Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- HEARING ON OVERSIGHT OF THE NUCLEAR REGULATORY COMMISSION [Senate Hearing 119-339] [From the U.S. Government Publishing Office] S. Hrg. 119-339 HEARING ON OVERSIGHT OF THE NUCLEAR REGULATORY COMMISSION ======================================================================= HEARING BEFORE THE COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS UNITED STATES SENATE ONE HUNDRED NINETEENTH CONGRESS FIRST SESSION __________ SEPTEMBER 3, 2025 __________ Printed for the use of the Committee on Environment and Public Works [GRAPHIC NOT AVAILABLEIN TIFF FORMAT] Available via the World Wide Web: http://www.govinfo.gov __________ U.S. GOVERNMENT PUBLISHING OFFICE 63-177 WASHINGTON : 2026 ======================================================================= COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS ONE HUNDRED NINETEENTH CONGRESS FIRST SESSION SHELLEY MOORE CAPITO, West Virginia, Chairman SHELDON WHITEHOUSE, Rhode Island, Ranking Member KEVIN CRAMER, North Dakota BERNARD SANDERS, Vermont CYNTHIA M. LUMMIS, Wyoming JEFF MERKLEY, Oregon JOHN R. CURTIS, Utah EDWARD J. MARKEY, Massachusetts LINDSEY O. GRAHAM, South Carolina MARK KELLY, Arizona DAN SULLIVAN, Alaska ALEX PADILLA, California PETE RICKETTS, Nebraska ADAM B. SCHIFF, California ROGER F. WICKER, Mississippi LISA BLUNT ROCHESTER, Delaware JOHN BOOZMAN, Arkansas ANGELA D. ALSOBROOKS, Maryland JON HUSTED, Ohio Adam Tomlinson, Republican Staff Director Dan Dudis, Democratic Staff Director C O N T E N T S ---------- Page SEPTEMBER 3, 2025 OPENING STATEMENTS Capito, Hon. Shelley Moore, U.S. Senator from the State of West Virginia....................................................... 1 Whitehouse, Hon. Sheldon, U.S. Senator from the State of Rhode Island......................................................... 3 WITNESSES Wright, Hon. David, Chairman, Nuclear Regulatory Commission...... 4 Prepared statement........................................... 7 Responses to additional questions from: Senator Capito........................................... 13 Senator Lummis........................................... 17 Senator Whitehouse....................................... 20 Senator Markey........................................... 25 Senator Kelly............................................ 29 Senator Padilla.......................................... 30 Crowell, Hon. Bradley, Commissioner, Nuclear Regulatory Commission..................................................... 33 Prepared statement........................................... 36 Responses to additional questions from: Senator Capito........................................... 40 Senator Lummis........................................... 43 Senator Kelly............................................ 46 Marzano, Hon. Matthew, Commissioner, Nuclear Regulatory Commission..................................................... 48 Prepared statement........................................... 50 Responses to additional questions from: Senator Capito........................................... 54 Senator Lummis........................................... 58 Senator Kelly............................................ 62 HEARING ON OVERSIGHT OF THE NUCLEAR REGULATORY COMMISSION ---------- WEDNESDAY, SEPTEMBER 3, 2025 U.S. Senate, Committee on Environment and Public Works, Washington, DC. The committee met, pursuant to notice, at 10:13 a.m. in room 562, Dirksen Senate Office Building, Hon. Shelley Moore Capito (chairman of the committee) presiding. Present: Senators Capito, Whitehouse, Cramer, Lummis, Curtis, Sullivan, Ricketts, Boozman, Husted, Markey, Kelly, Padilla, Schiff, Blunt Rochester, Alsobrooks. OPENING STATEMENT OF HON. SHELLEY MOORE CAPITO, U.S. SENATOR FROM THE STATE OF WEST VIRGINIA Senator Capito. All right, again, good morning. I have said good morning a lot, and I will say it one more time. Nothing wrong with saying good morning. Thank you all for being here. I hope everybody is rested and happy. We are really excited, obviously, the Ranking Member is very happy. He is happy as can be. He just expressed that. [Laughter.] Senator Capito. We are all being honest with one another, that is what we are being. Anyway, this morning, we are going to hold our first oversight hearing on the Nuclear Regulatory Commission (NRC), the first one we have had since March 2023. Since our last oversight hearing, the outlook for the nuclear industry continues to rapidly evolve, and with that, the work and issues pending before the Commission have significantly changed. Today, we will discuss some of those changes as well as ongoing policy, licensing, and management activities, and work to identify opportunities to meet this moment for nuclear energy. American homes and businesses need more affordable and reliable energy, and need that power as soon as possible. As our Nation's nuclear safety regulator, the NRC is central to determining the future of nuclear power in our energy system. For decades, the NRC took too long, cost too much, and did not have a predictable and efficient process to approve new licenses or modernize outdated regulations. That is why I worked with Ranking Member Whitehouse to get the ADVANCE Act signed into law last year. The ADVANCE Act was passed to spur the Commission, to give the Commission the tools to take urgent, bold steps to set the agency on the right course for the next generation of nuclear energy. Since the bill was signed into law, the NRC staff and the Commission have been hard at work implementing the law. The Commission updated its mission statement for the first time in 35 years, since the NRC first articulated a mission in 1990, to accurately reflect the NRC's role today and to recognize that nuclear energy benefits the public. This mission statement must now guide both the staff and the Commission in their daily work. Ultimately, the NRC's success will be judged on what they do, not just on what they say. That means establishing clear and achievable safety regulations, and approving licensing actions in an efficient, affordable, and timely manner. This is where President Trump's Executive Orders complement the ADVANCE Act. In May, President Trump issued Executive Order 14300 to reform the NRC by establishing clear licensing deadlines, reconsidering how the agency is organized, and revising outdated regulations. I support President Trump's objective to enable the quick and safe deployment of nuclear power. The initial signs to improve licensing efficiencies are encouraging. In August, I visited Wyoming. First time I have ever been to Wyoming. It is a beautiful State with a lot of wide open spaces there in Wyoming. Senator Lummis. Yes, I was sorry I missed you that day. You were at the Kemmerer Mine. Senator Capito. We were. Senator Lummis. The Labor Secretary came out and I was with her in that same mine. We thank you so much for coming. Senator Capito. We learned a lot. It is the construction site of TerraPower, a leading, innovative nuclear company. I heard how the NRC is revising its processes to help expedite the construction of advanced nuclear reactors. Since initially accepting TerraPower's license application, the NRC has considerably shortened their review time to reflect an improved approval process. In a novel approach, the NRC approved TerraPower's request to separate nuclear and non- nuclear energy systems to allow the State of Wyoming to permit parts of the system while the NRC completes its safety review. To make these changes predictable and durable, the Commission must ensure they can be repeated for future license applications and the NRC staff must then execute these streamlined processes. Ultimately, it is the Commission's responsibility to set NRC policy, approve nuclear regulations, and adjudicate licensing disputes. The Commissioners must respond to congressional oversight, and we will continue to hold them accountable for their decisions and the ongoing work of them and their staff. The staff has initiated a comprehensive review and revision of all the NRC's regulations, pursuant to President Trump's Executive Order. This is an enormous task and must be done deliberately. Creating rapid and major disruptions to the nuclear regulatory framework may unintentionally create instability and lead to uncertainty for financing for future projects. Through all the various initiatives, the NRC must not lose sight of the central role of ensuring nuclear safety. To be successful in this effort, the NRC must work with us, with Congress, the regulated community, and other stakeholders. That is why we are here this morning, so we can hear the Commission's plan to successfully implement the ADVANCE Act and the executive orders, to get an understanding of how they are prioritizing their work, and to challenge the Commissioners to further improve. I am optimistic the information that we gather today will be useful in our ongoing bipartisan efforts with Ranking Member Whitehouse to enable the use of nuclear energy. With that, I will now recognize the Ranking Member for his opening statement. OPENING STATEMENT OF HON. SHELDON WHITEHOUSE, U.S. SENATOR FROM THE STATE OF RHODE ISLAND Senator Whitehouse. Thank you, Chairman, and welcome to the commissioners and the chair who are present. Nuclear energy is one of the most powerful tools in our energy arsenal to meet rising power demand and address the climate crisis. It is our largest source of zero-carbon electricity. Novel advanced reactor technologies are uniquely equipped to produce high-temperature heat for industrial applications and can use spent fuel to mitigate our nuclear waste problem. TerraPower, to wit. Dozens of new projects are being announced and moving forward. Through passage of our bipartisan ADVANCE Act last year, and prior bipartisan reforms, on which I was the lead Democrat, Congress equipped the Nuclear Regulatory Commission to usher in a nuclear revival. Unfortunately, the Trump Administration is throwing unprecedented and dangerous obstacles into the Nation's nuclear path, obstacles that threaten to derail our bipartisan progress, undermine the growing support for nuclear energy, and put the public at risk. Some in the administration want to turn the NRC into a ``rubber stamp,'' and have said so, using unaccountable and clueless DOGE staffers to restructure the agency and upend its rules. DOGE staffers with no background in nuclear energy are ousting nuclear experts at all levels of the agency and replacing them with under or unqualified staff, adding uncertainty and delay in nuclear regulation, and rerouting supposedly independent commission decisions through political operatives at the White House. The industry stands or falls on the NRC's gold-standard reputation for nuclear safety. It is now in jeopardy. Congress created the NRC with the primary goal to split the conflicting roles of the Atomic Energy Commission, whose encouragement of nuclear deployment came to overpower its safety mandate. As the Atomic Energy Commission's safety record lost the agency, both public and industry confidence, Congress created the Nuclear Regulatory Commission as the safety regulator, leaving the Department of Energy as the industry. This regulatory firewall rebuilt public trust and enabled the United States to safely develop and operate the world's largest and most effective nuclear fleet. The Department of Energy, like many bureaucracies, now seems to seek territorial expansion into the NRC. Trump's DOGE- y boys seek, whatever, reviving past mistakes by eroding the NRC's independence and injecting political favoritism into its processes, or at least trying to. We see this interference in front of us today. Three well- regarded Commissioners sit here. There should be two more. Commissioner, previous Chairman, Chris Hanson was illegally fired by President Trump. Commissioner Annie Caputo had had enough and left. We see this interference in NRC's senior leadership. In July, I showed this Committee how the NRC had already lost seven senior-level managers. Now, four others have departed or announced their departure and more will follow. It is not just the senior ranks. NRC reports that 143 people departed between January and June, yet it hired only one person in the second quarter of the year because of the Federal hiring freeze. More than 100 other staffers took the deferred resignation offer and will depart by the end of the year. It is a personnel bloodbath. An industry built on 80-year investments with a zero- percent acceptable failure rate cannot withstand the loss of regulatory certainty and public trust, particularly if it is damaged by DOGE-boy neophytes out to ``move fast and break things.'' What they will likely break will be this industry. An independent NRC with in-house technical expertise is the way to U.S. nuclear dominance. I think Chair Capito and I agree on this, and should the turmoil at the NRC subside, I look forward to working with her, members of this committee, and the commissioners, including newly re-installed Chairman David Wright, to see the NRC keep delivering the full promise of nuclear energy that in the Senate, on a bipartisan basis, we have worked so hard to encourage. Thank you. Senator Capito. Thank you to the Ranking Member. The way we have set this up is I think the way it has been set up in the past. Our first witness is the Chairman of the NRC, David Wright. As we all know, Chairman Wright was confirmed in the Senate to his third term on the commission in July. President Trump has designated him to serve as the NRC Chair. He will speak for 5 minutes, then the subsequent commissioners have 3 minutes to give their opening statements. Welcome, Chairman Wright. It is nice to see you. You are recognized for 5 minutes to deliver your opening statement. STATEMENT OF HON. DAVID A. WRIGHT, CHAIRMAN, NUCLEAR REGULATORY COMMISSION Mr. Wright. Thank you so much. Chairman Capito, Ranking Member Whitehouse, and distinguished members of the committee, good morning. Thank you for the opportunity to appear before you today. It is an honor to serve as Chairman of the U.S. Nuclear Regulatory Commission, and I am grateful for the trust placed in me to continue leading this exceptional agency. My colleagues and I appreciate the opportunity to discuss the NRC's licensing and oversight activities today. The NRC was established to regulate commercial nuclear power plants; research and test reactors; nuclear fuel cycle facilities; and radioactive materials used in medicine, academia, and industry. The agency also regulates the transportation, storage, and disposal of radioactive materials and waste; the export and import of radioactive materials, nuclear reactors, and fuel cycle facilities; and the export of nuclear facility components. This year marks the NRC's 50th anniversary, a milestone that reflects five decades of unwavering commitment to public health and safety. Our success is rooted in the dedication and expertise of our work force, whose efforts have made the NRC the global gold standard in nuclear regulation. I am proud to lead this agency at this dynamic time. The signing of the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act 1 year ago has positioned the NRC to meet the Nation's evolving energy and security needs. While reflecting on the past 50 years has value, our focus remains firmly on the future, and the ADVANCE Act has been instrumental in laying the groundwork for the next 50 years. The Act reinforces our mission focus and empowers us to prioritize safety-significant activities while embracing innovation. We are delivering on this mandate with urgency and purpose. The NRC is implementing Executive Order 14300, which calls for a modernized, more agile regulatory framework to support the safe and timely deployment of advanced nuclear technologies. This directive challenges us to think differently, act decisively, and collaborate effectively across government. While we work in partnership with agencies such as the Department of Energy and the Department of Defense, the NRC remains responsible for commercial civilian licensing and oversight. We are establishing expedited pathways for reviewing reactor designs that have demonstrated safe performance in Federal programs. Additionally, we are updating our processes to provide reviews that are commensurate with the associated level of risk. At the same time, we are reinforcing our commitment to transparency and accountability. This is not just regulatory reform, it is a cultural transformation that positions the NRC to be a forward-leaning, risk-informed regulator for the future. The NRC is actively reforming its internal culture to become a more efficient and modern agency, while maintaining our focus on safety. Consistent with the agency's new mission statement, we issued a new procedure on interactions with industry to drive quicker regulatory decisions through more effective communications. It establishes clear expectations about how NRC staff should be proactive in clarifying gaps in regulatory requirements, offering insights into potential solutions, and being a helpful and responsive regulator. The NRC is also increasing accountability through a new project management initiative that ties metrics to individual performance. In May, we approved the NuScale US460 small modular reactor standard design 2 months early and launched a risk-informed, technology-inclusive microreactor licensing plan. Two months later, we extended reactor design certification terms from 15 to 40 years, reducing regulatory burden while maintaining safety. We also reached a historic milestone by completing key licensing actions to facilitate the restart of the Palisades Nuclear Power Plant, potentially the first permanently shut- down reactor to resume operations. This sets a precedent for future restarts, including a reactor at the Crane Clean Energy Center and at Duane Arnold. Additionally, we completed the VC Summer Subsequent License Renewal both early and under budget, extending operations there through 2062. We began an unprecedented 6-month review for Disa Technologies' multi-site radioactive materials license, aimed at remediating up to 15,000 abandoned uranium mines, many on tribal lands. This represents a significant advancement for the NRC, made possible by the bipartisan support of Congress. The NRC is delivering results that matter: expedited reviews, streamlined regulations, and a rededicated focus on the safety mission. We are embracing innovation. Our work is not just about regulation, it is about enabling a safer, more secure energy future for all Americans. Thank you for your continued support of our mission. I look forward to your questions. [The prepared statement of Mr. Wright follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Senator Capito. Thank you, Mr. Chairman. Our next witness is certainly someone who is no stranger to the committee, it is Commissioner Bradley Crowell. Commissioner Crowell was confirmed to serve as a member of the NRC in 2022, and has over 20-years of experience in energy and environmental policy, including having worked for Ranking Member Whitehouse. Commissioner, welcome, and you are recognized for 3 minutes. STATEMENT OF HON. BRADLEY CROWELL, COMMISSIONER, NUCLEAR REGULATORY COMMISSION Mr. Crowell. Thank you. Good morning, Chairman Capito, Ranking Member Whitehouse, and members of the committee. Thank you for holding this hearing at a critical time for the NRC and for the safe operation and deployment of nuclear energy technologies. Today we find ourselves at a pivotal juncture that will determine the future of commercial nuclear power not just in the United States, but around the world. When I began my tenure on the Commission almost exactly 3 years ago today, I had growing confidence in our collective ability to position the U.S. as the world leader for deploying the next generation of advanced nuclear energy technologies, and to do so while maintaining our hard-earned, world-class reputation for nuclear safety. My confidence was buoyed by this committee's success in building and sustaining bipartisan support for both expanding the use of nuclear power and for needed NRC reform. Along with your colleagues in the House, this committee harnessed the bipartisan momentum to pass essential legislation providing the NRC with both the policy direction needed and the tools necessary to efficiently oversee the safe design and operation of the next generation of commercial nuclear power. Key legislation, including 2019's Nuclear Energy Innovation and Modernization Act and the 2024 ADVANCE Act has accelerated our efforts, sharpening the NRC's focus and creating an overall platform for success. I appreciate Chairman Wright's testimony highlighting some of the NRC's accomplishments this year. I will supplement it quickly with a few notable additions since I have joined the commission in 2022. We have issued five licenses for new reactors, including the two new units at Plant Vogtle in Georgia. We have renewed the licenses for six reactor sites, for a total of 10 individual reactor units. These have been renewed for 20 years and represent 10 gigawatts of generating capacity that will stay on the grid. In response to unexpected industry demand, we have developed a viable regulatory pathway to restart recently shut- down reactors. We have approved the use of new remediation technologies to accelerate cleanup of abandoned uranium mine waste across the west. We have established a new regulatory structure to license emerging fusion energy technologies. The NRC staff is also currently engaged on over 30 advanced reactor projects, ranging from pre-application meetings to actively reviewing fully submitted applications. The NRC is continuing to get things done. We should not lose sight of this fact amidst the attention on reform. We can, and we are, making progress on all fronts. In May, the Administration issued Executive Order 14300 ordering the reform of the Nuclear Regulatory Commission. The Executive Order (E.O.) doubles down on the Agency's current work and related reform efforts. In this regard, the E.O. is a welcome expression of support for the integral role of the NRC in catalyzing the safe deployment of new and advanced nuclear energy systems. However, I also worry that select elements of this E.O. and other executive orders will be counterproductive to achieving the goals of E.O. 14300 itself. I take the opportunity today to point out these likely contradictions not to sow confusion, but based on conversations I have had with members of this Committee, other administration officials, and a wide range of stakeholders, I firmly believe we all share the same goals. Thus, we need to work together to resolve any obvious hurdles that will undermine our collective efforts. My greatest concern is the current and future NRC work force. The Agency has been directed to do more with less despite a growing workload and aggressive timeframes. This is an unsustainable dynamic. The ADVANCE Act provided tools to retain and grow our work force, yet Executive Order 14300 calls for considering reductions in force. Such reductions would be on top of the historically high rate of attrition already happening this year in response to the Deferred Resignation Program and other efforts impacting Federal employees. As you saw on the chart from Senator Whitehouse, the NRC is not just losing technical experts. We have lost valuable senior executives. These work force challenges are further compounded by the governmentwide hiring freeze, currently in place until mid-October, and potentially decreasing budgets. These conditions are not a recipe for success. I note the recent report from the administration's Energy Dominance working group that speaks clearly to the importance of adequately staffing agencies, including the NRC, to ``ensure that nuclear fuel and reactors can be developed, licensed, sited, funded, and exported.'' The working group's report raised another caution stating that ``procedural successes will not be sufficient to secure nuclear energy dominance without investor, customer, and public confidence in projects.'' One path to jeopardizing public confidence is to decrease transparency. This is especially true for nuclear energy. A significant portion of the NRC reforms will involve rulemakings. As we make progress on modernizing the NRC, we must also retain some ability to engage proactively and transparently with the regulated community and with all other stakeholders. Failure to do so risks undermining public trust and forfeiting the ``social license'' essential to a lasting nuclear renaissance. Working together, I am confident we can find ways to conduct meaningful public engagement without compromising the efficiency we all desire. Finally, unnecessary disruption could counterbalance efficiencies gained and those still to be implemented. As one commentator aptly put it recently, ``A regulatory whipsaw effect would strangle the nuclear renaissance.'' On this point, I again draw your attention to the administration's Energy Dominance report: ``While creating new licensing and permitting pathways is important, they must be compatible with existing processes to ensure that project developers have full access to markets, and that existing licensing work is not disrupted.'' Making the staff's job more difficult and licensing less predictable is antithetical to staying focused, maximizing efficiency, making reasoned safety cases, retaining staff, and simply getting things done. Members of the committee, as of today, I have 665 days remaining in my current term, and I want to report many more accomplishments to you during that time. While I have concerns, our shared goals across the government for a stable, safe, and prosperous energy future give me optimism and measured confidence that we can stay on the high end of this slippery slope and the right side of history. Thank you, and I look forward to your questions. [The prepared statement of Mr. Crowell follows.] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Senator Capito. Thank you very much. Our final witness is Commissioner Matthew Marzano. Commissioner Marzano was confirmed by the Senate to be a member of the NRC in December last year, previously having been detailed by the Idaho National Laboratory to support this committee for then-Chairman Carper. Welcome back, Mr. Marzano. You are recognized for 3 minutes. STATEMENT OF HON. MATTHEW J. MARZANO, COMMISSIONER, NUCLEAR REGULATORY COMMISSION Mr. Marzano. Thank you, Chairman Capito, Ranking Member Whitehouse, members of the Environment and Public Works Committee. I appreciate the opportunity to appear before you today. It feels a bit like a homecoming to return to this Committee where I once had the privilege of serving on staff. Although my former boss may no longer be on the dais, I know I am not the only one who finds themselves repeating his trademark sayings. I suspect that Chairman Capito might miss a few of them from time to time as well. In my 8 months of service as a commissioner, the importance of the NRC's mission to enable the safe use of technology has become even clearer to me. Our Nation desperately needs clean, reliable, and affordable energy to meet not only today's needs, but also the projected growth in electricity demand. This imperative has precipitated a cultural shift that has empowered every member of our staff to innovate the way that we conduct our business. Nuclear energy is undergoing a period of rapid evolution, and the NRC must evolve in parallel to meet this moment and the challenges of tomorrow. Speaking of change, from a personal standpoint, my wife and I recently welcomed the arrival of our second child just a few short weeks ago. That experience has only strengthened my sense of responsibility for the future we are building for the generations that will follow and underscores the vital work of the NRC. While much has changed, my priorities as a Commissioner that I presented to this committee remain as relevant today as they did a year ago. The path to achieving safe deployment of new nuclear power generation, both through innovations in the operating fleet and advanced reactor designs, requires a proactive approach that anticipates technical issues, where possible, far ahead of the license review process. We as regulators must prepare with clear, efficient, and predictable licensing pathways that protect safety without unnecessary delay. The only way to accomplish all that is required of the NRC is through a strong, well-resourced work force. The NRC staff has always demonstrated an exceptional level of expertise, and, particularly in recent months, has shown an incredible resilience and an ability to rise to the occasion. That said, we have seen many highly experienced employees leaving the agency for other jobs, particularly as the nuclear landscape is ripe with opportunity. Cultivating the rich institutional talent within the agency is more important now than ever, in order to effectively perform our mission as well as train and prepare our staff and leaders for the next 50 years and beyond. Further, a central value of the NRC is, and continues to be, openness. The NRC's emphasis on transparency ensures that the agency devotes its full focus to assuring safety and security for the public. The NRC exercises deep expertise in public engagement which supports the public trust in a strong, reliable regulator, and is critical to unlocking the benefits of nuclear technology. You have my commitment to uphold the core principles on which this agency was built as we continue to transform. I want to close by thanking my wife, Jennifer, for being so resilient and steadfast throughout these past few months. Jennifer, your unwavering support strengthens my resolve to serve the American people in this role with integrity and purpose. I thank the members of this Committee for your support, and I look forward to your questions. [The prepared statement of Mr. Marzano follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Senator Capito. Thank you, and congratulations on the birth of your second child. That is an exciting time. One of the ones that Chairman Carper always said was, bipartisan solutions are lasting solutions. We will just throw that one out there for both of us to hear, all of us to hear. Chairman Wright, thank you. I want to talk about the mission statement, making it actionable. We have all kind of alluded to the fact that the mission statement was realigned for the first time in many, many years. To achieve its greatest impact, the commission has to, with the staff, has to rewrite the guidance so that further actions can adhere to the vision that is outlined in that statement. The ADVANCE Act required the commission to describe to Congress how it will update agency guidances to reflect the new mission statement. The report was due in July, but we have yet to receive that report. What are your observations about how the agency has reflected the spirit of the revised mission statement in its activities to implement the ADVANCE Act? Where do you see us going from here? Mr. Wright. Thank you for the question. The mission statement is something that we worked very hard on, especially my colleague here to my left. We worked very hard on that over the holidays last year. Finally, the whole commission, as you know, adopted it in January. The mission statement outlines exactly what we do as an agency every day, its every factor. Even with the executive orders that are out there, as I see it right now, it supports the executive orders as well. I do know that the mission statement, the guidance was paused while I was gone off the commission. I do not know the whole details behind it. Senator Capito. Have you restarted that? Mr. Wright. When it was paused, and I believe Commissioner Caputo was the one who was notified by staff that they wanted to revisit and take a look at it in light of 14300 and some of the things that were going on, I have not talked to the staff yet. I just learned about this last week. I will be following up, yes, and would like to get that guidance moving forward. Senator Capito. All right. Commissioner Crowell, I know Chairman Wright alluded to the fact that you all worked hard together on this. Do you have anything you would like to update, or any additional comments you would like to make regarding that? Mr. Crowell. I would just say that I think the mission statement we worked out on a bipartisan basis was well received by this committee. I think it reflects the current goals and mission of the agency. Candidly, I am not sure it makes sense to redo it at this point as directed by E.O. 14300. If that is what the administration desires, we will endeavor to do that. I do think our current mission statement is the right one for this time in the commission's history. Senator Capito. Thank you. I think it is core to the mission. We would like to see, of course, the guidance follow that so that we can have actionable followup. Congress passed the ADVANCE Act to direct the NRC to be more efficient in its regulation, we have all talked about it, to focus on issues that are more important to safety. Prime example of unnecessary regulations is what is known as non- emergency event reporting, which is some 300 issues that require licensees to notify the NRC. These are issues that are captured either in oversight activities or reports. After more than 8 years of work last summer, the career NRC staff submitted a proposed rule to the commission to eliminate a small subset of those issues. I would like to ask each of you briefly, do you support this straightforward, simple proposal that career NRC inspectors and staff endorsed? If so, while the rulemaking proceeds, would you support providing a temporary compliance relief for licensees? We will start with you, Chairman Wright. Mr. Wright. Thank you. My position for a long time has been that that effort to eliminate these requirements is a good example of risk- informing our regulations and improving them. Yes, I would support that. Senator Capito. Commissioner Crowell? Mr. Crowell. Yes. I think what we can do to reduce the burden on our inspectors for doing potentially needless paperwork exercises is a valuable part of our efficiency goals. Senator Capito. Commissioner Marzano? Mr. Marzano. From my experience, working in the industry as a senior reactor operator, I have encountered this reporting requirement several times. There is definitely room for improvement. I support the staff's work here. Any way that we can ensure that the NRC remains situationally aware of what is going on in the fleet at any given time, that is a valuable aspect of this type of reporting. I do support streamlining and making that process more efficient. Senator Capito. Good. Thank you. I am going to go to my Ranking Member here, Senator Whitehouse, so I do not take too much time. Senator Whitehouse. First of all, thank you all for being here. I customarily offer encouragement to have the regulatory process support the effort to find locations where they are boiling water to make electrons and swap in nuclear if the boiling water is being done by a decommissioned or obsolete plant. Also to lean in where the process allows for the re-use of spent fuel. That may not be reflected in the economic imperatives to the individual companies. I think there is a huge public value to finding a way to make sure that spent fuel can be productively and safely re-used. I urge you to lean in on that. I say those things all the time, and I am saying them again here. Given all of the intrusions from, in my view, the Department of Energy and from this DOGE operation and potentially from the White House into what is supposed to be an independent process, I am worried about the transparency issue, which I have seen, I think everybody on the panel mentioned the importance of transparency. Here is my concern. As you all are developing a regulation, it seems to me that, if I understand the process correctly, when all your work is done, and your work is sent to Office of Information and Regulatory Affairs (OIRA), the Office at OMB that supervises from the White House's perspective the development of regulations, no step in that process before it gets to OIRA is public. If you had a situation in which an industry influence had a heavy hand over at OMB, or had a policy directive that was very different from the safety imperative that you are supposed to exhibit, implement, you could have a situation which basically, they just drop in the reg that they want at OIRA through the White House, all your work gets dismissed and now comes back to you with a very strong headwind from the White House saying, do this or you are out of luck. It seems to me that transparency along the way, that people can see what went into OIRA, and compare it to what came out of OIRA, would be useful. Chairman Wright, do you agree with that? Mr. Wright. Transparency and openness are big, keeping the public informed, keeping our stakeholders, hearing from them, learning from them, them being a part of the process is, that has been key to what we have done historically. It is very important. I know that we are working very closely with OIRA to understand the process. They have worked pretty seamlessly with us. We have not seen any of the things that you have alluded to, although we are aware, and if there is an issue, we know that, we feel confident that we can have a serious discussion with them. Senator Whitehouse. If something like that should happen, I would ask that you have somebody notify this committee that that has happened, even if it is not a public matter, so we can inquire. If OIRA becomes the drop box for special interest influence and all of your work as an independent commission basically gets blown out of the water by OIRA, and it is all done secretly because none of your preparatory work is public and what OIRA does is secret, then behind that veil of secrecy a lot of mischief can happen. I would ask you to make sure that we know about that. Mr. White. Yes, sir. Senator Whitehouse. Last, I call them ``doggie,'' call them DOGE, whatever you want. Senator Capito. You need to clarify that, because some folks on our side here are really confused when you say ``doggie.'' Senator Whitehouse. Doggie-boys, the doggie-boys. Senator Capito. I am looking at them saying, it is DOGE. It is DOGE. Senator Whitehouse. As of today, it seems there are seven DOGE staff at NRC. Is that true? Do I have the number right? Mr. Wright. Yes. Senator Whitehouse. Yes. Had any of them worked on nuclear energy prior to onboarding at NRC, to your knowledge? Mr. Wright. I know of one who has worked at a plant and has also worked on the coal side as well. That one I know for sure. Senator Whitehouse. Yes. On the coal side of nuclear energy? Mr. Wright. Well, no, no. He worked at a nuclear plant, but then he also worked at the coal plant as well. Senator Whitehouse. At a coal plant. Got it. In your QFR responses, you said that the lead staffer from DOGE did not have an NRC supervisor. As of today, which of the staffers have an NRC supervisor? All seven? Some of seven? None of seven? Mr. Wright. The one you are talking about was the first one there, Mr. Blake. He is a senior advisor and a consultant to the NRC, but he also does consulting work at, my understanding is at DOE and also at EPA. He works in coordination with our EDO, Mike King, at the NRC. All the other members, the other six, do report to the NRC. Senator Whitehouse. An NRC person? Mr. Wright. Yes, sir. Senator Whitehouse. Okay. My time is up. Thanks very much. Senator Capito. Senator Lummis? Senator Lummis. Thank you, Madam Chairman. Once again, thank you for coming to Wyoming. You are invited back often. We are delighted that you had a chance to see what we are doing there. I want to thank the commissioners for being here today. One of you in your testimony mentioned what I think is the crux of the matter for the commission. That is just two words: safe use. I think some of us on this committee get the impression that when one party is in control, it is all about non-use. When another part is in control, it is all about unsafe use. I want to just reaffirm for you, it is both. It is both for all of us. We know that we need incredible amounts of energy in order to win the artificial intelligence race. It is absolutely critical that the United States be the leader in AI. To do that, we need all sources of energy. Nuclear is included. The frustration that I experienced during the last 4 years is very similar in terms of the frustration level that the Ranking Member just expressed. It was from the opposite point of view. I had worked for 4 years with Senator Mark Kelly of Arizona to help the Navajo Nation cleanup their many sites that are contaminated. With the DISA technology, that is basically what I call a car wash for rocks, they are able to clean up tailings and old nuclear sites to a level that exceeds 90 percent. For some reason, somebody at the NRC's lower level staff decided that that was not good enough, and used their bureaucratic position to thwart that cleanup. To me, that was just nonsensical. The Navajo Nation did not get it; I do not get it. We experienced the frustration of not being able to identify a faceless bureaucrat that was stopping the cleanup of these sites on the Navajo Nation, and could do it for other sites that are on Federal land and private land as well. I share that kind of frustration. Senator Whitehouse, we felt exactly the same way when the Keystone XL pipeline was shut down. No notice to anybody. All those jobs lost in 24- hour, boom. I get it. When you are not in control, there is a certain amount of frustration that goes with the change of administration. There is something that is always going to be true with this group, with this commission. It gets down to the issue of safe use. We are seeing new technologies in nuclear that are being developed and advanced that we need, and we want it expedited. We do not want it expedited by sacrificing safety. If I could just say to all three of you, Godspeed, move forward, get nuclear back in a position where it is a big component of the American energy mix. Never do it by sacrificing safety. Those are my soapbox remarks. Now I am going to ask a question about what the western States are doing. Wyoming, Idaho and Utah have recently entered into an agreement to jointly pursue nuclear industry growth in the region. I will ask this of the chairman. How are you working with State level energy officials to support nuclear development and doing it in a safe manner? Mr. Wright. Thank you, Senator, and I appreciate your comments too, earlier. We work with any stakeholder out there. We work with the States, whether it be the agreement State program or if it is companies that want to have a conversation with us about what they are trying to accomplish, we will early engage with them. That is just a good thing to do, it is just a good business practice. Whatever the business is going to do, they are going to decide at their boardroom, right? If it is a technology that they are going to pick, that is a decision they make. We do not pick that for them. We will work and we will collaborate with them, which we already do when we travel. We collaborate with the local State officials to get the answers that they need and provide service if we need to. Senator Lummis. My time is up because I was on my soapbox too long. Maybe if there is a second round, I can actually get to my questions. Thank you. Thanks, Madam Chairman. Senator Capito. Thank you. Senator Padilla? Senator Padilla. Thank you, Madam Chair. If I can jump on Senator Lummis' soapbox for a minute as well, I actually agree with a lot of what you said, starting with the need for the United States to maintain its leadership in AI, and to do so with the accompanying energy supply to continue to drive it. I have heard a lot from this administration and from a lot of people here in the Senate about all of the above, all of the above, all of the above. If that is the case, you are making the pitch for why nuclear has to be part of the mix, I would also suggest that hydrogen, that not just wind in inland States like Wyoming, and coastal States like California, but the added opportunities of coastal States for offshore wind to be supported and further invested in, not funds withdrawn as we are seeing by this administration. If we are in agreement on that, let us continue to work together to make those appeals for continuing the smart investment that we have had. Now, to the subject at hand today, thank you to all the witnesses who are here. A little bit of a reminder for members of the committee, and a benefit for those watching at home, the year was 1974, when Congress acted to dissolve the Atomic Energy Commission as it existed and separated its responsibilities between two bodies: the Nuclear Regulatory Commission and what is now the Department of Energy, recognizing that one entity cannot and should not be charged with both the nuclear safety regulation of policymaking and decisionmaking as well as promoting nuclear. It creates a real perceived conflict of interest, and it is important to maintain the public trust in these endeavors. Today, we see DOGE staffers detailed to the NRC, but referring to themselves as DOE representatives, injecting themselves into the regulatory review, the NRC reorganization, and stating their intention for NRC to be a rubber stamp for DOE approvals. We also see the NRC being directed to create expedited pathways to approve DOE tested reactor designs without revisiting DOE's analysis. This is a dangerous trend that I fear could have significant implications for the safety, back to your safe use, Senator Lummis, to the safety of our nuclear power industry, and more importantly, that the trust that the American people deserve to have in nuclear energy. As you all know, when it comes to anything related to nuclear and the public trust, once you break that trust, it is really, really hard to regain it. My first question is for Chair Wright. How is this not a return to the once upon a time Atomic Energy Commission approach that combined both the regulation and promotion of nuclear? Mr. Wright. Thank you, Senator. While I am answering your question, I am going to correct something as well. Senator Padilla. Please do. Mr. Wright. Working with DOE and working with DOD or any other agency is nothing new to the NRC. We have done this historically. Yes, we are the safety regulator. We have to be ready to review and license all comers. DOE, on the other hand, they can pick winners and losers. They are the promoter of all things energy. There is nothing that is really different now. Yes, they are over there helping implement 14300. They are not directing that. We are working collaboratively with DOE on this. In fact, on the microreactor program that they are pushing now, we are actually going to be putting people at DOE to help do the reviews. They need our help. Senator Padilla. Just building on that for a second, because you are right, there has been that collaboration and partnership before. From where we are now, and going forward, would it be beneficial to have a formal Memorandum of Understanding (MOU) in place to clearly define the roles and responsibilities of each party? Mr. Wright. We have an MOU with DOE. We have had it for years. We are also looking at implementing an MOU with DOD. Senator Padilla. Well, that is what I am referring to, that one with DOD. Would it be beneficial to have it? Mr. Wright. We are working on that now. Senator Padilla. What is the timetable that we can expect it, or at least a preliminary? Mr. Wright. I am going to have to get back to you about that. Our EDO is back here, I can probably find that out right after the hearing for you. It is soon. They are talking about it now. Senator Padilla. Okay. That would be helpful to have. I know my time is running out. It does go by quickly. I will followup with questions on other topics, including but not limited to seismic safety. Mr. Wright. Yes, sir, I just wanted to for the record let you know that that rubber stamp comment that made the papers or whatever while I was out, I was in that meeting. What was not reported is how we pushed back and said, we do not rubber stamp anything at the NRC. We are not going to let our name on anything we have not reviewed and accepted and proven to be safe. DOE, their two gentlemen who were there, agreed wholeheartedly with that. The pushback was made. Senator Padilla. Okay. I appreciate the pushback. Would love to get it documented and especially see the administration's respect for that check and balance. Thank you. Senator Capito. Senator Curtis? Senator Curtis. Thank you, Chair, and again, Commissioner Marzano, congratulations on that second. As a father of six, I would simply say, two is a good start. [Laughter.] Senator Lummis. I would say thank you for recognizing your wife. Senator Curtis. Yes. Good. Mayor Wright, we have established in this meeting precedents and you are mayor and always will be in my mind. Thank you for your service there and here, and commissioners, thanks for being here. My colleague to the left from Wyoming has talked about the agreement with Utah, and I think Utah is clear that they want to be an innovator, they want to be a leader on this. Our State legislature stands ready to jump through hurdles. We have sites that have been working on preparation for years. I want to kind of dovetail on her question of working with State governments. We really explored to our fullest extent what we can do, working with our State governments, to help expedite the process, with what can they become partners with us on, and how can we use our State government for States like Wyoming and Utah and the others who are ready to roll. Mayor? Mr. Wright. Right. Thank you for that. Again, we are a safety regulator. That is what our job is. We do review and license. We do not promote a particular technology. Again, if a State is looking at, or utilities are looking at a particular technology to build, or if they need information, we have got the information on our website. We have dashboards that are up there where anyone who is looking to find out how to get something done, it is there on the NRC website. Or they can call us directly. Senator Curtis. I know my legislature has actually been up to visit you. Mr. Wright. I have been to your State, I have been up to Wyoming as well, and talked with their government officials. You also have got trade organizations, too, that they can lean on, like Nuclear Energy Institute (NEI) or people like that. The National Conference of State Legislatures as well. Senator Curtis. We do not have time to fully explore this, but I think it is clear from the comments up here we would love to keep massaging this and figure out what we can do with our States to be as ready as we can. Same thing, obviously, the ADVANCE Act has been talked about a lot today. Inside that, I had a bill, the Advanced Nuclear Reactor Prize Act. I would say one of the motivating factors for including that was to bring certainty and clarity into this. Those of you that have been around long know about Utah Associated Municipal Power Systems (UAMPS) and their attempt to get a small nuclear reactor and the difficulty with that. I would ask, Mr. Wright, what are you doing as an organization to provide this certainty that these organizations need? How can we better clarify exactly how to do this? Mr. Wright. Well, if you are talking about the Prize Act? Senator Curtis. I am talking about overall certainty for those who are wanting to go through this process that can last many years. Mr. Wright. Oh, yes. Senator Curtis. My observation is if you are fortunate enough to be TerraPower and have vast resources to move through this, you can move quicker, still not real fast. If you are a UAMPS, in their case it took them about 10 years to move about halfway through the process. Mr. Wright. Well, so, we have learned as we have gone along, especially since the NuScale thing first started, we have instituted tiger teams and things like that as well to review, to try to keep things on track and in focus. Having said that, early engagement from anybody is going to be helpful, because the whole goal is to build as robust a package as you can, so that you can get it through as quickly as possible. We are committed to the 18 months for construction review, and then do the safety review as well for the nuclear site. We are going to--we are not going to be the problem here. If there is a problem, it is going to be fuel, it is going to be money, it is going to be work force, it is going to be supply chain. It is not going to be the NRC. Senator Curtis. It might be worth a whole separate hearing on fuel. We will save that for another day. Clearly, your comments indicate that you are hoping to lead this organization through a transition of change and clarity. Can you just give us a top line of what we can expect and how you are doing that? Mr. Wright. Yes, sir. That is a loaded question. I could talk an hour about it. I will tell you, we are not through yet, going through what we have to. I will relate it to, you know, I am a colon cancer survivor. I knew when I was told I had cancer that I had to do stuff fast, I had to make decisions quickly, so I could get through the process and out on the other side. We are going through that process right now of, we are losing people, and we are going to lose more. I mean, it is a perfect storm for us. People are retirement age, it is a great opportunity, they are being recruited by other companies right here in D.C., Maryland, Virginia. We have got to, and we are doing our re-org now. Once we get the re-org plan done, we are going to then be able to see, because that is focused on workload, and where the work is going to be. Then we are going to be able to put people into those spots and see, do we have gaps. Right now, we can get things done. We can do the licensing, we can do the reviews, we can even license a reprocessing facility under our regs right now. We have got to get through that re-org part before we can get to what you really are looking at is, do we need more people. You have given us the tools to fill those holes through the ADVANCE Act. We can direct hire. Senator Curtis. I am out of time. Thanks, commissioners. I yield back my time. Senator Capito. Thank you. Senator Kelly? Senator Kelly. Thank you, Madam Chair. First question, actually both of them I am going to try to get through quickly, because I think they are both equally important. I am going to ask each of you to provide an answer. The administration has set ambitious goals for nuclear energy, 10 new reactors under construction by 2030, you guys know this, quadruple the generation capacity by 2050, which is roughly 300 new utility-scale reactors over the next 25 years. There is bipartisan agreement, these are the kinds of goals we need to meet our Nation's energy demands reliably while reducing emissions. If past is prologue here, the Country is not on track to meet these goals. Today only six reactor designs are certified, only one of which has ever been built. Over the past 25 years, the NRC has only issued 14 operating licenses, resulting in just two new reactors. As energy demand has skyrocketed, so has the demand for more nuclear power plants. At the same time, the industry is aggressively pursuing advanced reactor designs that have never been deployed. These designs, they do promise to be safer, more flexible and easier to deploy. They will take precious NRC time and resources to certify and license. My question is, where should the NRC focus its attention to get more nuclear on the grid at scale in the time to meet our energy needs? I see two options here. The NRC can fast-track proven utility scale designs to get shovels in the ground now, or the other option, the NRC can certify tomorrow's advanced modular reactors. Commissioners, would you agree that the NRC could move faster and bring more nuclear energy to the grid if the commission could prioritize one of these pathways as opposed to trying to do both at the same time? If so, which path do you think the NRC should follow to make this happen? Either fast-track proven utility scale designs to get shovels in the ground now, or certifying the new advanced modular reactors? I am going to start with Mr. Wright. Mr. Wright. Thank you, Senator. Quite honestly, you need both. You really do. If you are going to hit 400 gigawatts, you are going to have to build big plants. You are going to have to build a lot of them. You are not going to be able to hit everything that you need with advanced reactors or microreactors. Although they are used for specific, different purposes, chemical plants, things like that, that is for sure. For grid- scale stuff, we are going to have to have big plants, no question. Senator Kelly. That would clearly be the first option here, is to try to get the utility-scale, the existing designs, shovels in the ground? Mr. Wright. You know, there is some low-hanging fruit that is out there, power uprates, No. 1. That is the lowest-hanging fruit that is out there. Then you have got license renewals and subsequent license renewals, so the plants that are aging out can get licensed for another 20 years or more. Then you have got the opportunity to bring, as we are doing with Palisades, bring decommissioned plants back online. That is cheaper than building a new plant. Then you are looking at the possibility to build big plants again, because the AP1000, we have got the design certification for 40 years, and there has been announced that they are looking to build maybe 10 in the U.S. Then finally is the micros and the Small Modular Reactors (SMRs) and advanced reactors. Those are the five things that are out there. Senator Kelly. Mr. Crowell and Mr. Marzano, do you agree with that? Mr. Crowell. Yes, and I will be very quick here. We have to do both. I do not think we have a choice. On the new application advanced reactor site, it is all going to depend on the quality of the application that comes in, whether we can do that quickly and efficiently. In the near term, we could make significant progress with keeping and putting more power on the grid for nuclear in three ways: completing these efforts to restart recently shut-down reactors, approving power uprates, so existing reactors could produce more power, and also making progress on advanced fuels, higher-burning fuels that will allow more power and longer run times and less down time. Senator Kelly. I have 30 seconds. Mr. Marzano, I am going to ask you this next question. It is about abandoned uranium mines. As I have discussed with all of you before, we have 500 of them on the Navajo Nation. We have been working for decades to clean these things up. There have been challenges. One of these challenges has to do with how we deploy new emergent technologies. As I believe all of you know, the EPA and the Navajo Nation have piloted the technology that could reduce the amount of hazardous waste at an abandoned mine site by as much as 85 percent. This technology has not been able to be used more widely because it is still going though a licensing process at the NRC. I know you have made some progress on this in recent years to alternative licensing pathways. Do you agree that a site-specific licensing process for remediation of abandoned uranium mines will unnecessarily delay the deployment of innovative technologies across the western United States? Mr. Marzano. Yes. For the number of features that are out there that are causing these public health concerns, in order to address this problem, we need to move quickly. Each site has its unique features, but ultimately the technology is what it is, and it is repeatable at these different sites. Senator Kelly. Can I get each of you, because I am out of time, and I am over, to commit to me to prioritizing the review of any licensing applications pending before the commission, so we can start cleaning up more of these abandoned mines? Mr. Wright. Absolutely. Mr. Crowell. Yes. Mr. Marzano. Yes, sir. Senator Kelly. Thank you. Thank you, Madam Chair. Senator Capito. Thank you. Senator Husted? Senator Husted. Thank you, Madam Chairman. I appreciate you, commissioners and chairman, for being here today. The question of safety and speed is at the center of much of the conversation today. I come at this from someone who represents a manufacturing State, Ohio. If you look at our energy demands as we as a Nation look to do more made in America, more manufacturing, we are going to require more electricity. You have more battery demand electricity through cars and certainly with AI. We are the fifth largest AI State in the Country. We are continuing to see demand grow for electricity. We are not a State where solar or wind can even come close to meeting that increased demand, particularly with the reliability issues of needing power 24-7, 365, to run these facilities. Nuclear is the only zero carbon solution that is out there, which I think is a uniting element of a lot of the conversation. There were questions raised earlier today about safety, that there perhaps are an inadequate number of professionals at the commission to meet current safety demands. Mr. Chairman, I am going to give you an opportunity to clear that up, that, you know, are things, do we have the adequate professional staff necessary to provide for the safety of the nuclear industry in this Country? Mr. Wright. Oh, my gosh, yes. Safety is not an issue. Safety is our north star. It is our strike zone over home plate. We are not taking out eyes off of that. Our staff, that is what they focus on. We are not going to approve anything that is not safe, regardless of speed. That is why early engagement is so critical, so that we can understand, if it is a new and novel technology, what are the gaps that we have, and where is that information going to be filled from. We have the expertise on our staff now to do what needs to be done. Safety is not going to be compromised in any way, I can assure you of that. Senator Husted. It is, as you look to the future, so we now, I know you are going to continue to try to modernize, that you have issues with people retiring, people in demand from the private sector, all of these things which we have discussed, and you are going to modernize and improve. How are you--I will ask this question. How much nuclear energy do we expect to come online in the next 10 years? Mr. Wright. Well, I do not know the actual answer to that. All I know is that whatever is going to be coming to us to be reviewed and licensed is going to be done in an efficient manner. We are going to get that process done so they can get to market. Senator Husted. From start to finish, how long does that typically take? How long should it take, and how long does it take, to followup on Senator Kelly's question to go from, it appears on your desk to approval to construction and then electrons going out the door? Mr. Wright. Right. We are looking at new and novel ways to do things, to expedite things like we did in Wyoming with TerraPower. We have got, it is going to be kind of up to the applicant and working with us to build a robust application. We are committed to try to do it in 18 months for the construction side. Again, in that 18-month timeframe to try to get the whole nuclear side of it done as well. They can be done in tandem, they can be done at the same time. We do not have--so we are committed to efficient, making things more efficient. It used to be the safety side was further to the left and got done quicker than the environmental side. That is changing. That is going to be, that is a game changer for the NRC, and actually for the industry as well. It is going to help us get things done quicker. We only have, as you know, you have got, we have the design cert that we just did for the AP1000. Then you have had NuScale, that is the only advanced reactor that has been approved. You have got five others, Kairos and others who have applications before us. You have got another 25 or 30 who have not come to us with any application. We know they are probably coming. We just do not know when. We will be ready. That is what we are doing now. Senator Husted. I would just add that, I think it is pretty widely known when you look at the math that the demand for electricity through AI alone is increasing at a far faster rate than we are bringing energy online to meet that demand. We all say we care about inflation and lowering costs for consumers. If we do not get this right, it is going to come with great consequences to us economically and for the people who pay those electric bills. Mr. Wright. This is one of the things that is important about a whole-of-government approach to this issue, because it is a national energy emergency. That is what we are trying to do, working with DOE and DOD at Idaho with the microreactor program. If it is needed in other areas, then if the Congress pushes it, DOE wants to do it, we are going to be a partner and get that done as well. Senator Husted. Great. Thank you, Madam Chair. Senator Capito. Senator Blunt Rochester? Senator Blunt Rochester. Thank you, Madam Chairman, and thank you to our Ranking Member. As a person who sits in this seat for Chairman Tom Carper and a former staffer, I will congratulate you, Commissioner Marzano, on the birth of your child. It is good to see you again, Mayor, as well. I will say that to me, this panel is so important. The five-member panel that governs the Nuclear Regulatory Commission ensures independence, reliability, and continuity in the incredibly important corner of the energy sector, being nuclear. The bipartisan nature of the panel also protects the NRC's stability from changes in administration, so that it does not change with the winds. I am starting with you, Chair Wright. Can you talk about why this five-member structure is so critical for nuclear safety and regulatory certainty? Mr. Wright. Thank you for the question, and I do agree, we work best when we have a full complement of five members. We do. We all bring different backgrounds. We have diverse thoughts; we have different life experiences that actually work to help us educate each other and help us come to a better solution. I have worked on commissions with four, and with three. We have found a way to make it work. Senator Blunt Rochester. Commissioner Crowell? Mr. Crowell. I do believe that five, as intended, is the ideal number. It is all about relationships between the commissioners, no matter how many there are. We intend to make the most of it, even if there are just three of us. Senator Blunt Rochester. Commissioner? Mr. Marzano. Thank you, Senator. Ultimately, the structure leads to more reasoned, balanced and robust decisions, decisions that stand the test of time. I will echo the sentiments of my colleagues here that we all benefit from this deliberative process and decisionmaking. Congress intentionally set up not just the Nuclear Regulatory Commission, but the Atomic Energy Commission way back when as highly valuable for that type of, given the complexity of the nuclear industry and nuclear technology. Senator Blunt Rochester. I think that is the whole point, is not necessarily, I am referring to the structure, and those different perspectives that are brought to bear, and also taking the politics out and focusing on the expertise and what is necessary. I express this because I am concerned about the administration's recent track record with interfering with independent Federal agencies, like the Federal Reserve, even. The Ranking Member's comments, and even your testimony about recent retirements, the firing of a commissioner, and the number of vacancies, we are seeing that even the NRC is not immune. Again, this is really about our health and our safety, as well as our competitiveness. I will follow up with you later, Chair Wright, because I can not imagine that the loss of technical expertise that was shown on that board does not have some impact, whether it is in the timeliness or--that has to have an impact. I think we need to make sure that you have the resources you need, because nuclear energy is not the place that we want to play around. I will followup with you on those needs. Nuclear energy continues to be a big part of the conversation about the future of energy in this Country. We need this option on the table. Not only at the expense, we do not want it to be at the expense of safety of our communities. That being said, there has been a clear delay in nuclear licensing that has been discussed. Enhancing the efficiency of NRC reviews while ensuring safety is critical to NRC licensing. Chair Wright, where are you seeing bottlenecks in the licensing process? Mr. Wright. Thank you for the question, and I look forward to following up with you as well. Again, it is, that early engagement is so critical, right? Not all these technologies are the same. We have to be prepared for whoever comes in to us, right? We do not pick winners and losers like DOE can do. We have to be ready. We want to try to help them on the front end as they are constructing their license program for an application. We want it to be as strong and robust as possible and answer as many questions as we can early so that we can get through the process quicker. Again, a lot of this is up to the applicant as well. Senator Blunt Rochester. Got it. That pre-application engagement is key, is what you are saying? Mr. Wright. Oh, it is critical. Yes. Senator Blunt Rochester. With respect to Executive Order 14300, and the directive to undertake a review and wholesale revision of its regulations and guidance documents, will NRC hold public meetings and solicit public comment before these revisions are finalized? That is just yes or no. Mr. Wright. Yes. Senator Blunt Rochester. Thank you. Again, ultimately, this is about safety, this is about our health. It is also about the competitiveness of us as a Nation. Our focus on clean, reliable energy is important. I look forward to following up with you as well, Chairman, commissioners. I yield back. Senator Lummis. [Presiding.] The Chair recognizes Senator Ricketts. Senator Ricketts. Thank you very much. Thank you to the commissioners for coming here today for this oversight hearing. We really appreciate it. Nebraska is very proud of our nuclear power. It is clean, safe, and reliable. Our Cooper Nuclear Station is an 835 megawatt facility that can generate power for about 385,000 residences, even in the hottest part of summer. Nebraska is working to expand its nuclear energy capabilities through several different avenues. As the industry continues to grow throughout Nebraska and the Country, clarity in rulemaking is vital to success. In situ recovery uranium mining is critical to the U.S. bolstering our domestic supply of uranium. One of the challenges to incentivizing more In Situ Recovery (ISR) mining in the U.S. is the lack of clarity with respect to the NRC groundwater restoration standards. President Trump recently issued an executive order directing reform of the NRC. Chairman Wright, how will the NRC work to address the lack of clarity regarding groundwater standards as part of its new reforms? Mr. Wright. Thank you, Senator. I love your State, by the way. Senator Ricketts. Thank you. Do I. Mr. Wright. The NRC is working right now on ISR standards as part of this whole comprehensive rulemaking on 14300, right now. That is going to happen, the review. Senator Ricketts. Do you have a timeline for when we might be able to expect to see some of these first new rules? Mr. Wright. Well, I think that we are trying to get, I think right now we are looking to maybe get something up on 14300 in October, and I think February is when we are supposed to be looking at something final. Senator Ricketts. Okay, great. Thank you very much. Mr. Wright. Subject to check. Senator Ricketts. Yes. I have been around here long enough to understand that these are ball park numbers usually. Great? The Nebraska Public Power District is currently phase two of a feasibility study for building a new small modular reactor. Looking toward the future in the licensing process for the state-of-the-art technology, I would like to learn more about how the NRC is implementing the ADVANCE Act to improve efficiencies in the licensing process. On August 18th, the acting executive director for operations issued a memo in accordance with Section 505 of the ADVANCE Act. The memo identifies a series of actions the agency has taken to accelerate the efficiency, predictability, and timeliness of license reviews. Which of those actions do you think is the most promising to improve the NRC's licensing efficiency, especially for new and developing technologies? What are some of the next actions that the staff and commission are considering to continue its implementation of Section 505 in the ADVANCE Act? Mr. Wright. I do not think there is any one that is better than the other. I think the whole of these actions taken together is what it is going to take, and it is going to make the biggest impact. Again, as the report stated, the NRC staff is, we anticipate that the agency will realize the further efficiencies when the rulemaking efforts for E.O. 14300 are completed. That is part of that whole process. Senator Ricketts. Just on an operational side, one of the things when I was Governor I implemented at the State of Nebraska was Lean Six Sigma, a process improvement methodology. We we were able to be able to save literally hundreds of thousands of hours of our teammates' time as we rolled that out to everybody in the organization. You are nodding your head like you are familiar with this. I highly encourage you to take that. For example, one of the things we were able to do is, with our air construction permits, it was taking is about 190 days to get those issued. Again, we can not change any of the environmental regulations at the State level. By simplifying the process, we took it down from about 110 steps to about 22 steps. We were able to get those permits issued in 65 days versus 190 days. That is just an example of how leveraging process improvement methodologies can help streamline the duplicative processes, taking out the steps that do not add any value, that sort of thing. I would certainly encourage you to take a look at that as part of the overall efficiency and effectiveness of the organization. Mr. Wright. Thank you so much. Yes, we were already becoming more efficient before I met you and learned about Lean Six Sigma and how you implemented that in Nebraska. I will tell you, we are leaning in on every front. We are leaning in on the materials side, as you have heard Senator Lummis on DISA and Senator Kelly, we are leaning in on the advanced reactor side. That is, to me right now, that is the shining star in the agency because of just how many people are coming and what we are doing to prepare and get ready. We have been ahead of schedule on everything right now. We are staying that way. They are committed to it. Thank you, and I will take you up on that. Senator Ricketts. Great. Thank you, Mr. Chairman. Senator Lummis. The Senate is blessed to have the experience of former Governors. As you can see, that experience is on display with Senator Ricketts' questions. Thanks so much. The Chair recognizes Senator Schiff. Senator Schiff. Thank you, Madam Chair. Mr. Wright, you acknowledged earlier in the hearing being present when one of the DOGE representatives made a comment about rubber stamping decisions made elsewhere. Can you tell us exactly what the comment was and who made the comment? Mr. Wright. Thank you so much. That meeting happened in early June, if I remember correctly, subject to check. I was contacted by Mike Goff at DOE. He and Ted Garrish wanted to come over and talk about the executive order for DOE and DOD. They came on a Friday morning. We had started our meeting. There were three people who came in, Adam Blake, I mentioned him earlier, he had two other people with him. One was a lady, an attorney. I do not remember her last name; I think her first name was Alicia. Then there was another attorney there by the name of Seth Cohen. That meeting--it was actually Seth Cohen that used the rubber stamp comment. It was, when they walked in, I stopped the meeting and I let them introduce, let Mr. Blake introduce the others. When I started the meeting back, I told them, I said, we were just talking about the executive order for DOE and DOD. That is when the comment was made, he said, oh, well, if you all are basically going to put in a practice that is going to sort of rubber stamp what they do. I said, well, we do not---- Senator Schiff. He was referring to rubber stamp the decision made by DOE and DOD? Mr. Wright. No. Maybe. I did not press him on that. I did not ask him about that. All I said was---- Senator Schiff. Was it a sense that he was suggesting that the NRC was simply going to rubber stamp what the nuclear industry wanted? Mr. Wright. No, I pushed back. That is what was in the article. Senator Schiff. Was that his suggestion, that his expectation was that the NRC was now going to be a rubber stamp for the industry? Mr. Wright. I think he was thinking the intent of that, whatever the executive order was---- Senator Schiff. That is how he was interpreting the executive order? Mr. Wright. Yes, whether he chose the right words or not, I do not know. We pushed back and said, we do not rubber stamp. The meeting that we were having with DOE and DOD---- Senator Schiff. Commissioner, I am grateful that you pushed back. I appreciate that. I am just trying to get an understanding of how he views your role, which is obviously alarming to everyone who is concerned about nuclear safety. Let me ask a related question to each of you. I will start, Mr. Marzano, with you. Should you decide the nuclear design is unsafe, notwithstanding the wishes of DOE or DOD, or anyone else, do you think you are at risk of being fired from the commission by a president who has demonstrated willingness to fire commissioners without cause? Mr. Marzano. I certainly think that we have seen that happen, and I think there is pressure. Ultimately, the NRC will not license a reactor that is unsafe. If that does not meet our standards, we will not approve such a design. Senator Schiff. You acknowledge that it is very possible, should you decide that a reactor design is unsafe and vote that way, that you may be fired by the administration? Mr. Marzano. I think that is a possibility. Senator Schiff. Mr. Crowell, is that a possibility, in your view? Mr. Crowell. I think on any given day, I could be fired by the administration for reasons unknown. Senator Schiff. Mr. Wright, do you think you would be fired if you should decide against the administration's desires that a nuclear reactor design is unsafe? Mr. Wright. It does not matter. I am going to make the right decision, and I will stand by that decision. Senator Schiff. You acknowledge you have to at least be concerned about the possibility you will be fired for it? Mr. Wright. I do not know. In my mind, it is speculation. It is talking, it is not something--but I am going to make the right decision, period. Senator Schiff. Well, it may be speculation, Chairman. If you and the other commissioners have to be concerned that if you make a decision in the interest of public safety that runs afoul of the desire of the administration to approve something on a short timetable, that you would be fired, that is not a conducive situation to nuclear safety. Would you agree, if you have to be worried about being fired for making the right decision? Mr. Wright. Well, I may look at it a little bit differently than how you are saying it. Senator Schiff. Well, let me ask you this. The timetable says now within 12 months or 18 months you have to approve or reject a design. What if you do not have the information in 12 or 18 months? Do you have to vote on it regardless? Mr. Wright. No. The 12 and 18 months is actually for, you have got 12 months, 18 months on the construction side, then you have another 12 or 18 months to do the other part of it. Senator Schiff. If you do not have sufficient information within that timetable? Mr. Wright. Again, if you do not have the information to make a safety decision or to approve an application, you do not approve it. Senator Schiff. You can ignore the timetable if you do not believe you have sufficient information? Mr. Wright. Absolutely. Senator Schiff. Okay. Thank you, Madam Chair. Senator Lummis. The Chair recognizes Senator Alsobrooks. Senator Alsobrooks. Thank you so much. Thank you to our commissioners for being here today. The first question is for Chair Wright. The Nuclear Regulatory Commission plays a vital role in my State, which is Maryland, overseeing the Calvert Cliffs Nuclear Power Plant, which generates nearly 40 percent of our State's electricity. The NRC ensures that these plants operate safely and reliably, protecting both the public and the environment. However, this agency, and we have heard some of this this morning, faces significant work force challenges. Currently roughly 77 percent of the staff at the NRC are over 40 years old, and approximately 22 percent of the work force was eligible to retire by the end of Fiscal Year 2025. We believe this puts critical institutional knowledge and expertise at risk. I think we can probably all agree with that. In addition, the NRC's work force has decreased by nearly 30 percent since 2010, raising concerns about the capacity to meet evolving regulatory demands. I just want to know, Mr. Chair, if you could share with us, given all of these realities, how do you plan, I have heard you allude a bit to it, but how do you plan to replace the retirement-eligible workers and ensure that the NRC staffing levels and staff, that the skill sets align with the needs of the nuclear landscape? Mr. Wright. Thank you, Senator. Before I answer the question, I was hoping Senator Graham might be here, so that he, I do not know if you have told him about your Seneca, South Carolina connections. You and I share some connections in Waynesboro, North Carolina, things like that. Senator Alsobrooks. Yes, oh my goodness. Mr. Wright. As it relates to the work force that we have, you are correct, about 20 percent of our people are currently eligible to retire. The market that is out there right now for job recruitment, it is good for people in our line of work. We are going to be losing more people. We do have people on the bench. We are not without people. Now, it is going to be, there are going to be fresh opportunities for people to step up and to chart their path and to make their name at the NRC. We have got plenty of talent. We are recruiting people. We have hired about 54, I think, since January maybe. Although we do have a hiring freeze, we do have some exemptions on things that we can hire. We have direct hire authority that the ADVANCE Act provided as well for those things if we know we have someone, a specific talent we know we have to go get, we can go get it. Also, we have been told that there are exemptions and exceptions that we can ask for that would be provided, if we-- nobody is going to leave us in a lurch, let us put it like that. Senator Alsobrooks. Okay. I was going to ask you about the hiring freeze. You have some exemptions that would allow you to backfill if necessary, those positions. Mr. Wright. Yes, for specific jobs, yes. Senator Alsobrooks. Okay. Let me ask you just another question. On May 23d, the President issued an executive order, 14300, we have heard about that this morning, ordering the reform of the Nuclear Regulatory Commission. The order directed the NRC to take a wholesale revision of its regulations. There is a concern about rushed regulatory changes that lack depth and thoughtfulness that come from collaborative engagement with the public and stakeholders. This tends, I think, to create regulatory uncertainty for applicants already navigating the licensing process. I wonder whether you can commit, Mr. Chair, to taking the necessary time to meaningfully engage stakeholders on any regulatory reforms to ensure they maintain safety and regulatory predictability? Mr. Wright. Yes. The short answer is yes. Senator Alsobrooks. Okay. If that is the case, I have just a question I want to ask of each commissioner. This is regarding, the commission established the NRC's Principles of Good Regulation in 1991 to guide the agency's performance and ensure public trust. The principles are clarity, openness, independence, efficiency, and reliability. Quite frankly, I think most people are concerned now, most especially, about independence. I wonder whether each of you would commit to this committee that your decisions will continue to be driven by protecting public health, safety, and these principles and nothing else? Mr. Wright. Yes, ma'am. Mr. Crowell. Absolutely. Mr. Marzano. Yes. Senator Alsobrooks. Okay, and finally, just one last question. The NRC's website lists over 30 potential applicants and vendors currently engaged in preapplication activities. Many of these efforts are backed by strong Federal support, like the Department of Energy's Advanced Reactor Demonstration Program. There is one notable example, and it is in my State. X- Energy is a company based in my State, in Maryland. These applicants have submitted high quality applications that the NRC has committed to reviewing on an accelerated timeline. Now, given the significant expansion in your workload, coupled with the ongoing loss of critical staff essential to completing these reviews, how will you assure that this committee and these applicants at the NRC, that you will complete the reviews on schedule without cutting safety corners? Mr. Wright. Some of those people that are leaving the NRC are going to X-Energy because they have 500 jobs posted in Gaithersburg. It is a serious thing. The attraction is real. You can not blame them, right? You can not. Again, we have got the people. Our advanced reactor side of the house is where, I mentioned earlier, it is the shining star, they are ahead of the game on everything that has an application in front of us. The people that are in early engagement with us, they are trying to help them build as robust an application as they can, so that when they do come in, be it 2026 or 2027, depending on the technology, that they are ready to go and we will have the people in place to review it. Senator Alsobrooks. Okay. Thank you so much. Thank you. Senator Lummis. The Chair recognizes Senator Markey. Senator Markey. Thank you, Madam Chair. President Trump issued an executive order in February of this year that attacked so-called independent regulatory agencies like the NRC. Under this order, the NRC has to submit every regulatory decision to Trump's Office of Information and Regulatory Affairs in the White House for its review. Chairman Wright, how many NRC decisions have been sent to the White House for review since this order was issued? Mr. Wright. Subject to check, about 18, maybe. Senator Markey. Eighteen. How many of those decisions would have been transmitted before Trump's executive order in February? Mr. Wright. As I understand it, maybe the main item that we have historically transmitted has been our annual fee rule. Senator Markey. It is 18 so far that have been sent? Mr. Wright. Subject to check, sir. Senator Markey. As part of the new partisan review process, can the White House change the Nuclear Regulatory Commission's rules and decisions? Mr. Wright. I do not--I may have to get back to you about that just on detail. I am not sure how that works. I do know that there is a--we have the ability to have conversations with them on things that maybe are not aligned or do not, either they do not agree with or something like that. Senator Markey. Has the White House used its authority to overrule the Nuclear Regulatory Commission on any of the rules and decisions transmitted by the commission? Mr. Wright. They seem to have worked very well with us. They have been accommodating. Senator Markey. They have not overruled you on anything so far? Is that what you are saying? Mr. Wright. Subject to check, sir. I am not aware. Senator Markey. Is anyone aware that any changes have been made? Mr. Marzano. No. Senator Markey. None have been made, is that what you are saying? Mr. Marzano. That is my understanding. Senator Markey. Okay, good. There is again, from my perspective, no chance that a qualified nuclear professional in the White House is reviewing these rules at the White House to make them stronger? That is not what has happened? It would be to water them down, that is what this White House is all about, watering them down, to give a rubber stamp to the nuclear private sector industry to move forward more quickly. That would be the only reason that they would act, and there is nothing effective about putting our nuclear safety in the hands of a partisan, political White House instead of independent nuclear experts. The White House does not have the Nuclear Regulatory Commission's nuclear safety expertise; it does not have the NRC's mission to protect public health and safety. It has an agenda, and that agenda is to rubber stamp new nuclear power plants to make up for the upwards of 500,000 megawatts of wind and solar that the White House has killed. They have to find a way of making up for that with nuclear, which of course is going to be impossible unless they completely trash the safety rules for nuclear power. That is why I am afraid, that is why I am very afraid of what the pressure is going to be on you. AI is growing, the demand for electricity is growing, they have killed wind and solar, and they are now looking at you to expedite the safety procedures. If you do not, the White House will just overrule you. That is what is unfolding right in front of us. Imagine if you went to the doctor, who looked at your symptoms, made an expert diagnosis, said you needed surgery. That would be you. Before you could get treated, you had to wait for the city's mayor to review the prescription and decide, you are actually fine with a Band-Aid. That is what the Trump administration is doing here. That is what they are putting in place. The Trump administration is putting its political agenda between you and your safety. It is putting a curtain up between the public and its right to know what is going on. The transparency of the NRC is replaced by the darkness of the Trump White House, in terms of who is talking to them, what is being asked about these regulations that ultimately result in a compromise of the safety protections which you have put in place. You are telling me you do not know if they can override you. You do not know if you can replace your judgments. You do not know if the safety that this commission has put in place in order to advance is going to be compromised. That is the problem with this White House. Again, they are doing it at the same time that they are saying they are going to put a nuclear reactor up on the moon. They are going to put a nuclear reactor between us and our moon at the same time that we know that the sun is setting on the nuclear industry. The nuclear moon is getting ready to rise. It could be very dangerous without the NRC having a real role, and the safety of that nuclear power plant. All across the board, there is a nuclear agenda here which is very dangerous. It is going to leave the public in the dark, uninformed and unaware of the decisions that directly affect their health and their safety, and these decisions are going to be made in darkness in the White House about the nuclear safety of these power plants across our Country. You provide transparency, the White House provides darkness. Out of that, we are going to have something that is not trustworthy for local communities. It is going to make it even harder to license nuclear power plants if they believe that there is no transparency, if they believe it is just the industry showing up and trying their best to compromise the safety regulations. Your job is to regulate the industry, not to promote it. The job of the White House is to promote it, not to regulate it. We know that that is why we created the Nuclear Regulatory Commission in the 1970's, to avoid that conflict. The White House right now is putting that conflict back into action, Mr. Chairman. Give me an assurance that the NRC will not stand on the sidelines if safety is being compromised by this White House. Mr. Wright. I can assure you, safety is not going to be compromised. As I mentioned earlier, it is our North Star. It is our strike zone over home plate. Senator Markey. Even if the White House issues an order saying that the safety regulations you have promulgated must be compromised? Mr. Wright. Safety will not be compromised. I can assure you of that. Senator Markey. Do you agree with that, Commissioner? Mr. Marzano. Yes, sir, I agree with that, and to this point, safety is in the recognition of the public's trust of nuclear power and this social license that we have talked about. The White House, from my understanding here, prioritizes safety as well. I think the devil is in the details. To this point, we have not had any---- Senator Markey. They just lied, Commissioner. They are saying wind is unsafe. They can tell the same lie about nuclear power. It is safe, do not worry about the Nuclear Regulatory Commission regulations that will make it safer, that will provide safety. They just lie through their teeth when it comes to their political agenda to kill wind and solar. They lie about the fact that they are inherently safe, and over here, an inherently dangerous technology, nuclear, which is why we have an entire agency--we do not have a solar agency. We do not have a wind regulatory commission, because there can be no nuclear, there is no solar radioactive, no fallout, there is no wind radioactive fallout. You do not have to say to Pennsylvania, begin to think about evacuating if a wind or a solar plant goes down. With nuclear, you have to. I will give you the final word, Commissioner Crowell. Mr. Crowell. I do think that we all genuinely support and care about safety. That being said, if we lose any more staff, it is going to be tough to credibly make safety cases on the timeline that we are being asked to do so. I am also concerned with respect to the agency's historic independence, that on the rulemaking front, the commission's votes will no longer be made public. The public will not have the benefit of knowing the thinking of the three of us and the agency, in terms of rulemaking proposal that then goes to OIRA. There are transparency concerns. I think they are resolvable if we acknowledge them. Senator Markey. Nuclear safety is about to fall into a nuclear regulatory black hole---- Senator Lummis. The gentleman's time is expired. Senator Markey [continuing]. that is going to disguise and hide the safety concerns from the American people. Thank you. Senator Lummis. Well, unless someone else returns to testify, I am going to ask one last question of each of you, and I would like you to do two things. One is to share your perspectives about how it is going with regard to updating your environmental review requirements. My other question for each of you is, is there anything that you were not asked today that you would like the Senate to know? We will start with Chairman Wright. Mr. Wright. Thank you, Senator. We are actively working right now on a rulemaking to align Part 51 with the National Environmental Policy Act (NEPA) revisions that were in the Fiscal Responsibility Act (FRA). We do expect that these revisions will meet the intent of the ADVANCE Act and are going to facilitate a more efficient, timely, and predictable environmental review. It is happening, and hopefully it is going to happen sooner rather than later. I know that we are, I do not have a date certain on some of this, but I know it is right before us now. We are working that very hard. As far as what no one asked, I would be at a loss. One thing that I think that you all have talked about before at this committee is the potential for an ADVANCE Act 2.0 and what might be in an ADVANCE Act 2.0. Some of those things, obviously, the mandatory hearing has been talked about, the elimination of that. I think Senator Scott has a bill before the Senate that does that, I think. There are some other areas that were in 1.0 that dealt with microreactors that maybe could be expanded to cover the rest of the advanced reactor side. Obviously, those are a couple of things right now. That would be the only question that I wish that we had talked about a little bit. Senator Lummis. Thank you. Mr. Crowell? Mr. Crowell. Thank you, Senator. I appreciate you mentioning NEPA, because we had not got into that so far, and it is a very important topic. I also think it is the area where we stand to be able to make the most efficiency gains. There are lots of things we can do differently in the NEPA space in terms of how we do the whole process, if necessary. Leveraging categorical exclusions and ES's and things like that, it is just not what the agency has historically done. I think we will get a lot of efficiency gains through our improvements to NEPA. In terms of what I was not asked about today, there are a lot of topics. One of the important ones, and this goes right to my concerns about work force, is in addition to the hiring freeze, our inability to have graduate intern programs and fellowships and internship programs is a real problem, because that is our future work force. It would be helpful to have any constraints removed from our ability to build that next generation work force. The only way we are going to get them to come to the NRC is if we grow them out of the university. I do not think we can compete with private industry to take them out of the job market. Senator Lummis. Thank you. Mr. Marzano? Mr. Marzano. I agree with my colleagues. While I can not offer too many details on the process, given where we are with the OIRA process itself, I think we have made a lot of meaningful changes. The Chairman was absent during the time, but we reached an agreement to get the rulemaking that reflected the Fiscal Responsibility Act changes moving through the process. That is there. I will offer that one of the key things there is, there is no statutory requirement in the Atomic Energy Act or the Energy Reorganization Act to require an environmental impact statement for every reactor. That is something that I think could produce a lot of efficiency, and it has already been evidenced by some of the applicants that have come in, particularly Kairos, with their reactor. As far as what we have not gotten a chance to talk about, I think it is a little bit more of what we each kind of think about how we get to a decision where shovels are going in the ground faster. One of the things I have learned in this time is what can we learn from our partners in the international regulatory community. Canada has just recently approved the construction permit for a design for Ontario Power Generation. They used a little bit of a different method to get to a decision to begin construction. I think there is a lot of opportunity. I heard the question asked about ADVANCE Act Section 505. I think that that is where a lot of this type of efficiency, these kinds of creative solutions that we can get to a faster decision will play out. Senator Lummis. Well, please feel invited to approach the members of this committee on things that we can help you improve your processes. We do want use of nuclear, and of course, as we have all said, we want safe use. I sincerely thank the members of the commission for being here today, and for making yourselves available to the Senate. With no further questions, we all thank you kindly, every member of the committee. Senators who wish may submit written questions for the record that they will forward to you. The Senators will have until 5 p.m. on Wednesday, September 17th to do so. The witnesses' responses to those questions are due back to the committee no later than 5 p.m. on Wednesday, October 1st, and will be submitted for the record. With that, again, with our sincere thanks to the commission, this hearing is adjourned. [Whereupon, at 1:59 p.m., the hearing was adjourned.] [all]