OVERSIGHT OF THE ARCHITECT OF THE CAPITOL: ADDRESSING PAST LESSONS, PRESENT PROJECTS, AND FUTURE CHALLENGES

Committee on House Administration House June 3, 2026

Witnesses (1)

  • Thomas E. Austin, Architect of the Capitol

From the witness list in the published hearing record.

Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.

- OVERSIGHT OF THE ARCHITECT OF THE CAPITOL: ADDRESSING PAST LESSONS, PRESENT PROJECTS, AND FUTURE CHALLENGES

[House Hearing, 119 Congress]
[From the U.S. Government Publishing Office]

 OVERSIGHT OF THE ARCHITECT OF THE
 CAPITOL: ADDRESSING PAST LESSONS, PRESENT
 PROJECTS, AND FUTURE CHALLENGES

=======================================================================

 HEARING

 before the

 COMMITTEE ON HOUSE
 ADMINISTRATION

 HOUSE OF REPRESENTATIVES

 ONE HUNDRED NINETEENTH CONGRESS

 SECOND SESSION 
 __________

 JUNE 3, 2026 
 __________

 Printed for the use of the Committee on House Administration

 [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] 

 www.govinfo.gov
 www.cha.house.gov 
 
 ______
 
 U.S. GOVERNMENT PUBLISHING OFFICE

63-913 WASHINGTON : 2026 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 COMMITTEE ON HOUSE ADMINISTRATION

 BRYAN STEIL, Wisconsin, Chairman

LAUREL LEE, Florida, Vice Chair JOSEPH MORELLE, New York,
BARRY LOUDERMILK, Georgia Ranking Member
H. MORGAN GRIFFITH, Virginia TERRI A. SEWELL, Alabama
GREG MURPHY, North Carolina NORMA TORRES, California
STEPHANIE BICE, Oklahoma JULIE JOHNSON, Texas
MARY MILLER, Illinois
MIKE CAREY, Ohio

 Mike Platt, Staff Director 
 Jamie Fleet, Minority Staff Director 

 
 C O N T E N T S

 ----------
 
 Page

 Opening Statements

Chairman Bryan Steil, Representative from the State of Wisconsin. 1
 Prepared statement of Chairman Bryan Steil................... 3
Ranking Member Joseph Morelle, Representative from the State of 
 New York....................................................... 4
 Prepared statement of Ranking Member Joseph Morelle.......... 6

 Witnesses

Thomas E. Austin, Architect of the Capitol....................... 7
 Prepared statement of Thomas E. Austin....................... 9

 
 OVERSIGHT OF THE ARCHITECT 
 OF THE CAPITOL: ADDRESSING 
 PAST LESSONS, PRESENT PROJECTS, 
 AND FUTURE CHALLENGES

 ---------- 

 June 3, 2026

 Committee on House Administration,
 House of Representatives,
 Washington, D.C.
 The Committee met, pursuant to notice, at 10:20 a.m., in 
room 1310, Longworth House Office Building, Hon. Bryan Steil 
[Chairman of the Committee] presiding.
 Present: Representatives Steil, Loudermilk, Griffith, 
Murphy, Bice, Carey, Miller, and Morelle.
 Staff present: Mike Platt, Staff Director; Abby Salter, 
Deputy General Counsel; Elliot Smith, Director of Oversight; 
Phillip Pinegard, Professional Staff; Kristen Monterroso, 
Director of Operations; Libby Sippel, Deputy Director of Member 
Services; Jamie Fleet, Minority Staff Director; Khalil Abboud, 
Minority Deputy Staff Director; and Matt Schlesinger, Minority 
Senior Counsel.

 OPENING STATEMENT OF HON. BRYAN STEIL, CHAIRMAN OF THE 
 COMMITTEE ON HOUSE ADMINISTRATION, A U.S. REPRESENTATIVE FROM 
 WISCONSIN

 Chairman Steil. The Committee on House Administration will 
come to order.
 The title of today's hearing is ``Oversight of the 
Architect of the Capitol: Addressing Past Lessons, Present 
Projects, and Future Challenges.''
 I note that a quorum is present.
 Without objection, the Chair may declare a recess at any 
time.
 Also without objection, the hearing record will remain open 
for 5 legislative days so Members may submit any additional 
materials they wish to be included therein.
 Thank you, Ranking Member Morelle, Members of the 
Committee, and our witness, for participating in today's 
hearing.
 Mr. Austin, welcome back to the Committee on House 
Administration. Under your 2 years of leadership, we have seen 
a lot of positive changes on the Capitol campus, both in 
management and to the infrastructure.
 The Architect of the Capitol has broad responsibilities, as 
we all know, and deals with unique challenges every day. I am 
eager to hear about your recommendations on how we can continue 
to improve the AOC's operations and learn lessons from the 
past.
 I will start with the recently completed Cannon Building 
Renewal Project. While I know I speak for pretty much everybody 
on campus in saying we are pleased to see this project finally 
coming to a close, there are definitely, I think, some tough 
lessons that we could also learn from that long construction 
project.
 As Congress debates future large-scale projects like this, 
my primary goal is to ensure that we are good stewards of 
taxpayer resources.
 Mr. Austin, that is exactly why your perspective today, I 
think, is so critical.
 If we look at the Cannon Renewal Project, the total cost 
was $971 million. That is a $200-million increase from the 
original 2009 estimate.
 I think some of those lessons are critical as we turn to 
the potential renewal--or rebuild of the Rayburn Building. That 
renovation must prioritize financial discipline and completing 
the project on time. On time, under budget, of course, is the 
goal.
 The Rayburn Building plays a significant role for this 
institution. It houses nearly 200 Member offices, committee 
hearing rooms, suites, SCIFs, three levels of parking, and even 
a Capitol Police firing range.
 Unfortunately, despite being a newer building, it is in far 
greater need of renovation than the Longworth Building, 
according to our experts. Cost estimates, including swing space 
construction, in some ways are mind-boggling.
 As we develop plans for such a massive project, it is also 
essential that we minimize disruption to Capitol operations. 
That is why, in 2024, the AOC initiated a swing space study to 
address the question. Results of the study were presented to 
Members in December 2025.
 I have appreciated your focus on this growing issue and the 
regular updates that you have provided this Committee during 
that review process, and I look forward to discussing that at 
this hearing with you today.
 We will also discuss the ongoing work by the AOC to draft a 
new Capitol Complex Master Plan, or CCMP. In theory, this must 
be done every 5 years, but, as we know, it has been 15 years 
since this has been completed. I both appreciate and applaud 
your efforts to prioritize drafting this update and look 
forward to reviewing the published document.
 I will also underscore the need for stakeholder engagement 
on this plan, especially given the efforts by the Trump 
administration to clean up and beautify the Nation's capital 
for everyone to enjoy.
 Before I conclude, let me thank you, Mr. Austin, for your 
work and, in particular, your staff, some of whom are sitting 
behind you but knowing that there are dozens more across this 
campus--hundreds more across this campus that work dutifully 
every day to keep the Capitol campus complex open to the 
American people, to staff, to Members, keeping in mind the 
importance of keeping everyone here safe as well. It is no easy 
task. We thank you but, in particular, all the men and women 
working under your leadership in the Architect of the Capitol's 
Office.
 As we celebrate the Nation's 250th birthday, I look forward 
to also discussing how we can work together to prepare Congress 
to serve the American people for the next 250 years. I 
appreciate you being here, Mr. Austin, and I look forward to a 
robust discussion.
 With that, I will yield to my colleague, the Ranking 
Member, Mr. Morelle, for his opening statement.
 [The prepared statement of Chairman Steil follows:]

 PREPARED STATEMENT OF CHAIRMAN OF THE COMMITTEE ON HOUSE 
 ADMINISTRATION BRYAN STEIL

 Mr. Austin, welcome back to the Committee on House 
Administration. Under your 2 years of leadership, we have seen 
a lot of positive changes on the Capitol campus, both in 
management and to the infrastructure.
 The Architect of the Capitol has broad responsibilities, as 
we all know, and deals with unique challenges every day. I am 
eager to hear about your recommendations on how we can continue 
to improve the AOC's operations and learn lessons from the 
past.
 I will start with the recently completed Cannon Building 
Renewal Project. While I know I speak for pretty much everybody 
on campus in saying we are pleased to see this project finally 
coming to a close, there are definitely, I think, some tough 
lessons that we could also learn from that long construction 
project.
 As Congress debates future large-scale projects like this, 
my primary goal is to ensure that we are good stewards of 
taxpayer resources.
 Mr. Austin, that is exactly why your perspective today, I 
think, is so critical.
 If we look at the Cannon Renewal Project, the total cost 
was $971 million. That is a $200 million increase from the 
original 2009 estimate.
 I think some of those lessons are critical as we turn to 
the potential renewal or rebuild of the Rayburn Building. That 
renovation must prioritize financial discipline and completing 
the project on time. On time, under budget, of course, is the 
goal.
 The Rayburn Building plays a significant role for this 
institution. It houses nearly 200 Member offices, committee 
hearing rooms, suites, SCIFs, three levels of parking, and even 
a Capitol Police firing range.
 Unfortunately, despite being a newer building, it is in far 
greater need of renovation than the Longworth Building, 
according to our experts. Cost estimates, including swing space 
construction, in some ways are mind-boggling.
 As we develop plans for such a massive project, it is also 
essential that we minimize disruption to Capitol operations. 
That is why, in 2024, the AOC initiated a swing space study to 
address the question. Results of the study were presented to 
Members in December of 2025.
 I have appreciated your focus on this growing issue and the 
regular updates that you have provided this Committee during 
that review process, and I look forward to discussing that at 
this hearing with you today.
 We will also discuss the ongoing work by the AOC to draft a 
new Capitol Complex Master Plan, or CCMP. In theory, this must 
be done every 5 years, but, as we know, it has been 15 years 
since this has been completed. I both appreciate and applaud 
your efforts to prioritize drafting this update and look 
forward to reviewing the published document.
 I will also underscore the need for stakeholder engagement 
on this plan, especially given the efforts by the Trump 
administration to clean up and beautify the Nation's capital 
for everyone to enjoy.
 Before I conclude, let me thank you, Mr. Austin, for your 
work and, in particular, your staff, some of whom are sitting 
behind you but knowing that there are dozens more across this 
campus hundreds more across this campus that work dutifully 
every day to keep the Capitol campus complex open to the 
American people, to staff, to Members, keeping in mind the 
importance of keeping everyone here safe as well. It is no easy 
task. We thank you but, in particular, all the men and women 
working under your leadership in the Architect of the Capitol's 
Office.
 As we celebrate the Nation's 250th birthday, I look forward 
to also discussing how we can work together to prepare Congress 
to serve the American people for the next 250 years. I 
appreciate you being here, Mr. Austin, and I look forward to a 
robust discussion.
 With that, I will yield to my colleague, the Ranking 
Member, Mr. Morelle, for his opening statement.

OPENING STATEMENT OF HON. JOSEPH MORELLE, RANKING MEMBER OF THE 
 COMMITTEE ON HOUSE ADMINISTRATION, A U.S. REPRESENTATIVE FROM 
 NEW YORK

 Mr. Morelle. Thank you, Mr. Chairman. Thanks for calling 
this hearing.
 Thanks to my colleagues.
 Certainly, thanks to our witness, the first Architect of 
the Capitol in American history chosen by the U.S. Congress.
 We are delighted that you are here, Mr. Austin. Thank you 
not only for being here today but all the work that you do and 
your team does 24 hours a day, 7 days a week, literally, 365 
days a year.
 You know, the Architect of the Capitol employs, as I 
understand, 2,600 people, roughly. This is a huge operation--
maintenance crews, skilled tradespeople, tour guides, other 
professionals responsible for keeping the Capitol campus's 18 
million square feet--and they are amazing--18 million square 
feet of facilities, 570 acres of grounds operating safely and 
effectively.
 Like many legislative-branch agencies, the AOC is 
continually being asked to do more with less. While the 
agency's dedicated workforce has made a Herculean effort to 
keep the campus running, it has done so on a budget that has 
not kept pace with the work.
 The men and women of the Architect of the Capitol make it 
possible for the rest of us to do our jobs and, as the Chair 
said, for millions of Americans to come and see their 
Government working and to see these just amazing, gorgeous 
buildings, and they deserve--you all deserve our support.
 In the last year alone, as I understand it, the team 
responsible for the House office buildings addressed about 
5,000 heating and cooling problems--and as a son of a 
pipefitter who did HVAC, that is a lot of problems to be 
dealing with in the course of a year--more than 500 pipe leaks, 
nearly 200 elevator failures--it feels like the one in Cannon 
is one that is a perpetual elevator problem, but--all while 
managing a backlog of dozens of unfunded repair projects.
 I have often spoken about how we have weakened Congress's 
Article I capacity by failing to adequately invest in this 
institution, the Congress, and there may be no better 
illustration of that than the failure of what is happening with 
the Rayburn House Office Building.
 Even before the current Architect's appointment, the agency 
had been sounding the alarm about Rayburn's deteriorating 
infrastructure. I want to thank the Architect for the many 
briefings that he has provided to the Members and the staff of 
this Committee, the Appropriations Committee leadership, and 
other stakeholders, and as a Member of the Appropriations 
Committee, I certainly appreciate that.
 The message has been consistent, unequivocal: Absent a 
comprehensive renovation, the Rayburn Building faces what the 
Architect, I believe, himself, has described as a risk of 
catastrophic systems failure. That is not some distant, 
hypothetical concern for decades from now. That is happening 
right now.
 Since 2023, Rayburn has experienced 25 major water leaks, 
resulting in millions of dollars in repair costs and the 
displacement of Members and staff from their offices for months 
at a time.
 As I wrote in a recent letter to the Speaker, every year we 
delay this project, the cost only grows, and we all know that. 
The longer you put off those repairs that you need to do at 
your home, at your business, anywhere, the more expensive they 
get and the more profound those problems become.
 The concern over Rayburn is not limited to the AOC. In 
2020, an independent panel concluded that Rayburn's critical 
systems were already at imminent failure risk.
 Unless Congress acts, we will continue pouring millions of 
taxpayer dollars into temporary fixes instead of addressing the 
underlying problem.
 To that end, the first major step in the renovation is the 
design and construction of swing space to accommodate displaced 
Members, committee and support offices, as well as staff. After 
a comprehensive study, the Architect concluded the most cost-
effective solution would be to build a new House office 
building, one I endorse and support and one that could later 
serve as swing space for a future Longworth renovation, which 
is going to have to follow Rayburn, and ultimately become a 
permanent part of the Capitol complex.
 So--and this is not as it relates to the authorizing 
committee but more to the Appropriations Committee--I am, 
frankly, deeply disappointed to see Appropriations report a 
funding bill that fails to provide even a single dollar for 
swing space design, despite the agency's request. It also fails 
to fund a new parking structure the AOC has identified as a 
necessary enabling project for the renovation.
 While the legislative-branch bill does provide limited 
funding for the design of the renovation of Rayburn, that work, 
as I understand it, cannot meaningfully begin until the agency 
has clarity on what the additional infrastructure, that swing 
space, will be and how it will be made available.
 Allowing the buildings we work in to deteriorate around us 
is a fitting illustration of the broader failure to strengthen 
and sustain Article I that has come to define, in my view, this 
Congress.
 We owe it to the people who work in the building, who visit 
these buildings, the American people, including your employees 
who keep them standing, to plan and fund this work before a 
failure forces our hand. It will not be pretty, as they say, 
when that happens. We owe this to the American people.
 We cannot effectively carry out the duties they elected us 
to perform in the buildings that are, to quote the Architect 
once again, at risk of catastrophic systems failure.
 I look forward to the hearing. Thank you for indulging me. 
These are important issues. I want to thank you again for being 
here, for all your good work; and, Mr. Chairman, for holding 
this hearing. I look forward to the discussion.
 I yield back.
 [The prepared statement of Ranking Member Morelle follows:] 

PREPARED STATEMENT OF RANKING MEMBER OF THE COMMITTEE ON HOUSE 
 ADMINISTRATION JOSEPH MORELLE

 Thank you, Mr. Chairman. Thanks for calling this hearing.
 Thanks to my colleagues.
 Certainly, thanks to our witness, the first Architect of 
the Capitol in American history chosen by the United States 
Congress.
 We are delighted that you are here, Mr. Austin. Thank you 
not only for being here today but all the work that you do and 
your team does 24 hours a day, 7 days a week, literally, 365 
days a year.
 You know, the Architect of the Capitol employs, as I 
understand, 2,600 people, roughly. This is a huge operation--
maintenance crews, skilled tradespeople, tour guides, other 
professionals responsible for keeping the Capitol campus's 18 
million square feet--and they are amazing--18 million square 
feet of facilities, 570 acres of grounds operating safely and 
effectively.
 Like many legislative branch agencies, the AOC is 
continually being asked to do more with less. While the 
agency's dedicated workforce has made a Herculean effort to 
keep the campus running, it has done so on a budget that has 
not kept pace with the work.
 The men and women of the Architect of the Capitol make it 
possible for the rest of us to do our jobs and, as the Chair 
said, for millions of Americans to come and see their 
Government working and to see these just amazing, gorgeous 
buildings, and they deserve--you all deserve our support.
 In the last year alone, as I understand it, the team 
responsible for the House office buildings addressed about 
5,000 heating and cooling problems--and as a son of a 
pipefitter who did HVAC, that is a lot of problems to be 
dealing with in the course of a year--more than 500 pipe leaks, 
nearly 200 elevator failures--it feels like the one in Cannon 
is one that is a perpetual elevator problem, but--all while 
managing a backlog of dozens of unfunded repair projects.
 I have often spoken about how we have weakened Congress's 
Article I capacity by failing to adequately invest in this 
institution, the Congress, and there may be no better 
illustration of that than the failure of what is happening with 
the Rayburn House Office Building.
 Even before the current Architect's appointment, the agency 
had been sounding the alarm about Rayburn's deteriorating 
infrastructure. I want to thank the Architect for the many 
briefings that he has provided to the Members and the staff of 
this Committee, the Appropriations Committee leadership, and 
other stakeholders, and as a Member of the Appropriations 
Committee, I certainly appreciate that.
 The message has been consistent, unequivocal: Absent a 
comprehensive renovation, the Rayburn Building faces what the 
Architect, I believe, himself, has described as a risk of 
catastrophic systems failure. That is not some distant, 
hypothetical concern for decades from now. That is happening 
right now.
 Since 2023, Rayburn has experienced 25 major water leaks, 
resulting in millions of dollars in repair costs and the 
displacement of Members and staff from their offices for months 
at a time.
 As I wrote in a recent letter to the Speaker, every year we 
delay this project, the cost only grows, and we all know that. 
The longer you put off those repairs that you need to do at 
your home, at your business, anywhere, the more expensive they 
get and the more profound those problems become.
 The concern over Rayburn is not limited to the AOC. In 
2020, an independent panel concluded that Rayburn's critical 
systems were already at imminent failure risk.
 Unless Congress acts, we will continue pouring millions of 
taxpayer dollars into temporary fixes instead of addressing the 
underlying problem.
 To that end, the first major step in the renovation is the 
design and construction of swing space to accommodate displaced 
Members, committee and support offices, as well as staff. After 
a comprehensive study, the Architect concluded the most cost 
effective solution would be to build a new House office 
building, one I endorse and support and one that could later 
serve as swing space for a future Longworth renovation, which 
is going to have to follow Rayburn, and ultimately become a 
permanent part of the Capitol complex.
 So--and this is not as it relates to the authorizing 
committee but more to the Appropriations Committee--I am, 
frankly, deeply disappointed to see Appropriations report a 
funding bill that fails to provide even a single dollar for 
swing space design, despite the agency's request. It also fails 
to fund a new parking structure the AOC has identified as a 
necessary enabling project for the renovation.
 While the legislative branch bill does provide limited 
funding for the design of the renovation of Rayburn, that work, 
as I understand it, cannot meaningfully begin until the agency 
has clarity on what the additional infrastructure, that swing 
space, will be and how it will be made available.
 Allowing the buildings we work in to deteriorate around us 
is a fitting illustration of the broader failure to strengthen 
and sustain Article I that has come to define, in my view, this 
Congress.
 We owe it to the people who work in the building, who visit 
these buildings, the American people, including your employees 
who keep them standing, to plan and fund this work before a 
failure forces our hand. It will not be pretty, as they say, 
when that happens. We owe this to the American people.
 We cannot effectively carry out the duties they elected us 
to perform in the buildings that are, to quote the Architect 
once again, at risk of catastrophic systems failure.
 I look forward to the hearing. Thank you for indulging me. 
These are important issues. I want to thank you again for being 
here, for all your good work; and, Mr. Chairman, for holding 
this hearing. I look forward to the discussion.

 Chairman Steil. The gentleman yields back.
 Without objection, all other Members' opening statements 
will be made part of the hearing record if they are submitted 
to the Committee clerk by 5 p.m. today.
 As our witness today, we have Thomas Austin, Architect of 
the Capitol.
 Mr. Austin, you are recognized for 5 minutes to provide an 
opening statement.

 STATEMENT OF THOMAS E. AUSTIN, ARCHITECT OF THE CAPITOL

 Mr. Austin. Good morning, Chairman Steil, Ranking Member 
Morelle, and distinguished Members of this Committee. Thank you 
for the opportunity to appear before you representing the men 
and women of the Architect of the Capitol.
 I appreciate the Committee's continued support and would 
like to offer my sincere thanks to the members of your staff, 
particularly Elliot Smith, Matthew Schlesinger, Phillip 
Pinegar, and Kwame Newton, whose engagement is critical to our 
mission success.
 I look forward to sharing the hard work of the Architect of 
the Capitol and serving the needs of Congress while preserving 
the historic buildings and grounds that inspire the 30,000 
daily occupants and over 4 million annual visitors to the 
Capitol campus.
 I would also like to express my sincere gratitude to the 
2,600 dedicated Architect of the Capitol employees for their 
unwavering commitment and professionalism to preserve and 
maintain over 18.5 million square feet of facilities, 570 acres 
of grounds, and thousands of works of art. I have been 
continually inspired by the dedication and expertise of our 
workforce.
 Since assuming the role of the 13th Architect of the 
Capitol in June 2024, I have prioritized strengthening 
transparency, accountability, and communication across the 
agency and with our stakeholders. These principles are 
foundational to maintaining trust and ensuring disciplined 
stewardship of the resources entrusted to us.
 This year, the Architect of the Capitol has prioritized 
addressing critical system needs, implementing increased 
security infrastructure across the Capitol campus, and 
completing the Cannon Renewal Project.
 Because maintaining and modernizing the Capitol campus is a 
central part of our mission and our biggest challenge, this 
requires a proactive, comprehensive approach to facilities 
management, addressing both routine and complex matters.
 With this Committee's support, we have been able to 
initiate a number of modernization projects in the House office 
buildings.
 This year, we launched a pilot program for constant digital 
monitoring of our elevators, which would enable our mechanics 
to drastically reduce response times and elevator outages. We 
have also continued to upgrade elevator and escalator systems 
to ensure more reliable operations, reducing the burden on 
Members, staff, and visitors navigating the House office 
buildings.
 Along with the House Chief Administrative Officer, we 
continue the Hearing Room Modernization Program to restore 
critical infrastructure and improve technology, ensuring 
continuity in Congress's legislative duties and allowing your 
constituents to remotely access congressional proceedings.
 We have also initiated a number of new projects to improve 
our facilities. This month, we will break ground on a new 
external security screening facility for the south entrance of 
the Capitol Building, which will improve security operations 
and reduce wait times for staff and visitors on official 
business.
 We also continue to execute a number of other security 
improvement projects across the Capitol campus, including end-
of-life replacements for security infrastructure and renewal of 
U.S. Capitol Police facilities necessary for the safety and 
security of Members, staff, and visitors.
 One of my top priorities since assuming my role as the 
Architect has been to get a deep understanding of the condition 
of campus facilities and infrastructure and to share that 
understanding with Congress.
 To guide the agency's long-term strategic planning efforts, 
we are completing the Capitol Campus Master Plan, which 
outlines infrastructure requirements and the agency's 
recommendations over the next few decades. The goal of this 
assessment is to assist Congress with long-term planning and 
budgetary decisions, to prioritize critical infrastructure 
improvements, and maintain the beauty and functionality of the 
Capitol campus for generations to come.
 As the Cannon renewal comes to a close, my top concern is 
now with the condition of the Rayburn House Office Building. 
The condition of the Rayburn House Office Building is at a 
critical juncture, and time is of the essence. We are 
experiencing major challenges each day that impact our ability 
to keep this facility functional for the operation of Congress.
 I appreciate the discussions we have had with this 
Committee over the past year-and-a-half highlighting the 
urgency of a full renovation of the building and the 
requirements for swing space.
 The AOC is committed to providing this Committee and your 
colleagues with all the information necessary to make informed 
decisions about not only a Rayburn renovation but all of our 
major projects.
 Chairman Steil, Ranking Member Morelle, and Members of this 
Committee, thank you again for your continued support and 
oversight of the Architect of the Capitol. I am honored to be 
here and look forward to your questions.
 [The prepared statement of Mr. Austin follows:]

 PREPARED STATEMENT OF THOMAS E. AUSTIN 
 
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] 

 Chairman Steil. Thank you very much, Mr. Austin.
 I will begin with questions, followed by the Ranking 
Member, and we will alternate sides. I recognize myself for 5 
minutes for the purpose of asking questions.
 I want to dive in, as it relates to Rayburn, on what is the 
driver of the cost. Before I get there, I want to do a quick 
history of how did we get here.
 What is the cause--obviously, Rayburn is a significantly 
newer building than Longworth, but the maintenance costs are 
significantly high. Is this a design failure when Rayburn was 
originally built? Was it mismanagement of the building? Did we 
fail to do preventative maintenance?
 Can you give us a really brief history lesson as to why is 
Rayburn failing?
 Mr. Austin. Thank you, Chairman.
 When you say it is one of the newer facilities, that is 
kind of a relative term when we are talking on campus. It is 
over 60 years old. During those 60 years, unfortunately, there 
was not a lot of investment made in this facility. Many of the 
components of these buildings are original to the building.
 One of the easiest examples I can say is that the air-
handling units that provide fresh air and circulate air to the 
building were designed for 30 years of operation and are coming 
up on their 61st birthday. We are well beyond the need for 
replacement of those particular components, but that is endemic 
throughout the building.
 Other cost drivers that you spoke about are because, when 
it was constructed in the early 1960's, it was kind of that 
sweet spot where we were using both asbestos and lead in our 
buildings, and so those hazardous materials are embedded 
throughout the infrastructure in this building.
 The condition of the pipes, the condition of the wires, all 
of these things that are hidden behind the walls have 
deteriorated over the years without replacement, and now they 
are causing some of the issues that both you and the Ranking 
Member brought up in your statements, the continual leaks and 
the issues that we have.
 Chairman Steil. If I can, let us look forward. Obviously, 
large cost numbers in these buildings. What is the driver in 
the significance of the cost that we are seeing? Obviously, we 
are--in a good way, we are not going to use lead and asbestos 
and other things in modern construction, but what is the driver 
in the large, kind of eye-popping number to redo Rayburn?
 Mr. Austin. Thank you, sir.
 Part of this is, to put it in context, the Rayburn House 
Office Building is the largest office building on campus by a 
large stretch. It is somewhere around 2.3 million square feet 
of facilities all by itself. It is the largest building on 
campus just in terms of gross square feet. The size issue is 
part of that.
 It also has what we just spoke about, you just said, lead 
and asbestos. Those all have to be remediated and removed and 
encapsulated, depending on what we are talking about.
 Some of the other cost drivers are just the operations of 
Congress. We need to maintain at least some portion of the 
facility because of lack of swing space. We need to be able to 
maintain security and environmental controls and all these 
things in the building while some of it is being renovated and 
some of it is being used by Congress for committee hearings and 
the regular operations of Congress.
 Then we have just the challenges we have here on campus--
security challenges, historic preservation challenges. All of 
these things--and visitor access--these all add multiples to 
what would normally be considered your price per square foot. 
All these things add up to the cost of this project.
 Some of it is the scale; some of it is the historic 
preservation, security, Member access, and just nowhere to keep 
this building operational while it is being renovated.
 Chairman Steil. I think the operational piece while it is 
being renovated is something I want to just probe on for a 
second.
 The U.S. Capitol complex is actually really unique amongst 
all democracies across the globe, that we are open and 
accessible to the American people. I think that is actually 
mind-blowing to foreign visitors that come here, that they can 
just walk in. Sometimes it is surprising to American citizens, 
but hopefully they are all aware that you can just come and 
visit. We are doing both keeping people safe, not only the 
visitors but Members and staff, but at the same time open and 
accessible.
 The Cannon complex was done in multiple phases, including 
four key phases while the building was operational. As we look 
at the Rayburn project, is that a lesson learned for a cost 
savings, to not do it in that many steps?
 Mr. Austin. It absolutely is.
 One of the enduring lessons we learned from Cannon--I call 
it ``the big three lessons of Cannon''--were that doing it in 
what essentially was five phases--zero, one through four--was 
inefficient. You know, all this cycle of mobilization, 
demobilization, having all this construction in such close 
proximity to Members, this was all inefficient and disruptive 
to Congress.
 Chairman Steil. That requires swing space, according to 
your study. What is your number-one recommendation on the swing 
space from a--go ahead.
 Mr. Austin. As we discussed, Chairman, it is to construct a 
separate facility for swing space. Given the unique needs of 
Congress and proximity to the Capitol Building, that was the 
only viable one--or, not the only one, but it was one of--the 
best course of action that we could come up with.
 Chairman Steil. Your recommendation is to not look to 
revitalize Madison, the Madison Building, as a way for 
Congress--but to build new. Why?
 Mr. Austin. For a variety of reasons.
 No. 1, Madison was never built for high-occupancy office 
space, so we would have to do all sorts of renovations and 
reconstruction inside of it. The ceilings are low. They have a 
lot of structural columns that are in the way. We would have to 
do the HVAC, the plumbing, the electrical, all these upgrades. 
It essentially would be a reconstruction of a large portion of 
Madison.
 Chairman Steil. Let me close with one question that I have 
heard.
 Your job is unique. You are a member of the Capitol Police 
Board, which maybe is intuitive to everybody here on campus. 
The infrastructure of the Capitol campus is so essential for 
the security of this campus.
 Do you remain committed to working with the U.S. House 
Sergeant at Arms as you go about your work in conjunction with 
the security needs of campus?
 Mr. Austin. Absolutely, Mr. Chairman. The House Sergeant at 
Arms as well as House CAO and U.S. Capitol Police are all key 
stakeholders in all the work we do. I am committed to engaging 
with them constantly, as I do as a member of the Capitol Police 
Board, as you pointed out, but also in my role just as the 
Architect. They are a key stakeholder.
 Chairman Steil. Thank you very much. I appreciate your 
testimony today.
 I yield back.
 I now recognize the Ranking Member, Mr. Morelle, for the 
purpose of asking questions.
 Mr. Morelle. Thank you, Mr. Chair.
 First of all, I appreciate the stress on the air-handling 
systems. I think I was designed for about 30 years, and I am 
way past my useful time as well, so I know the pain and 
suffering of that.
 I am just curious, sort of following up with the Chair's 
question--but I want to back up. In layperson's terms, when 
people use the phrase ``catastrophic system failure,'' I mean, 
it sounds frightening, and it does suggest, obviously, a 
significant risk, but what does that mean? What would it look 
like if there was a catastrophic system failure that we are at 
risk of?
 Mr. Austin. Sure.
 The way we define ``catastrophic system failure,'' 
Congressman Morelle, is any failure of one of the building's 
systems--specifically, the mechanical, electrical, or plumbing 
systems--that would cause part or all of the building to become 
unusable for the function it was intended--in this case, the 
operations of Congress.
 I think probably the easiest way is to describe a failure 
that happened just this past year, happened this past October, 
where one of those air-handling units did indeed fail. It threw 
a bearing, and that caused the motor to run asynchronous, 
caused a lot of vibrations.
 Credit to the House Office Buildings team that they caught 
it early before the air handler rattled itself to pieces or 
even caused a friction fire. That failure of just that one 
component caused over 22 suites to be without conditioned air 
at that time.
 Because those air-handler units are so old that we do not 
have components made for them anymore, they had to custom-
fabricated in order to repair it. Took about 6 weeks.
 We got lucky. No. 1, the mechanics saw it early, caught it 
early--less damage. No. 2 was, it was a temperate time of the 
year, and in this particular case Congress was mostly out of 
session, so the impact to Membership was slight.
 Mr. Morelle. Yes.
 Mr. Austin. Had that happened in June or July or, say, 
January, when the conditions are more extreme, those offices, 
those 22 suites and other associated spaces, would have been 
unusable for that period of time, and we would have either had 
to mitigate it with expensive temporary fixes or we would have 
to relocate staff and do ad-hoc facilities.
 Mr. Morelle. Should that happen, I assume we have 
contingency plans where staff would go, but it has to be 
limited, right? I mean, if you lost 50 suites--I mean, 
obviously, each additional office that is put out of the office 
just complicates this more.
 Do you have contingency plans? How many people could you 
relocate given your existing physical structures?
 Mr. Austin. Well, this is something we certainly want to 
work closely with this Committee on, as well as House 
leadership, as to what is in the realm of possible when it 
comes to contingency.
 Currently, there are only four swing space suites available 
for normal operations. Things that happen, like when we have 
these floods that we described earlier, when we have to 
relocate Members and staff to different facilities, there are 
only four of those.
 We have had a system-wide--a failure like we just talked 
about in 2022, we would have had to come up with on-the---I 
will say, ad-hoc solutions, utilizing committee spaces, 
utilizing hearing rooms, utilizing other common spaces, so that 
Members of Congress could continue to do their function.
 We look forward to continuing this conversation with this 
Committee to identify additional spaces.
 Mr. Morelle. Yes.
 Do any of these pose--I mean, you mentioned electrical, you 
mentioned the possibility of fire. I mean, those are health and 
safety risks to the staff, Members, visitors who are here. Is 
that right?
 Mr. Austin. Well, I would say that the facility--I want to 
assure people who work in these buildings, these facilities are 
safe to be in. You know, all of the hazardous materials we 
talked about were encapsulated. That is really only an issue 
when we try to do renovations or we have some kind of, you 
know, major leak or something like this.
 However, really, the challenge is operations. We are at 
risk of having operations failures with these buildings; less 
so safety failures.
 Mr. Morelle. Yes.
 I mentioned the number of HVAC-related and pipe leaks. Has 
that number gone up over time? Can you give me a sense of the 
numbers and quantify the growing risk, growing problems?
 Mr. Austin. Sure.
 You are absolutely right; it has gone up over time. As 
these facilities age, we kind of reach this tipping point where 
we start having an increasing number of failures as all these 
systems age out and they start having a series of failures on 
top of each other. That number has gone up over the past year.
 Just over the past--over this just past 12 months, we have 
had 16 major leaks that impacted 6 Member suites, 4 committee 
office spaces, 5 Member storage areas, and 2 hallways. Each one 
of those required millions of dollars to remediate--or, not 
each one, but collectively they required millions of dollars of 
remediation and repairs, and that just got us back to where we 
started.
 Yes, they are increasing.
 Mr. Morelle. We should anticipate even greater numbers if 
we do not address this.
 You had mentioned swing space. I assume the goal is--and I 
think in our conversations we have all had this discussion--
that that would make those offices that you build in swing 
space--we would build a new building; swing space would be 
used--but that would be available, then, for the House to be 
able to use once the project is completed and people have moved 
back into Rayburn. It still would allow us to be able to make 
use of that space, obviously, into the future.
 Mr. Austin. Absolutely. Yes. That would be permanent space 
to be utilized at the direction of Congress--certainly as swing 
space for future renovations, as the Chairman pointed out, for 
potentially the Longworth renovation that would happen----
 Mr. Morelle. Right.
 Mr. Austin [continuing]. subsequent to Rayburn. Also, we 
rent, on the--we lease, on the House side, hundreds of 
thousands of square feet of other facilities that could be 
reshored back onto the Capitol campus. It would also be 
available for use by Congress however they decide.
 Mr. Morelle. Gotcha.
 Thank you for your indulgence. I yield back.
 Chairman Steil. The gentleman yields back.
 The gentleman from Georgia, Mr. Loudermilk, is recognized 
for the purpose of asking questions.
 Mr. Loudermilk. Well, thank you, Mr. Chairman.
 Thank you for being here and for the work that you are 
doing. I know it is a daunting task, especially when you are 
dealing with aging technology, aging buildings.
 One thing--and I know there is some of this you may not be 
able to talk about in this setting. Can you give us kind of a 
brief rundown on where we are with security upgrades? I know 
that there were several that were underway prior to the 
incidents of January 6, 2021. Can you give us an idea of where 
we are?
 Mr. Austin. Thank you for the question.
 You are correct, there are certain things I cannot discuss 
in open forum, but would be happy to meet with you afterwards 
if you would like to speak in more detail.
 I can say for certain some things we have put on the record 
thus far is, all the exterior doors to the Capitol Building 
have been replaced with high-security doors. We have also 
replaced all the outside-facing windows of the Capitol 
Building. We are doing that in a round-robin fashion to the 
House and Senate Office Buildings. That is happening right now.
 We have made some--we are in design phase, getting ready to 
implement some changes on the west front to the Capitol, extend 
our security perimeter further out that way. We have certainly 
added a lot of camera infrastructure, a lot of sensors, a lot 
of lights to the infrastructure.
 One of the most visible ones is the one I spoke about in my 
opening testimony, is a new south door to the Capitol 
Building's security screening facility, where that is going to 
start construction just this month, and we will be working 
through that.
 We have done a variety of other system upgrades in 
different ways--some visible, some not.
 Mr. Loudermilk. OK.
 Being our semiquincentennial year, we expect a lot of 
people in and around the Mall and around the Capitol, with the, 
you know, National Fair and other events.
 Do you feel that we have made enough progress to handle the 
influx of people?
 Mr. Austin. I have, both from a security perspective, as 
you just mentioned, as well as just welcoming all these 
visitors to the Capitol Visitor Center. Definitely looking 
forward to all the activities associated with 250th, and 
looking forward to welcome the American people to the beautiful 
Capitol campus.
 Mr. Loudermilk. Well, I appreciate that.
 I know there is a lot of discussion regarding future 
refurbishments, and, from what I understand, Rayburn would be 
the next priority. I just want to make sure that I understand. 
We are talking potentially building a facility as temporary 
space. Is that right?
 Mr. Austin. Correct. That is one of the recommendations we 
have made to Congress, and we are still awaiting Congress's 
decision and consensus guidance on that. That is one of the 
recommendations, is to build what would be a permanent 
facility, but the temporary use of that would be for swing 
space for those renovations--Rayburn and Longworth, 
specifically.
 Mr. Loudermilk. Just from logistics and security, would 
that be something collocated here, with underground access to 
other buildings? OK.
 Mr. Austin. Yes, Congressman. I did not mean to nod to say 
``yes.'' Yes, that would be correct.
 We want to follow the Committee's guidance, which was very 
helpful, when they said that for the Members, specifically, and 
the staff, we want to have no more than a 10-minute walk 
between the offices and the chambers to facilitate votes and 
then underground access for security and all-weather access.
 Mr. Loudermilk. OK.
 Do we have any timeframe? I know you are probably waiting 
on Congress, which means it may happen in the next millen--
maybe the next 250 years before we get to it. If everything 
lays out properly or the way it should, when would you expect 
that we would see the refurbishing of Rayburn to begin?
 Mr. Austin. You are absolutely correct, Congressman; that 
is dependent on a lot of decisions that were still pending to 
do so.
 We know there is enabling work that needs to be done 
regardless of the scenario that we pick. Based on the one that 
we received guidance here from this Committee on, we are 
looking probably about 5 years into the future--I want to make 
sure I am phrasing this correctly. If we went with a separate-
building option, it is probably closer to about 8 years before 
we would actually----
 Mr. Loudermilk. OK.
 Mr. Austin [continuing]. start the Rayburn renovation 
itself, and get all the design and enabling work complete 
beforehand.
 Mr. Loudermilk. In that 8 years, is there anything we can 
do to make the Rayburn escalators all work at the same time?
 Mr. Austin. I will say, perception is everything, but we do 
have 27 of 28 escalators are currently functional. One of those 
is in the Longworth. That is correct, that it is currently not 
functional. It is part of the challenge with all of this part 
of the campus; those, in a lot of cases, are still original 
components to some of these buildings.
 We have received funding in the past for a vertical 
transportation system, which includes both elevators and 
escalators, and we are starting to replace major components in 
a round-robin fashion.
 We are looking, as that is a programmatic requirement going 
into the future, to spend money on those upgrades of 
components--not full replacement, but components--to make them 
more reliable.
 Mr. Loudermilk. Well, I appreciate that, because, quite 
often, I can either go up or I can go down, but I cannot do 
both in Rayburn, so--or I can go from one floor to the next, 
but not the next one. Anything you could do to facilitate that, 
I would appreciate it.
 Thank you.
 I would yield back.
 Chairman Steil. The gentleman yields back.
 The gentleman from Virginia, Mr. Griffith, is recognized 
for 5 minutes.
 Mr. Griffith. Thank you, Mr. Chairman. I appreciate it.
 I am going to switch gears for a minute, and then I will 
switch back over to Rayburn. Everybody is interested in what is 
going on at Rayburn.
 Ranking Member Morelle and I have this little bill in, and 
we thought--I thought originally it was going to be our 
jurisdiction; turns out it is T&I. It is to create an adult 
changing station in the Library of Congress and in the Visitor 
Center.
 Because I had constituents who came to me, and they brought 
their severely handicapped child up here, who needs to be 
changed, but she is an adult, and there was no facilities, when 
they were visiting the Capitol, where they could find adequate 
space to change their daughter.
 I was just wondering--I mean, we have got the bill, and it 
is always nice to get a bill passed. Do we need a bill passed? 
Can you take care of that?
 Mr. Austin. Thank you for the question.
 This is something that we have been addressing. We have 
identified two locations inside the CVC--one on the Senate side 
of the CVC, one on the House.
 We have program money in this year's bill, and we are 
waiting for authorization from both the House and Senate--
because in the CVC it is joint space--in order to proceed with 
the design of it.
 Those upgrades, as you know, Congressman, those are more 
significant than just, say, a baby changing station.
 Mr. Griffith. That is correct.
 Mr. Austin. It requires electrical, plumbing. There are 
some structural concerns, and just the size of it. So----
 Mr. Griffith. Well, right.
 I mean, for the viewers back home, when you are talking 
about an adult child, you cannot just put them on one of the 
changing stations that you find in your basic highway rest 
area. You have to have a whole room, and it has to be 
dedicated. You have lots of different types of disabilities you 
have to take into account.
 I am not thinking it would be something easy. You are 
right; it takes a lot. You think we can get it done?
 Mr. Austin. I think we can get it done. Again, we have the 
money programmed in order to do the design this year, and just 
waiting on approval, but I do not expect that to be an issue.
 Mr. Griffith. All right.
 Let us talk about Rayburn for a minute. I appreciate that 
it is going to take some time to plan so you cannot just rush 
in there and do things, but it has been very frustrating for 
about the last year, as a Member of Energy and Commerce, 
because one of our rooms is being renovated, and the amount of 
time it has taken to renovate the hearing room just seems to be 
inordinately long.
 I am hopeful that we can figure out ways to do that faster. 
Because I have seen houses built--particularly when you know 
you are coming in--I have seen houses built faster than 
renovating our Committee hearing room.
 I know we have got electrical issues, and because it is 
Energy and Commerce and we are supposed to be the technology 
committee, it would be nice to have, you know, microphones that 
actually work and so forth, and I get that.
 Can you explain why it is taking so long?
 Mr. Austin. Sure. I understand.
 The Hearing Room Renovation Program is something we have 
been working closely with House CAO in order to accomplish. As 
you pointed out, Congressman, this is more than just a quick 
refurbishment of a few things. We have to pull up the floors, 
because all of the electrical infrastructure runs under the 
floors. In many cases, we are extending the dais, depending on 
the needs of the committee, if the committee membership has 
expanded. We have the audiovisual and the hookups and 
everything else, to modernize and standardize that package. Of 
course, working with the House CAO and the House Sergeant at 
Arms for security and upgrades to the building itself. Then, of 
course, the historical preservation.
 Also, as you pointed out in your earlier question, we are 
also making these chambers and hearing rooms ADA-accessible, 
and often that requires structural improvements to the facility 
itself.
 I believe that is part of the--all of those challenges were 
associated with the Energy and Commerce section.
 Mr. Griffith. Switching quickly to Rayburn, here is what I 
would say--because that is a Rayburn committee hearing room--
is, when you are doing your planning, see, I mean, particularly 
because Members are going to be relocated and all of that, 
figure out how you can do as much modular stuff as you can do 
so we get kicked out and you are pulling stuff out and putting 
stuff back in fairly quickly. Since you have some time to plan, 
I would hope that you all would work on that.
 Let me give you two other quick things before I run out of 
time.
 One, it was probably before your time, but there is a 
little company in my district called Crenshaw Lighting that 
does a lot of the lighting for the Capitol when there is a 
problem, because they can reproduce or replicate some of that 
historic lighting. We appreciate that business, because every 
job in my district is very important. I have--we are 409 on 
household income, out of the 435, so every job is important. We 
appreciate that.
 Then you mentioned having to get or reconstruct replacement 
parts for certain things because they are out of date. If you 
have the specs, there is a little company in my district that 
can do any metal and do 3D printing. They might not save you 
any money, but they will save you a lot of time. Because 
instead of getting at the back of the line for custom-made 
foundry-work or metalwork, they do all metals, including 
titanium, and they can replicate whatever part you need. They 
are doing it now for DOD. They have done parts on Naval ships. 
They can do parts for the Capitol.
 Now that I have touted my district and gotten a few things 
off my chest, I will yield back, Mr. Chairman.
 Chairman Steil. The gentleman yields back.
 The Chair now recognizes the gentleman from North Carolina, 
Dr. Murphy.
 Dr. Murphy. Thank you, Mr. Chairman.
 Thank you for coming before the Committee today.
 I have a bunch of questions.
 I want to go back on the Cannon issue. How much was that 
over-budget?
 Mr. Austin. The original midpoint of the budget estimate 
was about $750 million. We are coming in at $971 million 
overall.
 Dr. Murphy. OK. Almost a quarter-million dollars over.
 How about timing? How long overrun was it?
 Mr. Austin. The short answer to the question: It was not, 
because the committee spaces were tied--or the office spaces 
were tied to the congressional move cycle. In all four phases, 
we were able to turn over every suite on time so it could be a 
part of the move cycle.
 To your point, though, we did move some of the ancillary 
features and portions of the project to the tail end of the 
program overall so that we could make those accelerated 
turnover of--with the suites.
 There are certain things that went to the end of the 
project, but the primary features of the project were turned 
over on time.
 Dr. Murphy. What was the--if you had to pick out one thing 
or the top two things, the primary cost overruns, what was the 
issue?
 Mr. Austin. I would say there are several things, I would 
say, as part of the enduring lessons we learned from the 
project.
 I would say, one of the things was change-management issues 
when we first started the project. We allowed kind of a low 
threshold for changes, and we got a lot of changes that came in 
from Congress. Some of the changes came just because--part of 
the design.
 We want to have a higher bar for future projects with 
change management, a higher threshold to make those changes.
 Dr. Murphy. Who makes your contracts?
 Mr. Austin. We do. We do the contracts with the 
contractors.
 Dr. Murphy. All right. I am assuming that there are 
pullbacks if there are cost overruns or, if there is something, 
that there is some risk that the contractors would accept.
 Mr. Austin. Yes----
 Dr. Murphy. I am just trying to--again, if we are going to 
talk about this with redoing Rayburn, we have to use every 
little bit of experience from Cannon to make sure that the 
same--I do not want to say ``disaster''--the same, you know, 
cost overruns do not occur with Rayburn.
 Mr. Austin. I would say that this has come up before, and I 
just want to briefly--when it came to the Cannon, as the 
Chairman pointed out earlier, the original cost estimate was 
done in 2009 for the $750 million. Because it was put forward 
so early in the project, our estimators gave a plus or minus 40 
percent, which is large when it comes to----
 Dr. Murphy. Good Lord.
 Mr. Austin [continuing]. construction projects.
 During the time through all the projects--the timeline came 
through, and including early 2020's, when we had the COVID 
shutdowns and the pandemic and the price escalations----
 Dr. Murphy. Sure.
 Mr. Austin [continuing]. and the material displacement and 
we had an enforced shutdown of the project in early 2021, all 
those create significant headwinds. Even after all of that, 
coming in at $971 million, although it is high in that 
estimate, is still within the original estimate.
 Dr. Murphy. Yes.
 Well, I would just say, you know, the outside world loves a 
Government contract. I hope there are people within your 
department or whatever that are questioning every nickel and 
dime, as it would out in the private world, because this is 
taxpayer money. It is not, you know, just going to come out of 
air. To have real due diligence on these things, I think, is 
critically important.
 Let me move on a little bit for the Capitol Complex Master 
Plan. Where are you guys with that?
 Mr. Austin. It is a multiphase project. We are in the last 
phase of that with our designers. We are finishing that up this 
fall.
 We have certain aspects of it, like the Rayburn, like some 
things in the Senate, that are complete now. As part of the 
whole, comprehensive plan, that will be complete this fall. We 
look forward to future briefings to both this Committee and 
others.
 Dr. Murphy. Do you ever get any type of outside consultants 
to look at this? Or is this all done--this master plan--done 
within the Government itself?
 Mr. Austin. It is both. We do have outside consultants that 
we are working with for the master plan. We have a large 
architecture and engineering firm that we are working with that 
is helping us with the master plan. We do bring in other 
consultants as needed.
 Dr. Murphy. OK. I mean, it just--I do not think we use 
outside sources enough in the Government. We tend to turn in. I 
think, sadly enough, that creates more bureaucracy and, 
actually, it ends up more cost.
 Going back to our favorite topic of the Committee hearing, 
the Rayburn, if we are going to put another building to replace 
it, where is that--are you at liberty to say where that would 
be?
 Mr. Austin. Well, we will put it where Congress tells us to 
put it, Congressman. So----
 Dr. Murphy. Where have I heard that before?
 Mr. Austin. We have suggestions as far as different 
locations. The preferred location, the one we have briefed out, 
is over the West House Underground Garage, but that is still 
very much up for discussion.
 We are conscious of the guidance this Committee has given 
us, that anyplace we select has to be within a 10-minute walk 
of the chamber and it has to have tunnel access. That narrows 
our choices down significantly.
 Dr. Murphy. OK. If you are doing that, if you do not mind, 
put in an underground baseball complex for some of us that are 
stupid enough to get up at the early part of dawn, so we do not 
have to drive across the city. I am just kidding.
 Good luck. You have a huge, monumental task and a lot of 
money and a lot of appropriations to occur, a lot of planning. 
As we are, I think, bipartisan in this approach, we are at your 
disposal.
 Thank you very much.
 I yield back.
 Chairman Steil. Dr. Murphy yields back.
 The gentleman from Ohio, Mr. Carey, is recognized for 5 
minutes.
 Mr. Carey. Thank you. I want to thank the Chairman and the 
vice chair--or the Ranking Member as well.
 You mentioned early on--and you were about to expand upon, 
and I think you got interrupted. You said there were three main 
lessons from the Cannon Building that we could look at to 
maybe--as we look at Rayburn. What were those three?
 Mr. Austin. Sure. Thank you, Congressman.
 The big three--we discuss some in detail--is that, by doing 
Cannon in so many small phases, that was inefficient because of 
the mobilization and demobilization of the contractor and also 
being tied to artificial constraints.
 The second one, which is sort of tied to the first, is, we 
want to separate our construction from the operations of 
Congress as much as possible. The more we can have our 
construction be on one side of the building and Congress 
operating on the other and not have to intermix this much--
because disrupting operations of Congress is certainly 
something we always want to avoid.
 The inverse is true, too. When we have operations of 
Congress that have to interrupt the operations of the 
construction, that means we do a lot of construction at night, 
we do a lot of construction on the weekend. We pay a premium 
for that. That is inefficient, and we do not get as much 
productivity out of our contractors because of that.
 The second lesson is, separating construction from Congress 
as much as possible is desirable.
 Then the last one was--I spoke about just a moment ago--was 
about change management. We want to make sure that we nail the 
design up front, that we get our program of requirements 
identified, that is has been vetted, and then any subsequent 
changes, unless they involve design oversights, differing site 
conditions, or life/health safety, really have a high bar for 
implementation, so we do not have kind of a good-idea fairy 
hitting us way late in the project that is adding cost and time 
to the project.
 Mr. Carey. As somebody that has been involved with historic 
preservation most of my life--it is a passion of mine--do you 
see the changes--I mean, Cannon was built in, if I am correct, 
1908. Then you had Rayburn in the 1960's. Obviously, the 
material that was used in the construction of Cannon, quite a 
bit different than what was done in the 1960's.
 As you are looking at that expense, you know, and the delta 
between what you had planned and then ultimately had to spend--
looking at the Rayburn, I am going to imagine that there is 
going to be, as you mentioned, asbestos, significant mitigation 
that is going to be required for that, much more so, probably, 
than in the Cannon.
 Am I correct with that?
 Mr. Austin. That is correct. They integrated asbestos 
specifically more into the Rayburn Building than they did into 
Cannon. It is literally embedded into almost all the fibers, 
especially the structural components, in Rayburn.
 Mr. Carey. That, in itself, also would affect--the reason 
we are having issues with the mechanicals. Because, in many 
ways, you cannot--I am doing this more anecdotally, but--the 
reason that you cannot access a lot of these areas of the 
Rayburn is because of the threat of exposing with asbestos and/
or lead paint exposure, yes?
 Mr. Austin. It is absolutely a complicating factor in all 
of the work we do in Rayburn, yes.
 Mr. Carey. One other thing. You mentioned how you had to 
fabricate some of the inner workings within the air-duct system 
at the Rayburn Building. You are finding that--I mean, in your 
role, you find that all over the Capitol, correct? I mean, just 
like our subways, for example?
 Mr. Austin. Correct. More so in some places than other, 
but, yes, when we are working with historic components, as you 
pointed out, most of that is custom work in order to do that.
 When it comes to the mechanical components, because some of 
ours are so old, a lot of that has to be custom-fabricated. I 
can point to many examples if you would like.
 Mr. Carey. You know, to the end of, you know, talking, 
again, anecdotally about, you know, having escalators that work 
and all of those things, I mean, they are great concepts, but, 
I mean, we still are a functioning office facility, while in 
the sense we have to be mindful of preserving the past.
 How--and I only have a minute, and I will let you expound, 
and then we will follow up.
 While you were going through the process of making it a 
building, a living building, but, in the same sense, having to 
deal with the historical significance of what you can and 
cannot change--it would be much more efficient to replace the 
subway under the system right now than it would be to 
refabricate all these things. How do you have to--what do you 
have to--what is the process you have to go through in order to 
do something like that?
 Mr. Austin. You are absolutely right; it is a complicated 
process, and it is balancing a lot of factors. Between form and 
functionality, historic preservation, the desires of Congress, 
ADA, there are a lot of factors that play into it.
 We have what is called an Architectural Review Board that 
we work through internally with our stakeholders to make sure 
all the voices are being heard. Then we make these decisions in 
the best interests of the future functionality of the space as 
well as in light of historic preservation. Because we want our 
future visitors to have that same ``wow'' experience when they 
come to our campus that we get when we see it today.
 Mr. Carey. I would agree with the Ranking Member in terms 
of a new structure. I would be happy to work with you on how we 
would begin the process of design. I am assuming that the 
environmental scan has already been done, you have already done 
the soil samples and all those things.
 All right. With that, Mr. Chairman, thank you, and I yield 
back.
 Mr. Loudermilk.
 [Presiding.] The gentleman yields.
 I now recognize--can you hear me now? OK.
 We will now recognize the gentlewoman from Illinois, Mrs. 
Miller, for 5 minutes.
 Mrs. Miller. Thank you, Chairman, for hosting this hearing.
 Thank you, Mr. Austin, for being here.
 The Architect of the Capitol is an important job here in 
Washington, D.C., especially ahead of our Nation's 250th 
birthday.
 Mr. Austin, you oversee many employees who help preserve 
and maintain the Capitol Grounds and the safety of Members, 
staff, and visitors. This Committee appreciates the steps that 
you have taken to bring stability and organization to the 
agency.
 Not only is the Capitol Building historic, but it is also 
an important symbol of democracy all over the world. Managing 
the upkeep of this building and its grounds is essential to 
making sure our Government is able to function efficiently. As 
a result of the work of the AOC and its employees, the Capitol 
continues to provide an enduring and inspiring home for 
American democracy.
 Your job is not easy, and we do certainly appreciate all 
that you have accomplished in the short time you have been in 
the role.
 My question is, could you please explain what deferred 
maintenance is and how it is different from your maintenance 
backlog and how you plan to address both?
 Mr. Austin. Sure. That is a long conversation, 
Congresswoman, and I am happy to have a more in-depth 
discussion with you.
 The short version of that is: Our maintenance backlog, 
identified projects--or, deferred maintenance is projects that 
we have identified, we have scoped, sometimes in some cases 
designed, and have not yet been funded or have been pushed into 
future years because of operational or budgetary needs.
 Our maintenance backlog--or, deferred maintenance can be--
it is everything from the sampling of our mechanical systems to 
sampling of our plumbing systems, all work to design, and we 
look at that in terms of an overall value to the building.
 I hesitate to give numbers associated with these because I 
think it undersells the amount of work that we are required to 
do. We have had discussions in the past where numbers have been 
thrown out that would not be sufficient in order to take care 
of all of these missions.
 Just this budget year alone, we have over $600 million of 
identified projects that we are looking to do. This exists in a 
time continuum, so if we do not do those in the present year or 
current years, they get pushed into future years. Because none 
of that work really goes away; it just gets added to future 
maintenance issues.
 Mrs. Miller. Uh-huh.
 What is your most complicated issue, your biggest 
challenge? How can we help you?
 Mr. Austin. I would say, the facilities' condition in 
general.
 The Committee has been very helpful as we have been 
designing the Rayburn project. I would say, my Rayburn program 
overall--how we go about it, the means, the methods, the swing 
space, the phasing and all that--is something that--that is my 
biggest challenge, is to get a firm course of action so that we 
can start moving forward on that project.
 As I spoke about earlier, time is of the essence when it 
comes to that. It is because, as these system failures keep 
increasing in frequency and severity, that is going to start 
impacting Members of Congress more and more. I am keen to avoid 
that, and I am keen to get ahead of it as much as possible.
 Mrs. Miller. How do you facilitate proactive maintenance in 
order to prevent reactive maintenance on the Capitol Grounds?
 Mr. Austin. I will say a shout-out to my staff, as they do 
a great job keeping abreast of facility issues as much as they 
possibly can.
 Some things that are hidden behind our walls, like our HVAC 
issues, our plumbing, electrical, some of those things do not 
show up until they show up, and then we have an issue. Some 
things, where you talk about preventative maintenance with our 
HVAC systems, preventative maintenance when it comes to some of 
our plumbing components, they do a great job of doing that.
 We do over a half a million work orders a year throughout 
the Capitol campus. The Ranking Member spoke about just the 
plumbing and some of the hydronic issues we have inside campus. 
It is a constant challenge.
 We do a great job of tracking it. Our on-time-work-order is 
over 95 percent these days. We want to make sure that we are 
staying abreast of those and doing great data tracking, great 
predictive maintenance, by utilizing the feedback systems we 
have with our maintenance systems.
 Mrs. Miller. I think you have been doing a good job, and we 
are happy to support you.
 Mr. Austin. Thank you, Congresswoman.
 Mrs. Miller. I yield back.
 Mr. Loudermilk. The gentlelady yields.
 I now recognize the----
 Mr. Griffith. If I could steal some of your time?
 Mr. Loudermilk. The gentleman from Virginia.
 Mr. Griffith. Thank you, Mr. Chairman. I am going to steal 
a minute of your time.
 I went through all that stuff about that great southwest-
Virginia business that does the metal 3D printing--and they do 
big stuff, too--and did not tell you the name, and it is MELD 
PrintWorks.
 It truly is, Mr. Chairman, a southwest-Virginia success 
story. A lady by the name of Nancy Hardwick fought for 20 years 
to get the technology developed. It is woman-owned, an 
entrepreneur, and a real success story.
 I just--if you have got some part that you cannot find and 
it is going to cost you a bunch of money and take 6 months, 
they can get it done quicker.
 I yield back.
 Mr. Loudermilk. The gentleman yields.
 I now recognize the gentlelady from Oklahoma, Mrs. Bice, 
for 5 minutes.
 Mrs. Bice. Thank you, Mr. Chairman.
 First let me say, Mr. Austin, thank you for being here.
 On behalf of Oklahoma's congressional delegation, I want to 
thank you and your team for working with my office to plant a 
sapling of the Oklahoma City National Memorial sapling tree on 
the Capitol Grounds last April to honor those that were lost in 
the Alfred P. Murrah Federal Building bombing on April 19, 
1995.
 We are excited to direct our constituents to the Capitol 
Grounds to see this sapling. I was there a month ago with 
Senator Lankford, and it has grown tremendously since it was 
planted last April. Huge appreciation from our delegation in 
your assistance in getting that done.
 I also want to thank you and your team for the ADA pickup 
and drop-off outside of the Capitol.
 You know, when I became the Modernization and Innovation 
Subcommittee Chairwoman, I was shocked to learn that there was 
not a permanent ADA access point for individuals coming to 
this, the people's House.
 You were instrumental, and your team, in figuring out how 
to make that happen quickly, keeping in mind security aspects 
that are important on this campus, but also recognizing that 
many people who visit the building that have physical 
disabilities were having a hard time. We got to celebrate that 
important ADA pickup/drop-off launch last year, and I am very 
thankful for that.
 Your office and the challenges that you face are unique, 
and I hope that, with continued transparency with the Architect 
of the Capitol, in conjunction with House Administration, that 
we can help address the looming challenges that make the 
Capitol complex more sustainable for future generations.
 You have been a great partner, and I hope that we can 
continue to build off of the successes that we have seen since 
taking over this role.
 My question to you is sort of a general one, and that is: 
What do you believe that the AOC's largest opportunities for 
institutional growth are?
 Mr. Austin. As far as institutional--well, first off, let 
me preamble, the survivor tree is definitely a survivor tree, 
because it has thrived since it has been on campus. That is a 
huge success story, as we discussed. Thank you for that shout-
out, and I will make sure I pass it on to my Capitol Grounds 
and Arboretum team. They are very proud of those trees.
 As far as institutional growth, Congresswoman, I would say, 
when we are talking--we have had some discussions about the 
scale of the Rayburn renovation. It certainly will be the 
largest renovation program this agency has ever taken on. I 
would probably posit to say, inside the Federal Government writ 
large it is one of the largest renovation programs.
 As we are trying to tackle that challenge, what do I have 
to look at, and my staff, in order to make sure that I can 
support such a program of that size? As the parameters of that 
program get fleshed out, I look for opportunities to have a 
discussion about what that program team will look like and grow 
them into that.
 Some other areas that we are trying to be more responsive 
to the needs: We have had a lot of discussion today about 
elevators and escalators, so I want to be more responsive to 
that. We are looking at technology issues in that, but we are 
also looking at human capital that way, as well, so that we can 
respond more quickly and at all hours to it.
 Right now, on the weekends, for instance, we will have 
someone to respond, because we have people to respond to 
elevator outages, but we want to make sure there is an elevator 
mechanic that can respond at all hours in case something like 
that happens.
 Those are some of the challenges.
 We also want to be more responsive in emergency management. 
We have seen some shortfalls there that we want to make sure 
that we are prepared for in case those happen. We are looking 
for some institutional growth in those areas as well.
 In general, I am certainly focused on our facilities, but 
when it comes to growth--and since you are giving me the 
opportunity to speak to this--is that I am looking for ways 
that we can be more responsive to Congress.
 Mrs. Bice. When you mentioned the Rayburn renovation--can 
you maybe talk a little bit briefly about the difference with 
renovating a building like Rayburn versus what we have been 
working on with the Cannon Building?
 Mr. Austin. Sure.
 The most obvious way is its size, as Rayburn is 
significantly larger, almost three times the size of Cannon--
not quite, but almost three times the size of Cannon.
 It also has a lot more challenges associated with just the 
way it was constructed. We have talked a little bit about 
asbestos and lead and some of the challenges that are much more 
prevalent in that building than they were in Cannon. There are 
a lot of materials issues and things of that nature as well.
 I would say the biggest differences between those two are 
going to be when it comes to just the way we maintain Member 
access, the points in and out of the building. Also, this 
facility--or Cannon has some, but this facility, Rayburn, has 
more hearing rooms and committee spaces and other specialty 
facilities, like a firing range for the Capitol Police, and 
other things that were not challenges inside Cannon and 
certainly will be part of this program.
 Mrs. Bice. Thank you.
 I appreciate all you have done for this institution and 
certainly for the campus and our collaboration in working 
together on making sure that we are doing what we can to 
improve the people's House. Thank you and your team for your 
hard work.
 With that, Mr. Chairman, I yield.
 Mr. Loudermilk. The gentlelady yields.
 I would like to thank our witness for appearing before us 
today.
 Members of the Committee may have some additional questions 
for you, and we ask that you please respond to those questions 
in writing.
 Without objection, each Member will have 5 legislative days 
to insert additional material into the record or to revise and 
extend their remarks.
 If there is no further business, I thank the Members for 
their participation.
 Without objection, the Committee stands adjourned.
 [Whereupon, at 11:17 a.m., the Committee was adjourned.]

 [all]