Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- CONTRACTING AND THE INDUSTRIAL BASE [House Hearing, 114 Congress] [From the U.S. Government Publishing Office] . CONTRACTING AND THE INDUSTRIAL BASE ======================================================================= HEARING BEFORE THE COMMITTEE ON SMALL BUSINESS UNITED STATES HOUSE OF REPRESENTATIVES ONE HUNDRED FOURTEENTH CONGRESS FIRST SESSION __________ HEARING HELD FEBRUARY 12, 2015 __________ [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] Small Business Committee Document Number 114-001 Available via the GPO Website: www.fdsys.gov ____________ U.S. GOVERNMENT PUBLISHING OFFICE 93-326 WASHINGTON : 2015 ________________________________________________________________________________________ For sale by the Superintendent of Documents, U.S. Government Publishing Office, http://bookstore.gpo.gov. For more information, contact the GPO Customer Contact Center, U.S. Government Publishing Office. Phone 202-512-1800, or 866-512-1800 (toll-free). E-mail, [email protected]. HOUSE COMMITTEE ON SMALL BUSINESS STEVE CHABOT, Ohio, Chairman STEVE KING, Iowa BLAINE LUETKEMEYER, Missouri RICHARD HANNA, New York TIM HUELSKAMP, Kansas TOM RICE, South Carolina CHRIS GIBSON, New York DAVE BRAT, Virginia AUMUA AMATA COLEMAN RADEWAGEN, American Samoa STEVE KNIGHT, California CARLOS CURBELO, Florida MIKE BOST, Illinois CRESENT HARDY, Nevada NYDIA VELAAZQUEZ, New York, Ranking Member YVETTE CLARKE, New York JUDY CHU, California JANICE HAHN, California DONALD PAYNE, JR., New Jersey GRACE MENG, New York BRENDA LAWRENCE, Michigan ALMA ADAMS, North Carolina SETH MOULTON, Massachusetts Kevin Fitzpatrick, Staff Director Stephen Dennis, Deputy Staff Director for Policy Jan Oliver, Deputy Staff Director for Operation Barry Pineles, Chief Counsel Michael Day, Minority Staff Director C O N T E N T S OPENING STATEMENTS Page Hon. Steve Chabot................................................ 1 Hon. Nydia Velaazquez............................................ 2 WITNESSES Mr. Randall D. (Randy) Gibson, President, Whitesell-Green, Inc., Pensacola, FL, testifying on behalf of the Associated General Contractors of America......................................... 3 Mr. James P. Hoffman, PE, President, Summer Consultants Inc., McLean, VA, testifying on behalf of the American Council of Engineering Companies.......................................... 5 Mr. John McNerney, General Counsel, Mechanical Contractors Association of America, Rockville, MD.......................... 6 Mr. Andrew Hunter, Director, Defense-Idustrial Group and Senior Fellow, Center for Strategic and International Studies, Washington, DC................................................. 8 APPENDIX Prepared Statements: Mr. Randall D. (Randy) Gibson, President, Whitesell-Green, Inc., Pensacola, FL, testifying on behalf of the Associated General Contractors of America............................. 22 Mr. James P. Hoffman, PE, President, Summer Consultants Inc., McLean, VA, testifying on behalf of the American Council of Engineering Companies...................................... 42 Mr. John McNerney, General Counsel, Mechanical Contractors Association of America, Rockville, MD...................... 50 Mr. Andrew Hunter, Director, Defense-Industrial Group and Senior Fellow, Center for Strategic and International Studies, Washington, DC.................................... 60 Questions for the Record: None. Answers for the Record: None. Additional Material for the Record: The Design-Build Institute of America (DBIA)................. 69 The National Association of Surety Bond Producers (NASBP) and The Surety & Fidelity Association of America (SFAA)........ 74 CONTRACTING AND THE INDUSTRIAL BASE ---------- THURSDAY, FEBRUARY 12, 2015 House of Representatives, Committee on Small Business, Washington, DC. The Committee met, pursuant to call, at 10:30 a.m., in Room 2360, Rayburn House Office Building. Hon. Steve Chabot [chairman of the Committee] presiding. Present: Representatives Chabot, Gibson, Radewagen, Velaazquez, Chu, Hahn, Meng, Adams and Lawrence. Chairman CHABOT. Good morning. While I am beginning my 19th year as a member of the Small Business Committee, this is my first hearing as chairman. In that capacity, I look forward to working with my friend and colleague, the ranking member, Ms. Velaazquez, and all of my colleagues on both sides of the aisle in an effort to improve the plight of American small businesses. I am particularly pleased to see that we will begin that endeavor today by discussing a subject that has much promise for small businesses and taxpayers alike, federal contracting reform. As you know, the government has a goal of awarding at least 23 percent of federal prime contract dollars to small businesses, and in Fiscal Year 2013, we met that goal for the first time in many years. Early indications are that we met the goal again last year. However, it is not enough to simply meet the goal; we have to focus on why Congress created those goals in the first place. The goals exist as a tool. They are intended to make sure we have a broad spectrum of small businesses working with the government across industries. Having a healthy small business industrial base means the taxpayers benefit from increased competition, innovation, and job creation. It also means that we can securely support programs crucial to our national defense. The percentage of dollars awarded to small businesses is a good measure of success, but it is not the only measure. Indeed, it appears that over the last four years, while the percentage of dollars being awarded to small businesses was increasing, the number of contract actions with small businesses fell by almost 60 percent. At the Department of Defense, the number fell by almost 70 percent. The size of the average individual small business contract action increased by 230 percent during that same period, and by nearly 290 percent at DoD. These statistics are all alarming in their own way, but one of the more clear cut and disturbing figures is that there are over 100,000 fewer small businesses registered to do business with the Federal Government than there were in 2012. These data points suggest we have a problem with our small business industrial base. Today's witnesses are going to address specific recommendations to improve the competitive viability of our small business contractors. This is only the first of a series of Full Committee and Subcommittee hearings we will be having on this topic. As chairman, I expect that the Committee will actively pursue ways to increase opportunities for small businesses to access capital and contracts, while removing barriers to small business success. And I am quite confident that our Subcommittee chair, Mr. Hanna, and his Subcommittee on Contracting and Workforce, will be thoroughly exploring this issue in the very near future. And I look forward to working with each of you and want to welcome our witnesses here this morning. I now would yield to the ranking member for the purpose of making an opening statement. Ms. VELAAZQUEZ. Thank you, Mr. Chairman. For several decades now, the federal government has looked to the private sector to provide services and supplies for its day-to-day operations. As such, a vibrant industrial base has become essential to the U.S. economy and our national security. It comes as no surprise to those in this room that small businesses are at the heart of the supply chain. With a strong presence in a variety of different industries, from construction to manufacturing, small businesses continue to play a vital role in providing our government with goods and services. In order for this sector to continue its resurgence, we need to ensure that small businesses are able to compete both globally and here in America. Here at home this means ensuring that small firms can gain access to the nearly $500 billion federal procurement marketplace. Numerous policies and protections have been put in place to ensure their continued participation in this arena. This includes goals, set-aside programs, and the assignment of federal personnel to work on behalf of small contractors. Many of these initiatives have evolved over the years to reflect the changing needs of small firms. In many regards, these efforts have paid off as small businesses last year won nearly $100 billion in awards. However, it appears that we have stalled, and in many ways the goal is becoming a ceiling rather than a floor. And with regard to set-aside programs, we continue to see over and over again non-small businesses gaining access to small business awards, whether it is HUBZone, service disabled veterans, or 8A awards, we need stronger protections to keep bad actors out of the federal marketplace or trying to gain access to federal contracts that were designed for small businesses in the first place. Another trend is occurring that may also impact small contractors. Data shows that the average contract size is increasing. On first take, this appears to be promising as larger contracts might be more profitable for small companies. However, it might suggest that more contracts are being consolidated, resulting in fewer opportunities for small businesses. I am particularly interested in the witnesses' perspective on this during today's hearing. What is important for this committee to keep in mind is that these developments are part of a bigger picture, which is that the federal procurement marketplace is always evolving. Whether it is sequestration, reductions in federal procurement staff, or the rise of multiple award contracts, there will always be new issues for small businesses to overcome. And against this backdrop, we must ensure small businesses are not left behind and that procurement laws evolve with this changing landscape. During today's hearing, I look forward to learning about the challenges facing small contractors and possible solutions. Doing so is not only essential for small firms and our nation's industrial base, but the economy overall. Small firms bring new ideas to the table which in turn generate new jobs and even new industries. Taken together, this is a key part of what has made the U.S. the leader in today's economy. I thank all the witnesses for being here today, and I yield back the balance of my time. Thank you, Mr. Chairman. Chairman CHABOT. Thank you. The gentlelady yields back. And if Committee members have opening statements prepared, I would ask that they submit them for the record. And I would like to take just a moment to explain the time rules that we operate under here, which is the same that the other Committees do. It is the five-minute rule. You will have five minutes to testify. We will have five minutes, each of us, to ask questions. We even have a lighting system set up for that. The green light will come up. You can talk for four minutes. The yellow light comes on to let you know you have one minute to wrap up. When the red light comes on, we would ask that you try to terminate your testimony as close to that as possible. So we give you a little leeway, but not much. I appreciate your cooperation. And I will now introduce our first witness, who is Randall Gibson--or Randy Gibson, our son's name; not Gibson, but Randy--who is president of Whitesell-Green, Inc., a general contractor in Pensacola, Florida. He is also the chairman of the Associated General Contractors (AGC), Naval Facilities Engineering Command Committee, and a member of the United States Army Corps of Engineers Committee. He is testifying today on behalf of AGC. We thank you for being here, and you are recognized for five minutes. STATEMENTS OF RANDALL D. GIBSON, PRESIDENT, WHITESELL-GREEN, INC.; JAMES P. HOFFMAN, PRESIDENT, SUMMER CONSULTANTS,, INC.; JOHN MCNERNEY, GENERAL COUNSEL, MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA; ANDREW HUNTER, DIRECTOR, DEFENSE- INDUSTRIAL GROUP AND SENIOR FELLOW CENTER FOR STRATEGIC AND INTERMNATIONAL STUDIES STATEMENT OF RANDALL D. GIBSON Mr. GIBSON. Chairman Chabot, Ranking Member Velaazquez, and members of the Committee, thank you for inviting the Associated General Contractors of America to testify on reforms to the Federal Government's contracting laws important to our industry. My name is Randy Gibson. I am president of Whitesell-Green, Incorporated, a small business based in Pensacola, Florida, providing general contracting and design-build service to Department of Defense and other federal agency clients throughout the Southeastern region of the United States. Since our founding in 1970, my company has constructed over 400 heavy commercial projects, resulting in nearly one billion dollars in completed contracts. While my written testimony covers all the topics for today's hearing, I will use the time allotted today to address the need for Congress to (1) prohibit all federal agencies from procuring construction services through reverse auctions; and (2) encourage sensitive consideration of past performance records in joint venture and teaming context. AGC strongly supports full and open competition for construction contracts; however, reverse auctions for constructions services have the effect of turning away qualified and experienced contractors, especially small business firms like mine, for a host of reasons. Procurement of construction services is different than for manufactured goods like pens and paper. Construction services are complex, most often requiring the participation of numerous trade subcontractors and vendors in lower-tier arrangements with the general contractor. They are project-specific and inherently variable. And they require a large degree of professional expertise. In a reverse auction, nonprice factors of consequence to the owner, such as quality of relationship, past performance, scheduling, long-term maintenance, and unique needs are deemphasized by the process. In a reverse auction, a bidder has no incentive to offer its best price. Winning bids may simply be an established increment below the second lowest bid, not the lowest responsible and responsive price. In a reverse auction, discipline is difficult to maintain. General contractors can underbid the contract simply to win the award, putting the government at significant risk to receive lower quality construction and even contractor default. This also exposes subcontractors to risk for nonpayment. It is my belief that AGC's position on reverse auctions is shared by other important stakeholders to the procurement process. The U.S. Army Corps of Engineers, the White House Office of Federal Procurement Policy, and even the largest reverse auction vendor to the Federal Government, FedBid, have all publicly stated that reverse auctions for construction are not appropriate. Yet, agencies like the Department of Veterans Affairs, the Department of the Interior, and the General Services Administration continue to conduct them. Considering this inconsistency, AGC urges members of this Committee and Congress to enact a law that prohibits reverse auction procurement for construction services government-wide. Turning to the joint venture and teaming issue, AGC and its members are increasingly finding that federal agencies will disqualify small businesses from competition when they seek to partner with another business for the first time. In an environment where agencies are bundling contracts worth upwards of $100 million, and specifically setting them aside for small business, it is often beyond the capacity of a small business alone to bond and perform such large-dollar projects. Consequently, small businesses, like my firm, often seek to partner with other small or nonsmall businesses to win such awards. Some federal agencies are not allowing small businesses and their partners to submit the relevant past experience of each individual company to prove qualification for the contract. Rather, agencies demand that the small business and partner submit only past experience that they have performed together, or otherwise be disqualified from consideration. This limitation often prevents the governments from receiving the benefit of project-specific experiences and resources which the first-time collaboration of these teams may offer. AGC strongly supports a sensible legislative solution to ensure that federal agencies reasonably consider the individual past performances of construction contractors seeking to joint venture or team, even if they are teaming for the first time. Thank you again for the opportunity to testify. I look forward to answering your questions to the best of my abilities. Chairman CHABOT. Thank you very much. And thank you for staying within the time constraints. Our next witness is James Hoffman, who is president of Summer Consultants, Inc., in McLean, Virginia. Prior to starting with Summer over 22 years ago, Mr. Hoffman served as a platoon leader and company executive officer in the 317th Engineer Battalion in the United States Army. He is testifying on behalf of the American Council of Engineering Companies. We thank you for being here today. We thank you for your service, and you are recognized for five minutes. STATEMENT OF JAMES P. HOFFMAN Mr. HOFFMAN. Chairman Chabot, Ranking Member Velaazquez, and members of the Committee, I appreciate the opportunity to testify before you today about the issues surrounding contracting and the industrial base. My name is James Hoffman, and I am the president of Summer Consultants, a consulting mechanical, electrical, and plumbing engineering firm located in McLean, Virginia. Summer Consultants is a small business with 30 employees. Our practice focuses on the federal market for the past 50 years. My firm is an active member of the American Council of Engineering Companies, the voice of America's engineering community. ACEC oversees over 5,000 member firms, represents hundreds of thousands of engineers and other specialists throughout the country, are engaging a wide range of engineering works that propel the nation's economy, and enhance and safeguard America's quality of life. Almost 85 percent of these firms are small businesses. Design build is a type of construction where engineers team with industry professionals. There are two forms of design build--two-step and one-step. Two-step requires the team submit qualification packages to the contracting officer in the first round. The contracting officer reviews them and notifies the teams if they are selected for the second round. At this point, the design build team develops expensive and detailed plans for the contractor to bid, generally without any reimbursement. Industry best practice has three to five finalists in the second round. In the recent years, there have been more than 10 finalists at some competitions as current law allows the contracting officer to increase the number of finalists without limitation. This causes problems for both the industry and for the government. My firm's marketing risk is inversely correlated to the number of finalists, and the contracting officer must review all the proposals and give feedback to each team member that does not win the project, which is time- consuming. This issue has driven many, including small businesses, out of the federal market. One-step design build creates an even more precarious environment. One-step allows the owner to solicit complete proposals from the construction market without a qualifications review. This forces out small businesses as they cannot spend dollars on projects where there are too many competitors, many of which may not have the qualifications for the project. It is an inefficient process for the Federal Government as it asks the contracting officer to review multitudes of proposals. This Committee has been a strong supporter of this issue, and we ask the Committee to continue to improve the design build market by supporting the reintroduction of H.R. 2750. The second issue, the Court of Federal Claims ruling on the nonmanufacturer rule, poses a challenge for the construction industry, as it is a service industry that typically did not have to address this rule in the past. The rule exists to ensure that a contract for goods is restricted to small businesses, rather than act as a pass-through for large entities. The course interpretation would require that any firm who is a prime contractor be responsible for their subcontractors' use of small business products, and potentially, the many different tiers of subcontractors as is undefined at this time. The burden on this rule is staggering as I, as a business owner, would have to take the most conservative view to make sure that I am complying with the law. We have concerns that due to the unknown nature of this rule, that we can be penalized by an overbroad court ruling. ACEC asks the Committee to work with SBA on language to make sure that construction services and products continue to be excluded from the rule. I urge Congress to reintroduce H.R. 2750 and enact it into law. I also encourage Congress to work with the SBA to limit the scope of the nonmanufacturing rule on service industries. These bills can help my firm and other engineering firms to serve our clients' needs and thrive. Thank you for the opportunity to participate in today's hearing, and I would be happy to respond to any questions from the Committee members. Chairman CHABOT. Thank you very much for your testimony. I would now like to introduce our next witness, John McNerney, who is general counsel of the Mechanical Contractors Association of America, the MCAA. The MCAA represents about 2,500 firms involved in heating, air conditioning, refrigeration, plumbing, piping, and mechanical service. We thank you for your testimony here that you will be giving this morning, and you are recognized for five minutes. STATEMENT OF JOHN MCNERNEY Mr. MCNERNEY. Thank you, Mr. Chabot. Good morning, Ms. Velaazquez. On behalf of the 2,500 members of MCAA, thank you very much for the opportunity to be here. I am general counsel, and I have been involved in the work of this Committee for several years now, as have our members. We testified here several times on the old 3 percent withholding tax on Federal Government contracts, and we commend your work on that. You were persistent, and we hope it does not come back again. That was a big threat to cash flow and prompt payment for all our members. We also would commend you for your recent activity having a naming rule for small businesses in prime contract, small business contracting plans, and allowing those firms some assurance that they will be selected or have recourse to the contracting officer if they are not. Having said that, we also admire your persistence on the reverse auction rule. The Federal Government lags the private sector in recognizing just how bad that practice is. So we hope this time we can pursue that until we get it where it should be. The Corps of Engineers Pilot Study on Reverse Auction came in more than 10 years ago. They studied nine projects, and they came out with a conclusion in about a 95-page report that said it was totally unacceptable for low bid awards. But since then it has been fitful by getting this Congress to do something about it. Our statement on it is attached to my written statement. In summary, it says simply this. There is a strong discipline in the sealed bid, low bid process that protects the project owner's best interest in well-considered judgments by its bidders, and all that discipline is lost in the publicly disclosed price auction with hasty and frenzied judgments imperiling careful offers and awards. You know, back in 2004, when this started, a lot of private sector industries took this up. Most of them have given up the project, and those who have not have been fired by customers, fired by the contractors as their customers. And we think that the persistence of some government agencies to do this is impairing competition. So in all, I think there are three problems with the reverse auction. Number one, it shows that some bad ideas, like the 3 percent withholding tax, for example, have a habit of recurring. Projects that are mischaracterized as commodity purchases then are subject to the lack of discipline of the sealed low bid, and when construction projects are misclassified as commodity purchases, the government and the contractor are deprived of protections and benefits of the many standards for construction contract clauses that serve to allocate risk fairly. The unforeseen conditions cause, the equitable change clause, the prompt payment clause, and some of the warranty clauses, too. So in summary on that point, we commend the Committee for pursuing this and trying to finally implement the Corps' categorical assessment that this is a bad practice. Nothing has changed since then that would mitigate that conclusion, so we look forward to your reintroduction of that bill. We would also suggest when you do that, that you consider expanding it Part 15, Negotiated Procurement. And Part 14, Sealed Bid, is where we are looking at it now, but we understand that many agencies are going to a species of negotiated procurement, low priced technically acceptable where once the team is evaluated it becomes a low bid process. So we need to legislate those kind of controls into that process. Our members are having anecdotal evidence that there are selection abuses in LPT awards as well. On the individual surety reform, we are fully in support of the industry consensus. There is no harm and only benefit to closing the individual surety loophole where there can be elusory assets and fraud and bad practice there. Your reform preserves the possibility of individual surety but protects against the abuses, so we think that can only increase competitiveness in that market. And on the nonmanufacturing rule, I talked to my members and they said they cannot buy a tiller from a small business company or an air handling unit or mechanical equipment. It is entirely inapt for our industry. So with that, sir, I will stop and look forward to your questions. Chairman CHABOT. Thank you very much. I appreciate your testimony. I would like to yield to the ranking member. Ms. VELAAZQUEZ. I guess that you started out on the wrong track today. Mr. Chairman, it is my pleasure to introduce Mr. Andrew Hunter. Mr. Hunter is the director of the Defense-Industrial Initiatives Group and a senior fellow for the International Security Program at the Center for Strategic and International Studies here in Washington, D.C. He focuses on issues affecting the industrial base, including sequestration, acquisition policy, and industrial policy. Prior to joining CSIS, Mr. Hunter served as a senior executive at the Department of Defense, including as chief of staff to Ashton B. Carter and Frank Kendall, while each was serving as under-secretary of defense for Acquisition, Technology, and Logistics. Welcome, Mr. Hunter. STATEMENT OF ANDREW HUNTER Mr. HUNTER. Well, thank you, Chairman Chabot, and Ranking Member Velaazquez. Thank you for the opportunity to testify to you today about contracting and the industrial base. I am Andrew Hunter from CSIS, and as mentioned, prior to being at CSIS, I worked at the Department of Defense under two undersecretaries of defense for Acquisition. And prior to that, I spent 17 years working in various capacities in the House of Representatives. So this is a little bit of a homecoming, and a happy one. A major focus of my work at CSIS involves understanding the evolving partnership between the Federal Government and the industrial base. This partnership is critical to the successful execution of the more than $400 billion in federal contracting that occurs annually. I have a particular focus on how this partnership is evolving between industry and the Department of Defense; however, CSIS performs in-depth analysis on data from all federal agencies, and I will try to keep that hat on today. The industrial base is important because without it the Federal Government cannot function. The health of the industrial base, therefore, is of critical importance to the nation as a whole. While federal contracting is only a small portion of the overall economy, it is nonetheless very important to certain sectors of the economy and the industrial base, especially those that focus on government-intensive areas, such as defense, transportation, and healthcare, not least of great importance to many small businesses. Contract obligations represent the overwhelming majority of the federal spending that is received by industry, and examining the contracting data is essential to understanding what is happening in the industrial base. I will briefly summarize some of the chief findings of the analysis that CSIS has done on this data and try to provide some context for the discussion today and hopefully for the Committee's work in this Congress. Our first central finding is that sequestration is currently the dominant force in federal contracting. With repercussions that have been particularly severe in defense contracting, but also across the board. We are in the midst of a significant reduction in federal contract obligations that are affecting every sector of the contracting world in the industrial base. Within that overarching story, secondly, there is an important dynamic going on specific to research and development. Federal contracting for research and development performed by industry is particularly challenged under sequestration, potentially impacting the historical role that small businesses have played in technology innovation that Ranking Member Velaazquez referred to in her opening statement. A great deal of the cutting-edge innovation has its source in small business. They are frequently incentivized to pursue innovative technologies that larger businesses do not have the same incentive to pursue. And that has been important to the nation over many years. R&D contract obligations are declining much more rapidly than overall contract obligations, and we have not reached the bottom yet, even though we are likely approaching the bottom for contract obligations overall. Third, small business contracting is highly sensitive to changes in the overall federal contracting environment. Small businesses are likely to be significantly affected therefore by return to sequestration levels, spending levels in 2016. Contract obligations with small businesses plunged in the first year of sequestration, 2013, then happily, but somewhat unexpectedly, recovered very well in 2014. I believe the reality for small business in truth is somewhere between the crisis picture that the 2013 data presents and the relatively healthy picture that the 2014 data presents. But I suspect that a return to full sequestration would send us, again, in a sharply downward directly. And then lastly, the composition of small businesses participating in federal contracting has been significantly reshaped since 2000, which is when a lot of the federal data started to become widely publicly available contracting data. And much of this has been the result of policies established in the Small Business Act. And I mention this to point out that the future direction chosen by this Committee will shape the future of small business contracting over the next 10 to 15 years, so it is very important. The work of this Committee is very important. And lastly, I just want to emphasize that the continuing, in some cases increasing complexity of the federal contracting process referenced by many of my colleagues here, remains the most significant barrier to entry for firms of all sizes in the industrial base, particularly small business. And small businesses are challenged to absorb the overhead required to successfully navigate through this vast complexity. And I would say when you are making these decisions, I would suggest that you tend to err as much as possible on the side of reducing complexity in all of these approaches. So thank you, and I stand ready to address your questions. Chairman CHABOT. Thank you, Mr. Hunter. We thank all the panel members for their excellent testimony here this morning. And I will begin with myself with five minutes of questioning. How can we get more small business construction companies to compete for federal work as either prime contractors of subcontractors? And Mr. Gibson, if you do not mind, I will start with you. And anybody else that would like to weigh in is welcome to do so. Mr. GIBSON. Taking from my own experience, sir, as a small business, I would say the way to invite more firms to get interested and involved in federal contracting would be to hopefully take some of the regulations away that sometimes deter firms from entering the marketplace. And also to enhance the teaming and partnering ideas that we have been talking about in my testimony today. Lots of times a firm needs a mentor or somebody who has been in the federal construction process. Allowing them to team, show their own qualifications, share the qualifications of their partner, get involved, learn the ropes, that would be an opportunity for them to ease their way into the marketplace. Chairman CHABOT. Thank you very much. Mr. Hoffman, did you want to weigh in on that? Mr. McNerney? Mr. MCNERNEY. My members would agree with that ability to partner and team more. My very small members, of which I have many, do that and they would like to do more of it. And the idea that all the team members would be evaluated is a good idea. Any more discerning selection criteria is highly favored by my members because they prosper when the selection criteria is high. Chairman CHABOT. Okay. Thank you. Mr. Hunter, did you want to weigh in? Mr. HUNTER. I would just say I think this gets a little bit to the design build discussion that happened earlier; that the more you can make it easier for companies to get in the front door and participate, the better. I think having more companies engaged in the front end of the process is a good thing, and it is true that the bid and proposal costs can be one of the major barriers to entry. I think the trick a little bit in that is for the government having to evaluate based on a list of qualifications makes it a little bit hard on the contracting officer to withstand bid protests. And bid protests are something that we are seeing has a very pervasive influence throughout the contracting process. It is driving many more of the decisions that get made than I think it was ever really intended to be driving. And so I think sort of that larger story is playing out in the design bid and the construction context. Chairman CHABOT. Okay. Thank you. Let us see, Mr. Hoffman, I think I will start off with you on this one. Some would argue that by only having five teams submit full bids on a design build project we are limiting competition. Could you explain why the two-step process is actually pro-competition? Arguably pro-competition? Mr. HOFFMAN. Yes, sir. First of all, the first phase of competition is open to everyone. So everyone is able to participate. And then with respect to the second step, what we are going to find is that the most experienced architect, engineers, and construction contractors are going to step out if there are more than five construction contractors. So we are going to have less qualified people participating in federal projects because the opportunity to win that project with significant investments is dramatically diminished once you go beyond the three to five recommended in industry practices. Chairman CHABOT. Thank you. And then I will have each of you just address this very briefly, if you would. If you could just tell us legislatively what you would like to see us do; if there were one or two things that we could do that would really make a difference? Maybe I will start with Mr. Hunter this time and go in the opposite direction. Mr. Hunter, if you want to suggest one or two things. Mr. HUNTER. Yeah. I am going to make a suggestion that may be slightly hard to implement. But as I mentioned, I think trying, wherever you can, to reduce complexity in the system is the way to go. Chairman CHABOT. I would go with Mr. Gibson's reducing the regulations basically. Mr. HUNTER. Yes. And of course, you have to be careful. Many of these regulations have a history. They exist for a reason, but I think there are frequently less complex ways to implement the statute and regulations and to get the same job done. Chairman CHABOT. Okay. Mr. McNerney? Mr. MCNERNEY. Mr. Hunter's comment about the roadblocks and the complications from bid protests is a good one. And I do not know how you would legislate that, but our members prefer a more robust evaluation, a past performance evaluation on completed contracts, more robust than exists now. If you had that and more widespread use of the federal awarded past performance information system, I think would help bolster selection criteria, exclusions, if you will. Again, I think that our members on the main would like to see the selection process be more discerning, and I think that would increase competition. Some of my members say they will not compete in the federal market because of not so careful selection procedures. Chairman CHABOT. In order to enforce my five-minute rules against myself, I am going to cut it off at that point. And I will either talk with you briefly or in a second round or we will get back to it. But I now recognize the ranking member for five minutes. Ms. VELAAZQUEZ. Thank you. Mr. Hunter, in evaluating the awards to small businesses over the last few years, there seems to be a trend in which the dollar value of small business contracts has increased. What effect does this concentrated dollar value have on the small businesses' industrial base? Mr. HUNTER. It is a very interesting point. As someone who spends a lot of time analyzing contract data, it would be great if we could dig deeper into that and understand. Is it because the locus of where the awards are happening within the space of federal contracting? In other words, is it because it is more construction happening and less in the world of supplies? Because that can affect contract size. Construction projects are going to be bigger than most commodity purchases. But having not carefully analyzed it at this point, my suspicion is that it is not that; that it is, in fact, that the average awards are growing bigger across the board, because our data shows that small businesses are generally succeeding in the areas where they have always succeeded in the contracting process. And I do not know if that is being driven by the way the government is putting out solicitations and proposals. That would generally probably be the first place to look. Ms. VELAAZQUEZ. Do you think that bundling has a lot to do with that? Mr. HUNTER. It certainly could. It could also be that some of the smaller purchases which may have historically been done with small businesses, if they are now being done with a purchase card at Walmart, you know, that may be driving some of that. Smaller business and directions away from small businesses. And I think if it is an issue of interest, having someone take a deeper look at that, those trends, would be good. Ms. VELAAZQUEZ. Thank you. Thank you. Mr. McNerney, during its pilot program of reverse auction, the Corps found that the process might move too quickly for competitors to actually reassess their costs or the way they will actually do the work. There have even been reports in which the buyer had to step in to prevent a supplier from meeting a price that would harm the company. Do you believe that contractors are actually able to perform the contract at the price they beat or are some of them putting the viability of their company at risk? Mr. MCNERNEY. All of that, Ms. Velaazquez. I read the report on the subway down here and the Corps of Engineers says all of that very empathically. And I talked to some of my members yesterday who were involved in--the pharmaceutical industry was a big adopter of this back in 2002-2003. I will not name the company, but I asked him, I said, `` Did you continue to bid that work as either prime or sub?'' And he said, `` No, I fired that customer.'' Because when the hasty judgments--the first Corps of Engineer Pilot Study ended up in a bid protest because the prime contractor who won said he did not mean to push the button the last time, ironically. So that tells you, what is that, an error in judgment or a clerical error? Ms. VELAAZQUEZ. Do you believe then that some of the same concerns that we see in construction reverse auctions will exist in other industries? Mr. MCNERNEY. I think it is very likely. You know, the Corps of Engineers report said that for commodities it can be done well and it can help you find the lowest price. But the hearing you held last year with the VA did not prove that out. Ms. VELAAZQUEZ. Right. Okay, thank you. Mr. Hunter, the contribution of small businesses to R&D has long been recognized as critical to our economy and national security as these firms have developed some of the most innovative technology. You noted in some areas of your testimony the decline in R&D contracting at the Department of Defense, indicating that this is a worrisome trend that is incompatible with achieving national objectives. Can you explain this statement and what this trend means for the industrial base? Mr. HUNTER. Yes. What we found is that the magnitude of the reduction in contract obligations for R&D is much greater than what you see overall. I think that is a result of the fact that for many--for the Department of Defense for certain, and for many federal agencies, there is a lot of rigidities within their budget that make it very hard to cut in other areas. And obviously, in the case of the Department of Defense, there is a strong desire to avoid cuts to things like military compensation. And so then the cuts have to be taken elsewhere. And R&D is inherently something that can be rescheduled and retasked fairly quickly because you are inventing things and you cannot invent on a schedule. The contracts are all designed to reflect, to be rewritable or adjustable as work proceeds. And that is good in a R&D context, but it also means it is very easy to, when the budget cut comes, to take money out of that contract. Ms. VELAAZQUEZ. But let me ask you a last point. Given the fact that when it comes to R&D spending, the agency has so much flexibility. How can we reverse that trend? Mr. HUNTER. I think it is making it clear that this remains a priority. And I mentioned in my testimony that the goals and objectives that have been set in statute have actually reshaped the way that contracting is being performed. And so I think continuing to emphasize the importance of research and development and innovation is a key thing. Ms. VELAAZQUEZ. Thank you. Chairman CHABOT. The gentlelady's time has expired. The gentleman from New York, Mr. Hanna, is recognized for five minutes. Mr. HANNA. Thank you, Chairman. Boy, there is a lot to talk about. The 3 percent rule is gone. Relax. I cannot imagine it coming back. In the last Congress, we worked on some of the subjects you mentioned, Mr. Gibson, in particular, reverse auctioning is, I mean, you all stated it one way or another, but it is a race to the bottom. I think we worked with the Department of Defense. I think with the chairman's permission, we can--I would like to continue on that path because I could not agree with you more. When all you have to do is click a button to be lower than the guy a moment before you, it does add, as you said, a degree of irrationality, and everyone wants to work. So everyone always thinks they can do a little bit better than they thought. So I get that. And in terms of the overall conversation though about bidding in general, one of the problems with the whole process is, and one of the reasons for bid protests is the very subjective nature of everything you do, which feeds back to the conversation over reverse auctioning and why it is such a bad thing. But how do you protect the interest of the public and at the same time limit the number of bidders? How do you take out those elements that cause people to protest bid? Because it is easy to do and it is easy to find a reason to do that. I personally was in that business for many years, so I have seen a lot of that. I guess it is hard to have everything. Like, with Mr. Hunter, how do you have a vibrant industrial base, have sequester, and have an efficient R&D, an effective R&D, and still have the right to cut back on the cost of doing business? I mean, you cannot just fund an industrial base because you always want them to be there. You cannot just pay people to manufacture things because someday you may need them, although you could argue that you might. I wonder how you balance all that. Mr. Hoffman, maybe you would like to say something about it. And anyone else. Mr. HOFFMAN. With respect to competition, the issue for us would be the design build piece. So everyone has the opportunity through sources--and small businesses can participate in that and it can be set aside. Irregardless of whether it is small business or it is unrestricted, small businesses can participate as part of larger teams, and everyone would benefit and the standard to follow the best practices of three to five bidders so that we can go ahead and make sure the best qualified teams are pursuing things. Mr. HANNA. So really what you are saying is you need a better way to qualify bidders, limit the number of bidders, and frankly, let the government have a more thoughtful and deliberate process for deciding not just how many, but how and what. I am interested though, Mr. Hunter, what do you think of-- how do you maintain all that? Mr. HUNTER. Well, I would say, you know, I think this issue of how does the government basically arbitrate amongst proposals, and if it is a list of qualifications, it may be a case that everyone has great qualifications and it is very difficult to discern the difference. Or it may be the case that it defaults to whoever has the longest history of past performance, which again, is not going to necessarily get new entrants into the process. I know the Department of Defense and in the R&D context, a lot of times they use an approach that is referred to as a `` white paper.'' And so you are asking folks to give you at a relatively low cost, something that is fairly short, but some description of what the approach that they would take to the problem would be. And that at least can provide a middle ground. I am not sure how well it works in the construction contracts because how far can you go into talking about a construction project before you are into some significant expense? In other contexts that can provide I think a way for the government to distinguish and to kind of call out the best folks to do the more expensive proposal. And I would say on your question about innovation, I think prototyping can be something that is a good middle ground, if you will, that allows for you to do work on innovative technologies without going to the expense of, again, designing an entire system that the government probably does not have the funding to actually purchase. Mr. HANNA. Thank you. Chairman CHABOT. The gentleman's time has expired. The gentlelady from California, Ms. Chu, is recognized for five minutes. Ms. CHU. Well, this question is for anybody on the panel, and it has to do with reverse auctions. You have all been pretty vociferous in being against reverse actions for the construction industry, and you have said that it does not guarantee the lowest price, may encourage imprudent bidding, does not allow for a thorough evaluation of value, and does not ensure that the successful bidder is responsive and responsible and may, in fact, go against federal procurement laws. And in fact, the Army Corps of Engineers study found that it did not even offer marginal savings over a sealed bid process. I find that very interesting because the reason for reverse auctions in the first place was to get to the lowest price. So I would like your comments on any of these factors that have come out because of the reverse auctions. Mr. GIBSON. Yes, ma'am. As a construction contractor, I can tell you that you might have what you think is the lowest price at time of award but it is the price you pay at the outcome that determines the real price of the job. If you have losses, if you have under proposals in there, they are going to come to life during the performance of that contract, and they are going to cause the government buyer a lot of problems. So I think it is putting up a smokescreen as to what real cost is when you invite that type of imprudent bidding. And I will give you one example. As a construction contractor, most typical jobs I bid involve about 30 to 50 crafts, other companies coming to me to offer their services, 5 to 10 offers in each craft. There are several hundred people offering prices on bid day. Sixty percent of those prices come in within the last two hours prior to the bid deadline. So in the reverse auction process, how does the contractor have the opportunity to go back to those people and say, `` Can you do better?'' He is making a guess, and those guesses end up costing the government in the long run. Mr. HOFFMAN. I might add that with respect to engineering services, reverse auctions, they do not look at lifecycle cost analyses and total cost of ownership. So the lowest cost is not necessarily the best cost. So if we look at construction in facilities, that cost is a small fraction of the total ownership costs once you go ahead and look at ongoing operation and maintenance. And I would urge the Committee to consider that, and I think you can only focus on first cost reverse auctions. I have no idea how you are able to understand what the total cost is of ownership when you do that. Mr. MCNERNEY. I would just emphasize what Mr. Gibson said. Reverse auction is the antitheses of a best value selection process, which I think is also the answer to Mr. Hanna's question. You know, the government has gone to design build best value to get away from the problems that existed in contract claims and dispute and defense of contract administration back when all projects were low bid, before 1994 Competition and Contracting Act. So I think Mr. Hanna, the answer to your question is, too, you have got to, you know, you have got to allow the CO to have governed discretion. He has the contracting warrant. He has to make discretionary judgments, and the bid protest agencies have to back him up. Ms. CHU. If I may change topics, Mr. Gibson, the SBA has two surety bond guarantee programs that guarantee 70 to 90 percent of the bonds up to $6.5 million in value to assist small businesses. However, many construction companies are not using the program and the individual sureties have filled the void. Why do you believe construction companies are not utilizing the program, and what are the steps that could make this program more attractive? Like, for instance, if they were guaranteed by 100 percent or if the total guaranteed value is increased from $6.5 million? Mr. GIBSON. Ma'am, I have to tell you that I am not a surety expert. I have had the relationship with my same surety for 40 years, one surety. So I know very little about their operations. I trust the solid company that I have been working with for 40 years, and I would prefer to defer to somebody else on the panel that might be able to talk about those distinctions. Ms. CHU. Okay. Anybody else on the panel? Mr. HUNTER. Well, I would just say about surety bonds, I think it is reflective of another issue in federal contracting, which is access to capital. And I think historically, when the Federal Government was sort of a bigger part--federal procurement was a bigger part of the overall economy, there was always just an assumption that it was a gold standard; that the private sector would always be willing to front the capital to make a federal contract work, and what we are finding is that that is not as true anymore. The margins to be made on government business are not as attractive in many cases as what companies can find in the tech sphere. So it is just not as attractive to a lot of companies to engage in this business, and it takes a little more effort on the part of the government to get companies involved. Chairman CHABOT. The gentlelady's time is expired. The gentleman from New York, Mr. Gibson, is recognized for five minutes. Mr. GIBSON. Well, thanks, Mr. Chairman. Just to start off, to both chairman and ranking member, I am excited to join the Committee. Looking forward to our work together. Small business, a huge part of upstate New York. And so to get this opportunity to provide a voice for our small business owners is a real privilege. Good session here. I am learning quite a bit and I appreciate the comments. Definitely taking notes here with regard to reverse auction, the bidding process, and how we are proceeding with protests, insights that you are providing for improvements. I am going to make a couple of observations of things that I have heard in my time moving around the 19th Congressional District and somewhat informed by the 29 years I had in uniform before I came to Congress. I would be interested in your commentary or perhaps policy recommendations that may be able to address some of these things. I do not think there will be anything surprising about what I am going to mention here. Just given your expertise, I would love to hear if you have some thoughts on how we could change law or insights on regulation to do better. The first is, I had a company in Kingston that I thought was really doing excellent work with regard to protection for our troops. Body armor and protection of both people and equipment. But they were having a hard time getting the attention of the DoD. And so sort of the first phenomenon, is there something about the processes, RFP and whatnot, that would cast a net a little wider and allow for small businesses who are doing really creative stuff, to make sure that they knew what the government was looking for, and for the government to get a better appreciation or even situational awareness on what small businesses are doing; number one. And number two is somewhat related. I have, and I do not think this is an epiphinal comment, but one of the value added of small businesses is that you really see agility. You see responsiveness and you see boldness in terms of pulling things together. Then the issue becomes one of scale. You go ahead and you really hit it and you hit it well, but then how do you compete? What I saw in my time in the military is it almost seemed like the DoD would rather safe side it and go to a bigger company, even if they might have been impressed with some of the ideas of a smaller company, because they did not want to take on the risk. And so there was this issue of scale. I do not know, maybe there is a finer point on design build on this score, but I would be interested in anyone from the panel commenting on those two general points. And then if you have any policy recommendations, I would love to hear them. Mr. GIBSON. I can just speak from personal experience on your scale issue. As a small business contractor, I have observed an inclination over the past several years for the purchasing agencies of the government to prefer the larger contractors. I actually had it said to me by agency representatives that they think they are buying down risk when they hire the larger contractors. And we have had to be creative to work--as a small business, to work around that. We have had to go outside of our marketplace, our custom marketplace to find work. Mr. HOFFMAN. Actually, with respect to scale, I think if we talk to the various agencies, it is interesting. Many times the contracting officers and some of the project managers appear to be willing to embrace the utilization of small businesses, but then they also need to sell it to their customers, and their customers can be more risk adverse. Certainly, we have seen a good many sources sought and a good many opportunities for small businesses, at least in our sector, to participate, and we appreciate that. With respect to policy changes, again, in our testimony, we would suggest the reintroduction of H.R. 2750 and the clarification of the nonmanufacturing rule. Mr. HUNTER. I think your example actually about troop protection is a really great case. Because that is one where the government tends to want to take a low-risk approach for very understandable reasons that you can certainly appreciate. And it is expensive to test some of the items and to prove out that they meet the specs that the government is looking for which are fairly stringent. Interestingly enough, there is a program at the Department of Defense called the Foreign Comparative Test Program that exists for a similar reason, to allow the department to test out equipment from overseas that may be something that we do not have here, and to pay for the testing just so that it can show what its capabilities are. And I think having some small amount of budget to sort of demonstrate, allow small companies to demonstrate what their products can do so that the buyer then does not have the fear that a smaller firm may not have designed something that is going to stand up over time or meet the spec. And the Army has done good work on this with field testing, essentially, of articles in the electronics realm that has really expanded the envelope of people able to participate. I think in troop protection that could be a very valuable example. Chairman CHABOT. The gentleman's time has expired. Thank you, gentleman. We will go to a second round at this time, and I will recognize myself for five minutes. I am not sure if I am going to take the whole five minutes. But my last question in the previous round, I had asked what legislatively would you like us to do, and we heard from Mr. Hunter and Mr. McNerney, so I would like to give Mr. Hoffman and Gibson an opportunity to suggest what maybe legislatively you would like to see us take up. I will prompt you by giving a couple of bills that I know that we are considering now, and I think you may be somewhat familiar with. One is Chairman Hanna's bill relative to surety bonds. And another is H.R. 2750, which is a design build bill; H.R. 2751, which has to do with reverse auctions. These were in the last Congress introduced, and I am sure we will be working on them this Congress as well. Another was the nonmanufacturing rule and also teaming and joint venture legislation. So those are some of the things. So you can either comment on those if you would like to or other things if you would like to bring to our attention, what you would actually like to see us do. And maybe I will begin with either one of you. Mr. Hoffman, do you want to go? Mr. HOFFMAN. Thank you. Actually, each one of those rules are in our written testimony, and we would encourage the Committee to pursue and pass those proposed reforms. And that would be what we would be looking for, sir. Chairman CHABOT. Okay. You cannot be much more specific than that. Thank you. Mr. Gibson? Mr. GIBSON. Absolutely the same. We support all of those, and have added that to our testimony as well today. Chairman CHABOT. Okay. Thank you very much. I think I am going to stop there. I got the answer I wanted, so thank you. I will now yield to the gentlelady from New York, the ranking member, Ms. Velaazquez. Ms. VELAAZQUEZ. Yes, I would like to go back to Mr. Hunter. We are now reviewing the budget for Fiscal Year 2016. In your testimony you mentioned that your data shows small business contracting numbers increased in the last fiscal year, despite the cuts imposed by sequestration. Can you give us an explanation as to why that happened? What can you tell us regarding the spending levels that are proposed for Fiscal Year 2016 and whether they represent a significant risk for small business growth? Mr. HUNTER. I will do my best. The same answer would be to say we need more data. What we have seen in several areas, and I will try to maybe highlight a little and not be cryptic. For example, we saw big differences between the military services and the way that their contracts were playing out. So the Army's contract obligations have sort of fallen off a cliff. The Navy showed surprisingly little variation in their contract obligations. And then the Air Force was somewhere in the middle and it was very hard to understand how you could have three such different outcomes when they are all facing relatively the same level of cuts. The 2014 data has now come in. We find that, in fact, it is the Navy whose contract obligations have gone down now quite a bit in 2014, much more so than 2013, and the other services not as much. And I think what is happening is that things are shifting around. So there is a semi- artificial barrier there which is the end of the fiscal year-- one fiscal year, the start of another. And to some extent the appropriations in terms of when they go on contract can be fungible across that boundary. And so I think there is a lot of shifting that is going on. And so I think work from 2013 got shifted essentially into 2014, partly probably due to the uncertainty when sequestration kind of came down in the middle of the fiscal year, and partly because of strategies that different agencies adopted. And so I suspect that if you were to sort of take the two years and average them out, that might be--and assume that in reality sort of that, there was more of a steady state trend line there and that those two numbers are extremes and the reality is somewhere in the middle, I suspect that is the case. So taking you then to 2016, this question of does it go back down to the full sequester levels and another drop? Or does it now start to go in a positive direction in terms of the total federal obligations? It is going to, I think, again, kind of, you know, it will be--in some ways it surprised agencies whichever outcome occurs because they have budgeted now for what the president's level is, which is higher, and if it ends up going back to sequestration, there is going to be that surprise again. And that is why I think it will be a sharp drop if that happens. Ms. VELAAZQUEZ. Thank you, Mr. Chairman. Chairman CHABOT. The gentlelady yields back. The gentleman from New York, Mr. Hanna, is recognized. Mr. HANNA. Thank you. Surety bonding. You know there was a bill in the last Congress that almost made it. It died but for one person in the Senate. You are familiar with that. Basically, it meant that bonding had to be backed by real assets. It is not that complicated and it is not that much to ask. We know that it has not always been that way. I would just like to give you a chance to talk about that, Mr. McNerney and Mr. Gibson. You are both in that racket, so. Mr. MCNERNEY. There are those notorious cases that you have all heard from the NASBP and the surety and fidelity, the individual surety who pledged coal waste as the security for a bond. If there were a claim made on that, my contractor would have been out of luck. He would have been on the hook for all his payroll and everything else when the prime failed. So I just think it is a very good government abuse. It is just a transparently bad loophole in the law. The contracting officers do not deal with it properly. It is more prevalent than you would think, I am afraid. What I hear from NASBP, it is just--I do not think you lose the virtues of independent---- Mr. HANNA. Bonding has always been based on a zero loss ratio. As soon as you factor in any loss at all, you are degrading the contractor and you are degrading the process. Mr. MCNERNEY. Right. Mr. HANNA. You would agree with that, Mr. Gibson? Mr. GIBSON. Yes. And I would say that we are here talking about small businesses. That loophole is very dangerous for small businesses who are thinking about getting into the Federal Marketplace. You do not want to step into the Federal Marketplace without a solid surety behind you, and you cannot get a solid surety unless you are solid yourself financially. So this Committee should help protect small businesses by closing that loophole. Mr. HANNA. Mr. Hunter, implicit in your statement--and I will just admit, just for myself, that sequestration is pretty ham-fisted and not nearly as discriminate as any thoughtful person would want it to be. But knowing that and knowing the other issues with the debt and the deficit and the way people feel about all that, and I agree with that, how do you maintain research and development and how do you maintain these companies without just throwing money at them to make sure they are in business when you need them? Because that is implicit in your statement, and yet, that is not logical necessarily to everyone, and certainly not to me. You have got two minutes. I mean, I would kind of like to know about that dynamic because we have, in my district, companies that are deeply invested in doing work for the government and find themselves through sequestration in trouble right in the middle of things that they are doing that everybody thinks are important. It is an interesting problem. Mr. HUNTER. It is. And I think the government needs to be very discriminating about how it approaches and how it invests its R&D dollars. And so I think that is kind of the answer in both directions to your question I would argue. Mr. HANNA. But you would agree; you just cannot throw money at the problem. Mr. HUNTER. You cannot throw money at the problem, and we do not need to be investing government dollars where the private sector is going to invest its own dollars. And generally, they are probably going to, I mean, history shows they are going to be successful in that in enough cases to make it not worth the government investment. So I think the government then needs to focus. When R&D budgets are declining and the government has to focus very hard, there is a tendency to say, well, we are going to invest in an area because we invested in it last year. We thought it was good then, it must still be good now. At a time like this, you really need to revisit those assumptions and say maybe the world has moved on. And in some cases it has. And in communications technology, the advancements on the commercial side are so rapid, it is highly unlikely the government investment is ever going to---- Mr. HANNA. So do you mind, can I speculate and say that sequestration is not all bad because it has made some people more thoughtful about how they do things and how they manage their total budgets? Mr. HUNTER. I would say the government should be thoughtful without sequestration. Mr. HANNA. But maybe it helped? Mr. HUNTER. And part of the problem with sequestration is it does not allow a lot of thought. So we end up cutting everything, even the things that are critical and necessary, and yes, we may have cut some of the things that are less critical and necessary, but we cut them exactly 10 percent, not 100 percent as maybe we should have. And so I think it is those rigidities and that mechanism. Mr. HANNA. Except in the last, they did allow for discretion in terms of that. That was the original way it went. But that changed, so. Mr. HUNTER. Well, but there are still rigidities within the budget process that tend to drive the cuts to certain areas, R&D in particular, more so than places where we maybe should be cutting. Mr. HANNA. Thank you. My time is expired. Thank you, Chairman. Chairman CHABOT. Thank you very much. The gentleman's time has expired. We want to thank all of the witnesses for their participation here this morning. It has been very helpful I think to the Committee. The testimony we heard I believe shows that there are changes this Committee can make to improve the competitive viability of small construction and A&E contractors and improve the health of our industrial base. We look forward to working closely I think on this issue and all issues. And I want to ask unanimous consent that members have five legislative days to submit statements and supporting materials for the record. Without objection, so ordered. And if there is no further business to come before the Committee, we are adjourned. Thank you. [Whereupon, at 11:45 a.m., the Committee was adjourned.] A P P E N D I X [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] A C E C AMERICAN COUNCIL OF ENGINEERING COMPANIES Introduction Chairman Chabot, Ranking Member Velaazquez, and members of the committee, The American Council of Engineering Companies (ACEC) appreciates the opportunity to testify before you today about the issues surrounding Contracting and the Industrial Base and specifically about the unique considerations within engineering services and construction more broadly. ACEC believes that small businesses can flourish in the federal market, but there must be continued oversight by this and other committees to reduce barriers to market entry. There must be a focus on improving the marketplace for design and construction services by eliminating wasteful spending by both the federal government and contract participants during the procurement process. ACEC will address issues that are present in federal design-build procurement, the potential issues with the implementation of a new court decision in the Nonmanufacturer Rule, the use of reverse-auctions, federal agency use of joint venture and teaming qualifications and surety improvement. My name is James Hoffman and I am President of Summer Consultants, a consulting mechanical, electrical, and plumbing engineering firm located in McLean, Virginia. Summer Consultants is a Small Business with 30 employees. We are committed to providing our clients sound engineering designs for various sized projects. Our practice focuses on the federal market and we have worked on many federal projects in the past 50 years. My firm is an active member of ACEC - the voice of America's engineering industry. ACEC's over 5,000 member firms employ more than 380,000 engineers, architects, land surveyors, and other professionals, responsible for more than $500 billion of private and public works annually. Almost 85% of these firms are small businesses. Our industry has significant impact on the performance and costs of our nation's infrastructure and facilities. We are at a critical juncture in our nation's history as the risk to the public is growing at an alarming rate, as there has been ongoing neglect of the nation's infrastructure. At the same time, we are coming out of the largest economic crisis that affected all professional engineering firms. The construction industry, which bore the brunt of the recession, is finally coming back to fiscal health. Procurement improvements that facilitate greater efficiency for both the industry and the government will help these entities create better public infrastructure while increasing good paying jobs. Design-Build Improvement Design-build is a method of construction where engineers team with other industry professionals on proposed work. It requires the design team, comprised of engineers and architects, to develop detailed drawings and specifications for the contractor so that construction suppliers can submit detailed prices for the final proposal. This method has become popular in recent years and the federal government has moved to expand its use in construction.\1\ --------------------------------------------------------------------------- \1\ Press Release, H. Comm. on Small Bus, Graves, Hanna Introduce Bipartisan Legislation to Benefit Small Construction Contractors. (July 19, 2013) (on file with author). There are two forms of design-build procurement: two-step and one-step. Two-step design-build requires that teams submit relatively inexpensive qualifications packages to the contracting officer in the first round. The contracting officer reviews the qualifications and notifies the teams if they are selected for the next phase. In the second round, the design team develops expensive detailed and extensive plans for the contractor to use in their bidding. The design group develops these plans, generally without any reimbursement by the federal government or other participants, resulting in firms risking funds to participate in the project.\2\ --------------------------------------------------------------------------- \2\ Building America: Challenges for Small Construction Contractors: Hearing Before the Subcomm. on Contracting & Workforce of the H. Comm. on Small Bus 113th Cong. 113-109 (2013). (statement of Helene Combs Dreiling, President, the American Institute of Architects). It is the industry standard for three to five finalists to be in the second round. However, in recent years, industry has reported often more than 10 finalists in that round. The current civilian statute states that the federal contracting officer should follow the industry standard, but the officer, at her or his own discretion, may increase the number of finalists when it is ``in the Federal Government's interest and is consistent with the purposes and objectives of the two-phase selection process.'' \3\ This exception causes issues for both the industry and for the contracting officer. Industry is risking greater exposure as more firms; small, medium, and large, are spending valuable resources developing expensive plans and specifications that have a lower chance for a successful bid. The contracting officer must review each of the plans and be prepared to give feedback to each team that does not win the project. With the increase in finalists, the government spends more time on proposal review, and introduces greater opportunity for errors or underbidding which impacts the project later. This issue has driven many, including small businesses, to stay out of the federal market. This makes the market less competitive and drives down industry participation. --------------------------------------------------------------------------- \3\ 41 U.S.C. 3309(d). One-step design-build creates an even more precarious environment for the industry as the qualifications step is eliminated. ACEC is staunchly opposed to this form of procurement as it eliminates the qualifications process, increases cost for all participants, and reduces market participation for engineers. One-step design-build allows the owner to solicit complete proposals from the construction market without a review of the team's past performance and qualifications. This mechanism forces teams to compete in large pools without any focus on technical capability, quality, or savings within the design. Due to this type of unqualified competition, many firms cannot justify the expenditures to compete against an unknown pool of applicants. This selection forces out small firms as they cannot spend valuable marketing dollars on projects where there are too many competitors--many of which that may not have the qualifications for the project. It is an inefficient process for the federal government as it asks contracting officers to review multitudes of proposals without the framework of qualifications to focus the evaluation. The U.S. Corps of Engineers has taken steps recently to limit one-step design-build, requiring high level, advanced approval for any projects over $750,000.\4\ When the government's largest construction agency implements limits on the process, other agencies should follow their precedent. --------------------------------------------------------------------------- \4\ James Dalton, PES, Limitations on the Use of One-Step Selection Procedures for Design-Build, Directive No. 2012-23 (2012) (on file with the author). Chairman Hanna held a haring on this issue on May 23, 2013 and the House Oversight and Government Reform Subcommittee on Federal Workforce, US Postal Service and Census, also held a hearing on this issue on December 3, 2013. Former Small Business Committee Chairman Graves sponsored H.R. 2750, the Design-Build Jobs and Efficiency Act of 2013, which was amended into the National Defense Authorization Act (NDAA) of 2015. The NDAA implemented a limitation on military design-build procurements over $4 million whereby the contracting officer must ask for permission to expand the finalist pool in a two- phase procurement beyond five finalists. However, the limitations including the prohibition on one-step design-build, reporting on any exceptions to the five finalists, or any limitations for either single or two-step design build were not extended to the federal civilian market. The Congressional Budget Office (CBO) found that H.R. 2750 ``would not have a significant net effect on the federal budget'' \5\ in their analysis of the bill. CBO determined that it would help to ``analyze fewer construction bids'' \6\ which would balance any additional costs that may be involved in the bill. We ask the Committee to continue to pursue the proposed efficiencies found in H.R. 2750, which will help small businesses compete in the federal market, while also harmonizing the language between military and civilian design-build construction. --------------------------------------------------------------------------- \5\ Matthew Pickford, Cong. Budget Office, H.R. 2750 Design-Build Efficiency and Jobs Act of 2014 (2014), available at http:// www.cbo.gov/sites/default/files/hr2750.pdf. \6\ Id. --------------------------------------------------------------------------- Proposed Nonmanufacturer Rule Changes The updated interpretation of the Nonmanufacturer Rule (NMR) poses a challenge for the construction industry as it is a service industry that typically did not have to address this rule in the past. The NMR exists to ensure that when competition for a contract for goods is restricted to small businesses that the good ultimately purchased was from a small business. Otherwise, the government risks restricting competition only to have the awardee provide a product it has simply passed along from a large manufacturer or international contractor. In a recent Court of Federal Claims ruling on Rotech Healthcare, Inc. v. United States \7\, the Court changed the common understanding of the rule. The Court found that the Small Business Act references ``any procurement for goods'' and that the SBA must apply that interpretation broadly across both services and commodities \8\. --------------------------------------------------------------------------- \7\ Case No. 14-502C (September 19, 2014) \8\ Id. at 6-8. ACEC has grave concerns with this interpretation. Currently, over 85 percent of all construction dollars are subcontracted to third parties.\9\ The Court's interpretation would require that any firm who is a prime contractor be responsible for their subcontractors' use of small business products. The paperwork burden on this concept is staggering. An example of the unintended result of this rule could require that engineering firms use paper made by small businesses to print out their correspondence for a federal construction job. Many businesses do not know who made their paper nor do firm owners concern themselves with the small business aspect of its production. The interpretation could require that the ink and any other materials, like specialized seismic machinery, that are not exempted through the regulations, must be obtained through a small business. The result of this ruling cannot be implemented without great cost to the businesses who work on and the taxpayers who fund federal construction projects. --------------------------------------------------------------------------- \9\ 13 C.F.R. Sec. 125.6. Second, in many instances, specific items may be manufactured in a foreign country. If an engineer specifies a part that has a foreign origin, or is made by a large manufacturer, it is most often because of necessary performance specifications that are essential to the project's long-term success. This ruling would have the engineer concerned with minutiae that is not relevant the responsibilities outlined above. This decision will result in the inefficient and wasteful use of taxpayer funds. ACEC asks the Committee to work with the SBA on language to make sure that construction --------------------------------------------------------------------------- services and products continue to be excluded from the NMR. Reverse Actions Reverse auctions are on-line sales where the bidders compete for work by lowering their price against other competitors in a specified time.\10\ Typically, agencies pay a variable fee, ``which is no more than 3 percent of the winning bid'' \11\ to the reverse action contractor. Reverse auctions force design professionals to bid on price, which is strictly prohibited by the Brooks Act and by many state professional licensing standards. It also fails to encourage any participant in the design and construction industry to focus on providing innovative and strategic solutions to the nation's infrastructure. It forces the competitors to focus solely on lowering their price. This often leads to errors or underbidding during the auction, without the ability to verify costs with subcontractors, who are often small businesses. The potential damage to a construction project and firms involved can be significant as project costs may increase beyond the bid or businesses could go out of business due to a mistake in the frenzy of bidding. Also of consideration is the fact that over ``a third of the...2012 reverse auctions...had not interactive bidding'' \12\ which means that no other vendor drove down the price. In short, the competition was sole-sourced out to a single bidder. --------------------------------------------------------------------------- \10\ U.S. Gov't Accountability Office, GAO-14-108 Reverse Actions--Guidance Is Needed to Maximize Competition and Achieve Cost Savings 6 (2004). \11\ Id. at 19. \12\ Id. at 26. Reverse actions have been used by the federal government in the past with commodities, with a noted lack of success in construction. The U.S. Corps of Engineers conducted a year-long study whereby they found that reverse auctions ``offered not even marginal edge in savings over the sealed bid process for construction service projects'' \13\. The Corps found that sealed bids for construction, typically the domain of contractors, was a better method than reverse auctions.\14\ Moreover, former OFPP Administrator Mr. Joseph Jordan, who is the current FedBid CEO stated, ``An agency might want to use FedBid to find a contractor to paint a wall, he said, but not to construct an office building.'' \15\ It is telling that both the Corps and the third-party vendor for reverse auctions do not advocate their use in construction. --------------------------------------------------------------------------- \13\ USACE, Final Report regarding the USACE Pilot Program on Reverse Auctioning 34-37 (2004). \14\ ACEC advocates for qualifications based selection (QBS) in the selection of the architect and engineer, but that is not the subject of this hearing. \15\ Danielle Ivory, `Reverse Actions' Draw Scrutiny, N.Y. Times, April 6, 2014 at B1. H.R. 2751, the Commonsense Construction Contracting Act of 2013, introduced by Rep. Richard Hanna (R-NY), sought to restrict the use of so-called reverse auctions as a means of procuring construction and design-related services. Like H.R. 2750, it was incorporated into the NDAA, but the prohibition was limited to the use of reverse auctions in design-build procurements. At this time, there are no programs that can be found by the industry that used this procurement method. While federal procurement law already prohibits the use of reverse auctions for engineering activities, we view the full legislation as necessary to protect firms of all sizes in our industry when they provide services in support of construction efforts. ACEC asks the committee to reintroduce H.R. 2751, to build stronger prohibitions against the use of this commodities --------------------------------------------------------------------------- based program for construction services. Joint Venture Rules Joint ventures and teams are important to construction and small businesses in the federal market.\16\ Teams are important to the design-build process as each discipline works together to compete on construction projects. Joint ventures allow for organizations new to federal procurement to work with experienced partners to gain entry to the market. It is important for teams to add or change firms to enhance their qualifications, to offer the best services for a particular project in the pre-competition phase. These practices allow the federal government to obtain innovative private sector talent while also increasing capable competition on federal projects. --------------------------------------------------------------------------- \16\ Joint ventures and teams are used interchangeably in this submission. Joint ventures are contractual relationships between entities while teams are groups of professionals working together towards a single project. They are very similar in nature, but differ in the legal sense. Current law states that small businesses may ``submit an offer that provides for the use of a particular team of subcontractors for the performance of the contract'' \17\ and that requires the contract be evaluated, ``in the same manner as other offers, with due consideration for the capabilities of all proposed subcontractors.'' \18\ There are recent reports that some agencies are requiring joint ventures or teams to present joint past performance in their qualification. This practice demonstrates that some contracting officers do not understand the rationale and benefit of teaming. Some agencies require that ``an [o]fferor must have proven experience and performance as an existing CTA (Contractor Team Arrangement) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements' \19\, or that past performance may only be considered if it is that of ``a parent company, affiliate, division, and/or subsidiary.'' \20\ Under present statute, the contracting officer must look at the qualifications of the individual organizations comprising a team rather than the past performance of the group as a whole. Requiring that the team have common past performance reviews discourages the use of new teams, new partners, and the inclusion of new small businesses in the federal market. --------------------------------------------------------------------------- \17\ Id. \18\ Id. at Sec. 15(e)(4), 15 U.S.C. Sec. 644(e)(4). \19\ GSA OASIS Request for Proposal (2013) available at http:// www.fbo.gov/ ?s=opportunity&mode=form&tab=core&id=df05de3d9c9cafle7943d278094eefbl&-- cview=1. \20\ HCaTS RFI APPENDIX 3 - DRAFT RFP SECTION L (2015) (on file with author). ACEC strongly encourages the Committee to amend the Small Business Act to protect the development of joint ventures and teams. Federal agencies are losing their opportunity for innovation and small business participation when contracting --------------------------------------------------------------------------- rules are not followed by federal agencies. Surety Improvements A surety is a third party product that guarantees payment if one party defaults on the agreement. In federal construction, there are two key bonds--payment bonds and performance bonds. The Miller Act requires that the contractor must provide a surety for payment and performance bonds on contracts greater than $150,000. This provides performance protection to the federal government that the taxpayer will not be damaged if the contractor fails to complete a project, while also guaranteeing payment to subcontractors if the contractor defaults. H.R. 776, the Security in Bonding Act of 2013, was introduced by Chairman Hanna to address the issues of bonding availability for small businesses and problems with individual surety guarantees. The bill increases the guarantee rate for the Preferred Surety Bond Program, which will help more small business obtain a bond at a reasonable rate, and requires verifiable collateral for the issuance of surety bonds. While ACEC members typically do not obtain surety bonds, with the exception of some of our larger members who are also construction contractors, we recognize the importance of this product for the taxpayer and the subcontractors. ACEC asks the Committee to reintroduce H.R. 776 in this Congress. Conclusions and Recommendations The engineering services industry is unique in how firms are established, perform work, selected for the project, and work with each other. Most firms in the industry are small, specialized, and have a business plan to remain that way to assure performance and reputation. These factors result in the need for special considerations when trying to ensure appropriate small business participation in federal procurements. We ask that the committee consider the following actions for the 114th Congress: Reintroduce H.R. 2750 and enact it into law. Work with the SBA on appropriate language to limit the scope of the NMR on service industries. Reintroduce H.R. 2751 and enact it into law. Strengthen the Joint Venture and teaming past performance rules. Reintroduce H.R. 776 and enact it into law. ACEC and I thank the Committee for the privilege and opportunity to address engineering and construction industry issues with current federal procurement and I am pleased to answer any questions. [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] MCAA Statement on the Use of Internet Reverse Auctions for Construction Services MCAA considers the use of Internet reverse auctions for procurement of construction services to be problematic for owners and contractors alike. While most applications of various e-commerce and Internet use (project websites, for example) have demonstrated or hold great promise for productivity and service improvements for owners and the industry at large, the same cannot be said for Internet reverse auctions. MCAA considers them to be little more than a form of electronic bid shopping; that is, disclosing the proprietary bid price of a competitor to all others for the purpose of obtaining even lower bids. While reverse auctions may be judged appropriate by some owners for certain well defined projects on a case-by-case basis, an across-the-board policy dictating reverse auction, price-only selection for all projects would be just as short sighted as dictating a single type of project delivery system for projects of all types. MCAA, along with the industry overall, long ago recognized the long-term detrimental impact of an across-the-board policy of low-bid, price-only selection criteria, and the bid shopping and chopping practices that are inherent in that system and undermine project success, such as: fragmented scopes of work and scope disputes, unnecessary changes and inordinate delays, and overhead waste relating to defensive contract administration, claims, disputes and lawsuits. In fact, many of the innovations in construction procurement, contracting and project administration over the past 20 years have been in direct response to the inefficiencies that stem from low-bid, price-only selection criteria. Those innovations include value-based selection criteria, careful past performance evaluations, prequalification screening of competitors, project partnering, integrated project contracting and delivery systems, design- build services delivery, and other positive contract administration procedures, including dispute avoidance mechanisms and measures to reduce project dispute overhead costs. Overall, these developments have represented a better investment in overall project quality and life-cycle cost effectiveness. Unfortunately, Internet reverse auctions can be seen as a way to adapt new technology to return to many of the problems of the past and give back the project efficiency gains that have resulted from innovative, value-added contracting procedures. Nevertheless, given recent experience with reverse auctions, MCAA members have encountered certain approaches that tend to ameliorate the more difficult aspects of the process as discussed below. > Well-defined scope of work - Reverse auctions are least likely to lead to problem jobs in those cases where the owner has firm, detailed design drawings and specifications. Recent studies strongly indicate that project planning up front is the best predictor of project success and problem avoidance. > Use of best-value prequalification criteria - Best-value prequalification criteria should be rigorously applied. The criteria should include demonstrated superior past performance related to project performance overall, including cost and schedule delivery, project safety experience, workforce training and development investments, and project management and site supervision expertise relating to equipment purchasing and other aspects of contract administration. > Transparency of auction procedures - The reverse auction procedures should provide maximum transparency in the interest of fairness for all competitors. The identity of all participants should be disclosed, as well as the dollar amount and ranking of all bids. Similarly, the owner should disclose the existence and amount of any reserved price above which the project would not be let. Just as laws pertaining to the auctions of goods are designed to protect fairness in the process and prevent fraud and abuse, the owner and Internet service provider for reverse auctions of construction contracts should make sure that all competitors are extended the same privileges under the auction rules. > Provide adequate procedures for redress of errors - The auction procedures should provide careful safeguards against both imprudent and administrative mistakes in bidding, as overall project success is strongly compromised by mistakes in selection decisions. Even at this early stage, it is widely recognized that the reverse auction process often tempts hasty and imprudent bidding given the tight time frame and competitive context of the auction procedure. The industry recognizes that selection based on competitive frenzy as opposed to more discerning judgment is a high risk factor for project success. Bid decrements and the time intervals for bid adjustments should be appropriate for the scope and size of the project. Clerical mistakes also should be excused in the auction process in the manner of treatment of those mistakes in the sealed bidding context. Overall the owner should not design the process as though construction service auctions can be conducted in the same way as commodities procurement. > Provide adequate safeguards against other abuses - The reverse auction procedures should also contain adequate safeguards against fraud and abuse, including express warranties against fictitous (``phantom bidders'') bidders and other conditions that would constitute fraud in the inducement of the contract award. Moreover, any procedure for post-bid negotiated awards should be disclosed up front so competitors can fairly judge whether they can afford to compete. Similarly, if post-bid price increases are to be permitted, that too should be disclosed up front. > Policy reservations - Notwithstanding adherence to the suggestions listed above, MCAA member experience suggests that reverse auctions remain a relatively new, untested and unproven method to actually lower construction costs without compromising project success. MCAA contractor experience with Internet reverse auctions suggests that the last bid in a reverse auction is not always the lowest and best price that may have been submitted even under sealed bidding procedures. Owners should be aware that a comparison of the opening bid with the last bid is not a valid indicator of actual cost savings on the project. Moreover, while open competition is good policy generally, even with careful prequalification screening, the auction process prompts fast and furious competitive judgments more than prudent decision-making. Negative experiences could significantly shrink the pool of willing competitors, and deliver negative project outcomes. In conclusion, early experience suggests that the risks of mistakes, misjudgments and the added costs of Internet services may well in many cases outweigh the perceived costs savings realized through the use of reverse auctions. MCAA will continue to monitor experience with reverse auctions for a continuing factual assessment of their costs and benefits and effect on project outcomes. Footnote - This statement does not address the many ways that public and private contracting practices vary with respect to contractor selection rules and procedures generally and reverse auctions in particular. In the main, Federal, state, and local open competition/sealed bidding rules prohibit reverse auctions for construction. The Federal procurement policy is to continue to use sealed bidding/competitive negotiations without price disclosure for construction services, even though one agency has Congressional authorization to test pilot reverse auctions. Another agency is attempting to categorize some construction/repair/alteration projects as ``commercial items'' to avoid construction procurement rules. At the state level, a growing number of states are amending procurement laws to permit reverse auctions for commodities, but are careful to rule out reverse auctions for construction services. Approved by the MCAA Board of Directors, February 28, 2004 [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] INTRODUCTION Chairman Chabot, Ranking Member Velaazquez and members of the committee, thank you for holding this hearing examining contracting and the industrial base. Further, thank you for the opportunity for the Design-Build Institute of America (DBIA) to submit the following testimony. DBIA is an institute representing leaders in the design and construction industry utilizing design-build and integrated project delivery methods to achieve cost and time savings on high performance projects. DBIA promotes the value of design- build project delivery and teaches the effective integration of design and construction services to ensure success for owners and design and construction practitioners in the delivery of projects from all sectors in communities across the country. Since we are design-build professionals focused on defining and teaching best practices, we will limit our comments today to the ``failure to properly use a two-step procurement process for design-build contracts'', as indicated in the February 5, 2015 hearing announcement. WHAT IS DESIGN-BUILD? Design-Build is a method of project delivery in which one entity - the design-build team - works under a single contract with the project owner to provide design and construction services. With design-build there is one entity with a single point of responsibility, one contract, one unified flow of work from initial concept through completion - thereby integrating the roles of designer and constructor. Design-build is a more efficient and better quality alternative to the traditional design-bid-build project delivery method. Under the traditional approach, design and construction services are split into separate entities, separate contracts, and separate work. [GRAPHIC] [TIFF OMITTED] T3326.020 Design-build project delivery provides benefits for both owners and practitioners. Owners experience faster delivery, cost savings and better quality than with other contracting methods. Research shows costs can be six percent lower with project delivery speed increased by as much as one-third \1\. --------------------------------------------------------------------------- \1\ Construction Industry Institute (CII)/Penn State 1999 Further, dealing with a single entity decreases owners' administrative burden and allows them to focus on the project, rather than managing separate contracts. The approach also reduces their risk and results in fewer litigation claims for --------------------------------------------------------------------------- all parties involved. Practitioners reap the benefits of a higher profit margin since an integrated team is fully and equally committed to controlling costs. Like owners, the design-builder benefits from a decreased administrative burden because the communication between designers and builders is streamlined. The advantages of design-build have become clear in recent years which is why today nearly 40% of all non-residential construction in the U.S. is done design-build, with the military using it for more 80% of its construction \2\. --------------------------------------------------------------------------- \2\ Design-build Project Delivery Market Share and Market Size Report, RS Means, May 2014 --------------------------------------------------------------------------- SINGLE-STEP VS. TWO-STEP DESIGN-BUILD Federal regulation allows for the use of design-build project delivery, including both a single-step process and a two-step process. In the single-step process, a request for proposals (RFP) is issued for a project. It is issued to an unlimited number of participants and any and all parties can respond with a proposal. A selection process is then used to determine the proposal that is best from both a cost and technical perspective. In a two-step process a request for qualifications (RFQ) is first issued, and any and all participants then respond with a statement of qualifications. The RFQ response is a relatively simple and inexpensive procedure where the design-build teams submits, for example, documents detailing their past performance, staff resumes, and examples of similar projects they've completed. Based on these statements a short list of three to five of most qualified respondents is determined. The RFP is then issued only to these ``shortlisted'' firms which then develop full proposals including cost, schedule, and technical response. Small Business Are Far Better Served By the Two-Step Process In a single-step process, all design-build teams are asked to spend time and resources creating detailed proposals immediately, as opposed to simply submitting their qualifications. Due to the high costs of this first step - often reaching hundreds of thousands of dollars or even millions - many design-build teams decide not to apply since their chances of final selection are so low. Small businesses in particular do not have the luxury to spend limited resources to apply for a project when the chance of being chosen may be less than ten percent. If small businesses were only required to initially provide their qualifications under the two-step process, as opposed to a full proposal under the single-step process, many more would be able to participate. This is not only good for American small businesses, it also benefits the federal government and the American taxpayer who can be sure the most qualified design-build teams were not scared away from a project simply due to the costs and risks of applying. Consider and Pass the Design-Build Efficiency and Jobs Act During the 113th Congress, legislation endorsed by DBIA, the Design-Build Efficiency and Jobs Act (H.R. 2750) was introduced by Congressman Graves and a version passed the House of Representatives. This bill was written to limit the use of single-step design-build procedures, and assure the proper use of two-step procedures as originally mandated by Congress. That legislation should be reintroduced, considered and passed into law. H.R. 2750 would have done two primary things: 1. To limit the use of single-step, H.R. 2750 would have limited its use to projects that are less than $750,000. This threshold is based on U.S. Army Corps of Engineers guidance which was issued in August 2012. Further, it will assure that for larger more complex projects risks for all firms are held in check, thus allowing small firms a greater chance to compete in the marketplace. 2. H.R. 2750 also would have encouraged better use of the preferred two-step procedures and by requiring agencies to better justify and report when their agencies short-list more than five finalists on a specific project in the two-step process. CONCLUSION Thank you again for the opportunity to submit this statement. We look forward to working with this committee on improving design-build procedures so the advantages of design- build delivery can be more fully realized and American small business can thrive. We are ready to answer any questions you may have. [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] The National Association of Surety Bond Producers (NASBP) is a national trade association of firms employing licensed surety bond producers who place bid, performance, and payment bonds throughout the United States and its territories. The Surety & Fidelity Association of America (SFAA) is a District of Columbia non-profit corporation whose members are engaged in the business of suretyship. SFAA member companies collectively write the majority of surety and fidelity bonds in the United States. The SFAA is licensed as a rating or advisory organization in all states, as well as in the District Columbia and Puerto Rico, and it has been designated by state insurance departments as a statistical agent for the reporting of fidelity and surety data. Our written statement begins with a brief description of the important role surety bonds play in the federal procurement arena. Our statement then addresses our support of three bills introduced in the 112th and 113th Congresses, H.R. 3534 and H.R. 776, and H.R. 838. H.R. 838 was introduced in the 114th Congress on February 10, 2015, by Representative Richard Hanna, and cosponsored by the Chairman of the House Small Business Committee, Steve Chabot and Representative Grace Meng. These bills concern the use of individual surety bonds on federal construction projects and reforms to the Small Business Administration's (SBA) Surety Bond Guarantee Program, and are representative of needed legislation on small business matters that NASBP and SFAA wish to bring to the attention of the Committee on Small Business for support. The Importance of Surety Bonds: Sound Public Policy Corporate surety bonds are three-party contract agreements by which one party (a surety company) guarantees or promises a second party (the obligee/federal government) the successful performance of an obligation by a third party (the principal/ contractor). In deciding to grant surety credit, the surety underwriter conducts in-depth analysis, also known as prequalification, of the capital, capacity, and character of the construction firm during the underwriting process to determine the contractor's ability to fulfill contractual commitments. Surety bonds are an essential means to discern qualified construction companies and to guarantee contracts and payments, ensuring that vital public projects are completed, subcontracting entities are paid, and jobs are preserved. The federal government has relied on surety bonds for prequalification of construction contractors and for performance and payment assurance since the late nineteenth century. In 1894, the U.S. Congress passed the Heard Act which codified the requirement for surety on U.S. government contracts and institutionalized the business of surety. In 1935, the Heard Act was superseded by the Miller Act, which required the continuation of these vital assurances so that U.S. taxpayer funds were protected and subcontractors and suppliers would receive payment for their labor and materials. Currently, the federal Miller Act requires performance and payment bonds from prime contractors awarded construction contracts exceeding $150,000.00, and payment security for contracts between $30,000.00 and $150,000.00. Types of Surety Bonds The bid bond assures that the bed has been submitted in good faith and the contractor will enter into the contract at the bid price and provide the required performance and payment bonds. A performance bond protects the project owner from financial loss should the contractor fail to perform the contract in accordance with its terms and conditions. The payment bond protects subcontractors and suppliers, which do not have direct contractural agreements with the public owner and which would be unable to recover lost wages or expenses should the contractor be unable to pay its financial obligations. Often, small construction businesses must access the federal procurement marketplace at subcontractor and supplier levels, and the payment bond is their primary recourse and protection in the event of prime contractor nonpayment or insolvency. The Construction Industry Supports of H.R. 3534 (112th Congress) H.R. 776 (113th Congress) and H.R. 838 (114th Congress) NASBP and SFAA along with many other organizations such as: the American Council of Engineering Companies (ACEC), the Associated General Contractors of America (AGC), the American Institute of Architects (AIA), the American Subcontractors Association (ASA), the Mechanical Contractors Association of America (MCAA), the Sheet Metal and Air Conditioning Contractors' National Association (SMACNA), the Construction Financial Management Association (CFMA), and the American Insurance Association (AIA), view H.R. 3534, H.R. 776, and H.R. 838 as critical means (1) to protect taxpayers, federal contracting entities, and construction businesses by assuring the integrity of surety bonds on federal contracts when issued by unlicensed individuals using a pledge of assets and (2) to provide additional opportunities for small and emerging construction contractors, which otherwise do not qualify for surety credit in the standard market, to utilize the Surety Bond Guarantee Program of the US Small Business Administration, so that such businesses will receive surety credit from regulated markets. Enact legislation to protect taxpayers, and small businesses Every contractor that bids and obtains a federal construction contract must secure its obligations under that contract. The most common form of security is a surety bond from a certified and approved surety insurance company. As noted earlier, the Federal Miller Act requires contractors to furnish surety bonds on federal construction projects to ensure that prospective contractors are qualified to undertake federal construction contracts and that bonded contracts will be completed in the event of a contractor default, thereby protecting precious U.S. taxpayer dollars and subcontractors and suppliers, many of which are small businesses. The financial strength and stability of the surety is the key to the success of the surety bonding system. Presently, there are three methods construction firms may use to furnish security on a federal construction project: 1. By securing a bond written by a corporate surety, that is vetted, approved, and audited by the U.S. Department of Treasury and listed in its Circular 570; 2. By using their own assets to post an ``eligible obligation,'' i.e. a U.S.-backed security, in lieu of a surety bond. The security is pledged directly and deposited with the federal government until the contractor is complete; or 3. By securing a bond from an unlicensed individual, if the bond is secured by an ``acceptable asset,'' which includes stocks, bonds, and real property owned in fee simple. It is this third alternative that has proven consistently problematic to the financial detriment of contracting authorities and of subcontractors and suppliers performing on federal projects. NASBP, SFAA, along with the other organizations supporting these bills, believe, based on substantial evidence and past testimony, that the current regulations pertaining to use of individual sureties on federal construction projects are fundamentally flawed, allowing gamesmanship by unlicensed persons acting as sureties. Such existing requirements need to be superseded by the statutory approach delineated in H.R. 3534/776/838. Federal Acquisition Regulation (FAR) 28.203-2(b)(3) permits federal contracting officers to accept bonds from natural persons, not companies, if the bond is secured by an ``acceptable asset,'' which includes stocks, bonds, and real property. These individuals neither are subject to the same scrutiny and vetting given to corporate sureties nor are they required to provide physical custody of the asset to the government that they pledge to secure their bonds to the contracting authority. This lack of thorough scrutiny of individual sureties and control over their pledged assets has resulted in a number of documented situations where assets pledged by individual sureties have proven to be illusory or insufficient, causing significant financial harm to the federal government, to taxpayers, and to subcontractors and suppliers, many of whom are small businesses wholly reliant on the protections of payment bonds to safeguard their businesses. Federal requirements do mandate a level of documentation and information from individual sureties. Individual sureties are required to complete, sign, and have notarized an affidavit of individual surety (SF 28), which is a standardized form for the purpose of eliciting a description of the assets pledged and the contracts on which they are pledged. SF 28, however, does not elicit other pertinent information, such as that about the character or fitness of the individual acting as surety, like criminal convictions, state insurance commissioner cease and desist orders, outstanding tax liens, or personal bankruptcies. Under FAR requirements, the pledged assets also are supposed to be placed in an escrow arrangement by the individual surety, subject to the approval of the contracting officer. The individual surety, however, is not required to turn the assets over to the physical care and custody of the contracting authority. Each contracting officer, not the Department of Treasury, shoulders the entire burden of determining the acceptability of the individual surety, its documentation, the escrow or security arrangement, and the value and adequacy of pledged assets, and must do so in relatively short order to progress the contract procurement. A missed, incorrect, or forsaken step may mean the acceptance of a fraudulent or insufficient bond, rendering its apparent and much needed protection worthless. This burden of assessing individual sureties is added to the already considerable responsibilities of contracting officers. They are required to determine the authenticity of the documentation of the assets pledged to support the individual surety's bond obligations and to verify that the pledged assets actually exist, are sufficient, and are available to the federal government. They have to know that a particular financial document is what it purports to be and to understand and to assess the different types of collateral, such as stocks and real estate located anywhere in the United States. It is not clear if and how often federal contracting officers receive specific training to understand and to perform the needed tasks of examination concerning individual sureties. Documents of federal agencies suggest that there are occasions when federal contracting officers may not have a complete understanding of what is required of them to safeguard taxpayers and small businesses from individual surety fraud. The Financial Management Service of the U.S. Department of Treasury issued a ``Special Informational Notice to All Bond- Approving (Contracting) Officers'' \1\ on February 3, 2006, still posted at http://www.fiscal.treasury.gov/fsreports/ref/ suretyBnd/special--notice.pdf. This informational notice was directed to federal contracting officers to remind them of the applicable FAR requirements governing individual sureties. Specifically, the notice, a copy of which is attached to this testimony, states in part: --------------------------------------------------------------------------- \1\ United States Treasury Department. Financial Management Service. ``Special Informational Notice to All Bond-Approving (Contracting) Officers''. February 3, 2006. ``Although FMS is not substantively responsible for approving individual sureties, we believe it prudent to issue this Special Informational Notice on a FYI basis to Agency Bond-Approving (Contracting) Officers who do --------------------------------------------------------------------------- have that responsibility under the FAR. Recently, FMS has been made aware of instances where individual sureties are listing corporate debenture notes and other questionable assets on their `Affidavit of Individual Surety', Standard Form 28. In some instances, the individual sureties used a form other than the Standard Form 28 as their affidavit.'' Likewise, the U.S. Department of the Interior issued a notice to its contracting officers in 2009 to remind them of FAR requirements associated with acceptance of individual surety bonds. This notice, titled ``Department of the Interior Acquisition Policy Release (DIAPR) 2009-15,'' states that the Department of the Interior Office of Inspector General conducted an investigation of contracting personnel practices concerning individual sureties and found concerns.\2\ Specifically, the release, a copy of which is attached to this testimony, states in part: --------------------------------------------------------------------------- \2\ United States. Department of the Interior. ``Department of the Interior Acquisition Policy Release (DIAPR) 2009-15''. September 8, 2009. ``The investigation identified several areas of concern that require our attention. There is concern that Contracting Officers (COs) are: (1) unfamiliar with the FAR requirements for individual surety; (2) accepting individual surety bonds without knowing or verifying the assets backing the bonds; (3) not vetting questions about individual surety bonds through the DOI Office of the Solicitor; and (4) not verifying individual sureties against the General Services --------------------------------------------------------------------------- Administration's Excluded Parties List System.'' If a contracting officer fails to perform adequately the necessary investigation of an individual surety, and the individual surety pledges assets that do not exist, are insufficient, or are not readily convertible into cash to pay the obligations of the defaulted general contractor, everyone on the project from the contracting agency on down is left unprotected and at risk for financial loss. If the assets pledged to support the bonds are uncollectible, unpaid subcontractors and suppliers protected by the bond, many of which typically are small businesses, will suffer financial hardship and could, in turn, default and become insolvent. Examples of Improper Individual Surety Activity There is no one place to go to find statistical data on individual surety problems because individual sureties typically operate outside of state insurance regulatory structures, despite the fact that they are required under almost all state insurance codes to obtain certificates of authority to act as a surety insurer from state insurance commissioners. Moreover, the federal government does not require individual sureties writing bonds on federal contracts to furnish proof of licensure or authority to operate in a state jurisdiction as a surety insurer. Consequently, little or no regulatory oversight may ever be exercised over persons acting as individual sureties on federal projects apart from the modicum of scrutiny undertaken, if at all, by the federal contracting officer. Nonetheless, in recent years, illustrations of individual surety problems abound. These situations usually involve individual surety bond assets that turned out to be inadequate, illusory, or unacceptable. One illustration is United States ex rel. JBlanco Enterprises Inc. v. ABBA Bonding, Inc, where, in spite of a March 11, 2005 cease and desist order from the Alabama Insurance Department, Mr. Morris Sears, doing business as ABBA Bonding, was able to submit bonds on a federal contract in Colorado supported by an affidavit (Standard Form 28) stating that ABBA Bonding had assets with a net worth of over $126 million. Although no assets were placed in escrow for the benefit of the government, the U.S. General Services Administration accepted the bonds anyway. JBlanco Enterprises, a small business 8a subcontractor performing work on federal contracts, nearly was forced to declare bankruptcy as a result of a deficient individual surety bond placed by Mr. Sears on a federal project that later proved to have no assets to support the bond. Ms. Jeanette Wellers, a principal of JBlanco Enterprises, provided oral and written testimony \3\ about this situation during a hearing on H.R. 3534. --------------------------------------------------------------------------- \3\ Wellers, Jeanette. Written Testimony before U.S. House Committee on the Judiciary Subcommittee on Courts, Commercial and Administrative Law. March 5, 2012. Sears eventually sought bankruptcy protection against numerous creditors (100+) arising from defaulted bond obligations, including protection against bond debts owed to three federal contracting agencies. Chief Bankruptcy Judge Margaret A. Mahoney, U.S. Bankruptcy Court, Southern District of Alabama held that Sears had ``knowingly made misrepresentations regarding collateral he pledged in support of surety bonds.'' \4\ Judge Mahoney also found that Sears falsely stated that the real estate had not been pledged to any other bond contract within three years prior to the execution of any Affidavit and that Sears made misrepresentations to numerous agencies. Thus, the Bankruptcy Court determined that the Sears' debts to the government were nondischargeable. His false statements then formed the basis of a criminal indictment against Sears, who died while undergoing criminal prosecution in the U.S. District Court for the South District of Alabama. --------------------------------------------------------------------------- \4\ United States. Department of Justice. US Attorney's Office. Southern District of Alabama. ``Pennsacola Man Indicted in Government Contract Survey Bond Fraud Scheme''. June 28, 2012. In another example, Edmund Scarborough, the owner of IBCS Fidelity, another individual surety, filed for bankruptcy in Tampa, Florida. IBCS issued countless individual surety bonds on federal, state, and private construction projects using suspect assets. In his bankruptcy petition, Scarborough listed $4.5 million in assets and $16.2 million in liabilities; IBCS had used a speculative commodity, mined coal waste, which it valued at $191 million, to back its individual surety bonds. That mined coal waste was valued at $120,000 in the bankruptcy filing.\5\ --------------------------------------------------------------------------- \5\ Richard Korman, Controversial Individual Surety Files for Bankruptcy Protection, Engineering News-Record, August 5, 2014 available at: http://enr.construction.com/ business--management/finance/2014/0805-Outspoken-Individual- Surety-Files-for-Bankruptcy-Protection.asp? The above individuals operated nationally and across state boundaries, victimizing public and private entities, small construction businesses, and businesses of all sizes. These examples, unfortunately, are not isolated instances. Other examples exist, both past and present, showing where individual surety bond assets proved illusory, uncollectible, or deficient. More businesses, many of whom are likely to be small businesses, will be victimized unless Congress acts to correct these flawed requirements, which permit unscrupulous individuals, many with criminal, personal insolvency, and tax lien histories, to issue worthless surety bonds on taxpayer- --------------------------------------------------------------------------- funded federal construction contracts. Common-Sense Legislative Solution Legislation like H.R. 3534, H.R. 776, and H.R. 838 are simple, common-sense legislative solutions that will eliminate opportunities for fraud by mandating that real assets be placed in the care and custody of the contracting authority. These bills require individual sureties to pledge solely those assets defined as eligible obligations by the Secretary of the Treasury. An eligible obligation is a public debt obligation of the U.S. Government and an obligation whose principal and interest is unconditionally guaranteed by the U.S. Government, such as U.S. Treasury bills, notes, and bonds, certain HUD government guaranteed notes and certificates, and certain Ginnie Mae securities, among other federally guaranteed securities. These safe and stable assets then are provided to the federal contracting authority, which will deposit them in a federal depository designated by the Secretary of the Treasury, ensuring that pledged assets are real, sufficient, convertible, and in the physical custody and control of the federal government. This is nothing more than what now is statutorily required of contractors who wish to pledge collateral as security on a federal contract in lieu of a surety bond. If enacted, it would eliminate the gamesmanship and opportunities for fraud endemic in the current regulatory system governing individual surety bonds and pledged assets and will remove a considerable administrative burden from federal contracting officers. Federal contracting officers no longer will need to assess a range of pledged assets, as all pledged assets will be limited to assets unconditionally guaranteed by the federal government; they simply will need to gain custody over the asset to deposit the asset in a federal depository, such as the Federal Reserve Bank, St. Louis. The asset will be released upon successful performance of the bonded obligation, with any accrued interest inuring to the benefit of the individual surety pledging the government-backed asset. Construction businesses working on a construction project-- either as subcontractors, suppliers, or workers on the job-- have no control over the prime contractor's choice of security provided to the federal government, but they suffer the most harm financially if the provided security proves illusory. The impact is particularly acute on small construction businesses, which may not have the strength to weather a significant disruption to their cash flow. Passage of legislation like such as H.R. 838 will mean that contracting agencies and the numerous subcontractors and suppliers on federal construction projects, in the event of a performance or payment default will know that adequate and reliable security is in place to guarantee that they will be paid for their valid claims. Increase the Guarantee to 90% for Surety Companies in SBA Program Background The U.S. Small Business Administration's (SBA) Surety Bond Guarantee Program (Program) was created to ensure that small and emerging contractors who do not qualify for surety credit in the standard market have the opportunity to bid on public construction work, grow their businesses and remain a viable part of the U.S. economy. Small businesses must have access to these bonds to obtain federal construction contracts after a certain dollar threshold, and the Program assists them in obtaining these bonds. As the Program has evolved, there are two plans under which sureties can participate in the Program. The Prior Approval Program (Plan A) was the original SBA bond guarantee program. In this Program, the surety must obtain SBA approval for each bond prior to writing the SBA guaranteed bond. The SBA maximum indemnification of the surety's loss as a result of a bond claim in Plan A is 80%, and 90% for bonds written for socially and economically disadvantaged contractors and bonds written for contracts under $100,000. The second program is the Preferred Surety Bond Program (Plan B). Under this plan, sureties apply to participate, submitting information up front on their underwriting practices and financial strength. Once a surety becomes a participant in Plan B, it is given an aggregate limit of bonds that it can write within the Program. As long as the surety complies with all of the requirements of Plan B, all bonds written within the Program qualify for reimbursement of losses. The SBA does not review or approve each individual bond before it is written and the guarantee attaches. In Plan B the surety receives a maximum 70% indemnification. Enhancements to Program Over the years, the Program has gone through several enhancements to increase participation and remove burdensome regulatory requirements. For example, a provision in the 2013 National Defense Authorization Act (NDAA) increased the guarantee limit from $2 million to $6.5 million to align the Program with the simplified acquisition threshold and with the needs of other SBA small business contracting programs, such as the 8a Minority Small Business and Capital Ownership Development Program. Additional reforms will provide greater enhancement opportunities for small businesses and to ensure participation from sureties. Legislative Recommendation NASBP and SFAA recommend amending Section 411(c)(1) of the Small Business Investment Act of 1958 (15 U.S.C. 694b(c)(1)) by increasing the guarantees afforded to surety companies that participate in the Program from 70% to 90%. This revision will likely stimulate greater corporate surety and surety bond producer participation, providing access to the corporate surety markets to small businesses which otherwise do not qualify for surety credit in the standard market. These small businesses are often the ones that may turn to unlicensed individual sureties, where they can be duped by unscrupulous persons seeking vulnerable businesses and offering surety credit to anyone, regardless of the firm's qualifications, financial wherewithal, or experience, and at rates many times higher than the filed rates charged by corporate surety markets. No Added Cost to the Government or Risk to Taxpayers According to the 2014 House Small Business Committee Report (REPT. 113-462, Part 2, pgs. 5-6) the Congressional Budget Office (CBO) ``estimates that implementing this change would not have a significant effect on discretionary spending because we expect the agency would raise fees to cover any additional costs arising from the higher guarantee percentage. Enacting such legislation would not affect direct spending or revenues; therefore, pay-as-you-go procedures would not apply.'' According to the SBA Office of Surety Guarantees, increased liability to the government does not seem to be a significant issue. Under the 2009 American Recovery and Reinvestment Act (ARRA), the SBA issued 218 final surety bonds for a contract value of $663 million, which resulted in only two defaults. The National Defense Authorization Act for Fiscal Year 2013 increased the eligible contract amount to $6.5 million, and up to $10 million with a Federal contracting officer's certification that the guarantee is necessary for the small business to obtain bonding. Since the increase in contract size amount, SBA has guaranteed over 170 total bonds with a contract value of over $500 million, which have resulted in no defaults. Conclusion NASBP and SFAA appreciate the opportunity to provide the Committee with information about the compelling need to enact legislation such as H.R. 838: (1) to protect taxpayer funds and construction businesses performing as subcontractors and suppliers on federal construction contracts and (2) to provide small businesses with greater access to regulated surety markets through the SBA Surety Bond Guarantees Program. NASBP and SFAA hope this statement proves beneficial and welcomes any inquiries from the Committee on the points raised in this written testimony or on other matters pertinent to small businesses and surety bonding. [all]