitigation. Also, proposed 
guidance for community involvement as part of the master planning 
process is being developed for issuance later this year as Army policy. 
Including local communities in the Army's master planning processes is 
essential, required by statute and Army regulation and is good 
practice.
 Secretary Berger. The Navy and Marine Corps have robust processes 
and procedures in place to proactively seek coordination with local 
defense communities and state/regional resilience entities across a 
variety of common interest areas, to include the military installation 
resilience component of installation master plans. Installation 
Commanding Officers establish and maintain this coordination by 
leveraging their Community Planning & Liaison Officers (CPLOs), who 
connect the installation, the community, the local, regional, and State 
government representatives, and private stakeholders. The Department of 
the Navy has also partnered with the Idaho National Laboratory to hold 
a series of Regional Resilience Workshops across the United States for 
Navy and Marine Corps experts to come together with State and local 
representatives, utility providers and other Federal and academic 
institutions to develop regional project concepts that enhance energy 
resilience, reliability, and efficiency for installations and 
surrounding communities. Another example of how we collaborate with 
defense communities and state/regional resilience, the Department of 
the Navy and the California Energy Commission have a Memorandum of 
Understanding to facilitate collaboration between the Navy and Marine 
Corps and the State on energy and water-related projects at DON 
installations. I will continue to amplify the success stories from 
these partnerships and initiatives and will ensure installations 
continue to coordinate with local communities to tackle shared 
challenges and pursue mutually beneficial opportunities.
 Secretary Chaudhary. Understanding the importance, connectivity, 
and vulnerability of infrastructure and resources outside the fence 
line is an important strategy for improving military installation 
resilience. The Installation Climate Resilience Plans (ICRPs), which 
are required by the Fiscal Year 2020 and Fiscal Year 2022 National 
Defense Authorization Act, include three sections that address the 
installation and host community relationship. Section 5 of the ICRP 
addresses community infrastructure and resources, including medical 
facilities, transportation infrastructure, and energy infrastructure. 
Section 6 of the ICRP addresses agreements in effect or planned with 
public or private entities for the purpose of maintaining or enhancing 
military installation resilience or community resilience. Section 7 of 
the ICRP addresses current coordination efforts and plans for 
additional coordination with public or private entities for the purpose 
of maintaining or enhancing military installation resilience or 
community resilience. During the development of these sections of the 
ICRP, installation staffs are directed to identify agreements with the 
surrounding communities that enhance military installation resilience.

 8. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, have you considered the possibility of 
authorizing and encouraging the creation of positions under the 
Intergovernmental Personnel Act (5 U.S. Code 3372) within installation 
master planning staffs to be filled by resilience planners serving with 
the governments of defense communities or regional or State resilience 
agencies?
 Secretary Owens. My organization has taken advantage of the 
Intergovernmental Personnel Act for short-term temporary hires and will 
continue to leverage this authority as needed. I defer to the Military 
Departments on their use of the IPA authority at military installations 
to fill positions requiring personnel with resilience skillsets.
 Secretary Jacobson. This option is worthy of serious consideration 
by the Army; we will take a closer look at our options to use the 
authority.
 Secretary Berger. The Department of the Navy has not yet sought to 
leverage this authority, however, I am optimistic about its potential 
benefits and have directed my staff to look into this opportunity.
 Secretary Chaudhary. The Defense Noise Working Group (DNWG) 
recommended the expansion of the Navy's Community Planning Liaison 
Officer (CPLO) program to other Services in a recent report to 
Congress. The Deputy Assistant Secretary of Defense (Real Property) 
supports and encourages the recommendation. DASD(RP) included a 
position description guide in a November 2022 memo to facilitate 
creation of these positions at noise-generating installations. These 
staff are to provide continuity and oversee civilian community 
outreach. As such they serve as the AICUZ program manager and point of 
contact for similar programs such as Range Air Installations Compatible 
Use Zones (RAICUZ) and the Office of Defense Community Cooperation's 
(OLDCC) Community Noise Mitigation program as appropriate. They create 
long-term relationships with landowners and local government staff that 
encourage communication.
 interagency regional coordinators
 9. Senator Hirono. Secretary Owens, Section 2872 of the Fiscal Year 
2023 National Defense Authorization Act requires DOD to establish 
within the Department of Defense four Interagency Regional 
Coordinators, with responsibilities for improving the resilience of a 
community that supports a military installation, and that DOD establish 
at least one such Coordinator serving each of the East, West, and Gulf 
coasts. What is the status of action to comply with this requirement?
 Secretary Owens. The Department is currently developing a construct 
for determining designations and the role of these coordinators within 
the context of existing interagency efforts. The Department anticipates 
establishing the program in late summer.

 10. Senator Hirono. Secretary Owens, have you established criteria 
for determining where such Interagency Regional Coordinators will be 
established?
 Secretary Owens. The Department is still assessing the requirements 
to ensure the appropriate location of each pilot.

 11. Senator Hirono. Secretary Owens, have you considered 
establishing the fourth of such Coordinators in Hawai'i?
 Secretary Owens. Yes, Hawai'i is under consideration as part of the 
program construct.
 military installation resilience projects for civilian infrastructure
 12. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, 10 U.S. Code 2815 authorizes DOD to 
develop and implement military installation resilience projects outside 
the boundaries of military installations if the Secretary concerned 
determines that the project would preserve or enhance the resilience of 
a military or state-owned National Guard installation or of community 
infrastructure determined by the Secretary concerned to be necessary to 
maintain, improve, or rapidly reestablish installation mission 
assurance and mission-essential functions. What regulations and/or 
guidance, if any, has your office developed for the use of this 
authority?
 Secretary Owens. 10 U.S.C. 2815 does not by itself provide the 
necessary authority for DOD to carry out military construction projects 
on property not owned or under the control of the Department. This 
provision conflicts with other title 10 authorities which, requires 
military construction projects to be carried out on military 
installations under the jurisdiction or control of DOD. This 
requirement under Title 10 is based upon the intent for the Department 
to have property accountability for a complete and usable facility or 
improvement that provides mission readiness. In addition, this 
provision does not provide authority to acquire a property interest for 
Department access or oversight, or to fund a non-DOD entity to execute 
a project. Therefore, no guidance has been developed for use of this 
authority. However, DOD will continue to report to Congress on 
authorized projects which meet the criteria from this provision 
regarding military installation resilience.
 Secretary Jacobson. The Army acknowledges that pursuant to 10 USC 
2815, the Secretary of Defense may fund projects outside a military 
installation if a determination is made that the project would preserve 
or enhance the resilience of a military installation. The Army has not 
yet developed regulations and/or guidance to direct or manage use of 
the referenced statute, 10 USC 2815. However, the Army will soon do so 
to promote use of this authority.
 Secretary Berger. The Department of the Navy has not issued our own 
guidance regarding this authority; We are using the Department of 
Defense's guidance for the Energy Resilience and Conservation 
Investment Program to apply this authority. In addition to 10 U.S.C. 
2815, the Navy and Marine Corps are leveraging multiple authorities to 
partner with the community to improve infrastructure. A great example 
of our community partnering is the Defense Community Infrastructure 
Pilot (DCIP) Programs authorized under 10 U.S.C 2861 to address 
deficiencies in community infrastructure that support our installations 
in order to enhance military value, installation resilience, and the 
quality of life of sailors, marines and their families. We are 
currently reviewing approximately 100 eligible grant proposals for next 
year's cycle. In September 2022, Navy Region Southwest and the Port of 
San Diego signed an Intergovernmental Support Agreement memorializing a 
first-of-its-kind partnership that will provide millions of dollars for 
further electrification efforts for both Naval Base San Diego and the 
Port of San Diego, and improve air quality and public health on and 
around the San Diego Bay Working Waterfront. In addition to title 10 
authorities, the Department of the Navy is encouraged that recent 
legislation, like the Inflation Reduction Act and the Bipartisan 
Infrastructure Law, present opportunities to improve the resilience of 
our defense communities.
 Secretary Chaudhary. The Department of the Air Force leverages a 
range of existing tools, authorities and programs to work together with 
community partners to identify potential community partnership 
opportunities that would benefit both installations and communities. 
Through the Air Force Community Partnership program, the DAF will look 
for additional ways to either utilize or expand utilization of the 10 
USC 2815 authority for military installation resilience projects.

 13. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, has this authority for projects 
``outside the fence line'' been used within DOD/each military 
department (MILDEP). If not, why not?
 Secretary Owens. Section 2815 does not provide the necessary 
authority to carry out military construction projects outside the fence 
line of a military installation.
 Secretary Jacobson. The policy 10 USC 2815 has not yet been used 
outside of an Army installation to date because the Army has not yet 
developed regulations or guidance. However, the Army is committed to 
doing so in the near future.
 Secretary Berger. The Department of the Navy has not yet used this 
authority given funding constraints and the need for high-priority 
construction projects within our installations. However, we are 
continuously looking for way to leverage the authorities granted by 
Congress to increase the resilience of our bases and strengthen our 
partnerships with the local community. We are also partnering with our 
community, State and Tribal partners to act on opportunities in the 
Bipartisan Infrastructure Law and Inflation Reduction Act to create 
resilience in our defense communities.
 Secretary Chaudhary. The Department of the Air Force is not using 
the authority on any current projects. The Department of the Air Force 
leverages a range of existing tools, authorities and programs to work 
together with community partners to identify potential community 
partnership opportunities that would benefit both installations and 
communities.

 shipyard infrastructure optimization program
 14. Senator Hirono. Secretary Berger, multiple Members on this 
Subcommittee are very interested in the health of our shipyards, 
especially during this period of great power competition. In light of 
the ongoing, once in a generation modernization projects across each of 
the four public shipyards, including the Dry Dock replacement at Pearl 
Harbor, how is the Navy ensuring that the Shipyard Infrastructure 
Optimization Program, and modern business practices like 
electrification, are executed in a timely and efficient manner?
 Secretary Berger. The Department of the Navy is employing a 
coordinated management strategy across contracting, organizational, and 
scope domains to control cost and schedule for Shipyard Infrastructure 
Optimization Program (SIOP) investments. The Navy has established 
formal project governance, learning from other mega-projects, that sets 
expectations for issue resolution. Shipyards have a dedicated Officer 
in Charge of Construction to provide a level of oversight far beyond 
the typical construction effort, patterned off recent success at other 
naval depots.
 We recognize that SIOP provides a unique opportunity to address 
environmental stewardship, climate change, and energy resiliency, while 
updating the shipyards to Navy criteria and industry standards. The 
SIOP program office is incorporating low impact, sustainable features 
to aid in environmental preservation and protection and minimize the 
carbon footprint, increase resiliency, and reduce noise and maintenance 
requirements. We are also requiring our larger utility projects to 
provide resiliency and reduction of fossil fuel use--specifically for 
the electrification of cranes--and analyzing the requirements for 
reliable utility systems and how to most effectively provide backup 
power and water storage. SIOP is incorporating microgrids into planning 
to manage various renewable energy sources across the shipyards that 
will provide power to critical loads in an outage situation. The Navy 
is closely working with the states that host our shipyards to achieve 
shared sustainability and renewable energy goals.
 One example of how the Navy is incorporating modern business 
practices is the project design for the Dry Dock 3 replacement project 
at Pearl Harbor Naval Shipyard. The acquisition strategy used early 
contractor involvement to obtain feedback from all five potential 
bidders on constructability of the project and the contract documents. 
Their feedback ensured the design was buildable, led to improvements in 
the design, and corrected items that would have otherwise been found 
during construction, potentially creating cost and schedule changes. 
The contract allowed for alternative technical approaches, changes to 
the design that the Government accepted as part of the award which will 
mitigate cost and schedule risk. The contract also offers significant 
award fees for completing specific milestones (including ultimate 
completion) by specific dates, providing meaningful incentives to meet 
performance standards, and includes an economic price adjustment clause 
that places risk for the escalation of many materials on the 
Government, lowering the award cost. Additionally, the Navy awarded 
separate contracts ahead of the main construction contract, to 
accomplish environmental dredging and remove unexploded ordnance, 
averting a significant risk of delay at the beginning of work. A 
separate contract was completed to relocate the perimeter fence around 
the Controlled Industrial Area, allowing unimpeded access for the 
construction contractor at the start of work.

 15. Senator Hirono. Ms. Field, what can you share regarding the 
work done by the Government Accountability Office (GAO) on how the Navy 
could improve the quality of its shipyards?
 Ms. Field. Over the past 7 years, GAO has issued a series of 
reports on the Navy's public shipyards. In 2017, we reported that the 
condition of the naval shipyards was poor and their capital equipment 
was generally past its useful life. We also reported that current dry 
docks were unable to support the Ford-class aircraft carrier and some 
Virginia-class attack submarines, and were vulnerable to flooding and 
seismic risks. In addition, the shipyards' inefficient layouts 
contributed to thousands of days of maintenance delay for aircraft 
carriers and submarines. We recommended that the Navy develop a plan to 
improve the shipyards' infrastructure and incorporate results-oriented 
practices, such as goals and metrics, in its efforts.
 In 2018, the Navy issued the Shipyard Infrastructure Optimization 
Plan (SIOP), which called for improvements in dry docks, facilities, 
and capital equipment. The Navy initially estimated this would take 
over 20 years and cost $21 billion. In 2019, we reported that this 
estimate omitted key costs that could add billions to the ultimate 
price and that the Navy risked cost overruns, missed deadlines, and 
performance shortfalls. We recommended the Navy incorporate GAO's cost 
estimating best practices and determine clear roles and 
responsibilities for implementing the plan.
 The Navy has concurred with all of our SIOP-related recommendations 
and has taken some actions to implement them. For example, the Navy 
issued guidance to clarify the roles of the shipyard improvement 
program office and shipyard officials. However, four of our 
recommendations remain open. Section 356 of the James M. Inhofe 
National Defense Authorization Act for Fiscal Year 2023 requires the 
Navy to implement these open recommendations, which would enhance the 
Navy's cost estimates and improve its ability to assess SIOP progress. 
We will continue to track and publicly report on the Navy's ongoing 
efforts to implement our open recommendations.
 We also plan to issue a new report in June 2023 on the status of 
the SIOP. This report examines the extent to which the Navy (1) has 
developed a full cost and schedule estimate for the SIOP, (2) used best 
practices for cost and schedule estimating for the Portsmouth Naval 
Shipyard dry dock project, and (3) aligned funding for the Portsmouth 
and Pearl Harbor Naval Shipyards' dry dock projects with cost 
estimates.

 operational energy
 16. Senator Hirono. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, the DOD and the Services are investing 
in operational energy improvements to reduce the logistics demands of 
the military. Whether it's the blended wing body in the Air Force, the 
Army's anti-idle capability in the Joint Light Tactical Vehicle, or the 
Navy's hybrid electric drive for its surface ships, there are many 
current and future projects that will both reduce energy consumption 
and increase capability. Can each of you please quickly highlight some 
of your demand reduction programs, and why you think they're important 
for the future force?
 Secretary Owens. The Department must ensure that our forces are 
getting the liquid fuel needed for warfighting, as well as account for 
the increasing role of electrical power in enabling awareness and 
lethality. The Fiscal Year 2024 President's Budget Request includes 
over $3 billion in investments that reduce demand for operational 
energy, diversify our energy sources, increase supply chain resilience, 
and enhance enterprise-wide visibility of our energy use. Within my 
office, the Operational Energy Capability Improvement Fund (OECIF) 
leads joint initiatives that are today's Service investment priorities, 
while the Operational Energy Prototype Fund (OEPF) propels advanced 
technology success forward beyond the prototype stage to support the 
Services' transition.
 On the demand side, highlights from the President's Budget 2024 
request include improved engines for tactical fighters and helicopters, 
aerodynamic improvements for large aircraft, and a prototype for a 
blended wing body aircraft suitable for airlift or aerial refueling 
missions.
 Looking at power, the Army is aiming to field hybrid tactical 
vehicles by 2035, fully electrified tactical vehicles by 2050, and a 
hybrid Humvee prototype. Beyond vehicles, the Navy is pursuing 
integrated power systems that enable a fully electrified suite of 
propulsion, sensors, and weapons on board our ships.
 Programs like OECIF continue leading next generation technology 
maturation across Aviation Efficiencies, Space-based Power 
Efficiencies, and Tactical Vehicle Hybridization and Electrification. 
In fiscal year 2024 we are focused on technology development solutions 
for hard-to-operate locations including the arctic and space, and for 
production of power and fuel closer to the fight including small, 
mobile, nuclear, waste-to-energy, and synthetic fuel production. 
Finally, we are developing next generation power delivery and fuel 
optimization across the joint force including interoperability and 
standardization out to coalition forces through employment of tactical 
microgrids.
 Secretary Jacobson. A major component of the Army's logistics 
demands include fuel that must be brought to the battlefield. 
Therefore, the Army has been focused on reducing the energy usage on 
the battlefield. The anti-idle capability for the Joint Light Tactical 
Vehicle and other tactical vehicles allows these systems to operate 
mission equipment with the engine running less, saving fuel, and 
increasing the vehicle service life. Similarly, using intelligent 
controls and integrating systems together into a micro-grid, we are 
reducing the run-time of generators at Contingency Bases, supplying 
only the power needed versus running all the generators all the time. 
The Army also is pursuing hybrid-electric drive tactical vehicles. The 
ability to operate these vehicles without the engine running would 
allow soldiers to operate covertly with less noise and heat signature. 
This technology has been demonstrated in the Bradley Hybrid Electric 
vehicle being tested at Aberdeen Proving Grounds. Finally, the Improved 
Turbine Engine is being developed to provide the Apache and Blackhawk 
helicopters with improved performance at high altitudes, increased 
carrying capacity and increased range.
 Secretary Berger. It is critical for the Department of the Navy to 
reduce the energy demand of our platforms and weapons systems so our 
operational forces can extend their range and time on-station. In line 
with the National Defense Strategy and direction from the Deputy 
Secretary of Defense, the Navy is ensuring that energy demand reduction 
and energy supportability are integrated into our requirements for new 
capabilities and supported throughout acquisition. Over the past 
decade, we have made steady progress in improving the energy efficiency 
of our existing operational platforms to increase our combat capability 
and reduce the logistics supply requirements for deployed forces.
 The Marine Corps has already completed fuel efficiency upgrades to 
the medium tactical fleet which have produced a 10 percent increase in 
efficiency on more than 2,000 vehicles. Our fiscal year 2024 budget 
request continues this effort by installing more fuel efficiency 
upgrades on the Medium Tactical Vehicle Replacement (MTVR), which will 
produce significant cost savings over the life of the vehicle and 
improve combat effectiveness by reducing logistics requirements, 
increasing expeditionary capability and extending operational range.
 The Navy has seven classes of logistics ships and four classes of 
combatants that are now on hybrid power or have significantly improved 
propulsion and efficiency. The Navy has also installed the advanced 
Global Energy Information Systems (GENISYS) upgrade in 23 Arleigh 
Burke-class guided-missile destroyers. GENISYS collects, consolidates, 
processes, and presents energy data that gives commanders the ability 
to make informed decisions on energy usage, availability, and 
efficiency. To make our new platforms more energy efficient, the 
Department of the Navy's fiscal year 2024 budget request funds test and 
evaluation efforts for various gas turbine fuel efficiency concepts to 
identify energy capability improvement technologies and energy 
monitoring methodologies. The Navy is also investing to develop higher-
efficiency Gallium Nitride High Power Amplifiers, which are used in 
maritime advanced technology radar and surface electronic warfare 
systems, to improve system performance while reducing the draw the 
system has on the ship's electrical power.
 Secretary Chaudhary. By improving the energy intensity of 
operations, the Department of the Air Force is increasing the 
efficiency of aircraft, operations, and processes to achieve more 
capability per gallon of fuel consumed. In short, we're getting more 
`bang for our buck' by using less fuel, enabling aircraft to fly 
farther and carry more, decreasing aircraft maintenance issues, and 
increasing readiness. We do this through a variety of ways including 
drag reduction technologies on our legacy aircraft, cargo optimization, 
engine sustainment improvement, advanced platform designs, cultural 
change, and more.
 For example, the DAF is procuring drag reduction capabilities for 
our Mobility Air Forces fleet including C-17 Microvanes, which are 
expected to reduce aircraft drag by 1 percent, with anticipated fuel 
cost savings of $11 million per year. C-130 finlets are estimated to 
reduce aircraft drag by 3 to 6 percent, with anticipated fuel cost 
savings of over $5 million per year, while the KC-135 Air Contour 
System will reduce drag by 1 to 2 percent and result in over $6 million 
per year in fuel savings. There are several other technologies like 
this that are estimated to save up to hundreds of millions of dollars 
once implemented.
 Additionally, our improved engine wash programs, which include 
adding detergent to existing water wash procedures and the innovative 
nucleated foam wash evaluation program, provide results that improve 
engine performance and reduce maintenance manpower impacts, translating 
into more aircraft available to meet mission and training requirements. 
 
 Finally, the transformational Blended Wing Body project aims to 
accelerate the next generation of large aircraft with a solution that 
reduces energy demand by 30 percent or more compared to current tube-
and-wing configurations, significantly reducing fuel logistics risk, 
and increasing range and capability.
 readiness and environmental protection integration program
 17. Senator Hirono. Secretary Owens, when can we expect corrective 
action to occur on the findings of DOD IG report 2023-061?
 Secretary Owens. Consistent with my office's response to the DODIG 
on this report, we are creating guidance to incorporate installation 
climate resilience plans and developing new Integrated Installation 
Resilience policy to integrate energy, water, climate, mission 
assurance and cybersecurity resilience across our installations. Both 
efforts are well underway and are expected to be completed in fiscal 
year 2024.

 18. Senator Hirono. Secretary Owens, why is it important to 
incorporate more resilient design into future construction projects?
 Secretary Owens. It is critical that our facilities be able to 
withstand and rapidly recover from the effects of extreme weather 
events and other anticipated changes in environmental conditions since 
the Department's installations are key mission enablers.
 In addition, investments in flood, wind, fire and wind resistant 
infrastructure reduces the likelihood that an extreme weather event 
will have catastrophic installation impacts and associated recovery 
costs.

 19. Senator Hirono. Secretary Owens, how important is the Readiness 
and Environmental Protection Integration (REPI), Program for helping 
installations address their vulnerabilities to extreme weather and 
climate change and enhancing cooperation with neighboring communities?
 Secretary Owens. The Readiness and Environmental Protection 
Integration (REPI) Program is a key element of DOD's multi-pronged 
approach to address vulnerabilities to extreme weather and climate 
change through partnership and cooperation with neighboring 
communities. DOD increased the REPI budget significantly to focus on 
collaboration with REPI program partners (states, local governments, 
non-governmental organizations, and other Federal Agencies) to enhance 
installation resilience through the implementation of nature-based 
solutions outside of the fence line. Examples include establishing off-
installation living shorelines, conducting dune restoration, and 
reinstating historical hydrology to prevent flooding and address storm 
surge; removing hazardous fuel loads, creating firebreaks, and 
implementing various land and forest management techniques to reduce 
wildfire risk; and protecting or enhancing aquifer recharge zones to 
preserve water supplies in drought prone areas. All these efforts are 
planned and executed at the local level to maintain and improve the 
resilience of defense and civilian infrastructure important to DOD.
 __________
 Questions Submitted by Senator Jeanne Shaheen
 per-and polyfluoroalkyl substances (pfas) testing transparency
 20. Senator Shaheen. Secretary Owens, I am extremely concerned with 
the Department of Defense's (the ``Department') interpretation of 
Section 345(a) of the Fiscal Year 2022 National Defense Authorization 
Act--a provision which sought to increase transparency of PFAS testing 
with impacted communities. Instead, the Department interpreted that 
provision by curtailing data sharing. I sought to fix the Department of 
Defense's (DOD) misunderstanding of congressional intent by including a 
clarifying provision in the Fiscal Year 2023 National Defense 
Authorization Act. Throughout the entire last year, my staff and 
committee staff were consistently assured by DOD officials that my 
provision would resolve the data transparency issue. However, upon 
enactment, DOD walked those assurances back, the data issue remains 
unchanged and our constituents still lack the testing information they 
were already receiving prior to the Fiscal Year 2022 National Defense 
Authorization Act being passed. Do you have an update on how the 
Department is planning on addressing this data transparency issue?
 Secretary Owens. The Department has determined that certain 
information--specifically the names and addresses of private 
residences--associated with off-base PFAS sampling is considered 
personally identifiable information (PII) and cannot be released or 
shared with the public under the Freedom of Information Act (5 U.S.C. 
Sec. 552(b)(6)), regardless of the language in Section 345(a) of the 
Fiscal Year 2022 NDAA. DOD is also evaluating whether latitude and 
longitude data should be treated as PII given the ease with which this 
information can be converted to names and addresses. The Department 
clarified, through policy published this summer, the information that 
can be released to facilitate information sharing and ensure 
transparency, while protecting PII.

 21. Senator Shaheen. Secretary Owens, is there a legislative fix 
that Congress can provide to address this issue once and for all?
 Secretary Owens. We believe a legislative fix would have to address 
several laws, such as the Freedom of Information Act, to balance the 
ongoing sharing of PFAS sampling data and specifically allow 
associating this sampling data with private residential addresses and 
names. The Department clarified, through policy published this summer, 
the information that can be publicly released to facilitate information 
sharing and ensure transparency on our cleanups, while protecting PII. 
DOD stands ready to work with Congress to develop a path forward that 
fully addresses this issue fully.

 22. Senator Shaheen. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, this problem exacerbates an existing trust 
issue between PFAS-impacted communities and the DOD. How do you plan on 
addressing that widening fault?
 Secretary Owens. The Department publicly releases PFAS sampling 
data but does not identify this sampling data with specific private 
residential addresses or owner names (which are PII) when drinking 
water samples are taken off-base at private residences. DOD clarified, 
through policy published this summer, the information that can continue 
to be released publicly to facilitate information sharing and ensure 
transparency, while protecting PII.
 In addition, the Department launched the Environmental Cleanup 
Communication and Outreach Initiative (ECCOI) in the fall of 2022 to 
examine existing dialog and communication with community residents, 
Restoration Advisory Board (RAB) members, environmental regulators, and 
other stakeholders. We have had several in-person engagements with RAB 
and community members throughout this initiative and are considering 
the feedback and concerns we have received from community residents as 
we implement DOD's policy on information sharing and PII.
 Secretary Jacobson. The Army is committed to fulfilling our cleanup 
responsibilities and remaining transparent about our progress with both 
Congress and the public. At the Headquarters Army level, Army 
leadership has participated in OSD hosted outreach events with advocacy 
group leaders to provide status updates of Army PFAS activities and 
answer questions. At the Army installation level, the garrison 
commander and the installation environmental team engage their 
community impacted by Army releases of PFAS through public meetings, 
townhalls, Remedial Advisory Boards, and direct communication with 
impacted landowners. Army installations post PFAS information to the 
installation webpage and provide an installation level point of 
contact. Army encourages input from regulatory and public stakeholders 
on how to best engage the impacted communities and how those 
communities would like to receive information on Army actions to 
address PFAS that best suits the community's needs. In addition to PFAS 
information posted on installation webpages, the Army makes cleanup 
information and final reports available in the CERCLA administrative 
record and on multiple Army websites. The Army updates these webpages 
regularly:
 https://www.denix.osd.mil/army-pfas/
 https://aec.army.mil/index.php/PFAS https://www.nationalguard.mil/
Environmental/PFAS/
 The Army also submits off-installation private drinking water 
sampling results monthly to OSD, which publishes the information at:
 https://www.acq.osd.mil/eie/eer/ecc/pfas/map/pfasmap.html.
 Secretary Berger. The Department of the Navy understands the 
importance of transparency and clarity of communication and works under 
the DOD PFAS Task Force to ensure alignment among the services. The 
Office of the Secretary of Defense has established policy and a website 
to ensure a consistent DOD-wide approach in public disclosure of 
planned PFOA/PFOS testing in drinking water within a covered area in 
accordance with the requirements of Section 345(b) of the Fiscal Year 
2022 National Defense Authorization Act. The Department submits 
sampling results monthly to OSD, who then publishes at: https://
www.acq.osd.mil/eie/eer/ecc/pfas/map/pfasmap.html.
 Secretary Chaudhary. Consistent with our priority to protect our 
personnel, their families and residents of our surrounding communities, 
the Department of the Air Force is dedicated to addressing releases of 
per- and polyfluoroalkyl substances (PFAS) attributable to our 
activities. We remain committed to fulfilling our cleanup 
responsibilities, operating within the authorities provided by the 
Federal cleanup law, and increasing transparency by clearly 
communicating and engaging with impacted communities. We recognize that 
building trust with the community requires accountability and the 
cleanup process can be complicated, confusing and lengthy. The 
Department is proactively taking action to build and sustain 
understanding of the cleanup actions we take to address environmental 
releases resulting from DAF activities. We have pledged to establish or 
improve public trust and are developing and providing the resources, 
tools, guidance and training to support our engagement efforts with 
community stakeholders, to include local, State, and Tribal 
governments; non-governmental organizations; and community members.
 pfas budget display
 23. Senator Shaheen. Secretary Owens, the fiscal year 2023 omnibus 
appropriations bill included a requirement for the Department of 
Defense to submit a budget display detailing PFAS-related funding lines 
across the Department. However, as of today that document has yet to be 
submitted to Congress. Why is that budget display document delayed and 
when can we expect it to be delivered?
 Secretary Owens. The Department provided this report to Congress in 
August. Additionally, a breakout of PFAS costs were included in the 
Operations and Maintenance Overview, provided as part of the Defense 
Budget Materials for the Fiscal Year 2024 President's Budget Request.

 pfas activity budgeting
 24. Senator Shaheen. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, Congress has shown a willingness to 
accelerate testing and cleanup by increasing DOD funding for those 
activities--such as the $517 million authorized in the Fiscal Year 2022 
National Defense Authorization Act. However, the Department claims it 
is unable to execute additional funds Congress is willing to provide to 
accelerate PFAS responses. In September, Senator Rounds and I sent a 
letter to DOD and the White House about the need to improve the 
Department's budgeting for PFAS-related activities, including the need 
to plan how to utilize higher levels of funding. How does the fiscal 
year 2024 budget request improve on past years' efforts to fund PFAS-
related activities?
 Secretary Owens. The Department's annual budget request is based on 
a number of factors, including cleanup schedules, how much work would 
be ready to award in a fiscal year, and the amount of work that can be 
managed by DOD and our regulatory partners. The Department has ensured 
that the fiscal year 2024 request reflects the amount needed to 
continue the cleanup process based on information known at the time the 
budget was submitted. DOD continues to refine the fiscal year 2024 work 
plan as investigative phases are completed and needed information is 
acquired to move a site into the next cleanup phase. Sites may be 
prioritized differently during the year of execution as these 
adjustments are made, which may allow us to execute funding above the 
requested level during the year of execution. DOD continues to work 
with our contracting offices and regulatory partners to optimize 
execution of anticipated and appropriated funding.
 Secretary Jacobson. The Army's fiscal year 2024 budget request 
($198 million) will address PFAS remedial investigations and removal 
actions at Army installations and National Guard locations and reflects 
the amount needed to continue the cleanup process based on information 
known at the time the budget request was submitted. The Army is also 
coordinating with OSD and evaluating likely budget impacts related to 
the EPA notice of proposed rulemaking on PFAS MCLs.
 Secretary Berger. The Department of the Navy shares the concern you 
expressed in your letter and is working diligently to address PFAS 
releases in order to mitigate risks to personnel on military 
installations and in the surrounding communities. The Department of the 
Navy's fiscal year 2024 budget request reflects our utilization of 
higher levels of congressional funding and incorporates information 
from our preliminary assessments and site inspections. As we move 
forward in the program, the Department will continue to improve our 
understanding of the full nature and extent of PFAS releases across our 
installations and to better refine the resources and timelines required 
to clean them up.
 Secretary Chaudhary. The Department of the Air Force executed all 
the congressional plus up (8$1.3 billion) to date. The fiscal year 2023 
DAF PFAS request was 8$87 million, and the fiscal year 2024 DAF PFAS 
request is 8$188 million.

 25. Senator Shaheen. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, has the Department taken action to prepare 
to accept the higher funding levels Congress has shown willing to 
provide?
 Secretary Owens. The Department supports addressing our PFAS 
releases as quickly as possible, under the applicable cleanup laws. 
This is a stepwise process that includes identifying, investigating, 
and cleaning up releases of PFAS caused by DOD activities. Based on 
recent data from our investigations, the Department has issued policy 
to implement interim actions to prevent further PFAS migration off-base 
and plan for pending regulatory requirements for certain PFAS in 
drinking water.
 Secretary Jacobson. The Army and DOD follow the Federal cleanup law 
which is a risk-based phased process. As the Army gathers more site-
specific PFAS information and progresses in its cleanups, updated 
funding requirements will be incorporated into future budget requests. 
The Army is fully prepared to implement the DOD PFAS Task Force policy 
to incorporate additional interim actions to support PFAS cleanups. The 
Army is appreciative of congressional plus-ups that have allowed us to 
fund year of execution PFAS needs, and the Army is best prepared to 
accept a higher funding level if provided in the overall DERA account 
rather than appropriated as line item PFAS specific funding.
 Secretary Berger. Yes, the Department of the Navy has identified 
sites for cleanup investigations and actions. In addition, the 
Department is preparing for future requirements in the Environmental 
Restoration Program in consideration of EPA's proposal of a National 
Primary Drinking Water Regulation including maximum contaminant levels 
for certain PFAS under the Safe Drinking Water Act.
 Secretary Chaudhary. The DAF Installation Restoration Program is a 
risk-based program that prioritizes funding first those projects that 
pose the highest risks to human health and the environment, consistent 
with the DOD Relative Risk Site Evaluation framework. Using this 
framework, we evaluate the relative risk posed by one site in relation 
to other sites and apply funding to projects based on the relative 
risk-based priority of all DAF cleanup requirements. We are prepared to 
allocate our funding on a ``worst first'' basis, to address human 
health and environmental impacts. DAF is also evaluating the 
possibility of applying funds to PFAS pilot studies, engineering 
projects, and drinking water treatment improvements.
 mass timber
 26. Senator Shaheen. Secretary Owens, mass timber is not only the 
only renewable construction material, but it is also the most 
sustainable given 50 percent of its dry weight is carbon actively 
sequestered from the environment. Equally as important in this venue, 
however, is the fact that mass timber far exceeds installation 
resilience standards required for optimal readiness. Mass Timber 
strength surpasses anti-terrorism force protection (ATFP), seismic 
activity, lateral wind, and fire performance requirements. If those 
benefits were not enough, mass timber buildings also consistently go up 
almost 40 percent faster with at least 40 percent reduction in 
construction labor requirements and 90 percent less onsite construction 
traffic. Mass timber was included in the UFC in 2016 when the first 
privatized Army hotel was built, and the Department has known about all 
of those benefits for years. Commercial industry also makes effective 
use of this material--like the new headquarters campus for Walmart. 
Given this wide range of benefits, for each of the Services here, why 
is it going to take until fiscal year 2025 to use mass timber in a 
Department of Defense building?
 Secretary Owens. The Department is pursuing use of sustainable 
building materials, including mass timber, on projects when these 
materials meet project performance and durability requirements and are 
life cycle cost effective. DOD has several mass timber buildings on 
installations today. The DOD facilities guidance has been updated to 
accommodate use of mass timber. However, like most technologies before 
they gain significant market penetration, adoption of mass timber still 
faces challenges, such as a relatively small pool of suppliers often 
located long distances from our constructionsites. Similarly, skilled 
subcontractors are not necessarily geographically co-located for prime 
contractors to find and hire. These factors have made it difficult to 
broadly implement however, the Department recognizes that constraints 
to adoption are easing as mass timber becomes more widely used and is 
committed to its use.

 27. Senator Shaheen. Secretary Owens, what policy changes need to 
be made to ensure mass timber is equally evaluated in the beginning 
stages of a military construction (MILCON) project, and do you need any 
of those through legislation?
 Secretary Owens. The Department seeks to use sustainable building 
materials when they meet required performance parameters and are 
lifecycle cost effective. The Department is currently reviewing its 
policies with respect to sustainable building materials, including mass 
timber. However, use of mass timber technologies in DOD projects is not 
restricted by Department policies. The Military Departments are 
currently undertaking several pilot project designs that include mass 
timber.

 28. Senator Shaheen. Secretary Jacobson, how does the Army ensure 
its designers and engineers are aware of unique material benefits once 
included in the UFC, especially in light of the current MILCON backlog 
and need to revitalize infrastructure?
 Secretary Jacobson. The Army has a robust innovative material 
analysis, evaluation and incorporation program under the Corps of 
Engineers' Engineering Research and Development Center (ERDC). Regular 
working group meetings between ERDC researchers and Corps Subject 
Matter Experts facilitates knowledge transfer, promotes use cases, and 
updates to facility standards and criteria.
 Additionally, the Army is conducting two military construction 
pilot unaccompanied housing projects at Joint Base Lewis McChord--an 
fiscal year 24 Sustainable Materials pilot and a fiscal year 25 Mass 
Timber pilot. The lessons learned from these pilots will inform the 
engineering and design of ensuing military construction and restoration 
and modernization projects and will provide field-verified data for 
updating UFCs, specifications, and other engineering guidance.
 __________
 Questions Submitted by Senator Tim Kaine
 additional authorities
 29. Senator Kaine. Secretary Owens, during the April 19th Senate 
Armed Services Committee's Readiness and Management Support 
Subcommittee hearing, you referred to the Office of Local Defense 
Community Cooperation's (OLDCC) Defense Community Infrastructure 
Program (DCIP) as DOD program available to assist defense communities 
address threats to their communities and the key civilian 
infrastructure supporting DOD installations from sea level rise and 
other impacts of climate change. How is your office also making use of 
(1) 10 U.S. Code 2815, which, as amended in the Fiscal Year 2021 
National Defense Authorization Act, authorizes DOD to directly plan and 
implement military installation resilience projects outside of military 
installations and (2) 10 U.S. Code 2815a, enacted in the Fiscal Year 
2022 National Defense Authorization Act, which authorizes DOD to 
directly plan and implement storm water management projects both on 
military installations and in related areas outside of those 
installations?
 Secretary Owens. 10 U.S.C. 2815 does not by itself provide the 
necessary authority for DOD to carry out military construction projects 
on property not owned or under the control of the Department. This 
provision conflicts with other title 10 authorities which, requires 
military construction projects to be carried out on military 
installations under the jurisdiction or control of DOD. This 
requirement under title 10 is based upon the intent for the Department 
to have property accountability for a complete and usable facility or 
improvement that provides mission readiness. In addition, this 
provision does not provide authority to acquire a property interest for 
Department access or oversight, or to fund a non-DOD entity to execute 
a project. Therefore, no guidance has been developed for use of this 
authority. However, DOD will continue to report to Congress on 
authorized projects which meet the criteria from this provision 
regarding military installation resilience.

 30. Senator Kaine. Secretary Owens, what regulations and/or 
guidance has your office developed for the use of these authorities?
 Secretary Owens. 10 U.S.C. 2815 does not by itself provide the 
necessary authority for DOD to carry out military construction projects 
on property not owned or under the control of the Department. This 
provision conflicts with other title 10 authorities which, requires 
military construction projects to be carried out on military 
installations under the jurisdiction or control of DOD. This 
requirement under title 10 is based upon the intent for the Department 
to have property accountability for a complete and usable facility or 
improvement that provides mission readiness. In addition, this 
provision does not provide authority to acquire a property interest for 
Department access or oversight, or to fund a non-DOD entity to execute 
a project. Therefore, no guidance has been developed for use of this 
authority. However, DOD will continue to report to Congress on 
authorized projects which meet the criteria from this provision 
regarding military installation resilience.

 31. Senator Kaine. Secretary Owens, if no such guidance or 
regulations have been issued for 10 U.S. Code 2815 and 10 U.S. Code 
2815a, what steps are you taking to develop and promulgate such 
guidance or regulations, and when do you anticipate that those will be 
completed?
 Secretary Owens. 10 U.S.C. 2815 does not by itself provide the 
necessary authority for DOD to carry out military construction projects 
on property not owned or under the control of the Department. This 
provision conflicts with other title 10 authorities which, requires 
military construction projects to be carried out on military 
installations under the jurisdiction or control of DOD. This 
requirement under title 10 is based upon the intent for the Department 
to have property accountability for a complete and usable facility or 
improvement that provides mission readiness. In addition, this 
provision does not provide authority to acquire a property interest for 
Department access or oversight, or to fund a non-DOD entity to execute 
a project. Therefore, no guidance has been developed for use of this 
authority. However, DOD will continue to report to Congress on 
authorized projects which meet the criteria from this provision 
regarding military installation resilience.

 32. Senator Kaine. Secretary Owens, have these authorities for DOD 
to plan and implement resilience projects ``outside the fence line'' 
been used within DOD/each MILDEP? If so, please provide a list of such 
projects. If not, why not?
 Secretary Owens. Section 2815 does not provide the necessary 
authority to carry out military construction projects outside the fence 
line of a military installation.

 defense access roads programs
 33. Senator Kaine. Secretary Owens, the vulnerability of key access 
roads to military installations (such as Hampton Boulevard and access 
to the Norfolk Naval Base) to the impacts of flooding, sea level rise, 
and other impacts of climate change is a major issue in assuring 
military installation resilience and continuity of operations. In 
recognition of these vulnerabilities, 23 U.S. Code 210, the authority 
for the Defense Access Roads (DAR) program, was amended in the Fiscal 
Year 2019 and Fiscal Year 2020 National Defense Authorization Acts to 
broaden the scope of the DAR program to include actions to key 
airfields and seaports that support the deployment of U.S. Forces and 
logistical support to those deployed forces. Have the guidance and 
regulations governing the DAR program been updated to reflect these 
amendments? If so, please provide those updated guidance and 
regulations. If not, why not, and when will such additional guidance 
and regulations been promulgated?
 Secretary Owens. The Office of the Secretary of Defense signed out 
a memorandum on December 23, 2019, directing the update of Defense 
Access Road (DAR) Program guidance to expand the eligibility criteria 
to include a new criterion to address potential recurrent flooding 
issues. These criteria are further promulgated in DODM 4510.12, 
released June 14, 2023.

 34. Senator Kaine. Secretary Owens, has the amended DAR authority 
been used to reduce the vulnerability of Defense Access Roads such as 
Hampton Boulevard to flooding, sea level rise, and other impacts of 
climate change? If so, please provide details on those projects.
 Secretary Owens. To date, the Military Departments have not 
submitted any requirements under the new DAR authorities added in the 
Fiscal Year 2019 and Fiscal Year 2020 National Defense Authorization 
Acts. OSD is not aware of any recurrent flooding or sea-level rise 
impacts that are creating a national security risk due to 
transportation access to defense facilities.
 However, we are aware of 11 active Defense Access Roads (DAR) that 
may be subject to riverine flooding. During the routine planning and 
design process, flood risk reduction measures are evaluated and 
implemented in accordance with Federal, State, and local standards 
based on the road functional classification. The Department notes that 
the DAR Program is a mechanism to fix a problem based on a DOD action, 
so once a project is completed for construction, the road is turned 
over to the State or local municipality for future maintenance and DOD 
does not track them as active projects.

 35. Senator Kaine. Secretary Owens, DAR projects are now typically 
funded by minor MILCON funds. Should Congress authorize the use of 
operations and maintenance (O&M) funding for such projects in certain 
circumstances, as it has with regard to certain resilience projects 
under 10 U.S. Code 2815?
 Secretary Owens. DAR projects are typically funded through 
specifically authorized and appropriated military construction 
projects, not unspecified minor military construction funding as those 
thresholds (in 10 U.S.C. 2805) are too small to undertake substantial 
new construction. 23 U.S.C. 210 already allows the use of O&M funding 
on DAR-certified roads, but mainly for maintenance purposes. The 
Department has not currently identified and certified any roads that 
would benefit from the authorization of O&M funding for this purpose.

 climate resilience
 36. Senator Kaine. Secretary Owens, Office of the Inspector General 
Report DODIG-2023-061, ``Audit of Military Department Climate Change 
Assessments and Adaptation Plans in the Southeastern Continental United 
States'', dated March 23, 2023 found that DOD Instruction 4165.70 does 
not contain language requiring all installations to include climate 
resilience in their Master Plans and that UFC 2-100-01 does not provide 
sufficient guidance to standardize climate risk assessments. How is 
your office correcting these deficiencies, and when do you anticipate 
that each of these required corrective actions will be completed?
 Secretary Owens. Consistent with my office's response to the DODIG 
on this report, we are creating guidance to incorporate installation 
climate resilience plans and developing new Integrated Installation 
Resilience policy to integrate energy, water, climate, mission 
assurance and cybersecurity resilience across our installations. Both 
efforts are well underway and are expected to be completed in fiscal 
year 2024.

 37. Senator Kaine. Secretary Owens, 10 U.S. Code 2285(e) requires 
that the Secretary of Defense develop a framework that authorizes and 
directs installation commanders to engage with State, regional, and 
local agencies, and with local communities, on planning for climate 
resilience, to enhance efficient response to impacts of extreme weather 
and secure collaborative investment in infrastructure that is resilient 
to the current and projected impacts of extreme weather. Has the 
Secretary charged you with complying with this requirement?
 Secretary Owens. Yes, in my role as the Assistant Secretary of 
Defense for Energy, Installations and Environment, I have been 
delegated all of the of the statutory authorities required to execute 
this role to include 10 U.S.C. 2285(e).

 38. Senator Kaine. Secretary Owens, if the Secretary of Defense has 
charged you with complying with the above requirement, what is the 
status of your actions to develop the required framework and when do 
you anticipate it be completed and communicated to the military 
departments?
 Secretary Owens. The master planning guidance already contains the 
requirement to coordinate master plans with local municipalities for 
the purpose of promoting installation and community resilience. I defer 
to the Military Departments on the implementation of this guidance.
 coordination efforts
 39. Senator Kaine. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, coordination of the military installation 
resilience component of installation master plans with defense 
communities and state/regional resilience entities requires 
participation by representatives of those entities in the process of 
developing this component of installation master plans. What guidance 
will you provide (for the) (within your) military department(s) with 
regard to providing such inclusion and coordination?
 Secretary Owens. The master planning guidance already contains the 
requirement to coordinate master plans with local municipalities for 
the purpose of promoting installation and community resilience. I will 
continue working with the Military Departments and provide the 
appropriate oversight to ensure this guidance is implemented.
 Secretary Jacobson. The Army's ICRP process has strived for full 
stakeholder participation across all installation functions and service 
areas, as well as Army tenants, other DOD tenants and community 
governmental organizations, such as Regional Councils of Government. 
Off-installation infrastructure capacity and conditions are included in 
the ICRPs when available and vulnerable assets are identified by local 
governments. Furthermore, the ICRPs provide strategies for 
strengthening (or establishing) community partnerships and associated 
administrative actions for adaptation and mitigation. Also, proposed 
guidance for community involvement as part of the master planning 
process is being developed for issuance later this year as Army policy. 
Including local communities in the Army's master planning processes is 
essential, required by statute and Army regulation, and is good 
practice.
 All ICRPs are being accomplished in this interactive manner. ICRPs 
for Fort Carson, CO, Anniston Army Depot, AL, Fort Greely, AK, Fort 
Wainwright, AK and Fort Bliss, TX are complete. ICRPs are also underway 
for Fort Liberty, NC, Fort Cavazos, TX and Fort Stewart, GA and 
expected to be complete in fiscal year 2023.
 Secretary Berger. To meet the new resilience requirements in the 
Fiscal Year 2023 National Defense Authorization Act, the Department of 
the Navy developed a new, all-inclusive, 5-day course for installation 
master planners that incorporates master planning, resilience, and 
relevant areas of the Naval Facilities Engineering Systems Command 
Climate Change Planning Handbook. To date, this course has been offered 
to installation master planning staff in Naval Base San Diego and 
Commander, Fleet Activities Yokosuka, and is planned to be implemented 
across the Department. We have also issued standard operating 
procedures to ensure installation master planners know how to create 
installation resilience components consistently and effectively. This 
guidance identifies and leverages tools and data from subject matter 
experts internal to the Department as well as from other Federal, 
regional, State and local agencies.
 Additionally, the Navy and Marine Corps have robust processes and 
procedures in place to proactively seek coordination with local defense 
communities and state/regional resilience entities across of variety of 
common interest areas, to include the military installation resilience 
component of installation master plans. This coordination is 
established and maintained by our Installation Commanding Officers 
leveraging their Community Planning & Liaison Officers (CPLOs) who 
serve as the bridge between the installation, the community, local, 
regional, and State government, and private stakeholders. Community and 
climate action are key drivers across my EI&E portfolio; I continue to 
amplify the success stories from these partnerships and provide 
guidance to our Shore enterprise to prioritize robust coordination with 
local communities focused on tackling our combined climate resilience 
challenges.
 Secretary Chaudhary. During the development of the Installation 
Climate Resilience Plans (ICRPs), which are required by the Fiscal Year 
2020 and Fiscal Year 2022 National Defense Authorization Act, 
installation staffs are directed to identify agreements with the 
surrounding communities that enhance military installation resilience 
and specifically work to mitigate the hazards to community resources 
outside the installation boundaries. Major community partnership 
efforts such as the Readiness and Environmental Protection Integration 
(REPI) program and the Military Installation Sustainability Program 
(MISP) often include Memorandums of Agreement (MOA), which support 
installation and community resilience.

 40. Senator Kaine. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, what specific steps have you taken to 
provide the necessary training to installation master planners?
 Secretary Owens. OSD has existing policy in place requiring DOD 
Components to provide master planning training for key personnel using 
curricula developed either in-house or through the Army's Master 
Planning Institute, toward a goal of at least 4 hours of training for 
installation commanders and 32 hours of training biennially for 
installation master planners. I defer to my colleagues on the specific 
curriculum the Military Departments are using to train planners.
 Secretary Jacobson. Preparing the workforce to operate in a climate 
altered environment is a specific action within the Army's Climate 
Strategy (ACS) Line of Effort (LOE) 3: Training. Climate 101 training 
is available for installation personnel and garrison commanders from 
the Army Materiel Command. This training introduces climate impacts to 
natural resources and other post infrastructure and operations. Courses 
on sustainability, resilience, and energy are provided through USACE 
and enhance the skillsets of installation master planners (along with 
the entire Army workforce).
 The U.S. Army Corps of Engineers offers other courses on 
sustainability, resilience, energy, and master planning. USACE provides 
a suite of online and in-person training courses for installation 
planners that includes master planning principles as a prerequisite to 
advanced courses in area development planning, energy, sustainability, 
resiliency, and practices for managing master planning programs. These 
courses evolve to address requirements of the NDAA, DOD policy and 
certain industry standards, such as those published by American Society 
of Heating, Refrigerating and Air-Conditioning Engineers. USACE will 
continue to offer these courses with respect to installation resilience 
planning. USACE is beginning work on a new sustainable building 
training program that should be offered within the next year.
 The Army issued Installation Climate Resilience Plan (ICRP) 
guidance in November 2022 which directed the use of climate-related 
data and climate resilience indicators to align with installation 
planning functions to address risks and climate resiliency goals. The 
Army uses contractors to develop the ICRPs. The contractors facilitate 
onsite workshops, and installation master planners build their 
knowledge and expertise as they coordinate ICRP activities and 
integrate input from the full range of installation stakeholders 
including community partners.
 The Army ICRP process is providing critical on the job training for 
installation master planners who have a crucial role to integrate input 
from installation stakeholders including community partners. 
Contractors supporting the Army's initial ICRP efforts are providing a 
model that can be followed by installation master planners in the 
conduct of future workshops. The master planners, along with all 
participants in the ICRP process, provide active input and comments to 
the resulting ICRP documents.
 Finally, Army training is evolving to build climate literacy. An 
Army Climate Strategy working group is developing implementation plans 
for training objectives to capture lessons learned, best practices for 
climate adaptation and mitigation, and inculcation of climate literacy 
into leader development and workforce training curricula.
 Secretary Berger. To meet the resilience requirements of the Fiscal 
Year 2023 National Defense Authorization Act, the Department of the 
Navy developed a new, comprehensive 5-day course for installation 
master planners that incorporates master planning, resilience, and 
relevant areas of the Naval Facilities Engineering Systems Command 
Climate Change Planning Handbook. To date, this course has been offered 
to installation master planning staff in Naval Base San Diego and 
Commander, Fleet Activities Yokosuka, and is planned to be fully 
implemented across the Department through fiscal year 2024. We have 
also issued standard operating procedures to ensure installation master 
planners know how to create installation resilience components 
consistently and effectively. This guidance identifies and leverages 
tools and data from subject matter experts internal to the Department 
as well as from other Federal, regional, State, and local agencies.
 Secretary Chaudhary. The Department of the Air Force provides 
training for installation master planners through the Air Force 
Institute of Technology and other venues. For example, AFIT has both a 
basic course in installation planning (Installation Planning 
Principles), an advanced course (Comprehensive Planning and 
Development) and an entire curriculum on Environmental Management. 
There is some cross-pollination. The Interservice Environmental 
Education Review Board promotes quality education and consistent 
approaches across all Services by identifying courses that fulfill 
common needs. Finally, installation master planners are encouraged to 
seek Professional Military Education (PME) appropriate to their grade 
and aspirations. PME enhances their leadership and problem-solving 
skills while firmly connecting their built environment work to the 
installation's mission.

 41. Senator Kaine. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, does the online and in-person training 
program for installation planners administered by USACE include courses 
in this regard? If not, what measures are being taken to expand these 
training opportunities?
 Secretary Owens. I defer to Secretary Jacobson to characterize what 
type of training is offered by USACE.
 Secretary Jacobson. USACE provides a suite of online and in-person 
training courses for installation planners that includes master 
planning principles as a prerequisite to advanced courses in area 
development planning, energy, sustainability, resiliency, and practices 
for managing master planning programs. These courses evolve to address 
requirements of the NDAA, DOD policy and certain industry standards, 
such as those published by American Society of Heating, Refrigerating 
and Air-Conditioning Engineers. USACE will continue to offer these 
courses with respect to installation resilience planning. USACE is 
beginning work on a new sustainable building training program that 
should be offered within the next year.
 USACE also offers courses in public involvement, instruction on 
communications to engage effectively engage with the public, and team 
building to provide skills needed to work in multi-discipline teams 
involving project members, other Federal, State and local agencies, and 
the broader public. Steps can be taken to establish the set of 
requisite courses or expand the curriculum to include climate-related 
topics and focus.
 Secretary Berger. The Department of the Navy defers to the 
Department of the Army to speak to the USACE curriculum. To meet the 
resilience requirements of the Fiscal Year 2023 National Defense 
Authorization Act, the Department of the Navy developed a new, 
comprehensive 5-day course for installation master planners that 
incorporates master planning, resilience, and relevant areas of the 
Naval Facilities Engineering Systems Command Climate Change Planning 
Handbook. To date, this course has been offered to installation master 
planning staff in Naval Base San Diego and Commander, Fleet Activities 
Yokosuka, and is planned to be fully implemented across the Department 
through fiscal year 2024. We have also issued standard operating 
procedures to ensure installation master planners know how to create 
installation resilience components consistently and effectively. This 
guidance identifies and leverages tools and data from subject matter 
experts internal to the Department as well as from other Federal, 
regional, State and local agencies.
 Secretary Chaudhary. The DAF provides training for installation 
master planners through the Air Force Institute of Technology and other 
venues. For example, AFIT has both a basic course in installation 
planning (Installation Planning Principles), an advanced course 
(Comprehensive Planning and Development) and an entire curriculum on 
Environmental Management. There is some cross-pollination. The 
Interservice Environmental Education Review Board promotes quality 
education and consistent approaches across all Services by identifying 
courses that fulfill common needs. USACE courses are among those 
listed.

 42. Senator Kaine. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, developing assessments of the climate 
vulnerabilities of essential supporting civilian infrastructure in 
defense communities and development of plans to address those 
vulnerabilities in the military installation resilience component of 
installation master plans requires consistent DOD-wide criteria for 
determining which supporting civilian infrastructure is essential, and 
how to assess the vulnerability of such essential infrastructure. What 
guidance, if any, have you provided in those two regards?
 Secretary Owens. My office is creating guidance to incorporate 
installation climate resilience plans and developing new Integrated 
Installation Resilience policy to integrate energy, water, climate, 
mission assurance and cybersecurity resilience across our 
installations. Both efforts are well underway and are expected to be 
completed in fiscal year 2024.
 Secretary Jacobson. The DOD updated the United Facilities Criteria 
(UFC) 2-100-01, Installation Master Planning (Change 1, 18 April 2022) 
to add the requirement to identify coordination efforts to maintain or 
enhance military installation resilience or resilience of the community 
infrastructure. The Army also issued guidance in November 2022 to 
develop the Installation Climate Resilience Plans (ICRPs) which are 
required as a functional component of the installation master plans per 
UFC 2-100-011. Both policies emphasize the need to identify community 
infrastructure that are critical to support installation readiness and 
to establish or enhance agreements with neighboring communities.
 Following the above guidelines, external community partners are 
participants in the ICRP workshops or sharing community infrastructure 
information. The Army's ICRP process has strived for full stakeholder 
participation across all installation functions and service areas, as 
well as Army tenants, other DOD tenants and community governmental 
organizations, such as Regional Councils of Government. Off-
installation infrastructure capacity and conditions are included in the 
ICRPs when available and vulnerable assets are identified by local 
governments. Furthermore, the ICRPs provide strategies for 
strengthening (or establishing) community partnerships and associated 
administrative actions for adaptation and mitigation. Also, proposed 
guidance for community involvement as part of the master planning 
process is being developed for issuance later this year as Army policy. 
Including local communities in the Army's master planning processes is 
essential, required by statute and Army regulation, and is good 
practice. Proceeding in this manner, master planners will also be able 
to integrate the ICRPs are they developed with updates to the 
installation master plan component updates to the Vision Plan, Area 
Development Plans, the Installation Planning Standards, and the Capital 
Investment Strategy.
 Additionally, the Army works with local and regional utility 
providers to assess risk and document needed resilience improvements in 
the Army's Installation Energy and Water Plans. Army installations are 
also collaborating with local communities to invest in shared solutions 
to vulnerabilities. With supportive endorsements from the 
installations, some communities have successfully received Military 
Installation Resilience grants through the Office of Local Defense 
Community Cooperation. The Army will continue to work with DOD to 
establish applicable criteria and other integrative approaches to 
achieve improved installation resilience.
 Additionally, the Army works with local and regional utility 
providers to assess risk and document needed resilience improvements in 
the Army's Installation Energy and Water Plans. Army installations are 
also collaborating with local communities to invest in shared solutions 
to vulnerabilities. With supportive endorsements from the 
installations, some communities have successfully received Military 
Installation Resilience (MIR) grants through the Office of Local 
Defense Community Cooperation. In fiscal year 2022, four communities 
received grants to assess critical land use and utility assets, 
totaling $1.7 million, which could affect installation resilience at 
Fort Knox, KY, Fort Drum, NY, Fort Bliss, TX and Camp Atterbury, IN. 
The Army will continue to work with DOD to establish applicable 
criteria and other integrative approaches to achieve improved 
installation resilience.
 Secretary Berger. Within the Department of the Navy, we have issued 
standard operation procedures that promote comprehensive instruction to 
ensure installation master planners know how to create effective 
installation resilience components. This guidance directs planners 
assess the infrastructure outside our installations' fence lines using 
several methods, such as Mission Assurance Assessments, the DOD Climate 
Assessment Tool, DOD Regionalized Sea Level (DRSL) data base, and 
related local studies from the State, academia and other organizations. 
The Navy and Marine Corps also have robust processes and procedures in 
place to proactively seek coordination with local defense communities 
and state/regional resilience entities across of variety of common 
interest areas, to include the military installation resilience 
component of installation master plans. Additionally, the Department of 
the Navy has also partnered with the Idaho National Laboratory to hold 
a series of Regional Resilience Workshops across the United States for 
Navy and Marine Corps experts to come together with State and local 
representatives, utility providers and other Federal and academic 
institutions to develop regional project concepts that enhance energy 
resilience, reliability, and efficiency for installations and 
surrounding communities. Finally, as the Department of the Navy's Chief 
Sustainability Officer (CSO), I am issuing a series of memorandums to 
establish and oversee the execution of sustainability goals and metrics 
across the Department. To date, I have issued memoranda on 
infrastructure, water security, and nature-based resilience. Future 
memoranda will continue to reinforce the importance of resilience and 
mission assurance at our installations and the important role that 
community infrastructure plays in the accomplishment of the Navy and 
Marine Corps mission.
 Secretary Chaudhary. The Department of the Air Force understands 
that the importance, connectivity, and vulnerability of infrastructure 
and resources outside the fence line is an important component 
improving military installation resilience. Consideration of community 
support and infrastructure has been part of our master planning efforts 
for years. Our current template for completion of the military 
installation resilience component of installation master plans (known 
as Installation Climate Resilience Plans (ICRPs) in Unified Facilities 
Criteria 2-100-01) includes 10 USC Sec. 2864 language as guidance: 
``Community infrastructure and resources located outside the 
installation (such as medical facilities, transportation systems, and 
energy infrastructure) that are: (A) necessary to maintain mission 
capability or that impact the resilience of the military installation; 
and (B) vulnerable to the risks and threats described in section 1.'' 
During ICRP development installation staff are directed to identify 
agreements and activities with surrounding communities that enhance 
military installation resilience and specifically work to help mitigate 
the hazards to community resources outside the installation boundaries. 
Major community partnership efforts such as the Air Force Community 
Partnership (AFCP) Program, the Readiness and Environmental Protection 
Integration (REPI) program, and Military Installation Sustainability 
Program (MISP) often include Memorandums of Agreement (MOA) which 
support installation and community resilience.
 energy
 43. Senator Kaine. Secretary Owens, I have seen reports about DOD's 
ongoing inter-agency negotiations to map out future offshore wind lease 
opportunities in the Central Atlantic and would like to ask about the 
Pentagon's engagement with the White House, the Bureau of Ocean Energy 
Management (BOEM), and the U.S. Coast Guard. If the lease sale were to 
happen today incorporating DOD's initial position, it would fail to 
allow Mid-Atlantic states to meet their surging offshore wind demands. 
In addition, the American offshore wind supply chain needs a pipeline 
of future projects to be sustainable, which will help foster additional 
economic development and job creation. While I certainly appreciate the 
need to protect the major existing military activities conducted off 
the Central Atlantic coast, I'm also aware of the Pentagon's commitment 
to improve our energy independence and the national security threat 
presented by climate change. What can you do to ensure a more 
coordinated, all-of-government approach to help increase the amount of 
offshore wind space in the Central Atlantic and meet our clean energy, 
climate and national security goals?
 Secretary Owens. Thank you for giving me the opportunity to comment 
on the media reports of an initial position by the Department 
concerning wind lease opportunities in the Central Atlantic. Once BOEM 
identifies large potential areas for wind development, we work with all 
DOD stakeholders to identify any compatibility challenges at the 
beginning of the process. We then work with BOEM as it considers inputs 
from all the stakeholders. Once BOEM takes the feedback and refines the 
development areas, we refine our analysis to match the updated 
geographic boundaries. In the time since the media reports you 
mentioned, BOEM has provided a smaller development area for 
consideration, and we are currently assessing the level of impact 
attendant to this area. We have participated in similar deliberate 
analyses in other coastal areas and have been able to find compromises 
that allow sufficient offshore development while preserving military 
testing, training, and operations. We are actively engaged with BOEM, 
NASA, USCG and the White House on Central Atlantic wind development 
projects and we are confident we can identify compromises that allow 
sufficient offshore development while preserving military testing, 
training, and operations.

 44. Senator Kaine. Secretary Owens, will you commit to exploring 
all possible solutions that allow for sufficient leasing to grow 
offshore wind and support State energy goals while ensuring 
compatibility with national security, in the Central Atlantic?
 Secretary Owens. Yes, the Department is committed to explore all 
possible solutions to grow offshore wind while ensuring the protection 
of national security.

 45. Senator Kaine. Secretary Owens, are you committed to early 
engagement and resolution of potential conflicts--both internal to DOD 
and with other agencies--to ensure that these offshore wind leasing 
processes aren't unduly delayed by inter-agency communication issues?
 Secretary Owens. Yes, the Department is committed to early, often, 
and continued engagement to find areas for wind development that are 
compatible with military operations. The DOD Military Aviation and 
Installation Assurance Siting Clearinghouse, on my staff, was 
established for that purpose. The Clearinghouse provides industry and 
other agencies a clear lead for those discussions and has a track 
record of positive engagement to find solutions to compatibility 
challenges.
 __________
 Questions Submitted by Senator Tammy Duckworth
 real property space availability (rpsa)
 46. Senator Duckworth. Secretary Owens, Secretary Jacobson, 
Secretary Berger, Secretary Chaudhary and Ms. Field, 2 years ago, I 
introduced legislation to pilot the Army's Real Property Space 
Availability (RPSA) tool. This tool, known as ``Zillow.mil'' 
facilitates costs savings by cataloging available Federal real eState 
space so that the Army and other agencies can avoid unnecessary and 
costly commercial leases by moving into unoccupied office space. 
Recently, the DOD Inspector General positively reviewed the RPSA. Would 
your organization benefit from an expanded RSPA pilot program? If so, 
what benefits can you forecast by having this tool for use DOD-wide?
 Secretary Owens. I have not yet been briefed on the Army tool and 
cannot at this time comment on the applicability of the tool across the 
Department, or if there is benefit beyond the Army. I understand that 
other options or tools may also exist within the Department, so further 
review is necessary. I commit to engaging with the Department of the 
Army to get up to speed on their RSPA pilot and understand its 
potential benefit to DOD.
 Secretary Jacobson. Thank you for the question, and a special 
thanks for your advocacy and support for this exciting real eState 
initiative. The RPSA online multiple listing service is now operational 
and contains at least one actual real property ``listing'' from each of 
the ten participating Army installations.
 The short answer to your first question is ``yes'' we do think it 
makes sense to drop the participation limit of ten installations and 
eliminate the pilot's expiration date, so we can open the tool up to 
the entire Army.
 Our vision for the RPSA is to integrate, automate, standardize, and 
increase data transparency to empower land holding commands to make 
better leasing and stationing decisions. My office is working closely 
with our G-3/5/7 and G-9 to integrate the RPSA permanently into the 
Army's stationing, military construction, and real eState management 
processes.
 In response to your second question, we are implementing the DODIG 
recommendations and have developed a ``RSPA Use Policy'' which is 
expected to be issued soon. The intended outcome is to rapidly identify 
pockets of re-usable existing space and avoid more costly MILCON or 
leased space proposals. This outcome is far more likely to be achieved 
if we can leverage the entire Army installation inventory within the 
RPSA online MLS.
 Regarding the other Military Departments and the Office of the 
Secretary of Defense, the Army built the RPSA so that other Military 
Services and even other Federal agencies can register in the system 
with credentials, along with the General Services Administration (GSA), 
and search the listed and available Army inventory.
 The ten existing RPSA pilot installations are: 1) Rock Island 
Arsenal, IL; 2) Fort Knox, KY; 3) Fort Benning, GA; 4) Redstone 
Arsenal, AL; 5) Devens Reserve Forces Training Area, MA; 6) Fort Meade, 
MD; 7) Fort Rucker, AL; 8) Detroit Arsenal, MI; 9) White Sands Missile 
Range, NM; and 10) Parks Reserve Forces Training Area, CA.
 Secretary Berger. The Department of the Navy is not currently using 
the Army's Real Property Space Availability (RPSA) tool. I have 
requested information and a demonstration of the tool's capabilities in 
order to assess how the Department of the Navy could benefit from an 
expanded pilot. The DON is committed to optimizing and reducing our 
facility footprint when compatible with our mission requirements. Our 
fiscal year 2024 budget request includes $228 million for the Navy and 
$112 million for the Marine Corps to demolish obsolete infrastructure 
and reduce our current footprint, which will enable the DON to better 
prioritize existing our facilities sustainment funding across our most 
critical facilities.
 Secretary Chaudhary. The Department of the Air Force reviewed the 
Army's Real Property Space Availability (RPSA) online tool and believes 
that expanded use of this tool may expedite screening timelines and 
reduce manpower resources to identify available real property and could 
facilitate improved space utilization of facilities with DOD Component 
requirements. If expanded, the DAF would assess data base resources, 
information technology, and funding requirements for the RPSA tool.
 Ms. Field. GAO has not specifically reviewed the Army's pilot Real 
Property Space Availability (RPSA) tool, but GAO has issued a number of 
reports on improvements needed for the Department of Defense (DOD) to 
better identify and share information on underutilized space and to 
reduce use of commercial leases.
 For example, in 2015, we reported that when the General Services 
Administration (GSA) was working to satisfy the space needs of its 
clients, it did not routinely contact DOD installations to inquire 
whether space might be available (see GAO-15-346). We also found that 
DOD waited for non-DOD Federal agencies to inquire whether space was 
available and did not generally reach out to GSA or agencies that may 
be interested in space. We recommended that DOD, in collaboration with 
GSA, identify and implement actions to enable and enhance routine 
information sharing about utilization of facilities on military 
installations, including with non-DOD Federal Agencies seeking 
workspace. In response, DOD and GSA took action to better share 
information on available space and reviewed and shared a list of 
expiring leases.
 We also reported in 2022 that GSA had taken some steps to support 
Federal office space-planning in the post-pandemic environment (see 
GAO-22-105105). Specifically, in response to the pandemic, GSA 
supported Federal agencies by expanding ongoing office space-planning 
services and collecting new data. These data collection efforts include 
pilot-testing technologies for collecting space utilization data and 
collecting data at GSA-leased and federally owned properties. We 
recommended that GSA develop a plan to broadly share information 
learned from its pilot programs and data collection efforts and, as of 
February 2023, GSA has taken steps to implement this recommendation.
 We have an ongoing review of DOD management of its excess and 
underutilized space. We plan on issuing this new report in late 2023.
 __________
 Questions Submitted by Senator Mark Kelly
 airspace
 47. Senator Kelly. Secretary Owens, Arizona is home to two 
installations that fly the F-35, and variety of other aircraft 
including 4th generation fighters, heavy aircraft, remotely piloted 
aircraft and helicopters. In multiple meetings with installation 
commanders and senior DOD leaders, the topic of expanded airspace in 
Arizona comes up. Flying conditions in Arizona are unmatched with the 
incredible weather and visibility and some of the best ranges in the 
world. Marine Corps Air Station Yuma, Luke Air Force Base, and Davis 
Monthan Air Force Base have identified expanded airspace as priority 
that is critical for providing realistic air-to-air training for 4th 
and 5th generation fighters and preparing for future competition with 
adversaries. Can you please provide an update on the intent to conduct 
an Environment Impact Statement regarding changes to airspace use 
agreements, including coordination across current ranges, to expend 
available airspace in Arizona?
 Secretary Owens. The Air Force would be the lead Service for any 
effort to expand the airspace supporting our training ranges in 
Arizona. I defer to Secretary Chaudhary to provide a status update on 
any assessments or evaluations related to this issue.

 48. Senator Kelly. Secretary Owens, when will this study happen, 
and when can we expect the findings?
 Secretary Owens. The Air Force would be the lead Service for any 
effort to expand the airspace supporting our training ranges in 
Arizona. I defer to Secretary Chaudhary to provide a status update on 
any assessments or evaluations related to this issue.

 49. Senator Kelly. Secretary Owens, are all the service offices 
collaborating on this effort?
 Secretary Owens. If this effort is initiated, all stakeholders, 
including the Office of the Secretary Defense and the Military 
Departments, would be involved where appropriate.

 military construction (milcon)
 50. Senator Kelly. Secretary Owens, in Arizona, many of our 
installations were created before World War II and many of those 
buildings are still being used today with very little modernization. 
For some of the older buildings that may not meet the threshold for 
MILCON, there are a lot of ``band-aid'' fixes that are used to keep the 
buildings functional, but sometimes those fixes over time end up 
costing more than the new MILCON would have cost. At Luke Air Force 
Base some of the buildings our airmen use to support the F-35 
maintenance requirements have no permanent, working air conditioning, 
they were rundown, had mold, and a host of other problems. The base 
leadership has done everything they can to provide interim solutions to 
make these buildings workable, but ultimately all the repairs and 
interim fixes will continue to be a money pit until we can get them a 
new facility, which will take years. The cost of all those band-aid 
fixes, funded with Facilities Sustainment, Restoration, and 
Modernization (FSRM) funds, have ended up costing more than a new 
building. How are you approaching this issue of budgeting for expensive 
band-aid solutions over time and comparing that to the cost of a MILCON 
project?
 Secretary Owens. I would agree that incremental modernization to a 
single facility year after is not an efficient use of resources; 
however, the Military Departments have limited funding available to 
address all facility requirements and fund all the other requirements 
called for in our strategic guidance documents. The Department has 
developed a tool, the Sustainment Management System, that the Military 
Departments are required to use to conduct and record their facility 
inspections. The SMS is designed to enable the Military Departments to 
document facility condition and prioritize restoration, modernization 
or demolition investment in as optimal a manner as achievable. While 
the Military Departments are still populating specific asset 
information into the tool, some are already using the information to 
prioritize what facilities need funding to meet mission requirements. I 
defer to Secretaries Jacobson, Berger, and Chaudhary on how they 
prioritize replacement of deteriorated facilities within their 
component military construction programs.

 51. Senator Kelly. Secretary Owens, how can we ensure that we're 
not sinking millions of dollars into temporary fixes across the 
services, which are often ineffective, when it might make more sense to 
increase the priority for a longer-term MILCON project?
 Secretary Owens. The Department has developed a tool, the 
Sustainment Management System, that the Military Departments are 
required to use to conduct and record their facility inspections. This 
information will better identify each facilities specific maintenance 
and modernization needs. While the Military Departments are still 
populating specific asset information into the tool, some are already 
using the information to prioritize what facilities need funding to 
meet mission requirements. I defer to Secretaries Jacobson, Berger, and 
Chaudhary on how they prioritize replacement of deteriorated facilities 
within their component military construction programs.
 pfas
 52. Senator Kelly. Secretary Chaudhary, the issue of PFAS 
contamination is a major concern in Arizona, particularly as we face a 
historic drought. The most frequent impact of PFAS contamination in our 
State is groundwater. For most communities in Arizona, our groundwater 
is our backup source of drinking water--the primary sources are the 
Colorado and Salt Rivers. As drought conditions worsen in Arizona, 
groundwater becomes a more critical source of drinking water. While not 
all contamination has been linked to DOD facilities, any delay in 
conducting assessments and beginning remediation of groundwater plumes 
near DOD facilities has the potential to threaten Arizona's water 
future. Since your confirmation how has your office addressed concerns 
regarding human exposure to PFAS from DOD facilities in Arizona?
 Secretary Chaudhary. The Department of the Air Force is aware of 
the critical water needs in Arizona and the importance of aquifer 
protection for this stressed area. To address perceived human health 
impacts from PFAS attributable to the Air Force, DAF has initiated 
several pilot studies to evaluate the treatment of existing groundwater 
sources under our Emerging Chemical of Concern (PFAS) process and is 
aggressively moving toward developing in-situ treatment options which 
may be employed in the event of the establishment of an enforceable 
Federal regulatory limit.

 53. Senator Kelly. Secretary Chaudhary, what are the immediate 
steps the Air Force can take to expedite remedial investigations and 
quickly begin work?
 Secretary Chaudhary. DAF has accelerated the initiation of 
Comprehensive Environmental Response, Compensation, and Liability Act 
(CERCLA) PFAS remedial investigations. DAF initiated 111 remedial 
investigations.

 54. Senator Kelly. Secretary Chaudhary, how do you believe that 
drought risk should be considered when DOD makes prioritization 
decisions with scarce remedial cleanup funds?
 Secretary Chaudhary. DAF makes remedial cleanup funding decisions 
based on the DOD Relative Risk Site Evaluation (RRSE) framework. This 
framework considers overall risk based on contamination levels, the 
likelihood of migration, and the potential receptors. This framework 
also ensures we consider the impact of a loss of groundwater on a 
community. If a community primarily relies on diminishing groundwater 
sources, its risk will be evaluated higher given the presence of 
elevated concentrations of a known contaminant and drinking water 
receptors.
 __________
 Questions Submitted by Senator Dan Sullivan
 innovative building materials in alaska
 55. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, Alaska's building season is much shorter than 
states in the Lower 48 and construction costs are much higher. That 
makes long-term infrastructure planning more critical than in other 
locations where construction delays of a few weeks do not result in 
projects being halted for 6 months until the weather is warm enough to 
resume construction. What design, planning, or building materials 
innovations is your service considering or using in places like Alaska 
where extreme weather limits construction season and presents unique 
heating and cooling challenges?
 Secretary Jacobson. Some specific methods and techniques that are 
being considered include increased pre-fabrication of building 
components making use of the controlled environments in shops and 
factories to shorten overall construction time. Mass timber 
construction is being considered for use due to the potential for speed 
of erection and prefabrication.
 Secretary Berger. In more extreme climates where permafrost is 
present, some innovations include vented piles/foundations, thermal 
piles, geofoams, and other manufactured materials to insulate building 
foundations and roadways. Additionally, offsite construction has been 
used in projects in Alaska to support remote site location and short 
construction window. Whenever possible, definable features of work are 
prefabricated/assembled offsite and barged to the project location as a 
package (e.g. building structural steel assembly, building envelope, 
HVAC). These innovations will be addressed in the next updates of 
Department of Defense and Naval Facilities Engineering Systems Command 
design criteria.
 Secretary Chaudhary. Construction in Alaska does require additional 
planning and development for successful execution. The DAF targets 
awarding projects in Alaska in the second quarter of the fiscal year. 
This allows construction activities to begin with a full construction 
season in the first year for Design Bid Build projects. For Design 
Build projects the DAF targets a fourth quarter award to allow design 
activities to occur in the winter months and prepare for construction 
during the first available season. The DAF and our construction agents 
also work with the contractors to plan weather dependent work 
activities in advance to ensure all required materials and equipment 
are positioned for execution as the weather allows. There are no 
Alaska-specific innovations in the works.

 56. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, is your service using cross-laminated timber, also 
known as mass timber, for any military construction (MILCON) projects?
 Secretary Jacobson. The Army has a fiscal year 2025 mass timber 
pilot project, a new barracks building, at Joint Base Lewis-McChord in 
Washington State. Following positive results from the pilot project, 
mass timber is likely to be used in future MILCON projects.
 The Army's Privatized Lodging Program also has several hotels 
constructed with cross-laminated timber; more are planned.
 Secretary Berger. The Navy has a fiscal year 2024 military 
construction project to build a new child development center at Joint 
Expeditionary Base Little Creek-Fort Story in Virginia and is 
evaluating that project as one where Navy could use mass timber in 
accordance with Section 2861 of the Fiscal Year 2022 National Defense 
Authorization Act. While mass timber is the preferred course of action 
for the primary structural material for this project, the design team 
is still in the evaluation phase and has not finalized material 
selection. We expect the project designers to make a final decision on 
structural components upon completion and approval of the 35 percent 
design, scheduled for late summer 2023. Department of the Navy will use 
this project's evaluation of mass timber to inform future Department of 
the Navy military construction projects.
 Secretary Chaudhary. No, the Department of the Air Force does not 
have any current projects in design or construction using mass timber. 
The DAF is dedicated to innovation, fairness, and open competition, and 
does not restrict designs to specific technologies. This ensures all 
contractors can equally consider a variety of technologies, including 
mass timber, to meet facility requirements and provide the best value 
to the DAF.

 57. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, is your service planning to use mass timber for 
any MILCON projects in Alaska?
 Secretary Jacobson. The Army's mass timber pilot project is sited 
at Joint Base Lewis-McChord in Washington State. Following positive 
results from the pilot project, mass timber may be featured in future 
Alaska projects.
 Secretary Berger. The Department of the Navy does not have any 
current MILCON projects planned for the State of Alaska.
 Secretary Chaudhary. No, the Department of the Air Force does not 
currently have any planned projects to use mass timber for any MILCON 
projects in Alaska.
 electric vehicle (ev) testing in alaska
 58. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, what extreme cold weather testing is your service 
conducting in Alaska as it experiments with electric vehicles?
 Secretary Jacobson.

 There currently is no extreme cold weather testing of 
Army electric vehicles (EV) ongoing in Alaska.

 The Army anticipates the electric Light Reconnaissance 
Vehicle (eLRV) will be the first opportunity to take the electric 
vehicles to low and high ambient testing. Vehicle range will likely be 
impacted in cold weather for EVs, but range is also impacted with 
conventional platforms.

 Initial data indicates that hybrid systems will perform 
better than conventional vehicles due to the larger energy storage 
system and larger starting motors (100+kW generators) that are capable 
of large torques to support cold temperature starting.

 The Army conducts cold temperature testing on all 
powertrain systems in development with cold soaks in test cells down to 
-40C, and sometimes colder depending on requirements, for low 
temperature cold starts. EVs have not been tested to that temperature 
at this point.

 All Army vehicle platforms with anti-idle capability 
include fuel fired heaters to maintain cabin temperatures with the 
engine off at cold temperatures. These systems are also capable of 
enabling arctic start/operation.

 The Army expects EVs outfitted with 6T lithium-ion 
batteries with integrated heating to perform well at low temperatures 
as the 6T is equipped with a heater.

 Secretary Berger. While the Department of the Navy is not 
conducting cold weather testing for electric vehicles in Alaska, we are 
leveraging the commercial EV battery sector to accelerate our defense 
capabilities by adopting commercial EV battery technologies for 
military use. One example of our work in this area is the Department of 
the Navy's partnership with the Department of the Army and the Defense 
Innovation Unit on the Jumpstart for Advanced Battery Standardization 
project, which aims to accelerate the adoption of commercially proven 
EV battery technologies by prototyping battery systems based on 
standardized modules that leverage state-of-the-art technology and 
manufacturing capabilities. Developing a standardized battery module 
will increase DOD's demand signal for commercial batteries, reduce 
barriers for the commercial sector to work with the DOD, and pave the 
way for future battery advancements to be seamlessly integrated and 
adopted within military platforms.
 Secretary Chaudhary. The Department of the Air Force DAF is not 
testing for extreme cold weather impacts on electric vehicle 
performance of our commercially available non-tactical vehicle fleet. 
We are adding northern-tier installations into our electric vehicle 
pilot program and will begin electric vehicle infrastructure in 2024/
2025 and will enable the use of Zero Emission Vehicles (ZEV) in cold 
weather conditions. The DAF would not replace an Internal Combustion 
Engine (ICE) vehicle with an EV that could not support the mission.

 59. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, what temperature range is your service using to 
evaluate electric vehicles for combat use?
 Secretary Jacobson. The Army is not presently evaluating fully 
electric vehicles for combat use. However, when the time comes for 
testing tactical EVs, the military uses Military Standard (MIL-STD) 
810G testing for all equipment unless operating conditions are 
specified otherwise. MIL-STD 810G defines a range of temperatures 
including Hot (Daily High of 120 F), Basic (temperatures vary from a 
Low of -25 F to a High of 110F), and Cold (Low of -50F) and Severe Cold 
(Low of -60 F). Electric vehicles for combat use would be expected to 
operate in these temperature ranges.
 Secretary Berger. The Department of the Navy is currently not 
pursuing full electrification for our tactical and combat vehicles; we 
are evaluating the hybridization of tactical vehicles to improve their 
range and resilience in order to give our warfighters an operational 
advantage. Both the Navy and Marine Corps have research programs 
underway to generate the requirements for hybrid tactical vehicles. The 
normal operating temperatures that our tactical vehicles, weapons 
systems, and platforms are required to operate in is between 
temperatures of -55 to +125 Celsius. As we look at leveraging hybrid 
energy technology in our tactical fleet, we are evaluating engineering 
solutions that will adapt power electronics, energy storage and 
microprocessors to meet our operational requirements.
 Secretary Chaudhary. The Department of the Air Force relies on the 
Army as the executive agent to develop, test, and field tactical 
vehicles and large format terrestrial batteries to maximize 
commonality, interoperability and safety to support worldwide combat 
development. DAF remains focused on developing requirements for 
electrifying commercially available non-tactical vehicles. The Air 
Force Research Laboratory is supporting electrification of the DAF 
Agency Peculiar Vehicle fleet for DAF flightline support equipment.

 60. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, what temperature range is your service using to 
evaluate electric vehicles for use in the United States and its 
territories?
 Secretary Jacobson. The military uses Military Standard (MIL-STD) 
810G testing for all equipment unless operating conditions are 
specified otherwise. MIL-STD 810G defines a range of temperatures 
including Hot (Daily High of 120 F), Basic (temperatures vary from a 
Low of -25 F to a High of 110F), and Cold (Low of -50F) and Severe Cold 
(Low of -60 F). Electric vehicles for combat use would be expected to 
operate in these temperature ranges.
 Secretary Berger. The Department of the Navy is focused on 
leveraging the significant advances and investments in commercial 
electric vehicle sector as we transition our non-tactical fleet to 
electric vehicles. Currently, commercial electric vehicles operate 
within a wide range of temperatures similar to those in which internal 
combustion engine vehicles can operate. Vehicle range decreases at 
lower temperatures, depending on the vehicle, the charging conditions, 
and whether the battery comes with thermal management that includes 
low-temperature mitigation such as battery heating. Many commercial 
batteries include thermal management required for higher temperatures 
that exist in places such the southern Continental United States, 
Puerto Rico, and Guam.
 Secretary Chaudhary. The Department of the Air Force is not 
performing electric vehicle testing at specific temperature ranges and 
is cognizant of temperature as a factor in vehicle electrification. Our 
non-tactical vehicle Pilot Program expanded from two mid-Atlantic 
locations (Maryland and New Jersey) across the CONUS to include 
Washington, Idaho, California, Arizona, New Mexico, Colorado, Texas and 
Florida. We are looking into methodologies to consider cold-weather 
range reductions in our charging station planning processes.

 base operations contracts
 61. Senator Sullivan. Secretary Jacobson and Secretary Chaudhary, 
Base Operations and Support contracts do not get a lot of attention but 
they are critical linkages between bases and the surrounding 
communities in places like Alaska. Alaska has the largest per capita 
veteran population in the US and our citizens are proud to support our 
military bases by providing services. There have been some issues with 
how contracting officers are sharing cost data and this is turning 
Alaska contractors off from bidding on these contracts. What steps can 
you take to ensure accurate data is presented when contractors bid on 
these contracts?
 Secretary Jacobson. This is an important issue and we will explore 
it more fully. All contractors with interest in providing services 
should be receiving the same information on contract opportunities, and 
no contractor should be receiving information associated with the 
independent Government estimate. We will inquire if contracting 
officers are adhering to solicitation procedures and required controls 
and identify areas of failure or weakness. Data should not only be 
accurate but also be shared to the appropriate level and distributed 
equally so that there is a level playing field for all interested 
service providers.
 Secretary Chaudhary. When the Department of Air Force issues a 
solicitation for Base Operations and Maintenance Services (BOMS), it is 
traditionally issued competitively and, therefore, we are typically 
prohibited from obtaining cost data in accordance with Federal 
Acquisition Regulation (FAR) 15.403-1(b). Moreover, Cost data is 
considered proprietary information that may not be released amongst 
competing contractors. As stated in FAR 3.103-4(b), ``contractor bid or 
proposal information and source selection information must be protected 
from unauthorized disclosure in accordance with 14.401, 15.207, 
applicable law, and agency regulations.''
 The DAF strives to provide industry, including Alaska Native 
Corporations and Alaska veteran-owned small businesses, with as much 
information as possible relating to workload and scope, to encourage 
understanding of our mission requirements and participation in our 
acquisitions. In appropriate cases, this information may include 
anticipated or projected contract values. The BOMS contract at Joint 
Base Elmendorf-Richardson is a Firm Fixed Price contract based on known 
and projected workload. Whenever Alaska businesses feel that the shared 
information is unclear, they are encouraged to request clarification 
from DAF contracting officers and small business professionals. Alaska 
small businesses are also encouraged to work with their local DOD-
supported Alaska APEX Accelerator (formerly known as the Alaska 
Procurement Technical Assistance Center) where they can obtain 
procurement history information on prior or similar projects. 
Additionally, Alaska Businesses have access to USAspending.gov that 
provides information on contract award amounts.
 advocating for domestic critical mineral supply shain
 62. Senator Sullivan. Secretary Berger, in its Climate Action 2030 
Strategy, the Navy states that it will develop plans to acquire ``100 
percent zero-emission vehicles by 2035, including 100 percent zero-
emission light-duty vehicle acquisitions by 2027.'' It also states that 
it must reduce its greenhouse gas emissions in order to achieve net-
zero emissions by 2050. The strategy goes on to discuss how the 
Department of Defense ``is in the process of implementing a 
standardized lithium version of the vehicle standard ``6T'' battery as 
the first step toward broader ground vehicle hybridization.'' What I 
did not see in the Climate Action 2030 Strategy was a call to establish 
secure supply chains of the critical minerals necessary not only to 
pursue EVs in some capacity but to produce the advanced weapons we need 
to deter and defeat enemies. The strategy says ``the DON [Dep]artment 
of the Navy] is coordinating across the Department of Defense (DOD), 
Federal agencies, and industry to ensure a domestic supply of lithium 
batteries needed for mission functions as well as our Nation's 
industrial base.'' Recent experience has shown me that the DOD's voice 
on the national security implications of domestic critical minerals 
production and processing is totally ignored by the Biden 
Administration. Can you explain how the Navy intends to advocate with 
the executive branch for the creation of domestic critical mineral 
supply chains necessary for EV efforts and advanced weapons production? 
It is very clear that the views of the Department of the Interior are 
more important than the DOD's in this Administration.
 Secretary Berger. Supply chain resilience is absolutely vital to 
maintaining a combat-ready naval force capable of deterring aggression. 
To address energy storage and lithium battery supply chain 
vulnerabilities in the defense industrial base, the Department of Navy 
is supporting a whole-of-government approach to execute the Department 
of Defense's strategic roadmap for Securing Defense-Critical Supply 
Chains. This roadmap focuses on stimulating market demand for end-
products using domestically manufactured high-end batteries; 
strengthening responsibly sourced supplies for key advanced battery 
materials, such as lithium; promoting sustainable domestic battery 
materials, cells and pack production; and investing in the people and 
innovations that are central to maintaining a competitive edge. To 
secure the supply chain components that are common with commercial EV 
markets, the Navy is leveraging our membership in the Federal 
Consortium for Advanced Batteries (FCAB) to coordinate efforts with 
Energy, Commerce, State and other organizations across government. The 
FCAB provides a venue to guide investments in domestic lithium-battery 
manufacturing value chains and to support industry in order to secure 
raw and refined materials; support growth of a U.S. materials-
processing base; stimulate the U.S. electrode, cell and pack sectors; 
enable end-of-life reuse and recycling; and maintain advanced U.S. 
battery technology leadership.

 infrastructure, quality of life, and mental health
 63. Senator Sullivan. Secretary Owens, Secretary Jacobson, 
Secretary Berger, and Secretary Chaudhary, Alaska experienced a surge 
in servicemember suicides in 2021. While that number decreased in 2022, 
thanks to a significant focus from the Army and the 11th Airborne 
Division, underlying quality of life issues, such as the condition of 
barracks and access to high-speed internet, remain long-term 
challenges. What, if any, coordination do you have with mental health 
providers to determine the impact of substandard housing on 
servicemember mental health?
 Secretary Owens. My office is working closely with the Office of 
the Under Secretary of Defense for Personnel and Readiness (OUSD(P&R)) 
to implement the recommendations from the Suicide Prevention and 
Response Independent Review Committee and is a member of the 
Department's Suicide Prevention Implementation Working Group led by 
OUSD(P&R). It is through this group that we coordinate with mental 
health providers to understand the impact of housing on servicemember 
mental health.
 Secretary Jacobson. At this time, there has been no coordination 
with mental health professionals to understand the specific impact of 
substandard housing on servicemembers mental health, but the Army 
strives to provide soldiers with access to mental health care providers 
and quality housing at all times. The following examples are just two 
actions that the Army is taking to understand soldiers needs/desires 
for living quarters and to engage soldiers in annual wellness 
assessments.
 The Office of the Deputy Chief of Staff, G9, Housing Division and 
the Defense Centers for Public Health-Aberdeen developed a survey that 
was conducted from June to November 2022 to gather input regarding 
experiences with current permanent party barracks and new barracks 
design standards to determine the extent that living environment 
influences readiness, retention, and behavioral and social health 
issues. The survey was distributed to 837,000 residents in the grade of 
E1-E5 and E6 and above barracks managers of permanent party barracks at 
Forts Liberty, Drum, Cavazos, Wainwright, and Joint Base Lewis McChord. 
The results are available to the Army's Oversight Committees.
 Soldiers stationed in Alaska also are required to participate in 
Mission 100. This program requires annual wellness checks for 100 
percent of soldiers in Alaska, so that 100 percent of soldiers feel 
connected. These engagements with counselors help break the stigma 
around seeking assistance, gather anonymous feedback for action, assure 
appropriate handoff to other required services, and assist in 
recognition of harmful behaviors earlier in the process.
 Secretary Berger. Our sailors and marines remain our most precious 
resource, and the condition and safety of the facilities where they 
live and work has a direct impact on their quality of life, which is 
vital to individual and operational readiness. The Department of the 
Navy takes this issue seriously and is implementing a variety of 
reforms designed to address ongoing concerns, particularly for our 
single sailors and marines living in unaccompanied housing.
 The Secretary of the Navy and the Chief of Naval Operations 
recently released a memorandum entitled ``Charting the Course for Navy 
Quality of Service (QOS), outlining a commitment to our people, 
including additional opportunities to live off ship while in homeport 
and access to high quality Wi-Fi. In June 2023, the Secretary of the 
Navy also hosted a full-day offsite with senior Navy and Marine Corps 
leadership and mental health professionals. The Navy and Marine Corps 
are conducting a stem-to-stern review of barracks operations, current 
condition issues, and exploring Unaccompanied Housing (UH) 
privatization options to improve the overall condition of our 
portfolio. These have reviews already led to the development of Marine 
Corps UH Guarantees and Resident Responsibilities, and the Navy UH Bill 
of Rights and Responsibilities
 Secretary Chaudhary. We do not regularly coordinate with mental 
health providers to determine the impact of substandard housing on 
servicemember mental health. The Department of the Air Force's current 
policy is to refer residents who report potential environmental-related 
health issues to their health care provider. In DAF unaccompanied 
housing, our Airmen Dormitory Leaders and unaccompanied housing 
facility managers are responsible for identifying maintenance, health 
and life safety concerns with unaccompanied facilities and common/
campus areas and ensure requirements are identified to the appropriate 
authority for action.

 64. Senator Sullivan. Secretary Jacobson, Secretary Berger, and 
Secretary Chaudhary, how much longer does it take to build a barracks, 
child development center, or recreation facility in Alaska compared to 
the Lower 48?
 Secretary Jacobson. Since 2010 a total of nine of these three 
facility types (barracks, child development centers and recreation 
facilities) have been completed in Alaska and 99 having been completed 
in the lower 48. Comparing construction durations of each group 
suggests that it takes approximately 25 percent longer (due to the 
constrained construction season in Alaska) to construct these three 
facility types in Alaska than it does in the lower 48.
 Secretary Berger. The Department of the Navy is not the design and 
construction agent (DCA) for Alaska-based Military Construction 
projects. I defer to the Department of the Army/USACE to answer this 
question.
 Secretary Chaudhary. With proper planning and execution, the 
construction time for project in Alaska will be similar to the Lower 
48. However, if a project experiences delays and planned work is not 
completed in the associated construction season a delay of 6 months or 
more can occur until the next construction season begins.

 65. Senator Sullivan. How much more does a barracks, child 
development center, or recreation facility in Alaska cost to build 
compared to the Lower 48?
 Secretary Jacobson. To assist in determining the cost estimating in 
various locations, the Department of Defense established Area Cost 
Factors (ACF) published in UFC 3-701-01 DOD Facilities Pricing Guide 
after verification through the Defense Construction Agents, in the 
Army's case, the U.S. Army Corps of Engineers. These factors are 
revised annually by cost engineers using various data metrics. The 
national average construction cost is considered an ACF of 1.0. There 
are 202 locations in Alaska with ACFs ranging from 2.15 to 4.17, 
meaning construction in Alaska is 2.15 to 4.17 times higher than the 
national average. The expected cost of construction varies greatly 
between locations and project type.
 Secretary Berger. The Department of the Navy is not the design and 
construction agent (DCA) for Alaska-based Military Construction 
projects. I defer to the Department of the Army/USACE to answer this 
question.
 Secretary Chaudhary. The expected cost of construction varies 
greatly between locations and project type. To assist in determining 
the cost estimating in various locations, the Department of Defense 
established Area Cost Factors (ACF), published in UFC 3-701-01 DOD 
Facilities Pricing Guide. These factors are developed annually by cost 
engineers using various data metrics and the national average 
construction cost is considered an ACF of 1.0. There are 202 locations 
in Alaska with ACFs ranging from 2.15 to 4.17, meaning construction in 
Alaska is 2.15 to 4.17 times higher than the national average.

 nuclear micro-reactors
 66. Senator Sullivan. Secretary Chaudhary, can you provide my 
office a written update on the micro-reactor project at Eielson Air 
Force Base, including an overall timeline of the project and whether it 
is on schedule?
 Secretary Chaudhary. The Department of the Air Force's Source 
Selection Evaluation Board (SSEB) began evaluations in March 2023 and 
is in the process of conducting proposal reviews with DLA Energy. SSEB 
down-selection has not yet occurred. We are on schedule to select a 
vendor by late Summer 2023. In 2024, we anticipate the Nuclear 
Regulatory Commission (NRC) will begin their licensing process with the 
vendor (applicant), which is expected to include preparation of an 
Environmental Impact Statement (EIS) under the National Environmental 
Policy Act (NEPA) in cooperation with DAF. From 2025 through 2027, NRC 
will continue their licensing process with the vendor, culminating in 
micro-reactor testing in 2027. Following successful testing, the DAF 
will enter into a multiyear agreement with the vendor to purchase the 
energy delivered by micro-reactor.

 67. Senator Sullivan. Secretary Jacobson, on your testimony you 
said the Army was closely following the micro-reactor project at 
Eielson Air Force Base and is considering micro-reactors for bases in 
Alaska. Can you provide my office a written update on the Army's 
involvement with micro-reactors including what bases it believes are 
suitable for the application of this technology to generate power?
 Secretary Jacobson.

 The Army Reactor Program is managed by the Army Reactor 
Office (ARO) within the United States Army Nuclear and Countering 
Weapons of Mass Destruction Agency, (USANCA). USANCA is a field 
operating agency within the Army Deputy Chief of Staff for Operations, 
G-3/5/7. The Army Reactor Office manages the Army's current reactors, 
which include the test reactor at White Sands Test Site, and the 
oversees dismantlement of the Army's remaining power reactors at Ft. 
Belvoir, VA, and Ft. Greely, AK, that date from the 1950's and 1960's.

 The ARO provides oversight for all Army nuclear reactor 
activities. The U.S. Army Office of the Chief of Engineers (OCE) is the 
prime executor of Army nuclear activities. As the Army's principal for 
prime power, the OCE acts as the HQDA single point of contact for 
nuclear reactor engineering and design, reactor construction, and 
decommissioning design and implementation. The OCE also has 
responsibilities for establishing training qualifications and ensuring 
environmental compliance throughout any nuclear project lifecycle.

 The Army has in the past designed, acquired, and operated 
nuclear power reactors, yet this authority has not been exercised in 
many decades. Therefore, the Army is studying Army oversight 
responsibilities for nuclear reactors, whether for those licensed by 
the Nuclear Regulatory Commission or by other sources, and developing 
updated policy and regulations to establish a comprehensive framework 
within which to license, manage, and safely operate future nuclear 
power capabilities.

 The Army is currently evaluating the use of fixed 
location modular reactors, up to 50MWe in size, for use at 
installations in Alaska and other locations to provide reliable power 
to critical mission facilities. The Office of the Secretary of Defense 
is currently working with the Department of Energy (Pacific Northwest 
National Lab) in conducting a small modular reactor project analysis, 
which is scheduled to be completed this summer. The Army will utilize 
the results of that effort in evaluating the best locations to host 
small modular reactor technology on Army installations. Factors will 
include critical mission requirements, available space, community 
interest, and local commercial grid power generation and other 
attributes. In certain locations, nuclear may be the only carbon-free 
power generation option due to land constraints and other geoclimatic 
conditions.

 68. Senator Sullivan. Secretary Owens, what is the DOD's plan for 
nuclear micro-reactors?
 Secretary Owens. Microreactors have the potential to provide energy 
resilience through dependable access to reliable, quality power to 
support critical missions and remote operations. The Department is 
currently pursuing two parallel microreactor initiatives: a prototype 
mobile microreactor and a commercially owned and operated stationary 
microreactor.
 Project Pele is led by the Strategic Capabilities Office (SCO) in 
close collaboration with the Department of Energy (DOE), Nuclear 
Regulatory Commission, and industry partners, with the objective to 
design, build, and demonstrate a prototype mobile nuclear reactor. SCO 
selected a single vendor in 2022 to assemble and test the reactor by 
the end of 2024. The reactor will then be shipped to Idaho National 
Laboratory (INL), where it will be fueled and will reach full power for 
the first time in 2025. The demonstration reactor will be designed to 
be transported by the DOD and able to deliver 1 to 5 megawatts of 
electrical power for a minimum of 3 years of full power operation. The 
Department will evaluate the cost and warfighting effectiveness of 
using nuclear power to support operations across the battlespace based 
in part on this demonstration project.
 Microreactors are also a promising technology to meet the 
Department's need for installation energy resilience, as they can 
provide `islanding power capabilities' during an emergency scenario for 
years, not just days. This can help ensure mission critical 
infrastructure is protected against physical or cyberattacks, extreme 
weather, pandemic biothreats, and other emerging security threats.
 The Air Force and DLA-Energy are currently engaged in source 
selection activities for a power purchase agreement to build, own, and 
operate a 5MW microreactor at Eielson Air Force Base. Working with 
DOE's Pacific Northwest National Lab (PNNL) and INL, the Department is 
looking at other DOD installations to assess their suitability as 
potential future microreactor sites. We expect the results of this 
study to be available later this year.
 The PNNL and INL study results, along with insight gained from the 
Eielson microreactor project and continuing work on the Project Pele 
prototype, will inform DOD's efforts to develop a plan for future 
potential microreactor use.
 air force's use of artificial intelligence (ai) for scheduling
 69. Senator Sullivan. Secretary Chaudhary, in 2022, the Air Force 
launched Puckboard, which as you briefly mentioned in your testimony, 
is a scheduling system powered by artificial intelligence. How has 
Puckboard impacted the work load of pilots and mobility personnel who 
historically used manual drafting to schedule flights and track leave 
and exercises?
 Secretary Chaudhary. Puckboard dramatically decreased the workload 
for schedulers; tasks that took hours now take minutes as the system 
compares training requirements and available assets and aircrew and 
matches them to optimize a schedule and improve readiness. Puckboard 
has over 20,000 users across the Air Force and schedules thousands of 
sorties; which translates to thousands of hours saved weekly among 
active Puckboard users.
 Flight crews benefit from the Puckboard post mission paperwork 
application. which saves airmen approximately 8 hours preparing and 
processing paperwork following each sortie while automatically checking 
the accuracy of information.
 The AI engine component, currently in development, will further 
improve the system by looking for opportunities to increase the 
``training per gallon'' and reduce the overall workload of a squadron 
as they maintain their readiness. The engine, for instance, has solved 
a 6-month simulated calendar consisting of 170 events supporting a unit 
of 300 personnel in under 30 seconds, significantly reducing the time 
required with traditional scheduling methods.
 army energy sources at ft. wainwright
 70. Senator Sullivan. Secretary Jacobson, in your testimony you 
mentioned the Army's decision to transition from coal to natural gas at 
Fort Wainwright. Interior Alaska uses natural gas less extensively than 
coal, which is widely available. Can you explain in detail the Army's 
plan to ensure an adequate and consistent supply of natural gas for 
power generation at Fort Wainwright?
 Secretary .Jacobson

 Our assessment, conducted as part of our National 
Environmental Policy Act (NEPA) Environmental Impact Statement (EIS) 
analysis of alternatives, does not anticipate the natural gas supply to 
negatively impact the Army's transition from coal to natural gas 
generation at Fort Wainwright, if the preferred alternative is 
selected.

 On February 10, 2023, the Army issued a Notice of 
Availability of the Final EIS as part of the NEPA environmental 
planning process to address heat and electrical upgrades at Fort 
Wainwright. As part of the NEPA process, the Army evaluated various 
alternatives and identified the preferred alternative to install 
distributed natural gas boilers. Based on a comprehensive analysis of 
available information, the Army does not anticipate a natural gas 
supply shortage that would foreclose this alternative. However, as 
noted in the final EIS, the selected alternative would increase the 
regional demand for natural gas, which may constitute a long-term, 
moderate, adverse impact because only limited natural gas storage and 
distribution infrastructure is currently available in the Fairbanks 
region. The Army understands that increased natural gas delivery and 
storage infrastructure for Interior Alaska is being planned, which 
could alleviate any anticipated supply concerns. For example, since 
2016, the Interior Gas Utility has completed construction and put into 
service a 5.25 million gallon storage facility, constructed regional 
infrastructure in the surrounding Fairbanks and North Pole area and 
continues to connect residents to natural gas.

 No energy solution in Alaska is without its challenges 
and the Army's preferred alternative was informed by: public comments; 
environmental, social, technical, and economic considerations; and the 
ability to support mission requirements of USAG-Alaska and the 11th 
Airborne Division. The Army is evaluating the latest information 
concerning natural gas supply forecasts for Interior Alaska to ensure 
long-term availability. Additional information will continue to be 
posted, as appropriate, in both the Federal Register and on our 
website: https://home.army.mil/alaska/index.php/fort-wainwright/NEPA/
HEU-EIS.

 uniformed privatized housing inspection standards
 71. Senator Sullivan. Director Field, as you touched on in your 
testimony, the DOD currently does not have consistent standards for 
inspecting privatized military housing. This lack of consistent 
standards includes no uniformity in rating a home as passing, 
conditionally passing, or failing and makes each inspection highly 
subjective. You have offered several related recommendations to the 
DOD. Has the DOD set a deadline for the creation of consistent 
standards to be used across all services?
 Ms. Field. Our April 2023 report on the Department of Defense's 
oversight of privatized military housing (GAO-23-105377) recommended 
that the Secretary of Defense should ensure that the Deputy Assistant 
Secretary of Defense for Housing establishes department-wide turnover 
inspection guidance that includes clear and consistent inspection 
standards for assigning ratings to each of the components evaluated in 
the turnover maintenance checklist. We also recommended that the 
Military Departments--in coordination with each other--should establish 
detailed training for military housing office inspectors based on the 
inspection standards, once they are established. DOD generally 
concurred with these recommendations. As of June 2023, DOD has not yet 
provided us with a corrective action plan to include deadlines for 
addressing these recommendations. Implementing these recommendations 
will better position DOD to hold private partners accountable for 
providing quality housing to servicemembers and their families in a 
more meaningful way. Moving forward, we will closely monitor DOD's 
implementation of our recommendations.
 __________
 Questions Submitted by Senator Kevin Cramer
 bomber agile combat employment (bace) and nuclear dispersement
 72. Senator Cramer. Secretary Chaudhary, Grand Forks Air Force Base 
used to have a 300-foot-wide runway that launched bomber missions until 
1994.'There also used to be six bomber bases between Michigan and 
Montana that could launch B-52s North to provide the flexibility of the 
nuclear triad. Now there are only two of those bases left, Minot and 
Grand Forks, and the Grand Forks runway has been narrowed to 150 feet 
because of runway light placement. Are you supportive of restoring that 
runway so that it is has the appropriate conditions to support missions 
from these larger aircraft?
 Secretary Chaudhary. The Department of the Air Force has no plans 
to widen the Grand Forks AFB runway or taxiways to support B-52 
aircraft.

 areawide contracts
 73. Senator Cramer. Secretary Berger, Areawide Contracts are 
contracts that allow regulated public utility companies to provide 
utility services to the Federal Government. However, DOD does not 
consistently utilize this authority, in part due to what it deems 
unclear authorities surrounding the contract. It is my understanding 
that Area Wide Contracts can quickly and cost effectively streamline 
procurement and help the Services and the Department of Defense (``the 
Department) achieve energy reliability and resilience requirements at 
installations. Would the Department benefit from a clarification of 
authorities that explicitly allows DOD to utilize the Areawide 
Contract?
 Secretary Berger. Yes, the Department of the Navy is eager to work 
with Congress to ensure that Area Wide Contracts can quickly and cost 
effectively streamline procurement and help us to achieve our 
installation energy resilience goals.

 74. Senator Cramer. Secretary Berger, in your opinion, would 
utilization of the Areawide Contract help installations more rapidly 
initiate and execute energy resilience projects and improve readiness?
 Secretary Berger. Yes, Areawide Contracts can help the Department 
of the Navy's installations meet energy resilience goals.

 __________
 Questions Submitted by Senator Angus King
 sustainable building materials
 75. Senator King. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, Section 2861 of the Fiscal Year 2022 
National Defense Authorization Act directed each Service Secretary to 
conduct a pilot program to evaluate the effect of utilizing sustainable 
building materials as a primary construction material in military 
construction projects. Cross-laminated timber meets the criteria of 
section 2861, and is an affordable product that meets military 
requirements while providing a sustainable and climate-friendly option 
for construction. What is the status of the Department of Defense's 
current use of cross-laminated material for any project as well as 
projects that qualify under section 2861?
 Secretary Owens. The Department seeks to use sustainable building 
materials when they meet required performance parameters and are 
lifecycle cost effective. The Military Departments are currently 
undertaking pilot project designs that include mass timber. For 
example, the Navy is pursuing a design for a child development center 
project in fiscal year 2024, that is currently evaluating the 
suitability of mass timber and the Army has a design for an fiscal year 
2025 Unaccompanied Enlisted Personnel Housing project that is assessing 
the use of mass timber in its structural and architectural features.
 Secretary Jacobson. The Army has a fiscal year 2025 mass timber 
pilot project, a new barracks building, at Joint Base Lewis-McChord in 
Washington State. Following positive results from the pilot project, 
mass timber is likely to be used in future MILCON projects.
 The Army's Privatized Lodging Program also has several hotels 
constructed with cross-laminated timber; more are planned.
 Secretary Berger. The Navy has a fiscal year 2024 military 
construction project to build a new child development center at Joint 
Expeditionary Base Little Creek-Fort Story in Virginia and is 
evaluating that project as one where Navy could use mass timber in 
accordance with Section 2861 of the Fiscal Year 2022 National Defense 
Authorization Act. While mass timber is the preferred course of action 
for the primary structural material for this project, the design team 
is still in the evaluation phase and has not finalized material 
selection. We expect the project designers to make a final decision on 
structural components upon completion and approval of the 35 percent 
design, scheduled for late summer 2023. The Department of the Navy will 
use this project's evaluation of mass timber to inform our future 
military construction projects.
 Secretary Chaudhary. The Department of the Air Force is not 
currently designing or constructing any facilities with mass timber; 
however, we continue to evaluate various sustainable construction 
technologies, including mass timber, for potential integration on 
future projects.
 The DAF intends to construct the $97 million Patrick Space Force 
Base Consolidated Communication Center under the Fiscal Year 2022 
National Defense Authorization Act Section 2861 pilot program to 
evaluate the effects of sustainable materials. The project was 
authorized and appropriated by Congress in fiscal year 2023. We are 
currently finalizing the design and anticipate awarding the 
construction contract in the first quarter of fiscal year 2024. The 
project includes reinforced concrete as the primary structural 
component and modifications to the design specification will increase 
the sustainability and reduce emissions associated with concrete, with 
a target reduction in emissions of 30 to 40 percent compared with 
conventional concrete baselines.
 energy storage
 76. Senator King. Secretary Owens, Section 225 of the Fiscal Year 
2023 National Defense Authorization Act authorized a program to 
facilitate the development of battery technologies for warfighters. Has 
the Department of Defense (``the Department'') established a warfighter 
electric battery transition project authorized by this section? If so, 
provide an update on the critical path items, budgetary authority, and 
project deliverables. If not, what are the obstacles and reasons for 
not establishing such an important program?
 Secretary Owens. The Under Secretary of Defense for Research and 
Engineering (USD(R&E)) is overseeing activities under this NDAA 
provision and is coordinating with the Strategic Environmental Research 
and Development Program (SERDP) in my office. Currently, there are 
multiple battery-related investments across the Department. In 
OUSD(A&S), we synchronize within and the Environmental Security 
Technology Certification Program (ESTCP), Operational Energy Capability 
Improvement Fund (OECIF) and Operational Energy Prototyping Fund 
(OEPF), OASD (Industrial Base Policy), as well as across OUSD(R&E), and 
the Defense Innovation Unit. In alignment with the recommendations in 
the Securing Defense Critical Supply Chains action plan, the USD(A&S) 
also signed the DOD Lithium Battery Strategy 2023-2030 to tackle 
strategic battery challenges. Several lines of effort from the 
strategy, including installation energy storage and recycling, are 
being led by my office. Likewise, we reach out across the Services and 
interagency to leverage work done through the Service and National 
Laboratories as well as Federal Consortium for Advanced Batteries, led 
by the Department of Energy. While focused on aligning with efforts 
across the Department, we believe each separate group adds value, 
across the technology development spectrum, to ensure the warfighter 
has the power and battery technology required for asymmetric 
warfighting advantage.

 77. Senator King. Secretary Owens, energy storage is not only the 
key to our Nation's clean energy future, it also is fundamental for 
improved resilience and readiness on our military's installations. 
Leadership by DOD can have important spillover benefits for our broader 
society. The Energy Policy Act of 2020 established the Joint Long-
Duration Energy Storage Demonstration Program between DOD and the 
Department of Energy (DOE) for exactly these reasons. As the 
legislation stated, the program aims ``(i) to demonstrate promising 
long-duration energy storage technologies at different scales; and (ii) 
to help new, innovative long-duration energy storage technologies 
become commercially viable.'' The Bipartisan Infrastructure Law 
appropriated $150,000,000 for this program and a related program at 
DOE. What is the current status of this Joint Demonstration Program?
 Secretary Owens. In May 2023, a memorandum of understanding was 
signed by the Deputy Assistant Secretary of Defense for Environment and 
Energy Resilience and the Director of the Office of Clean Energy 
Demonstrations, formalizing the agencies' collaboration in the Joint 
Demonstration Program.
 As stated, the Bipartisan Infrastructure Law appropriated 
$150,000,000 to DOE for the Joint Demonstration Program and a related 
DOE program. DOE is budgeting $50,000,000 for the Joint Demonstration 
Program, $30,000,000 for demonstration projects at U.S. Department of 
Energy National Lab facilities and $20,000,000 for demonstration 
projects on U.S. military installations. Additional funding may be 
directed to the Joint Demonstration Program depending on outcomes from 
DOE's related program, with a current budget of $100,000,000 (budgetary 
numbers do not account for program management costs). Across the two 
programs, DOE and DOD are seeking to demonstrate a diversity of 
technologies to meet the intent of the legislation.

 78. Senator King. Secretary Owens, what projects from the Joint 
Long-Duration Energy Storage Demonstration Program have been funded, 
and which are in the pipeline to be funded?
 Secretary Owens. In early July 2022, the Joint Demonstration 
Program collaborated with the Defense Innovation Unit to issue a 
solicitation and is currently evaluating several opportunities for 
technology demonstrations on military installations. No projects have 
been selected as of the writing of this response. With the current 
budget for the Joint Demonstration Program, ]it is anticipated that one 
or two demonstration projects to be conducted on a military 
installation(s) and will be initiated this fiscal year. If, based on 
outcomes from DOE's related program, DOE directs additional funding to 
the Joint Demonstration Program, additional proposals for technology 
demonstrations on military installations will be evaluated.

 79. Senator King. Secretary Owens, what benefits can energy storage 
programs across the DOD confer to our military's warfighting 
capabilities?
 Secretary Owens. Energy storage enables a range of warfighting 
capabilities, including reduced logistics burdens, extended range, 
reduced thermal and acoustic signatures, rapid acceleration, dismounted 
communications, and distributed operations, and directly powers 
unmanned systems, directed energy weapons, and hybridized and 
electrified tactical vehicles.
 These improvements in operational effectiveness are in full 
alignment with the defense priorities articulated in the 2022 National 
Defense Strategy and will build enduring advantages for the Department.
 wastewater infectious disease surveillance
 80. Senator King. Secretary Ownens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, section 712 of the Fiscal Year 2021 
National Defense Authorization Act authorized capabilities for the 
Department to test for, diagnose, and protect service-members from 
infectious disease threats. Wastewater infectious disease surveillance 
is a newer and now critical component of infectious disease 
preparedness infrastructure. How has the Department used its 
authorities under this section, or related sections, to utilize 
wastewater disease surveillance to protect servicemembers from 
infectious disease threats?
 Secretary Owens. It is my understanding that the Office of the 
Undersecretary of Defense for Personnel and Readiness is the office 
responsible for implementing Section 712 of the Fiscal Year 2021 
National Defense Authorization Act. I understand that the Army Public 
Health Center, now known as the Defense Centers for Public Health--
Aberdeen (DCPH-A), initiated a COVID-19 wastewater surveillance pilot 
study at Aberdeen Proving Ground in October 2020 that was successfully 
completed in March 2023. Upon completion of this study, the DCPH-A 
immediately transitioned to conducting full-time wastewater 
surveillance and identification of SARS-CoV-2 and its many variants and 
expanded detection capabilities to known and emerging threats. This 
effort remains ongoing, albeit under the management, funding, and 
control of the Defense Health Agency (DHA) based on the transfer of 
public health equities as required by Section 1073c of Title 10, United 
States Code. The Army also participates in a wastewater surveillance 
working group, chaired by Assistant Secretary of Defense for Health 
Affairs, to develop policy and guidance to sustain/expand wastewater 
surveillance efforts across the Department.
 Secretary Jacobson. The Army Public Health Center, now known as the 
Defense Centers for Public Health--Aberdeen (DCPH-A), initiated a 
COVID-19 wastewater surveillance pilot study at Aberdeen Proving Ground 
in October 2020 that was successfully completed in March 2023. Upon 
completion of this study, the DCPH-A immediately transitioned to 
conducting full-time wastewater surveillance and identification of 
SARS-CoV-2 and its many variants and expanded detection capabilities to 
known and emerging threats. This effort remains ongoing, albeit under 
the management, funding, and control of the Defense Health Agency (DHA) 
based on the transfer of public health equities as required by Section 
1073c of Title 10, United States Code. The Army also participates in a 
wastewater surveillance working group, chaired by Assistant Secretary 
of Defense for Health Affairs, to develop policy and guidance to 
sustain/expand wastewater surveillance efforts across the Department.
 Secretary Berger. Navy Medical Research Unit (NAMRU)-6 Bacteriology 
is currently conducting a Global Emerging Infections Surveillance 
(GEIS)-sponsored project titled ``Comprehensive surveillance of drug-
resistant ESKAPE-E pathogens at the human/animal/environmental 
interface in Lima, Peru through wastewater, hospital, and 
slaughterhouse sampling.'' In addition, NAMRU-3 in Sigonella, Italy, is 
in the early planning stages of a wastewater surveillance proposal for 
COVID-19 and respiratory pathogens of epidemiological importance in 
Jordan. Additional wastewater research programs are in the planning 
stages.
 Secretary Chaudhary. Since July 2020, the Department of the Air 
Force collaboratively worked with joint mission partners to advance 
wastewater surveillance for the protection of servicemembers from 
infectious disease threats. Wastewater analysis was performed by fixed 
laboratories, such as Defense Centers for Public Health-Dayton (DCPH-
D), as well as by airmen at the installation level, using mobile and 
field-deployable instrumentation. To date, over 20 Air Force locations 
participated in these wastewater surveillance efforts. The Air Force 
developed concepts of operation/standard operating procedures to 
conduct wastewater surveillance and have laboratory capabilities to 
evaluate biological threats such as SARS-CoV-2 and other infectious 
organisms using polymerase chain reaction (PCR) and next generation 
sequencing (NGS) technologies. The Air Force also piloted PCR and NGS 
onsite at multiple installations and worked with the Joint Program 
Executive Office for Chemical, Biological, Radiological and Nuclear 
Defense (JPEO-CBRND) on in-situ screening methodologies. Currently, 
methodological development continues at DCPH-D to adapt detection for 
other pathogens of concern.
 __________
 Questions Submitted by Senator Elizabeth Warren
 non-disclosure agreements being used by privatized military housing 
 companies
 81. Senator Warren. Secretary Owens, 10 U.S. Code Sec. 2890(f) of 
the Fiscal Year 2020 National Defense Authorization Act clearly states 
that ``A tenant or prospective tenant of a housing unit may not be 
required to sign a nondisclosure agreement in connection with entering 
into, continuing, or terminating a lease for the housing unit. Any such 
agreement against the interests of the tenant is invalid.'' However, 
the Department of Defense has responded to concerns by saying that 
housing agreement non-disclosure agreements (NDA) are compliant with 
this law. What are the specific terms in the non-disclosure agreements 
across each Military Housing Privatization Initiative company? Please 
provide examples from all contracted companies.
 Secretary Owens. The Department is focused on further enhancing our 
oversight to ensure MHPI housing conditions and customer care minimize 
the number of potential Landlord/Tenant disputes while ensuring that 
servicemembers and military families feel they can report issues 
without fear of retribution or reprisal.
 Examples of specific terms in non-disclosure agreements that comply 
with the requirements set out in 10 U.S.C. 2890(f) and 10 U.S.C. 
2891a(d)(7) include:

 Resident acknowledgement that, pursuant to the National 
Defense Authorization Act for Fiscal Year 2020, the Resident has been 
notified of their right to assistance from the legal assistance office 
at the installation;

 Resident acknowledgement that they are entering into the 
agreement voluntarily and understanding that they are not required to 
sign a non-disclosure agreement in connection with entering into, 
continuing, or terminating their current or future lease for the 
property, or any other privatized military family housing owned or 
managed by the MHPI company or any of its affiliated entities; and

 Acknowledgment by the Resident that the agreement is 
executed as part of the settlement of litigation or to avoid 
litigation.

 82. Senator Warren. Secretary Owens, what specific sections of the 
NDA language does DOD determine are compliant with 10 U.S. Code Sec. 
2890(f)?
 Secretary Owens. The Office of the Assistant Secretary of Defense 
for Energy, Installations, and Environment reviews settlement 
agreements to ensure that current or prospective tenants are advised 
that they are not required to sign an NDA in connection with entering 
into, continuing, or terminating a lease for the housing unit and that 
any NDA language included is applied as part of the settlement of 
litigation or to avoid litigation if they (the tenant) has retained 
legal counsel or has sought military legal assistance.

 83. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, 10 U.S. Code Sec. 2890(13) provides 
``the right to receive advice from military legal assistance on 
procedures involving mechanisms for resolving disputes with the 
property management company or property manager to include mediation, 
arbitration, and filing claims against a landlord.'' Is this legal 
assistance provided to tenants on an opt-in or opt-out basis?
 Secretary Owens. Tenants of privatized housing are advised of their 
right to seek military legal assistance, but it is not mandatory that 
the tenant meet or receive advice from a legal assistance attorney. 
Private civilian legal counsel or other assistance may also be obtained 
by tenants as their own expense, regardless of whether the tenant has 
sought military legal assistance.
 Secretary Jacobson. Legal assistance is provided on an ``opt-in'' 
basis for tenants eligible for military legal services. Private 
civilian legal aid or other assistance may be obtained by tenants at 
their own expense. In addition, a Tenant Advocate from the Military 
Housing Office is available to provide the tenant advice and assistance 
on the Dispute Resolution Process. The resident has the option to use 
these resources at any time during the dispute resolution process.
 Secretary Berger. Military Housing Offices provide MHPI residents 
information and a clear path on how residents can access legal 
assistance from the Region Legal Service Office. This is an ``opt in'' 
service that residents are informed of in the ``MHPI Tenant Bill of 
Rights'' and ``Plain Language Briefing,'' which are provided to 
residents lease signing. Additionally, housing advocates who work in 
the Military Housing Offices will refer residents to Region Legal 
Service Offices when needed.
 Secretary Chaudhary. It is not mandatory that the tenant meet with 
a legal assistance attorney. Tenants are advised of their right to seek 
legal assistance from the installation legal office during their 
initial Tenant Bill of Rights briefings. If a tenant meets with a legal 
assistance attorney, that relationship is covered by Attorney-Client 
privilege and the attorney cannot disclose if a meeting occurred 
without the client's consent. As conflicts may arise, depending on a 
specific attorney's involvement with the Civil Engineer Squadron, 
Installation leadership, or other DAF entity, Air Force Judge Advocate 
(AF/JA) recommends having at least one conflict-free attorney available 
to provide this legal assistance. Legal offices can also create a 
relationship with a nearby legal office who can assist their tenants, 
thereby ensuring there are no conflicts of interest. Many installations 
have done that, with the legal assistance being provided virtually if 
they are not located in the same area as the installation at which the 
tenant resides. The local installation coordinates the hand-off to the 
nearby installation.

 84. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, how are tenants notified of this 
right?
 Secretary Owens. The Military Housing Office at the installation 
level has the primary responsibility for providing this information and 
does so in a variety of ways, including in the mandatory Plain Language 
Briefing, on installation web pages, and through communication methods 
such as social media.
 Secretary Jacobson. The Dispute Resolution Process has been 
incorporated into the Plain Language Brief required by the 2020 
National Defense Authorization Act and is given by the Army Housing 
Office to each prospective tenant prior to lease execution with the 
privatized housing company. The Plain Language Brief is then reviewed 
again with the tenant 30 days after lease signing. Tenant rights to 
legal counsel are reviewed within the Brief.
 Secretary Berger. Military Housing Offices provide MHPI residents 
information and a clear path on how residents can access legal 
assistance from the Region Legal Service Office. This is an ``opt in'' 
service that residents are informed of in the ``MHPI Tenant Bill of 
Rights'' and ``Plain Language Briefing,'' which are provided to 
residents lease signing. Additionally, housing advocates who work in 
our Military Housing Offices will refer residents to Region Legal 
Service Offices when needed.
 Secretary Chaudhary. Military tenants are advised of their right to 
legal assistance in multiple ways. First, all military tenants receive 
an initial new resident briefing from the Military Housing Office (MHO) 
advising them of this service. Second, military tenants are provided a 
handout on the Dispute Resolution Process that also advises the tenant 
of available legal services. Third, when a military tenant enters into 
a formal dispute, the MHO advises them of the availability of this 
service. Finally, 10 USC 2891a. requires a landlord to notify the 
tenant of the tenant's right to legal assistance at the installation 
legal office before entering into a settlement or non-disclosure 
agreement. These notifications are in addition to the other general 
adverts by DAF legal offices of the availability of legal assistance 
services for servicemembers, dependents, and other eligible members.

 85. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, and Ms. Field, what are the benefits and 
risks of NDAs between tenants and Military Housing Privatization 
Initiative (MHPI) companies?
 Secretary Owens. NDAs protect the confidentiality of the 
signatories and allow all parties to reach an amicable resolution on 
the identified issues, especially in regard to litigation or to avoid 
litigation where the claim being resolved involves disputed facts or 
law. Settlement agreements with an NDA also provide all parties with 
assurances that disputes can be negotiated in good faith and proceed in 
a manner that conserves the time and financial resources of each party 
with the potential for non-legal solutions that may not be available by 
law. If tenants do not want to accept settlement agreements or NDAs, 
they still may pursue legal recourse.
 Secretary Jacobson. Confidentiality clauses and non-disclosure 
agreements (NDAs) are frequently used as a part of settlement 
agreements where parties wish to preserve the confidentiality of the 
settlement terms. This is true particularly in cases where the claim 
being settled involved disputed facts or legal theories. NDAs are not 
required as a prerequisite to obtaining maintenance services from a 
housing provider. They are also not intended to prohibit or discourage 
the reporting of substandard housing conditions to the Army or any 
other entity that may have regulatory jurisdiction over the housing 
company. Rather than resorting to settlements, the Army promotes the 
utilization of the dispute resolution process that was developed as 
part of its implementation of the Tenant Bill of Rights. This approach 
offers numerous advantages, as it uses a thorough, collaborative 
process that ensures the prompt and fair resolution of disputes that 
arise between the housing providers and tenants.
 Secretary Berger. The Department of the Navy complies with the 
Department of Defense's current policy on dispute resolution. We are 
standing ready to assist Department of Defense in any future review of 
the formal dispute resolution process and/or the use of Non-Disclosure 
Agreements. This ``last resort'' option often offers an agreeable 
resolution to both parties.
 Secretary Chaudhary. The benefits of a Non-Disclosure Agreement 
(NDA) is that it allows for honest negotiations while protecting those 
discussions from release to the media or on social media. The risks are 
that tenants may feel the MHPI companies have something to hide and 
therefore, they are less inclined to trust the process. NDAs are a 
standard practice in settlement agreements. Servicemembers are not 
obligated to accept settlement agreements or the terms therein. If 
servicemembers do not want to accept the terms of an offered settlement 
agreement and any associated NDA of that agreement, they still have 
access to all remedies provided by law. With settlement agreements, the 
benefit is the settlement, the risk is agreeing not to disclose the 
terms of the agreement.
 Ms. Field. The scope of our audit work for our recently issued 
report on DOD's oversight of privatized military housing (GAO-23-
105377), as well as prior work we have completed, did not specifically 
address the use of non-disclosure agreements by the privatized military 
housing companies. As such, we have not conducted the work necessary to 
answer this question.

 86. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, and Ms. Field, the DOD says they do not 
work with tenants regarding NDAs. Is the DOD considering updating the 
formal dispute resolution process to include sharing NDAs with DOD and 
the services?
 Secretary Owens. The Department is not considering updating the 
formal dispute resolution process to include sharing NDAs across the 
DOD due to concerns that this would eliminate or reduce the Tenant's 
privacy, including the attorney-client privilege provided by military 
legal assistance, and limit non-litigation-based alternatives to 
resolve conflicts between the MHPI landlords and Tenants.
 Secretary Jacobson. The Army currently does not engage in the NDA 
process between the Tenant and the Privatized Housing Providers. OSD 
reviews all proposed NDAs with MHPI companies and Tenants to ensure 
consistency with 10 USC 2890(f), prior to execution. The Army continues 
to ensure that Tenants have the ability to personal legal advice from 
military legal assistance attorneys on ways to resolve disputes with 
Privatized Housing Providers, including concerns regarding NDAs 
proposed by the MHPI company.
 Secretary Berger. The Department of the Navy complies with the 
Department of Defense's current policy on dispute resolution. We are 
standing ready to assist Department of Defense in any future review of 
the formal dispute resolution process and/or the use of Non-Disclosure 
Agreements.
 Secretary Chaudhary. Within the Department of the Air Force, the 
military tenant may use the legal assistance from the local legal 
support office or their own legal counsel to review any proposed NDA, 
but such discussions would be subject to attorney-client privilege. 10 
USC 2891a. requires the landlord to provide a copy of the NDA content 
and format to Office of the Secretary of Defense (OSD) prior to its 
adoption, but any underlying material that may be subject to attorney-
client privilege is not included.
 Ms. Field. Because the scope of audit work for our recent report on 
DOD's oversight of privatized military housing (GAO-23-105377) did not 
specifically address the use of non-disclosure agreements, we are not 
aware of any such updates to the formal dispute resolution process that 
DOD might be considering.

 87. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, DOD says they also do not track NDA 
agreements as part of historic maintenance work. What is the rationale 
for this?
 Secretary Owens. Historic maintenance work is tracked within the 
privatized housing provider's work information management system and 
NDAs are not. It would be inappropriate to track NDAs as maintenance 
actions. Such work is tracked in the work order maintenance system 
regardless of whether the work in question is the subject of a Tenant 
dispute, whether through the MHPI formal dispute resolution process or 
another legal action.
 Secretary Jacobson. Maintenance work is tracked in the work order 
maintenance system regardless of whether the work in question is the 
subject of a Tenant dispute, whether through the MHPI formal dispute 
resolution process or another legal action. NDAs would not be tracked 
as a part of historic maintenance work. Further, not all settlement 
agreements or NDAs between MHPI companies and Tenants involve home 
maintenance issues.
 Secretary Berger. The Department of the Navy complies with the 
Department of Defense's current policy on dispute resolution. We are 
standing ready to assist Department of Defense in any future review of 
the formal dispute resolution process and/or the use of Non-Disclosure 
Agreements. The Navy and Marine Corps Military Housing Offices have 
access to the MHPI partner's maintenance systems and we keep records of 
home issues in our enterprise Military Housing (eMH) data base. While 
these records are not tied to NDAs, they do capture past issues and 
complaints in a home.
 Secretary Chaudhary. Historic maintenance work is tracked within 
the privatized housing provider's work information management system 
and NDAs are not. It would be inappropriate to track NDAs as 
maintenance actions.

 88. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, according to GAO, ``officials . . . 
told us that, based on their reading of their Military Department's 
policy, they were unclear about which office was responsible for 
conducting the independent investigation of the dispute.'' How is the 
independent investigator in the dispute resolution process chosen?
 Secretary Owens. The independent investigator in the dispute 
resolution process is chosen by the Military Service installation 
commander or region commander. Various mechanisms ensure impartiality, 
like not having Housing Management staff or individuals with the 
tenant's chain of command serve as investigators.
 Secretary Jacobson. The Installation Management Command (IMCOM) 
Commanding General (CG) appoints an Investigating Officer (IO) to serve 
for a specific formal dispute resolution or for a period of 90 days to 
serve over multiple formal dispute resolutions. The IO is selected from 
the Headquarters, IMCOM G4 staff, and is an individual who can review 
the case objectively. These investigators are experienced IMCOM command 
staff who provide neutral third-party perspectives to the dispute 
resolution process. To further ensure impartiality, Housing Management 
staff do not serve as IOs.
 Secretary Berger. The Navy and Marine Corps both outline the 
process for entering the Formal Dispute Process in the plain language 
briefs provided to all residents residing in MHPI housing. The 
resolution process currently identifies the need for Regional Command 
involvement in the formal dispute resolution process and potentially 
the use of independent investigators. Current policy gives the Regional 
Commander responsibility for handling dispute resolution cases and to 
identify, select and fund the use of independent investigators. The 
Department of the Navy will continue to will work with our installation 
commands to reinforce this message to Military Housing Offices.
 Secretary Chaudhary. The Department of the Air Force uses the same 
process that is used for Commander Directed Investigations. The 
Deciding Authority appoints an investigating officer that must be 
unbiased, without conflict of interest and of equal or higher rank than 
the military tenant. The individual cannot be in the military tenant's 
immediate chain of command nor be in the chain of command responsible 
for delivery of housing services. As a part of the appointment process 
attorneys from the local office of the Staff Judge Advocate (SJA) make 
recommendations to the Deciding Authority to assist in selecting the 
investigator. The attorney reviews the subject of the dispute to point 
out any specific skills that would be helpful for investigating the 
dispute. The attorney advising the Deciding Authority will not be 
involved in providing legal assistance to the tenant.

 89. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, what happens if either party doesn't 
agree this investigator is truly independent?
 Secretary Owens. In the dispute resolution process, if either party 
does not agree that the independent investigator is truly independent, 
the parties can express their concerns to the Military Housing Office 
who will, in turn, share it with the Military Service installation or 
region commander. Each Military Service chain of command allows the 
issue to be further elevated as needed for resolution.
 Secretary Jacobson. The Independent Dispute Resolution Investigator 
is an individual who can investigate the case objectively without bias 
and has no stake in the outcome. In the event that both parties believe 
that the investigator is not truly independent, then the Deciding 
Authority, IMCOM CG, will determine whether another investigator needs 
to be assigned.
 Secretary Berger. Both the Navy and Marine Corps have both informal 
and formal dispute resolution processes with multiple pathways that are 
available to residents. We strongly encourage residents to coordinate 
and seek advice through the Military Housing Offices (MHOs) first if an 
issue cannot be resolved with the property manager. Within the MHOs, 
resident advocates are available to advise residents of their options, 
which include coordinating legal services, engaging installation 
leadership, and/or engaging local and State authorities. The Navy and 
Marine Corps currently have a policy that indicates who can be an 
independent investigator and the criteria for these investigators. If 
they are not satisfied, residents can continue to work with the MHO and 
all other available pathways as necessary if the independent 
investigator becomes a concern.
 Secretary Chaudhary. If either party has concerns with the 
investigator, they can raise this to the Military Housing Office (MHO), 
the Deciding Authority, or the installation SJA. If it is raised to the 
MHO, they can forward the concerns to the SJA who will advise the 
Deciding Authority on the next steps, to include whether to replace the 
investigating officer.

 90. Senator Warren. Secretary Owens, why is the DOD dispute 
resolution process not consistent across the services?
 Secretary Owens. All of the Military Departments follow the same 
basic approach to dispute resolution, guided by the documents and 
policies developed by OSD in February 2021 pursuant to the requirements 
in 10 U.S.C. 2890, as well as the detailed requirements contained in 10 
U.S.C. 2894. However, there is some variation due to the terms of their 
individual legal agreements with the privatized housing companies.

 91. Senator Warren. Secretary Owens and Secretary Chaudhary, why 
does Air Force have more than double the number of eligible disputes 
filed than the other Departments?
 Secretary Owens. The Department of the Air Force (DAF) believes the 
right to formal dispute resolution is an important resource for their 
tenants, as it provides them with a way to be heard and helps local 
commanders truly learn the concerns at the lowest level. As such, the 
DAF has attempted to make this process as accessible as possible, 
especially for their junior members.
 Secretary Chaudhary. While the Department of the Air Force may have 
more eligible formal disputes than the other services, that number is 
still quite low with 23 disputes from Q4 calendar year 2021 to Q1 
calendar year 2023, which include all tracked formal disputes to date. 
The DAF believes the right to formal dispute resolution is an important 
resource for our tenants, provides them with a way to be heard and for 
the installation commander to truly learn the concerns at the local 
level. As such, we have attempted to make this process as accessible as 
possible, especially for our junior members. This includes keeping the 
dispute resolution authority at the installation, rather than at a 
region or higher command. In the majority of cases, the Deciding 
Authority is an O-6 rather than a general officer, reducing any 
perceived intimidation. Additionally, as our local commanders learn 
about the subjects of the disputes, it provides them with action items 
for oversight, which in the long run should enhance the tenant 
experience and reduce the number of disputes.
 tenant bill of rights implementation
 92. Senator Warren. Assistant Secretary Owens, according to GAO, 11 
of the 14 private housing companies have agreed to fully implement all 
18 rights in the Tenant Bill of Rights, and the remaining three have 
agreed to fully implement 15 of the 18 rights. What is DOD's plan to 
ensure all installations agree to the tenant bill of rights?
 Secretary Owens. The Department considers full implementation of 
the Tenant Bill of Rights (BOR) important to ensuring a positive 
military resident experience in MHPI housing and continues to work 
toward full implementation through voluntary agreement by all MHPI 
companies. All 18 tenant rights set out in the Tenant BOR are available 
at all but 3 of the nearly 200 installations with MHPI housing, and 16 
of these rights are available at the remaining 3 installations. The 
Department expects all 18 rights to be available at 100 percent of 
installations with privatized housing by the end of 2024.

 93. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, and Ms. Field, does DOD have a general 
guideline for who should be the tenant advocate across the Departments?
 Secretary Owens. As part of the MHPI reforms that the Department 
has implemented since 2019, the Military Departments have established 
Government employees as tenant advocates at each installation with MHPI 
housing. In a few cases, installations have hired a Resident Advocate 
who is not a member of the Military Housing Office.
 Secretary Jacobson. In the Army, the installation Army Housing 
Office serves as the tenant advocate.
 Secretary Berger. I defer to the Department of Defense to answer 
this question. The Department of the Navy believes the Military Housing 
office needs to be an integral part of the tenant advocate process, and 
we are updating out training program for our housing professionals to 
better equip them to advocate for residents. We are ready to support 
the Department of the Defense in any review of our process.
 Secretary Chaudhary. The Department of the Air Force chose to 
increase its manning and hire full time government employees to act as 
Resident Advocates. These employees were selected through the DAF 
hiring process. Per AFI 32-6000 the Resident Advocate's primary purpose 
is to serve as the Privatized Military Housing Resident Advocate for 
the Installation Vice Wing Commander (CV). Incumbent is the liaison 
between privatized housing residents, the MHO, the privatized housing 
project owner, and the Installation Commander for issues pertaining to 
privatized housing resident's rights and advocacy. The Resident 
Advocate handles issues pertaining to privatized housing resident 
rights and advocates for safe and healthy housing. In addition, the 
incumbent will use a variety of interpersonal, communication, problem 
solving, and negotiation skills to identify, validate, and assist in 
resolution of resident concerns with privatized housing leased by the 
member. The Resident Advocate will employ these skills to aid, consult, 
and address the concerns of the resident to ensure issues are elevated 
to the appropriate level in the chain of command or office of 
responsibility to expedite resolution.
 Ms. Field. The National Defense Authorization Act for fiscal year 
2020 required that, as part of the dispute resolution process, 
residents have access to advice and assistance from a military housing 
advocate employed by the Military Department concerned. The law did not 
specify whom the Military Departments should designate as military 
housing advocates, nor did it elaborate on the expected roles and 
responsibilities of the advocates. In February 2021, OSD issued policy 
that included a template for a universal lease to be implemented at all 
privatized housing projects. The universal lease template includes 
language stating that a tenant advocate from the military housing 
office may provide the tenant advice and assistance on the dispute 
resolution process, but does not provide any additional information on 
who should fill the tenant advocate position or other roles and 
responsibilities for this position. The Army and the Navy, to include 
the Marine Corps, determined that the roles and responsibilities of the 
existing military housing office staff met the intent of this tenant 
advocate requirement and, as a result, did not establish any new, 
related positions within their military housing offices. The Air Force 
created a new Resident Advocate position, separate from and in addition 
to its existing military housing office personnel.
 We are not aware of any overarching guidelines for who should serve 
as the tenant advocate. In our recent report (GAO-23-105377), we found 
that the military departments had not clearly identified the roles and 
responsibilities for these personnel, or communicated useful 
information to residents about how they can and cannot use the tenant 
advocates. To address this, we recommended that the military 
departments, in collaboration with each other, update internal policy 
documents, as well as brochures provided to residents, to more clearly 
identify the specific roles and responsibilities of tenant advocates, 
including what they can and cannot do to support residents. DOD 
generally concurred with these recommendations, and we will closely 
monitor DOD's implementation of our recommendations.

 94. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, 10 U.S. Code Sec. Section 3051 of the 
Fiscal Year 2020 National Defense Authorization Act required a uniform 
code of basic standards and plan to conduct inspections and 
assessments.'' According to GAO, ``we found that individual Military 
Department guidance does not provide detailed standards for how an 
inspector should rate homes'' and ``Military housing officials and 
private housing company officials we spoke with at all five 
installations said that the absence of clearly defined standards for 
rating each of the individual components on the checklist has 
contributed to disagreements between the military housing offices and 
private housing companies.'' When will more detailed standards for home 
inspections be in place?
 Secretary Owens. Pursuant to the Fiscal Year 2020 NDAA Section 
3051, the Department developed a uniform code of basic housing 
standards for safety, comfort, and habitability modeled from the 
International Property Maintenance Code and an inspection checklist to 
document the required housing inspections within the enterprise 
Military Housing system.
 The GAO recommended and the Department concurred with the 
recommendation that the DOD establish Department-wide turnover 
inspection guidance that is clearer and more concise regarding 
standards for assigning ratings to each of the components evaluated on 
the inspection checklist.
 Secretary Jacobson. Army concurs that more consistency in 
inspections and inspection standards are needed. To help standardize 
inspection practices, the Army created a rapid action Army housing 
inspection course in February 2021 which quickly trained inspectors on 
what to look for during inspections, such as those conducted between 
occupancy. Since then, the Army determined that a standardized 
inspection course, used by the other Military Services, would be a more 
complete approach and is implementing the Military Housing and Lodging 
Institute (MHLI) Housing Inspector Course used by the Air Force. To 
date, more than 137 out of the 900 Housing Management Specialists have 
attended the MHLI Housing Inspector Course. The training includes 
instruction on how to conduct Quality Assurance inspections with a 
checklist that was coordinated with all the Military Services. The 
approved checklists are currently being used to record inspection 
results in the DOD Housing system of record, Enterprise Military 
Housing.
 Secretary Berger. The Department of the Navy currently utilizes a 
standard checklist located in enterprise Military Housing (eMH) data 
base. This checklist is coordinated the other Military Departments and 
the Department of Defense. We have updated our training program to 
include additional guidance for the inspection process.
 Secretary Chaudhary. In accordance with Section 3051(d) of Fiscal 
Year 2020 National Defense Authorization Act and OSD guidance, the 
inspectors possess the appropriate credentials for the inspections as 
defined by the respective State and do not have a fiduciary 
relationship with the Federal Government or an individual or entity who 
owns or manages privatized military housing. While there is inherently 
some subjectivity in any inspection program, the inspectors conduct the 
inspections in accordance with the International Property Maintenance 
Code (IPMC) and the International Association of Certified Home 
Inspectors (InterNACHI). As of May 31, 2023, DAF has completed section 
3051(d) home inspections at 30 DAF bases (over 25,000 units) all in 
compliance with IPMC and InterNACHI standards.
 Regarding Change of Occupancy Maintenance (COM) inspections 
conducted by Military Housing Office (MHO) personnel, DAF uses the 
following tools to ensure consistency in COM inspections: 1) attendance 
by all MHO inspectors of Air Force Institute of Technology Certified 
Military Housing Inspector Course (CMHI); 2) DAF written COM inspection 
rating criteria; 3) bi-monthly virtual MHO training that includes COM 
inspection training and examples; and 4) a COM standards training 
session during DAF's Global Housing Symposium in May 2023.

 95. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, and Secretary Chaudhary, GAO found inspector training ``is 
general and does not always focus on issues related to the unique needs 
of projects or turnover inspections.'' What steps are being taken to 
improve these trainings?
 Secretary Owens. Currently, the Military Departments offer Military 
Housing Inspector training courses that comply with Federal, State, and 
local environmental health and safety training standards. These courses 
include a combination of participative lectures, designed to stimulate 
class discussions, group lab activities where students participate in 
simulated inspections, and supplemental slides and videos. The DOD is 
leading discussions amongst the Military Departments to assist them in 
considerations for improving these training courses to better assist 
inspectors in addressing the broad range of concerns that can occur 
across the nation-wide privatized housing portfolio.
 Secretary Jacobson. The Army generated and is implementing a 
Corrective Action Plan based on the findings of the GAO Audit 
``Military Housing: DOD Can Further Strengthen Oversight of Its 
Privatized Housing Program'' to improve training, dated 6 April 2023, 
reissued with revisions 20 April 2023. This plan has 4 key elements: 1) 
Review and update the current training program; 2) Identify untrained 
personnel and require these individuals to complete the Housing 
Inspector's Course; 3) Request additional program funding from Army 
Civilian Career Management Activity for additional Housing Inspection 
Courses in fiscal year 2023 and onward; 4) Inspect training records 
during Knowledge Competency Assessment Team validations or during 
Ground Lease Compliance Inspections. When the plan is fully executed, a 
comprehensive review will be conducted to assess to what extent 
oversight was strengthened.
 Secretary Berger. The Department of the Navy continues to update 
our training courses, with a keen focus on the inspection process. In 
addition, incoming installation commanding officers receive dedicated 
and specialized training related to housing on their installations.
 Secretary Chaudhary. The Department of the Air Force is 
continuously improving the delivery of training for the inspectors. As 
no training course could possibly cover every ``unique'' issue that 
could arise during an inspection, inspectors are advised to contact the 
Air Force Civil Engineer Center on any unique issues. These questions 
are answered by subject matter experts typically professionally 
registered engineers, architects and/or fire protection engineers.

 96. Senator Warren. Secretary Owens, according to military 
officials and the Office of the Secretary of Defense (OSD), DOD has 
sufficient authorities and several mechanisms to hold private housing 
companies accountable for poor performance, misconduct, or fraud. 
However, no military department has ever terminated a housing project, 
and the likelihood of such termination is low. Why has this authority 
not been exercised?
 Secretary Owens. The MHPI project ground lease and associated legal 
agreements include ``termination for cause'' (i.e. default) clauses 
that can be exercised in extreme cases where a MHPI project has 
repeatedly failed to address poor performance, misconduct or fraud. 
However, termination for default is a severe action that would impose 
significant and immediate operational costs upon the Department with 
potential additional adverse effects on the provision of housing at an 
installation. The DOD is focused on ensuring the long-term success of 
the existing partnerships and projects rather than considering their 
termination, whether for re-competition/selection of new companies to 
own and operate the MHPI projects or for resumption as Government-owned 
and operated housing.

 97. Senator Warren. Ms. Field, GAO recently issued a report that 
found three housing companies still has not implemented all of tenant 
bill of rights and that there is confusion about the role of tenant 
advocates--what is the impact of this confusion for servicemembers and 
their families?
 Ms. Field. In April 2023, we reported (GAO-23-105377) that without 
guidance for residents about how and when to use tenant advocates, and 
without detailed guidance and training for military housing officials 
about how to implement this right, confusion and frustration regarding 
this key National Defense Authorization Act provision will likely 
continue. The risk of frustration among residents, in particular, may 
negatively affect DOD's and private housing company representatives' 
goal to build and maintain trust with the residents. In addition, we 
have reported that members of different Military Services may live at 
installations managed by military services different than their own. As 
such, it is important that oversight expectations generally be 
consistent across the Military Departments and the projects they 
manage. Moreover, we reported that without mechanisms to collect and 
incorporate feedback from residents on the effectiveness of the 
resident advocate position, OSD is missing an opportunity to improve 
implementation and ensure that these initiatives are achieving their 
intended results.
 To address these problems, we recommended the military departments, 
in coordination with each other, update internal policy documents, as 
well as brochures provided to residents, to more clearly identify the 
specific roles and responsibilities of the military housing office 
officials designated as tenant advocates, including what they can and 
cannot do to support residents. The Military Departments generally 
concurred with this recommendation, and we will closely monitor their 
implementation of our recommendations.

 98. Senator Warren. Secretary Owens, what steps is your office 
taking to educate servicemembers about their rights under the tenant 
bill of rights, including on the availability and role of the tenant 
advocate?
 Secretary Owens. The Office of the Assistant Secretary of Defense 
for Energy, Installations, and Environment utilizes DOD installation 
visits to meet with servicemembers and their families and directly 
discuss the housing issues they are facing, as well as to educate them 
on resources available to assist in the resolution of issues. In 2024, 
the Office of the Assistant Secretary of Defense for Energy, 
Installations, and Environment intends to work within OSD to better 
provide housing information on various organization and key outreach 
websites like Military OneSource. Key pieces of information would 
include the Tenant Bill of Rights and the roles of the Military Housing 
Office and tenant advocates.

 99. Senator Warren. Secretary Owens, according to GAO none of the 
residents they spoke with understood how the dispute resolution process 
works. What is the DOD's plan to implement clear guidance on formal 
dispute resolution?
 Secretary Owens. The Department is collectively developing and 
implementing corrective action plans to all recommendations contained 
within the GAO report ``DOD Can Further Strengthen Oversight of Its 
Privatized Housing Program.'' These corrective actions include 
addressing the need to provide military housing offices with additional 
training to pursue increased education for Tenants and clarify their 
understanding of the MHPI dispute resolution process and the role of 
tenant advocates.

 100. Senator Warren. Secretary Owens, Secretary Jacobson, Secretary 
Berger, Secretary Chaudhary, and Ms. Field, according to GAO, there is 
some disagreement ``resident advocates, residents, and military housing 
office officials about what the advocates' roles and responsibilities 
are.'' What is DOD doing to create a standard policy about the role of 
the tenant advocate?
 Secretary Owens. The Department is collectively developing and 
implementing corrective action plans to all recommendations contained 
within the GAO report ``DOD Can Further Strengthen Oversight of Its 
Privatized Housing Program'' with anticipated completion in 2024.
 Secretary Jacobson. Though OSD has not issued a standard policy on 
the role of the Tenant Advocate, the Army will be refining the Plain 
Language Brief to clearly identify the specific roles and 
responsibilities of Army Housing Office officials designated as Tenant 
Advocates.
 Secretary Berger. The Department of the Navy defers to the DOD to 
provide an answer on a standard DOD policy. With the Department of the 
Navy, the Navy and the Marine Corps have issued Service-specific policy 
and standard roles and responsibilities for resident advocates and 
housing office personnel.
 Secretary Chaudhary. The Department of the Air Force will develop 
new or revised job aides that delineate the roles and responsibilities 
between Privatized Housing Resident Advocate and the MHO Manager. DAF 
will review and revise DAFI 32-6000, Housing Management, to ensure 
Privatized Housing Resident Advocate roles and responsibilities are 
clearly identified and provided to military members leasing privatized 
housing.
 Ms. Field. Our recent report (GAO-23-105377) recommended the 
Military Departments, in collaboration with each other, update internal 
policy documents, as well as brochures provided to residents, to more 
clearly identify the specific roles and responsibilities of the 
military housing office officials designated as tenant advocates, 
including what they can and cannot do to support residents. DOD 
generally concurred with these recommendations. We are unaware of any 
actions being taken by DOD to create a standard policy about the role 
of the tenant advocate, and, as of June 2023, DOD has not yet provided 
us with a corrective action plan with stated deadlines for addressing 
these recommendations.
 Implementing these recommendations will better position DOD to hold 
private housing companies accountable for providing quality housing to 
servicemembers and their families in a more meaningful way. Moving 
forward, we will closely monitor DOD's implementation of our 
recommendations.
 public complaint data base
 101. Senator Warren. Secretary Owens, when will the public 
complaint data base for privatized military housing--which was required 
in the Fiscal Year 2020 National Defense Authorization Act--be made 
available?
 Secretary Owens. In fiscal year 2023, the Department initiated work 
to implement the public access MHPI complaint data base required by the 
Fiscal Year 2020 NDAA, as amended.
 Initial efforts are focused on obtaining interdepartmental and 
consultant input to identify data base operational, security, budget, 
and contractor requirements, and an expedited project timeline to 
achieve full data base implementation. This includes obtaining updated 
input from the Consumer Financial Protection Bureau's consumer 
complaints data base.
 The Department is targeting full data base implementation in fiscal 
year 2025, but the final schedule will depend on implementation and 
operational requirements and resource availability, including funding.
 When fully implemented, the complaint data base will provide an 
additional avenue for MHPI Tenants to raise concerns about their 
housing and will provide greater transparency of the experience 
provided by privatized housing on DOD installations.

 protections for military spouses
 102. Senator Warren. Secretary Owens, when I introduced a bill to 
create a military readiness council to provide oversite of the military 
housing policies, the Department of Defense opposed the inclusion of 
military spouses. Will you commit to supporting the inclusion of 
military spouses in oversight of military housing?
 Secretary Owens. The experience of military spouses is a valuable 
source of information for quality of life initiatives for 
servicemembers and their families, particularly those related to 
housing. My office fully supports the inclusion of military spouses in 
the fiscal year 2024 NDAA established Military Family Readiness Working 
Group for Military Housing.

 103. Senator Warren. Secretary Owens, the tenant bill of rights 
covered spouses under most provisions, but their omission from 
protections against retaliation by private housing providers if they 
raise complaints leaves them vulnerable--would you support adding 
retaliation protections for spouses to the tenant bill of rights?
 Secretary Owens. The Tenant Bill of Rights already recognizes 
spouses as covered Tenants, consistent with the requirements in 10 
U.S.C. 2890.
 The Department is aware of concerns raised by some spouses 
regarding their access to the Tenant Bill of Rights, or their rights to 
sign an MHPI housing lease.
 The Military Departments are reviewing these concerns to ensure 
that spouses who are Tenants of MHPI housing have access to all tenant 
rights afforded at the installation where their housing unit is 
located.
 progress on climate risk preparedness in the department of defense
 104. Senator Warren. Secretary Owens, the National Defense 
Authorization Act for Fiscal Year 2023 includes a provision that 
requires DOD to set up a pilot program for transitioning its non-
tactical vehicle fleet to renewable fuel sources, and to submit a 
report to the Armed Services Committee about cost estimates and risk 
assessments before entering into a contract to procure and replace the 
existing non-tactical vehicle fleet with electric or renewable power-
sourced vehicles. Please describe the Department of Defense's progress 
so far on executing this pilot program and report. If there has been no 
notable progress, why not?
 Secretary Owens. Each of the Military Departments has initiated 
pilot programs required by Section 323 of the Fiscal Year 2023 NDAA at 
their selected installations. The report required by Section 328 of the 
Fiscal Year 2023 NDAA was submitted to the congressional defense 
committees on March 30, 2023.

 105. Senator Warren. Secretary Owens, when does the Department of 
Defense expect to complete the pilot program by?
 Secretary Owens. Each of the Military Departments has initiated 
pilot programs required by Section 323 of the Fiscal Year 2023 NDAA at 
their selected installations and they are proceeding on different 
timelines. OSD is also conducting studies to understand and mitigate 
the grid stresses associated with increased electrification of 
infrastructure on our installations. Those studies will likely conclude 
in late fiscal year 2024.

 106. Senator Warren. Secretary Owens, will the Department of 
Defense release a public report of the results of the pilot program?
 Secretary Owens. Yes, the Department plans to release results from 
the pilot programs when they are completed.

 107. Senator Warren. Secretary Owens, when does the Department of 
Defense expect to release the report to the Armed Services Committee 
regarding costs estimates and risk assessments?
 Secretary Owens. The report required by Section 328 of the Fiscal 
Year 2023 NDAA was submitted to the congressional defense committees on 
March 30, 2023.
 progress on climate risk preparedness for army installations
 108. Senator Warren. Secretary Jacobson, the U.S. Army released its 
Climate Strategy last year to enhance the resilience and sustainability 
of its installations, acquisition and logistics, and training. Does the 
Army think it will be able to install a micro-grid on every 
installation by 2035? What progress has been made so far?
 Secretary Jacobson.

 The Army is working diligently to install a microgrid on 
every installation by 2035. The Army currently has 28 operational 
microgrids at 22 installations. Additionally, the Army has nine 
microgrids under construction, 26 microgrids in the design phase, and 
more than 70 microgrids in the planning phase. Many of these projects 
are being funded through the Energy Resilience and Conservation 
Investment Program (ERCIP).

 Given the cost and complexity of these systems, the Army 
is working to leverage both appropriated funds (e.g., Military 
Construction, ERCIP, and Sustainment Restoration and Modernization) and 
private financing methods that include partnerships with industry and 
utility companies (e.g., Energy Savings Performance Contracts, Utility 
Energy Services Contracts, and leases) to develop microgrids.

 109. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to achieve onsite carbon pollution-free power generation 
for Army critical missions on all installations by 2040? What progress 
has been made so far?
 Secretary Jacobson. This Army Climate Strategy goal is being 
implemented in concert with the goal to install a microgrid on every 
installation. Our emphasis is to install microgrids comprised of 
carbon-free generation, battery storage, and advanced controls. The 
Army is committed to achieving these nested goals; they are key to our 
approach to meeting our statutory energy resilience requirements and 
our Climate Strategy goals.
 In fiscal year 2022, the Army increased its renewable energy 
capacity for the seventh year in a row, adding 3.6 MW of carbon free 
energy (CFE) capacity through 15 new projects, resulting in the total 
Army having 739 MW of CFE generation capacity. Of that, Army power 
projection platforms and mobilization force generation installations 
host and utilize 280 MW CFE generation capacity.
 Numerous carbon free energy projects are in development. The Army 
leverages both appropriated and private financing methods to deploy CFE 
power generation assets. Appropriated funds are secured through 
Military Construction, Energy Resilience and Conservation Investment 
Program, and Operations and Maintenance. Army also aggressively pursues 
partnership-based acquisitions funded through long-term private 
financing using power purchase contracts, real eState out-grants, 
Energy Savings Performance Contracts, and Utility Energy Services 
Contracts.

 110. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to achieve onsite carbon pollution-free power generation 
for Army critical missions on all installations by 2040? What progress 
has been made so far?
 Secretary Jacobson. This Army Climate Strategy goal is being 
implemented in concert with the goal to install a microgrid on every 
installation. Our emphasis is to install microgrids comprised of 
carbon-free generation, battery storage, and advanced controls. The 
Army is committed to achieving these nested goals; they are key to our 
approach to meeting our statutory energy resilience requirements and 
our Climate Strategy goals.
 In fiscal year 2022, the Army increased its renewable energy 
capacity for the 7th year in a row, adding 3.6 MW of carbon free energy 
(CFE) capacity through 15 new projects, resulting in the Total Army 
having 739 MW of CFE generation capacity. Of that, Army power 
projection platforms and mobilization force generation installations 
host and utilize 280 MW CFE generation capacity.
 Numerous carbon free energy projects are in development. The Army 
leverages both appropriated and private financing methods to deploy CFE 
power generation assets. Appropriated funds are secured through 
Military Construction, Energy Resilience and Conservation Investment 
Program, and Operations and Maintenance. Army also aggressively pursues 
partnership-based acquisitions funded through long-term private 
financing using power purchase contracts, real eState out-grants, 
Energy Savings Performance Contracts, and Utility Energy Services 
Contracts.

 111. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to provide 100 percent carbon pollution-free electricity 
for Army installations' needs by 2030? What progress has been made so 
far?
 Secretary Jacobson. Carbon-free electricity (CFE) is a priority 
line of effort for all Army installations, and we hope we will be able 
to substantially achieve this goal by 2030 through strategic 
acquisitions with utility companies and power providers as well as by 
installing and hosting CFE on Army installations in support of 
accomplishing our broader energy resilience statutory mandates.
 In one example, the Army is participating in the CFE Pathfinders 
pilot initiative led by the Office of the Secretary of Defense and 
executed through Defense Logistics Agency. This initiative is focused 
on consolidated energy procurement opportunities in the service areas 
of Duke Energy Progress (North Carolina) and the Electric Reliability 
Council of Texas (ERCOT).
 In fiscal year 2022, the Army consumed 34.5 percent of its 
installation power needs from CFE sources. The Army will continue to 
improve its consumption ratio from CFE sources as the energy 
marketplace evolves to increase CFE opportunities and as more 
installation cited CFE comes online.

 112. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to implement installation-wide building control systems by 
2028? What progress has been made so far?
 Secretary Jacobson.

 The Army is actively implementing building control 
systems, otherwise known as building automation systems (BAS). Today we 
have installed or planned BAS in approximately 40 percent of all 
facilities.

 The Army has a comprehensive inventory effort underway to 
enable HQDA to fully identify Army's requirements to achieve this goal. 
Concurrently, Army installations are implementing, expanding, and 
modernizing installation BAS through all applicable programs as 
facilities are renovated, modernized, and constructed, using military 
construction, facility repair and modernization, and energy savings 
performance contracts.

 113. Senator Warren. Assistant Secretary Jacobson, does the Army 
think it will be able to achieve 50 percent reduction in greenhouse gas 
(GHG) emissions from all Army buildings by 2032, from a 2005 baseline? 
What progress has been made so far?
 Secretary Jacobson. Army's building portfolio GHG emissions have 
been trending downward since tracking and reporting began in 2010. 
Army's emissions are 35 percent lower than the fiscal year 2005 base 
year. We expect to be able to reach the 50 percent GHG building 
portfolio emission target by 2032 with enhanced implementation of our 
current strategies. The Department's focus on energy efficiency, 
resilience, and security have contributed to GHG emission reductions.
 The Army Climate Strategy set clear goals for more resilient and 
sustainable Army installations, and many synergistic efforts are 
underway which support this goal's accomplishment. For example:

 There are several Army pilots in progress to assess new 
design and construction approaches to electrify new construction to 
make it carbon-free energy ready, as well as testing strategies to 
reduce embodied carbon in the purchasing and construction processes. 
These pilots are in the early stages but will test if there are better 
ways to acquire and execute design and construction services in order 
to build more resilient, less energy and water intensive, buildings 
with minimal to no life-cycle cost increase.

 We continue to (1) pursue the most energy efficient 
building construction that is life cycle cost effective for new 
construction and major renovation; (2) use EPSC and UESC to identify 
and implement energy efficient repairs and modernize our existing 
buildings; and (3) pursue carbon free energy for onsite use.

 Partnerships are key to the Army's strategy for energy efficiency 
and resilience, which will contribute to reductions in GHG emissions. 
Our Office of Energy Initiatives works diligently to find win-win 
proposition with utilities and independent service providers to develop 
onsite energy generation projects. Additionally, the Army participated 
in a pathfinder study that leverages Federal Government purchase power 
to solicit more carbon-free energy sources from our utility providers, 
which should yield results in the near term.

 114. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to attain net-zero GHG emissions from Army installations 
by 2045? What progress has been made so far?
 Secretary Jacobson. Army Installations annual GHG emissions which 
includes the building portfolio, mobile emission from vehicles, and a 
very small portion from fugitive emission from onsite landfills and 
wastewater treatment plants have been trending downward since reporting 
began in 2010. Army's total Installation emissions are 34 percent lower 
than the fiscal year 2005 base year.
 Achieving a net zero portfolio is dependent on utility markets, 
technology available, access to sufficient funding, and the 
distribution grid upgrades to manage onsite energy generation (e.g., 
microgrids). After efficiency improvements, the use of renewable energy 
would have the greatest impact on reducing or offsetting GHG emissions, 
but it can be costly. We continue to install traditional systems like 
solar photovoltaic arrays and ground source heat pumps, however, we are 
also monitoring developments in the energy marketplace like small 
modular nuclear systems, waste-to-energy technologies, and larger 
geothermal power systems, capable of providing not just heating and 
cooling, but large amounts of electricity. We are also implementing an 
aggressive non-tactical fleet conversion to zero-emission vehicles with 
installation of the requisite supporting electric charging 
infrastructure at our Installations.
 Our goal for net zero emissions for all of our buildings by 2045 is 
driving us to reevaluate how we design and construct, repair and 
renovate our facilities. We intend to electrify building systems as we 
construct new facilities or renovate older ones, while designing to 
more aggressive energy use reduction targets. Electrification will 
enable us to leverage resilient, onsite generation, as well as carbon-
free energy sources from local utility markets. This not only reduces 
our carbon footprint, but also gives us more localized, resilient 
options for powering our installations.
 Partnerships are a key part of the Army's strategy for energy 
efficiency and resilience, which will contribute to GHG emission 
reductions. Our Office of Energy Initiatives works diligently to find 
win-win proposition with utilities and independent service providers to 
expand onsite energy generation projects. Additionally, the Army has 
participated in a pathfinder study that has leverages Federal 
Government purchase power to obtain access to more clean energy sources 
from our utility providers, which should yield results in the near 
term.

 115. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to field an all-electric light-duty non-tactical vehicle 
fleet by 2027? What progress has been made so far?
 Secretary Jacobson. The Army has made significant progress in 
achieving its goal of fielding an all-electric light duty NTV fleet by 
2027. Army has surpassed is fiscal year 2023 ordering target of 2,006 
zero emission vehicles (ZEVs), with 2,314 vehicles ordered from GSA to 
date. This number represents 61 percent of the vehicles eligible to be 
replaced in fiscal year 2023. The Army's light duty vehicle fleet 
stands at 1,623 vehicles delivered as of the end of June 2023, as a 
result of orders placed in fiscal year 2022 and fiscal year 2023. Army 
is partnering with GSA to ensure that the highest possible number of 
ZEV orders will be fulfilled.
 The Army has been a leader in light duty ZEV acquisition and 
fielding and remains committed to achieving this goal, but there are 
some external factors which may ultimately impact progress:

 Sufficient, affordable ZEV inventories must be made 
available to GSA by vehicle manufacturers; although the availability of 
these vehicles has notably increased in fiscal year 2023, there were 
supply chain challenges in fiscal year 2022.

 Vehicle manufacturers must produce vehicles which meet 
all Army mission requirements--for example, operating ambient 
temperatures and battery range requirements, particularly for those 
vehicles used off-post and those traveling long distances, such as by 
recruiters, Reservists, and National Guardsmen.

 Off-post vehicle charging availability and compatibility must 
increase and be more reliable for those missions where vehicles are 
stored off-post or travel long distances. Progress on this front will 
continue as the charging market begins to stabilize and as industry.

 116. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to field an all-electric non-tactical vehicle fleet by 
2035? What progress has been made so far?
 Secretary Jacobson.

 The total Army NTV fleet is just over 56,000 with about 
34,142 (60.5 percent) being light duty, 17,180 (30.5 percent) being 
medium duty, and 5,092 (9 percent) being heavy duty. Army is surpassing 
targeted goals for electric light-duty vehicle orders through GSA. If 
Army reaches the goal of all light-duty vehicle electrification by 
2027, this will put Army at sixty percent (860 percent) of the 2035 
Army Climate Strategy goal. This would allow 8 years for the Army to 
achieve the additional forty percent (840 percent).

 There are not currently well-established medium or heavy-
duty vehicles commercially available that meet Army mission 
requirements. Exemptions will be granted if a comparable ZEV does not 
exist to replace an internal combustion engine (ICE) vehicle. If 
vehicle manufactures and industry can create sufficient inventory of 
medium and heavy-duty vehicles that satisfy Army mission, then Army 
will lease these vehicles through GSA to the greatest degree possible.

 117. Senator Warren. Secretary Jacobson, has the Army continued to 
advocate for an expanded Army Compatible Use Buffer? If not, why?
 Secretary Jacobson. The Army is celebrating the 20th-year 
anniversary of the inception of the ACUB Program and continues to 
advocate for expanded use of Army Compatible Use Buffers. In addition 
to encroachment projects, Army is expanding the program to promote 
projects with benefits to installation resiliency for the mission, such 
as those to mitigate effects to species habitat and to address climate 
change. The Army is hosting an ACUB/REPI workshop session to foster 
sharing of information for expanding partnering for resiliency, 
leveraging resourcing partners for greater sharing of resources, 
increasing Army procurement capacity to exercise cooperative 
agreements, conducting training for personnel, and advocating for 
budgeting and funding to sustain the mission into the future.

 118. Senator Warren. Secretary Jacobson, has the Army included 
climate change threat mitigation into Army land management decisions? 
If not, why?
 Secretary Jacobson. Yes. A critical tool for the Army to mitigate 
climate change threats is the Army's installation Integrated Natural 
Resources Plans (INRMPs). INRMPs serve as planning documents that 
outline how military installations having significant natural resources 
will manage those resources for resiliency. INRMPs integrate military 
mission requirements with natural resources on a landscape or ecosystem 
basis. They are considered living documents that provide direction for 
daily natural resources management activities/sustainable land 
management practices, providing a foundation for resiliency--adapting 
and mitigating to sustain military readiness. Application of these land 
management decisions and projects affect species and habitat 
management, watershed management and wildlife hazards/prescribed fire 
measures, supporting current and future land management and training.
 Army has also entered a RAND Study, ``Enhancing Army Land 
Management Decisions to Mitigate Climate Change Impacts'', to improve 
effectiveness of such decisions. Furthermore, Army NEPA proponents are 
directed to consider climate change as part of the environmental 
baseline for NEPA analyses (including land management decisions) 
prepared in accordance with 32 CFR 651, Environmental Analysis of Army 
Actions. Army NEPA proponents assess greenhouse gas emissions and 
climate change effects resulting from proposed Army actions, including 
assessment of the social costs of carbon dioxide, nitrous oxide, and 
methane, in Environmental Assessments and Findings of No Significant 
Impact, and Environmental Impact Statements and Records of Decision.

 119. Senator Warren. Secretary Jacobson, has the Army incorporated 
the latest climate and environmental science into stationing, 
construction, and fielding decisions? If not, why?
 Secretary Jacobson. The Army does not currently have a ``climate 
change'' Military Value Analysis (MVA) attribute included in 
stationing, construction, and fielding decisions. The ASA(IE&E) and DCS 
G-9 have proposed a RAND study to create a climate-related MVA 
attribute to help the Army with stationing.
 Even without a formal climate-related MVA, the Army takes some of 
the current effects of climate change and extreme weather into account 
for major stationing decisions. However, the long-term projections of 
future climate change effects are not yet comprehensively considered.
 An example of how climate change effects are accounted for--the 
Army computes a ``Range Sustainability'' attribute in our Military 
Value Analysis (MVA). It is one of the more heavily weighted parts of 
the Army's MVA. ``Range Sustainability'' analyzes available maneuver 
training land, which takes into account unusable acreage due to 
wetlands, for example. It also applies a factor for soil resiliency. 
Climate change will affect both the amount of available maneuver land, 
as well as the soil resiliency (desertification can decrease resiliency 
and increase erosion).
 The Army also takes climate into account for its installation 
master plans. Those master plans in turn shape the ``Developable Area'' 
MVA attribute. The Developable Area classifies all real property into 
three categories, based on how easily or how difficult it would be to 
build facilities on those parcels.
 The Army is fielding an interactive climate vulnerability 
assessment tool developed by the US Army Corps of Engineers to evaluate 
the near-term vulnerability of CONUS Army installations to six climate-
related threats: coastal and riverine flooding, drought, 
desertification, wildfire, and permafrost thaw.
 Last, whenever the Army performs an analysis of proposed major 
stationing or new system fielding actions through the National 
Environmental Policy Act (NEPA), the proposed action (in this case the 
stationing or fielding of systems) is required to be analyzed to 
account for cumulative environmental effects and reasonably foreseeable 
actions. If there are measurable effects of climate change, proponents 
must summarize and incorporate by reference relevant scientific 
literature concerning the physical effects of climate change, use the 
most up-to-date scientific projections available, select and use tools, 
methodologies, and scientific and research information that are of high 
quality and available to assess relevant effects and mitigation.
 progress on climate risk preparedness for army acquisitions and 
 logistics
 120. Senator Warren. Secretary Jacobson, has the Army modernized 
existing Army platforms by adding mature electrification technologies? 
If not, why?
 Secretary Jacobson. The Army is in the process of modernizing 
existing Army platforms by adding mature electrification technologies. 
For example, the Army is in the process of modernizing its legacy 
fleets with mature intelligent anti-idle electrification technologies 
and is partnering with other Services and industry to develop and 
incorporate commercial leading-edge electrification technologies that 
will inform the development of future tactical vehicle fleets.
 The Army is engineering and testing tactical vehicle 
electrification kits (TVEK) which provide anti-idle capability for all 
the tactical wheeled vehicles with procurement beginning in fiscal year 
2025. TVEK is expected to reduce the fuel consumption of a vehicle by 
at least 20 percent and engine runtime by up to 50 percent. Moreover, 
the TVEK provides extended silent watch capability. The reduction in 
fuel consumption and maintenance hours will reduce risk, extend 
operational endurance, improve readiness, and reduce maintenance costs.
 The Army is also developing technologies for hybrid-electric drive 
vehicles. Hybrid-electric vehicles are expected to reduce fuel 
consumption by up to 35 percent but will also provide other tactical 
capabilities such as extended silent watch and silent mobility. Two 
Bradley hybrid-electric drive demonstrators are now in testing. Two 
hybrid-electric HMMWVs and one hybrid-electric JLTV are on-order with 
expected delivery in fiscal year 2024.
 Tactical vehicle electrification will provide a substantial 
competitive advantage with benefits that range from the tactical 
through strategic levels of war and include such increased capability 
like reduction in acoustic, thermal signature, silent mobility, 
increased dash speed, extended operational reach, increased 
reliability, reduction in risk to soldiers, fuel demand reduction, and 
reduced logistical tail.

 121. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to field purpose-built hybrid-drive tactical vehicles by 
2035 and fully electric tactical vehicles by 2050? What progress has 
been made so far?
 Secretary Jacobson. Yes, as long the Army is able to continue 
research, development, and testing of tactical vehicle electrification 
capabilities to include battlefield recharging, then it is reasonable 
to believe that the Army will achieve its aimpoints. The goal to field 
hybrid-drive tactical vehicles by 2035 and all-electric tactical 
vehicles by 2050 is contingent on the rate of technology advancement, 
which is currently not mature enough to adequately meet military 
specifications.
 Before any technology is fielded, the Army ensures it meets the 
demands of our warfighters and does not place them or the mission at 
risk. Rigorous testing occurs prior to fielding any new technology or 
equipment. For example, combat vehicles have to withstand ten times the 
vibration and shock expected of commercial vehicles, climb grades off-
road that are twice as steep as the steepest paved U.S. road, and 
operate at greater temperature extremes than commercial vehicles. They 
must do all this while wrapped in armor that restricts the availability 
of cooling air. The electronics must be able to operate at 105 degrees 
centigrade, while typical commercial electronics are limited to 85 
degrees.
 The Army is partnering with commercial industry to further develop 
these technologies. Two Bradley hybrid-electric drive demonstrators are 
now in testing, and two hybrid-electric HMMWVs and one hybrid-electric 
JLTV are on-order.
 The Army has requested funding in the President's Budget for fiscal 
year 2024 for the Electric Light Reconnaissance Vehicle (eLRV), with 
the first prototype expected for delivery in fiscal year 2025. The eLRV 
will potentially be the Army's first all-electric vehicle.

 122. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to develop the charging capability to meet the needs of 
fully electric tactical vehicles by 2050? What progress has been made 
so far?
 Secretary Jacobson. Yes, there is an Army-wide coordinated effort, 
led by Army Futures Command, in collaboration with industry, to advance 
battlefield charging technology. Industry is already deploying 
commercial mobile recharging solutions.
 The Army is exploring Tactical Battlefield Recharging (TBR) 
capability options required to sustain hybrid and all-electric vehicle 
fleets in remote, austere environments under combat conditions. This 
includes the planning of small-scale proof of concept projects to test 
and evaluate system efficiencies as well as tactics, techniques and 
procedures for TBR employment.
 The Army is confident that this technology will continue to mature 
as the force gradually transitions to modern electrified vehicles to 
meet our 2050 aimpoint.

 123. Senator Warren. Secretary Jacobson, has the Army developed 
predictive logistics that drive more precise and make faster decisions? 
If not, why?
 Secretary Jacobson. The Army is in its initial stages of developing 
its Predictive Logistics (PL) capability requirements. There is no 
comprehensive commercial solution that the Army can easily adopt. 
Significant advances have been made through experimentation and 
warfighting exercises which will help to inform and define the 
requirement.
 Experimentation efforts that inform the requirements development 
process span across aviation and ground platforms. For example, the 3d 
Infantry Division (3ID), is working to digitize maintenance processes, 
which is essential to capturing the data required to train and feed the 
algorithms envisioned to predict maintenance and logistics 
requirements. Goals to achieve PL are ultimately predicated on 
replacing manual processes with digital workflows. While those broader 
goals are pursued, this work will enable us to reduce the burden on 
operators and maintainers, improve diagnostics, and automate 
maintenance and supply transactions. 3ID leaders highlighted 
preliminary improvements to the unit's maintenance culture. The 
division also reports that work orders and parts requests no longer 
linger for days on paper forms, and leaders have greater confidence 
that their operators and maintainers--guided by prompts from up-to-date 
TMs--are conducting troubleshooting and services correctly.
 Another example is how the Army leveraged United States Army 
Project Convergence 2022, a modernization learning and experimentation 
demonstration campaign. It included Special Operations Forces with our 
U.K. and Australian partners moving vehicle performance data off a 
platform with the use of SATCOM (beyond the previous limitation of 
line-of-sight) and incorporating that data into the mission command 
network where it could be accessed and assessed by maintainers.
 On December 8, 2022, GAO published a report titled, ``MILITARY 
READINESS: Actions Needed to Further Implement Predictive Maintenance 
on Weapon Systems'' (GAO Project No. 105556). The Army is also working 
on implementing all GAO recommendations and will continue to refine its 
efforts as it learns more through the planned actions.
 In November 2022, Program Executive Office, Command, Control and 
Communications-Tactical (PEO C3T) was assigned as the Material 
Development Office of Primary Responsibility (OPR). Once a requirements 
document is approved, PEO C3T will lead Predictive Logistics and 
Prognostic and Predictive Maintenance early teaming activities across 
the acquisition community. PEO C3T will then determine when it is 
appropriate to bring any emerging acquisition programs or efforts to an 
Acquisition Shaping Panel for initiation, eventually moving forward in 
determining a materiel solution.

 124. Senator Warren. Secretary Jacobson, has the Army established 
policies that standardize contingency basing to increase resilience and 
reduce fuel requirements? If not, why?
 Secretary Jacobson. Army policy directs fuel demand reduction on 
basecamps through Army Regulation (AR) 700-147 (2019). However, the 
Army is in the process of reviewing other existing policies and 
guidance to determine where improvements are needed to address basecamp 
energy demand reduction and resilience.
 AR 700-147 (2019), ``Contingency Basing,'' prescribes policy and 
responsibilities for the planning, design, construction, operations and 
management of base camps outside the United States. This regulation 
directs the Army to increase energy resiliency by maximizing the use of 
energy efficient shelters, micro-grids, renewable energy sources, and 
adopting practices and process that reduce energy demand.
 The Army operates in compliance with DOD Unified Facilities 
Criteria (UFC) 1-200-02, ``High Performance and Sustainable Building 
Requirements,'' and DOD Directive 3000.10, ``Contingency Basing Outside 
the United States,'' both of which direct the use of energy-efficient 
materials and systems in the construct of non-permanent DOD facilities 
and structures outside the United States to the greatest extent 
practical.
 As part of the Army Climate Strategy Implementation Plan, the Army 
continues to review policies and contracts to ensure energy 
supportability and demand reduction considerations are incorporated 
into all future Army contingency activities.

 125. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to significantly reduce operational energy and water use 
by 2035? What progress has been made so far?
 Secretary Jacobson. Yes, the Army is well on its way to 
significantly reducing operational energy and water use by 2035 with 
R&D investments that are advancing vehicle electrification, demand 
reduction, and water procurement technologies. To maintain battlefield 
dominance in future potential contested logistics environments, the 
Army is dedicated to improving its expeditionary capability by reducing 
demand in all classes of supply and services, not just fuel and water.
 Vehicle fuel demand reduction technologies are progressing in the 
areas of intelligent anti-idle controls, hybrid-electric vehicle 
drives, and advanced battery architectures.
 The Army Futures Command's Initial Capabilities Document for 
Tactical and Combat Vehicle-Electrification (TaCV-E) provides a roadmap 
toward vehicle electrification and more fuel-efficient vehicles. Near-
term goals include adoption of anti-idle controls with highly 
electrified components in tactical wheeled fleets that will reduce the 
fuel consumption by at least 20 percent and engine runtime by up to 50 
percent. Mid-term goals aim toward mild-hybrid to full-hybrid tactical 
and combat vehicles with electrified drivetrains powered by a 
combustion engine or fuel cell that are expected to reduce fuel 
consumption by up to 35 percent. A Long-term goal is to field all-
electric vehicle fleets that could potentially reduce fuel consumption 
by 50 percent when tactical recharging is considered.
 The Army is replacing its antiquated legacy generator fleet with a 
new family of AMMPS generators that reduce the fuel consumption of 
ground-based power by an average of 21 percent over their predecessors. 
Integration of the AMMPS with a microgrid can potentially increase that 
efficiency to 45 percent reduction in fuel consumption. The integration 
of tactical battlefield electrical storage solutions could raise that 
to 65 percent.
 The Army is also exploring and experimenting with water filtration, 
purification, and generation technologies that will enable forward 
deployed units to treat and produce potable water in forward deployed, 
harsh field conditions. For example, USACE's Heat Driven Atmospheric 
Water Generator (Heat DAWG) is a new atmospheric water generation 
system that is powered by waste heat from a tactical generator. It can 
produce water at the point of need, thereby reducing water resupply 
requirements.
 Increased unit autonomy made possible with fuel demand reduction 
and potable water generation technologies, as well as 3-D manufacturing 
capabilities that enable spare part production at point of need, will 
significantly reduce resupply frequency. This will even further reduce 
operational fuel consumption as well as minimize unnecessary Soldier 
exposure to enemy action.

 126. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to achieve carbon pollution-free contingency basing by 
2050? What progress has been made so far?
 Secretary Jacobson. Yes, the Army believes it is on track to 
achieve this goal. The Army is making considerable headway with 
reducing fossil fuel demand at base camps and contingency basing 
facilities and is optimistic about the continual advancement of carbon-
free energy generation and storage technologies, which will help make 
this goal achievable.
 The Army continues to invest in the development of vehicle 
electrification, advanced battery architectures, renewable energy 
sources such as solar and wind, and alternative energy sources such as 
hydrogen.
 These developments are continuing to evolve but achieving carbon 
pollution-free by 2050 is conditional on how rapidly the technology 
advances.

 127. Senator Warren. Secretary Jacobson, has the Army adopted a Buy 
Clean policy for procurement of construction materials with lower 
embodied carbon emissions? If not, why?
 Secretary Jacobson. The use of low-carbon construction materials is 
a priority for the Army. Buying clean, low-carbon construction 
materials is a requirement under the forthcoming Department of the Army 
policy guidance on Resilient Buildings. Publication of the guidance is 
expected in the Fall. The Army's way forward is based on market-ready, 
proven technologies that meet mission requirements for strength and 
durability, are readily available, minimize construction costs, and 
significantly reduce embodied carbon emissions. This is a multi-level 
effort involving Army leadership, design and construction subject 
matter experts, and Corps of Engineers construction research labs, as 
well as expertise from private sector and not-for-profit organizations.

 128. Senator Warren. Secretary Jacobson, has the Army implemented a 
revised energy key performance parameter? If not, why?
 Secretary Jacobson. Yes, the Army actively works to incorporate 
considerations of energy demand and supportability into requirements 
for Army systems. Recently, the Army revised the guidance on the 
implementation of the energy key performance parameter in the Army's 
Writers Guide for Requirements which outlines how the Army develops an 
energy key performance parameter and how the Army conducts an energy 
supportability analysis.

 129. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to attain net-zero GHG emissions from all Army 
procurements by 2050? What progress has been made so far?
 Secretary Jacobson. The Army is on track to reduce the Greenhouse 
Gas (GHG) emissions from procurements to accomplish a Net-Zero posture 
by 2050, but recognizes that this will require our suppliers to 
implement significant changes. The initial step in the Army Climate 
Strategy Implementation Plan requires Army suppliers to disclose their 
GHG emissions related to Procurements, and encourages suppliers to 
pursue net-zero GHG emissions in any products and services supplied to 
the Army. These steps are on track with two proposed revisions to the 
Federal Acquisition Regulation (FAR), FAR Case 2021-015: Disclosure of 
Greenhouse Gas Emissions and Climate Related Financial Risk and FAR 
Case 2021-016: Minimizing the Risk of Climate Change in Federal 
Acquisitions that were opened in 2021, where the final rules have an 
estimated publication date of December, 2023 and late 2024 
respectively. The FAR Council publication of the final rule will allow 
the Army to track GHG emissions resulting from Army procurement and 
encourage suppliers to provide net-zero GHG products.

 130. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to analyze all Army supply chain Tier 1 sources and 
contracts for climate change risks and vulnerabilities by 2025? What 
progress has been made so far?
 Secretary Jacobson. The Army believes it will be able to analyze 
all Army supply chain Tier 1 sources and contracts for key climate 
change risks and vulnerabilities by fiscal year 2025. The Army is 
establishing a supply chain risk management framework, which includes 
climate adaptation and considers the resilience of Army supply chains. 
Currently, the Army is identifying and compiling a list of Tier 1 
suppliers, which are defined as companies that directly supply the 
company on contract with the Army. The Army also will conduct strategic 
wargames and simulations to stress test exemplar Army supply chains 
against climate adaptation and resilience risks. This will facilitate 
the Army's ability to describe and assess key climate change risks and 
vulnerabilities to Army supply chain Tier 1 sources and contracts.

 131. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to develop plans, policies, and contracts to ensure Army 
supply chain resilience by 2028? What progress has been made so far?
 Secretary Jacobson. Yes. The Army will publish a Directive on 
Supply Chain Risk Management. In support of the Policy, the Army has 
established an active community focusing on identifying supply chain 
risks and ensuring that risks to critical capabilities are managed. 
This will be implemented in contract language to ensure risk management 
is conducted and communicated by the Government. Supply Chain Risk 
Management is a complex problem for the Army as we have layers of 
suppliers for our complex weapon systems. The key is to identify how 
critical the risks are within the supply chain and focus on mitigating 
the areas the impact critical Army missions.

 progress on army climate training
 132. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to publish climate change lessons in 2024 and best 
practices every 2 years? What progress has been made so far?
 Secretary Jacobson. Yes. The Army is on track to publish in 2024 
climate change lessons learned, and will continue to update best 
practices every 2 years going forward. Moreover, the Army has 
participated in the OSD-led Climate Literacy Pulse Check and followup 
focus groups to assess current levels of climate literacy in the force 
and identify gaps that would improve mission assurance. The Army is 
already implementing its Climate Strategy and, in the process, is 
generating case studies on best practices for increasing installation 
resilience and operational efficiency.

 133. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to update Army programs of instruction for leader 
development and workforce training to incorporate climate change topics 
no later than 2028? What progress has been made so far?
 Secretary Jacobson. Yes. The Army has already made significant 
progress in incorporating relevant climate information in leader 
development and workforce training.
 Leader development: Army Senior Leader programs, such as the Army 
War College and the US Military Academy at West Point, have 
incorporated the topics of climate impacts to security and military 
resilience strategies into programs of instruction. In September 2022, 
West Point in partnership with ASA (IE&E) to launched the Sustainable 
Infrastructure, Resilience, and Climate Consortium (SIRCC). SIRCC is a 
transdisciplinary team of faculty from the Departments of Civil and 
Mechanical Engineering (CME), Chemistry and Life Science (CLS), and 
Geography and Environmental Engineering (GENE) which is leading 
educational and research initiatives. Through SIRCC, West Point Cadets 
are conducting hands-on capstone research projects on challenges 
including developing waste to energy conversion technologies and 
electrifying medium-and heavy-duty tactical and non-tactical vehicles. 
SIRCC's mission to educate and inspire cadets, staff, and faculty to 
address DOD challenges related to sustainability, resilience, and 
climate will develop future officers capable of leading in a complex 
world and will build and distribute intellectual capital for the Army 
and the Nation.
 Workforce training: As the Army supports the OSD-led Climate 
Literacy effort, the entire Department is working together to develop 
requirements for general on-boarding and initial entry education that 
will provide mission-essential climate information to all incoming 
military and civilian personnel. In addition, the Department is working 
together to create a DOD Climate Resource Repository that is intended 
to be an authoritative central source for scientifically credible, 
neutral, climate change information. The US Army Corps of Engineers is 
preparing a new digital training platform that is incorporating climate 
change topics for their technical experts.

 134. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to increase the number of soldiers and Army civilians 
serving in strategic headquarters with advanced credentials on climate 
change topics by 2035? What progress has been made so far?
 Secretary Jacobson. The Army is leveraging the expertise of 
civilian climate scientists at Headquarters Department of the Army 
(HQDA) Assistant Secretary of the Army for Installations, Energy, and 
Environment (ASA (IE&E), at the Army War College and at our research 
laboratories run by the U.S. Army Corps of Engineers: Engineering 
Research and Development Center (ERDC), Construction Engineering 
Research Laboratory (CERL), Cold Regions Research and Engineering 
Laboratory (CRREL), Coastal and Hydraulics Laboratory (CHL) and our 
Environmental Laboratory (EL). We are actively increasing the number of 
soldiers with advanced credentials on climate change topics by funding 
research on environmental security and the strategic aspects of climate 
adaptation at Army War College.
 Programmed efforts starting in fiscal year 2024 include Regional 
Climate Expertise for select CCMDs (EUCOM, SOUTHCOM, and AFRICOM) to 
obtain SME support on climate related matters, including regional 
climate threats, operational energy requirements, and allied/partner 
country outreach and climate resilience support. Also beginning in 
fiscal year 2024, there is programmed funding to the Army's Prime Power 
School to develop power generation specialists and solutions for 
expeditionary power.
 The Army recognizes that developing a workforce is a multi-year 
effort, and we are in the initial stages of incorporating climate 
change topics into advanced credentials. We are currently studying 
National Security requirements and determining climate credentials that 
are relevant at the headquarters level across the Army. As we 
deliberate, we intend to create an Army-wide policy for vetting and 
approving advanced credentials on climate change topics. SIRCC at West 
Point and the Army War College are beginning to track and incorporate 
advanced credentials on climate change topics and how climate and the 
environment relate to national security.

 135. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to ensure that all Army operational and strategic 
exercises and simulations consider climate change risks and threats by 
2028? What progress has been made so far?
 Secretary Jacobson. Yes. The Army is already conducting and 
participating in strategic tabletop exercises and wargames exploring 
the impacts of climate threats on geopolitical stability and great 
powers competition. The Army is an active member of the OSD-led Climate 
Wargaming Sub-Working Group, and, in June, the Center for Strategic 
Leadership at Army War College hosted the Inaugural Environmental 
Security Workshop focused on the polar regions. This conference brought 
together scientists, policymakers and the defense community to generate 
recommendations and requirements for climate adaptation that contribute 
to resilient defense systems, education and workforce development, and 
an understanding of operational requirements to compete and win within 
the polar regions. The findings of this conference are being used to 
formulate an Army polar wargame for January 2024, and future region-
specific workshops and wargames are upcoming.

 136. Senator Warren. Secretary Jacobson, has the Army considered 
reduction of GHG emissions as a factor in planning to optimize the 
Army's mix of distributed learning, virtual learning, and resident 
courses? If not, why?
 Secretary Jacobson. Yes. The Army is developing a training 
emissions model for estimating the quantity of GHG emissions reduced or 
created by course offerings by resident, distributed learning, or 
virtual learning. Both scope 1 emissions (GHGs produced as a direct 
result of training itself) and scope 2 emissions (GHGs that are caused 
indirectly by the training, such as the GHG emissions from transporting 
students to/from training sites) are factors under review.

 137. Senator Warren. Secretary Jacobson, does the Army think it 
will be able to develop ways to reduce direct GHG emissions resulting 
from Army individual and collective training by 2028? What progress has 
been made so far?
 Secretary Jacobson. Yes. By fiscal year 2025, the Army will have 
the results of the training emissions model and will analyze and 
compile the data and publish individual and collective lower-emissions 
training handbooks by fiscal year 2026. These handbooks will describe 
lessons learned and best practices for minimizing Army GHG emissions 
produced by training activities. These lower emissions training 
handbooks will add to the body of climate literacy knowledge that is 
currently being collected and will be published every 2 years beginning 
in fiscal year 2024. In order to fully implement this strategy by 2028, 
unit individual and collecting training will utilize these handbooks to 
reduce direct GHG emissions.
 progress on climate risk preparedness in the navy
 138. Senator Warren. Secretary Berger, the Department of the Navy 
released its Climate Action 2030 plan last year to build climate 
resilience and reduce climate threat among its forces, systems, and 
facilities. Does the Navy think it will be able to achieve a 65 percent 
reduction in scope 1 and 2 greenhouse gas emissions Department-wide by 
2030 (measured from a 2008 baseline)? What progress has been made so 
far?
 Secretary Berger. Yes, the Department of the Navy has set a goal of 
achieving 100 percent carbon pollution-free (CFE) by 2030, and we have 
multiple efforts underway to accelerate our progress in this area. We 
are focusing on combining onsite CFE generation with the local CFE grid 
mix delivered by the utility, and we have multiple efforts underway to 
accelerate our progress. For example, last year, Marine Corps Logistics 
Base Albany became the Department of Defense's first energy ``net-
zero'' military installation, and we are applying lessons from our 
success at Albany to the rest of our Navy and Marine Corps 
installations. We are also leveraging programs such as Energy 
Resilience and Conservation Investment Program (ERCIP) to upgrade 
infrastructure and make our installations more efficient, we are 
investing in our tactical platforms to advance hybridization and 
electrification, and we continue to seek innovative opportunities and 
partnerships to continue to lean forward and make tangible progress.
 The Department of the Navy is also working with both unregulated 
and regulated local utility service providers such as Hawaiian Electric 
(HECO) to combine their renewable energy efforts with the Department's 
to increase the speed in which we can collectively achieve Net Zero. 
Similarly, we are working with industry groups such as the Edison 
Electric Institute to leverage the power of private industry to help 
the Navy decrease its carbon emissions. Collectively as a part of the 
Department of Defense, we are also involved in programs like Energy 
Resilience and Conservation Investment Program (ERCIP) to upgrade 
infrastructure and make our installations more efficient. We will 
continue to invest in our tactical platforms as well to advance 
hybridization and electrification, and we continue to seek innovative 
opportunities and partnerships to continue to lean forward and make 
tangible progress.
 Regarding our progress so far, the Navy's scope 1 and 2 greenhouse 
gas emissions have decreased every year from fiscal year 2015 to fiscal 
year 2021. The Navy's yearly emissions decreased 13 percent during this 
time period, from 19.2 million metric tons of CO2 equivalent in fiscal 
year 2015 to 16.7 million in fiscal year 2021. This included a 22 
percent decrease in emissions from shore installations due to a 
combination of reduced energy consumption and reliance on cleaner 
energy sources.

 139. Senator Warren. Secretary Berger, does the Navy think it will 
be able to achieve 100 percent carbon pollution-free electricity by 
2030, at least half of which will be locally supplied clean energy to 
meet 24/7 demand? What progress has been made so far?
 Secretary Berger. Yes, the Department of the Navy has set a goal of 
achieving 100 percent carbon pollution-free (CFE) by 2030, and we have 
multiple efforts underway to accelerate our progress in this area. We 
are focusing on combining onsite CFE generation with the local CFE grid 
mix delivered by the utility, and we have multiple efforts underway to 
accelerate our progress. For example, we are working with local 
utilities like Hawaiian Electric on synergetic projects for both the 
State's specific goals as well as our own. As another example, the DON 
has a partnership with the State of California for long-term battery 
storage solutions and carbon reduction programs like the Low Carbon 
Fuel Standard program which reduces the dependency on petroleum and 
increases the range of renewable alternatives. We have also 
successfully deployed renewable energy technologies at many of our 
installations across the world. Marine Corps Logistics Base Albany is 
the Department of Defense's first ``Net Zero'' installation and 
operates a microgrid that runs on excess biomass generated steam and 
two additional generators powered by landfill gases. The DON is 
leveraging industry groups like the Edison Electric Institute to find 
ways to partner and work collectively with entities outside our 
fencelines to achieve shared goals.
 As the Department of the Navy's Chief Sustainability Officer, I 
have released a memorandum regarding Infrastructure that sets DON 
standards and goals for sustainable building design and facility 
decarbonization such that the DON will quickly move toward an end State 
of standard facility design elements that are electrified, sustainable, 
energy efficient, resilient and carbon free. Together with the other 
Services, the Navy and Marine Corps are participating in CFE pilot 
programs at Joint Base Pearl Harbor-Hickam, Naval Station Norfolk, 
Naval Air Station Pensacola, Marine Corps Base Camp Lejeune and Marine 
Corps Air Station Cherry Point. We will continue exploring 
opportunities to increase the energy security of the commercial grid 
while buying greener energy and will update our policies and criteria 
to reflect more sustainable solutions for our installations.

 140. Senator Warren. Secretary Berger, does the Navy think it will 
be able to acquire 100 percent zero-emission vehicles by 2035, 
including 100 percent zero-emission light-duty vehicle acquisitions by 
2027? What progress has been made so far?
 Secretary Berger. Yes, we believe that Department of the Navy can 
acquire 100 percent zero-emission vehicles by 2035, including 100 
percent zero-emission light-duty vehicle acquisitions starting in 2027. 
The Navy and Marine Corps predominantly rely on the General Services 
Administration (GSA) to lease our non-tactical vehicles, and there are 
limited ZEVs through GSA. So we are working with GSA to lease new ZEVs 
and convert our existing vehicle leases to ZEV vehicle leases. While 
our current focus is on electrifying our light-duty fleet, and we have 
requisitioned medium/heavy-duty vehicles as well. Additionally, we are 
in the planning stages to deployment of charging infrastructure at our 
installations. Since fiscal year 2022, we have funded infrastructure 
projects to deploy more than 500 L2 and L3 charging ports and conducted 
EV site assessments at 20 installations to create initial EV charger 
infrastructure project schematic designs to enhance project execution.

 141. Senator Warren. Secretary Berger, does the Navy think it will 
be able to achieve a 50 percent reduction in emissions from buildings 
by 2032? What progress has been made so far?
 Secretary Berger. The Department of the Navy is taking aggressive 
steps now to meet these goals by changing behaviors and implementing a 
wide range of adjustments to how we construct our facilities. As the 
Department of the Navy's Chief Sustainability Officer (CSO), I am 
issuing a series of memorandums to establish and oversee the execution 
of sustainability goals and metrics across the Department. The first 
memorandum in this series was focused on infrastructure, specifically 
on sustainable building design and facility decarbonization. This 
memorandum directs the Navy and Marines Corps to:

 Incorporate sustainable design elements into all new 
construction and renovation projects to move the DON toward a net-zero 
facility inventory.

 Design elements should include, but are not limited to, 
the use of sustainable materials, electrification of building systems, 
elimination of fossil fuel combustion systems and equipment where all-
electric technology alternatives exist, building envelope improvements, 
passive mechanical systems, efficiency measures, and onsite power 
generation.

 Apply lessons learned from the development of the 
Sustainable Building Material pilot project, the Net-Zero building 
pilot projects, and other energy efficiency and resiliency projects--in 
real time to transfer the learning into action in other project 
designs--and to continuously update and improve facility criteria and 
design standards.

 Quantify intensity and consumption reduction 
(electricity, water, etc.) and emissions reductions resulting from 
sustainable design elements of all capital improvement projects.

 Establish metrics and document during project development 
(engineering estimates) and post-construction or commissioning 
(measurement and verification).

 Identify pathfinder opportunities for additive 
manufacturing of facilities.

 Ensure the workforce is trained and equipped to design, 
build, operate, and maintain sustainable facilities and all-electric 
systems.

 The Department of the Navy is also drafting implementation guidance 
for the Department of Defense's new policy on the electrification of 
building components. This guidance will direct all Department of the 
Navy military construction and restoration and modernization projects 
to immediately incorporate into advance planning and design efforts the 
use of all-electric technologies for all facility system components, 
including but not limited to space conditioning, water heating, 
cooking, and laundry, where market ready technologies exist. The Navy 
and Marine Corps will also develop interim technical guidance until 
updates to the Unified Facilities Criteria are complete; establish a 
process to share market-ready technologies and best practices; and 
update training and processes for planners, engineers, designers, and 
construction professionals.
 The Department of the Navy's fiscal year 2024 budget request 
includes funding for the execution of one sustainable building 
materials military construction pilot project, one net-zero emissions 
military construction pilot project, and planning and design funding 
for a future second net-zero-emissions pilot project. The fiscal year 
2024 net-zero project will focus on features like passive mechanical 
systems, natural lighting, multi-zone heating and cooling, integrated 
designs, and natural features (green walls, roofs, etc.), with the 
intent to construct this facility to a net-zero emissions standard. 
These pilot projects are key to determining the techniques, procedures, 
and updated building standards needed to meet this goal. The lessons 
learned here will not only apply to new construction, but will be 
deployed across the shore portfolio as we renovate the DON's current 
facility inventory. While it will not be possible to fully renovate all 
existing facilities by 2032, the DON will focus on replacement of 
individual systems as their service life expires with low carbon or 
carbon-free alternatives, as well as targeted whole-building deep 
energy retrofits where it makes economic sense.

 142. Senator Warren. Secretary Berger, does the Navy think it will 
be able to annually divert at least 50 percent of non-hazardous solid 
waste from landfills, including food and compostable materials, and 
construction and demolition waste and debris by 2025? What progress has 
been made so far?
 Secretary Berger. For non-hazardous solid waste, our fiscal year 
2022 diversion rates were 34 percent and 35 percent for Navy and Marine 
Corps respectively. The Department of the Navy faces several challenges 
in achieving the aim to meet the 50 percent diversion goal due to the 
decline in the recycling market and other factors. To increase our 
diversion rates, the Navy and Marine Corps are evaluating and adopting 
several initiatives, to include establishing regional Qualified 
Recycling Programs, implementing food waste composting programs, and 
better accounting for items that are diverted through reuse.
 For construction and demolition (C&D) waste, Navy and Marine Corps 
currently meet the diversion goal of 50 percent, with fiscal year 2022 
diversion rates of 72 percent and 78 percent respectively, and we 
anticipate being able to continue to meet this goal.

Department of the Air Force Overall Response to Senator Warren:
 Thank you for your interest in the Department's Climate Action 
Plan, released in October 2022. The DAF Climate Action Plan established 
our three priorities, six objectives, and 19 key results. We are 
currently finalizing our implementing plan--the Climate Campaign Plan--
which identifies the specific actions we must pursue to produce the key 
results and assigns activities, offices of primary responsibility, and 
timelines toward these priorities. We will publish that plan shortly on 
the same public-facing URL: https://www.safie.hq.af.mil/. We are 
executing actions and anticipate sharing an annual progress highlights 
report commencing in summer 2024.

progress on maintaining air and space dominance in the face of climate 
 risks
 143. Senator Warren. Secretary Chaudhary, the Department of the Air 
Force released its Climate Action Plan last year to define how it will 
preserve operations, increase resilience, and mitigate future climate 
impacts in order to maintain air and space dominance in the face of 
climate risks, make climate-informed decisions, and optimize energy use 
and pursue alternative energy sources. Does the Air Force think it will 
be able to make targeted investments to improve base resilience, 
starting with $36 million in fiscal year 2023 and increasing to $100 
million per year by fiscal year 2027? What progress has been made so 
far?
 Secretary Chaudhary. The Department of the Air Force is confident 
that it will meet the investment targets we set in the Climate Action 
Plan. We are approaching this objective by first formalizing the 
definition of a resilience investment and providing guidance to the 
field on implementation and tracking. The DAF expects this guidance to 
be published late this summer, after which point we will assess fiscal 
year 2023 investments to establish a baseline and incorporate it into 
development and prioritization of future year's programs.

 144. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to develop a framework established to evaluate the 
effects of climate change at department installations to inform 
resourcing and basing processes by fiscal year 2024? What progress has 
been made so far?
 Secretary Chaudhary. Yes. We are testing a preliminary framework. 
Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.

 145. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to ensure that the Department of the Air Force Severe 
Weather and Climate Hazard Screening and Risk Assessment Playbook is 
fully implemented at installations requiring an Installation 
Development Plan in accordance with Department of the Air Force 
Instruction 32-1015, by the end of fiscal year 2026? What progress has 
been made so far?
 Secretary Chaudhary. Yes. We are establishing Playbook 
implementation completion criteria. Additional details will be 
available in the forthcoming Climate Campaign Plan and progress will be 
reported in summer 2024.

 146. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to implement Energy Resilience Readiness Exercises 
executed at 35 installations by the end of fiscal year 2027? What 
progress has been made so far?
 Secretary Chaudhary. Yes, the Department of the Air Force is on 
track to execute Energy Resilience Readiness Exercises at 35 
installations by the end of fiscal year 2027. The Air Force has 
executed 14 exercises since fiscal year 2020 and is scheduled to 
complete five Energy Resilience Readiness Exercises each fiscal year 
through fiscal year 2027. Additional details will be available in the 
forthcoming Climate Campaign Plan and progress will be reported in 
summer 2024.

 147. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to ensure Installation Energy Plans are completed for 
installations requiring an Installation Energy Plan in accordance with 
Department of the Air Force Instruction 90-1701, by fiscal year 2023, 
with identified projects submitted to compete for funding starting in 
fiscal year 2024? What progress has been made so far?
 Secretary Chaudhary. Yes. By the end of fiscal year 2023, DAF will 
complete 112 Department of the Air Force Installation Energy Plans 
(IEPs), including the AF Reserve and Air National Guard. This includes 
all OSD-designated DAF-priority installations and the top 75 percent 
electricity consumers in the DAF. The remaining Active Duty 
installations will be funded in fiscal year 2023 and completed in 
fiscal year 2024. The National Guard Bureau plans to fund their 
remaining IEPs by fiscal year 2025 with anticipated completion by 
fiscal year 2026. The DAF is developing project concepts (third-party 
funding and DOD-funded) for these installations, focusing on 
installations on the priority list. Additional details will be 
available in the forthcoming Climate Campaign Plan and progress will be 
reported in summer 2024.

 148. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to ensure the Department of the Air Force's 
installations portfolio is at net-zero emissions by fiscal year 2046, 
including a 50 percent emission reduction from 2008 levels by fiscal 
year 2033? What progress has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is 
working aggressively toward the net-zero and emission reduction targets 
set in Executive Order 14057 and the DAF Climate Action Plan. SAF/IEE 
is currently establishing a net-zero framework that will define and set 
the scope for DAF's approach to achieving the Executive Order net-zero 
targets. We are participating in several pilot projects that will 
reduce emissions, including vehicle and building electrification 
pilots, net-zero building designs, a nuclear microreactor 
demonstration, as well as participating in pilot efforts to procure 
carbon pollution-free electricity (CFE). Under the Energy Resilience 
and Conservation Investment Program, DAF is developing projects that 
will reduce carbon emissions, including microgrids with renewables and 
battery storage as well as electric vehicle service infrastructure. 
Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.
 progress on air force making climate-informed decisions
 149. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to integrate climate considerations into department 
professional military education curriculum by fiscal year 2024? What 
progress has been made so far?
 Secretary Chaudhary. Yes. We are working with the Office of the 
Secretary of Defense (Personnel & Readiness) staff Office on its 
climate literacy efforts which will help us achieve our objectives. 
Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.

 150. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to integrate climate considerations into department 
technical and continuing education curriculum by fiscal year 2024? What 
progress has been made so far?
 Secretary Chaudhary. Yes. We are working with the Office of the 
Secretary of Defense (Personnel & Readiness) staff Office on its 
climate literacy efforts which will help us achieve our objectives. 
Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.

 151. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to incorporate climate considerations, security 
language, and goals in Air Force and Space Force concept development 
and Air Force Major Command and Space Force Field Command operational 
plans and campaign plans starting in fiscal year 2024? What progress 
has been made so far?
 Secretary Chaudhary. Yes. We are taking steps to introduce climate 
considerations into concept development, operational plans, and 
campaign plans. Additional details will be available in the forthcoming 
Climate Campaign Plan and progress will be reported in summer 2024.

 152. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to incorporate climate considerations into department 
title 10 wargames starting in fiscal year 2023? What progress has been 
made so far?
 Secretary Chaudhary. Yes. We are incorporating climate 
considerations into the next Title 10 wargame, Global Engagement 24. 
Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.

 153. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to include potential effects and security implications 
of climate change in engagements with allies and partner nations 
starting in fiscal year 2023? What progress has been made so far?
 Secretary Chaudhary. Yes. Climate change considerations are 
integrated as a topic in the Department of the Air Force International 
Engagement Plan. The Chief of Staff of the Air Force, General Brown, 
signed a Declaration of Intent along with 34 other Air Chiefs, 
establishing the Global Air Forces Climate Change Collaboration 
(GAFCCC), which pursues areas of cooperation among allies and partner 
nations, holding working groups, sharing best practices, expertise, and 
where appropriate, resources and research to optimize energy use while 
simultaneously understanding the security implications of climate 
change. Additional details will be available in the forthcoming Climate 
Campaign Plan and progress will be reported in summer 2024.

 154. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to incorporate Energy Key Performance Parameters in 
weapon system capability requirements in accordance with the Joint 
Capabilities Integration and Development System Manual? What progress 
has been made so far?
 Secretary Chaudhary. Yes, the Air Force's current focus is to build 
the Department's capability to conduct thorough and realistic Energy 
Supportability Analysis (ESA), generating valid energy Key Performance 
Parameters (KPPs) through data analysis, modeling, and simulation. ESAs 
are now part of the acquisition program requirements development 
process, including for future aerial refueling platforms. Additional 
details will be available in the forthcoming Climate Campaign Plan and 
progress will be reported in summer 2024.

 155. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to identify effects of climate change for select supply 
chains by end of fiscal year 2023 with risk mitigation approaches 
informed by the end of fiscal year 2024? What progress has been made so 
far?
 Secretary Chaudhary. Yes. We have identified and verified available 
data sources to assist in this analysis. Additional details will be 
available in the forthcoming Climate Campaign Plan and progress will be 
reported in summer 2024.
 progress on air force optimizing energy use and pursuing alternative 
 energy sources
 156. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to increase operational energy intensity of Air Force 
flying missions by 5 percent by fiscal year 2027 and 7.5 percent by 
fiscal year 2032 through standardized use of aircraft drag reduction 
technologies, modern software scheduling tools, and enhanced engine 
sustainment practices? What progress has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is on 
track to improve the operational energy intensity of flying missions on 
this timeline through a mix of initiatives in four key areas. First, we 
completed a pilot program that encourages energy efficiency best 
practices called the Mission Execution Excellence Program that saw a 2 
percent improvement in energy intensity for four C-17 squadrons, and we 
are expanding this program across the mobility air forces. Second, we 
invested in software and scheduling improvements that increase the 
productivity of our missions, meaning we get more training, airlift, 
refueling support, or combat operations per gallon. Third, we supported 
sustainment programs such as advanced engine washes and improved engine 
components that not only make the aircraft engines more efficient, but 
also reduce maintenance and increase the lifespan of components. 
Finally, we've made progress on drag reduction efforts on large 
aircraft such as Microvanes on C-17s, which will save $11 million per 
year and have a payback period in months. Overall, our data indicates 
we will be able to achieve our goals in the next 5 and 10 years. 
Progress to date includes the best practices initiatives in aviation 
operations, mobility allocation software, tanker planning tools, and 
engine wash initiatives that are already improving energy intensity by 
about 0.5 percent, which we expect to increase rapidly as programs 
complete implementation.

 157. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to complete development and testing of a full-scale 
blended wing body prototype by fiscal year 2027? What progress has been 
made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is on 
track to fly and complete initial testing of a full-scale blended wing 
body (BWB) prototype by the end of fiscal year 2027. After over 20 
years of BWB technology maturation by NASA, AFRL, and industry, in 
fiscal year 2023 the Air Force accelerated digital design work on 
specific solutions with multiple industry partners. Beginning this 
summer, the Air Force plans to further advance preliminary digital 
design work on a blended wing body demonstration aircraft that can 
serve both military and commercial potential derivatives. Preliminary 
Design activities will be followed by Critical Design activities 
beginning in fiscal year 2024, leveraging state-of-the-art digital 
engineering and multi-domain optimization tools that will enable rapid 
progression to a prototype build and flight demonstration starting in 
fiscal year 2025 and completed by fiscal year 2027.

 158. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to complete successful pilot of drop-in compatible 
sustainable aviation fuel at two operational Air Force locations by 
fiscal year 2026? What progress has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is 
progressing on this initiative and working closely with an established 
Sustainable Aviation Fuel (SAF) Working Group led by DLA Energy. We 
continue to collaborate with other government agencies, industry 
partners, and our allies/partners to understand where the sustainable 
aviation fuel production capabilities will tie in with the commercial 
distribution networks. The SAF fuel cost differential however, 
currently 3-5 times higher than traditional petroleum-based aviation 
fuel, will present a challenge with SAF blend percentage objectives in 
our Climate Action Plan. We will track those locations where we share 
resources with commercial operations to help with refining the test 
locations where the SAF percentages are highest.

 159. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to complete a successful pilot of micro-reactors by 
fiscal year 2028 to demonstrate viability of this technology as a 
feasible alternative energy source? What progress has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is on-
track to meet the demonstration timeline. However, there are risks to 
the schedule, including availability of commercial fuel supply and NRC 
licensing for this new technology. SAF/IE is partnering with the 
Defense Logistics Agency (DLA) Energy Office to execute a power 
purchase agreement (PPA) under 10 USC Sec. 2922a with a third-party 
developer, who will license, own, and operate a micro-reactor, to 
deliver electricity and steam on Eielson Air Force Base in exchange for 
DAF's long-term purchase of the energy it generates.
 Success of the pilot will demonstrate micro-reactors are a viable 
technology. The DAF will document the feasibility of utilizing the 
technology under 10 USC Sec. 2922a as part of the pilot project 
analysis.
 Progress so far includes the following:
 2020:

 A Request for Information (RFI) was released in September 
2020 and closed in December 2020. DAF received several responses from 
industry and considered their recommendations as the pilot was 
initiated.

 2021:

 DAF conducted a site visit to gather data for the 
environmental baseline survey in July 2021.

 Eielson AFB was announced as the preferred location for 
the Micro-reactor Pilot in October 2021. DAF sent letters to Tribal 
Nations and local government leaders to engage stakeholders and provide 
awareness of the potential pilot.

 2022:

 A Memorandum of Understanding (MOU) between DAF, DLA 
Energy, Nuclear Regulatory Commission (NRC), and the Department of 
Energy (DOE) was executed in August 2022 to establish an interagency 
partnership supporting the deployment of a micro-reactor at Eielson Air 
Force Base.

 A power purchase agreement Request for Proposal (RFP) was 
published in September 2022 for the pilot. DAF held a pre-proposal 
conference at Eielson AFB for prospective offerors to ask questions 
related to the micro-reactor pilot project and tour the combined heat 
and power plant on base.

 DAF established the Council for the Alaska Micro-reactor 
Program (CAMP) in October 2022 to facilitate effective and meaningful 
dialog and information sharing amongst community leaders and interested 
parties. Meetings are held on a quarterly basis.

 2023-2024:

 The RFP solicitation closed on 31 January 2023.

 DAF hosted two additional CAMP meetings, one virtual 
meeting in January 2023 and one in Fairbanks, AK in April 2023. The 
next CAMP meeting is planned for August 2023.

 The micro-reactor pilot is now in the proposal evaluation 
process. DAF plans to select a vendor and release the Notice of Intent 
to Award in 2023.

 Through 2024, we anticipate the NRC will begin their 
licensing process, which is expected to include preparation of an 
Environmental Impact Statement (EIS) under the National Environmental 
Policy Act (NEPA) in cooperation with DAF.

 2025-2028+:

 From 2025 through 2028 and beyond, NRC plans to continue 
their licensing process, culminating in micro-reactor testing by the 
vendor in 2027. Following successful testing, the DAF will enter into a 
multiyear agreement with the vendor to purchase the energy delivered by 
the micro-reactor.

 160. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to reach 100 percent carbon pollution-free electricity 
on a net annual basis by fiscal year 2030, including 50 percent 24/7 
carbon pollution-free electricity? What progress has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is making 
progress toward achieving the CFE targets established in Executive 
Order 14057 and the DAF Climate Action Plan. Onsite generation projects 
including microgrids with renewables and battery storage are in 
development. DAF is participating in CFE procurement pilots in the Duke 
Energy and Electric Reliability Council of Texas (ERCOT) service 
territories, as well as several other utility pilots scheduled to be 
rolled out in the coming months. The DAF is currently reviewing and 
assessing CFE tariffs from several utilities for potential 
participation. Additional details will be available in the forthcoming 
Climate Campaign Plan and progress will be reported in summer 2024.

 161. Senator Warren. Secretary Chaudhary, does the Air Force think 
it will be able to reach 100 percent zero-emissions non-tactical 
vehicle acquisitions by fiscal year 2035, including 100 percent zero-
emission light-duty vehicle and aircraft support equipment acquisitions 
by fiscal year 2027 and fiscal year 2032, respectively? What progress 
has been made so far?
 Secretary Chaudhary. Yes. The Department of the Air Force is 
aggressively implementing infrastructure to support 100 percent Zero 
Emission Vehicles (ZEV) acquisitions by fiscal year 2035 including 100 
percent light-duty vehicle acquisitions by fiscal year 2027. The DAF's 
success will be limited by the availability and supply chain of zero 
emission vehicles that will meet our requirements. We continue to watch 
the progression and research in zero emission vehicle technologies for 
medium and heavy-duty vehicles with an understanding those fleets may 
not be battery operated and could be fueled by hydrogen or another fuel 
source. Electric support equipment is still under development at the 
Air Force Research Laboratory and hopes to field prototypes in fiscal 
year 2024.
 The DAF began a charging infrastructure planning process at several 
installations and is maximizing its acquisition of zero emission 
vehicles through the General Services Administration (GSA). DAF is 
releasing a Framework (late summer 2023) enabling all installations to 
begin their respective infrastructure planning processes and is working 
with the GSA on relaying our vehicle demands so they can coordinate 
with the Original Equipment Manufacturers (OEMs) on product 
availability. We placed an order for 880 ZEVs (majority are Plug-in 
Hybrid Electric Vehicles) in fiscal year 2023. That is roughly 33 
percent of our leased vehicles for this fiscal year. Because of supply 
chain challenges from the OEMs to the GSA, none of these ZEVs have yet 
arrived. Additional details will be available in the forthcoming 
Climate Campaign Plan and progress will be reported in summer 2024.
 information on addressing pfas in drinking water
 162. Senator Warren. Secretary Owens, according to a GAO report on 
``Firefighting Foam Chemicals: DOD Is Investigating PFAS and Responding 
to Contamination, but Should Report More Cost Information,'' DOD only 
cleaned up drinking water with PFAS in locations on or near military 
installations if it was at or above 70 parts per trillion (ppt), which 
was the Environmental Protection Agency (EPA) advisory level at the 
time. This meant it did not cleanup PFAS in drinking water (or find 
other ways of addressing it), even if it knew that there was PFAS in 
the water and it exceeded State levels, such as 20 ppt in 
Massachusetts. Now, though, EPA has published a proposed rule that 
would make the allowable level much lower--4 ppt for perfluorooctane 
sulfonic acids (PFOS and PFOA), two groups of PFAS--but DOD has been 
noncommittal about whether it will address PFAS in drinking water at 
sites on and near military bases at the levels in the new proposed 
rule. Now that the EPA has proposed a rule of 4 parts per trillion 
(ppt) for PFOS and PFOA, will you commit to going back and cleaning up 
all of the areas around former Fort Devens in Massachusetts, where you 
have detected PFAS in drinking water at 4 ppt or higher?
 Secretary Owens. The Department supports EPA's recent actions to 
propose a National Primary Drinking Water Regulation for certain PFAS 
that, once finalized, will apply to all community water systems and 
non-transient, non-community water systems, including those owned by 
DOD. The Department respects and values the public comment process on 
this proposed rule and looks forward to the clarity that a final 
nationwide drinking water regulation will provide.
 The Department commits to meeting the implementation timeframe laid 
out in the final regulation and is reviewing existing data and 
conducting additional sampling, where necessary, to prepare to 
implement the EPA's final drinking water regulation.