Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR 2017 [House Hearing, 114 Congress] [From the U.S. Government Publishing Office] ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR 2017 _______________________________________________________________________ HEARINGS BEFORE A SUBCOMMITTEE OF THE COMMITTEE ON APPROPRIATIONS HOUSE OF REPRESENTATIVES ONE HUNDRED FOURTEENTH CONGRESS SECOND SESSION __________ SUBCOMMITTEE ON ENERGY AND WATER DEVELOPMENT MICHAEL K. SIMPSON, Idaho, Chairman RODNEY P. FRELINGHUYSEN, New Jersey MARCY KAPTUR, Ohio KEN CALVERT, California PETER J. VISCLOSKY, Indiana CHARLES J. FLEISCHMANN, Tennessee MICHAEL M. HONDA, California JEFF FORTENBERRY, Nebraska LUCILLE ROYBAL-ALLARD, California KAY GRANGER, Texas JAIME HERRERA BEUTLER, Washington DAVID G. VALADAO, California NOTE: Under Committee Rules, Mr. Rogers, as Chairman of the Full Committee, and Mrs. Lowey, as Ranking Minority Member of the Full Committee, are authorized to sit as Members of all Subcommittees. Donna Shahbaz, Angie Giancarlo, Loraine Heckenberg, Perry Yates, and Matthew Anderson Staff Assistants __________ PART 6 DEPARTMENT OF ENERGY Page Nuclear Regulatory Commission......... 1 Applied Energy Funding................ 49 Office of Science..................... 149 Environmental Management.............. 213 __________ Printed for the use of the Committee on Appropriations __________ U.S. GOVERNMENT PUBLISHING OFFICE 20-729 WASHINGTON: 2017 COMMITTEE ON APPROPRIATIONS ---------- HAROLD ROGERS, Kentucky, Chairman RODNEY P. FRELINGHUYSEN, New Jersey NITA M. LOWEY, New York ROBERT B. ADERHOLT, Alabama MARCY KAPTUR, Ohio KAY GRANGER, Texas PETER J. VISCLOSKY, Indiana MICHAEL K. SIMPSON, Idaho JOSE E. SERRANO, New York JOHN ABNEY CULBERSON, Texas ROSA L. DeLAURO, Connecticut ANDER CRENSHAW, Florida DAVID E. PRICE, North Carolina JOHN R. CARTER, Texas LUCILLE ROYBAL-ALLARD, California KEN CALVERT, California SAM FARR, California TOM COLE, Oklahoma CHAKA FATTAH, Pennsylvania MARIO DIAZ-BALART, Florida SANFORD D. BISHOP, Jr., Georgia CHARLES W. DENT, Pennsylvania BARBARA LEE, California TOM GRAVES, Georgia MICHAEL M. HONDA, California KEVIN YODER, Kansas BETTY McCOLLUM, Minnesota STEVE WOMACK, Arkansas STEVE ISRAEL, New York JEFF FORTENBERRY, Nebraska TIM RYAN, Ohio THOMAS J. ROONEY, Florida C. A. DUTCH RUPPERSBERGER, Maryland CHARLES J. FLEISCHMANN, Tennessee DEBBIE WASSERMAN SCHULTZ, Florida JAIME HERRERA BEUTLER, Washington HENRY CUELLAR, Texas DAVID P. JOYCE, Ohio CHELLIE PINGREE, Maine DAVID G. VALADAO, California MIKE QUIGLEY, Illinois ANDY HARRIS, Maryland DEREK KILMER, Washington MARTHA ROBY, Alabama MARK E. AMODEI, Nevada CHRIS STEWART, Utah E. SCOTT RIGELL, Virginia DAVID W. JOLLY, Florida DAVID YOUNG, Iowa EVAN H. JENKINS, West Virginia STEVEN M. PALAZZO, Mississippi William E. Smith, Clerk and Staff Director (ii) ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR 2017 ---------- Wednesday, February 10, 2016. DEPARTMENT OF ENERGY--NUCLEAR REGULATORY COMMISSION WITNESSES STEPHEN BURNS, CHAIRMAN, NUCLEAR REGULATORY COMMISSION KRISTINE SVINICKI, COMMISSIONER, NUCLEAR REGULATORY COMMISSION WILLIAM OSTENDORFF, COMMISSIONER, NUCLEAR REGULATORY COMMISSION JEFF BARAN, COMMISSIONER, NUCLEAR REGULATORY COMMISSION Mr. Simpson. The hearing will come to order. I would like to thank all the subcommittees again for their hard work on the fiscal year 2016 omnibus bill. I look forward to working with you during this busy year ahead. We just had an organizational meeting and things are moving relatively rapidly since the President's budget came out yesterday. We are trying to get all our hearings in and try to move things up and go through regular order, and get individual bills done, which would be novel. We have not passed all of the individual appropriation bills and conference reports since 1994. It would be nice to actually get things done on time. There are a lot of things in this world that I am uncertain about, but I am 85 percent sure of when October 1 comes. You would think we could get it done, but it is going to be a difficult year, and a more rapid year because we are obviously gone in August, and we have a couple of weeks where we are going to be out because of the party conventions in July. I appreciate you all being willing to come first thing. I do not know if this is the first hearing in any of the subcommittees or not, but it is one of the first. Although we just received the President's budget yesterday, we begin our oversight hearings today. The Appropriations Committee wants to move all 12 bills under regular order within the caps that are currently set in law, and finish our work on time. We will need to maintain an aggressive schedule in order to conduct the thorough oversight that is needed to ensure that the fiscal year 2017 energy and water appropriations bill provides responsible funding to the programs within its jurisdictions. Today's hearing is on the budget of the Nuclear Regulatory Commission. We have before us Stephen Burns, the chairman of the Commission, and his fellow commissioners, Kristine Svinicki, Bill Ostendorff, and Jeff Baran. Thank you all for being here today, and I would like to congratulate you on your leadership and the progress that has been made in recent months on the right-sizing of the NRC. I think you have done tremendous work. I admit that initially I questioned the NRC's commitment to right-sizing. I was very troubled by the letter the NRC sent to us during last year's budget process. While I am confident that had the NRC received a lower appropriation, you, the commissioners, would not have actually voted to adopt reductions that could risk safety and health before a more thorough review of lower priority activities was conducted, it was still disappointing to see a letter that suggested that you would. That having been said, since then, the NRC has taken important first steps toward right-sizing. I congratulate you, and I look forward to further discussions on continuing these promising efforts. The Commission plays an important role in ensuring that our nation can count on the clean and reliable energy that our nuclear power plants provide. The NRC must continue to assure the protection of public health and safety and provide a timely and predictable licensing process for the nuclear industry. In addition, we must move forward on long term waste storage and the Commission must be prepared to advance new and innovative nuclear technologies. I look forward to your thoughts on all of these issues. I would also ask the witnesses to please ensure for the hearing record that questions for the record and any supporting information requested by the subcommittee are delivered in final form to us no later than 4 weeks from the time you receive them. Members who have additional questions for the record will have until the close of business tomorrow to provide them to the subcommittee office. With that, I would like to welcome our ranking member, Ms. Kaptur, to our first hearing of the new budget season, and yield her any time she may use for an opening statement. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. Thank you, Mr. Chairman, very much, and good morning, Chairman Burns, and Commissioners Svinicki, Ostendorff, and Baran. Very happy to have you here today to talk about the Nuclear Regulatory Commission, and thank you for the work that you do. Nuclear energy is a critical component of our nation's energy mix, and as a source of electricity which does not contribute to climate change, it will be particularly important as we strive to meet the targets of the clean power plan and to deliver on the commitments made to reduce our carbon emissions at COP21 in Paris. As part of meeting these targets, we currently rely on an aging fleet of nuclear power generation facilities with an average age of 35 years. Many have already outlived their initial 40 year licenses while others are quickly approaching it. At the forefront of my mind with regards to aging nuclear plants is First Energy's Davis-Besse plant in my own district, which in December of last year received a 20 year extension of its license. These plants provide good, stable and high paying jobs in addition to reliable and cost effective electricity, so in regards to this, I am happy to see Davis-Besse's license extended. However, the bulk of our nuclear fleet is passing through this relicensing process, and I look forward to hearing about the steps you are taking at the NRC to ensure that communities in areas surrounding these plants are safe, especially as one in three Americans' lives lie within 50 miles of a nuclear power plant. Last year at this hearing, there was a great deal of discussion on the right-sizing and re-baselining of the NRC's budget. I understand the report detailing that effort is scheduled to be completed in the next couple of months, and I hope you will be able to comment on the progress that you have made to that end as well, and the impact of your findings on the NRC's budget. Finally, I would like to close by noting that yet another year has passed and we do not seem to be any closer to resolving how and even more controversially where to dispose of our nuclear waste. The current approach of maintaining high level radioactive waste on-site at dozens of plants distributed throughout our country is far from ideal, and in the absence of a real forward motion at Yucca Mountain or another site, our Nation has no long term solution to this pressing problem. In fact, I was asked by someone in the press yesterday about this very issue. In addition to $10 billion we have already spent on Yucca, the Department of Energy estimates that we have $27 billion of liabilities deriving from our failure to meet our legal obligation to dispose of this waste. Interim storage may serve as a step in the right direction, but we truly require a permanent strategy. The government must live up to its responsibilities to our nation and provide for the eventual safe disposal of commercially spent fuel that is currently stored at these sites. I look forward to your thoughts on how we can meet this obligation, and I thank you, Mr. Chairman, for yielding me this time. Mr. Simpson. Thank you. Chairman Burns, you are going to give the opening statement, and others will have a few minutes if you wish to comment on the opening statement. Is that correct? Mr. Burns. Yes. Mr. Simpson. Ok. The floor is yours. Mr. Burns. Thank you, and good morning, Mr. Chairman, Ranking Member Kaptur, and distinguished members of the subcommittee. We appreciate the opportunity to appear before you today to discuss the Nuclear Regulatory Commission's fiscal year 2017 budget request. As you know, the NRC is an independent agency established to license and regulate the civilian use of radioactive materials in the United States. The resources we are requesting in fiscal 2017 will allow the NRC to continue to uphold our important safety and security mission. Our proposed budget is $970.2 million, which includes 3,462 full time equivalent staff, and for the Office of Inspector General, an additional $12.1 million. Over our base budget, this represents a decrease of about $20 million and 90 FTE from the fiscal year 2016 enacted budget. For further context, our request is $74 million and 280 FTE less than our fiscal 2014 enacted budget, and the fiscal 2017 budget request reflects our continued focus on our important mission while it also achieves resource savings and improves our efficiency. As we continue to work through the Project Aim initiative, we anticipate additional savings. We are required to recover 90 percent of our budget through fees, so accordingly, $861.2 million of this fiscal 2017 budget request would be recovered from NRC licensees, resulting in a net appropriation of $121.1 million. Let me highlight some of the work we plan to achieve. The NRC will continue licensing and oversight activities for 100 operating nuclear power reactors, and 31 research and test reactors. The NRC expects to continue reviewing three new reactor combined license applications. Additionally, we will continue inspections of four new reactor units under construction, and continue our vendor inspection program. We expect to review one small modular reactor design certification and to review three applications for medical isotope facilities. The budget request provides funding for licensing reviews and oversight activities at reactors undergoing decommissioning, as well as continued oversight over nuclear waste and spent fuel storage facilities. We expect to review one application for a consolidated spent fuel storage facility. We will continue to license and oversee the safe and secure use of radioactive materials, and in fiscal 2017, the NRC will complete approximately 2,000 materials actions, licensing actions, and about 900 routine health and safety inspections. Of note, our 2017 request includes $5 million in non-fee billable activities to develop regulatory infrastructure and related activities to effectively review advanced nuclear reactor applications and technologies. As we continue to work through Project Aim, we are confident the agency is on the right track. The savings have already been identified through a comprehensive evaluation that involved staff and stakeholder input, and are reflected in part in our fiscal year 2017 request. Still, we remain mindful of the importance of a highly skilled technical staff in carrying out our safety and security mission. While our size may change to reflect efficiency gains, the need for the service we provide the American people remains unchanged. I want to highlight one other area we are focusing on improvement. We are cognizant of the committee's concerns regarding early commissioner involvement in rulemaking, and have approved a new approach to do so, and will provide requested information to the committee later, actually, beginning of next month, as provided in the committee report on the fiscal year 2016 appropriation. On behalf of the Commission, I thank you for the opportunity to appear before you, and I know you share our dedication to our vital mission, and I would be pleased to answer your questions. Thanks very much. Mr. Simpson. Thank you, Mr. Chairman. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Simpson. Others? Ms. Svinicki. Ms. Svinicki. Thank you, Chairman Simpson, Ranking Member Kaptur, and distinguished members of the subcommittee for the opportunity to appear before you today at this hearing on the NRC's fiscal 2017 budget request and associated matters. The Commission's chairman, Stephen Burns, has outlined an overview of our agency's budget request, as well as a description of some of the key challenges and opportunities before the agency in this year, fiscal 2016. As described in the materials provided to your subcommittee concurrent with the budget request, the NRC has continued over the past year its comprehensive initiative to right-size the agency, streamline agency processes to use resources more wisely, improve timeliness in regulatory decision making, and promote a more unified agency purpose through agency-wide priority setting. When I appeared before your subcommittee at this time last year, I testified that I looked forward to reflecting progress on these initiatives in our future budget submittals to you. I believe our fiscal year 2017 budget request coupled with the further efficiencies that we have identified and continue to identify under these Project Aim initiatives demonstrates this progress. The NRC will continue to push forward on each of these fronts in the coming year while continuing to keep our critical mission of public health and safety and security always in the forefront. I appreciate the opportunity to appear and look forward to your questions. Thank you. Mr. Simpson. Thank you. Mr. Ostendorff. Mr. Ostendorff. Good morning, Chairman Simpson, Ranking Member Kaptur, and distinguished members of the subcommittee. I appreciate the chance to be before you today with my colleagues. I am in complete alignment with Chairman Burns' testimony this morning. Regarding Project Aim, I want to thank the subcommittee and the full committee for their support of the NRC's structuring our Aim reductions thoughtfully and in a disciplined manner. I am personally pleased with the thoroughness of our staff's work in this area. I am confident when all is said and done, we will be in a better place. Regarding NRC's work on advanced reactors, I want to highlight a couple of topics here. NRC submitted a report to Congress in 2012 talking about how we license advanced reactor technologies and our strategy. I believe we are preparing in a thoughtful way for advanced reactor technology license applications. Interest in the subject continues in the United States and overseas. In September of this last year, the NRC co-hosted a workshop with our colleagues at the Department of Energy to discuss the development of these new reactors, and we had a chance to engage our stakeholders on the new technologies. Our budget request includes $5 million in non-fee billable resources to continue this work, and to ensure the NRC is in the best possible position to license any such advanced reactor license application that may be submitted to us for our review. I appreciate the opportunity to be here today, and I look forward to your questions. Mr. Simpson. Thank you. Mr. Baran. Mr. Baran. Thanks, Mr. Chairman. Chairman Simpson, Ranking Member Kaptur, and members of the subcommittee, thanks for the opportunity to appear today. It is a pleasure to be here with my colleagues to discuss NRC's fiscal year 2017 budget request and the work of the Commission. You have already heard a lot about Project Aim, and no doubt, you will hear quite a bit more before the end of the hearing. I want to briefly share just a few thoughts about this important initiative. I have been very impressed by the willingness of the NRC staff to take a hard questioning look at what work the agency is doing and how we are doing that work. The staff has identified numerous ways to achieve the substantial savings that are reflected in the fiscal year 2017 budget request. As my colleagues have noted, the Commission is currently reviewing a long list of additional potential efficiencies. This effort is about more efficiently focusing on the right safety priorities, not about relaxing regulatory oversight of licensee performance and safety. That means identifying further savings while remaining focused on our core mission of protecting public health and safety. As Chairman Burns noted, there has also been congressional interest in ensuring that non-routine NRC rulemakings are approved by the Commission early in the process before significant resources are expended. I agree with that objective. The Commission looked at this issue and decided that the staff should send a brief streamlined rulemaking plan to the Commission to get approval for each non-delegated rulemaking. We just need to make sure that rulemaking plans stay lean and do not themselves require significant staff resources to prepare so we can achieve our shared goal of increased accountability and efficiency. There are, of course, a number of other important efforts underway at NRC, from implementation of post-Fukushima safety enhancements, to a decommissioning reactor rulemaking, to preparations for the first small modular reactor design application expected later this year. We are happy to discuss these and any other issues of interest. Thank you, and I look forward to your questions. Mr. Simpson. Thank you. Again, thank you all for being here. I think it is important that all of you be here before the committee because I want the committee to get a chance to know you and you to know the committee. I appreciate all of you taking the time out of what I know is a busy schedule to come here. Ms. Kaptur. Ms. Kaptur. Thank you, Mr. Chairman, very much for yielding to me in this round. Chairman Burns, I wanted to ask you if you could report to the American people on the year of 2015, and the safety of nuclear power production at the 100 commercial reactors, and the 31 test and research reactors across our country. How would you compare what happened in 2015 to prior years if you were to give a weather report to the public in terms they can understand? How did 2015 compare to prior years? Mr. Burns. I think there was continued good performance overall within the industry. We had a couple of plants go into what we call Column 4, which required enhanced oversight on our part, the Arkansas Nuclear One and the Pilgram plant both operated by Entergy. We are providing an additional oversight on that. Again, apart from the operating fleet, I would note that we continue to inspect the construction of the four units in Georgia and South Carolina, and also reached a decision with respect to the operating license for Watts Barr Unit 2 in Tennessee. It has begun pre-operational testing and commercial operation is expected this spring. The other part of it, which does not sometimes get as much attention, is our engagement with the Agreement States. As you may know, 37 of the states have an agreement under the Atomic Energy Act, where they carry out the regulation of radioactive materials under rules compatible with the national standards. I think this is a good example of a very good Federal-state partnership, and we continue to engage them. We support them with training and communicate well with that. As Commissioner Ostendorff elaborated on, we have two issues, one looking forward is the question about--as you will see in the budget proposal--additional areas for engagement on potential advanced reactor design. We expect a new small modular design. The other issue in terms of again giving electricity markets cheap natural gas and all that, the question about continued operation of some nuclear units in those markets. We have indications of what I will call early shutdowns in the sense of before the end of the licensed life. We are prepared to deal with that. We have initiated a rulemaking to make our processes for that a little more efficient and effective. That will take a few years. We are able to engage in that and have been. That is sort of like a 50,000 foot level, if that answers your question. Ms. Kaptur. In 10 words or less, for 2015, what do you say to the American people about the safe performance of our nuclear plants? Mr. Burns. I think there was continued good performance of the nuclear plants in the county overall, and continued work on the enhancements that we identified in cooperation with industry after the Fukushima accident, so improving safety. Ms. Kaptur. I think it is really important to assure the American people of that safety in words that they can understand. I wanted to just ask a second question very briefly. We had testimony from some of our labs last year about the difficulty of recruiting people in very high-level skills. I would like to ask you in terms of qualified nuclear engineers, who are citizens of the United States as well as qualified technicians, nuclear technicians in the electrical field, for example, plumbing, pipe fitting, all the skills that are necessary. Do you have any specific focus on that recruitment issue and education issues? So we are able to recruit U.S. citizens for these positions? How does NRC position itself for that? That will be my final question on this round. Mr. Burns. The NRC has, as the Committee will know, has included within our appropriates for a number of years about $15 million grants program which we have been administering. I can provide the number of institution across the country for the record, but that provides some funding in terms of training programs and similar things. Not only at the engineering level, but I think there are some trade schools. Basically, you know, community colleges and other places where you can get the trades involved. I know in some of my visits, most recently, to the South Texas plant and the Palo Verde Plant in Arizona that it is interesting. You can see partnerships between the utility and local community colleges in terms of developing trades and a workforce that is, in effect, local that may contribute as employees of those plants in future years. So, again, our role in some respects is a small one, but I think we are trying to do the effect with what we have. Ms. Kaptur. I would urge you on in those efforts and thank you, Mr. Chairman. Mr. Simpson. If the gentlelady would yield for just a second before I turn it over to Mr. Frelinghuysen. You did not ask for the $15 million in this budget request? Mr. Burns. That is correct. Again, this is the President's budget and in terms the approach the Administration has taken toward that. What I will say is it has been now, I think about 8 or 9 years, where it is routinely, and we have embraced that and carried it out, I think, in an effective manner. Mr. Simpson. I appreciate that. The reason we gave it to the NRC is because we used to do it within the Department of Energy and the Department of Energy did not take it very seriously, and so we gave it to the NRC which I think you have done a good job with. Mr. Frelinghuysen. Mr. Frelinghuysen. Let me thank you all for taking on the commissioner assignments. I note that Miss Svinicki is a native of Michigan, but she spent some time in Idaho, so you probably know quite a lot about the Chairman which you probably should keep to yourself. But Mr. Ostendorff and Mr. Baran worked up here on the Hill. I think it is good, you know, to have you on the other side of the table, since, obviously, you have prepared members of Congress in your respective positions for such testimony. Yes, you want to get an Idaho comment in? Mr. Simpson. No. I was just going to see if you would yield for just a second. I did want to say because it is kind of unusual that we have all of the commissioners here. When someone asks a question, if others would like to comment on it also, feel free to do so. Mr. Frelinghuysen. I just assume you would not comment on your career, but let me say I know you commanded a submarine as well, so you have another part of our nuclear obligation that comes before this committee. A lot of anxiety, obviously, out there, and I am within shouting distance of Chuck Schumer, so I will not get into that. About the relative safety of our nuclear facilities, there was a report. I have read it or at least seen a summation about cyberattacks. Could you comment about that report? It seemed to be pretty disturbing. I think it is, in general, open sources here. That there is a degree of vulnerability. You have had double the amount of incidents that other Federal facilities have been subject to, and what are you doing about it? Mr. Burns. You are correct. Mr. Frelinghuysen, that there are actually two reports that came out, actually fairly close. One a Chatham House report out of the UK, and then a Homeland Security within about a week. The Chatham House was a general perspective on cyber. Not particularly in the U.S. In fact, no one who prepared that report talked to anybody at the NRC about it. It is not clear who they talked to, an unnamed source. The basic ideas or the issues you want to get at which is, you know, keeping the reactor controls systems, critical safety systems separate from the internet. Those are things that are required. Those are the things that are being done here. The principles they were enunciating I think were good. Homeland Security, about a week or two later, actually gave the nuclear industry a pretty good score in terms of where it was. Part of that, I think, comes from the fact that we had established a set of regulations several years ago which the industry is implementing that addresses the cyber security type issues. They have gone through the first phase. We are doing inspections and follow up inspections this year. There is another phase it will do, but overall, I think this industry is in pretty good stead. It requires vigilance. Mr. Frelinghuysen. Are there a number of contracts? The IG laid out some evidence that, perhaps, maybe some of these contracts might be scrapped. Mr. Burns. Actually. I apologize, I may be referring to different points. Our inspector general issued a report with respect to our internal, NRC internal, issues, and there are some issues we need to address in terms of some of our contracts and the like. But overall, we have not experienced a significant attack. We need to be, you know, vigilant on this as every industry. Mr. Frelinghuysen. Let me just make a few comments and then I will stop. Mr. Burns. Ok. Mr. Frelinghuysen. The report does not fault your staff at the National Security Operations Center, the SOC. They are meeting the requirements of the $262 million contract, which I guess expires next May of 2017. This is a quote, ``The problems are in the contract itself,'' said the report, ``which found that the terms require staff to do a little more than manage a few anti-virus, anti-malware, and anti-spam systems.'' Is that true? We can upgrade to something a little more proactive? Mr. Burns. My understanding, and I would be pleased to provide more details for the record, is that we are addressing the IG's findings in the contracting process and taking the corrective actions there. So I think we agree with the findings that the IG had. We need to be better. Mr. Frelinghuysen. Ok. Thank you. Mr. Chairman. Mr. Simpson. We are pleased to have with us today the ranking member of the full committee, Miss Lowey of New York. I know you have a very busy schedule, so we would be happy to recognize you next. Ms. Lowey. You are very gracious Mr. Chairman. I want to, first of all, thank you for bringing us together for this very important hearing. As you can imagine, I have been concerned about Indian Point. I do not think it is any surprise. It is in Buchanan, New York. It houses one decommissioned, two operational nuclear power reactors owned by Entergy. Earlier this week Entergy notified the NRC and state authorities that radioactive tritium contaminated water leaked into the ground water at Indian Point. Entergy found, ``alarming levels of radioactivity at three monitoring wells.'' Just this morning Entergy has reported that tritium levels have gone up in the ground water beneath Indian Point. This is the third time since 2005, that we know of, that tritium has leaked into ground water at Indian Point. Though contamination has not spread to the Hudson River, and does not seem to pose an immediate threat to public health, it is clear that this incident requires a full and thorough investigation. Based on the many problems at Indian Point and what seems to be poor oversight on the part of the NRC it seems the NRC is not adequately prioritizing public health and safety. There are three NRC resident inspectors who work fulltime at Indian Point. They are following Entergy's groundwater monitoring program and should have been on top of an inadequate pump system in place in recent years. While your agency is sending another inspector to the site this week, and has begun an investigation, I am deeply concerned that the NRC is turning a blind eye to glaring problems at a critical time when Entergy's relicensing process is underway. So a few questions, and thank you, Mr. Chairman. When were these resident inspectors made aware of the groundwater leak at Indian Point? What actions has the NRC taken to address this tritium leak? Will the NRC be fully investigating the leak, as I urged you to do in a letter earlier this week? Could you elaborate for us what that investigation will entail and when findings should be expected? Mr. Burns. Certainly. I believe our resident inspectors and our regional office were informed of the leak or the spill Friday evening when Entergy identified it. It was at an amount that was actually below the threshold reporting limits, but Entergy reported it to us. Ms. Lowey. Could I just ask a quick follow up? Before you said when Entergy reported it, so there are three resident inspectors that are there. Mr. Burns. Right. Ms. Lowey. There is no way of them knowing or identifying the leak until Entergy reported it, is that correct? I just want to make sure I am understanding the sequence and the process. Mr. Burns. I would expect, and I can certainly confer with our regional staff, but I would not necessarily expect the resident to be present when the spill or the leak occurred or something like that. I mean, our inspectors do go through the plant. They observe certain evaluations, but they would not necessarily have seen that right away. Ms. Lowey. I mean, I am going to let you continue with the approval of our Chair, but there are three resident inspectors, so I just wonder what they are looking for as they are walking around there fulltime? Mr. Burns. They are looking for any number of things. They have a particular protocol, I believe, that we set that an inspector goes out and looks at. They may observe particular plant operations. They may observe this phase of equipment and things like that. They go through the plant at the various times to do that. Ms. Kaptur. Ok. Mr. Burns. Ok? Ms. Lowey. But it would not be incumbent upon them to identify a leak? They have to wait until someone tells them, is that correct? Mr. Burns. Unless they had observed it directly themselves. After all, the operator is responsible for the operations within the license requirements, and is ultimately responsible for the safety of the plant. If indicated, we will have inspectors, both we have the resident inspectors who make observations during their normal rounds in terms of what the plant is doing as well as send, as you indicated here, we have sent a specialist out there to help with the evaluation of what happened and the significance of it. Ms. Kaptur. Now, as I understand it, Entergy said to you, the NRC, that the radwaste sump pump has been out of service since October 2014. Will the NRC inspectors at Indian Point and other nuclear power plants begin doing annual or semi-annual reviews of all systems at these facilities? I am just puzzled about that. Mr. Burns. Well, I would expect, again, as part of our evaluation of this particular incident to understand how that contributed to the tritium spill or the tritium leak. I would expect that to happen. We will inspect during outages various pieces of equipment and in particular sometimes operation of equipment and those types of things during our inspection program. Ms. Kaptur. Mr. Chairman, lastly, it is since 2007 that Entergy has been seeking to extend its licenses for Indian Point's two reactors, Units 2 and 3, for another 20 years. Both of these reactors have eclipsed their original licensing periods. So despite the expiration of their licenses, Indian Point can continue to operate until a final decision is made by the Nuclear Regulatory Commission. Do you have any updates when the commission will make a final decision, and will the recent tritium leak impact the final decision? Mr. Burns. I believe that a supplemental environmental review is due later this year. I can provide you for the record what the timing is. I do not happen to know it off hand. I know there is a supplemental review. The question on the tritium leak. The tritium leak is part of the ongoing oversight process for the plant. I would expect actions related to the performance of Entergy to be taken account of through our normal oversight and evaluative process for that. They would not await the license renewal process. Ms. Lowey. Thank you, Mr. Chairman. I appreciate the time. Thank you. Mr. Burns. Thank you. Mr. Simpson. Thank you. Mr. Calvert. Mr. Calvert. Thank you, Mr. Chairman. First and foremost, thank you for being here today. Thanks for your service to our country. After the fall of the Soviet Union some of the nuclear materials in some regions are still unaccounted for. There have been, as you know, multiple attempts recently by criminal networks with suspected Russian ties that have sought to sell radioactive material to extremists throughout portions of Eastern Europe. These repeated attempts to acquire nuclear materials signal, what appears to be, a potential nuclear black market that has emerged in several former Soviet states. Investigations have revealed that smugglers are explicitly targeting buyers who are enemies of the West, and those buyers' intentions are to target the West, in particular Americans. Considering the recent breakdown in relations between the West and Russia, cooperation and information sharing on matters have become more complicated. Some individuals within Russian organized crime cling to a Soviet-era hatred of the West. Islamic extremists groups like ISIS, obviously, share that same hatred. Both organizations have made clear their intent and willingness to use nuclear weapons. This development represents the feared scenario in which organized crime and terrorist organizations, like ISIS, establish a mutual partnership. What procedures and equipment are in place to ensure that if an extremist is able to purchase nuclear materials, that they would be prevented from being smuggled into the United States? Considering that we have lost track of nuclear materials here in the U.S., what is being done to ensure bad actors could not acquire the domestic material? Mr. Burns. I think the response to your question actually crosses over a number of agencies. We may actually have less to do with it than some of the others. What we do is we keep in touch with the Department of Energy, the Customs Agency, and others that might have a role in that. I know, again, this is not something that the NRC operates or licenses. Mr. Calvert. If the gentleman would yield. That even bothers me more because if you have a number of agencies that are looking at this is there anything being lost in communication between those agencies? Mr. Burns. I do not think so. I think we have good cooperation and good communications among the agencies. On our end, what we can do, as the NRC, is we can do our best with respect to licensable radioactive material in the United States in terms of protecting sources, assuring that licenses are issued only to those who should have licenses. There are security aspects to that in terms of the category and quantity of radioactive or nuclear material. So that is where I think our responsibility lies. In the interagency, and I know Commissioner Ostendorff is experiencing that, there is, I think, good communication, cooperation because we are concerned with that. Mr. Calvert. Commissioner. Mr. Ostendorff. Thank you for the question, Congressman Calvert. I would just add two things here. The NRC, we have responsibilities under Federal law to rule on export license applications, and we work very closely with the State Department and the Department of Energy and the National Security Council staff on those matters. The Chairman mentioned the interagency, we ultimately meet, typically every 6 months, in the Top Secret, Sensitive Compartmented Information, TS/SCI, briefing in our SCIF, in NRC headquarters, to receive updates on threat assessments for nuclear materials, smuggling, al- Qaeda, ISIS, ISIL, other jihadist groups, and I think each of the commissioners spends quite a bit of time on a regular basis getting periodic updates in between these 6-month briefings. With respect to the National Security Administration, I used to be an official there, 2007, 2009, they had the bulk of the programs. For instance, there is a container security initiative to use portal monitors to screen containers coming into the United States' various ports to detect nuclear materials, and I think NSA does a very good job at keeping us informed of anything they find of a concern in those areas. Mr. Calvert. Well, I just wanted to bring that up. I cannot think of anything more important than keeping nuclear material out of the hands of those who would harm us. One quick question on decommissioning, there is a nuclear facility in California near my congressional district, San Onofre. On the issue of decommissioning nuclear facilities, why does it take so long? I have been told by Edison it is going to take 10 years before they would be able to decommission that site. Any comments on that? Mr. Burns. There are different approaches to it. They are actually going at an approach called DECON, which goes toward a more immediate, although, as you indicated, maybe a decade-long process versus what we call SAFSTOR, which is basically set and do it some years later, even 10 years later. But part of it is that it allows the reduction of some residual radioactivity. It allows them to do it in a methodical way. I do not know that there is a magic date or timing they can do it, but it is a big deconstruction project. I know, having gone out to the one in Illinois, near Gurnee, Illinois, northwest of Chicago, the Zion plant, which they are undergoing, and one of the things they told me, they are actually at a point it is not radioactive material that is the concern, it is actually other heavy metals and other types of hazardous materials that you have got to be careful about as well. It is not just the radiation, for example, if they use lead paint when the plant was built in 1970 for signage and things like that. So from our standpoint, it is a safe approach that they can do; I recognize it may take some time. Mr. Calvert. Ten years seems like a lot of time, but thank you, Mr. Chairman. Mr. Simpson. Ms. Roybal-Allard. Ms. Roybal-Allard. Thank you, Mr. Chairman. Thank you so much for being here. The March 2011 accident at Japan's Fukushima Daiichi nuclear power station was caused by a tsunami that was triggered by a powerful offshore earthquake. After the disaster, NRC required U.S. nuclear power plants to re-evaluate their seismic risk. NRC is requiring the nuclear power plant seismic evaluations, as I understand it, to be submitted to the agency by the end of 2019. Based on the initial seismic screens completed in 2015, how many U.S. nuclear plants may be subject to greater earthquake forces than they were designed to withstand, and in the interim, is NRC requiring nuclear plants to make any major modifications to reduce seismic risk before the plant evaluations are completed in 2019? Mr. Burns. I would have to supply for the record that there are a number of them, I believe it is true, I do not know, it is a half-dozen or more, we will provide that for the record, that had a higher seismic evaluation conducted. What we have done, and for example, in California, the Diablo Canyon, I think its revised seismic evaluation is due in 2017, and Columbia Station in Washington in 2019. What we do expect is that they are capable of meeting their current design basis, and if they have identified areas which there may be vulnerability, that they may be taking additional measures, but for the most part, the plants themselves, in terms of their design, are extraordinarily robust, so we are satisfied, given what we know at this time, that the plants can operate safely pending the final outcomes on the re-evaluations. Ms. Roybal-Allard. Ok, and if the evaluations show that some modifications need to happen, what is the timeline or how long would you expect those things to take? Mr. Burns. On a plant-specific basis, and again, it would be in terms of assessing the significance of what it is, what the nature of the outcome is or what the equipment that might be affected, but we would establish a timeline, and again, if during that time, we would either have interim measures that would assure safety, and that could be a variety of things, I think. Ms. Roybal-Allard. Ok. The decommissioning work that the NRC oversees, as has been stated, is critical to ensuring the safety of workers and those who live in neighboring communities, and in the county of Los Angeles, NRC lists two sites that are being decommissioned; first, Magnesium Alloy Products of Compton, which used thorium, and second, Isotope Specialties of Burbank, which fabricated radioactive sealed sources and packaged low-level radioactive waste for disposal. After these licenses expired, authorities found radioactive contamination at both sites. What is NRC's responsibility for ensuring that the safety of the public and the environment at these formerly licensed facilities, and also can you provide an update on the remediation efforts, and who is responsible for the cost of cleaning up the Compton and Burbank sites? Mr. Burns. I would be pleased to provide. I am not familiar with those two particular sites. There are a number of instances in which licenses that may have been terminated, for example, and I do not know if that is the case with these, under the Atomic Energy Commission, where we have gone back and said that there additional remediation needs to be done, but I would be pleased to provide you some information that is responsive on that. Ms. Roybal-Allard. I would just appreciate it, and just in a more general question, what is NRC doing to ensure that licensed facilities that are closed in the future are held accountable for newly identified contamination post-closure? Mr. Burns. Primarily what we do in terms of close-out inspections, what I would expect us to do is have a thorough assessment of the site, understanding what the historic operations are, that sometimes the challenge with some of these sites is that they may have had historic operations, sometimes that went in before there was licensing either under the AEC or NRC, so making sure you have good site characterization, that you have good oversight of the activities done to decommission, and that, I think, going forward, those are the things for those areas that are under our jurisdiction that I think can help the most. Ms. Roybal-Allard. Ok. Mr. Simpson. Thank you. Mr. Fleischmann. Mr. Fleischmann. Thank you, Mr. Chairman. Chairman Burns, Commissioners, thank you all for being before us today. I represent the 3rd District of Tennessee, that is an east Tennessee district. Nuclear energy is important to my district, from the TVA Sequoia and Watts Bar facilities in the south to the famous X-10 nuclear reactor in Oak Ridge, which is the oldest reactor in the world. In my view, nuclear provides clean electricity, creates American jobs, and stimulates the Unites States economy. Chairman Burns, I am very interested in the development of small modular reactors, and this subcommittee has made funding for them a priority. As we anticipate an SMR application in the next year or so, what is the NRC's plan to address the funding, technical, and licensing issues of SMRs to support the commercialization? Mr. Burns. We expect to receive a design certification application from NuScale, which is located in Oregon, at the end of this year, and for, I think, about the last two years or so, I know it was going on before I came back to the NRC in late 2014, our staff has engaged with NuScale to make sure that I think on both sides we have a good understanding of expectations, in terms of we have an understanding in terms of what we are seeing, in terms of the technology, as well as they understand our needs in terms of what is needed for the design certification, and I think that dialogue has gone pretty well and puts us in good stead to receive and act on the design certification that we will get. The funding, we do not provide the funding for the design, develop and all that, that is primarily through the Department of Energy, and I think they have received some funding through the DOE. But one other thing I would add is, in addition to the NuScale application, I think we do expect to receive from Tennessee Valley Authority an application for an early site permit. Basically, it is at the Clinch River site, and basically what that is, it is looking at the site with an assumed technology. It gets you a review of some of the environmental issues and siting issues, geology, seismology, things like that. So I believe we are receiving that this spring, sometime this spring, I think in April. Mr. Fleischmann. In your consideration of SMR license applications, are there lessons to be learned from the recent licensing of Watts Bar 2 and Westinghouse AP1000 plant at Vogtle and V.C. Summer nuclear power station? Mr. Burns. Probably less so from Watts Bar 2, because Watts Bar 2 is completed under the 2-phase licensing process of a construction permit followed by an operating license. Now, it may well be that if some future applicants are interested in going that way, you can use the 2-step or you can use the so- called 1-step licensing that the Summer and Vogtle have gone through, so there may be some things to learn, and I believe our staff is doing the knowledge management on that. Commissioner Svinicki. Ms. Svinicki. Something that I would like to bring to the subcommittee's attention, in my time as a commissioner, I have occasionally been concerned that agencies like NRC are very tradition-bound. We are most comfortable making decisions on what we are familiar with, which is the large light water reactors like Watts Bar 2, and as we look over the horizon at small modular reactors, but maybe even more so to other advanced technologies that I know your subcommittee has heard from DOE about multiple times, I wondered about our flexibility to adapt our regulations to something that looks quite a bit different from what we have licensed, which by the way, we are cautious about; even those can take quite a bit of time to do. So I have really challenged the NRC staff to say, what are the measures that could give us confidence when we tell Congress, if we get an SMR, we could do this in four years or something, half the time of what we have been doing? Something that is an odd analogy, I think, is that my confidence was raised that our staff has completed a review of a different, it is not a reactor, in Janesville, Wisconsin or near there, there is proposed to be a medical isotope production facility. That applicant came in in medical space, but it was a different kind of aqueous reactor, kind of a reactor, quasi-technology, to make medical isotopes, and I was impressed, and my confidence was increased at NRC's ability to be a little bit more agile and adaptable in adapting the regulatory framework to something else. Because for the NRC staff, this application and technology did not fit neatly at all into the regulations that we have, but what they did is, they looked at applicable parts of the regulations and said, take this from power reactors, this from other materials space, and we were able to find both a legal and technical path to do that. I think that was an accomplishment for us, because it was something we had not licensed before. It is not a perfect solution for SMRs and advanced reactors, but I do think it is a demonstration of something real in terms of our flexibility. Mr. Burns. I agree. Thanks. Mr. Fleischmann. Thank you all. Mr. Chairman, I will yield back and wait for round 2. Mr. Simpson. Thank you. Mr. Fortenberry. Mr. Fortenberry. Thank you, Mr. Chairman. Thank you all for joining us today. What is the future of nuclear power in America, or let me rephrase the question, in the world? Mr. Burns. The interesting part of the answer to that question is, I think if you look, you wind up in worldwide, you wind up having to look at different places. Start with the United States, right now, we have with cheap natural gas, what I will hear from utility executives, distortions in the electricity market in terms of how they see their nuclear units valued, so you have somewhat an uncertainty. You have units being built in the southeast and in regulated markets, and we have applications. We just issued yesterday the authorization for the combined licenses for South Texas Units 3 and 4, and they talk as if they are very serious about that. So that is in the U.S. If you look in Europe, my three years there, it was extraordinary in terms of how people talked about it. You have the Germans with the Energiewende, with turning away from nuclear, though buying some French nuclear and buying Polish coal generation. You have the United Kingdom going forward with its program. You have Eastern Europe going forward in its program. Then you move to Asia where you have India and China, China on a very aggressive building program, and India, less so, but also growing their nuclear generation. Then you have the question of so-called new entrants, with countries like Vietnam. You have a country like the UAE with 2 units under construction and another two, so you have a mixed bag, and I am probably not the best fortune teller or forecaster on that, but that is what I have seen across the world on it. Mr. Fortenberry. Well, the question becomes, maybe you can explain if there is any, your interaction with other countries' design standards, because to Mr. Calvert's question, the reality is, if we are going to have nuclear power, we are going to have problems with nuclear science, the waste, the technology getting in the wrong hands, the switches being flipped to potential military uses. So while I understand that is not the fullness of your charge, nonetheless, you are out on point creating regulatory atmosphere to ensure safety, but also, I would hope, to be helping us think strategically about how to prevent non-proliferation of harmful technology and new options for dealing appropriately with waste and other problems. This is the second part of the question. If you would return to the small modular reactor, what does that buy us in terms of those questions I just posed? Mr. Burns. Well, I think that is an interesting question, because some of things, for example, that we will need to look at, we have started to look at some of those in the siting, is what is the security profile for an SMR? What is, in fact, the number of operators that you need in a control room for an SMR; that is more of a safety question. But that is one of those things that we need to deal with. We have put out, I think, for public comment the question on what is the emergency planning profile for the small modular reactors. A lot of what you do here, and I think partly that is going to be to the extent that DOE helps with that, part of it is our engagement, that there is in some of the advanced designs, more inherent protection from a security safeguards perspective. I think those are important things to look at, and I think that is something that not just us in the United States, the extent, like there is a Generation 4 forum, those are the types of things that they will look at as well. Those are good questions; I am not sure we have all the answers yet, but what you hear is that there are some aspects of that just from the safeguard security standpoint that you may have better inherent activates. Mr. Fortenberry. Yeah, assuming this is the way of the future and these become scalable and easily replicable, it does not lessen the deeper, harder questions and in fact it makes it worse, not just in terms of your job and making sure the immediate site is secure and that there is not going to be any significant accident but this larger issue of the problematic strategy that is facing humanity or the problems that are facing humanity in general about a strategy in which we control this technology and all of the potential harm that can come from it. Mr. Burns. Yes, and one of the things that we can do as NRC and we are doing, that NRC does to the extent that DOE and some of the broader non-proliferation issues you raise is that we are engaged with the International Atomic Agency in terms of looking, there is a new form on SMRs there, through my old organization, the Nuclear Energy Agency at the OECD. There is a multinational design evaluation program where there is cooperative and they are starting to look at the SMR. Mr. Fortenberry. Mr. Chairman, does he have time? Mr. Simpson. The gentleman's time has expired for this round. Mr. Fortenberry. Thank you. Mr. Simpson. Mr. Valadao. Mr. Valadao. Thank you, Chairman. Good morning, Chairman and Commissioners. I understand the NRC has been working hard to reduce the licensing backlog that has grown over the past four years and the NRC prioritizes license amendment requests based on the importance to safety, however, some license amendment requests do not necessarily impact safety but involve improvements in the economic performance for liability of the plants. Many of these plant changes can only be performed during plant outages which occur every 18 to 24 months, which highlights the importance of a timely review by the NRC. Delays by the NRC in processing license amendment requests can have significant impact on the plant's bottom line, and hopefully the actual rate that our folks pay, by pushing off significant capital improvement projects. Safety should come first, but because NRC is the country's sole commercial nuclear licensing and regulatory authority, it is imperative that the NRC provides timely servicing of the licenses it issues. Do you agree that license holders should be able to establish and rely on schedules that assume NRC will live up to its commitment to process all licensee actions within two years and do you believe that the NRC staff should adhere to the internal procedures to ensure timely and disciplined review of the license amendment requests? And what is the NRC's long term strategy for ensuring the capability to provide predictable and reliable and timely processing of license amendment requests? Mr. Burns. I do agree that it is important for us to set objectives like the 2 year objective. Again, they may not be hard and fast in all circumstances but it gives us something to work to. It enhances, I think, communication with licensees and the like. What we have been doing over the last couple of years, we have been working down the licensing backlog and I believe that through 2016, or by 2017, we will have worked it off so we have been giving that some good attention and are trying to meet those goals and objectives. Mr. Valadao. All right, I think I might have time for one more, if I am not mistaken, Chairman? One of the goals of Project Aim is to ensure adequate sizing of the agency is achieved by 2020 with the target of 3,400 full-time equivalents. When Project Aim's efforts began, NRC budget was well over one billion dollars with 3,778 staff positions. With FY16, the NRC was appropriated approximately one billion and NRC set a target staff ceiling of 3,600 positions by the end of fiscal year. Based on the current projections, NRC seems to have met that ceiling target at the beginning of this calendar year. Your request for fiscal year 2017 again requests a decrease in funding as well as a decrease in staff. Because the previously anticipated level of reactor licensing did not occur, areas that had grown in anticipation of the projected workload demand, such as staffing and acquisition of a third building at a headquarters complex should be reexamined. Because housing is now a major fixed cost that the NRC carries annually in its budget, the committee would benefit from better understanding what actions the NRC is considering to reduce its housing footprint at the headquarters complex once its right-sizing efforts are completed. Do you agree that the NRC should be reevaluating the need to occupy three buildings, especially in light of the staffing reduction targets? If so, what are the NRC's plans to right- size their physical footprint? Mr. Burns. Well, a point of fact, we are the minority tenant in the third building at this point. The most important thing, probably we have in there is our operations center which was upgraded a few years ago and we have some staff offices but we are the minority tenant. As we look at the overall staffing size of the agency, I would agree, we need to look at what our footprint is. What do we need in terms of space? And to the extent that we do not need, be responsible about the space we have and, where possible, reduce our footprint, if it maintains our--I think Commissioner Svinicki wanted to add something. Ms. Svinicki. Congressman, I was listening very closely to the figures in your question and if I heard correctly, I agree with all of the figures that you quoted. I did want to offer one clarification. I think you quoted 3,400 FTE as the ultimate goal for Project Aim in the year 2020. I want to clarify; it is accurate that we published that figure. It was a preliminary staff estimate at the very beginning of our Project Aim work. It is not informed by any of the work that we had done over the last 18 months and the Commission had not endorsed this figure. The Commission did endorse a figure of 3,600 for the current fiscal year as an interim step but I think it is fair to say that the Commission does not feel it has adequate information to know if 3,400 is the right number so we never endorsed that and we certainly have encouraged our staff not to be bound. Frankly, I think that, as a personal view, that figure may not be ambitious enough thank you. Mr. Valadao. All right, well thank you. I yield back, Chairman. Mr. Simpson. Mr. Visclosky. Mr. Visclosky. Thank you, Mr. Chairman. Chairman, in your testimony, you indicated that the NRC expects to review an application for interim consolidated storage in 2017. It is my understanding that waste control specialists in Texas announced that they may submit a licensed application during the coming year. It is also my understanding that there is an Energy Alliance in New Mexico that may also, at some point, submit an application. I do not thing the time is as clear. Do you have enough money in your budget to adequately address one, and possibly two applications during the coming year? And if not, what are you lacking to make sure that they receive consideration? Mr. Burns. I think my understanding is that we do have the money available in the current budget to address the Waste Control Specialists, which, as you indicated, is the first expected application. It may require some reprogramming of funds and then if it triggers the marks, we would come to the committee on it. Because we did not know and did not expect at the time the 2016 budget was promulgated, we did not particularly plan for it but we think we have the room in there for that, and the one in New Mexico I think is not expected until '17. It is not in the budget so I think we would have to look. I think again, my understanding is we may be able to shift some funds to be able to cover that but we could make sure we are clearer on that for the record. Mr. Visclosky. If you could, for the record, that you are clear for, if nothing else, the Texas application, assuming that it would come online for '16, I would appreciate it very much. Mr. Burns. Yeah. Mr. Visclosky. Just as far as spent nuclear appeal storage, what is in the pipeline and how do you expect to prioritize different application requirements? Mr. Burns. Primarily, the new things are these potentially consolidated storage sites. Other sites, I would have to get for the record. A number of plants already have the storage capacity. They have done the above ground dry storage or they have done the dry storage pads and some are working to it. I would be pleased to provide what new ones we may be getting from individual sites; I just do not have that number on the top of my head. Mr. Visclosky. But it would not be your anticipation? That would be for the coming fiscal year? Mr. Burns. Pardon? Mr. Visclosky. You would not anticipate those to be coming for the fiscal year we are funding. I just want to make sure you have enough resources if there are other things that are coming over the horizon. Mr. Burns. I think we are okay on that but I will check back on that. Mr. Visclosky. If you could for the record, please. Thank you. Thank you very much, Chairman. Mr. Simpson. Thank you. Let me ask a couple of questions about the budget. First, I would like to thank the Commission for the work that you have done thus far to develop the issues and issue a supplemental environmental impact statement for Yucca Mountain because the Department of Energy seems to refuse to do so. Can you lay out for us the schedule to complete the EIS supplemental and do you have sufficient funds to complete the supplemental? Mr. Burns. We do have sufficient funds to complete the supplemental statement. I anticipate it being issued this spring. My recollection was that it is sometime this spring, in March. Mr. Simpson. Can you tell me what the next steps would be after the EIS supplemental and do you have sufficient funds for this next step, and if not, what additional funds would be required in 2017? Mr. Burns. What we have is the remaining carryover that was appropriated earlier from the high level nuclear waste fund. We have, on the order, about $2 million which essentially we have--I believe we have informed the Committee before, targeted towards transferring the bulk of the documentation into our archival--the so called ADAMS document system, and then that expends what we have. The steps, once the staff issues an environmental statement. The remaining steps with respect to what the agency would have to do relate to the hearing process that is required under the act and we have pending, when the hearing was suspended, about 288 contentions that would go in front of our licensing board and then ultimately the decision would be subject to review by the commission. We have estimated in the past that to complete a review, would take on the order of about $330 million. Mr. Simpson. Would that be necessary in the next year budget or how long would that take? Mr. Burns. No, that would---- Mr. Simpson. Over what period of time? Mr. Burns. It would be multiple years and I am not quite sure the breakdown of that. Mr. Simpson. Ok. As I mentioned in my opening statement, the NRC has taken important first steps towards right-sizing. The budget requested for fiscal year 2017 is $19. 8 million below the fiscal year 2016 and projects a reduction of 90 FTEs, as we mentioned. Before we discuss the right-sizing process in greater detail, I have a couple of questions about the budget request. Do you all agree that the budget request will not impact safety? Ms. Svinicki. I agree. Mr. Burns. I agree. Mr. Ostendorff. I agree. Mr. Baran. I agree as well. Mr. Simpson. Do any of you have any additional comments on the actions that you have taken as part of the budget process to ensure that safety remains a top priority? Mr. Burns. As we develop the budget, I think that is always our top priority. We look those things where it is important for us to maintain oversight, where it may be important to us to have interface. For example, I mentioned our agreement state partners, where it is important to be able to move through an effective licensing process that assures safety and security so I am comfortable with where we are in this budget on that. Mr. Simpson. Ok, in your testimony, it mentions $41.1 million in savings for fiscal year 2017 has been identified as the result of the rebase lining. Does that budget request reflect any of these savings? Mr. Burns. It reflects about $10 million of those savings and again partly because the process of our development, as you know, the budget development process, these were things we identified when we went through the Executive Branch process. We were fairly comfortable with the $10 million and what we have done and what the staff has identified in the rebase lining paper, which I think we have provided to your staff, is identified about $30-31 million additional areas, which are before the Commission for review right now. We got the paper about a week ago but that do reflect some additional, having taken a hard look, they reflect some additional potential savings. Mr. Simpson. I understand that we are in the middle of a lot of changes that are going on and so forth. Will you be done with that and be able to identify whether that additional $31 million in savings is a reality in savings that can be achieved by the time we do a budget or an appropriation bill? Do you think in the next three or four months? Mr. Burns. Yeah, I would expect that. Mr. Simpson. Donna is looking at me like: ``Two to four months. We are talking two months maybe.'' Mr. Burns. I think that is our intention. I have read, myself and my colleagues can speak for themselves, I have read the paper, I flagged--I think the staff did a good job but sometimes they are just talking in shorthand, even to some of us who work within the building and I want to make sure I understand what those things are and I have a handful of those so that is part of our due diligence and I expect my colleagues are probably in the same boat. Ms. Svinicki. Yes, Chairman Simpson, I believe to a person, it is our intention to act promptly and the NRC staff has made very clear to us their desire for a timely Commission decision so that we can inform this budget cycle and your work. Mr. Simpson. Thank you. Mr. Baran. I would just add, so the staff identified 151 specific items that would generate potential savings and a number of those, I think it is 29, were incorporated to the FY2017 budget request. The rest of them were not and so before the Commission right now is the 151 for our review, and to your prior question about are there anything in this budget that we feel would adversely impact safety? I think that is a key part of our review of these 151 items. I want to take a close look at those and make sure we are not doing anything that is going to relax regulatory oversight of licensee performance and safety. That, for me, is going to be a top priority in looking at those 151. I think a lot of them are going to make a lot of sense. There are a few of them that could involve reduced inspection hours, for example. I would give those a hard look. Mr. Simpson. Ok. Mr. Ostendorff. I would say that I have looked at the 151 and I have discussed with my staff just this week. Although the Commissioners were paying proper attention to this, when I look at the reactor oversight program in last year, for instance and the enhanced oversight for Arkansas Nuclear One and the Pilgrim Plant in Massachusetts and our baseline inspection program activities that Commissioner Baran is referring to. It is not apparent to me that any of these proposed reductions would negatively impact our oversight but we need to dot a couple of ``I''s and cross some ``T''s here. Mr. Simpson. Thank you. Ms. Kaptur. Ms. Kaptur. I would like to yield to Congresswoman Lowey for a final question and then I will---- Mr. Simpson. Ok. Ms. Lowey. Thank you for your gracious hospitality and thank you Mr. Chairman as well. Chairman Burns, I just wanted to bring to your attention, some questions regarding the Aim pipeline Spectra, which as an energy company, as you know, is constructing the Algonquin Incremental Market Expansion, the Aim project, which would expand the natural gas pipeline, which runs just 100 feet from vital Indian Point Structures. This is a great concern to me and many of my constituents and I strongly believe that the NRC has not adequately investigated the risk, nor responded substantively to the concerns that have been raised. I remain particularly disappointed in your conclusion that a further independent risk analysis, beyond NRC's internal analysis is unnecessary. So my question is, does the presence of a potentially dangerous pipeline impact the security procedures NRC mandates at a nuclear power plant and what steps does the NRC plan to take to ensure the Indian Point Evacuation Plan is updated to reflect the additional risk of a pipeline in the vicinity? Mr. Burns. Congresswoman Lowey, we have looked at the pipeline issue. In fact, our staff met with one of the persons, Mr. Cooper, last week on it. Our evaluation is that there is not an adverse impact on the Indian Point Plan. Having said that, I believe we would look at what the impact might be and I would have to consult with our staff in terms of what they have done or what additional action might be required because of the analysis that they have done on what is called the security--if there is an impact or a potential impact on the security barriers. I do not know the answer to your question immediately but I can ask our staff to inform us and inform you of that but that, again, would be our primary. Looking at it, we would be concerned of--our concern is assuring that there is not an adverse impact on the safe operation of the plant or equipment or barriers involved or security barriers at the plant. Ms. Lowey. So, I am just trying to understand this. Does the presence of a potentially dangerous pipeline impact the security procedures the NRC mandates at a nuclear power plant? Mr. Burns. The impact of a pipeline on a facility that could have--that has, for example, an explosive--here the question is basically a rapid explosion and release from that pipeline, those types of things are taken into account and are looked at when new projects come in where an existing site is or are taken into account in the licensing of a new facility and what our staff does is make evaluation, whether or not it has an adverse impact from the ability--in terms of the ability to shut down the plant or protect the plant or something like that. Ms. Lowey. So then the question is are there steps that the NRC plans to take to ensure the Indian Point evacuation plan is updated to reflect the additional risk of a pipe line in the vicinity. Mr. Burns. I would have to ask and consult with the staff and would be pleased to get you an answer for that. Ms. Lowey. I would appreciate that and then one other question that I wondered with regard to Indian Point we talked before about the multiple safety issues at Indian Point. The recent tritium leak, transformers, elevated moated temperatures, temperature issues on the seals of the reactors and in the last two years energy has blamed vendor failures for major malfunction that resulted in shutdowns at Indian Point. I just wondered to other nuclear power plants experience so many vendor failures at this rate and has the NRCC thoroughly evaluated these vendor failures at Indian Point. Mr. Burns. We look at as part of our review what the attributed cause of a failure or a violation or some sort of transient at the plant and I could not speak right now as to whether or not Entergy is blaming vendors more than another licensee may. Ultimately the licensee is responsible for the safe operation of the plant. It may have issues in terms with respect to its vendors but ultimately they need to have processes in place that ensure the quality of the material that they are installing in the plant as well as maintaining the plant. Ms. Lowey. And lastly and I think this is an issue that has come up over and over again. If a fifty mile area around Indian Point were to be evacuated every resident of West Chester County, New York City, even parts of Long Island would be forced to evacuate. Quite simply there is no way to move all those people safely. So for many of us Indian Point's evacuation plan leaves much to be desired relying on buses to get residents away from the potential in the event of an emergency. The plant was built but not allowed to go into operation because there was no feasible evacuation plan. Does the NRC actually believe the evacuation plan for Indian Point is feasible and could you share what the NRC is doing to work with nuclear power plants in densely populated regions to improve evacuation plans? Mr. Burns. Well we certainly work with a Federal and state partners with respect to emergency planning and emergency preparedness around nuclear power plant sites. Ultimately those entities, other Federal entities such as FEMA and the state are responsible emergency preparedness backgrounds. We have found that the emergency plans for the Indian Point plant meet Federal requirements but we continue to work with as I say with Federal and state partners in terms of improving and exercising those plans. Ms. Lowey. And lastly really lastly do you have any update on when the commission will make a final decision of relicensing and I wonder whether the recent tritium leak will impact that decision? Mr. Burns. Our evaluation of the tritium leak will go into our normal oversight process and the consequences or the significance of the leak would be taken into account as part of our day to day evaluation and oversight of operations. My understanding about the Indian Point renewal proceeding is that there is a supplemental environmental statement that is due out this spring, later this spring. There are potentially some additional hearings with respect to that and there could be a decision later this year but I think rather than--let me make sure we supplement that for the record because I think there is more time. There happens to be an unusual situation. I am actually recused from the decision on the renewal because of my prior role as senior staff counsel at the agency some time ago. But I would be pleased to get you the information that you want. Ms. Lowey. Thank you very much Mr. Chairman for your indulgence. I thought you were recused because you moved to West Chester County. Thank you very much. Mr. Fleischmann. Thank you Mr. Chairman. Commissioner Ostendorff I wanted to hear about your upcoming visit to my district to speak at the advanced reactor summit at the Oak Ridge National Laboratory and then I am going to have a follow up question sir but before I do that I wanted to convey to you my sincere thanks and appreciate not for the work only that you do at the NRC for the past 6 years but for all you have accomplished for the people of Tennessee in our country and your service at the House Arm Services Committee, at the NNSA and of course in our great United States Navy, sir. Mr. Ostendorff. Thank you sir. I am flying out this afternoon to Knoxville. I will be speaking at 8 o'clock tomorrow morning delivering a keynote speech on advanced reactor technology at Oak Ridge National Laboratory. The key messages I will be delivering will be discussing the NRC's readiness to receive license applications for small modular reactors and other non-light water reactor advanced technologies. I will be talking about the experience we had with our current fleet that is under construction in Georgia and South Carolina as well as Watts Bar and the NuScale experience that was discussed by colleagues here and also will be talking about our experience in non-light water reactors technologies over the last 30 years. I am looking forward to engaging with the folks at Oak Ridge. Mr. Fleischmann. Thank you sir. A follow-up question, there is concern over the future of licensing nuclear technologies which are venture-funded start-ups. The NRC's current process for licensing is not compatible with this new funding model. How does the NRC plan to meet this challenge? Mr. Ostendorff. Thank you for the question Congressman. Let me just talk a little bit about the experience we have had so far to date in pre-application meetings with NuScale. Again as the Chairman mentioned we are expecting a license from NuScale in December of this year. Our staff has been working very closely in pre-application meetings with their executives, scientists and engineers. Our staff has approved what we call design specific review standards that would guide our staff's review of an actual license application. I think a lot of the technology issues (whether or not electrical power is required to meet certain safety requirements, the use of passive safety features, new design aspects) have been addressed and will continue to be addressed by our staff. Mike Johnson who is our Deputy Executive Director for operations for reactors and Jennifer Uhle who heads our new reactor office have also been discussing the use of a step wise approach to provide incremental decisions back to potential investors through our work in pre-application meetings with an applicant or potential applicant to give them partial answers based on submittals that would deal with one aspect of a design. So I think we are making good progress in that area and I am looking forward to seeing applications coming in. Mr. Fleischmann. Thank you sir. My next question is for all of you all if you would like to participate I encourage that. The Oak Ridge National Laboratory is the home to CASL, the Consortium for Advanced Simulation of Light-Water reactors. CASL uses modeling and simulation to improve the performance and safety of commercial nuclear reactors. I am interested in knowing what kind of relationship you have with CASL and encourage you to take advantage of the valuable work being done at ORNL? Ms. Svinicki. Congressman thank you for the question. I have had the opportunity to visit Oak Ridge during my service as a Commissioner. I did want to note that you mentioned the X- 10, the historic facility. I will say that as a bit of a nerd about science and someone who has studied nuclear science it was amazing to stand in that location and think about the atomic pioneers of the United States. So I am glad we have that type of preservation of facilities like that and I commend the folks at Oak Ridge for realizing that is a part of our history. My only regret is we could not get every middle school science student to come through there. I did meet with the researchers in CASL and they are an impressive bunch but I think very significantly not only in terms of what is happening in Oak Ridge CASL is a consortium and it involves research institutions across the country, academic and DOE national labs and I think that kind of synergistic leveraging is how we can afford to do the cutting edge science that we need to do. It is leveraging virtual collaboration across the country through high speed communications tools and getting time on super computers at various DOE labs. But I was energized about it, I did listen to the presentations with an eye of saying how could NRC leverage some of its research needs, I am not sure at my level I walked away with any dazzling ideas of my own about how that could be done but I think that the CASL consortium is moving our cutting edge knowledge on nuclear science in the right direction. Mr. Fleischmann. Thank you does anyone else wish to comment? Ms. Roybal-Allard. The NRC is organized into four distinct regions which oversee all licensees and facilities and while some of these regions have experienced nuclear reactor decommissionings others have seen an influx of nuclear power plant constructions. As part of the overall project game plan to enhance operational efficiencies have you looked at ways to incorporate these regional differences into future plans for the NRC and does it continue to make a sense to think about the NRC in terms of this regional distribution? Mr. Burns. I think the current regional distribution does make sense. Sometimes you get some questions about whether it might make more sense to say move the oversight of a particular reactor into a different region because you have other reactors operated by the same company in that other region. We once had five regions in the NRC. About twenty years ago we eliminated Region 5 which was primarily the West Coast and it is now overseen by our Region 4 that operates out of Dallas. What we have done with some of the regional offices is we have actually consolidated some activities into those regions. I am satisfied about where that is now. For example our Region 2 office out of Atlanta is doing new reactor construction over sight at the Vogtle and Summer plants and at the Watts Bar plant. They also do the fuel facilities across the country. Our Region 1 and Region 3 offices because that is where the bulk of the materials licensees that are still under direct NRC jurisdiction they have responsibility for that. So I think in the past we have taken some advantage of that leveraging in efficiency by consolidating some of those activities when the activity is not as prevalent in one of the regions. For decommissioning that is an interesting question but I think right now because you have activity in the various regions it probably makes sense to continue with that model. Because--in most of the regions that there is ongoing working in that area. Ms. Roybal-Allard. To improve the transparency and to simplify how the NRC calculates and accounts for fees and the timeliness of communicating fees which is a key process strategy of Project Aim. What specific measures has the NRC taken to improve transparency and engage with the regulated community and what actions have been taken to simplify how the NRC calculates these and what still needs to be done? Mr. Burns. We have been holding public meetings with mostly fee payers are probably most of the folks that come to that meeting as you would expect so our chief financial officer has been doing that. She is responsible for the development of the fee rule. We have been doing some things to align the fee rule more closely to our budget process and budget request so I think that helps transparency because you are not trying to interpret two different ways of looking at it. So those are some of the steps. We will be publishing soon the Fiscal Year 2016 rule probably about the beginning of March. Again I think having some public outreach on that it takes some work but I think we are getting better at it. Ms. Roybal-Allard. Thank you. Mr. Fortenberry. Thank you. I am going to return to the earlier question particularly as you brought up the interaction you had with the International Atomic Energy Agency and standards setting worldwide. I see the IAEA as growing not only in relevance but prominence and necessarily so given the trajectory of nuclear and nuclear threats. The mission of the agency seems to be shifting from one of ensuring safety to one of ensuring nonproliferation and that is a very important shift. So explain your interaction with--this is a mysterious question to me how we do provide funding for them through a variety of means. Does any of that come from your agency? Mr. Burns. I will take the last question you asked. I think only indirectly in the sense that we provide experts who may attend meetings. Some are our technical experts. I attend the general conference that is held once a year as part of the US delegation. So my understanding, that's the primary way that they direct. The rest of it is through primarily the State Department budget. The Department of Energy probably has this in a similar way in terms of support. But I think primarily the funding comes through the State Department's support for international organizations. The first part of your question, our engagement again primarily is on civil nuclear safety, civil nuclear security and where that has interfaced with nonproliferation. IAEA has always had in a sense that dual role. In many ways when it was founded coming out of President Eisenhower's atoms for peace speech in the early 1950s part of the idea was to move down from nuclear weapons but make the availability of atomic energy for civilian purposes available and necessary. That is the primary place that we play a role in terms of participating in some of what I will call standards making activities. We also do that through the NEA and a good example of where standards and this is more on the--I will give you an example both on what I call a purely safety side as well as a security side. We adopt the IAEA transport regulations. They are guides and then we and DOT will adopt them and that helps in terms of protection of material both from a safety and security standpoint. The other thing for example and source security one of things going on before 9/11 because I think as Mr. Calvert noted it came out of the problems identified with basically abandoned material in the former Soviet Union. But then after 9/11 the new concern about terrorists getting material so there was an IAEA code of conduct which the US has subscribed to and in many ways our PAR 37 which is for source security reflects those types of ways of trying to protect and provide security over sources. So that is a quick illustration about we contribute, where we try to use the standards that are developed. Mr. Fortenberry. All of the questions I have asked are pointed at the need for all of to think strategically about I think to your earlier point we all do this we tend to get captured by what is in front of us rather than what ought to be or could be. Because of your clear leadership in terms of setting policy or enforcing policy that to me dictates a certain necessity of relying on you as well for strategic advice in this regard. Mr. Ostendorff. If I could say NRC staff frequently presents NRC-US industry best practices at IAEA conferences, workshops. We have staff that participates in leading missions to other countries to help try to show best practices to other countries trying to develop standards. I had a chance last June to give a major speech in Vienna talking about our cyber security practices--what we do in the United States--to the international community. Other Commissioners do similar outreach in their speaking engagements so I think we are very much aligned with your notion that we take a strategic leadership role. Mr. Fortenberry. Thank you. Mr. Simpson. Ms. Kaptur. Ms. Kaptur. Mr. Chairman, I began my questioning today, Chairman Burns, with asking you to grade the nuclear power industries safety and security for 2015 and you gave it a pretty good grade. In view of Congressman Lowey's questioning about the tritium leaks at Indian Point as we begin 2016 how do you think the industry is doing compared to 2015? Mr. Burns. It may be too early to tell but I think for the most part we have seen continued performance. The Indian Point issue is one we are following up on, but I would note again that we were informed of it by the licensee at a reporting below what was the mandatory reporting threshold. They are obviously in a highly charged environment up there and they are closely watched. But we will see issues in performance. I think we are on top of it and overall so far about six weeks into the year generally good performance. Ms. Kaptur. I want to ask a question following that on Project Aim and the relationship of that to corporate support and how we are ensuring the safety and security of our nuclear power production in this country. Can you expand on your comments so far about how you intend to ensure that project maintains or improves current safety and security requirements? Mr. Burns. Yes. Under Project Aim one of the other things that we have done besides the rebaselining report is we as a Commission approve what is called a strategic workforce planning and why that is so important I think is because it is having our human resources office in coordination with all of our staff technical offices focus on what are the technical skills we need to maintain as an agency so we can do those things we are expected to do. Inspect. Review license applications. Learn from operating experience and the like. That is one of the keys and that came out of Project Aim. When we talk about corporate support one of the things we were looking at through Project Aim is how to be more effective in providing the support to the staff, corporate support and overhead type activities. It is your computer, it is your office space you are in, it is the training. It may be the training that you undertake. We need to make sure our people are supported with those things, but what we have identified and that is what we are going to look at in this rebase lining report. I think primarily you are looking at a lot of areas where you may get administrative type efficiencies. We need to be careful as Commissioner Baran said that some of those that have the interface with the safety mission to make sure that making a decision--no we do not need to do that, that we are making a good, well informed decision. Ms. Kaptur. That is a concern because Commissioner Baran inferred that there might be fewer inspections. He kind of hinted at that. And in view of Ms. Lowey's situation and my personal experience--horrendous experience over 3 decades of service now with two massive problems at a nuclear power plant that I represent I have to tell you I am very concerned about the industry at a point where natural gas prices and oil prices are impacting what is happening across the energy industry. And some of these plants from a operating standpoint are facing additional pressures and economic pressures in the market place and so I am very worried about investment in equipment, personnel and so forth. And how does a tritium leak happen at a plant? How is it possible that the core cover--the reactor head at a plant in Ohio was eaten through completely by the boric acid reaction with the steel? How is that even possible to a point where it was quite dangerous? And so I am very worried about how you are protecting the safety of the public in view of what is happening in the marketplace. Do you want to comment on that? Mr. Burns. Where I think we maintain our presence and our oversight--particularly through our resident program sites-- when we have incidents such as Congresswoman Lowey described at Indian Point where we send out specialty inspectors and have that type of reactive inspection that is where we are providing substantial value in the inspect area and those are the types of things we are not pulling back under Project Aim. Maintaining that core staff, undertaking that responsibility remains at the centerpiece and the central point of our activities. Ms. Kaptur. Well Mister Chairman you also in your budget you talked about training and staff and so forth and I in my first round asked about trained personnel. Your budget does not include an appropriation for the integrated university program for high level nuclear engineers and I asked you about other trained personnel who are actually on the ground in these plants moving between plants and how they are trained. I am going to--and there is nothing specific in the budget on that, but I am going to ask you for your regions to provide for the record the types of relationships the NRC has for its training programs with various apprenticeship programs, community college programs, through its integrated university program with universities. I want to know what you are doing because I think the pipeline is very haphazard. And I can tell you for the plant that I represent if it were not for the workers--and these were not nuclear engineers that went into that plant in the 1980s and the 1990s we would have had a nuclear mishap there. So that training is so important and because of their work we were able to remediate two very serious situations in both decades requiring an enormous investment by the private sector to upgrade those plants. I have fought for so many years unsuccessfully in this Congress to have more robust nuclear training programs. And I will tell you it was the plumbers and pipe fitters, it was the electricians that risked their own lives not knowing what was happening that saved us. And I want to give them more primacy in your budget and more direct relationships for training. Just know that. I continue to work for that. I would love to have your cooperation, but I will ask for that information for the record. I am going to turn a little bit here to another question. Can you tell me do you maintain records of the waste heat that is generated by your various nuclear power plants around the country or could you obtain it for me, the ones that you regulate. If something is coming out of a big stack what is it and how much is it? Mr. Burns. I would have to give you something for the record on that. Ms. Kaptur. All right, very good. And finally a simple question and I do not want to go over on my time, Mister Chairman, on Ukraine, does the NRC have any relationship or collaboration ongoing with instrumentalities inside the nation of Ukraine? Mr. Burns. Yes and I ask Commissioner Ostendorff to supplement my answers since he visited Ukraine last year, but we do have some bilateral arrangements with them and we provide a cooperation and advice to them and I know I will pass it to Commissioner Ostendorff because he was there last year. Mr. Ostendorff. Thank you. The answer to your question is yes we do. Ms. Kaptur. Ok. Mr. Ostendorff. And at several levels. We have had Commissioner visits, various Commissioners. I was the most recent one there in June of last year working with a regulator and talking about the importance of an independent regulator with technical competence. We have had our security folks go over there to provide offers of assistance for security training. There is a video teleconference that occurred just this past fall between our senior staff and Ukrainian regulator staff to look at questions they have about trying to resume construction of the Khmelnitsky Plant about 4 hours west of Kiev. And how did we look at similar resumption of construction activities at our Watts Bar plant in Tennessee. And I think we have a very healthy dialogue going on right now. We as a commission will have meetings with their head regulator Mr. Bozhko here in about three weeks when we have our annual regulatory information conference. He is coming to that in Rockville so I think that relationship is very alive and robust. Ms. Kaptur. I would ask for more specificity on that either privately or for the record. Mr. Ostendorff. Sure, we can provide more details. Ms. Kaptur. I do have another question Mister Chairman but I want you to have the ability to rotate to other members. Mr. Simpson. Mr. Visclosky, if you would like to go ahead and ask the other question and I can wrap it up. Ms. Kaptur. Ok, this is really my last question and that concerns the continued storage of spent nuclear fuel. The commission extended the length of time assumed to be safe for storage of spent fuel at reactor sites from 30 to 60 years and I am very interested in your opinion as to how that will impact the safety and security of the public. It assumes that we cannot find a storage site for this material. Mr. Burns. Yes, madam. That decision that you refer to relates to an environmental review that we are required to do with respect to licensing. It is not a decision in favor of extended storage. What it says is that from an environmental standpoint, from a safety standpoint it can be safely done, it can be safely done. That decision is actually in litigation here. Ms. Kaptur. I was going to ask you about that. Mr. Burns. Yeah, it is in litigation here and I think in the D.C. Circuit Court of Appeals. Ms. Kaptur. If the challenger succeeds in their argument do you believe the court should side with the challengers and what would be the impact to the rule and by extension operating plants. Mr. Burns. Well, I think the court should side with the agency on that. They are challenging our decision. I think the four of us are comfortable with the decision we made. It is hard for me to speculate what the court--if the court agreed even in part with the petitioners it is hard for me to speculate what that would mean--that they may remand it to the agency for further evaluation, they may issue some sort of an order. I would not want to speculate too far because there is multiple things that the court could possible do. But we are confident that we reached an appropriate decision on the matter that was put before us and again I want to emphasize it is not a decision that was intended to reach in effect a license for an interminable period of time or to encourage that type of approach to ultimate treatment in handling of nuclear waste. Ms. Kaptur. Thank you very much and thank you Mister Chairman. Thank you all for your testimony today. Mr. Simpson. A couple of questions, one, what are your estimated carry over balances at the end of this year? Mr. Burns. I believe at the end of this year--there is none from fiscal 2016 if I am articulating this right. We plan to fully obligate for '16. We have some carry over from prior years. I believe the total is maybe up to about $25 million-- about $13 million fee based. That is what I understand. Mr. Simpson. So this budget request does not assume use of any of those funds in the budget request that you currently have as carry over funds? Mr. Burns. Yes, that is correct. It does not. Mr. Simpson. Secondly, on the rule making, and frankly I would like to commend the Commissioner for choosing to modify the NRC stats for the proposal on rulemaking so that it fully reflects the direction we provided in the Omnibus. Rulemaking is significant authority under the law and the Commission should assume the responsibility of that authority early in the process as you all have mentioned you are starting to do in your testimony. Do you expect that we will receive the rule making plan no later than the March 15th deadline and that it will reflect the requirements outline of the Omnibus. Mr. Burns. Yes, I do expect you will get it by that date and it will conform to the language. It will be consistent with the language provided in the report. Mr. Simpson. The committee received a report in January that indicated that the Commission now has 43 proposed rules pending instead of 93. Can you please discuss what happened to change the number of the rules and do you expect the number to reduce further once the new rulemaking plan is implemented? Mr. Burns. Actually I have been talking to my colleagues about supplementing that report. The report that we gave you focused on what was expected to be worked on in fiscal 2017. I think the number is higher. We are going to provide you a supplemental report. What we did not include in that report is some things like petitions for rulemaking and other things. We need to get you some more up to date and better information about that. The other aspect just to highlight one other, there are some things that if you look at what is technically a rule making activity in front of the agency includes some things that are sort of long suspended, there are no activities on it, but I think in the interest of full disclosure and transparency we are going to give a supplement to that report. Mr. Simpson. Is there any challenge in not having a fifth member of the Commission or decisions being postponed because there are splits of two to two or anything like that because we do not have a fifth commissioner that has been approved? Mr. Burns. I have not experienced--I think we worked well together. I do not know of anything we have put off because we do not have a fifth commissioner. Ms. Svinicki. As the longest serving current member of the Commission I would note I have served on a Commission of four, Commission of three, a Commission of five, back to four again. Five works well and Congress set us up at five for the kind of natural advantages you are talking about. It does help clarify outcomes, but I think actually the pace of doing the business before our agency I have to say candidly I am extremely impressed with how effectively I think this group of four even with the disadvantage of maybe a 2-2 and that has occurred. I do not mean to indicate that has not occurred since we went back down to four, but there are ways we have of determining that outcome. Often it goes back to staff delegated authority so I would say that maybe not speaking to whether or not we get a fifth, but I think this four is gosh-darn impressive. Mr. Simpson. Thank you, Ms. Kaptur do you have one other thing? Ms. Kaptur. Yes, I just want to reiterate if I might to the Chairman and the members that based on what is happening in the marketplace with energy prices I would urge you to consider developing an economic model that can anticipate the impact on given firms economic performance based on what is happening in the energy markets and the likelihood that they would not be-- they would be less likely to invest because of what is happening and to have a rating that you look at and you can identify out of the dozens of plants that are operating because I have a concern that there is going to be cost cutting and a lot of things are going to have to be done that might impact safety, so I would just urge you to consider that suggestion. Thank you. Mr. Simpson. Let me just say in conclusion thank you all for being here and I am not one who is frankly easily impressed but I got to tell you in all honesty I have been impressed by you all. I appreciate the fact that you have tried to follow the Congressional direction or intent that we put in the language and tried to work with us on that. I know of a lot of agencies in the Federal government that could learn a lesson from the way that you have implemented this last budget and have been working with Congress. I appreciate that very much. I do not expect that you all agree on everything. If that were the case three of you would not be necessary, but it seems to me that you hash things out and try to come to a solution and that when you come to a solution you all say okay, that is what we are going to do and I appreciate that because it restores the credibility that had been deteriorated in previous years in the NRC and the one thing that is very important with the NRC is your credibility. Not only what you do but your credibility around not only this country, but around the world. I appreciate the work that you do. I look forward to working with you as we implement this budget, as we continue on to progress with Project Aim and trying to right size the agency. I say that as one who supported increases in the NRC budget over the years when we saw the nuclear renaissance coming and we wanted to make sure that we had the personnel and everything so we were ready to license these things. Circumstances have changed so I appreciate the fact that you are willing to recognize that and work with us to maintain the right size of the agency and look forward to working with you and implementing this budget as we move forward. Thank you all for being here today. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Wednesday, March 2, 2016. DEPARTMENT OF ENERGY, APPLIED ENERGY WITNESSES FRANKLIN ORR, UNDER SECRETARY FOR SCIENCE AND ENERGY, DEPARTMENT OF ENERGY JOHN KOTEK, ACTING ASSISTANT SECRETARY FOR NUCLEAR ENERGY, DEPARTMENT OF ENERGY CHRISTOPHER SMITH, ASSISTANT SECRETARY FOR FOSSIL ENERGY, DEPARTMENT OF ENERGY PATRICIA HOFFMAN, ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY, DEPARTMENT OF ENERGY Mr. Simpson. The hearing will come to order. I would like to welcome our witnesses, Dr. Franklin Orr, Under Secretary for Science and Energy, John Kotek, Acting Assistant Secretary for Nuclear Energy, Pat Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, and Christopher Smith, Assistant Secretary for Fossil Energy. This past summer the President announced ``Mission Innovation'', a pledge to double the investment into clean energy research and development over the next five years. Together, your programs' budgets represent the majority of where these increases would take place in order to meet the President's goal. An ``all of the above'' strategy would propose that all of the programs within the ``Mission Innovation'' category would receive a 20 percent raise each year in order to attain the goal of doubling clean energy research and development in the pledged five year period. However, that is unfortunately not the case. In fact, the EERE budget receives a 50 percent increase when comparing funds in the ``Mission Innovation'' category to last year's level. This generous and unbalanced increase is proposed while the budget request reduces Nuclear's clean energy activities, and drastically reduces total funding for Fossil. In looking at the overall request it is clear that ``Mission Innovation'' is another attempt by the Administration to provide massive increases to the EERE budget at the expense of other Applied Energy technologies. A more balanced approach would fund emerging energy sources and support the reliable energy sources that we count on today. Each of you has an important role in managing and developing the future of these diverse energy sources. I look forward to hearing how your vision supports a balanced approach and continues to make investments in our energy future. Please ensure that the hearing record, questions for the record, and any supporting information requests by the subcommittee are delivered in final form to us no later than four weeks from the time you received them. Members who have additional questions for the record will have until close of business on Friday to provide them to the subcommittee office. With that, I'll turn to my ranking member, Ms. Kaptur, for her opening statement. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. Thank you, Mr. Chairman and good morning. Dr. Orr, great to have you back here. Secretary Smith, again, and Secretary Hoffman, thank you for being here today, and Mr. Kotek. We are so glad that you are all here today and thank you for being here to present your 2017 program request. I am very sorry that Dr. Danielson could not be here today. I know all of our prayers go out to him and his family during this very, very trying time. The research and development of energy technologies your programs have generated is revolutionizing everything around us, so we are living it in real time. The Vehicle Technology's office works to find ways to lightweight our cars, allows us to stretch each gallon of gas. Your new building codes are making our homes and places of work more efficient and more comfortable. The unbelievable growth of the fracking industry which originated from your research and has brought America back to the forefront of the world's energy producers, and has significantly reduced our dependence on foreign oil truly is transformative. And the boom in renewable energy is breathtaking, and I am so proud to have a leading silver company in our district that is reaping the benefits, First Solar. I was there at its birth and I have seen its growth, and I know its future is going to be exponential. As Secretary Moniz noted yesterday, there are now 208,000 direct jobs in the solar industry. Two hundred and eight thousand. If you had asked somebody 30 years ago would that even be possible they would think that you were some science fiction movie. These accomplishments in your work are truly bringing America into its new future. I am just glad I am given the opportunity to live during years to witness it. Too few Americans recognize just how important the role of the Department of Energy is in protecting our national security, in addition to being one of our most important tools to deal with the changes in climate that affect our environment. Our coastal dwellers certainly know that, and people in other parts of the country do too, such as those of us on the Great Lakes that have seen the very difficult challenge of algal blooms threaten our fresh water systems. With that in mind, I am happy to see that in your final budget request of this administration your goals are just as ambitious as ever. Our Nation has made significant strides towards a new energy reality. Yet, they are but the first steps in the marathon of reaching energy independence for our country, and thus strengthening our national security and achieving carbon neutrality. The energy innovation championed by your offices holds the key to unlock the full potential of America's modern clean energy economy, and we look forward to hearing your goals for advancing our Nation's sustainable, diversified, and self-reliant energy future. As I said to the Secretary when he was up here this week, one can look no further than my district where in our region we see a company like Nature Fresh from Canada come and make a $175 million investment in a new, I think about 200 acre, undercover production for vegetables using the CO2 off of North Star Steel. I am telling you, this thing is delivering tomatoes and peppers to Kroger Company this month for the first time. It is astounding to witness the changes, the way our private sector is transforming based on a new energy future. So I am just so excited about what you do and we look forward to your testimony today. Mr. Chairman, thank you for the time. Mr. Simpson. Thank you. Dr. Orr. Mr. Orr. Chairman Simpson, Ranking Member Kaptur, members of the subcommittee, thanks for the opportunity to testify on the Department of Energy's 2017 budget request for the applied energy programs. Before I get started with the details I would just like to say thanks for all the support that you provided in the Consolidated Appropriations Act of 2016 which, of course, we are in the middle of working hard on now. Joining me today, of course, are my colleagues. As Ranking Member Kaptur noted, Dave Danielson was called away for a family emergency, but the Deputy Assistant Secretaries are here with us, and if there are detail questions they will be able to help us get past those. As we meet here today, our Nation stands at an important point in the transition to a clean energy economy. Cost reductions and technological improvements are leading to increased deployment of clean energy technologies. If you just look at the last 7 years, the cost of utility scale portable tag solar power has declined by 59 percent. The cost of power purchase agreements for wind power fell 66 percent, and deployment of energy efficient LED lights went from 400,000 lights to over 35 million with a corresponding reduction in price of 90 percent. So that tells you something about what some combination of research and technology developments and deployment at scale can really do. Yet, work obviously remains to enhance the energy security in U.S. clean energy competitiveness while we work on global climate goals at the same time. It is in this spirit that the President is joining in an unprecedented global initiative across 20 nations to commit to doubling public clean energy research and development known as Mission Innovation. This is, of course, complemented by a private breakthrough energy coalition, and no doubt, lots of other investors as well. A private sector-led effort to mobilize patient capital to support clean energy technology is emerging from the R&D pipeline. It is an opportunity to bolster the innovation ecosystem that has been so productive for this country over the years. The Department of Energy Science and Energy programs invest in all stages of innovation across a diverse portfolio of clean energy technologies. This work is aimed at fundamentally enhancing American economic competitiveness and securing America's long term energy security in an environmentally prudent manner. The National Laboratories are key contributors to this work, and they provide the Nation with strategic, scientific, and technological capabilities that are very important to our future. The applied energy programs make use of the expertise that exists in the labs and, of course, strengthen it going forward. At the same time, they work with partners across government and industry to research, develop, demonstrate, and deploy innovative clean energy technologies. The Department's 2017 request takes the first step in our effort to double the clean energy R&D effort over 5 years. It includes key new initiatives such as the regional energy innovation partnerships, a desalination hub, national-lab focus initiatives including small business partnerships. I will also mention the request is built on technological foundations that came from our 2015 quadrennial technology review. I am forced to advertise for that because it was a lot of work. It actually, of course, has been hugely important as we thought about all the different ways we could invest the research portfolio. So it is based on kind of an analytical systems based analysis that really did play an important role in our budget debates. The overall science and energy request is $12.9 billion which is $2.8 billion above the fiscal year 2016 enacted level. The applied energy portion of this request is $5.1 billion to advance the state of technological capability and enable the clean energy future. And as the Chairman noted, this is a big part of what is counted in the Mission Innovation area. In fossil energy this means continuing to develop our carbon capture and sequestration capabilities, and improving the performance of natural gas infrastructure. In nuclear energy we are moving forward on licensing small modular reactor designs, advanced reactors, and implementing the President's nuclear waste management plan with consent-based siding. I am sure we will talk more about that as we go forward. In the renewal space this means continuing to drive down the costs of solar, expand the deployment of wind power, and take advantage of the Nation's hydropower and geothermal energy resources. As I know, the Secretary has noted for you a number of times, in the end it is about driving down costs, so energy is woven through every bit of the fabric of modern societies, and societies that do a good job on making the cost be low and be competitive will be ones that thrive going forward. New in this year is 21st century transportation initiative to scale up clean transportation R&D that involves some things that we have worked on already, but continues the effort on batteries, biofuels, and automation. In energy efficiency, it means increasing the efficiency of home appliances, but also making industrial process and manufacturing more efficient as well. Again, those reduce costs in ways that benefit the whole economy. Critical to bringing all these clean energy technologies to homes and businesses across the country is the Nation's power grid. And we are continuing to invest in this through our grid modernization initiative and through advances in energy storage and cyber security. To leverage the expertise the department holds across these programs we are also working to continue to build productive links across the agency. One of the ways we have done this is through cross cutting initiatives. The current initiatives include efforts on the energy water nexus, exascale computing, supercritical CO2, subsurface science, clean energy manufacturing, and grid modernization. We introduced this model in fiscal year 2015 and a number of those efforts have grown and matured since. A good example is the grid modernization cross cut which has led to a proposal of a grid modernization institution, and also our recent announcement of $220 million in grid modernization projects to be spent over the next few years. Building on the crosscuts' successes so far this year, we are also introducing a new cross cut on advanced materials. I would be happy to talk about that more later if you wish. Today the Department's portfolio investment will drive innovation and technology advancement that is essential for economic growth enabled by affordable, clean, and reliable energy. And with the increased momentum on the international stage I believe we will look back on this period as one of significant acceleration in the transition to a clean energy economy. The fiscal year 2017 budget supports this transition, and my colleagues and I would be pleased to answer questions that you may have about the request, so thank you for this. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Simpson. Thank you. Do others of you have opening statements? Mr. Orr. No. Mr. Simpson. Ms. Kaptur. Ms. Kaptur. Thank you, Mr. Chairman, very much. I wanted to ask Dr. Orr, first on sustainable water utilities, your budget request includes $9 million for work in energy efficient resource recovery in water supply and waste water infrastructure. I also note you have a desalinization initiative. Desalinization does not affect the Great Lakes, but I will tell you, algae does. Particularly in Lake Erie, but recently in the Ohio River last year. And when I asked the Secretary the other day about this issue of the Great Lakes versus the coasts, salty water versus fresh water the answer he gave was, well, look at our proposal for regional centers. But I am asking you, in terms of what our urban water systems are facing in places like Toledo, a place called Carol Township, Ohio which had to shut down its water system a couple of years ago because of algal blooms. What Sandusky faces, Loraine, and ultimately, Cleveland. This is a big issue for us. The algae is being produced because of excess of nutrients. But I am really interested in how the Department of Energy might look at this region to deal with the daunting challenge, certainly we will see it this year, of a watershed that is being heavily impacted by algae, and where our utility plants are spending enormous amounts of money. Not just on chemicals, but on electricity to do what they have to do to provide pure water, and frankly, treat the waste water. So my question is, for the $9 million for your work in energy efficient resource recovery in water supply and waste water infrastructure can you outline what you are hoping to achieve with this funding? And if I can get you a little bit to think about the Great Lakes I would sure appreciate it. Mr. Orr. We could actually have a good time with this topic for a long time but I suspect our time will be limited but I will just say a couple of things. One, that this question of how we take water that, I mean one extreme is ocean water but there is a lot of stuff in the middle, there is produced water from the Utica shale in Ohio that is less saline than ocean water. There is, you mentioned the waste water treatment area. In one sense, waste water contains a series of nutrients and chemicals. The nutrients that you mentioned that come from fertilizer use are one thing and so the possibility exists to recover some of those resources that can be useful at the same time that we are purifying water, the place where the desal idea comes in is that there are kind of multiple steps in getting to a pure water stream or a water stream that can be useful for agriculture or for cooling at a power plant and so on. And we are really trying through this initiative to look at each of those pieces so particularly the water that is in preparation for--that might come from waste water or non- traditional water, dealing with the energy requirements that are in the waste water streams as well, those really fit in this whole question of how we use energy and water together so I think that they are very much in the purview of the energy and water nexus. Ms. Kaptur. This is not under your energy and water initiative, this is a separate---- Mr. Orr. But I am actually making the argument that they really are connected because the way--I mean right now, if you just take the ocean water as one thing, there is plenty of water but you spend energy to get the salt out of the water and that is really true of any other material that is in the water that we do not want to be there and algae fits within that, so thinking about the energy use of all of these processing steps, particularly the early ones where you would have impacts across the whole country and not just in drought places. Ms. Kaptur. We each represent a place and I would urge you as you think through how this initiative, along with the energy water nexus initiative is going to work, to seriously look at Lake Erie. It is the shallowest of the Great Lakes and because of climate change, without ice cover in the winter, there is more evaporation and because we have the largest watershed in the entire Great Lakes that dumps into Lake Erie with all those nutrients, we have a huge problem and the amount of those nutrients is increasing. This cannot continue, it simply cannot continue and we have now had alarming things happen with our freshwater systems; meanwhile the plant operators are spending more and more on electricity to do what needs to be done to provide a freshwater supply to people so it is really at a tripwire stage. Mr. Orr. And this is actually a place where I actually do agree with the Secretary that one of the ideas behind the regional efforts to understand the combinations of energy and water use is really because there are these differences. The specific applications that you are talking about are ones that involve a combination of energy and water that is quite different from what might exist in Arizona for example so the regional focus in those modeling efforts is a chance to look at those kinds of problems. Ms. Kaptur. And a lot of what I have read about algae, usually what goes on is they have to produce new algae to create fuel where you are looking at biofuels but here you have this stewpot that is already out there. I do not know if we can collect these materials; that is another issue but I would like to stop them from flowing into, we actually need to arrest them from flowing into the lake. Mr. Orr. We probably want to look at the upstream fertilizer use too as another way to get at some of the same problems. Ms. Kaptur. And the resource recovery issue which you kind of hinted at, I read an article recently about phosphorous over the next--already we are in a phosphorous deficit situation globally and what it is going to require would be phosphorous recovery in order to help our farmer that needs a bit of refinement maybe on the second round you can talk a little bit more about how you view the energy water nexus, what progress you have made since it was first discussed in the 2014 report and I will wait for the second round to do that. Thank you, Mr. Chairman, thank you. Mr. Fleischmann. Thank you Mr. Chairman and good morning everyone. It is good to see you all again and I appreciate all of the kind words in our earlier visit about Oak Ridge and I represent the third district of Tennessee and I am going to start with you, Ms. Hoffman because Chattanooga is also a very large city--I was pleased to hear of your visit last week at the Oak Ridge National Lab for a roundtable discussion on the Department of Energy's grid modernization initiative with a number of electric power officials from my Congressional district. I was particularly glad that you met with representatives from both Chattanooga and Oak Ridge and other localities in between. Could you please talk about the grid modernization initiative, both the challenges and opportunities for our country, what lessons have been learned between the partnership between Chattanooga, the electric power board with its smart grid, Oak Ridge National Lab and the Department of Energy, ma'am? Ms. Hoffman. Thank you very much, Congressman. I really do appreciate it and I did enjoy the visit to Oak Ridge and having a roundtable discussion with a lot of stakeholders in the region. The grid modernization initiative is a strategy that the Department has pulled together looking at the integration of renewable resources, energy storage, Microgrids, data integration and one of the things that we are trying to do is work very closely with the regions where they are at to how they can expand some of their capabilities in advancing the grid activities. Some of those include partnerships with buildings and looking at that data and how the data can improve the efficiency and the operations of the electric grid but also looking at how it can improve better customer services so some of the activities in the regions, the importance of the grid is very apparent with the electric power board at Chattanooga and some of the projects that they are looking at from a Microgrid point of view as well as their data integration for reliability and resilience. Mr. Fleischmann. Thank you so much. Mr. Kotek, the small modular reactor program will help promote our leadership in the use of nuclear power worldwide and represent significant investment in first of a kind engineering for small modular reactors in the United States. Can you please update the subcommittee on the progress made towards preparing for the eventual commercialization of SMRs and what is your assessment of the current market for this emerging industry, sir? Mr. Kotek. Thank you very much for the question. Very pleased with where we stand with the current work we have going on and the SMR program, our request this year, for fiscal 2017 will complete our funding commitment to new scale for the development and certification activities for the new scale design. We expect to see them submit a design certification application to the Nuclear Regulatory Commission by the end of this calendar year. In terms of potential users and a market for that technology, as you may know, we are currently engaged in some site specific work looking at particular locations that our utility partners may want to use for construction and SMR, one of course is TDH site in Tennessee. The other is a construction called UAMPS, Utah Associated Municipal Power Systems which is looking at a series of potential sites in the west, including a couple of sites at the National Laboratory Site. I was very pleased that a couple of weeks ago, we were able to reach an agreement with UAMPS on a site use permit that would allow the private entity to potentially use locations on National Laboratory site which could offer them advantages in terms of site characterization data, access to infrastructure and other benefits. So we are seeing in the U.S., utility interest, as you may know there are several states that are now starting to consider SMRs as a potential vehicle for them to meet future electricity demands. We are also hearing more interest internationally in the potential use of SMRs, which may offer very attractive low carbon, actually zero carbon life cycle alternatives for countries with maybe smaller electrical grids where it does not make sense to build two units of 1,000 megawatts each or something. Of course, I expect that interest to firm up more as the new scale design goes through the design certification process and is a product which can actually be ordered which is still several years down the road but I am very pleased with the progress thus far so thanks for the question. Mr. Fleischmann. Yes, sir. I have another question for you, sir. I know you have had a few visits to the Oak Ridge National Lab this past year and I hope you have had a chance to see the nuclear facilities that support the Office of Nuclear Energy and the Office of Science. It has been challenging that ORNL has not received adequate nuclear infrastructure funding in the administration's budget request for many years. I understand this is a complex situation but now the office of science is having to fund more than its fair share. On a related issue, the lab's nuclear activities generate low volumes of liquid radioactive waste. This waste is processed by the office of environmental management as part of Legacy Waste Management on the Oak Ridge reservation. I am told the systems used to process this waste will be decommissioned and this will require ORNL to develop and operate a new radioactive liquid waste treatment system. If this system is not operational by 2020, ORNL's nuclear missions are at risk due to the lack of a waste disposal capability. Is there a path forward on this problem, sir? Mr. Kotek. Thank you, sir, for the question. Everything you just talked about, really, touches on the question of funding for those facilities. Of course, that has been an issue that we have dealt with, both this committee and the counterparts on the Senate over the last couple of years. This year, we have gotten, I believe the number is 26 million dollars in the Office of Science budget, up from I think it was 12 in last year's request so there has been an attempt by the Department to address the funding challenges there. With respect to the question of fair share, as an example, what we call the doors open costs for the facilities that we have in Idaho at the Idaho National Laboratory, we fully fund those out of the nuclear energy budget even though NNSA science and other programs might use those facilities, they will pay for the incremental costs of their programs but in terms of the base operating cost, say the door is open, waste management, et cetera, I think it is fair to say that we have taken a similar approach here with the facilities at Oak Ridge and the Science budget. I think our science counterparts are here this afternoon, is that right? Mr. Orr. Yes, we will be back this afternoon. Mr. Kotek. And so they may have more that they may want to add on that subject at that time, thank you. Mr. Fleischmann. Thank you, sir. One final question, Dr. Orr, I would like to talk about the success of the manufacturing demonstration facility at ORNL. They are doing a terrific job and have attracted a number of businesses that are coming to work and solve big manufacturing problems. The Department of Energy budget goes into some length about mission innovation for clean energy. The budget proposes this as a new initiative to establish regional innovation and partnerships called Regional Clean Energy Innovation Partnerships. Can you please tell me how the advanced manufacturing office and the MBF might fit into this initiative with the lab and the University of Tennessee, the MBF and the advanced composites institutes? We already have a lot of original capabilities, how would these play into the proposed initiative, sir? Mr. Orr. Well we will certainly continue the very successful effort that is in the advanced manufacturing arena and the composite at Oak Ridge is a prime example of ways that you can take the scientific capabilities of a place like Oakridge and make them available and build an ecosystem around them. The regional partnerships overlap in some ways and not in others but the idea there is that if you take assets like universities and entrepreneurial communities and national labs that are distributed around regions in the country, that they will look at the combination of energy challenges and opportunities that they have and those challenges and opportunities will be different depending on where you are. If you are in Maine, then maybe it is wind, offshore or not, and a whole variety of approaches that fit in the area there. If you are in Southern California, it is a different energy challenge and a different set of opportunities to deal with and a different set of assets to put to work. The idea would be to create some non-profits that would manage a local energy ecosystem research effort that would benefit that area and would undoubtedly have benefits beyond as well but to take advantage of both the heterogeneity around the country and the creative juices of all the people that can work on things that matter for their areas but we will still continue to invest in things like the advanced composites institutes because those have their own ways to contribute in a more specific way. The regional partnerships would be technology neutral in the sense that they would go beyond the specific application. Mr. Fleischmann. Thank you, Dr. Orr. Mr. Chairman, I yield back. Mr. Simpson. Ms. Royal-Allard. Ms. Roybal-Allard. Thank you all for being here. The DOE's Weatherization Assistance Program is a critical program that helps low income families retrofit their homes to become more energy efficient, ultimately reducing the cost of their energy bill. In fact, the DOE evaluation of the Weatherization Program found that a single family--a home saved, on average, $283 per year. Meanwhile, DOE's Building Technologies Program works to advance technologies and practices to make buildings in the U.S. energy efficient. To ensure that beneficiaries of the Weatherization assistance program are receiving the most up to date and effective building technologies, does collaboration exist between the weatherization assistance program and DOE's building technologies program? Mr. Orr. Indeed, one informs the other and we are certainly wanting to do the best job we can in terms of both providing efficiently and at the same time taking advantage of what we have learned on how to do this across the building space. Kathleen, do you want to add anything to that? This is Kathleen Hogan who is the Deputy Assistant Secretary here and has this in her purview. Ms. Roybal-Allard. Ok well let me just add to that and maybe you can answer. Once the building technologies program identifies effective technologies, how quickly are they introduced into the market and how are they adopted by the Weatherization Assistance Program? Also, if you could maybe comment on what sorts of new building technologies you are phasing in for the Weatherization Assistance Program in 2017? Ms. Hogan. Sure, so as Dr. Orr spoke, there is a lot of collaboration between these two efforts and when we work with the Weatherization Program, the thing to keep in mind is that when the community action agencies that field the cruise to go in and do the audit look at the opportunities in those homes, they do have to identify opportunities that have a positive savings to investment ratio so we are always talking about the technologies that are up and coming and what can deliver on that positive savings to investment ration in low income homes so there have been any number of technologies but also sort of improved practices because some of the things that are providing the greatest savings in weatherization are things like improved insulation, improved home ceiling, just really getting the things that are, you know, letting the conditioned air leak out of the home, the really low cost measures that can give sort of the deeper savings to the low income homes. I think some of the technologies we are looking at, include things like windows, higher efficiency air conditioning, type measures. I think we are also looking at the opportunity for renewable energy in the regions of the country where that can make sense as well. Ms. Roybal-Allard. Thank you. According to the DOE, addressing soft costs like financing, permitting installation, labor inspection, another non-hardware cost provides the greatest opportunity to spur strong U.S. growth in solar deployment in coming years. In an effort to make solar deployment faster, easier and cheaper, the DOE's Solar Market Pathways, which began in 2014, is a program that supports solar related projects. In fiscal year 2017, the DOE plans to build upon the success of the Solar Market Pathways program and supports six to ten new awards. How do they activities proposed in 2017 apply to the Nation as a whole and are you ensuring this research is not replicating or subsidizing work that is more appropriate in the private sector. Mr. Orr. Thank you for the question, it is an excellent one. I think that the cost evidence indicates that the hardware costs have come down more quickly than the related costs, and I know this to be true from my own experience installing solar cells at my house in California, and that there is an opportunity on both sides. We have not given up on the fundamentals of photovoltaics. We know that there is still more to be done there, and there is some really exciting work with perovskites, for example, that could lead to real cost reductions in the future. But at the same time a parallel effort like the one you described which looks all the ways that the process slows down and, therefore, costs more, these are regulated at State and local levels and so, in one sense, creating some best practices and a competition amongst places to figure out how to streamline the process, offers some ways to get to a more efficient process and, therefore, to lower cost. So we think that the appropriate thing to do is to work on both sides of the equation because we know that this can be done more efficiently. Ms. Roybal-Allard. Mr. Chairman, I am not sure if I have time for another question or not. Mr. Simpson. Go for it. Ms. Roybal-Allard. Go for it? Ok. Dr. Orr, the budget request contains a new request for funds to support the SMART Consortia Initiative within the Vehicle Technologies Office, yet does not expand on these efforts. The SMART Consortia Initiative is part of the Smart Cities efforts announced by the President last year to invest in technology collaborations to help local communities reduce traffic, foster economic growth, improve the delivery of city services, and manage the effects of climate change. Can you outline what exactly the vehicle technologies office proposed to fund in support of this effort? Mr. Orr. Mm-hmm. So, I am going to have to ask for help on that, but I will start by saying that one of the things that we learned in doing the Quadrennial Technology Review was thinking about energy systems offered some ways to be much more efficient. And if you think about cities and the way we have complicated systems that supply electricity, some more that supply water, that deal with wastewater, and that move all of us around, and all of those are linked together in interesting ways, so figuring out how to look at those systems as systems, and look for the efficiencies that come from being able now to deploy sensors and use advanced computing to manage these systems, that there are real opportunities there that we are only kind of just beginning to figure out how to work on. So we are taking this area as one example of ones where we can make some progress and learn how to do it better at the same time. So, let us see, Reuben, I guess you are the right one. This is Reuben Sarkar. Mr. Sarkar. Reuben Sarkar. Thank you for the question. Just to build on what Dr. Orr had said, within DOE and within the transportation sector, we do not exactly have a program called Smart Cities, per se. Smart Cities is the vernacular that is used by a number of agencies to describe data-driven cities, and the ways that we can use controls and information to make cities more efficient. What we do have is a Smart Mobility program that is going to be part of our Transportation as a System program, and builds on our component level of research which looks at the efficiency of an individual vehicle and takes it up to the level of how do we make future mobility systems more efficient when we think about things like connected and automated vehicles, a multimodal transportation, and the convergence of IT systems into cars. And so our Smart Mobility program is a multi-lab consortia, part of our Transportation as a System program, and it is very complementary to the work that is being done by other agencies, like DLT and their Smart Cities challenge, but it looks very specifically at how do we optimize the energy benefits that we get when we look at all of these future mobility systems, these new business models that are coming, both in the movement of goods, and, as well, in the movement of people. Ms. Roybal-Allard. Ok. What did you do to ensure that you did not duplicate any efforts from the Department of Transportation? Was there some coordination? Mr. Sarkar. Yes. So we do both joint program briefings in which DOT comes and briefs us on their efforts and then we brief them on ours. We also recently hired a lab M&O contractor from the National Renewable Energy Lab from DOE and we embedded them with DOT on their Smart Cities team. And we use that person as the liaison to make sure that we are coordinating our activities and that what we are investing in is a very high value to what DOT is investing in. Ms. Roybal-Allard. Ok. Thank you. Mr. Sarkar. Thanks. Mr. Simpson. Mr. Honda. Mr. Honda. Thank you, Mr. Chairman, and welcome. Dr. Orr, I have a question about energy efficiency programs, and much of the focus on energy efficiency goes towards large power consumption devices, such as appliances and motors through the Energy Star programs. But the proliferation of consumer electronic devices means their energy consumption is adding up to a very significant level, especially if you go global. Furthermore, the vampire devices that continue to draw power even when they are not in use are adding to consumer utility bills and our overall energy usage as well as our resources. So, what is your office doing to address this ever-growing concern that I have? And then with regard to energy efficiency in manufacturing, saving energy cannot only reduce cost, but also reduce climate and environmental impact. What is your office doing to help the Nation's small- and medium-sized manufacturers to become more efficient? Mr. Orr. Well, you are absolutely right that energy efficiency is something that offers lots of benefits and often ones that pay off economically with shorter payback times than lots of the other investments, so it is a really important area. I am going to ask Kathleen Hogan to talk about the specifics of the appliance efficiency standards with respect to how they apply to the so-called parasite or vampire devices, I guess, is what they are called. But I will note that, in general, that the efficiency standards that we have worked on have had a real impact in saving lots and lots of money for consumers and, at the same time, reducing greenhouse gas emissions. So it is an area that really does deserve considerable effort and we will continue to do that. Kathleen. Mr. Honda. In your response would you also address where we are at in improving the energy process, the Energy Star program? Because I think that there are ways that we can double the efficiency, but I do not know where we are at and what needs to be done, whether it is going to be industry-driven or Energy Department-driven. Mr. Orr. Well, the one thing I would say there is that in establishing the energy efficiency standards we actually do work quite closely with industry. It is a process that Kathleen can describe in more detail. Mr. Honda. Thank you. Ms. Hogan. Yes. Terrific. So, as you point out, this is a big problem, and one of the reasons it is a big problem is because there are so many types of devices that are out there. So you are always looking for the common elements where you can find energy efficiency opportunities, and that is really where the appliance standards have come into place. We have had appliance standards for external power supplies or things that have, you know, that power supply element. We can work with industry to find the appropriate standards there. We also have an ongoing rulemaking for battery chargers, sort of another area to look for improved efficiencies. We also, in our fiscal year 2017 budget, are proposing a new research and development area for miscellaneous electric loads that would leverage the great work we are doing in our advanced manufacturing office around something called wide bandgap materials, or also called, potentially, sort of like semiconductors. It is the next generation of semiconductors, right. So the extent that we can make semiconductors much more efficient, we can really drive down the energy use of all of these miscellaneous energy loads, so an exciting opportunity there. Mr. Orr. Say a word, Kathleen, too, about the business competitions for reducing energy use and the energy-efficient businesses. Ms. Hogan. Just working more broadly with industry to drive down their loads. Mr. Orr. Yes. Yes. But we have also worked with a variety of businesses to challenge them to reduce their energy consumption as well, and then publicize what they do. Ms. Hogan. That is right. Mr. Honda. So, perhaps, to the chair, I request that we can get together and sit down and go through the myriad of efforts that is going on, and also maybe look at converting that into cost savings in terms of the kinds of fields that is necessary to generate just--that will be saved because of this efficiency. I have a question on waste energy. Dr. Orr. Mr. Orr. Mm-hmm. Ms. Hogan. You know, I just checked the Zero Waste Energy Development Company operates the first large-scale commercial dry fermentation anaerobic digestion facility in the United States. This facility can process 90,000 tons of organic waste per year. That is just about wet waste. It generates about 1.6 megawatts of clean energy. Now, this type of facility not only keeps tons of wet garbage and green waste out of landfills, but also diverts mixed construction waste and debris for recycling and reuse. Replicating this innovative approach to recycling and landfill diversion will move our country to a more sustainable future. Can you explain to me how DOE intends to help both maintain our existing WTE infrastructure and capitalize on the potential of the WTE technology in meeting the Nation's renewable energy and GHG emissions goal. Mr. Orr. Well, I cannot explain it to you, but I bet one of my colleagues can. I would just say that being able to do that kind of thing, this is kind of the putting together of technologies that offer combinations. So they are kind of hybrid things that really do--just as a credit to a bunch of smart people. But, Reuben, can you help us on this? Ms. Hogan. Ok, Reuben is a smart guy, huh? Mr. Sarkar. Yes. In our bioenergy program, we have included both municipal solid waste as well as wet waste streams as part of our feed stocks that we are having for our next-generation pilot and demonstration programs that will be coming soon. And so we have bio solids to bio power represented in the next pilot and demonstration programs. Ms. Hogan. Well, we have one already established. How do we go about replicating and scaling up this kind of a process where you are actually doing 90,000 tons a year? And that is only a portion of our city. And if we can incentivize or create more programs like this, we generate the process where we avoid landfills, filling and base, avoid the smell and odor, and things like that. Is there a place where we can go to to use this as an example for replication? Mr. Sarkar. Yes. And maybe, just so I can clarify, our integrated bio refinery program, which is part of our demonstration and market transformation program, we will be conducting both pilot and demonstration-scale plants, so taking things from lower-scale, less integration, and moving them up into larger-scale facilities. And the goal is that demonstrating at a higher scale will then lower the technical risk and will provide access to more bank financing or financing through the loans program. And our goal is that once you demonstrate the lower risk of a technology and the viability, then you are able to then replicate those plants at others. Ms. Hogan. But if we are able to do that already, what is the next step? Mr. Sarkar. Within the bioenergy program, we fund only up through the demonstration-scale facilities and not all the way into the commercialization phase for plants. I can follow up and get you a more clear answer. Mr. Orr. And I would just say that, you know, in the end, it is about cost, so continuing to work to reduce costs means the ability to deploy more widely, that when municipalities see that it is in their interest to do this, they will. Ms. Hogan. To the chair, if I may, can we invite you to come down to the district and look at this, so you can help me articulate better how we do this, so replicate this throughout the other communities in the near future? Mr. Orr. Yes. We will look to figure out some way to do that. Ms. Hogan. Thank you. Thank you, Mr. Chairman. Mr. Simpson. Mr. Calvert. Mr. Calvert. Thank you, Mr. Chairman. I apologize that I am late. We are having hearings around here everywhere, at the same time, but we cannot help that. But I have a couple of quick questions. Obviously our grid, our electric grid, and I apologize if this question has already been asked, has become more complex over the years and certainly we have more challenges, extreme weather events, and now we have all these different sources of power, solar cells on everybody's roof, changing the dynamics on how the grid operates. I hear from the various electric providers that this is causing them all kinds of engineering problems and so they need to make various fixes to it. So I guess the question would be, how is the grid today? Do you look at it as resilient and capable of doing this job in the future? Mr. Orr. I would say that we are partway through the process of modernizing the grid to be as effective as it can be. Partly through the Recovery Act, for example, we install lots of sensors known to the technical experts as synchro phasors, but these tell us about voltage and frequency and kind of the state of the grid. That helped us be able to identify problems as they were developing and respond to them more quickly. But there is actually quite a lot more that we can do. As the fraction of renewables grows, as more distributed generation appears, that offers both some challenges and some opportunities. As we use storage to provide batteries or flow batteries or some things like that as a way to provide some balancing on the grid, those are all opportunities that we have to figure out how they work, both physically, but also from a market standpoint, and so our Office of Electricity is working hard on these things. I'll ask Pat to join me in responding here just for a moment. It is the reason we have created our Grid Modernization Initiative and our Grid Modernization Lab Consortium. We have 14 of our national labs working on various components on this, and we have a 5-year, multiyear program plan that is aimed at really improving services, improving efficiency, and at the same time, making the grid more reliable and resilient and able to recover more quickly when bad things do happen. So it is a very important effort for us. Pat, do you want to add to that? Ms. Hoffman. Yes, I would, thank you. Thank you, Congressman, for the question, and I think the grid is undergoing a transition, and like any transition, we have to help with the process as we move forward. California has reached its first 10,000 megawatts per hour ramp rate in California. Also, we have had a request for 1.3 gigawatts of energy storage on their system. I think California represents a leading edge of what is to come. The reason the Department of Energy did the Grid Modernization Initiative was really to take a look at the integration of distributed energy resources, renewable technologies, but also find a way to effectively integrate that, but to deal with some of the challenges that are occurring on the system. So part of the budget request, which is looking at grid modernization, which is the 262 request from OE and the budget request that is coming from EERE, we are integrating those aspects of renewable energy resources, looking at energy efficiency, looking at how we can better manage demand on the system. So these are great opportunities to provide the flexibility that the grid requires, but it is a work in progress and it is efforts that we will continue to work on. Mr. Calvert. Ok. I appreciate that. One other quick question, I know we spend a lot of time talking about solar and wind. We have some automobile companies that are, especially in California, moving forward with hydrogen technology, especially Hyundai has some technology that they are excited about, but, obviously, the infrastructure, just as we had with electric cars, is woefully not there. There is no way to power up your Tesla as you are going up the 5 freeway in California. So are there any plans for hydrogen vehicle infrastructure and where do you see hydrogen vehicles going? Do you think that it is a workable technology? I know Mercedes is putting a lot of money into that. Mr. Orr. Yes, I am going to pass to Reuben here in a moment, but I will say that this is one of those really interesting areas where there is a real competition. If you think about an electric vehicle, there, you are storing the energy on the vehicle in a battery, and then that drives an electric motor. A fuel cell vehicle is one where you store the energy in the hydrogen and then put that on the vehicle and then use a fuel cell to convert that into electricity to drive the vehicle. So they are competing technologies. There is interesting progress on both sides, and we will see what that diversity in the marketplace provides. There are now charging stations are appearing around the country. I would say overall on the hydrogen side, they are probably more limited on the hydrogen side for now than the electric side, but it is definitely a competition. Reuben, do you want to add to that? Mr. Sarkar. Yes, I will just build on it a little bit. As mentioned, hydrogen builds on an electrified platform, so there is benefits for electric vehicles as is for hydrogen. We do work in two areas. One, as you mentioned, there is already vehicles on the road, and so we are actually supporting the deployment of those stations in places like California. Through our H2USA public-private partnership, we have about 45 companies and agencies involved in developing the expeditious process for rolling out those stations in places like California, first on examples, working on safety codes and standards, trying to get standard reference designs for stations. We have developed equipment that can qualify stations very quickly and enable us to actually deploy those hundred planned stations much more rapidly. Then on the research side, we continue to drive down the cost of fuel cell systems on vehicles by lowering the amount of precious metal catalysts and things that we have onboard the vehicle, and at the same time, lowering the cost to store hydrogen off the vehicle at stations. Then lastly, the biggest nut that we are working on cracking is renewable hydrogen from advanced sources. We already can make renewable hydrogen from solar and wind today, and if we can push down the cost further through advanced water-splitting technologies, you have an opportunity to really deeply decarbonize transportation, and so we work on it both on the deployment side with the cars today as well as on the long- term research side. Mr. Calvert. Good. Thank you. Thank you, Mr. Chairman. Mr. Simpson. Thank you. First, let me ask, following up on the grid and modernization of the grid, we act as if we own the grid; we don't. The grid is privately owned by private utility companies. What is our role in helping modernize the grid? When you say ``we are partway,'' what do you mean? The private sector is partway? What is our role in helping the private sector do this? I understand there are BPA and TVA but the line that comes to my house is owned by Idaho Power. Mr. Orr. You are exactly right that it is complicated. The players range from utilities that generate the electricity in both investor-owned and the regulated utilities. There are the wires themselves and the transmission and then the distribution system, which often can be owned in separate ways, and then there are the regional balancing authorities that make sure that there is enough generation on the grid and that the whole thing is operating and stable. You are absolutely right that we are not the regulator, but, in some ways, that gives us a way to be a convener for the conversation amongst all these players. There are regional differences and some significant efforts going on to understand how it should work in particular markets. We can participate in all those conversations in a way that is harder for the Federal Energy Regulatory Commission to deal with or the state public utilities commissions. We can help conduct that conversation, and we can do research on the components that they need to do all this at the same time that we recognize that maybe the only thing that is more complicated in its regulatory approach is water, I think, because that goes right down to the community level. But, nevertheless, I think it is both an opportunity for some experimentation and some demonstration of what we need to learn, and the challenge as we figure out how to make it all work together. Pat, correct whatever I said that was wrong. Ms. Hoffman. Thank you, Mr. Chairman, for the question. With respect to the grid, yes, it is owned majoritively by the utilities and other entities out there and we do not own the grid. The issue that it comes down to is, how do we invest in new technology while minimizing risk for those entities? So there are a couple things that as utilities are looking at the integration of whether it is wind, it is how do they evolve their system to be able to keep pace with the demands of the new technologies that are coming on the system, so a couple things. With respect to grid technologies, we want to help reduce the cost of the technology. We want to de-risk the technologies so that the grid operators can install these technologies more cost-effectively based on rate payers and consumers and---- Mr. Simpson. But, ultimately, it is up to them to install it. Ms. Hoffman. It is up to them to install it, but we can help bring down the cost and we can bring down the risk. The other area is that the grid is a network system, that Idaho Power is connected to the Western Interconnect, and there are issues that would affect Idaho Power would affect the rest of the Western Interconnection. So how do we look at those systems issues from a wider area so that the utilities can advance their technologies but also be a part of the system so that they do not affect the rest of the system as they invest in these technologies? So those are a couple things that the analytics that we do support where technologies can be best placed on the system, the value of the technologies, and how we can improve the resilience of the grid writ large. Mr. Simpson. Tell me about the Grid Modernization Institute. What exactly will it do? I think you have requested $14 million for that in the budget. Ms. Hoffman. So thank you for the question. The Grid Modernization Institute is a core part of our mission innovation area with the Office, but what we would exactly like to do is focus on high-risk components that we need to have manufacturing in the United States to support. I know that, at least some of the numbers that I have seen, is the utilities will invest probably close to a trillion dollars over the next 20 years in upgrading components on the electric grid. What we would like to do with the Manufacturing Institute is take a look at some of those high-risk, hard, difficult-to-manufacture components and focus the Institute on investing and manufacturing for those type of devices or components. For example, one might be magnetic materials to help with cores and transformers. Transformers are a very difficult component to manufacture. We need more transformer manufacturing in the United States. Another area might be in the wires, the transmission and distribution wires of low resistivity materials so that we can actually get additional capacity and more efficiency in our transmission and distribution system. So those would be the efforts and the topics. We would run some workshops to fine-tune whether this is the best topic, but this is just an example of some of the things that we would look at. Mr. Simpson. So you would do research into those arenas? Ms. Hoffman. Yes, yes. Mr. Simpson. Mr. Smith, not to leave you out of this conversation, since fossil fuel seems to be the major source of energy in this country, let me ask you a couple of questions. Your office proposes to increase the STEP program, which seeks to realize more efficient electrical power generation from the use of a super critical fluid in the generation process. The increase would fund the initial design and construction of a pilot facility to demonstrate the use of this fluid. Due to the more near term deployment of this technology in the fossil energy field, the STEP initiative has been managed out of your office. However, coordination efforts are still ongoing with the Office of Nuclear Energy and Solar Energy Office in EERE. Can you update the committee on those coordination efforts and describe how they are incorporated in the long-term plan in this technology? Mr. Smith. Thank you very much, Mr. Chairman. So, in Dr. Orr's introduction, he talked a little bit about the cost cutting initiatives that cut across the offices within the Department of Energy. So, this is actually an excellent example. We do have a cost cutting initiative which is for the Supercritical CO2, the STEP initiative. That is co-chaired by the Office of Fossil Energy and the Office of Nuclear Energy, so we work very closely on that initiative. Nuclear Energy released an RFP in the first quarter of 2016. That is going to then feed into the work that EERE is doing. We are going to have a FOIA that we put out some time in March leading ton an award that will be made some time in the fiscal year, probably in September. The hope is that we will move forward on construction some time in the following year. So, again, very close collaboration between the Office of Nuclear Energy and the Office of Fossil Energy. We have noted that this technology is applicable to renewables, it is applicable to fossil energy, it is also applicable to nuclear energy. When you look at the different fuel sources used, the greatest efficiencies for a Supercritical CO2 we expect to occur in the temperature ranges that would be fossil applications, so that is why the highlight has moved from nuclear energy to fossil energy. Again, we work very closely with the Office of Nuclear Energy in executing this project, and in doing the research together. Mr. Simpson. John, do you have anything to say on that? Mr. Kotek. No, other than just to echo what Chris said. It is working very well from our perspective, and of course in addition to that cooperation, we have a little bit of work looking at the specifics of how you would link up a nuclear system through an energy conversion system like this. So, a little bit of work there, but the most of what we are doing is in cooperation with his office. Mr. Simpson. Mr. Smith, the Bipartisan Budget Act of 2015 directed DOE to complete a strategic review of the Strategic Petroleum Reserve and to develop and submit to Congress a plan for modernization of the reserve. What is the current status of the review, and do you expect to meet the deadline of early May? Mr. Smith. Mr. Chairman, thank you for the question. Certainly, we do expect to meet or exceed that deadline for May. We are working on that right now, and expect to get it to the committee shortly. Mr. Simpson. I know this is before the report comes out but do you anticipate there would be recommendations for fiscal year 2017 in the report, and if so, if it is the May deadline, it may be too late because we are moving with the budget as quickly as possible. Mr. Smith. Understood. So, we understand there is a May deadline that was input in the language. We also understand there is an opportunity to influence the ongoing process. So, we do expect to be able to move more quickly than May to get something back to the committee. In fact, that process has started within the Department of Energy and in our collaboration with OMB. So, that is ongoing in real time as we speak. We expect to be, as we noted in our congressional justification, submitting an amendment to our budget very shortly. Mr. Simpson. The Bipartisan Budget Act of 2015 established an Energy Security and Infrastructure Fund. That authorization allows appropriations' acts to direct the sale of up to $2 billion worth of oil from the reserve and to use the proceeds for the construction, maintenance, repair, and replacement of strategic petroleum reserve facilities. The budget request does not include use of this authorization, however. The budget request includes an increase of $45 million or 21 percent for the Strategic Petroleum Reserve. It is described as necessary to address the backlog of major maintenance activities. Why did we not use the fund that was created to do this in the budget request? Mr. Smith. There are two areas that we are looking at funding, our base budget, including the additional $45 million, which is to handle deferred maintenance, which we see as being essential for the immediate operation of the Strategic Petroleum Reserve. So, this is the ongoing maintenance and deferred maintenance to ensure that the Petroleum Reserve is able to operate as it is intended. In addition, we are expecting to submit an amendment to the fiscal year 2017 budget, which will be for modernization of the Strategic Petroleum Reserve. That would include life extension, and that would also include modernization of---- Mr. Simpson. Somebody is calling ``bull'' on that. That is wind energy. Mr. Smith. But I would also include the modernization of docks and to increase the distribution capacity of the Strategic Petroleum Reserve. That is the scope of the work that would be included within the budget amendment. Mr. Simpson. Ok. Mr. Orr. A simple way to think about this is we need to keep the dern thing operating in order to sell the oil that it takes to generate the income to do the big picks. Mr. Simpson. Mr. Kotek, I have not called you that in a long time. Mr. Orr. Has he called you worse? Mr. Simpson. No, I have never called him worse. I just have known him for a long time. What is the general health of the Advanced Test Reactor in Idaho, and has it adequately been funded to provide maintenance and upgrades necessary for it to last, and what projects and upgrades to the ATR are still outstanding but are not proposed in this year's budget request? Mr. Kotek. Thank you, sir, for the question. Of course, the ATR is central to both my programs in the Office of Nuclear Energy and to the work of the Office of Naval Reactors. One of the first things that I got into deeply when I came back to DOE about this time last year was to ensure that we had a plan in place to adequately invest in the long-term safe and efficient operations of that reactor. Both we and the Office of Naval Reactors see a need for that facility out until the 2050 time frame. So, what we have done is we have worked cooperatively with the Office of Naval Reactors and with the laboratory to put in place a 5 year rolling strategy focused on improving the reliability and predictability of ATR operations. Of course, the Congress in the fiscal 2016 budget provided additional funds beyond what we had already requested, which we will use to accelerate some of the work that we had identified in that plan. We have in our request for this year fully funded the activities that we had identified to be conducted in fiscal 2017 as part of that plan. The increase we received in fiscal 2016 came after we had put the 2017 plan in place. We will work with Naval Reactors and with the contractor to ensure that those funds are spent efficiently and at the highest priority for the long-term safe operation of the ATR because it is just essential to a wide range of DOE missions. Mr. Simpson. In this year's request, the Integrated Waste Management Systems account is proposed to fund two distinct activities, storage and transportation R&D and consent-based siting activities. In previous years, the focus of the Integrated Waste Management Systems account was on a generic research and development applicable to Yucca Mountain and other waste solutions. Does this new proposal still maintain this focus, and how much of this research and development applies specifically to Yucca Mountain and how much applies to an interim storage facility? Mr. Kotek. Thank you, sir, for the question. The $76.3 million we have for the Integrated Waste Management System is roughly split 50/50 between activities focused on consent-based siting and then work on nuclear fuel storage and transportation, which would be applicable regardless of what site was chosen for the ultimate storage or disposal of fuel. Of course, we do not have anything specifically tied to Yucca Mountain in our request, but we are looking at being ready to transport fuel, for example, when we are in a position to start moving fuel, for example, from shut down plant sites to consolidated storage, which of course, we have set as a priority. On the consent-based siting side, about $25 million that we have requested would be intended to be used for grants to states, tribes, local governments, potentially others that are interested in learning more about what it would mean to host a facility, either for storage or disposal, and either for civilian waste or defense waste repository sites, to help them understand what those challenges might be so that they can decide for themselves whether they might be interested in over the long term becoming what we call a ``willing and informed host.'' Mr. Simpson. So, I guess your legal counsel has made a determination of how far down that road we can go before we get the roadblock of not allowing the department to look at interim storage? Mr. Kotek. Well, the language in our request in the fiscal 2016 request speaks to continuing to lay the groundwork for the consent-based siting process, and of course, what we are embarking on now is a series of public meetings and other activities designed to get input from states and others as to what should be considered in the design of a consent-based siting process. For the fiscal 2017 request, we have in our language specifically said we now want to move forward with implementation of that process. Of course, as you point out, there is a need for new legislation to do a number of the things that we have included in the administration's strategy, assure access to the Waste Treatment Fund, setting up a new organization, an independent organization, and other things. Mr. Simpson. Well, I would just add I am not opposed to that. We are going to have this type of thing regardless of what happens with Yucca Mountain. We have to face that reality at some point in time, that we need a facility, more than one facility, as a matter of fact. Ms. Kaptur. Ms. Kaptur. Thank you, Mr. Chairman. I wanted to go back, Dr. Orr, to the issue of municipal utility systems, and ask, do you or any of your colleagues have any example at DOE on where the department has worked with a local municipality to make their energy use more efficient by reducing their energy costs for water and wastewater treatment? And in doing so, integrating the full range of Department of Energy technologies that might involve a new conduit, grid modernization, on-site installation of renewable energy technologies, including sensors, and implementing wastewater resource recovery so that we can recover essential elements, such as phosphorus, in the organics that result at the end of the treatment process? Do you have any example literally where the department has put its full weight behind transforming a community's utility system? Mr. Orr. Well, it is an excellent question and I need to ask for some help. Kathleen, are you on the hook for this one? Ms. Hogan. So, we have a number of engagements where we are assisting states and municipal governments through a variety of programs that we have, focusing on their water treatment and wastewater treatment to improve energy use. So, one very applicable technology is combined heat and power, right, where you can get the biogas recovery from anaerobic processes, trap the energy, use it on-site, and get substantially reduced energy bills for that wastewater treatment facility. We also have been working through our renewable energy program and have some solar applications. I think, as you are highlighting, that is not necessarily the full soup to nuts type of thing that can happen at a wastewater treatment facility, but we are trying to think through as part of the energy-water nexus what would be a fuller suite of opportunities for the Department of Energy to engage in, as well as with our partner agencies. So, certainly EPA would have an important role in these types of efforts. So, we have some of this thinking underway. Ms. Kaptur. First of all, thank you for the fine work you do, and I hope you keep thinking along those lines because as I said to the Secretary, one thing I have noticed, I have served on almost a majority of the subcommittees of the Appropriations committee in my career, and one of the startling facts for the Department of Energy as critical as your work is, I have found a remarkable lack of sensitivity to place, and your authorizing legislation probably does not give you full weight in that regard. I have found lots of separate programs, but no integration, and certainly at the community levels at which we work, and I think Congressman Honda was referencing some issues this morning, and I think the chairman was. I think your department has in some ways been cordoned off from that kind of thinking to relate to regions and places. I think you have a lab perspective, which is critical for the work that you do, but it is a little bit hard to integrate your programs, and I do not think it serves America as well as it could. If you need additional authorizing power, let us know. I think when you create something like an energy-water nexus that gives you the ability to integrate. Along those lines, let me also ask about the weatherization program. Congresswoman Roybal-Allard asked about the program. Again, here, do you have any examples of communities that have benefitted from weatherization assistance in accessing it through the states, but have developed robust local partnerships that use all of DOE's energy programs to help revitalize and target those dollars to neighborhoods, not just individual homes, but integrating your technologies along with those weatherization programs through workforce training and development, in places where these investments are made, accessing historic preservation, which is not your job but it exists out there, grid modernization, where it is possible, recapture of waste energy where possible, installation of renewables where it is possible, sensors where it is possible. So, again, will you target that weatherization in a way, even though it is a smaller program, where it really can have a major impact? I will just say in one of the regions I represent, there is a historic neighborhood. Unfortunately, the weatherization program, it comes in and does its thing, but what it could do if it could link these other assets that you have and other partners--it could do so much more. It seems to be unable to do that because the dollars flow through the state and the state is a long way from neighborhoods, at the local municipal level, let's say. So, do you have any examples where that broader approach has been taken, to your knowledge? Ms. Hogan. So, I would again say this is an active conversation at the department. We understand the importance of addressing communities as holistically as possible. I would point to one of the parts of our budget which is in the Office of Weatherization and Intergovernmental Programs. We are asking for a community oriented program where we could integrate this more holistic thinking in terms of solving the issues that are facing communities and really focusing on neighborhood revitalization opportunities where clean energy can really help be part of that goal. Ms. Kaptur. Literally, I represent neighborhoods where there is waste heat right near these homes, and there is no thinking about how to work with industry. The weatherization program comes in here, it does not connect at the local level. So, I would urge you. We put extra money in the budget for 2016 for weatherization. I do not know if your authority allows you to try to create some pilots around the country where you try to integrate programs. Please let me know if something prevents you from doing that. I do not think you are having maximum impact. Ms. Hogan. We will certainly take those words. Again, we are thinking through how to field an effort with partners across the country so we can bring those partnerships together. The weatherization program does have very strict rules in terms of when money is put into the weatherization program. It goes out in formula allocations to help the states, with the community action agencies, to deliver the weatherization services, and I think we look at the weatherization program as a very important network and set of activities that are happening in the community, but we agree with you about the importance of a broader set of partnerships that can leverage that or bring other things to the table to help these communities. Again, we are actively thinking this through and would love to come back and talk with you once we have done a little more thinking. Ms. Kaptur. Thank you for your openness to that very, very much. I think we could do something to modernize what is happening out there in the country. Finally, in terms of industrials, to change the subject to industrial assessment centers, Dr. Orr, I am glad to see the ongoing support for these. I would like to hear a little bit more about it, but I wanted to put this on the record this morning. I probably represent one of the largest automotive platforms in the country. I represent the largest Chrysler Fiat plant on the continent, with the manufacturer of the Wrangler and the Cherokee. I also represent General Motors' sole transmission facility, where we have moved from V4 to V6 to V8, and we are going up to V10, and becoming more energy efficient, serving all of its product lines. I represent GM's plant at Parma, Ohio, also. I think all of my automotive plants would benefit by your expertise in helping them save on their energy bill. Those components going to the Cruze, one of our most efficient GM vehicles. I represent Ford's breakthrough EcoBoost plant at Brook Park, very important in the energy efficiency of Ford, and also I represent their heavy truck plant at Avon Lake, Ohio, that was repatriated from Mexico. So, it would be great to have some kind of a forum where we could look at the combined energy use. One of the GM plants has put a solar roof on their facility. To help these companies, which can go global at any point and outsource their production, to look at energy and figure out hey, what can we do here to secure this manufacturing, critical manufacturing, for our country. So, if there is something you could do through this industrial assessment center to look at corridors like this. Just down the road is the General Dynamics tank plant. You know, we have big manufacturing in our region. Ask the question of how can the industrial assessment centers be used to help small and medium facilities look for energy savings opportunities? Mr. Orr. I actually would like to ask Kathleen to respond to that, if you do not mind. Ms. Hogan. We can take that on. Certainly, the industrial assessment centers have the opportunity to help small and medium facilities look for energy savings opportunities generally within the region, right? So they are a regional-type center. In addition to the industrial assessment centers we have efforts, as Dr. Orr was referring to earlier, where we will work directly in partnership with major companies to help them better understand and manage their energy use through things like our better buildings, better plants effort. And we have had tremendous success working in partnership and helping these organizations find savings on the order of 20 percent to 25 percent, you know, over a set of years as they, you know, strategize over the right investments to make. So we are happy to engage in this conversation. Ms. Kaptur. Every day when I am home I drive by the--and I am not criticizing--I am just reporting that the Chrysler facility, Chrysler Fiat facility at Toledo there is a big methane plume that just keeps burning off. And I see that and I go, is this really the best thing we can do? And I keep looking at what is going on across the region in these big plants, and so I will look forward to that, and I thank the Chairman for his forbearance on this. It is really important to our area. Mr. Simpson. I have not heard a problem here that a small modular reactor could not fix. Mr. Fortenberry. Mr. Fortenberry. Speak about the problem of small modular reactor, I do not want to go there on this one. I want to talk about renewable energy in a macro sense in terms of both capacity and the storage issue, and then implementation in a micro sense, the distributed generation, even down to the home owner level. I live in Nebraska. We get about 7 percent of our energy from wind. The surrounding states vary from 20 percent to 30 percent. We have got a little bit different model for energy generation in that we have a public power system and some transmission infrastructure challenges that I think have precluded the rapid development of wind. But, nonetheless, the cost of wind has come down 66 percent, I understand. What do you foresee, in terms of your own research, in terms of potential further declines in wind to make it even more competitive? And then the storage issue, research on the storage issue? And then integration of wind as well as solar on a micro level along with the micro storage issues? What is research looking like, the trajectory of research in that regard? Mr. Orr. I will ask my colleagues to join in here in a minute, but let me start by saying that one of the primary reasons for investing in the grid modernization initiative that is one of our key cross cuts, and I would say the best developed of our cross cutting efforts, is because that effort integrates a lot of the things that you just talked about. It aims at being able to accept deep penetration of intermittent renewables and other kinds of distributed generation. It aims at providing a variety of balancing options, so one of those, of course, is storage. Grid scaled, battery storage is one way to provide that, and sometimes scale of works. Mr. Fortenberry. Incentives for demand or incentive pricing for catch of demand? Mr. Orr. Yeah, so that is a place where we need a better market mechanism to recognize. Mr. Fortenberry. So basically you run your dryer at night? Mr. Orr. Well, yeah. Mr. Fortenberry. And get a credit for that? Mr. Orr. And in my case, at my house in California, I have time of day pricing. Mr. Fortenberry. Oh, good. Mr. Orr. And I do have some solar cells in the backyard, so I fixed it so that we do not run the dryer in the high cost period of that. Mr. Fortenberry. Right. Mr. Orr. I mean, it is an interesting system of systems, so particularly, we have micro grids that might generate power, mostly on their own, and be able to deal with a crisis, for example, or a disruption. But then be able to come back online in a reliable and straightforward way. Mr. Fortenberry. So define microgrid? Ms. Hogan. Well, microgrid, it could be as small as a good sized building, but it is often and could operate on its own. Mr. Fortenberry. I mean, I think that is where we are at in terms of we shifted to the concept of distributed generation and there has been some mild implementation of that. In California it is more possible with solar than where I live. But at the same time, you know, if it was cost affordable, feasible, why not think about, particularly in new home construction, becoming your own micro energy farm through a combination of not only wind and solar micro wind, but also geothermal? I understand there might be on the horizon solar panels that basically look like windows now that are translucent, and that takes care of this problem of aesthetics as well. Anyway, just speak briefly, if you could, to the technologies that are on the horizon for storage that will further empower integration of renewables into the overall portfolio and then drop prices that make it more feasible for micro systems to develop? I mean, where are we at in this? That is the core of my question. Mr. Orr. Yeah. We are in the middle of that process. In terms of batteries per grid scale, there are some things called flow batteries, for example, that you would not want to put these on a vehicle, but where they basically do an electrochemical reaction and store the products in tanks. You need space to do this, but you can do really big quantities. But people are looking at other kinds of battery storage and battery chemistries for that sort of thing as well. That is different from the other end of the scale where, on a vehicle, what you care about is the weight and volume of that battery and it is much smaller, so. Mr. Fortenberry. So what is the time horizon on the integration of these technologies in reality into the market system? Mr. Orr. Well, Pat Hoffman's troops are busy. We have a significant boost in the energy storage for some demos in 2017 to go test some of these ideas. So Pat could tell you more about that if you want to, but we are in progress. Behind the meter side of things, there are companies out there that now will sell you storage, you know, 5/10 kilowatt hours that might allow you to generate power from your solar system at your house during the day and then use that to power your house at night or to---- Mr. Fortenberry. Or just through the accounting methodology? Mr. Orr. Well, yeah. And, again, if it involves time of day pricing there would be incentives to be able to shift your load there. So it will be very interesting to see how the market values these things and how this plays out. But the technology pieces are starting to be there. Mr. Fortenberry. Well, I mentioned this to the Secretary, and I will defer to you in just a moment. I integrated a geothermal into my home. My home is about 25 years old. So I was glad to do that. I want to make advances in this regard. The payback period is probably on the outlying end of the spectrum, 10 years. It might be as early as seven. But this was made possible by tax credits, state loans, as well as rebates from the manufacturer given the timing I put in, and rebate from a local utility. It is complicated frankly. Mr. Orr. Yeah, yeah. Mr. Fortenberry. And so if you wanted to do this in a much more aggressive way, moving your home toward, in effect, being an energy farm, integrating solar geothermal smart metering, as well as the possibility of micro wind, is complex. Are there models out there in which this is being done successfully? Even in the area of the country where I live? Mr. Orr. Well, this is a good example, I think, of why we would think about these things as systems. That is something we are trying to do a better job of. But you're absolutely right that reducing that complexity would aid deployment, and I would also argue that we need to continue to work on cost reduction because if the research can help us give you that geothermal heat pump setting at a price that doesn't require the various complex programs to help get them deployed, then that will work too, so we need to work on the cost side. Pat, do you want to add something? Ms. Hoffman. Thank you Congressman, I would just love to add a couple points. I mean, our energy storage program at $44.5 million is looking at reducing the cost of energy storage, but also getting the deployment of energy storage out there, partnering with the states, looking for opportunities of deployment of energy storage whether it is on the grid, but on the distribution level. We also have a $30 million budget line for our smart grid that is looking at microgrids. Looking at the integration of technologies of the distribution system. And I think that is really important as we start optimizing generation. As you have discussed, how do we get a small ecosystem in pulling together technologies? But in addition to that, we have to work on the institutional issues which is looking at what we are calling distribution level reform to get that, to simplify the complexity. Mr. Fortenberry. Yeah, I will work on that for you. You just get us the technology, okay? I agree. Mr. Orr. Ok. It is a deal. Mr. Fortenberry. Changing cultures and carrying forward legacy costs, and it is complicated. I get it. But when do you think this technology, I know it is hard to predict, on a larger scale what we have talked about, being more fully integrated, what is your trajectory? Are we looking at two years? Twenty-five years? Mr. Simpson. You will be dead. Mr. Orr. We can beat 25 I think for sure. We will have some demonstrations and, for example, in remote communities in some parts of the country microgrids are already functioning for those. Mr. Fortenberry. Without providing too much work on you, would you write up just a brief summary of some of those models that are out there? Mr. Orr. Sure, sure. Mr. Fortenberry. I appreciate it. Thank you, Mr. Chairman. Mr. Simpson. That is exciting. I want my home to be a place where I come and kick off my shoes and turn on a fire and read a book and do not worry about any of this stuff. And I want to dry my clothes whenever they are wet. Mr. Honda. Mr. Honda. Thank you, Mr. Chairman. I have a question about the national network for manufacturing innovation, and then NNMI HUBS. The Department of Energy hosts three of the seven existing HUBS right now. One in Raleigh, another in Knoxville, and one is to be determined, I believe. So being from Silicon Valley I really appreciate how important it is that we focus on advanced manufacturing and potentially game changing technologies to ensure that the next Silicon Valley is right here in the United States. So I was curious though, what is the current status of DOE's NNMI Centers, and what are some of the successes from these centers? Then how many DOE-led centers do you envision in the full national network of 45 planned HUBS? Then, in your opinion, would these centers develop without seed funding from the agencies? Mr. Orr. So thank you for an interesting and complicated question, but let me do the specifics first. So, as you observed, we have three in progress. We are working on defining two more for this year, and then we requested in fiscal year 2017 funds for a sixth. So that part is in progress. The question of whether things like this would develop without the kind of initial funding to get them going. I mean, there certainly are some efforts to that effect. I think the experience so far with the advanced composites manufacturing at Oak Ridge and with the wide bandgap semiconductor that one is earlier, and so we have more to do to see how that goes. If the topics are chosen well and the institutional leadership is good then there really can contribute in interesting ways be bringing people together to work on, largely, the precompetitive kind of things that then can have a much broader impact. And I would just say that the advanced manufacturing area, particularly the additive manufacturing area, is on that because it has both advantages for energy efficiencies, advantages for the quantity of materials that get used, and for the kind of speed of the cycle time of developing some new process or part. All of those are things that really can benefit manufacturing across the whole country. The areas that Pat Hoffman mentioned for the grid kinds of applications are another one where there would be specific national benefits that really do make sense. So I think that imposes on us the responsibility of doing a good job of thinking through the topics where they make sense, and where there is an appropriate government role it is not necessarily to do all the commercial activities. It is really to figure out where it makes sense to invest taxpayer funds. Mr. Honda. The issue of seed money, so when the President announced his desire to see this thing deploy and grow, it seems like the seed money comes from the different agencies such as Department of Defense had to put up the seed money for the flexible hybrid electronics concept which is beginning to establish itself and create a new arena of technologies. Are we encouraging agencies to put up money also in their own budgets or do they have to see a benefit for their investments by their agencies in order for them to create this bottom line? Mr. Orr. I am not sure I am the right guy to answer this question, but I think we have been encouraged to think about where they make sense for the kinds of activities that we do. I am less certain about how that has gone for other agencies, but we have definitely been encouraged to think through where we can contribute. Mr. Honda. Well, the Department of Defense, they put in $75 million and private industry put in the rest, a quarter of a billion dollars. And I think that they saw a lot of benefits for folks who have solutions to problems that they are looking for, and the DOD has problems for which they are looking for solutions, so that marriage seems to be pretty good in terms of the area of flexible hybrid. Would something like this be applicable to energy storage? Because we are only looking at, it seems like it is only lithium, but there must be other forms of technologies that we have looked at that need some research that we can invite people to come together through a process like this. Mr. Orr. So there I would say that we actually have some other activities that I think fill that role. We, for example, have an energy storage hub. JCESR at Argonne is the center for energy storage research. It is funded specifically to look at advanced battery chemistries that have higher energy densities and lower weights and good durability. We also get at the fundamentals of that through quite a number of our energy frontier research centers that look at some combination of electrochemistry and nanostructured materials. So we do have that covered. We have also, actually at the other end of the innovation spectrum, we have funded through the loan programs office some activities with regard to battery manufacturing. So I do not know of anything involving one of the NNMIs, but we do have a lot of activity in the area. Mr. Honda. Through DOE you probably help us remain competitive in a global competition in innovation. Is there anything that DOE is focused on on next generation manufacturing? Mr. Orr. Well, the six centers are manufacturing institutes. The three that we are working on already and the three more that are in our budgets or plans are exactly aimed at those kinds of issues, so we do have that in our portfolio. Mr. Honda. So we can talk a little bit more about that later on? Mr. Orr. You bet. Mr. Honda. Ok. Last question, Mr. Chairman. On this topic of weatherization, it seems that there are statutes already in place, but the statute does not seem to incorporate or encourage the integration of solar. If weatherization is about saving costs to individuals, fixed income folks, poor neighborhoods and places like that, in hardening the building from losing heat, why don't we in this whole discussion of reinventing ourselves, why don't we incorporate the wording that would allow solarization as part of the cost savings for these homes? And at the same time, become more efficient and save the home owners or the users' pocketbook? It seems like they both will do the same thing, but solar would have a larger application cost as a country from east coast to west coast? Mr. Orr. It is an excellent question, of course. So as I understand it, we already have examples of solar thermal that a solar hot water heater as being included in the weatherization side. And I think it has allowed that any technology where we can show a positive savings over cost is a possibility for inclusion in that. Kathleen, is that correct? Ms. Hogan. Yes. Mr. Honda. Solar heating for water is through solar uptake or through dark pipes? Mr. Orr. No, it would be through dark pipes. So it is a question of this balancing of cost and savings to the consumer, and as the costs continue to come down that seems like a real possibility to me. Mr. Honda. Not to be argumentative, but it seems like placing solar on these homes would reduce the cost if we maintained certain kinds of credits or helping cap agencies to, you know, put these in on a long term basis. Cost savings to the home owner or the dweller over time it seems it would---- Mr. Orr. And those have to exceed the cost of installing the system, so I think it argues, again, for this idea that continuing to work hard to bring down costs both on the permitting side and the hardware side is a way to make these things more widely available. And that is really true across the energy spectrum. Mr. Honda. So do I hear you saying that it is not possible until we can come up with a point where cost savings would be greater than the costs? Mr. Orr. If I said that I did not mean to. Mr. Honda. No, I am just asking. Mr. Orr. I think it is within the power of these systems now to be able to do what you are suggesting. Now, there might be just the sort of institutional inertia that afflicts all of us, but I think it is possible where the cost targets can be met. Mr. Simpson. Our chairman can help us with that. Thank you. Mr. Orr. You bet. Mr. Simpson. Ms. Kaptur, do you have anything else? Ms. Kaptur. I actually do, Mr. Chairman, I do. I do. I wanted to ask about the offshore wind demonstrations and Dr. Orr, could you give us an update on the status of those? Mr. Orr. Sure. Ms. Kaptur. And when we could expect a decision on advancing some of the proposals. Mr. Orr. Yes, we have five offshore wind projects that are in various stages of working through their milestones and requirements. The next three are in the second period of that and two more are alternates and are in the primary period. We will evaluate all of those this spring and we expect the next decision point is in May. Ms. Kaptur. All right. I thank you for that clarification. On regional energy innovation partnerships, how do you see these partnerships coalescing? Mr. Orr. So partnerships, well we are imagining a competition that in a particular region that a variety of institutions, it could be industry, it could be universities, it could be a national lab would band together to create an entity, probably a 501(c)3, that would organize the research program, manage the funds, get them out, would not be a research provider but rather would be a research organizer. That we would select them competitively and then they would select competitive proposals which could be by members of the consortium, but with appropriate attention to conflict of interests of course along the way. But these would be focused on areas of regional interests and innovation at the regional scale. But at the same time would take advantage of the intellectual assets that exist in the area. Ms. Kaptur. And you would have to wait for your 2017 budget in order to implement that? There is nothing in the 2016? Mr. Orr. Yeah, that is right. Ms. Kaptur. Ok. On vehicle technologies, let me ask, do you have examples of where, successful examples of where natural gas has been integrated now into major fleets, truck fleets and are they cost competitive? Mr. Orr. I know there is quite a bit of, there are truck fleets around that do that now. Rueben, do you want to say a word about that? Mr. Sarkar. Rueben Sarkar, yes, through our Clean Cities program and through our national Clean Fleet partnerships, where we have partnered with a number of large corporations like Frito-Lay, Coca-Cola, and others, we have seen a considerable amount of natural gas deployment and have done a number of case studies to demonstrate the benefits of natural gas deployment. I don't have the exact numbers offhand, but we do track how much natural gas penetration we have had through our efforts, and how much petroleum displacement we have achieved. And we continue to do a lot of activity on the deployment side of the equation. We also do a lot of research and demonstration on the dual fuel side in the Class A truck space to see where we can displace additional diesel through implementation of dual fuel technologies as well. Ms. Kaptur. All right. What about public fleets, bus systems, or post office vehicles? Do you have any--is there any activity there on the natural gas side conversion? Mr. Sarkar. We have not done as much on the deployment side in the public transit sector. That normally goes to DOT. We do provide technical assistance, case studies and information that a lot of people make good decisions about adoption of alternative fuels, but not as much deployment and research on public transit. And then your second part of the question was on---- Ms. Kaptur. Post office vehicles. Mr. Sarkar. Post office. We engage with the post office to advise them on technology adoption as part of their RFP proposals. But we do not direct it. We generally provide them a basis for information, whether it is alternative fuels for electrification or natural gas. But we don't actually fund deployment activities with the U.S. Postal Service. Ms. Kaptur. Does your legislation not allow it? Mr. Sarkar. I would have to check on that. Normally, we are in an advisory capacity and that the U.S. Postal Service does their own separate RFPs the way it is structured, and all we do is provide assistance and guidance. Ms. Kaptur. Ok. I appreciate that very much, and my final question will be Dr. Smith, or Secretary Smith has sat there today and has not been asked very many questions. Mr. Simpson. I know he is disappointed by that. Ms. Kaptur. And in view of the emphasis that is being placed in other places in the budget, what can you tell us about fossil fuels and your priorities in this budget? Mr. Smith. Well, thank you for the question. So the center of our research and development budget is on carbon capture and sequestration, which we think is still a very important part of the challenge of ensuring that all of our sources of domestic energy including coal and natural gas are relevant in future energy systems. Our budget has a slight increase from last year, going from $869 million up to $878 million. The coal capture systems are also going up slightly, total capture budget for coal going from $131 million to $139 million. In addition to the coal capture budget, we have added a line for capture for natural gas systems and would like to point out that that indeed is in addition to the existing budget for coal capture systems. So we have maintained our focus on coal capture and in addition, we will be doing some additional research and development on capturing CO2 from natural gas fired systems. That will benefit our understanding of how to reduce emissions from coal as well. So that's the center of our program for---- Ms. Kaptur. Where are the majority of those coal capture systems installed? Where are they? Mr. Smith. Well, so this is a new area of innovation in terms of deployment. There is a couple of major demonstrations that the department is working on, one in Mississippi and one down in Texas. There are of course coal fired power plants throughout the United States which will be the candidates for retrofitting so that you can take those systems and reduce the greenhouse gas emissions that are coming out of the coal fired systems. So there will be coal fired power plants throughout the United States that will be candidates for this technology. Ms. Kaptur. I thought of one other question, Mr. Chair. Does the Department of Energy have a list, by state or region, of waste heat, facilities generating a great deal of waste heat and what type of waste heat it is. Mr. Orr. Good question. I do not know if we have it by waste heat, but we certainly do have a nationwide list of big CO2 sources and they are pretty likely to be connected. So it wouldn't be hard to get you, actually EPA maintains a list of the--and we do have a list. I am sure we have a list of all the power plants around the country. So they would be a primary location to go look for thermal energy that was not being captured. Ms. Kaptur. And what about steel plants? Mr. Orr. Steel plants would also be candidates there. I am sure---- Ms. Kaptur. What about refineries? Mr. Orr. Your refineries, well, we certainly know where they are. The refineries, because they use so much energy internally, they tend to be more organized around making sure that they can use the waste heat that they generate. Ms. Kaptur. What about 100 megawatt natural gas plant? Mr. Orr. Sure, there is a lot of thermal, sort of low-grade thermal energy that comes out of the cooling of the downstream end of the steam turbines. Ms. Kaptur. I am very interested in--this is very hard information to obtain, I would like to let you know. And it is very important for our region's economic growth to know where these waste heat sources are. But where does one go? Do you have to call every company? Mr. Orr. I bet that EIA, the Energy Information Administration, they must be able to estimate---- Ms. Kaptur. Where they might be. Mr. Orr. Yeah, I would think so. Ms. Kaptur. All right. Thank you. Mr. Orr. We will have to do some checking to make sure I am not promising something I cannot deliver, but let us look at that. Ms. Kaptur. All right. Thank you so very much. Thank you, Mr. Chair. Mr. Simpson. You bet. One source of heat waste is that hamburger waiting in my office. I am going to have to reheat that. Didn't the INL just convert all their fleet to natural gas or haven't they done that? Last year your office, John, developed the GAIN Initiative to make it easier for industry to utilize the department's state of the art infrastructure in order to help commercialize advanced nuclear technologies. Can you update the committee on those efforts in the previous year and what kind of activities will be supported in 2017? Mr. Kotek. Yes, thank you, sir. And that initiative, I should point out, grew out of some really good work done by the Idaho National Lab, I think as I taught Alan back there, who led an effort to work with Oakridge and some of the other labs and universities to work with this community of innovators in advanced nuclear that has grown up over the last several years. You may have seen their recent reports talking about dozens of small companies capitalized to the tune of more than $1.5 billion in private money and is now trying to work both fission and fusion concepts towards commercialization. The input we received from those companies was that the thing they needed the most out of DOE was the ability to access the capabilities that exist within the system, the reactors, the hot cells, the data and the codes and the brainpower that exists within the DOE system. And so GAIN was set up to establish a very convenient, streamlined way for these companies to access that series of capabilities. So what has been happening over the last several months is building on the work that we did through our nuclear science user facilities where university researchers and others can come in through a single portal and access capabilities around the system, we are now working to build that to make it easier for industry to use. Because of course when you bring industry in you have got more challenges, like intellectual property protections that you have got to deal with. So we are building on that. The Idaho National Lab, Oakridge and Argonne are kind of at the core of this and are working together to get in place a series of agreements that we need to have so that we can provide rapid access into the system for these private companies. Now, we are also hearing interest from international partners. And of course we do a lot of collaborative R&D. Other countries are coming to us and saying hey, we have got capabilities that may help fill in gaps in the U.S. capabilities, maybe we can come up with some sort of international arrangement. So we're trying to round that out. In the budget specifically, we have got a million and a half that is tied just for GAIN administration. We have got another couple of million dollars that we would assign for the continuation of this voucher program. You may have seen just yesterday we announced the first round of availability of funding. Just a couple million dollars, we expect to award maybe ten vouchers. But maybe $200,000 apiece roughly speaking, provide these companies some funding again to serve as the lab side of the project so they bring $50,000, we bring $200,000 and all of a sudden they've got $250,000 worth of access to the labs, an idea which I should say really EERE and Dave Danielson's shop pioneered. We just learned from it. It has been really through the coordination efforts that Dr. Orr's office has gotten us all engaged in. So those are the types of things we will do under the '17 budget to try and help some of these companies get to the point where they can commercialize some of these advanced designs. So pretty exciting times. Mr. Simpson. Great. Thank you all for being here today. Let me tell you just briefly the challenges we are going to face in this committee and I explained this to the Secretary yesterday, is that the budget submission by the administration calls for about a $650 million increase over last year. But in the energy and water environment that we have to deal with here, they use some, for lack of a better term, gimmicks to get the $650 million increase. I am not saying it is unique to what they have done. I have seen it happen time and time again with every budget submission from every administration and every governor that I have ever seen and that is kind of the way it works. But we have to deal with it in reality when we put the budget together. So we are going to have difficulty there. Second, the Mission Innovation Initiative has a 21 percent increase or a couple billion dollars and then they underfunded, the Army Corps of Engineers by over a billion dollars, which we are going to have to find somewhere. They know that they can underfund it because we are going to plus it back up because Congress is not going to sit still while it goes down a billion dollars. That is the challenge we face in trying to address both the overall budget and address this Mission Innovation Initiative and try to find the resources for that. Within our committee, I am certain that there is going to be some rebalancing of how those funds go in this Mission Innovation Initiative as we put this budget together. We look forward to working with you to address that. Pass our best along to Mr. Danielson. We wish him and his family the best. We know that there are more important things in this world than being here before the committee. So we certainly understand that and wish him the best. And lastly, John, I would not say this if Mr. Fleischmann's staff was not here. When he says to look at NE's budget and how much of it goes to Oak Ridge, remember they have the Science budget. So do not be taking too much of that and sending it to Oak Ridge. Oak Ridge is a great place, a great laboratory. It does great work. Years ago, I was sitting in a presentation by one of our weapons laboratories and they were going through their budget over the last 20 years and how it used to be funded by weapons activities almost 100 percent. Over the years, as weapons activities money had decreased, they had increased funding from Science. They were very proud of that, and I am going wait just a minute. You are taking that money from other laboratories when they do not have access to the weapons money that you have. So it is a challenge between the laboratories, but it is a good challenge. Be real careful there. Thank you all for being here and thank you for the work you do. It's both challenging and excited. So we look forward to working with you as we put this budget together. We're adjourned. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Wednesday, March 2, 2016. DEPARTMENT OF ENERGY, SCIENCE WITNESSES FRANKLIN ORR, UNDER SECRETARY FOR SCIENCE AND ENERGY, DEPARTMENT OF ENERGY CHERRY MURRAY, DIRECTOR OF THE OFFICE OF SCIENCE, DEPARTMENT OF ENERGY Mr. Fleischmann. Good afternoon. Mr. Simpson has asked me to get things started for today's hearing. So I want to welcome everyone. I would like to welcome all the witnesses. Dr. Franklin Orr, Under Secretary for Science and Energy, and Dr. Cherry Murray, Director of the Department of Energy's Office of Science. Dr. Orr, it is good to see you again. It was great to participate with you at Lab Day on the Hill last fall. What a great turnout we had to see firsthand the great work our national labs are doing to solve so many tough national and international problems. Dr. Murray, thank you for coming by to meet with me in January. I appreciated that so much. It is great to have you here. This is your first appearance, I believe, before our subcommittee, and thank you both and welcome. Dr. Orr and Dr. Murray, the budget request provides $5.6 billion for the Office of Science, a 4 percent increase over last year's level. The Office of Science has helped usher in some of the most important scientific breakthroughs in the 20th century and will continue to support important innovations in the future. However, the balance between supporting core research activities that maintain U.S. leadership in energy sciences while also planning for new experiments will be one of the major challenges you face as we move into the next phase of scientific discovery. The request assumes that the Office of Science Research, Operation and Construction goals can be met, but increasing budgets are not a given. Your challenge is to ensure that the new facilities don't come at the expense of your research mission. I look forward to discussing with you both how the Office of Science will make these hard choices and continue to ensure our country's leadership in the scientific community. Dr. Murray, please ensure that the hearing record questions for the record and any supporting information requested by the subcommittee are delivered in final form to us no later than four weeks from the time you receive them. Members who have additional questions for the record will have until the close of business Friday to provide them to the subcommittee office. With that, I will turn to our ranking member, Ms. Kaptur, for her opening statement. Ms. Kaptur. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. Thank you very much, Mr. Chairman. You look good in that position. And we want to welcome back Dr. Orr and Dr. Murray for being with us today and for the very laudable job that you both do. The United States is known and respected around the world as a leader in innovation. Scientific research continues to yield important discoveries that have changed the way we live and work from cell phones to high yield props to biotech medicines. At the United Nations Climate Change Conference in Paris, President Obama joined world leaders from 19 other countries to launch Mission Innovation. The initiative seeks to double Federal clean energy, research, and development investments government wide over the next 5 years. As part of this effort the Office of Science receives an increase of $276 million from this year's funding levels. I hope you will share your thoughts on how this effort will support innovation in the public sphere. We must harness the work of our best and brightest to drive domestic growth and help make American manufacturing globally competitive. While the value of funding scientific and other research is well- established, Federal resources remain limited and will remain so for the near term, it appears. Research, especially in science, can provide enormous value, but it is a long term and sometimes indirect investment that is too easily sacrificed for short term concerns. It would be helpful to hear from you about the long term consequences of this kind of underinvesting in science and research. We need to understand the tradeoffs that we are making in the name of budget scarcity. Scientific exploration can sometimes provide opportunities for immediate benefit. In certain cases tools and equipment designed for research can be applied to manufacturing processes to increase efficiency or improve product quality. Advanced devices and computers can help advance our understanding of basic science and help companies find solutions to challenging technical hurdles. With this in mind, I want touch briefly on the National Labs which are rightly viewed as a National Asset, and aren't they that. Coming from an area without a National Lab, as most members do, I continue to wrestle with how the labs can play a significant transformational role for organizations beyond their boundaries and help jump start American innovation, including in manufacturing, but not solely there, in other parts of the country. I hope you will share your thoughts on this and the other questions I posed, and I look forward to your insight, and I thank you, Mr. Chairman, for the time. Mr. Fleischmann. Thank you, Ranking Member Kaptur. Dr. Orr, your opening statement. Dr. Orr. Thank you very much Representative Fleischmann. I appreciate a chance to talk to you and others of the subcommittee again this afternoon. I will just thank the subcommittee for the support you provided. As I said earlier, at the Applied Energy hearing, for the support you provided in the budget this year. We are working hard on that, and we look forward to working with you as we work on this next budget. So I am glad to have Cherry Murray with me today. She is the confirmed Director of the Office of Science, confirmed in December, and I can tell you that based on a year of experience in office there is more than enough for all of us to do, so I am very glad to have her with us. The Office of Science, of course, if the labs are a crown jewel for the country, the Office of Science is really the keeper of the crown jewel, and indeed, a tremendous asset to the Nation. It supports research on the frontiers of science to enhance our understanding of nature, and also to advance the energy, economic, and national security of the United States. We stored in the Office of Science ten of the 17 national labs, as I know you know, and 28 state of the art national science user facilities. This enterprise supports more than 24,000 researchers at 300 institutions across the Nation, including some in Ohio. I will note that you folks are definitely users of the national labs. These are really fundamentally not only to the science enterprise, but also to our industry. The ability to use the x-ray light sources, for example, to characterize materials at the smallest scale, the Spallation Neutron Source at Oak ridge. There are facilities that allow us to evaluate materials for the most advanced energy applications. A favorite example for me is the little turbine blades made by additive manufacturing. You can use the Spallation Neutron Source to image the residual stresses that are in those little turbine blades, and if those are appropriately handled that turban blades will hold together in the aircraft engine the way it is supposed to. Really, the science facilities have plenty of applications in industry as well. The President's request, as Chairman said, is $5.672 billion, and we have that as a 6.1 percent increase from the fiscal year 2016 enacted level. The request takes the first step in fulfilling the government's Mission Innovation pledge. As the ranking member observed, an initiative across 20 nations to double public clean energy research and development over the next 5 years. The effort is complemented by commitments from private investors through the Breakthrough Energy Coalition. And no doubt, other investors as well. To continue global momentum and accelerate clean energy technology development, the Department's requests aims to further accelerate the Office of Science's innovative work that puts America at the forefront of the global clean energy race. Basic research supported by the Department's Office of Science will be crucial to enabling that transition to a low carbon secure energy future. Fundamental research is the key to developing truly transformative technologies that could radically change the energy landscape. It provides the scientific foundations for clean energy innovation through use inspired fundamental research on energy production, conversion, storage, transmission, and use. And actually many of the things that we talked about in the hearing this morning trace their origins to fundamental work that was supported by the Office of Science in its earliest days. The increased investments as part of Mission Innovation will support a broad-based strategy for accelerating the innovation process. The strategy emphasized investments targeted to support innovative platforms for early stage research and technology development. An example of this would be the successful Energy Frontier Research Centers. We have 32 of those, if I remember correctly now, but this will enable us to fully fund up to five new awards in the area of subsurface science with an emphasis on advancing imaging of geophysical and geochemical signals. The subsurface plays important roles across the energy spectrum, so that would be a value there. The request also sustains DOE's role as the largest Federal sponsor of basic research in the physical sciences. DOE supports fundamental research and scientific user facilities in a variety of scientific disciplines, from nuclear and high energy physics, to basic energy and biological research. The research conducted in these areas helps us achieved predictive understanding of matter and energy on microscopic scales, as well as complex phenomena such as the plants, climate, and biological systems. In funding this cutting edge research the request continues science's tradition of successfully building and operating world class facilities that enable researchers from across the country and the globe to conduct groundbreaking research. This includes design for a reconfigured, international long base line neutrino facility hosted at Fermilab. Initial construction for the Deep Underground Neutrino Experiment in South Dakota, and continued construction of the Facility for Rare Isotope Beams. The request also builds on the success of the Bioenergy Research Centers with additional funds to expand technology transfer activities during the last year of the tenured program. An area of priority for all of us with relevance across the whole innovation chain is high performance computing. U.S. leadership in science and industry is, of course, crucial to sustaining American economic competitiveness and developing new technologies in energy and other fields. In line with the President's national--strategic computing initiative our goal is to produce an exascale super computing environment capable of meeting 21st century scientific challenges by the mid-2020s. Finally, I will mention that my job as Under Secretary is to foster productive links between the science and energy programs. And one way we have done this is by establishing cross cutting initiatives to accelerate progress on key national priorities. The expertise in the Office of Science provides the scientific underpinnings for several of these cross cuts including the energy water nexus, exascale computing, and subsurface science. This year there is an additional cross cutting effort proposed on advanced materials for energy innovation. So altogether, the Office of Science's budget supports path breaking discovery while advancing American competitiveness and leadership in scientific research. Thank you for the opportunity to talk here today and to answer questions, if we can do so. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Fleischmann. Thank you, Dr. Orr. I know that many of the members have questions for both of you all. I am going to begin by recognizing Ranking Member Kaptur for 5 minutes. Ms. Kaptur. Thank you so much, Mr. Chairman. This committee has been ensuring support for American manufacturing for a number of years, and the department's budget request continues to have a significant emphasis on this area. Drs. Orr and Murray, how do the major science facilities, such as Light Sources, support American manufacturing, and have you made any changes since last year to increase support for American industry? Dr. Orr. So thank you for that question. I actually was thinking about some version of that question as I mentioned the idea of using the x-ray light sources to characterize advance materials of all kinds. If you think about the energy systems, what they do is they convert some primary energy resource, could be wind, could be sun, could be fossil or nuclear resources into energy services like electricity or heat or transportation. Almost every one of those, if you think about the process of building more efficient energy conversion methods, at their heart, they are fundamentally material sciences processes. They might require higher temperatures or pressures. They might require standing up under other harsh environments. They need to last a long time. They need to be cheap to produce, and they need to perform successfully. So one of the ways that we can get there is to use our ability now to control material structures at very small scale, so nanostructured materials are one version of that. When you couple that with understanding material properties of being able, for example, to design catalysts that are everywhere in chemical processing, and batteries, and fuel cells, and to predict those properties computationally when we can do those things effectively then we can design new materials that will serve us well, and figure out how to do that with cycle times that are shorter than the might otherwise be. So the fundamental science that goes with these things is an essential component of being able to get to advance manufacturing methods. Now, there is lots to do in between, and of course, that is the variety of our programs. In the end, the ability to use the user facilities to characterize all kinds of systems and to study their properties at the smallest scale, those enable practically everything else. Ms. Kaptur. I am going to push you a little bit, Doctor. The question related to your reply here is what thoughts do you have on how the Department of Energy and the National Labs can improve their interaction with industry? I am going to give you a real life example of what happened. Dr. Orr. Ok. Ms. Kaptur. Because I attempted to work with your labs. I will not say which ones, and I come from part of the country, as I said in the prior session, with a massive manufacturing. Massive. But we also have agriculture. And as I looked at the amount of jobs that have been outsourced from our region. Actually, in Indianapolis Carrier just announced it is moving to Monterrey, Mexico, 2,100 jobs. I thought how are we going to grow jobs here? One area where we can is in agriculture, but industrial agriculture. So, 2 years ago I went to one of the labs and I said, look, I need your help. Here is an example of an industry where we need material science to develop a better four season canopy, more energy efficient, more light sensitive in the sense the wave lengths matter, frequencies matter in the production of plants. And I said, so I want you to help me design a new envelope because for us to be successful we cannot have a third to a half of the bottom line being energy. We have got to figure out how to control the energy issue, and we have got to have robust plant life in there, and we have got to cut the carbon footprint because we cannot keep shipping half our fruits and vegetables from California. We have got to empower other parts of the country, and we can do it because we have the water. It took almost a year and three quarters, and one of your famous labs got back to me and said, this is not our job. This is the Department of Agriculture's job. Well, I was very disappointed because the Department of Agriculture is using old technology. But what happened was the private sector did something incredible. They just invested $200 million or $175 million, a company from Canada in our region, to build a state of the art, not new material science, but using the materials we have rather well, and the waste heat off of a steel company called North Star, CO2, 200 acre greenhouse undercover. It is going to supply Kroeger Company which just bought Harris Teeter about a year and a half ago. That one place is going to expand exponentially because of what is going on in the environment. But I sort of look back at that experience with DOE and think to myself, and I am not blaming you. I am not blaming anybody. Again, it is a resistance to place and to dealing with reality on the ground, trying to apply this high science to real production, and I still place the challenge out there for my region of the company. Help us cut the energy use in these industrial agriculture facilities from one-third to half to less than 10 percent. How do we do that and measure the nutrients, water? Work with light rays in a manner that is off the charts, so that we target a certain type of ray to a certain type of plant? I ask myself, do we really need light permeable coverings or could we do this in rooms like this. There is a lot of LED lighting going on now that we are using for plant production in some of our cities. So I really want DEO involved in this. I think it could help to give rebirth to the Great Lakes. So I am not being selfish here. I am trying to be innovative, but that is a real thing that happened with DOE, and now we are saying can DOE and DOA work together? Why should we waste 2 years on this? I mean, what a waste of time. We should have had cooperation like that. And so I point that out as a concern to mine. So my question is, what questions do you have on how the Department of Energy and the National Labs can improve their interaction with industry? Dr. Orr. Yes, so I am sorry. I meant to answer that the first time around, but I got off on nanostructure materials. One of the things we actually are part of doing as part of my office is to work on better ways to do that. So we established a new Office of Technology Transitions, for example, and we are implementing a requirement of the Energy Policy Act to establish a Technology Commercialization Fund that will help provide some support for interactions like this with the National Labs. And then we have also just created a Clean Energy Investment Center that is a way to help industries see more quickly into the National Lab system for ideas that they might want to engage upon. And also to streamline the cooperative research agreements that we use to foster these kinds of interactions when it makes sense to do so. So we recognize that the process of dealing with industry is slower than it should be and we are working to try to change that. Ms. Kaptur. Well, I would just make a formal request. When you are ready, hopefully it will not take 2 years, to find a way for your agency to interact with our major growers in our part of the country. And by the way, that particular corridor stretches from Erie, Pennsylvania to Kalamazoo, Michigan to all of Northern Ohio. It is a massive production platform with fresh water, and we need four season solutions because of what is happening with climate. And then earlier, I had asked about the automotive platform, the manufacturing. If you could find the right people within the department somewhere I would bring everybody together who cares about energy in the industrial agriculture field, and in vehicular manufacturing to see how they could relate to you. Because we do not have a lab in our area. Dr. Orr. Well, we talked about this some this morning, but we do, in fact, have quite a lot of interaction with the vehicle manufacturers. Again, part of it through the light weighting kinds of activities. Partly in all things like SuperTruck and various efficiency moves and so on, so we do work with the automotive manufacturers, the vehicle manufacturers quite a bit in a variety of ways. Ms. Kaptur. I will just end with this, Mr. Chairman. One of the automotive plants I represent which is a big one, the North American president of that operation I was with him at a ribbon cutting. I said, what can I do to help you? He goes, help me figure out what to do about energy in this particular plant. So I just put that out there. Dr. Orr. Yes, it is your right. Ms. Kaptur. A practical request. Dr. Orr. It is a good opportunity to the extent that energy reduction can be achieved they often payback very quickly. It was not in your district, but I visited a plant, a General Mills plant in Ohio that makes Cheerios, and I could observe that they contribute usually to national sanity because anybody that has a toddler, you put them in the high chair in the restaurant with a batch of Cheerios, and then everything is okay for a while. Anyway, but they managed to reduce their energy use in the plant by doing the kinds of things that you talked about. Waste heat recovery, using waste heat in one part of the plant somewhere else, reduce their energy use by about 25 percent. Some if it was lighting. There were a variety of things that they did, but by paying careful attention they could make substantial reductions, and so that is a good thing to do. Ms. Kaptur. Thank you very, very much. Thank you, Mr. Chairman. Mr. Fleischmann. Thank you, Ms. Kaptur. I am going to have a question for Dr. Orr and then a question for Dr. Murray, and then we will continue with our other members. Dr. Orr, several years ago short-sighted changes were made to the management structure at the Department of Energy Oak Ridge Federal office. These problems have removed incentives for the many Department of Energy program offices to work together in an integrated way. The program offices actually like this setup because it is easier for them to focus on their own priorities. But this works against the best interest of the tax payers, and stifles the kind of innovation and integration that the department strives to foster in its management emphasis. The changes have also resulted in serious conflicts with elected officials on top Department of Energy priorities. Yesterday, I asked Secretary Moniz to take a close look to find an incremental solution to reconnect these important program offices. My request of you, sir, is I ask you to join in this effort to work with me to find a solution. Will you do that, sir? Dr. Orr. Sure. I am happy to do that. Mr. Fleischmann. Dr. Murray we heard Dr. Orr refer to high performance computing in his open remarks and I thank you for your prioritization. I was very pleased to see the Department of Energy's budget request includes continued investments to advance exascale computing and that the department has created a more rigorous project management structure to keep this effort on track to develop and deploy an exascale system by the mid 2020s. I know the department has a program called CORAL to jointly purchase a next generation of leadership class computing systems that will deliver capabilities and better energy efficiency which are key milestones on the path to exascale. What will it take to make sure that CORAL systems are the fastest and most powerful super computers in the world when they come online in 2018? How many petaflops will they need in order to be the best in the world's systems? Dr. Murray. Thank you for the question. Of course exascale computing is absolutely essential for our national security and our economic security as well as putting us at number one in science. So it is a very high priority for the country and certainly the department. One of the things that it will take to put CORAL machines at a very high level of performance is what we have in place now which is a collaboration with industry, a collaboration between NNSA the national security part of the Department and Office of Science together working with industry to develop these machines. This is not just a purchase of a machine it is actually codevelopment. One of the things that is going to be critical and you of course know that the first CORAL machine is slated to go into Oak Ridge. Mr. Fleischmann. Yes, ma'am. Dr. Murray. Which I would say is one of our flagship office of science facilities. The three laboratories who are working on this machine are Oak Ridge, Argonne and Lawrence Livermore. As you may be aware I was Deputy Director at Lawrence Livermore back some years ago so I know the capabilities of the people in the NNSA. These machines are critically important for our stockpile stewardship mission. They are also critically important for doing the best science and as Dr. Orr said we can have much better understanding from the atomic scale up to the size of a turbine blade in our materials simulation where we can simulate them in conditions that we do not wish to have in the laboratory such as turbine blades blowing apart for example and in order to do this we need to have the project mindset and a goal in mind. The goal for the CORAL machine that is going into Oak Ridge will be around 200 petaflops and that will put it as a world class. As you are all aware we are in a neck-to- neck fight with the Chinese on machine speeds. We want capable machines that do not just do flops but actually run programs that are dealing with big data as more and more of our science and more and more of what industry needs is big data which means machine learning and it probably means new architectures. So I am very, very--it is one of my highest priorities is to make sure that this stays on track and this is why we are projectizing it. Mr. Fleischmann. Thank you Dr. Murray, Mr. Visclosky. Mr. Visclosky. Thank you very much Mr. Chairman. For either witness, if you could tell me what a crosscut program is for the department? Dr. Orr. Sure, I can do that. These work on problems that really demand expertise that come all the way across the whole department to have a variety of applications that do not just fit in those specific organizational approach that we have. And an example would be our grid modernization effort. On the one hand it is about how the transmission and distribution system works but it also involves the fundamentals of high performance computing in optimization kinds of setting and simulation is a very complex phenomenon. Another would be there are water and energy nexus because water gets used in all kinds of energy applications and at the same time it also we use lots of energy to move water around. Forty per cent of the water that is withdrawn from our lakes and rivers goes to the downstream end of a power plant for example. Mr. Visclosky. I appreciate that explanation. According to the testimony in the office, there are 32 energy Frontier Research Centers, two Energy Innovative Hubs, three bioengineering research centers, and five crosscut programs. In the 2017 budget, apparently there will be five more energy frontier research centers added, industry linkages for the bio energy research centers will be expanded, and there will be an enhanced role for the crosscut programs in the office. Dr. Orr. That is correct. Mr. Visclosky. That is a lot of irons in the fire. Who coordinates the priorities as far as research and the consistency of research given that you are at the Department of Energy? So there are lots of things going on here. Dr. Orr. There are a lot of things going on and we would argue that is a good thing. In the Office of Science, for example, the energy frontier research centers are a mechanism that we have used to bring together teams of people to work on use-inspired applications. The example I used earlier was the material science side of things---- Mr. Visclosky. When you say ``use inspire'' what does that mean? Dr. Orr. Well, that means a place--so I will give you an example. I mentioned earlier that catalysts appear in all kinds of devices: the fuel cells, batteries, chemical process industries and those kinds of things and so a use-inspired effort would be one where we develop our ability to go from absolutely first principles and calculate the performance of some exotic combination of metals or some configuration of the catalyst that make it more effective so to go from first principles to do that. Now it is use inspired in the sense that once you can do that then you can design all kinds of things for specific uses. Mr. Visclosky. So who ends up coming up with those ideas and who is coordinating that pure if you would and applied research and how often at some point do you say this is not working out and we have a finite number of dollars in our budget and we are going to cease and desist? Dr. Orr. Well, the Office of Science, and I am putting words in Cherry's mouth here, but the Office of Science evaluates Energy Frontier Research Centers periodically, sometimes they are extended and sometimes they are not so that is one version of this and they think hard about the priorities going forward and where there are good opportunities for new ones. Mr. Visclosky. Is there one office someplace that looks at all of these? Dr. Murray. Well, that would be me I think or actually Pat. So the Office of Science has a prioritization method which is tried and true that it has used for at least 20 years when I was on one of their--in fact it was Pat's basic energy sciences advisory committee. So they have Federal advisory committees, they report to me on every one of our programs. We--the programs charge the basic energy sciences for the energy frontier research centers with the prioritization of what is important, what are the scientific gaps. So we do not do applied research, we do a fundamental research. Mr. Visclosky. So it is your office. There is a proposal on the ledger for five more projects. Were people sending requests in, was it internally generated where there were 20 proposals and you picked five? Dr. Murray. No everything that we do is competed, and everything that we do is carefully thought out with either subcommittees of these advisory committees holding a large number of workshops. For example the basic research needs workshops are now probably about 40 of them and from those workshops there was one on subterranean. What is it that we as the industry or science or anybody in the world cannot do in the subsurface right now? A large number of workshops then written up with the priorities of the scientific community including industry coming in. From that we provide a funding opportunity announcement that says here is what was found at this workshop, we cannot do the imaging of subsurface well enough, give us your proposals. A bunch of proposals will then come in and then a panel of scientists will make a selection and then we review them annually. Mr. Fleischmann. Thank you Mr. Visclosky. Before I go to Mr. Fortenberry, Dr. Dehmer it is good to see you again, thank you for being with us today. Mr. Fortenberry. Mr. Fortenberry. Thank you. We are in the final phase of the Bioenergy Research Center funding what has been the outcome? Dr. Orr. Well, I would say of the ones that I have visited they each have very interesting results and a lot of positive contributions. There is the Great Lakes Center that has worked on a variety of plant systems there is the UC-Berkeley Lawrence Berkeley effort that has worked on various bioenergy systems really quite a lot has been accomplished and maybe I will ask-- -- Dr. Murray. I was just going to look up my statistics but as I recall there have been something on the order of 800 invention disclosures, two hundred and some to industry, nine companies spun off and more coming. There have been engineered microbes that are now in the industry. There are new processes and new software for simulating how to do bioreactors. Mr. Fortenberry. Are there plans to propose continuing this funding? Dr. Murray. The funding in fiscal year 2017 it will be the last year of these bioengineering research centers the tenth year and the intention is in that year to recompete new bioenergy but also biomanufacturing centers. The centers could propose to continue I mean they could certainly enter the competition but the thought is that a new competition is right for it now. Mr. Fortenberry. Define biomanufacturing. Dr. Murray. For example, it would be wonderful if we could engineer microbes to manufacture polymers. So right now we use oil. We are going to run out of oil at some point. If we could use corn stover instead and use yeast that is manufactured or one of the really interesting science tidbits is someone is actually manufactured diatoms in the sea to be part of a manufacturing process starting with methane and adding OH to it. If we can figure out how to acquire life forms that can manufacture for us because frankly if you look at things like spider silk they do a really good job of manufacturing really strong materials so that is the idea. Mr. Fortenberry. So we can call it spider competition. Dr. Murray. Exactly. Mr. Fortenberry. How much has been spent on the ITER Project? Dr. Orr. I will have to get back to you with the exact number we have but it is not currently lodged in my brain. Mr. Fortenberry. Well it is a big number. It has had its problems. What is its potential? Dr. Orr. So maybe I can just say a word about where we are in that process. As you observed there have been some issues of schedule and cost. They have a new director who has put in place some new systems to look at all that. They have a new proposed time scale as being reviewed by the member countries and---- Mr. Fortenberry. How is the coordinating entity, who is the coordinating entity? Dr. Orr. It is the ITER organization. Mr. Fortenberry. So how much do we refine or impact that culture? Dr. Orr. Well I think we had a lot to do with arguing for significant changes in the way it operated and a much more rigorous cost estimation and time estimation process and we also asked for an independent review of both of those things which is underway now. Mr. Fortenberry. So you know the difficulties of design by committee and then add on that design by international committee and you have a recipe for potential stagnation. And then it is an unknown outcome here I recognize it is experimental on frontier type research but it has been going on a long time and it does not seem to have produce any positive results. Dr. Orr. Well they are definitely under construction of the facility and the United States is well along the way in meeting our commitments. Mr. Fortenberry. Well let me ask you about our own domestic experiments--are they showing any promise in this area? Dr. Orr. Yes we continue to work hard on the fundamentals of behavior of high density, high temperature plasmas and those are part of building the understanding it will take to design future machines. I think it is still true in terms of getting to the DT burn the deuterium tritium reaction ITER is still the best opportunity out there to get to that but it is a big hard problem and a big complicated machine to do that so our strategy so far has been to try to add some rigor to that whole process and do what you said which is to build a project management culture as part of that that will deliver that on time and with stable costs. Mr. Fortenberry. And what are the projections for or the timeline for completion for experiments and potential outcomes? Dr. Orr. Yeah, mid-current projection for timeline is first plasma by mid-2020s so say 2025 and then DT burn in the 2030s range. Mr. Fortenberry. All right thank you. Mr. Simpson. Mr. Valadao. You were here first. Mr. Valadao. Thank you, Chairman. Thank you. Good afternoon. Dr. Murray, the Office of Science supports five light sources located across the country at four national labs. Last year the acting director said it was a high priority of the Office of Science, and the department, to maintain U.S. leadership in the light source capabilities such as those at the Berkeley Lab, which I was able to see last year. Can you describe what makes these light sources different from each other, and do we have five light sources to keep up with demand, or are there scientific capabilities that make each of these light sources unique? Dr. Murray. Thank you for the question. That's actually a very easy question to answer. The answer is yes. Mr. Valadao. There's follow up. Dr. Murray. They are unique. The ALS is our lowest wavelength light source. It has unique properties where you can actually go in--first of all, if you're going to look for what's called soft matter, otherwise known as living things, or polymers or liquid crystals, that is exactly the wavelength range you want to use. Also you can hit resonances with various chemicals or various atomic structures that you can't with higher x-rays. So if you want to do a certain type of experiment, you would want to go to ALS. As you are probably aware because they probably told you, they wish to do an upgrade to stay at the, you know, world class. And actually I will say we wish that all of our light sources remain at world class. Each of them has from 3,000 to 5,000 users and they are oversubscribed by at least a factor of 3. We have to turn people away. Mr. Valadao. All right. So then what is U.S. position relative to other countries when it comes to light sources and what is the Office of Science's plan to moving forward to meet scientific needs in the future? Dr. Murray. So we are I would say competing with Europe and Japan and China for the best light source facilities. Currently we are in good shape, but we need to make sure that we have the upgrades that all of the light sources need, and they are upgraded on a schedule so that they do remain world class. We currently have in a charge to the Basic Energy Sciences, which runs the light sources, Advisory Committee to look at all the proposed upgrades in basic energy science and ask the question, is it world-class science? Will these provide world- class science? And second, are they ready for an upgrade now? Have they worked out the engineering parts enough so that we could consider putting them in line for an upgrade? Our plan is to, of course, balance research with facility construction, but we have to have world-class facilities. So our plan would be to do upgrades in a rolling fashion just as we rolling fashion to upgrade our computers. Mr. Valadao. Ok. And for Dr. Orr, it is clear that from increases provided in the Office of Science that construction increases, excess computing, optimal facility operations are the highest priorities for this account. However, tradeoffs between running facilities at full capacity, research support, and construction of new technologies will have to be made in the coming years. Can you discuss the strategic future of the Office of Science given a flat budget scenario? And what are the Office of Science's greatest strengths, and how can we improve them in light of flat funding scenarios? Dr. Orr. Well, I would say that given my vantage point of looking across all the programs that research programs in science and energy at DOE, the Office of Science I think actually has the most rigorous process for thinking about what priorities are and in trying hard to balance the needs for the facilities, but also to have the support of the research communities that make use of them. Dr. Murray also mentioned that we make careful use of the Science Advisory Committees to help us think through where the research opportunities are, where the highest priority investment should be made, and we will absolutely continue to use that mechanism going forward as we make the tough tradeoffs. In some sense assembly of every budget is one where you ask the question of balance, of investment across the portfolio, but also where can we invest the next dollar for the highest scientific return for the country. So we're absolutely committed to do that in whatever funding environment we find ourselves in. Mr. Valadao. Thank you. Thank you, Chairman. I yield back. Mr. Simpson. Mr. Honda. Mr. Honda. Thank you, Mr. Chairman. And thank you Dr. Orr and Dr. Murray. I wanted to go into the advanced scientific computing area that's been already spoken of. It has been clear that it is a priority and it is important, just as the discussion around the issue of the light source discussion you had with Mr. Valadao. So with those two in mind, in light of the budget request proposals, there is an increase for advanced scientific computing research within the Office of Science. And we know that the national labs have an incredible computing resource and we are part of the top 10 most capable supercomputers in the world. But every sector of our society has become dependent on growth in a computing performance in order to continue to drive innovation in science and technology, but our Nation's leadership in advanced computing is increasingly been challenged as you have said by other countries. So how will this proposed budget be used to keep the U.S. at the forefront of computing technology? And then if you can provide us with an update on development of the plans in terms of moving the DOE to provide a report on the plan that develops the exascale computing systems. So we need that kind of information in order to just sustain the increase in budget, but there is always that problem like you described balancing your budget and trying to find that priority. Dr. Orr. Yeah, let me start and then I will ask Dr. Murray to chime in here. If you look back at the history of big advances in computing in this country DoE has actually been in the lead for a number of them. The one that sticks in my mind was at the time we agreed to stop testing nuclear weapons and we wanted to be able to simulate what happens as those devices operate in a way that we could assure ourselves that the stockpile was maintained in an appropriate way and that the deterrents would be there. The need for that advance in computing led to a big investment which led to a quantum leap in computing power. Once that was available, of course the scientific community said, well, heck, we can use this to do all kinds of cool stuff that we could not do before. This time around the question you asked about the leadership in computing, we recognize that leadership in many fields fundamentally makes use of the highest performance scientific computing and, therefore, we are leading the way in the Office of Science with this investment. Now, it does have important applications in the weapons side of things, so there is a substantial commitment from NNSA as well. But the intent there is that we will continue to lead the world and we will do that both by the speed of the machine, by the communications, because as you add processors and so on the communication links matter. And in the energy-efficiency side because the power consumption, if it just goes up linearly with the number of processors, you soon need one of those small modular reactors next to each machine. So the net result is that this is hugely important for us and for the Nation and for everything we do. Mr. Honda. So the bottom line is really what you have in our budget, if it is cut or if it is diminished, our ability to stay in front, our ability to complete, our ability to keep improving our computing power, will be diminished? Dr. Orr. I think that if we invest less, we get less. Ms. Murray. Yes, I would add that what is in the budget for the next 4 years is research and development with industry to try to figure out what is it that is going to be the next, call it quantum leap, but it's really 12 order of magnitude that the stockpile stewardship program attained. They did not do it by themselves sitting in a room, they actually brought in U.S. industry, including semiconductor industry, the IBMs of the world, for example. And I just turned to a page in the book of my cheat sheet which shows the plan for how we would get to exascale through developing bigger and bigger machines that are going to go to Oak Ridge, then Argonne and Livermore, then Los Alamos, then Oak Ridge, then Argonne, and so forth. And Berkeley will be-- the NERSC machine is upgraded regularly. Berkeley will have 30 petaflops, which is way beyond what we have today, by the end of 2016. And then it will be upgraded with the machines that then we go to like 200 petaflops at Oak Ridge by 2018 timeframe, and then we need to go to exascale. But we learn by getting bigger and bigger computers. One of the things that is going to be different this time is that what was developed and what has been developed so far in the industry and DOE are machines that are kind of I call them vanilla. That is to say they can do everything. They can do simulations, they can look at data sets, whatever. As we are going to exascale we probably will need to have different architectures for different problems. And so the use-inspired machine development will be, for example, Large Synoptic Survey Telescope will have petaflops of data coming in per day. And so how do we deal with that is an extremely good and very interesting question that is part of this effort. Dr. Orr. The DOE, we asked the DOE to provide a report on the plan, on developing the exascale computing system, and it was supposed to be developed within 180 days. So where are we on that report? Dr. Murray. I did not know about that. Mr. Honda. Ok. Can we get an update on that? Dr. Orr. We will get back to you on that. Dr. Murray. We will get back to you. Dr. Orr. I'm not sure either, so. Mr. Honda. Ok. Dr. Murray. Ok. Mr. Honda. Thank you. And do I have time, Mr. Chairman? Mr. Simpson. Sure. You have a petaflop. Mr. Honda. Ok. Thirty petaflops. This is about 1 year ago I was one of the lead authors of the National Nanotechnology Research and Advancement Development Act that paved the way for Federal Government's increased investments in nanotechnology. And that was a result of President Bush in his State of the Union message when he mentioned nanotechnology. So I had the pleasure of working with Chairman Balart in developing that bill. And then it went over to the Senate and got passed at the Senate with about $3.7 billion worth of grants back in '03. And I had the pleasure of attending the groundbreaking dedication of the Molecular Foundry at Berkeley Lab, and I will be joining them again celebrating their 10-year anniversary. And it looks like nanoresearch, some have said, made great progress in our enabling revolutionary science along with computing powers. Could you describe how these national scientific user facilities are benefiting our understanding of nanoscience and benefiting the economy, and what does the future look like for these centers and for nanoscale science at the DOE generally? And what can Congress do to--these are all softball questions-- support DOE's downscale science research centers. Dr. Murray. Yeah, the thing that is a little bit different about the nanoscale research centers from our other user facilities is that there are scientists at the research centers that actually collaborate with the users that come in. And that is incredibly important, not only for the graduate students who don't know how to use the machines, but also for industry. So there are tremendous collaborations with industry. We cannot do exascale without the nanocenters. For example, because things, and particularly things in energy technologies, happen at the nanoscale, it is materials, it is chemistry, and they are truly essential. They are also oversubscribed. Right now they are just flourishing and I think--I am not absolutely certain, I might ask Pat, how many users there are, but I will hazard a guess that they are in the thousands, including quite a bit-- yes? Thirty thousand---- Dr. Dehmer. No, about 2,000. Dr. Murray. Thirty thousand across the user facilities for Office of Science. But they are absolutely essential. So one of the things that a nanocenter did recently that I thought was incredibly cool, and this is like why didn't I think of that, is reducing the wasted heat of an ordinary light bulb. And that was an Energy Frontier Research Center as well as the Molecular Foundry, by putting nanoscale--call it photonic bandgap structures--around the tungsten filament that reflect the infrared light back to the tungsten. So they have reduced the energy loss of a light bulb to better than what an LED is. That is really cool. Mr. Honda. And it extends its life, also, does it? Dr. Murray. Don't know if it extends its life because the tungsten filament probably burns out a lot faster. However, this is using fancy photonic bandgap science and nanocenters to do something that is--you know, could affect a huge number of people. Mr. Honda. Mr. Chairman, if I could ask one more question. Using these---- Mr. Simpson. Wait one second before you ask one more question. I am still trying to understand this. Why is this a benefit? Just out of curiosity, if the filament burns out sooner, so you replace it sooner. I mean, you have reflected heat back, but big deal. It used to warm up my house, now I have got to have my electric heater running more to warm up my house because now that heat isn't going into my house with all of the lights being on. I'm curious as to what the benefit is that we reflect it back to the filament? Dr. Murray. So I will answer that you live in Idaho. Mr. Simpson. Yeah. Dr. Murray. If you happen to live in Florida, you would have a great benefit because you would not have to put your air-conditioning on. Mr. Simpson. Well, that would be a mistake living in Florida instead of Idaho. Go ahead. Dr. Orr. Could I just jump in here as long as you are poking fun at this? Mr. Simpson. Yes. I mean, I am not saying it is not cool. Dr. Murray. No, I just thought it was---- Dr. Orr. You know what is cool about it is that it increases the overall efficiency of how much electricity it takes to make light that gets out into the room. Mr. Simpson. So it takes less electricity to light one of these light bulbs than it does a---- Dr. Orr. Yeah, or you get more light for the same amount of electricity. That is the idea. Now cost, of course, is an issue here. Mr. Simpson. Sure. Dr. Orr. And these are fancy materials. But it tells you the opportunities that fundamental science can have for these kinds of hybrid interactions that really might pay off in a real way even if we don't use it exactly in that form. Mr. Simpson. Yeah, yeah. Mr. Honda. That was pretty cool. You probably could cook potatoes faster, too. Mr. Simpson. It doesn't take as much energy to cook a French fry. Mr. Honda. The other question I had was kind of off subject, but using these technologies, supercomputing, nanoscale, how close can we get or how close are we in replicating photosynthesis? If we can do that it seems to me that we could really move towards creating fuel without having to go through the process of the billions and billions of years that takes for---- Dr. Murray. That certainly is a grand challenge. We are not there yet. Life over billions of years has managed to do things that we don't know how to do yet. We do have an energy hub on exactly that, which is can we take light from the sun and create fuels out of it. It is, I would say--I would hazard a guess, 20 years out. But as we study how life actually does this and the same thing for a biofactory, we can either make things that look like life, biomimicry, or we can take things that are alive, such as yeast cells, and have them begin manufacturing things. Mr. Honda. But taking these computational powers and going down to nanoscale, merging together with the light source that Mr. Valadao was talking about, it seems that we could compress that time. Dr. Murray. You are right. Mr. Honda. But we need research monies. But the investment will return much higher it seems to me. Dr. Murray. I agree. It is a grand challenge. Actually a challenge of mimicking what life has been able to do is another grand challenge, not just, for example, creating fuels, but all sorts of things. Self-replicating, for example, and we are on it. That is an important challenge for science. Mr. Honda. Thank you, Mr. Chairman. Mr. Simpson. I am tempted to ask if we are even close to a perpetual motion machine, but I won't. I am frankly inadequate to sit in a hearing with this stuff because most of it I don't understand. It is fascinating stuff and it is good to go look at and I really get excited about science just for science's sake, but it is way above my comprehension level to a large degree. Let me ask you this, seldom do we think about the Department of Energy when somebody wants to talk about the biological sciences. Usually you think of Labor-HHS, NIH, CDC, etc. You have been included in the BRAIN Initiative, the President's BRAIN Initiative and the President's Cancer Moonshot. Explain to me how the Department of Energy is going to be involved in what are fundamentally biological sciences here? Dr. Orr. Well, I would just start by saying that we actually have been a long-term player in the biological interactions of some sort, mostly through the earliest work on radiation and what that did to living things. So we have had a very long effort there. In some ways that is what led to the human genome, because as we tried to figure out what kind of bad things could happen when radiation damaged the molecules, it was clear that one of the ways that you could cause damage was by damaging the genetic material. So that led to efforts to figure out what was there, and it got changed, and of course, now that, in turn, is what makes so much of what is called precision possible. Now, the medicine part of that, definitely NIH, but with regard to things like, how do we understand very complex interconnected neuron systems like the brain, that has a big computing element to it, and how do we understand huge datasets that involve genomic information, and images, and patient history, and all kinds of things, how can we pull those together and use advanced computing and sort of unsupervised- machine learning to---- Mr. Simpson. Explain unsupervised machinery---- Dr. Orr. Well, in other words, tell the built software that can go look at all this data and extract patterns out of it, and help us figure out ways to make use of information we gather about parents, for example, to help just add, how to treat a particular cancer, or how to avoid the conditions that led to it in the first place. Mr. Simpson. So these are machines that can teach themselves essentially? Dr. Orr. That is a part of the--and because this is a classic problem that actually goes much broader than just biological implications, it creates an opportunity for us to learn how to do some things as part of the advanced computing, an exascale exercise that will aid our whole exascale effort in the first place. So there is a legitimate role in here to do some things together with NIH, that neither agency can pull off as well on their own, and so that is the part that we are looking for, is that. Mr. Simpson. A lot of the facilities that the Department has are user-friendly facilities, but are they usually paid for under work for others, a lot of the activities? Dr. Orr. Some are. We provide the fundamental--the basic facility, but in some cases, for example, NIH comes in and we built the synchrotron, and they have built some end stations that work on their kind of biological systems. Dr. Murray. If I can interrupt for a bit. We provide competitively, so the users have to compete to use the facility. But once they are deemed scientifically competitive, the facility use is provided free. That is true for everyone except those who do not want to publish any open literature and want proprietary information. You know, so businesses actually have to pay the cost of using the facility, but NIH researchers do not have to pay the cost of the facility. Mr. Simpson. Because it is the government solely? I mean government organization. Dr. Murray. Because we provided it through their--you know, they are doing good science. They do have to pay the cost--NIH has to pay the researchers their time, we do not do that, but the facilities, including the computational facilities, are free of charge. Mr. Simpson. Ok. Marcy. Ms. Kaptur. Yes. As I am listening to all this, Mr. Chairman, I keep looking at the budget request of $5.672 billion. It is not a small budget. Mr. Simpson. True. Ms. Kaptur. And I think about the panel we had earlier in the week when we asked, what do you consider to be your major challenges, in addition to the work you do, and basically it was, those that will follow us. And how do we make science of interest to the next generation. And I keep rolling that over in my mind and looking at your budget, and thinking to myself, can the Department of Energy be more relevant to the next generation than it currently is? Not that you are irrelevant, you are not, because you have internships and you bring up labs, and so forth, but I thought I would just put this in, because I find Secretary Moniz most captivating, and he was up here before the committee the other day, and he is quite able to communicate. He has a very special gift. So I am asking you to be messengers back to the Department of Energy, thinking about all of your labs, and how can we create programming that would be shared with our science centers. Cleveland has the Great Lakes Science Center; Toledo has Imagination Station, there are science centers around the country, or with public television. Does the Department of Energy have any role to play? Now I have all these images of Dr. Moniz being a part of programming, like, there was a DVD called ``Finding Nemo'' a few years ago. It was the best-selling DVD of all time. And it was the two highest grossing G-rated films ever in our country, so I guess I could say, Finding Ernie, or Traveling with Ernie, and I could see part of this budget, part of this budget, and he would like to be inside the internal combustion engine that I saw in one of your labs in California, trying to figure out how propulsion really works. That registers in my part of the country where, you know, you have drugs, drips, and cars are made and all. But you could make it fun, you could task each one of your labs, you have got all these labs, 2 dozen labs every year, each of them would have to come up with two ideas that could be put to film, right. So, we then find him inside of algae in Lake Erie, and maybe going down with a snorkel and those things you put on your feet, what do you call those, when you swim. Mr. Simpson. Flippers. Ms. Kaptur. Flippers, flippers, right. So he is down there, then I think about the laser beam projects that I have seen, and can you imagine, you know, up on a wind turbine up there at NREL. I mean, there are all kinds of places you could be finding Ernie or traveling with Ernie, and we need a modern day Mr. Wizard. I was sort of auditioning you, Dr. Orr, and you have a wonderful voice, and you look a little bit like Mr. Wizard when I grew up. Dr. Orr. I think so, yes. Ms. Kaptur. I thought he was a very good-looking man, he used to wear, like tweed jackets, right. But I keep thinking, but how do we reach out, teachers could do this, you would have DVD, you could put, you know, public television could do it, we have to do something to break through the clutter, and you have this vast indecipherable world, it is like a planetary system to its own, but it has such unmapped potential to teach. That is not what you are authorized to do. That is the Department of Education. They are not succeeding in their mission, so they need some help. And I am not against them, but I see these assets that are not fully operationalized, and you have got intrigue. You have got unbelievable capacity and there is a communications budget at DOE, and it would not take that much. And obviously the secretary, his friends in high places, like at Google, and they hand out all these keyboards and all this stuff, you know. There is really something that can be done. So I just want you to think about it. Dr. Orr. Yes. Ms. Kaptur. Just communicate a message back. That was not really a question. I will be pleased to yield to the gentleman. Mr. Simpson. What you are bringing up is kind of interesting because one of the great shows of all times that got me interested in this stuff was Carl Sagan's ``Cosmos,'' which kind of took it down to almost understandable level with all this stuff, and I mean, I have got it on DVD, I have got it on VHS, I have probably got it on something else that we used to use, probably on disk, or something. Dr. Orr. A track---- Ms. Kaptur. He could, out of a battery. Dr. Orr. I cannot resist saying that I love the idea of all of us sitting around thinking up things for the Secretary to do, and---- Ms. Kaptur. Well, we could cast people in his like, but I would say, you have a gold mine, and I do not feel that gold mine, I can guarantee you, you talk about usage from Ohio, yeah, we have got usage, but if you look at the number of people that you directly touch at your labs, it is a very small percentage of the American people. But you have a powerhouse inside those labs and inside your department, and the department is a rather--compared to the SBA, you do not meet the ground. You are into the future, but it is that intrigue that could captivate, I think audiences, and we have platforms to display you, you just do not give yourselves to us in a way that is easily accessible to the American people, and I am just pushing you a little bit to say, think about that. With a $5.67 billion budget I think that we have the capacity to reach deeper into the country, so just, Dr. Murray, you are an educator, you are a researcher, you understand this and we have to reach the next generation in a really fun way. Dr. Orr. Now, I think you are right, that we need to learn better how to tell stories about, you know, if all of us--I mean, gosh, you cannot hardly cross the street without using the GPS that is in your cell phone. But there are so many layers and threads of science woven into the ability to do that, that being able to tell stories about the science that we kind of take for granted is actually done, would be a good way to help get kids excited for doing this in the future. Ms. Kaptur. I will tell you. When I went out to one of your labs and I saw, based from the nuclear research that the department does, this film, and you could not even see it, but at the end of it, was a nuclear chip that is being developed to use in medical to irradiate bad cells, not the good cells, just the bad cells, and it was, I do not know how many years from development, but I thought imagine if somebody at Cleveland Clinic, which is one of the institutes, imagine if those students could see that. Imagine if the Great Lakes Science Center in Cleveland could broadcast this, can you imagine the number of--it takes you into the future. And that is what you really do, and I think that is where young people would be attracted if you could somehow put a ring of folks around yourself, to disgorge what is already in your purview, it is just locked up. And I am going to get a little political now. We talk about 1 percent versus 99 percent, the 99 percent, large numbers of them need to understand why you are relevant. And I think that this is a way to do it, while we do the most important task and that is to raise the next generation to love science, to not be afraid of it, to understand how it relates to their lives, and to see that it is part of the magic that is going to help America and the world. And right how it is locked up. It is really--I read in one piece of the testimony 31,000 people users or something, these must be direct users of the lab, they have 325 million people now, or something. The way political people look, the way I look at that is, there is a mismatch here, between those that are creating the funds for the $5.67 billion to be transferred to the Department, and those that are directly involved. So I have made my point. But I want you to think hard about that, and I said that to the prior panel too, we need a modern day Mr. Wizard, we need that face, and if Nemo could do it, certainly, an institution with billions of dollars, and an interest in the future can help our country. So I am just challenging your staff and those who are listening. And I thank you, Mr. Chairman, and members. Mr. Simpson. Mr. Fleischmann. Mr. Fleischmann. Thank you, Mr. Chairman. I have got a couple of questions. The first question on the isotopes program transition; several years ago the Department of Energy transitioned all isotope production programs to the Office of Science; a transition that was directed by the Congress a number of years prior. Can you briefly provide an update to those efforts? Dr. Orr. I am going to let Dr. Murray respond to that. Dr. Murray. Ok. I have had one briefing on this, so I will provide this as updated as I can, and I can also give you more information. Mr. Fleischmann. Thank you. Dr. Murray. But in 2009, Congress directed the Isotope Program to move to nuclear physics. And nuclear physics charged their Advisory Committee with, okay, so now we have the isotope program, what do we do. They have so far created two strategic plans; the Committee has a new updated strategic plan, and has looked at what the Isotope Program is doing in 2015. The outside committee that looked at them was very pleased with the drawing from across the Department, various either reactors or accelerators that can create various isotopes that are needed. The Isotope Program started from the Atomic Energy Act, so DOE has the mission to provide isotopes to industry or to scientists as needed by the U.S., but in any competition with any industry partner who can create the isotopes themselves. It turns out there are not that many people that do this. You have to have a reactor, or you have to have a very large accelerator. And so, we are providing the isotopes that are necessary. One of the issues in the program, which you will see is in our fiscal year 2017 budget, a small amount of money to start a facility to make stable isotopes, this is the first facility in 20 years. We have not had the possibility of making stable isotopes. Mr. Fleischmann. Dr. Cherry, if I may? Dr. Murray. Yes. Mr. Fleischmann. Is this the facility that is proposed at Oak Ridge? Dr. Murray. Yes. It is. Mr. Fleischmann. Ok. Very good. If I may, let me ask my follow up. Dr. Murray. Ok. Mr. Fleischmann. We are on the same page. The request proposed to build a stable isotope production facility at Oak Ridge to produce medical isotopes and to provide inputs for commercial and suppliers of isotopes. Can you, please, explain then, when this new activity is needed, and what this brings to isotope program? Dr. Murray. Yes, absolutely. So as it turns out, for the last 20 years we have not had the capability in the U.S. to make stable isotopes. This turns out to be okay for the last 20 years, kind of okay, because we could either get them from Russia or we had them in a little drawers in Oak Ridge. We are running out of things and drawers in Oak Ridge, and we are relying on Russia for our stable isotopes. One of them is kind of important. It is Lithium-7. It is used in nuclear reactor coolants, and our industry needs it and we cannot make it. So that is an issue. This facility will also make the isotopes that are around the Molybdenun-98 or Molybdenum-100, which are used by NNSA, which is the agency that is responsible for the Moly-99 isotope. It is the one isotope that we do not create or provide. In order to actually get Moly-99, you have to start from somewhere, and one way of doing that is Moly-98 or Moly-100. This isotope is used for pretty much all cancer treatment and radiation therapy in hospitals. Mr. Fleischmann. Thank you. Thank you very much. Dr. Murray, we have touched on this earlier, but it is very important. The scientific user facility supported by the Department of Energy, Office of Science, provides some of the most unique, powerful, cutting-edge tools to over 30,000 university, industry, and government scientists from all over the country. Given the importance of these user facilities to the Department of Energy's overall science mission, this committee directed the Basic Energy Science Advisory Committee to prioritize the next three to five major user facility upgrades or construction projects within the Basis Energy Science Program. What is the current status of this effort, and has DOE provided any further direction or guidance to BESAC about implementing this requirement? Dr. Murray. Yes. I provided, I think it was my first day of work, a letter to the chairman of BESAC with the charge, and the chairman of BESAC has created a subcommittee of BESAC to look at the charge. And the charge is exactly the same charge that we use for our use for our project management of any major projects, including upgrades, which is, is this upgrade--they are looking at five different proposed upgrades, are these upgrades--is this upgrade going to produce world-class science? Do they have a good science case? And second, is this upgrade ready to go? Do they understand all of the engineering that they have to do, and have they thought through the design well enough that they could start actually doing real designs? That committee will report out in June. So I am looking forward to that report. Mr. Fleischmann. Thank you very much. Mr. Chairman, I yield back. Mr. Simpson. Mr. Visclosky. Mr. Visclosky. Mr. Chairman, I understand in my absence there was a discussion about the issue of new facilities coming online and the problem of making sure you can pay for their operation. I would just associate myself with that conversation. I do not know if it got specific enough as to whether or not the agency is going to provide a 5-year plan to show how this is going to work out as far as the operation of these new facilities. I do not think that is a bad idea either to put that into context. So thank you very much, Mr. Chairman. Mr. Simpson. Mr. Honda. Mr. Honda. Mr. Chairman, I want to talk a little bit about tech transfer to Cyclotron Road. Our national labs are really an amazing resource to this country, both in the facilities that they house and in the quality of the scientific talent that they attract, and we need better use of these resources to drive development in the private sector and make an impact on the energy industry. There is an innovate program at Lawrence Lab called the Cyclotron Road. The Cyclotron Road is combining the best elements and Silicon Valley startups with top talent, sense of urgency, and an all-in attitude and commitment, with the tools and expertise of Berkeley Lab to help these technology entrepreneurs to develop their cutting-edge clean energy technologies. And this is a type of partnership and innovation that we need to reinvigorate our energy innovation and accelerate the commercialization of these new technologies. So what is the department's current plans for this program at Berkeley Lab? And what is being done to expand the Cyclotron Road program to other facilities and other national labs? Dr. Orr. Ok, well, let me start and Dr. Murray can join in if she wishes. This has been an experiment that provides modest resources to let startups or small companies make use of the facilities, link up with the scientists at the lab that has an interest in the area, and make use of some of the incredible facilities that we have at the lab. So it is a little different from the transfer stuff out of the lab, but rather to create a conversation that we hope will be productive. I happened to be out for a meeting at Lawrence Berkeley here not too long back, and I had breakfast with a bunch of the young folks who were working on this scheme. And they were uniformly enthusiastic about both the scientific opportunity, but the chance to put some interesting questions in front of the scientists at the lab, who, of course, got interested in what they are doing, and so a good interchange all the way around. I know that the other lab directors are looking over the fence to see where something like that might work at their labs as well, and that is a conversation we are trying to encourage as part of our broader discussions with the Office of Technology Transition. So experiment in progress, conversation underway, and I think you will see more of that going forward. Mr. Honda. You will keep us updated on that. Thank you, Mr. Chairman. Mr. Simpson. If there are no other questions, Dr. Orr, we have taken your whole day. Dr. Orr. I think that is what I get paid for. Mr. Simpson. We apologize for taking your whole day, but you guys all do exciting work. Like I say, I wish I was smart enough to ask some questions because you do really need stuff. It is fascinating to go out and see what you do and have it explained to me when I am there, even though an hour later I am kind of going now what the heck was that? But I am glad there are smart people like you in the world that are making advances to make the world a better place for all of us. And like I say, sometimes I just want to sit down by a fire with a good book and forget about all this stuff. Dr. Orr. I do that, too. Mr. Simpson. I tell my wife all the time I am glad I am not going to live too much longer because the world is changing so rapidly, I am not sure I could keep up with it. I look at a kid going to high school today, or grade school today, what is going to change in their lifetime? How are they going to keep up with it? You know, it is fascinating stuff. I love the commercial on TV where the grandkids stop by the grandfolks' house, and they rush out to welcome them with the trays of all of their appliances, and hand it to them and say these do not work, you know. It is for the kids to fix them. That is kind of the way I am, at this these do not work anymore stage. I appreciate all you do, and it is good to work with you, and we look forward to working with you on putting together this year's budget, so keep up the good work. Thank you for being here today. Dr. Orr. Thank you. Dr. Murray. Thank you. Mr. Simpson. Thank you very much. We are adjourned. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Tuesday, March 15, 2016. DEPARTMENT OF ENERGY, ENVIRONMENTAL MANAGEMENT WITNESS DR. MONICA REGALBUTO, ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT, DEPARTMENT OF ENERGY Mr. Simpson. I would like to call the hearing to order. Good morning, everyone. Welcome to what is the last official hearing this year of the Energy & Water Subcommittee. We saved the best for last. I would like to welcome Dr. Monica Regalbuto to her first appearance before the Subcommittee. This is the first time since March of 2011 that we have had a Senate- confirmed Assistant Secretary for Environmental Management testify before the Subcommittee. So congratulations on getting through the Senate. We look forward to your testimony today and to hearing more about your plans to lead the environmental cleanup program through its many challenges. The purpose of today's hearing is to discuss the President's Budget Request for the Department of Energy's Office of Environmental Management. That request totals $5.4 billion, a reduction of $773 million below fiscal year 2016. Instead of requesting enough funding to keep all of the cleanup sites operating, the Administration has proposed to shift spending for the cleanup of Paducah, Portsmouth, and Oak Ridge to mandatory accounts. The Department includes these mandatory funds in their budget totals, but they are not the jurisdiction of the Appropriations Committee. Rather, this proposal to expand the authority of USEC Privatization Fund is ultimately under the purview of the authorizing committees. This budgeting gimmick allowed the Administration to push to the side the cost of these cleanup activities and use that money for some other initiative that they wanted to highlight. This is simply irresponsible and risks hundreds if not thousands of cleanup jobs. Once again it will be the work of this Subcommittee to put forth a responsible funding plan that will keep these and other programs of the Department of Energy functioning. Please ensure that the hearing record, responses to the questions for the record, and any supporting information requested by this subcommittee are delivered in final form to us no later than 4 weeks from the time you receive them. I also ask members to submit any additional questions for the record to the subcommittee by close of business tomorrow. With those opening comments I would like to yield to our ranking member, Ms. Kaptur, for any comments that she would like to make. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. Thank you, Mr. Chairman. Dr. Regalbuto, welcome to the subcommittee and thank you for taking time this morning to discuss the Environmental Management Program. The program faces massive challenges. You surely know that; we thank you for taking on this responsibility. The legacy of the Manhattan Project is an obligation we as a country must address. The continued issues at the waste isolation plant and at Hanford are illustrative of not only the dangers posed by the remaining materials, but also the technical and budgetary challenges that further complicate the eventual success of the Department's efforts. The budgetary challenges this year are exacerbated by the ill-conceived movement of a portion of the program to mandatory funding. There remain lingering concerns about the Department's safety culture. With such a critical mission the work environment at your sites must ensure employee concerns are addressed in a timely manner and without fear of retribution. Given the constrained fiscal environment it will be crucial that all resources are employed to their fullest potential. Therefore, issues of project management and corporate governance are increasingly vital to the success of the Department's mission. The Department must follow through with strong leadership and fundamental management reform. And failing to do so will significantly inhibit the execution of this mission as well as the Department's credibility. Finally, I would like to reiterate the budget hurdles posed by the use of mandatory funding and uranium sales to fund this important work. While I appreciate the Department is working with me to address concerns at the Portsmouth site, your budget effectively requests no funding for the uranium enrichment D&D fund. Though the Portsmouth site is one of three primary sites funded by this account, and is not in my district though it is in my State, and it is one of the highest unemployment counties in our country. Additional job losses and job uncertainty send harmful waves throughout the local economies of these sites. I hope we can continue working together to minimize instability and ultimately complete the important cleanup work at the site and find a way to transition workers who may be losing their positions. Thank you, Mr. Chairman, for the time. Mr. Simpson. Thank you. We are looking forward to your opening testimony. Ms. Regalbuto. Good morning, Chairman Simpson, Ranking Member Kaptur, and members of the subcommittee. I am pleased to be here today to represent the Department of Energy's Office of Environmental Management and to discuss the work that we have already successfully accomplished and what we plan to accomplish under the President's fiscal 2017 budget request. The total budget request for the EM program is $6.1 billion, which includes $5.4 billion of new appropriations, and $674 million of proposed mandatory spending as you correctly mentioned. The request will allow EM to maintain a safe and secure posture across the complex. We are maximizing our work on compliance activities. I would like to take this opportunity to briefly highlight a number of EM's recent accomplishments. Earlier this month, on a schedule with agreement with the State of Washington, workers started pumping tank waste from AY-102, one of our oldest double-shield tanks at the Hanford Site. This is a huge accomplishment by our workers, as you know that they are working in very, very challenging conditions. At the Savannah River site, the 4,000th canister radioactive glass was recently poured. Achieving this milestone enabled us to close the seven high level waste tanks at the site. And at Moab Site half of the estimated 60 million tons of uranium mill tailings have been removed and shipped to an engineering disposal cell. The fiscal 2017 budget request will allow us to continue to make progress in our ongoing cleanup priorities. Among EM's top priorities is the safe reopening of WIPP. EM continues to support recovery from two incidents at the facility that interrupted the national program for the disposal of transuranic waste. The request will support initiating waste emplacement operations by December of 2016, if it is safe to do so. In Idaho, the request will support the Integrated Waste Treatment Unit. This facility is planned to treat approximately 900,000 gallons of sodium-bearing tank waste. At the Savannah River Site we will complete construction and ramp up commissioning activities at the salt Waste Processing Facility which will significantly increase our ability to treat tank waste. In addition, we will also continue to receive, store, and process spent nuclear reactor fuel. At the Hanford Office of River Protection the request supports continued construction of the low activity waste facility, balance of plant, and outfitting of the analytical laboratory, which are the centerpieces of the Department's plan to begin the direct feed of low activity waste as soon as 2022. The requests at Richland allow us to continue important work on the central plateau and to complete the demolition of Hanford's Plutonium Finishing Plant, once one of the most dangerous buildings in the complex. At Oak Ridge the request supports continuing design of the Outfall 200 Mercury Treatment Facility at the Y-12 National Security Complex and complete the demolition of Building K-27, the last gaseous diffusion enrichment processing building. It will mark the first time that a gaseous diffusion enrichment site has been completely decommissioned. With the most challenging cleanup remaining we understand importance of technology development in reducing life cycle costs and enhancing our effectiveness. To help address many of the technical challenges involved the request reflects a total investment in technology development of $33 million. The funding will allow us to continue to integrate robotics technology into our efforts to help improve overall work and quality of life by easing the performance of physically demanding tasks. In closing, I am deeply honored to be here today representing the Office of Environmental Management. We are committed to achieve our mission and will continue to apply innovating strategies to complete our mission safely. Thank you very much for having me here today and I will be happy to answer any of your questions. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Simpson. Thank you. Ms. Kaptur Ms. Kaptur. Thank you, Mr. Chairman. Doctor, in order to give the public a sense of how much has been accomplished and what remains to be accomplished, you stated in your testimony there is about 300 square miles left of various types of cleanup. Put that in context for the American people, how much has been expended to take care of how many square miles? You say in your testimony what is remaining is some of the most daunting cleanup. Could you explain where we are on a platform here to finish this? Put it in a context. Ms. Regalbuto. I would be happy to do so. Thank you very much for your question. The Department of Energy Office of Environmental Management breaks down the projects into a number of different categories. One is material disposition and spent fuel disposition, the other one is sold waste, followed by soil and groundwater and facility activation, and then the most challenging one, which is liquid waste. In the area of nuclear material disposition and spent nuclear fuel disposition, we pretty much are complete with that task and we have successful consolidated and packaged those materials and they are ready to go once a disposal facility is available. So those we have completed. And, I am sorry, let me give you this for the record. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. Ok. Thank you very much. Ms. Regalbuto. I am sorry. Ms. Kaptur. So these are all the sites? Ms. Regalbuto. These are all the sites and they are lumped by the level of risk and difficulty that we face. So the first two categories, which is nuclear material disposition and spent fuel, we pretty much have completed--and you can see that by the blue bars, almost all the ones to the right hand side. And we have a number of containers and the bulk of the material. So once a disposal facility is available those are ready to go. The next category I would like to highlight is solid waste disposal. And let me focus your attention to contact-handled, which is the low level waste, the mixed low level waste and the transuranic waste. Those are roughly about anywhere between 75 and 80 percent completed. But clearly the transuranic waste that is remote-handled is still in just initiating. And we only initiated that at Idaho with terms of packing and the like. So it is the first site that we are actually doing this is in a very extensive form. In terms of soil, groundwater remediation, that is about 75 percent. This is where we actually do a lot of pump and treat. And I would like to emphasize that this is the area, even though it says estimated end date is 2075, this is where when we invest technology we can actually have a significant reduction on to-go cost. So what happens right now is doing pump and treat and we are trying to in the future move into bioremediation so we don't have to spend all that energy and different ionic exchange resins and the material that goes into doing this, mechanically pumping and treating. So there are a number of other technologies in the future as we move forward that require bioremediation that are more passive and actually will decrease that to go cost. And we started doing some of that at Savannah River, so we are in the process of testing. So that is where, in my opinion, investing some technology money really will pay in the future. So we are looking forward to those results. Ms. Kaptur. In terms of the number of square miles already completed. Ms. Regalbuto. Yes. Ms. Kaptur. If there are 300 left how many--is it really the square miles or is it the amount of material? Ms. Regalbuto. It is more the amount of material. Ms. Kaptur. Material. So on a scale of 1 to 100 are we 25 percent done, 50 percent done? Ms. Regalbuto. For groundwater? Ms. Kaptur. The whole cleanup project. Ms. Regalbuto. Ok, so if we don't account for the tank wastes, because the tank waste is by gallons versus by footprint, right. Ms. Kaptur. Right. Ms. Regalbuto. If you don't account for that I would say we are about 60 percent. Ms. Kaptur. Ok. All right. A very straightforward answer. And at a level of close to $6 billion a year, then how many years would it take us to complete this work? Ms. Regalbuto. Without tank waste, 25 years. With tank years, 50. Ms. Kaptur. All right. Thank you very much. That is a good way to begin this hearing. Thank you, Doctor. Mr. Simpson. Mr. Fleischmann. Mr. Fleischmann. Thank you, Mr. Chairman. Madam Secretary, good morning. Ms. Regalbuto. Good morning, sir. Mr. Fleischmann. Good to see you today. MS. Regalbuto. Thank you. Mr. Fleischmann. I wanted to begin my questions with the high-risk excess facilities. Secretary Moniz named a panel to find solutions to the pressing problem of high-risk excess facilities. What were the panel's findings and what is your plan and timeline for reducing the risks and taking down these buildings? Ms. Regalbuto. Thank you for your question. The Secretary's Infrastructure Panel or Excess Facility Panel is something that we all collectively collaborated. So it was Office of Science, NNSA, some of the smaller offices of DOE and Environmental Management. We have a report that is scheduled to be published. I believe it is at the beginning of the summer. But we certainly have enough information to do a briefing at any time that you may be available, or the committee will be available. Basically what it has done is it has ranked the different excess facilities in terms of risk. So what are the most high- risk facilities, and associated I would say a predetermined cost next to each of those facilities. So, for example, the Y- 12 facilities are already on the list and I think many of you know that. There are also some facilities that currently are not on the list that belong to Office of Science. And there is the caveat of some small universities and the likes. So that integrated list will be available once the report comes out. And I can find out exactly the date when the report will be out, but we will be happy to come back and brief you just specifically on the findings of that report. Mr. Fleischmann. Thank you, Madam Secretary. If I can follow up in that regard. The first House nuclear cleanup caucus event this year is scheduled for April the 20th. As you know we worked very hard last year with your cooperation and participation to make the Nuclear Cleanup Caucus a tremendous caucus with tremendous bipartisan support. Very thankful for that. You have alluded to the report. It would be so beneficial to have that before April the 20th. Will the Department release the report before that date so that we can have an open discussion and build support for our challenges ahead? Ms. Regalbuto. I appreciate the opportunity for the cleanup caucus to review this report and I will find out exactly the date that it is available, but if it is not available by the date, I believe it is April 20, for the caucus, we will be happy to still keep it on the agenda and give an informative briefing to the people participating because we do welcome their feedback. So regardless if the report is in final concurrence, because it has to go through a lot of desks, we will be happy to report on the findings. Mr. Fleischmann. Thank you. Ms. Regalbuto. So more than happy to facilitate that. Mr. Fleischmann. Thank you. If I can segue into historic preservation. Several years ago, the Department of Energy entered into an agreement with the State of Tennessee and several other parties on historic preservation in order to proceed with cleaning up the contaminated buildings at the East Tennessee Technology Park. For the past two years funding for the agreement has been zeroed out in the administration's budget. As chairman of the House Nuclear Cleanup Caucus stakeholders and contractors have complained to me of the distrust that is created when the Department fails to follow through on its commitments. Why does the Department sign agreements that the administration will not allow to be met? Ms. Regalbuto. Thank you for your question and interest. We are committed to meeting the consent agreement with the State of Tennessee for the historic preservation. In fiscal 2016 we received, and thank you for all of your support, $6 million which we are currently using those funds to meet our commitment for the visitor center for K-25. So we are using the funds that we receive in 2016 and continue to do and fulfill our agreements with the Historic Preservation Office. I understand there is a viewing tower in the visitor center planned with that money. Mr. Fleischmann. Thank you. On a related issue, recently I had the opportunity to tour the Oak Ridge water plant, which was transferred to the city about a decade and a half ago, on the premise that it was a valuable asset that could be run more efficiently by local government. It has turned out to be a cash drain on the city due to very serious infrastructure problems. Many in the community want the city to tie Federal assistance on the water plan to future cleanup work. I would rather see the Department of Energy become a better partner with its host communities which are strapped by a low tax base from Federal land ownership, substandard housing from the Manhattan era, and an aging population living on low pensions. It does not help when the Department centralizes decision-making in Washington on complex issues where there is sometimes a lack of experience and knowledge about the major sacrifices that these atomic cities have made. I was interested in your comments on this. Ms. Regalbuto. Thank you very much. I am very familiar with the Oak Ridge site as I started my career back in 1988, and I have seen the town, as you mentioned, really not blooming anymore. I still remember driving to the mall and the mall was closed. Mr. Fleischmann. Yeah. Ms. Regalbuto. And that really has a big impact, at least to me, when I used to be able to go and walk around after work and just get a little exercise. I do recognize that a lot of this is an impact to your local government. And the water plant, the details of that water plant and in what condition it is and when was this transferred, is something that I will have to go back and look at it. And I would be happy to work with you and the committee related to these issues. I do personally recognize that sometimes when decisions are made the exact impact of the well being of that facility is not truly known. Mr. Fleischmann. Thank you. Ms. Regalbuto. So we understand that. Mr. Fleischmann. It was really eye opening for me to see the dilapidated condition in the infrastructure, and really the decay that is at that facility. So I do appreciate your assistance in that regard. Mr. Chairman, I have one more question in this round, if I may? Last week, Madam Secretary, I visited Protomet, a very successful company that started out of the Department of Energy system. It has requested a land transfer of adjacent property that is no longer needed by the government. But the lengthy process may cost this homegrown business to move out of Oak Ridge. It has become apparent that the process needs to be streamlined. I am told that there are multiple and duplicative approval points in the process with no time limits for review. How can we work together to streamline and shorten the land transfer process that is so important to several Department of Energy communities? Ms. Regalbuto. Thank you for your question. I do share your frustration on this land transfer. Unfortunately, as you mentioned, there are a number of agencies that have to be involved in all of this review process, and each of them have a set of days that they have to go through. So we are committed to try to streamline anything that is within our control, so anything within, inside DOE we can expedite and control that. Once it gets to interagency, it requires a little bit more difficulty. For example, the last transfer that we did for the Metropolitan Knoxville Laboratory Station for the airport had to go through endless steps, including signing by EPA, the Governor's Office, Department of Energy, transfer to the GSA, and eventually transfer to the city. So those are the number of things that we are required to do in order to transfer land, and I recognize that it is a very tedious process. On the positive side, we did send the committee yesterday afternoon a letter regarding a transfer in the ownership of K- 31 and K-33 to Oak Ridge Economic Development Organization, so it may be working down the committee, and so that puts you 60 days away for getting 280 acres. So we are very excited about that. We are very excited, actually, with working with your community to do this, and during my business to Portsmouth and Paducah, I have set Oak Ridge and the model that you have for economic redevelopment as an example. So one of the things that we are going to be working with the unions and the community members at Portsmouth and Paducah is to bring Sue to come in and brief them, and also invite some of your community organizers to come in and teach them how they change from going from gaseous diffusion into an economic redevelopment area. So we are very happy and it was very well received by both Portsmouth and Paducah, because we have done this once already. Unfortunately, we know how much this costs, too, which is significant, but we also know some of the headaches that you mentioned and some of the lessons learned, so, hopefully, communities like Portsmouth and Paducah can benefit for the same type of turning gaseous diffusion plants into more economic development areas. And I certainly hope that your small business does not leave, because we do champion small business communities, and we actually try to do our best to promote that and increase that at the local level. Mr. Fleischmann. Madam Secretary, thank you for your hard work on this issue, and I appreciate the very good news on the land transfers. Ms. Regalbuto. Yes, we are very happy. Mr. Fleischmann. Mr. Chairman, I yield back. Mr. Simpson. Thank you, Doctor. A Federal judge has set new deadlines for the Hanford Vitrification Plant requiring this utility to come online and by 2036. How will the judge's ruling impact DOE's plans at Hanford? And does your budget request support the new deadlines or are we going to expect an amended budget request once you have had a chance to fully review the judge's decision? I notice that DOE proposed sliding milestones. I find that interesting, sliding--I am not sure if those are like sliding wedding vows or what, but ultimately, the court rejected those. What will happen if DOE is not going to meet a deadline? And finally, EM has been operating for years without a formal performance baseline for the Waste Treatment Plant against which progress could be measured. What will be done to improve the transparency of DOE's management of the project so that we can monitor DOE's progress? Ms. Regalbuto. Thank you, Mr. Chairman. As you mentioned, the District Court of Eastern Washington's ruling was last Friday, late on Friday, and the Department is in the process of reviewing all the legal paperwork regarding the court order and the consent decree amendment. With that, I would be happy to come back and once they dissect all of that and the 30-day period of communication is over, I would be happy to come back and brief you specifically on the impacts of the court order decision. With that said, the Department remains committed to initiating glass as early as 2022, and that is with the Direct Feed Law. We have requested sufficient funding to initiate operations by 2022; that includes the Low Activity Waste Facility, the balance of plant, which is all the infrastructure necessary to maintain that facility, and the Analytical Laboratory where we go and make sure that the quality of the product is good. Regarding the issue of the project cost, because this piece was carved out of the contract, so the contract was for the whole thing and we are committed to do this on a phase approach, which is, in our opinion, a more efficient way to chunk it in pieces. As the Secretary has put in his views regarding project management, it is easier to address a smaller portion than these huge capital projects. So we are following the Secretary's lead, and in that case, we are in the process of negotiating CLIN 1, which is basically doing what I described to you, and we should be getting very close to getting a baseline for that. Regarding the other facilities, that will be impacted by the court ruling, and we will be back to do that. In terms of project management, as you clearly pointed out, this facility has struggled over the years, and we have done a number of things regarding these facilities. Some of them are lessons learned from others. One of the recommendations has been to get an owner's rep, and we did hire an owner's rep, which is Parsons. We are already working with them, and they are walking through this facility. We do not have to wait until a year out before commissioning to find out any surprises. So we are walking very systematically through the plant and making sure that we address anything going forward. So we are taking a lot of modifications. There was also a GAO report regarding the tracking system of the issues that have been determined by the contractor or DOE, and we have gone back to them and made sure that the tracking system actually captures every single thing, and so that has been revamped. Also, the accountability to the contractor has been revamped, so we have put in a lot of effort in that. I think you know Kevin Smith, and I will say, in the last three years, Kevin has done a magnificent job just to make sure that that transparency is there for you and all the taxpayers to see. Mr. Simpson. Ok. This is a huge facility, billions of dollars, many years to operate to complete. I look at the IWTU in Idaho. In comparison, very small compared to the Waste Treatment Plant. I have to tell you in all honesty, I seriously wonder if WTP will ever be able to operate given the problems that we have had at the IWTU and trying to get it operating. I look at that huge facility and wonder if this will actually ever work. What do you think? Ms. Regalbuto. So let me address that. IWTU has a first of a kind technology, which is really the most challenging thing. Traditionally, we use either solvent extraction or ion exchange to do any of the separations of any of the materials, and then we either vitrify or grout. Those two technologies, vitrification and grout, are already being used every single day at Savannah National Lab and throughout facilities throughout the rest of the world. Hanford has the vitrification technology for the low activity waste. At least we do not have any of the dark cells, which have been really the issue of some of the technical issue resolutions, and we do not have any of the pulse jet mixers, also, which is another reason where those are new in this enterprise. So LAW has paddle mixers and traditional mixers that we use at Savannah River. It has ion exchange, filtration, similar technology that we used before. On the other hand, IWTU, unfortunately, when the technology was selected, they selected one that is not used commonly for environmental remediation. It is used in the pharmaceutical industry, and it is also used in some cases in the gas and oil industry for basically the catalytic converters where you increase your yield of gasoline. Those are projects that, in just my personal opinion, all of them make money on their product, so they can afford an exotic technology. In our case, we do not make money from our product. Our product is waste that is going to be disposed, so that has been the main challenge in IWTU, but we cannot correlate that to WTP, because it is a completely different technology. WTP correlates better with Savannah River because the technologies are the same. Mr. Simpson. Ok. Let me ask you about WIPP. WIPP funding is down from last year's level, partially due to the completion of the summer recovery activities. There is also a decrease associated with lower levels of construction project funding for the two projects that must be completed. In addition, part of the operating funding will now be used to provide funds to the State of New Mexico for road improvements. DOE did not request a specific amount for these costs, but rolled them into the overall funds for WIPP, and there are discrepancies in just how much the WIPP funding will be diverted to pay for these road improvements in the agreement. Last April, the Department of Energy recently agreed to provide the State of New Mexico $34 million in economic assistance to build roads in New Mexico as part of the settlement agreement with the State for the events that led to the closure of WIPP. Economic assistance payments were previously authorized under the WIPP Land Withdrawal Act and appropriated by Congress, but that particular spending authority expired after 15 years. Reinstating those economic assistance payments, which totaled about $20 million per year, has been a major goal of the State. Last year, the Secretary of Energy testified that WIPP would be reopened in March 2016 and resume full operation some time in 2018. The date for initial limited operations has now been pushed back to December and the Department has not released any new estimates for achieving full recovery. Is there a possibility that reopening WIPP to limited operations could be delayed beyond December? When exactly is WIPP scheduled to be returned to pre-2014 operational levels, and can you speak to the short and long-term challenges to resuming operations? Do you anticipate challenges in permitting or demonstrating safety operations with the regulators? And talk a little bit, if you would, about the money going to economic assistance or road development or improvement in New Mexico out of the operating costs of WIPP rather than out of a special line for economic assistance. Ms. Regalbuto. Thank you for your interest in WIPP. WIPP is, as you know, our highest priority. It does have an effect throughout the complex, and their inability to move waste has significantly affected the rest of the sites and our ability to meet the commitments with the other States. So it is critically very important for us. We are on target to reinitiate operations at the end of this year, December of 2016, provided it is safe to do so, we will never put safety ahead of a schedule, but right now, we are on target. We have got three activities, main activities, that need to be completed for us to reinitiate waste and placement operations. One is the DSA approval, which we are in the process to do so. We are working with the regulators and we are working with the Defense Board and all the interest stakeholders. We have been very transparent through our recovery process. We have town hall meetings, and we keep a website with every single piece of information we generate so the community knows exactly what we are doing, and also the regulators. So we will have the DSA approval, which is followed by an operation readiness review; one is done by the contractor, one is done by DOE, and other people are observers during this. Once we have that, we are ready to initiate operations. At the same time, there are a number of permit modifications that we are working with the State of New Mexico, and we are on target to complete our permit modifications as the schedule requires. So going back to the delay on the schedule, the original schedule that was published was published before the second Accident Investigation Board report was released. Once the second Accident Investigation Board report was released, it was clear that there were a significant number of things that needed to be done before we restart operations, and the most important one was--and I can briefly summarize it as--WIPP had to be a more demanding customer. So, in other words, we have to expand our boundaries all the way to the waste generators, because in order to protect our facility, we have to protect the start before the waste initiates. So that has caused some delays in the thinking, including some of the DSA and also a delay from the contractor--was also delayed by a number of months. So that caused the shift to December. Regarding funding, there was a decrease this year for $33 million, and that is really just a signal of we are making progress. Regarding funding to support the SEPs, and I am not a lawyer, so I will have to refer you back to general counsel, just a little engineer here, but it is my understanding from the attorneys that there is authorization under the Land Withdrawal Act to do this type of activities, but I would be happy to go back and take this as an action and get back to the committee. In essence, I really do not have the personal knowledge on that. What I can tell you is that the request includes for 2017, $18.4 million, and that is on PBS CB 0080, which is really our operating disposal of facilities, and the total for that PBS is $196.3 million, of which $18.4 are specifically for roads and operations. Mr. Simpson. Why not put that in a special line when you request it for 2017? I can understand trying to find another area to fund it out of in 2016 when you are looking at trying to meet agreement with the State of New Mexico and you do not have that line item available, but if that is going to be ongoing, why not create that line item instead of putting it in the operations budget? Ms. Regalbuto. I will follow up on why they did not create a new line item. Personally, I do not know the answer. What I can tell you is that it is not an ongoing cost, it is a one- time use of the money. It is almost like a grant that goes to the State and then the State manages multiyears. But I do not know the answer why they did not create a line item, and I would be happy to go back and get an answer for the committee. [The information follows:] The Department submitted to Congress on April 5, 2016, an amendment to increase by $8.4 million the appropriation request for the Defense Environmental Cleanup account to fund a portion of the settlement costs to resolve the New Mexico Environment Department claims against the Department of Energy (DOE) related to the February 2014 incidents at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, including the associated activities at Los Alamos National Laboratory. The additional $8.4 million will allow DOE Office of Environmental Management to pay a total of $26.8 million in Fiscal Year 2017 to the State of New Mexico for necessary repairs to its roads needed for transportation of DOE shipments of transuranic waste to WIPP. Mr. Simpson. Ok. Marcy. Ms. Kaptur. Thank you, Mr. Chairman. Dr. Regalbuto, the Department of Energy has failed to reach a number of cleanup milestones, most of which are part of an agreement with the State; some, like Hanford and Idaho, are subject to fines and penalties through the courts. How does DOE pay fines when they are assessed by the States or the courts, and do these come from the judgment fund, as many people believe, or must they be paid from appropriations? Ms. Regalbuto. Thank you for your question. We try not to miss milestones. That is a number one priority. When we see a milestone that is at risk, we engage with the State and EPA and the other agencies, and in some of our agreements, we have the opportunity to have a dialogue and change the dates as needed, so usually, that is the first thing we do. It is only when we cannot reach an agreement with the State or tri-parties or the stakeholders that we end up in an unfortunate litigation path. I personally prefer not to be there, because I will have to use my best engineers to start doing the positions on litigation when they should be doing cleanup. So, unfortunately, it is a big distraction for everybody, including the State and the Department of Energy and taxpayers at the end of the day. So that normally goes through a litigation process, which is held by the Department of Justice. It is not done by DOE, so Department of Justice does that. I will tell you that appropriated funds are not used to pay fines. We do not have that authority. Ms. Kaptur. Ok. Ms. Regalbuto. That at least has been what counsel has mentioned to me. Ms. Kaptur. All right. I want to go back to my original question about how much we have done and how much remains ahead, and you said, in most of the most serious categories, we have cleaned up about 60 percent of all material? Ms. Regalbuto. Yes. Ms. Kaptur. That excludes the water and the items that are in--the quantities that are in tanks? Ms. Regalbuto. Yes. Ms. Kaptur. Ok. So that is what remains. If we are expending $6 billion a year and we will not be finished for 50 to 75 years, going back to the start of this program, can you estimate how much we have spent to date cumulatively on all cleanup dating back to what year? Ms. Regalbuto. I don't have the exact number, but let me try. I think it is about $150 billion. So $150 billion since 1988. Ms. Kaptur. Since 1988. Ms. Regalbuto. When Department of Energy created the Office of Environmental Management. There was a big spike during American Recovery Act, as you probably remember where the funding almost doubled. That was since 1988. But we have gone from 104 sites to 16 sites. Ms. Kaptur. How many? Ms. Regalbuto. One hundred and four to 16 remaining sites. So that has been the footprint reduction--is huge. Rocky Flats and Mound were two huge industrial complexes that are gone. And when people say what impresses you the most, we say is what I don't see anymore, right, when you don't see this big industrial complex. So, you know, truly they are really like little mini cities that were built with complete infrastructure needs to be knocked out. So in terms of our disposition of the facilities, one of our main goals is to decrease the hotel costs. So some of our investments, for example, in the gaseous diffusion plants are to consolidate a lot of the switch yards. Those were very energy intense facilities. They tend to have four different switch yards to feed the facility. We eliminate all of them except for one so we can continue having electricity and the like for our D&D activities, but we don't need to support all other ones. We also do the material consolidation because material consolidation requires a high cost on safeguards and security and we are down to pretty much one, when we started with, you know, every site had everything. So now we are consolidating in that. So tried to, as much as to the extent possible, use our funding in a balanced approach where we tried to bring down hotel costs because that is money spend ahead of time. We also like to forecast what is coming ahead. So, for example, even though the Y-12 facilities haven't been transferred to us, eventually they will. I hope with some funding too, right. And we know already that there is a mercury problem associated with all of the COLEX facilities which used to, at the time, they separated lithium and they used mercury in the liquid phase as a catalyst. So it is all over the place, and it is in the groundwater, it is in the soil, it is in metallic form, it is everywhere in the Y-12 facilities. So knowing that, we are spending some technology dollars on that already and the purpose of doing that is we don't have to wait until they transfer those facilities. We can proactively start thinking how to invest in what is going to come ahead. Ms. Kaptur. I think in one of the facilities you closed and cleaned up Fernald, gaseous diffusion in Ohio, we are very glad to see that gone. Ms. Regalbuto. Yes, we are very happy and we are going to have a little ceremony in Tennessee when we finish that one and we would be happy if any of you could come to this end of the gaseous diffusion plant. It really is, it is a big win for us. So I have a little mercury plan. This is in general for doing the cleanup of Y-12s that I will pass for the record if the committee would like to take a look at. [The information follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Ms. Kaptur. All right. I am sure that the chairman would agree. We can put that into the record. Since you mentioned mercury, the export ban was established on mercury in 2008 and was contingent on our country establishing a domestic long-term storage facility. But DOE has made little progress, if any, on getting that facility up and running, so you began discussing that. Could you give us a little bit of an update? You talked about technology, what progress you have made, how soon could a storage facility location be selected. Can storage fees be structured to fully offset the costs of what will be required? Ms. Regalbuto. Thank you. The mercury storage facility, we have seen it bubble up, and I personally think it is a great idea because everybody has this orphan material all over the place, right, which is not a good way to manage it. Right now, the purview for the building of the mercury facility relies on the Office of Legacy Management. It is not under our purview. So we have given them forecasts and a number of things that can be done. I know some communities have expressed interest in hosting this facility. But I will have to get back to you with details. [Additional information follows:] In December 2008, the Acting Deputy Secretary of Energy assigned responsibility for construction of an operational elemental mercury storage facility to the Office of Environmental Management, and operations of this facility to the Office of Legacy Management. DOE issued its Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement in January 2011 and, subsequently, issued a Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement in September 2013. DOE is currently preparing the Congressional report as required by the Consolidated Appropriations Act of 2016, which will include a rough order of magnitude cost estimate for new construction of a mercury storage facility, and an estimated fee structure to fully recover the costs of operations and/or construction of such a facility. Additionally, DOE has initiated the planning and project management activities in accordance with DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. Ms. Kaptur. Ok. And what about the storage fees? Are you saying Legacy Management is the one that will take care of that as well? Ms. Regalbuto. Yes. [Additional information follows:] No. The Office of Environmental Management is preparing the Congressional report which will include an estimated fee structure to fully recover the appropriate costs of operations and/or construction of a facility for long-term storage and management of elemental mercury. Ms. Kaptur. Ok. Thank you for that clarification. I have other questions, but I am sure the chairman does as well, and I will. Mr. Simpson. Back to WIPP, we like to jump back and forth and around. It has been stated that when WIPP resumes operations, it will do so slowly, and we have heard there may be as few as five shipments a week for several months or even years. At Idaho in particular, there are hundreds of canisters of waste packaged and ready to be shipped to WIPP. Which waste will go to WIPP first? And with the improvements that you have to make to your packaging procedures, do you anticipate any of the waste at Idaho or other DOE sites will need to be repackaged? How long will it be before DOE catches up on all the true waste commitments, and particularly, how soon should DOE begin shipping waste out of Idaho to get through the backlog? What is WIPP's planned timeline for returning the pre- 2014 rate of shipments? Ms. Regalbuto. Thank you for your question. We do take WIPP starting to take care of the backlog very seriously. Let me walk you through a couple of things that are being done. In 2017, we requested sufficient funds for five shipments a week. That is, to give you a comparison, in our heydays, it was 17 shipments a week. With that, the purpose of doing that, and the reason why we cannot do 17 is because we don't have full ventilation capacity. So this is a slow ramp. Mr. Simpson. So that is what they mean when they say partial---- Ms. Regalbuto. It is a partial. Mr. Simpson. --opening? Ms. Regalbuto. When the full ventilation capacity comes into effect, then we can resume full operations, which is our goal. How do we determine WIPP? So there is a number of things that happens. One is, as part of the accident investigation report, and the fact that we need to go and relook at what is packaged and how we are going to package, we have done a number of scans throughout the complex and see if there is anything in there that could be concerning, right. So that is ongoing right now. And we have what we call the TRU Corporate Board where all the stakeholders who generate transuranic waste are part of the TRU Corporate Board, and they collectively determine what is the best way to do this. They met about a month ago, about 3 or 4 weeks ago. And the collective recommendation is that we are going to do what we call a weighted average. Basically, those who have the most get the majority of the shipments. Those who have less get the least amount of shipments, and we start moving things from all the sites. As you mentioned, Idaho has the greatest number of transuranic waste in the complex, so the weighted average is higher for Idaho, basically because of the amount of material that is currently stored. And if we look at the snapshot chart in here, you will see there is a little bit of transuranic waste generated, remote handled, that is all in Idaho. So we will be able to support those. Our plan is to increase operations as soon as the ventilation is up and running. So we will need to have, for full operations, we do need to have the complete ventilation. Mr. Simpson. Again, will any of these canisters that are already packaged have to be repackaged? Do you know? Ms. Regalbuto. From the quick scan that I have seen people doing, it is really more about what we call by waste streams. And also some waste streams in Sandia National Lab does and Los Alamos, also, but none of the other sites. We have a complete inventory of everything and we know exactly what waste stream was what and where it is. So some of them, they are suspicious if you want to call it that way, haven't been packaged. So that is an advantage. There is a small percentage of some that we will be a little more careful and set aside, but they are not in the giant number of dollars. One thing that we are investing in and we hope this technology pays for us is currently all we do is do an x-ray, and an x-ray just gives you a limited information. But if you ever had a CT scan, and I don't know if you have had the opportunity to, but I have. Mr. Simpson. Yeah, I have enjoyed those. Ms. Regalbuto. So a CT scan gives you significantly much more information. And so we already have CT scan technology in Homeland Security for cargoes that go in and out of our ports and we are actually building a prototype to scan our drums using a CT scan. So that will give us one more sense of confidence of what goes in there. Mr. Simpson. Does the ventilation system that currently exists for partial opening, would that be sufficient to address a problem that might arise should another container decide to expand beyond its ability to hold it? Ms. Regalbuto. Yes. Mr. Simpson. Explode? Ms. Regalbuto. Well, first of all, we hope we don't have that, but our strategy is not based on hope. Mr. Simpson. We hope we didn't have the first one. Ms. Regalbuto. Our strategy is not based on hope, it is based on what we have, right. So we are being extremely careful. And I jokingly say I wouldn't want to be the first drum going down the shaft because it is going to be really scrutinized. But that is what needs to happen and the ventilation will take in account. Now, remember that before the incident, we didn't have the ability to detect radioactive--airborne radiation inside the mine. And all of that has changed. So there is all the instrumentation in place to do that. Mr. Simpson. Ok. NNSA's new proposal to start shipping plutonium to WIPP, will that take up any of the limited shipping capacity? And if it is going to be years before EM catches up on its current TRU waste commitments, how will you prioritize the plutonium shipments? And is there any capacity available for adding an entirely new waste stream to the queue at all? And what exactly has NNSA asked EM to do to support its plans for the MOX alternative? Ms. Regalbuto. All right. So let me walk you through plutonium disposition. There are two types of plutonium assays, right, one that is a very low assay, which is waste, and the other one is pit material, which is very high assay. We have already disposed at WIPP low assay plutonium material because it is transuranic waste. So you have uranium on the periodic table and then you move to the right, so plutonium, neptunium, americium, and curium, so there is plutonium there, right. And that has already been--happened in an assay. They put an environmental impact statement a year ago in April, and they did select the preferred method for 6 metric tons. Again, that is low plutonium assay, which we already have disposed. If they decide to go on record of decision, and they will have to down blend, terminate safeguards, and package, which will take a number of years, and then they have to go to the queue. So the queue is determined by the stakeholders in the TRU Corporate Board. So unless somebody else is willing to give their spot, right, so they have to go to the queue as everybody else is in the queue. So that is where we are with the potential situation. Mr. Simpson. So you are saying that with the proposal currently by the Administration to down blend and package this stuff and ship it to WIPP, it won't delay the schedule of things that are already scheduled to go to WIPP? Ms. Regalbuto. Right. Those are higher priorities. You have to go to the queue. Mr. Simpson. Ok. Again, what is EM? What has NNSA asked EM to do to support their plans for this MOX alternative? Have they asked anything yet? Ms. Regalbuto. No. The MOX alternative right now, they are looking at options, and WIPP is an option, but also, all other repositories are potential facilities, could be an option. We personally are focusing on initiating waste and placement right now. So we have not done any analysis. That will be done by NNSA. Mr. Simpson. Have you reviewed the results of the red teams and the recommendations on the MOX alternative and do you see any issues implementing that alternative? Stanford University called on the Department of Energy to perform a new documented safety analysis, WIPP as a result of the proposed disposal of excessive plutonium at that facility. Also, articles have been published and the Secretary has recently testified that researchers at Sandia National Lab had looked further into the safety issues raised by outside groups concluded the risks were overstated. Have you looked at this? Ms. Regalbuto. So let me give you a little bit of background. Regarding the alternatives, I am familiar with the document. I read it a long time ago, so I don't have all the details right now in my mind. But I understand that the proposal is to down blend and dispose as opposed to converting to fuel. When one down blends and dispose, you actually take the plutonium assays and you mix it with a lot of other materials, which is classified, but it is a big mixture, right. And then you package and you dispose. So I did read in the media the concern regarding criticality. And I can only tell you a couple of things, basing it off of my engineering knowledge. And that is, one, in order for you to have criticality, two things have to occur. One is the plutonium molecules or the--not only the plutonium but the fissile material has to see each other. Ok, so they have to be close by. And second, they have to be a neutron generation. Those two things have to happen. So when you down blend plutonium or any fissile material, I mean it could be HEU for that event, same thing. When you down blend, you sparse the matrix, you know, collapsing or crunching or whatever is really not a separations method. So that would not happen. In addition, you have sodium chloride, which is one of the best neutron absorbents ever. So you don't have any neutron generation and that is why the accident is not credible. So, you know, from a point of view fissile material going critical, it is not like it is a reactor where everything is assigned to go like that. These are passive facilities. Mr. Simpson. Right. Well, and of course, the one study came out and said the idea of WIPP is that everything does get condensed eventually. Ms. Regalbuto. It gets collapsed, not condensed. Mr. Simpson. It gets collapsed? Ms. Regalbuto. So condensed means that I will have to take---- Mr. Simpson. If it doesn't get condensed, how does it get collapsed. Ms. Regalbuto. Yeah. So the same way, we have this bottle right, and we squish it and do whatever we want to do, that doesn't mean we physically separate the oxygen from the hydrogen. That takes a lot of effort. So, that is exactly the argument is you can do a lot of things here, but you really have not separated oxygen from hydrogen. And in this case you don't separate the plutonium from the matrix that it is in. It is very difficult. So it is not done by physical crunching or mechanical things. Mr. Simpson. How can there be so much disagreement on, and I don't know how much disagreement there is, but disagreement between professional individuals as yourself and other people that have made these things that say--I mean they essentially said, listen, it is not a matter of if it goes critical, it is when it goes critical. How can they be that wrong? Ms. Regalbuto. They are not wrong. It is just the probability. And, you know, there is a probability of something happening, and the way I can equate it to you is, there is a probability that I can grow 5 inches if I go to Mars, too, like the astronaut, right. But unfortunately, you know, my probability is very low that that will actually happen. But it is feasible that I could grow 5 inches if I go to space for 5 years. I think it was 2 inches per year, so maybe I will need to be there 2\1/2\. But this is based on probabilities, and some things are more credible than the others. And I think the Secretary mentioned the scenario was incredible given the circumstances. So it is not like a disagreement on the physics of things, it is really on the probability of that happening that is really the disagreement. Mr. Simpson. Ok. Mr. Fleischmann. Mr. Fleischmann. Thank you, Mr. Chairman. Madam Secretary, I have got some questions about the Manhattan Project National Park. Last November, the Manhattan Project National Historical Park became a reality, one park at three Department of Energy sites: Oak Ridge, Tennessee; Hanford, Washington; and Los Alamos, New Mexico. The park is now being created jointly by the National Park Service and the Department of Energy. My question is why was there no funding in the DOE budget request? And what is the Department of Energy doing to support opening these legacy sites to the public? Further, are there any security issues or new infrastructures that will need to be built to open these previously secret legacy facilities to the public? Ms. Regalbuto. Thank you for your question. We are actually very excited about the Manhattan National Park. In 2015, at the end of 2015, Department of Energy signed the Memorandum of Agreement with the National Park Service, which is part of the Department of Interior. And the Department of Interior manages all the park services for us and we are very happy for that collaboration. There are a couple of steps that we are following. Number one that has to occur--and this is actually a newer learning for me because I have never been in a situation where a national park is being built, so it is kind of learning for all of us. First of all, we have to have what they call a foundation document and that will be completed in 2016. Once that foundation document is provided that is what the Department of Interior calls the comprehensive interpretation plan and that is scheduled for 2017. You will see these activities and the funding request will come from the Department of Interior, but what is DOE doing in the process as we are going into this path? What we are doing is we are continuing to execute maintenance and surveillance of the facilities, but we are also rating the sites so that when these plans start being implemented, our timing of how we allow visitors to come into the areas is done properly. Right now I think you are familiar, one of our open sites already is B Reactor and B Reactor has hosted 60,000 visitors in the last 6 years and that is because we cap it at 10,000; otherwise, we cannot do it. It is run by volunteers and community members and we offered the tickets for free and the minute that they are offered, they are gone. If we offer 20,000, we will get 20,000, so we are very excited. We are using our own funds to make sure that these facilities come out to be released to the public at the right time. Mr. Fleischmann. Thank you. Final round of questions on the uranium D&D fund, Madame Secretary, the Department recently provided the committee with a report on the status of the uranium D&D fund that was directed by the fiscal year 2015 omnibus. It paints a pretty dire picture of the ability of the D&D fund to address projected cleanup costs. The report estimates that the fund ``will have a shortfall up to $19.2 billion'' and that ``without additional deposits the fund is projected to be exhausted in 2022.'' The Department of Energy's proposal to transfer a couple hundred million dollars from one fund to another seems to be a drop in the bucket in comparison to the projected shortfall and certainly not a comprehensive solution. I have three questions. What is the DOE's long-term plan for meeting these cleanup costs? Second, how much cleanup work remains to be accomplished? And thirdly, what costs have been updated since the last report? Ms. Regalbuto. Thank you for your question. We do share the same concern regarding the lack of funding for the UED&D as we move forward. We do have one thing that we have learned and that is we are about to complete this year the Gaseous Diffusion Facility at Oak Ridge. Our cost estimate is based on actually a job already being executed, which is a really good number. Our projection is that to finish the job at Portsmouth and Paducah is going to cost between 20 and $22 billion. That is the cost. Unfortunately, when the contributions to the fund were stopped back in I think it was 2006, I can't remember the exact date, but when the contributions were stopped, we didn't really know the true cost of what this job was going to take. The Secretary has been very interested in making sure that we follow the principles of polluter pays and that is something that he feels very strongly. I understand that the Department will be forthcoming with a proposal to the Authorizing Committee and also will come back and brief you at a later date related to that, but we do have really solid costs. We finished the job and we know exactly what it is. These facilities are big industrial sites and not only do they have radioactive hazards, they have a significant amount of chemical hazards that we have to deal with. So those are two main things that we have to look at. Mr. Fleischmann. Thank you, Madame Secretary. Mr. Chairman, I yield back. Mr. Simpson. Mr. Visclosky. Mr. Visclosky. Thank you, Mr. Chairman. Doctor, I understand you were confirmed on August 6th. Why did you want the job? Ms. Regalbuto. I think I am asking myself the same thing. Actually I have to tell you one thing. I have been very passionate about this type of work. I started my career at Argonne National Laboratory back in 1988, and I had just come out of grad school from the University of Notre Dame and I was pregnant with my third child and I needed a part-time job back then and when I requested a part-time job in industry they looked at me like I came from Mars. That was back in the eighties and those were different times, I understand. But I was very fortunate to be able to get a part-time job at Argonne National Laboratory. And my first job that I ever got was working with tank waste at Hanford. We were working with the transuranic--at the time it was Argonne East and West, so Idaho was part of the mix, and we were working with transuranic waste. And the plan was to take the fraction of low activity waste, high activity waste and then one was grouting, one was with petrified. We worked in the chemical process that did that. Over the years things change in terms of areas, but I also had the opportunity to work in other projects that have been implemented. For example, I was very fortunate to work with my colleagues at Idaho National Lab, Oak Ridge, Savannah River, and Argonne, too. Mr. Visclosky. You've got your bases covered. Ms. Regalbuto. Yeah. Well, are you all from here? Ok. Mr. Visclosky. If my---- Ms. Regalbuto. And we did all the cleanup work that is now the basis for SWPF at Savannah River. So I really believe in these efforts. Mr. Visclosky. I believe that you do and I appreciate as a Notre Dame grad myself---- Ms. Regalbuto. Oh, really? Mr. Visclosky. Yes. She is acting like she did not know. Ms. Regalbuto. No, no, I really did not know. Mr. Visclosky. She is acting like she did not know, Mr. Chairman. Ms. Regalbuto. I am going to have to look at your---- Mr. Visclosky. Which explains why you took the job. Mr. Simpson. The next you know she is going to tell us how good the Notre Dame football team is, right? Mr. Visclosky. No. Ms. Regalbuto. No, we do not want to go there. We do not want to go there. No, seriously, I did not realize that. Mr. Visclosky. Let me--because we have a hearing. But I will tell you, and I am deadly serious, you may have the most difficult job in the United States Government, because I have been on this wonderful subcommittee with great jurisdiction and great member staff for a long time. And I must tell you, every year when we have a hearing on environmental cleanup it is exactly the same hearing. You reference your time in the 1980s. I have a question on Hanford. I visited Hanford in the last century, and I see the same question here. I visited those tanks in the last century. On overbudget projects, it is a 5-to-1 ratio as far as those that are not overbudget compared to those that are. On Hanford, again, I see a question on proposed milestones being shifted further to the right when in the last century I visited those tanks and was told this was going along just like sliced bread, which is not your fault, but you are responsible now. I wish you well and trust that you will try to imbue everybody in your Department with a sense of urgency. I do believe, and we can have a budget conversation all day, that some of this is administration requests and congressional decisions as far as resources. I have had the privilege to be in the chairman's position as well as ranking, that at some point there is a finite amount of dollars. If we do not clean it up this year, we will clean it up this year. Well, I have been saying that since the last century, literally. So I do hope with whatever resources we are allowed to give you--and I know the chairman and ranking are killing themselves to do their very best here, there is no question about that--that you just use every dollar as efficiently as possible. And I hate to take the commissioner's time. I do have two questions, though. On Savannah River, on the processing of plutonium, have you looked at the total cost of the investment needed at Savannah River to support the NNSA's plan and the increased operating cost of securing the area? And if so, is the cost one that should be born by your Department or NNSA? Ms. Regalbuto. First of all, thank you for your confidence in me on this job and you have my full commitment that we will spend all our money that we are given to the environmental mission job wisely. And just a comment on that is we do not have the luxury of time anymore. Our infrastructure is old and the tanks are getting old. So my sense of urgency does not come from just simply wanting to get this. It is because I understand that we are beyond the point of luxury of time. The tanks are aging and we need to work on that. Mr. Visclosky. Right. But if I could ask you about the-- because I also understand if you are talking about infrastructure that the budget request is a hundred billion below this year's level. Ms. Regalbuto. The budget request for EM? Mr. Visclosky. For deferred maintenance. Ms. Regalbuto. For deferred maintenance for us is actually higher. Let me get you the deferred maintenance number. Was that--300, I want to say? Do you have the numbers? Mr. Visclosky. My understanding is the budget request for deferred maintenance is 100 million below this year's level. Ms. Regalbuto. No, let me have them check my number for you. [The information follows:] The Environmental Management program manages its deferred maintenance through an integrated facilities and infrastructure budget. Although the integrated facilities and infrastructure budget has several sub-areas that do not address deferred maintenance, overall our integrated facilities and infrastructure crosscut budget request is $15.7 million higher in 2017 than it was in 2016. Mr. Visclosky. If you could for the record. If we could get back to who should bear the cost. Ms. Regalbuto. Yeah, I would be happy to get back to you. I believe ours went up. Specifically, at Savannah River we increased--okay, what is the first--that one went down. Ok. Oh, that is the backlog. So we do have an investment in infrastructure and the investment in infrastructure is half a billion for EM across four sites: Carlsbad, Savannah River, Richland operations, and WTP--well, ORP. So those are the four and it is half a billion. It is 500 million for that. This is the backlog, unfortunately. Unfortunately, the backlog grows every year, which is a sad part. Mr. Visclosky. Who should bear the cost? Ms. Regalbuto. For Savannah River, we added an additional 30 million in infrastructure because we have some finance from the defense board in some of the buildings that were high issues. Mr. Visclosky. But on Savannah, and I appreciate that, I guess my second question was on deferred maintenance. Do you have an estimate on the increased operating costs? And again, do you believe that is your responsibility going forward if it proceeds or is that NNSA's responsibility? Ms. Regalbuto. So anything that is fuel take-back programs and things that NSSA has the purview, it is their responsibility to provide the funding for us to do so. Mr. Visclosky. For theirs, okay. All right. Ms. Regalbuto. Yes, it is. Mr. Visclosky. Thank you very much. Good luck. Thank you, Mr. Chairman. Ms. Regalbuto. Thank you. Mr. Simpson. Ms. Kaptur. Ms. Kaptur. Thank you very much, I appreciated Congressman Visclosky's emphasis on the amount of time this is taking. I wanted to ask about the funding for the environmental management program and how many of the milestones or those that you anticipate to miss over the next few years are strictly funding related and how many are due to other issues and could you discuss those issues? Ms. Regalbuto. Yes. Thank you very much. As I mentioned, a milestone is something that we take very serious. It is our commitment to the State and the stakeholders. At the point that any milestone is at risk we inform the State and the stakeholders that this will happen. We will enter into a period of negotiation in trying to address it. Some of the milestones are technical issues and some of the milestones are strictly funding, as you mentioned. I will say the majority are funding and to a lesser extent technical issues. Ms. Kaptur. I want to ask a question about the reindustrialization of cleanup sites, Doctor. As you make progress on the cleanup of the Manhattan Project sites, we always face the issue of how communities cope with that change and DOE is the primary employer at most of the cleanup sites, because those sites were initially located far from habitation. What can DOE do to promote future industrial or other uses of these cleanup sites? How early should that planning begin? And are there any examples you can describe where you think DOE has done this or other Departments have done this well? Ms. Regalbuto. Yes, we do recognize that we were number one employer, right, during the Manhattan Project and, yes, all these sites tend to be remote because that is how they got picked, right? One of the good examples that we use is Oak Ridge, at least from the EM point of view, where we really have worked with the community through the community reuse organization. Another very good example is Richland in Hanford where we have already released a significant amount of acres of our land to industrial revitalization. I will say the sooner we initiate conversations with the community, the better it becomes. Also, we do respect that the community sometimes has a desire for us to initiate cleanup in a slightly different sequence because they have a reuse program in mind, and when that happens we work with the community in going to the priorities that allows them to release the land or use the land sooner. At Oak Ridge, we were still doing D&D for the East Tennessee Technology Park and, at the same time, we have a number of small businesses moving in, so we coordinated that as we work our way out of the demolition jobs. Ms. Kaptur. I really appreciate your openness to this and as I said at other meetings, I think one of the greatest weaknesses of the Department of Energy because of the way that it was set up is that it doesn't think about place and I have often wondered whether it does need additional authorities to do that. This Secretary is trying very hard to think that way. And if I look at Ohio and the Piketon area and the D&D activities that are anticipated there, those are probably the highest unemployment counties in Ohio. So as this ratchets down one of the difficulties DOE really has, in my opinion, is working cross-departmentally, across the Federal establishment, to work with the Department of Labor, let us say, several of the trades that are onsite, looking at some of the new clean energy initiatives. I do not know what those counties would want to do. I don't represent those counties, but I really think that our country could do a much better job of transitioning these people and communities. We saw this in the coal situation where because of the mothballing of old coal-fired utilities you have entire States, our chairman from Kentucky, Mr. Rogers, experiences this firsthand. And Ohio, southeastern Ohio, is a tragedy in terms of what has happened in that industry, but it seems like we cannot catch up to ourselves. It is like we are too stovepiped at the Federal level. So as you work through this, if you have recommendations to us on additional authorities you might need, I think you could sign interagency agreements. I am not sure you need any additional authority, but it just seems to me that the Federal Government is too far away from where people live and you have such massive responsibilities just on the technical side, this really is not in your portfolio exactly. But it sure would be fine to see a way of approaching these communities, as you say, that we plan ahead, we work with the people there, and we do our best to minimize damage to human beings and their livelihoods. So I want to encourage you on in those efforts and I thank you for listening to that. I wanted to ask one additional question in this round on the Manhattan Project National Park, which is our newest national park authorized by the 2015 Defense Authorization Bill actually, and there was no funding. And my question is what is DOE doing to support opening these legacy sites to the public and are you paying for the cost of the national park? And is this a cost, as we believe it is, of the Department of Energy instead of the cost of the Park Service? Ms. Regalbuto. As you mentioned, we reached the agreement with the Department of Interior on the National Park Services in 2015, and actually that was really a great opportunity for us to get kickstarted. I know that many people worked very, very hard over the years to make this happen. In 2016, we have to combine it and it is led by the Department of Interior. We have to deliver the foundation document. And this is all news to me because I am used to a NEPA process and surplus and whatever, but they do have a process, too. And after the foundation document is delivered, then they have what they call a comprehensive plan. And in the plan is where it spells out what is going to be needed, the funding, and the likes. This will be part of the Department of Interior. With that said, we also have responsibilities on the EM side, and that is we continue surveillance, we continue to execute the mission so those parcels of property become ready for public access, and our job really is to coordinate as Interior moves forward to make those pieces of property available. We also have the responsibility for long-term surveillance of any of the sites because of the type of materials that were present in the past. I was mentioning before, the B Reactor in Hanford has received already 60,000 visitors in 6 years. That is already open to the public. If we could give more tickets, more people would come. It really is a destination area, and we have busloads of folks coming in who want to see the reactor. So, that one is already ongoing, and it will be folded into as part of the Manhattan Project National Park, but some areas are already open. We are very happy for that. Ms. Kaptur. So, on the Manhattan Project National Park, how is that cost-shared? Is it half and half, if you look at the total cost of operating those? Ms. Regalbuto. The cost of operating will have to be negotiated after they have the comprehensive plan, but we are responsible for cleaning the sites. So, what we spend is money that is used to clean up our sites. Ms. Kaptur. And what are you paying--what are you asking for this next fiscal year of 2017? Ms. Regalbuto. It is not a line item. It is embedded in the operations of Richland, Oak Ridge, and Los Alamos, for whatever pieces we are responsible for. So, if our job is to do surveillance, it would be embedded in there, but if you would like us to give you some more detail, I will be happy to do that. [The information follows:] The Department of Energy is responsible for sites within the Manhattan Project National Historical Park at Richland, WA; Oak Ridge, TN; and Los Alamos, NM. At these sites, the Office of Environmental Management is currently responsible for funding the surveillance and maintenance of the B Reactor at the Hanford Site in Richland and the Graphite Reactor at Oak Ridge. The budget request in FY 2017 for surveillance and maintenance of these facilities is about $2.5 million. This funding covers not only surveillance and maintenance activities, but also facilitates public access for visitors. The Office of Environmental Management has no current responsibilities for maintaining facilities or coordinating visits to Manhattan Project National Park facilities at Los Alamos. Ms. Kaptur. I think that would be very helpful to us. Are all those facilities safe for public access? Ms. Regalbuto. We do not open the whole site. We only open segments of the sites, and we have to make sure they are available, 100 percent safe for the public to come. Otherwise, we cannot use those facilities. Ms. Kaptur. Will you have to build new infrastructure? Ms. Regalbuto. No, all is existing. So, if you have a chance to go to B Reactor, you actually get to go to the control room with the original furniture that was in there. Of course, we removed all the radioactive materials and the like, but there is really no cost, and it is usually manned by volunteers who used to work in those facilities. The tours are very good. They are really, really good. Ms. Kaptur. Thank you very much. Mr. Simpson. I always ask this question, for the last 15 years or so. How are we progressing about moving facilities to EM that need to be moved to EM and getting them out of the laboratory part of the budget? You know, I am smart enough to understand that the laboratory people would like to have that moved to EM and have the responsibility go to EM, but the money to stay. My concern is, I want to know what our total responsibilities are on EM and what our reliabilities are on EM, so I want those things moved to EM that ought to be done by EM. Over the years, we have been trying to move that process along. How are we doing with that? Ms. Regalbuto. So, right now, we have not moved any new facilities to the EM side in the last few years, mainly because of budget constraints. So, once you get into---- Mr. Simpson. But the budget constraints--this is paper stuff. It is money that we are spending somewhere right now. What I want to know is what is our liability in the future. Ms. Regalbuto. Yes, somebody owns that liability no matter what; yes. Mr. Simpson. Right. Ms. Regalbuto. I do not know the exact amount until the report comes out, which will tally out the total liability regardless of who owns it, as to your point. We will come back and brief you on that. That exercise is ongoing, and that was one of the number one priorities, the Secretary wanted to know how much is still there, regardless of what office it does belong. So, we will have to come back to you, but it is part of this---- Mr. Simpson. Ok. Then we can make a determination about where it belongs, so we know what our total liabilities are in the future. That is what we have been trying to accomplish over the last several years. One final question for a colleague that is not here today, but I am sure I am going to be asked about it by that colleague and others. The largest reduction in your budget request is for the Richland Site office which is reduced $206 million below last year's. Why such a steep reduction, and can DOE fulfill all of its commitments to clean up the River Corridor at this funding level? DOE recently proposed shifting some clean up milestones for Richland back in order to concentrate on a tank mission at Hanford. Has the State weighed in on these proposals? Ms. Regalbuto. Thank you for your question. First, the request is $800 million, which is, you know, $190 million below the appropriated funds from last year. We do have a significant amount of carryover from the bump up we got the year before. Still remaining in the funding is areas of significant progress that we have done, and in order to do risk reduction, so PFP will be completed to a slab-on-grade this year, it will be done, and as you remember, it was the number one most dangerous building in the whole complex. So, we are very happy to have moved that one off the list. We also continue to do cesium and strontium capsule packaging in order to get it out of the old building, and the infrastructure is going down, and we will get out of there. In the same process, we are moving sludge out of the River Corridor, so we are packaging, procuring equipment, and initiating operations in order to start moving that area's sludge into the Central Plateau. So, that is still funded. We have also the 324 building, we are still working on the technology development for the soil underneath, and that will be done this year, so we can initiate that. The 618-10 burial grounds, we are also working on some of the vertical pipe units. So, that is ongoing. We recognize it is less than the appropriated funds from last year, but it is not at the expense--we really do look across them, and there are other sites that---- Mr. Simpson. So, is it accurate to say you do not anticipate any layoffs at Richland based on this budget? Ms. Regalbuto. Not as of today. Mr. Simpson. Let me ask, do other members have questions? Do you have more questions? I have to leave for a meeting. My Vice Chairman is going to take over here. Thank you for being here. I think what Mr. Visclosky said is absolutely true, you do have the toughest job in the Federal Government. Like most tough jobs, all of us that sit on the sidelines could do it better. That is the way we usually think, you know. Ms. Regalbuto. You are welcome to come and help. Mr. Simpson. We are great armchair quarterbacks. Thank you for the work you do, and we look forward to working with you. Ms. Regalbuto. Thank you very much. Thank you, sir. Mr. Fleischmann [presiding]. Madam Secretary, hello again. I am going to defer to the ranking member, Ms. Kaptur. Ms. Kaptur. Thank you very much. I think it is important for the record, for those who may be listening to our words, that your request for close to $6 billion this year actually constitutes a very large share of DOE's entire budget, much larger than other programs. I think of weatherization of $270 million. So, this is a very, very important office that you head. In terms of overbudget projects, it is my understanding that Environmental Management has about $15 billion worth of ongoing projects that are still considered to be either behind schedule or overbudget, and many of those do not have a valid project baseline against which project performance can be measured. For instance, there have been some references made to this, the Waste Treatment Plant, the most expensive project in the entire Federal Government, was last estimated in 2006 to cost $12.3 billion, and that was before DOE became aware of major design flaws. What is the current estimated cost for completing that project? Ms. Regalbuto. Thank you for your question. We do share your concern regarding project management and escalating of costs. This has been something that the Secretary has taken very seriously, and we have a number of initiatives that we are putting forward, including new project oversight, specifically WTP. We have an owner's rep that was recommended in the past for us to hire, so we hire persons to oversee WTP. We also have a revision in cost estimates and also assessment fees for performance, which is supporting the Secretary's strategy. Regarding WTP, the cost is still listed as $13 billion, as you correctly pointed out. We are in the process of rebaselining that cost estimate, and that is really because we are taking out of the original contract--which was really all WTP--taking out the phased approach, which includes the Low Activity Waste, the Balance of Plant, meaning the infrastructure needed to support that, and then the labs, so we can initiate that project by 2022. We are engaged in negotiations with the contractor, we are about to finish those negotiations, and once those negotiations are completed, we will rebaseline and we will provide that information to the committee. Regarding the rest of---- Ms. Kaptur. May I ask, why does it take until 2022, just lack of money? Ms. Regalbuto. To initiate the facility? To commission the facility, yes, 690 per year. We have to distribute those costs. That is the target date for operations. Ms. Kaptur. So, you cannot really state the current estimated cost for completing the project? Ms. Regalbuto. Once we finish the negotiations with the contractor, which should be very, very soon, we will come back and provide that information to the committee, but it will be rebaselined, yes. Ms. Kaptur. Do you expect it to go up? Ms. Regalbuto. Yes. Ms. Kaptur. A lot? Ms. Regalbuto. Yes. Ms. Kaptur. Thank you very much. Let me ask you about replenishing the Uranium Enrichment Decontamination and Decommissioning Fund. The Department recently gave the committee a report on that, and it states that the fund will have a shortfall of up to $19.2 billion, and without additional deposits, the fund is projected to be exhausted in 2022. Your Department's proposal is to transfer a couple hundred million dollars from one fund to another. It seems to be a drop in the bucket in comparison to the projected shortfall you will be facing. Your proposal does not seem to be a comprehensive solution. What is DOE's long-term plan for meeting these cleanup costs? Ms. Regalbuto. So, thank you for your question, and we do share with you the fact that these costs are significantly higher. One of the areas, as I mentioned, is we will be completed with the first gaseous diffusion facility at Oak Ridge. So, we now know the true cost of what it takes for these facilities, and then we have Portsmouth and Paducah, which are very similar, all three facilities were almost identical. The to-go cost for those two facilities is anywhere between 20 and $22 billion. This is based on real work that we did at Oak Ridge. Ms. Kaptur. All of them? Ms. Regalbuto. Yes, the two sites, Portsmouth and Paducah. Recognizing that, unfortunately, when the contributions to the UED&D Fund stopped by the people that use those enrichment facilities, we did not really know the cost of this job. So, we stopped it too soon. There has been some estimates that it is about a quarter of a million per kilowatt hour, which is really the fair cost of doing the decommissioning of these facilities, and the Secretary has proposed some language, and the department will be forthcoming with these proposals, but basically going back to the principle that the polluter pays. So, it is a combination of not having the complete costs at the right time when we stopped the contributions to the fund. I do understand the concern, and once we start moving into this area, I will be very happy to work with you and the committee because we do need a long-term plan for these facilities. The workforce needs to be stable, and one of the reasons why we are looking at this proposal is to provide some stability and funding at least for a few years until we really fix the big problem, which is the 20 to $22 billion. It is important that we proceed with this. These are very large complexes, they are almost little cities, the two of them are little cities right now. Ms. Kaptur. What was your reference to trained individuals to do the job? Could you expand on that? Ms. Regalbuto. Yes. We do have a number of things that we would like to implement, and one is training as the number one priority. We do have a very good workforce and they are coming from other facilities, especially in Ohio, that we can train to do the kind of work that we do. We also have a very nice initiative which is a robotics initiative, and it is our view that the same way we transfer a lot of the knowledge in robotics from Homeland Security to the police departments, we can do that in the environmental management arena. So, we are working with some of the employment groups. In fact, we will be visiting Sandia next week, because they were the ones who did this for the police department, so the goal is what we call the ``safety of science,'' but it has to be driven by the workers, not by us, right, because the workers know what tools do and what tools do not benefit them. There are a number of tools that we have that are really much more modern, and make their quality of life significantly better. What I like the most is it allows them to transfer this knowledge to other areas, so we joined the National Robotics Initiative. I will give you an example. The same prosthetics that were used and are targeted are used by the National Institutes of Health, because the population is getting older and people have to lift patients and the like, so the same exoskeleton that is used to lift is what we will use to lift a piece of equipment. Once they are trained in that area, they do not even have to stay with us, although I wish they would, because we pay for them and train them, but they can actually get jobs outside. Ms. Kaptur. Does your training account for part of the basic budget or is it a separate account? Ms. Regalbuto. It is under technology development. We also joined the National Science Foundation. There is some money there, go directly to universities. The goal is to have a workers, the universities, and the national labs triangle. Ms. Kaptur. Is there a way your Department or your office could provide to us the types of workers? How do you categorize the skills or the hiring categories? Are you able to do that, the kinds of workers you need to train? Ms. Regalbuto. You know, I am sure we can find that out. I am not familiar with those statistics. I can check for you. One of my goals is really to remove the amount of hazards that a worker has to face in a single day. So, to give you an example, in the U.K., when you walk into a facility that is contaminated, the first crew has to go and find out where all the hot spots are. That is a risk. Those are the first ones that go in. In the U.K., they put little drones in and they map the room before they go in. That is the kind of thing that we would like to teach our workers to use themselves in order to go into a facility without putting them in hazards which is unnecessary with technology. Ms. Kaptur. Do you know how many of your workers are union workers? Ms. Regalbuto. A significant amount of them are. Ms. Kaptur. I am interested because one of my interests for the Department as a whole is to get a better relationship between the training academies of these various skilled trades, and what tends to happen with the Department's relationships is they go to community colleges and universities, and I am not against that. However, in our part of the country, we have major training academies, whether you are a plumber and pipefitter, whether you are an electrician, whether you are an ironworker, where they are teaching. It has been my experience with the Department of Energy that they do not even realize--they do not even have a list of where these academies are. That was shocking to me, particularly in the area of nuclear power where it was, in fact, these trained workers, not because of the Department of Energy and not because of the local energy company, but because of the building trades that trained these workers, that literally saved thousands of lives in my part of the country because of what they detected in a faulty plant, nuclear plant. So, somehow we have to figure out a way of at least introducing the Department to the leaders of these academies, and if you are open to that, in terms of your skills training, I would love to find a way for you to meet some of them, where they are actually operating schools, big ones. Ms. Regalbuto. I appreciate the comment of the disconnects because we do have periodic meetings with the building trades. I am not sure if you are familiar with HAMMER, our facility in the State of Washington, and the National Training Center. Those we do jointly with the trades. What we are working on right now, and it will be ready roughly in a month, is one of the things we noted and it has been brought up to us by the building trades, is the ability to move from job to job, and the fact that you have to be qualified, so we are merging those two. And we are going to have the cost of reciprocity, where you reciprocate training that you took in one area to another, so I personally am taking Worker I and II, and so are they. It also allows us to have a population of workers that are already certified and the skill set is ready. Ms. Kaptur. Right. Ms. Regalbuto. So, we are working with the unions who are part of the National Training Center and HAMMER. With that, we also recognize that geographically, sometimes it is difficult to go out west or southwest, and they also have themselves some of these other training academies. We have a very successful program in Aiken with Aiken Community College, where we actually certify people to go work in the nuclear industry. We started that because there was a shortage of workers, because they were all going to work for the reactor operator for the AP-1000. So, we would train people and they will go work in this other area. We started a center, which has been very successful. We can duplicate this model, obviously with the caveat that every community has different needs, but through the community colleges is a very successful way to do this. A lot of the training can be done there. We also have for the first time this year what we call a ``trainership program,'' and the Secretary initiated a trainership program. We put it out for competition. The university will be announced. That is also to bring people to work with us that do not have traditional backgrounds. So, if you were an electrical worker, trained, you will have a background on nuclear, so you understand the hazards, with the understanding that we need mechanics, electricians, everything, not just people in the waste packaging arena. So, we are expanding because our population is aging, and we are going to need to replenish all our workers in the next 10 years or so. Ms. Kaptur. Well, if you are ever flying over Ohio, I would ask you to parachute down, and I would like to introduce you to some incredible workers whose training was amazing in what they did and their bravery in a couple of situations that was historic. I do not think they get the kind of recognition that they deserve, so it might be really interesting to host a meeting at one of these training academies, I would say probably the electrical, because there are two parts to the electrical union, and one works in nuclear power plants. Just to put on the record, what motivates me is that they were aware of certain things happening in this particular plant, and ultimately, it was not under your jurisdiction, it was the Nuclear Regulatory Commission, but the plant had to be shut down because the head on the reactor was subject to coming off. As the NRC began investigating what went wrong, they followed where these workers had stayed in various hotels, and there were nuclear particles in the hotel rooms. These people were carrying nuclear particles themselves. So, it is the new century--actually, it was at the end of the 20th century, and this is how we continue to treat workers in America. I am really driven on this. I would just like to watch an interaction between some of your representatives with some of our training academies to see if we cannot do a better job, and giving them a pathway to work with the Department of Energy more directly. What tends to happen in our area is if the community colleges are involved in training, they hire these people to do the training. I do not sense that there is that direct a connection with the Department of Energy in our region of the country. Maybe it is different in Indiana, maybe it is different in Tennessee, but I would just make that request. Ms. Regalbuto. I would be very happy to parachute and come over and visit. We are very sensitive to developing the next generation of the workforce. A very large percentage of our workforce, about 40 percent, can retire today. They will not have the benefit of the training that we had, working in these facilities when they were in production mode. So, we take very seriously who is going to be here in the next 10 years. I would be more than happy to do that, and there are other people in the department that will be very interested in doing this, too. Ms. Kaptur. Thank you. I do not want to inconvenience you, but when you find the right person, please let us know. Ms. Regalbuto. Yes, we will definitely put them in touch. Ms. Kaptur. Thank you. Ms. Regalbuto. Thank you. Mr. Fleischmann. Thank you, Ranking Member Kaptur. Mr. Visclosky, do you have any questions? Mr. Visclosky. No, thank you, Mr. Chairman. Mr. Fleischmann. Madam Secretary, in closing, again I want to thank you for coming before our subcommittee today, appreciate your answers to these difficult questions, and I, too, thank you for approaching this very arduous task that you have. It is very difficult. Again, I want to welcome you to the Nuclear Cleanup Caucus, April 20. We have communities, business interests, contractors, labor unions. We all come together to work together to try to solve this problem. As a matter of fact, the Nuclear Cleanup Caucus has become somewhat of a model. I know Ranking Member Kaptur is the national co-chair of the Automotive Caucus, and I am a vice chair, and we are actually using this model to try to make that a much more successful caucus. I look forward to working with you, and of course, with her, and I thank you for being with us today. Ms. Regalbuto. Thank you very much. Thank you, sir. Mr. Fleischmann. The subcommittee is adjourned. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] W I T N E S S E S ---------- Page Baran, Jeff...................................................... 1 Burns, Stephen................................................... 1 Hoffman, Patricia................................................ 49 Kotek, John...................................................... 49 Murray, Cherry................................................... 149 Orr, Franklin...................................................49, 149 Ostendorff, William.............................................. 1 Regalbuto, Dr. Monica............................................ 213 Smith, Christopher............................................... 49 Svinicki, Kristine............................................... 1 [all]