[H.A.S.C. No. 114-129] Aviation Readiness

Committee on Armed Services · Subcommittee on Readiness House July 6, 2016

Witnesses (4)

  • Davis, LtGen Jon M., USMC, Deputy Commandant for Aviation, U.S. Marine Corps
  • Manazir, RADM Michael C., USN, Deputy Chief of Naval Operations for Warfare Systems, U.S. Navy
  • Mangum, LTG Kevin W., USA, Deputy Commanding General, U.S. Army Training and Doctrine Command, U.S. Army
  • West, Maj Gen Scott D., USAF, Director of Current Operations, U.S. Air Force

From the witness list in the published hearing record.

Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.

- [H.A.S.C. No. 114-129] Aviation Readiness

[House Hearing, 114 Congress]
[From the U.S. Government Publishing Office]

 [H.A.S.C. No. 114-129]

 AVIATION READINESS

 __________

 HEARING

 BEFORE THE

 SUBCOMMITTEE ON READINESS

 OF THE

 COMMITTEE ON ARMED SERVICES

 HOUSE OF REPRESENTATIVES

 ONE HUNDRED FOURTEENTH CONGRESS

 SECOND SESSION

 __________

 HEARING HELD

 JULY 6, 2016

 
[GRAPHIC NOT AVAILABLE IN TIFF FORMAT]

 __________
 
 
 U.S. GOVERNMENT PUBLISHING OFFICE
20-796 WASHINGTON : 2017 
____________________________________________________________________________________
For sale by the Superintendent of Documents, U.S. Government Publishing Office, 
http://bookstore.gpo.gov. For more information, contact the GPO Customer Contact Center, 
U.S. Government Publishing Office. Phone 202-512-1800, or 866-512-1800 (toll-free). 
E-mail, [email protected]. 

 SUBCOMMITTEE ON READINESS

 ROBERT J. WITTMAN, Virginia, Chairman

ROB BISHOP, Utah MADELEINE Z. BORDALLO, Guam
VICKY HARTZLER, Missouri SUSAN A. DAVIS, California
AUSTIN SCOTT, Georgia JOE COURTNEY, Connecticut
ELISE M. STEFANIK, New York TAMMY DUCKWORTH, Illinois
FRANK A. LoBIONDO, New Jersey SCOTT H. PETERS, California
MIKE ROGERS, Alabama TULSI GABBARD, Hawaii
CHRISTOPHER P. GIBSON, New York BETO O'ROURKE, Texas
RICHARD B. NUGENT, Florida RUBEN GALLEGO, Arizona
BRAD R. WENSTRUP, Ohio (Vacancy)
SAM GRAVES, Missouri
STEVE RUSSELL, Oklahoma
 Margaret Dean, Professional Staff Member
 Vickie Plunkett, Professional Staff Member
 Jodi Brignola, Clerk
 
 
 C O N T E N T S

 ---------- 
 Page

 STATEMENTS PRESENTED BY MEMBERS OF CONGRESS

Bordallo, Hon. Madeleine Z., a Delegate from Guam, Ranking 
 Member, Subcommittee on Readiness.............................. 2
Wittman, Hon. Robert J., a Representative from Virginia, 
 Chairman, Subcommittee on Readiness............................ 1

 WITNESSES

Davis, LtGen Jon M., USMC, Deputy Commandant for Aviation, U.S. 
 Marine Corps................................................... 3
Manazir, RADM Michael C., USN, Deputy Chief of Naval Operations 
 for Warfare Systems, U.S. Navy................................. 8
Mangum, LTG Kevin W., USA, Deputy Commanding General, U.S. Army 
 Training and Doctrine Command, U.S. Army....................... 5
West, Maj Gen Scott D., USAF, Director of Current Operations, 
 U.S. Air Force................................................. 6

 APPENDIX

Prepared Statements:

 Davis, LtGen Jon M........................................... 45
 Manazir, RADM Michael C...................................... 75
 Mangum, LTG Kevin W.......................................... 56
 West, Maj Gen Scott D........................................ 65
 Wittman, Hon. Robert J....................................... 43

Documents Submitted for the Record:

 [There were no Documents submitted.]

Witness Responses to Questions Asked During the Hearing:

 Mrs. Hartzler................................................ 85

Questions Submitted by Members Post Hearing:

 Mr. Peters................................................... 89
 Ms. Tsongas.................................................. 89

 AVIATION READINESS

 House of Representatives,
 Committee on Armed Services,
 Subcommittee on Readiness,
 Washington, DC, Wednesday, July 6, 2016.
The subcommittee met, pursuant to call, at 10:03 a.m., in room 
 2118, Rayburn House Office Building, Hon. Robert J. Wittman 
 (chairman of the subcommittee) presiding.......................
 OPENING STATEMENT OF HON. ROBERT J. WITTMAN, A 
 REPRESENTATIVE FROM VIRGINIA, CHAIRMAN, 
 SUBCOMMITTEE ON READINESS
Mr. Wittman. I am going to call to order the House Armed Services 
 Committee, Subcommittee on Readiness...........................
I wish everybody a good morning, and thank you for being here 
 today to discuss a topic that is instrumental to the success of 
 our military operations, and that is aviation readiness........
Over the last several months, we have heard testimony from each 
 of the service branches about what needs to be done to overcome 
 our significant readiness challenges. A critical part of that 
 testimony has dealt with the negative impacts that aircraft 
 shortages, maintenance, and lack of adequate hangar space 
 continue to have, not only on our overall readiness levels, but 
 also on our military aviators..................................
In separate hearings about naval infrastructure readiness, both 
 Admiral Mary Jackson and General Azzano testified about 
 aircraft hangar fire suppression systems that were unusable and 
 inadvertently activated........................................
At the Air Force hangar at Eglin Air Force Base, the instability 
 of these systems ultimately rendered the entire hangar unusable 
 for nearly 3 months. The impacted portion of the hangar, 17 
 percent of that hangar's airspace, remains today unusable......
The Marine Corps and the Army face similar facility challenges. 
 The service branches also face real obstacles when it comes to 
 the retention and training of flight and maintenance crews. 
 Aging aircraft and prolonged maintenance times, not to mention 
 the operational demands associated with the fight against 
 terrorism, means that aviators and other personnel are dealing 
 with more danger and fewer training opportunities..............
Regrettably, the rash of recent military aircraft crashes have 
 highlighted the human and other cost of dwindling aviation 
 readiness. We owe our warfighters every protection and 
 precaution available and I look forward today to hearing from 
 each of our service branches about aviation readiness, 
 readiness recovery, impacts to safety, and where we can 
 continue to take risks and what risks are acceptable and those 
 which are not..................................................
With that, I welcome all of you, our members of our distinguished 
 panel and senior aviators before us today. We have with us 
 Lieutenant General Jon M. Davis, United States Marine Corps, 
 Deputy Commandant for Aviation; Lieutenant General Kevin 
 Mangum, U.S. Army, Deputy Commanding General, U.S. Army 
 Training and Doctrine Command [TRADOC]; Major General Scott D. 
 West, United States Air Force, Director of Current Operations; 
 and Rear Admiral Michael C. Manazir, United States Navy, Deputy 
 Chief of Naval Operations for Warfare Systems..................
Gentlemen, thank you for your presence and your testimony today. 
 I look forward to hearing your insights about the readiness 
 challenges to military aviation................................
I would now like to turn to our ranking member, Madeleine 
 Bordallo, for any remarks that she may have....................
[The prepared statement of Mr. Wittman can be found in the 
 Appendix on page 43.]..........................................
 
 STATEMENT OF HON. MADELEINE Z. BORDALLO, A 
 DELEGATE FROM GUAM, RANKING MEMBER, 
 SUBCOMMITTEE ON READINESS
 
Ms. Bordallo. Thank you very much, Mr. Chairman, and good morning 
 to all our witnesses. I thank you, Mr. Chairman, for holding 
 this hearing about some of the challenges and the solutions 
 that we are facing with regard to aviation readiness across the 
 services. We know that readiness shortfalls exist, from 
 degraded maintenance capabilities to reduced training hours, 
 and we need to address them....................................
Just as it will take time to build back readiness, these issues, 
 of course, did not arise overnight. What the services are 
 experiencing now and what we are working to remedy in the 
 fiscal year 2017 NDAA [National Defense Authorization Act] are 
 the consequences of years' worth of high operational tempo 
 experienced by fewer aircraft with fewer experienced operators 
 and skilled military and civilian personnel to sustain them....
The services have responded to falling material readiness 
 conditions by identifying deficits and prioritizing training 
 and maintenance needs, but these efforts are hampered by the 
 continuing impacts of sequestration and unstable and 
 unpredictable funding. When coupled with reductions in skilled 
 personnel at aviation depots, severe challenges in obtaining 
 spare parts for legacy systems, late and unpredictable funding 
 due to multiple continuing resolutions [CRs] and the 
 unrelenting operational tempo required by today's complex 
 security environment, it is not surprising that we are dealing 
 with what some are calling a readiness crisis..................
Just as these readiness issues did not arise overnight, they 
 cannot be resolved in a single fiscal year's defense bill. More 
 aircraft would bring some relief to the stress of high 
 operational tempo, but these aircraft need more trained, more 
 ready personnel to operate and sustain them and improved base 
 infrastructure to support them.................................
So, we also cannot just throw money at the problem though, and it 
 has become clear that consistency in funding are more helpful 
 than increased budgets.........................................
I welcome this opportunity today to hear from our witnesses about 
 the challenges they are facing in their services to achieve and 
 sustain aviation readiness. And I also encourage my colleagues 
 to listen to some of the underlying causes of our current 
 situation and also to think about the long-term financial 
 commitments we are making in the fiscal year 2017 NDAA.........
And I thank you, Mr. Chairman, and yield back....................
Mr. Wittman. Thank you, Ms. Bordallo.............................
Gentlemen, I have been told that each of you will make an opening 
 statement. And please proceed. And as a reminder, your written 
 testimony has already been made available to the members and 
 will be part of the official record............................
So, General Davis, we will begin with you........................
 
 STATEMENT OF LTGEN JON M. DAVIS, USMC, DEPUTY 
 COMMANDANT FOR AVIATION, U.S. MARINE CORPS
 
General Davis. Chairman Wittman, Chairman Thornberry, Ranking 
 Member Bordallo, distinguished members of the House Armed 
 Services Committee, Subcommittee on Readiness, and other 
 distinguished members, thank you for your continued support. We 
 appreciate the opportunity to testify on the current state of 
 Marine aviation readiness......................................
The Marine Corps' title 10 responsibilities are to be the 
 Nation's force in readiness. We are charged and expected to 
 always be the most ready when the Nation is least ready. This 
 responsibility is the very core of our identity as Marines, 
 your ``fight tonight'' force...................................
The last time I testified, we were only able to fly on any given 
 day about one-third of our aircraft. Today, we have improved 
 and can launch 42 percent, 443 aircraft, of our required 1,065 
 flight-line inventory, a 9 percent improvement. We could not 
 make this progress without your support. Thank you very much. 
 However, we are still far short of what we need to be the force 
 of readiness. Forty-two percent is not good enough; it is not 
 good at all....................................................
We are constantly transferring aircraft to fill out our deploying 
 squadrons. Deployment success is at the cost of our non-
 deploying squadrons. We balance F-18, Harrier, E-6, and CH-53 
 squadrons by reducing the number of aircraft per squadron 
 because of a lack of aircraft inventory........................
So, yes, while I can tell you we are improving, I would 
 characterize our current state of recovery as fragile. We are 
 in a deep hole and have a ways to go to climb out. Continued 
 progress in our race to recovery depends on consistent, 
 reliable, and targeted readiness and procurement funding. Our 
 risk is bought down through fixing old and procuring new.......
The CH-53K recently lifted more than any helicopter in history. 
 It is doing great in tests and is on track for replacing our 
 CH-53 Echo. Just last week, we stood up our second operational 
 F-35B squadron, VMFA-211 in Arizona............................
Today, we have five lieutenants, brand new guys, training to fly 
 the F-35B in South Carolina. The F-35B procurement ramp is 
 approaching 20 per year, enabling the transition from our 
 legacy strike force to an aircraft that can protect marines and 
 any threat as a fifth generation strike fighter, and then, at a 
 time and place of our choosing, transition to a fourth 
 generation bomb truck..........................................
We need the F-35s and 53Ks as quick as we can get them to replace 
 our proven but worn-out and wearing out F-18s, Harriers, EA-
 6Bs, and CH-53 Echos. The combination of fixing aircraft while 
 recapitalizing with new gear are both critical to Marine 
 aviation and the Marine air-ground task force [MAGTF]..........
I measure our recovery not only in terms of ready basic aircraft, 
 but also on how many hours our crew fly. The ultimate readiness 
 metric is aircrew flying hours per month per crew. The last 
 time I testified, Marine pilots averaged between 6 and 9 hours 
 per month. That is not good, either. Today, our non-deployed 
 aircrews average between 7 to 11 hours per month. This is an 
 improvement, but still 6 hours per month shy of what a trained 
 and ready force requires.......................................
The lack of ready aircraft in flight line is a reason for the 
 shortfall, but more concerning is the loss of experience this 
 generation of Marine aviators has preparing for the future. 
 Marine aviation has a history replete with being exceptional in 
 the air and able to provide unmatched aviation fire support to 
 our ground forces. Every hour not flown today by our forces 
 today means that they will have less of an experience base for 
 our future.....................................................
Our enlisted marines are the highest quality ever. They work hard 
 to sustain our aircraft and maximize every flight opportunity. 
 They do get frustrated at the lack of parts available for 
 fixing aircraft. They do work hours--long hours and weekends 
 just before deploying to get that last aircraft up to make that 
 on deployment or to complete a transfer to make sure their 
 deployment numbers are whole...................................
Our deployment-to-dwell is not an ideal 1:3. It is a sustained 
 1:2; technically a state of surge. We are answering the 
 combatant commanders' demand for incredible capabilities our 
 MAGTFs offer, but doing it with aging aircraft, not enough of 
 those aircraft, and our marines are stretched thin. They are 
 doing their level-best to make themselves ready to be that 
 potent and formidable combat-capable force, ready to take on 
 any threat, any place, any time across a range of military 
 operations.....................................................
In summary, Marine aviation readiness remains in jeopardy in this 
 fiscally constrained environment. We have a plan to recover. 
 The plan includes aircraft recapitalization, legacy aircraft 
 recovery and reset, and that plan is showing positive results. 
 But success requires continued funding stability, our 
 production ramps in new aircraft to stay whole and the 
 resources for our marines, sailors, civilians, and industry 
 partners to recover the readiness of our aging legacy aircraft.
Thank you for your time today. I look forward to answering your 
 questions......................................................
[The prepared statement of General Davis can be found in the 
 Appendix on page 45.]..........................................
Mr. Wittman. Thank you, Lieutenant General Davis.................
We will now go to Lieutenant General Mangum......................
 
 STATEMENT OF LTG KEVIN W. MANGUM, USA, DEPUTY 
 COMMANDING GENERAL, U.S. ARMY TRAINING AND 
 DOCTRINE COMMAND, U.S. ARMY
 
General Mangum. Chairman Wittman, Chairman Thornberry, Ranking 
 Member Bordallo, distinguished members of the Readiness 
 Subcommittee and other distinguished members, thanks for the 
 opportunity to appear before you today to address Army aviation 
 readiness......................................................
As a career Army aviator, I am proud to represent all the 
 terrific soldiers of our total Army aviation force who serve 
 our Nation faithfully every day. I can also definitively say 
 that the total Army aviation units across all our formations 
 and components have performed magnificently over the last 15 
 years of sustained combat and operations in various threat 
 environments...................................................
I say this knowing full well that Army aviation faces the same 
 and similar challenges and concerns as the rest of our Army in 
 this budget-constrained environment............................
Our aviation modernization and procurement accounts have slowed 
 to a snail's pace in order to build readiness for the current 
 fight. We have had seven serious manned mishaps, or Class A 
 accidents, and eight unmanned accidents thus far this fiscal 
 year. Flight training hours are our only resource to achieve 
 platoon-level readiness, proficiency...........................
And our aviation maintenance soldiers and our combat aviation 
 brigades are not deploying with their aircraft and aircrews, 
 which is causing an atrophy of critical skills that will be 
 needed for expeditionary operations in combat zones that do not 
 allow for contract maintenance.................................
While we have resourced our deploying aviation units to a level 
 of proficiency sufficient for the current and recent fights in 
 Iraq and Afghanistan, we see peer and near-peer competitors and 
 know that we will require resourcing our units to higher levels 
 of proficiency in order to train for combined arms maneuver 
 fights that will likely come...................................
We also know that with the prospect of sequestration in fiscal 
 year 2018 and continued unpredictable budgets, these areas of 
 concern may get worse before they get better as we prepare for 
 the future threat environment..................................
As a result of these operational, strategic, and budgetary 
 challenges, General Milley, our Army Chief of Staff, asked me 
 to lead a holistic assessment of Army aviation with the mission 
 to conduct a comprehensive assessment of all things Army 
 aviation. I was supported by a superstar team of Army aviation 
 subject matter experts who I would like to thank publicly today 
 for their incredible effort to complete our initial work.......
I have briefed General Milley on our initial findings and have 
 received his guidance to finalize our report, which we will do 
 very soon. And I am confident that those recommendations will 
 set us on a path to get after some of the readiness challenges 
 and opportunities that lay in front of us......................
I often describe aviation as a fragile ecosystem. In order to 
 keep this ecosystem healthy and thriving all the requisite 
 parts must be nourished routinely. If any get out of balance 
 for long, the whole system can begin to fray and collapse, 
 putting soldiers at risk.......................................
For army aviation and our readiness, this includes our personnel, 
 pilots, crews, maintainers and all those who work the numerous 
 support roles, our manned and unmanned aircraft systems, our 
 installations and training ranges and facilities, and the 
 resources and time necessary to meet battalion-level collective 
 proficiency with modernized equipment..........................
While we can and have continued to assume risk in some areas of 
 the ecosystem, in order to build the readiness needed to meet 
 global aviation commitments, we do risk getting out of balance, 
 which of course has consequences...............................
In order to meet the challenges of emerging and future threats, 
 we must provide realistic training, resource with time and 
 dollars and couple this with exceptional leader development. In 
 doing so, we set the best possible conditions for success to 
 provide a trained and ready aviation force whenever needed in 
 support of combatant commanders to meet any threat or 
 contingency....................................................
That said, what we cannot do is resource our aviation units to 
 platoon- or company-level readiness, yet expect that these same 
 units--these same units to operate in environments that require 
 battalion-level proficiency and flight skills. If there is 
 something that keeps me awake at night, this is it. 
 Additionally, if we do not address the issue of time and 
 dollars and the demand signal for aviation forces continues to 
 increase, we will consume readiness faster than we can rebuild 
 it.............................................................
In a nutshell, we need to resource Army aviation units to train 
 to battalion-level proficiency to keep the ecosystem in 
 balance. This will allow our units to become proficient in 
 those collective tasks required to operate at higher threat 
 levels against peer or near-peer adversaries. This also means 
 that our pilots and crews will get more repetitions to master 
 their craft, and more is better................................
The same is true for our soldiers who maintain our aircraft. They 
 will get more opportunities to fix, repair, and maintain, which 
 is critical to skill proficiency...............................
Last, and certainly not least, is that training to battalion-
 level collective proficiency allows for more robust leader 
 development to ensure our leaders can operate against complex 
 hybrid threats in the future...................................
Notwithstanding the challenges and concerns, the United States 
 Army retains the largest, most modern, and best trained 
 aviation force of its kind in the world. One that has been 
 tested in a variety of operational environments and whose 
 soldiers met and are meeting today, the tasks at hand no matter 
 how difficult the danger.......................................
Thank you again for the opportunity to testify today, we 
 appreciate your support and I look forward to answering your 
 questions......................................................
[The prepared statement of General Mangum can be found in the 
 Appendix on page 56.]..........................................
Mr. Wittman. Lieutenant General Mangum, thank you. Major General 
 West, we will now go to you....................................
 
 STATEMENT OF MAJ GEN SCOTT D. WEST, USAF, 
 DIRECTOR OF CURRENT OPERATIONS, U.S. AIR FORCE
 
General West. Chairman Wittman, Chairman Thornberry, Ranking 
 Member Bordallo, distinguished members of the House Armed 
 Service Subcommittee on Readiness, thank you for conducting 
 this hearing today and allowing me to join Army, Navy, and 
 Marine counterparts in testimony on our service readiness......
Today's national security challenges come from a combination of 
 strong states that are challenging world order, weak states 
 that cannot preserve order, and poorly governed spaces that 
 provide sanctuary to terrorists................................
The Nation needs a strong joint force and that force depends upon 
 Air Force capabilities at the beginning, middle, and end of 
 every operation. The Air Force must be able to disrupt, 
 degrade, or destroy any target in the world quickly and 
 precisely with conventional or nuclear weapons to deter and win 
 our Nation's wars. Whether in support of counterterrorism 
 operations or near-peer deterrence, your Air Force remains 
 constantly committed, as we have for 25 years..................
However two and a half decades of continuous combat operations 
 and reductions to our total force, coupled with budget 
 instability and lower-than-planned funding levels, have 
 contributed to the creation of one of the smallest, oldest, and 
 least ready forces in our history. While the Bipartisan Budget 
 Act of 2015 provides some space to recover readiness and 
 continue modernization efforts, the Air Force needs permanent 
 relief from the Budget Control Act, flexible funding, increased 
 manpower, and time to recover..................................
Today less than 50 percent of the conventional Air Force is ready 
 to conduct the full spectrum of combat operations. While we are 
 able to conduct nuclear deterrent operations and support 
 counterterrorism efforts, operations against a near-peer 
 competitor would require a significant amount of training. If 
 called upon to fight state-to-state, an associated training 
 delay would pose a significant risk to mission. Conversely, 
 deploying airmen in their current readiness state to fight 
 along soldiers, sailors, and marines, would significantly 
 increase the risk to success of the joint fight................
Accordingly, we will address readiness shortfalls in five areas: 
 critical personnel skills, weapons systems sustainment, 
 training resources, flying hours, and operations tempo. All 
 five must be synchronized and balanced. Since development of 
 human capital takes the longest to complete, we must first 
 address personnel shortfalls in critical skills................
We will also need to stabilize weapon system sustainment and 
 improve our training infrastructure............................
Finally, we need to increase our training hours and reduce 
 operations tempo to provide the time our airmen need to prepare 
 for full-spectrum operations...................................
Mr. Chairman Wittman, Ranking Member Bordallo, distinguished 
 members of the subcommittee, I look forward to answering your 
 questions as we work to resolve our readiness challenges.......
[The prepared statement of General West can be found in the 
 Appendix on page 65.]..........................................
Mr. Wittman. General West thank you so much. We will now go to 
 Rear Admiral Manazir...........................................
 
 STATEMENT OF RADM MICHAEL C. MANAZIR, USN, DEPUTY 
 CHIEF OF NAVAL OPERATIONS FOR WARFARE SYSTEMS, 
 U.S. NAVY
 
Admiral Manazir. Chairman Thornberry, Chairman Wittman, Ranking 
 Member Bordallo, distinguished members, I am proud to be here 
 with my brothers in arms. Thank you for the opportunity to 
 testify on the state of aviation readiness in the Navy.........
For the first time in 25 years, the Nation and your Navy are 
 facing the challenges of a return to great power competition at 
 sea. Provocations from state and non-state actors continue to 
 cause instability in almost every region of the world and pose 
 a significant threat to U.S. interests, our allies, and the 
 homeland.......................................................
But our Nation continues to answer the call. Today the Navy has 
 four carrier strike groups forward deployed: John C. Stennis, 
 Ronald Reagan in the Pacific; Dwight D. Eisenhower, Harry S. 
 Truman in the Mediterranean and Arabian Gulf. We also remain 
 vigilant with rotational presence of land-based aviation forces 
 such as EA-18G Growler, P-8 Poseidon, and the P-3 [Orion] in 
 the Middle East and the Western Pacific. These missions not 
 only demonstrate our Navy's responsiveness and warfighting 
 power, but also maintain our sailor combat proficiency, 
 readiness bought only with time at sea.........................
This required level of readiness is fragile and can be 
 squandered. As we reset in stride following 15 years of combat 
 stress to the force, we continue to face challenges associated 
 with balancing readiness for today and modernization for 
 tomorrow's fight. More of our force is being demanded, deployed 
 longer than planned; intended replacements are not keeping pace 
 with attrition. Fiscal constraints continue to force difficult 
 trades in capacity and readiness for long-term capability 
 improvements...................................................
Achieving full-spectrum aviation readiness requires us to restore 
 capacity and throughput at our aviation depots primarily 
 through workforce development changes and process improvement. 
 Through a concerted hiring effort with the support of 
 congressional budgetary increases, the recovery and maintenance 
 capacity is underway and continues to progress.................
Fleet Readiness Center hiring is on pace, and training continues 
 so that we may ensure the depots can meet the looming workload 
 demand. We have increased capacity at field sites, and are 
 swarming repairs of aircraft on the flight line................
So far in fiscal year 2016, we have completed 50 percent more 
 depot-level repairs on the flight line than we did in fiscal 
 year 2015. We have also partnered with industry to incorporate 
 additional engineering, maintenance, and depot capacity to 
 accomplish inspections and repairs outside of government depot 
 facilities. As a result of process improvement implemented in 
 2014, we saw a 44 percent increase in fiscal year 2015 F/A-18 A 
 through D depot production when compared to the prior year.....
We are recovering from a readiness deficit that started to accrue 
 in 2009, and was exacerbated by sequestration effects. With the 
 submission of the fiscal year 2016 omnibus request yesterday, 
 and with a fiscal year 2017 President's budget request, we have 
 invested to provide the maximum predictable and sustainable 
 presence under the Optimized Fleet Response Plan...............
The budget request harmonizes our readiness accounts to improve 
 aircraft availability, the leading factor in our readiness 
 challenge. Harmonization means that with the 2017 President's 
 budget request, we realigned funds from the flight hour 
 program, which is constrained by aircraft availability, to 
 readiness enabler accounts such as depot maintenance, aviation 
 support, aircraft spares, and aviation logistics. Each of these 
 vital programs underpins the flying hour account, but has been 
 critically underfunded in previous years.......................
Specifically, programs like the Aviation Support Program funds 
 engineers and logisticians, who help diagnose and develop 
 repairs for failed components discovered by fleet maintainers. 
 In this approach to readiness harmonization, the budget for 
 aviation support is broken into individual program elements 
 tied to specific platforms.....................................
In this manner we can track platform targeted investments, which 
 over time will yield improved aircraft availability. While we 
 are seeing signs of recovery, and our processes need time to 
 mature, we need funding stability to support our plan. The 
 bipartisan budget agreement of 2015 gave us the stability to 
 make target investments in the near term, but the threat of 
 continuing resolutions and the prospect of return to 
 sequestration would undo this progress, and further hamper our 
 fragile recovery plan..........................................
Ladies and gentlemen, your Navy aviation arm is the world's 
 premier sea-based airpower. That advantage could be lost if we 
 do not achieve stable budgets and make deliberate investments 
 in future readiness, while ensuring the force can fight 
 tonight. Mr. Chairman, distinguished committee members, we 
 welcome your continued support as we work together to overcome 
 these challenges, build and sustain the preeminent force of the 
 future. Thank you for your commitment to naval aviation, I look 
 forward to your questions......................................
[The prepared statement of Admiral Manazir can be found in the 
 Appendix on page 75.]..........................................
Mr. Wittman. Admiral Manazir, thank you..........................
I wanted to thank our other panelists here, and now I want to go 
 to the chairman of our committee, Chairman Thornberry, for his 
 comments and questions.........................................
The Chairman. Thank you, Mr. Chairman. I would just like to take 
 a moment to thank you and Ms. Bordallo for holding this 
 hearing, and for all the members of the subcommittee and your 
 staff for your deep dive into this important issue. I think it 
 is very important that we and the American people understand 
 what is happening, and I really admire the witnesses today and 
 their efforts to make the best of a difficult situation........
So first and foremost, I want to thank you, and as well as our 
 witnesses, for dealing with this. I want to take just a moment 
 and clarify one issue with General Mangum, if I may. You 
 testified sir, that starting in fiscal year 2015, a combat 
 aviation brigade was deployed to Afghanistan--it was supposed 
 to have 2,800 soldiers, it only sent 800, right?...............
General Mangum. Yes, sir.........................................
The Chairman. And one of the ways you got from 2,800 to 800 was 
 to leave most of the maintainers behind, right?................
General Mangum. Yes, sir.........................................
The Chairman. And so what do those maintainers do when they are 
 left here in the states, when their aircraft and their pilots 
 are in Afghanistan?............................................
General Mangum. Sir, they are not doing a whole lot of aviation 
 maintenance....................................................
The Chairman. Well, and I think that your point, as I understand 
 it, is that does not help readiness when you have important 
 maintainers without aircraft to work on........................
General Mangum. No sir, we are building a deficit of experience 
 and expertise in our formations as a result....................
The Chairman. And then my second question was, as I understand 
 it, what is happening in Afghanistan is that we have 
 contractors who are taking care of those helicopters, right?...
General Mangum. That is correct, yes, sir........................
The Chairman. And does that cost more or less than if the 
 maintainers had been there with them?..........................
General Mangum. It costs more....................................
The Chairman. To have contractors?...............................
General Mangum. To have contractors there, we are paying around 
 $100 million this year for contractors in Afghanistan..........
The Chairman. And that practice that started in fiscal year 2015 
 continues today?...............................................
General Mangum. Yes, sir.........................................
The Chairman. Mr. Chairman, I just think it is important for 
 members to understand this point. I understand that there may 
 shortly be an announcement on troop caps for Afghanistan, and 
 one of the ways the troop caps are reached is like this........
And it costs more, and yet where does that money come from? It 
 comes out of the readiness of all these folks, and what they 
 are trying to do. It is only a subset of the issues you are 
 looking at today, but I think it is important for us to 
 understand it..................................................
Thank you for letting me take a moment to clarify that. I yield 
 back...........................................................
Mr. Wittman. Well, thank you Mr. Chairman, I appreciate you 
 bringing that up...............................................
I know Lieutenant General Mangum and I had a chance to talk about 
 that the other day, and that does get down truly to the element 
 of only platoon-level readiness, and if you don't have the 
 maintainers there and the ability to operate at those higher 
 levels of training at the battalion and brigade level, then it 
 creates a whole new set of circumstances.......................
I would like to ask a question collectively of all of our 
 witnesses. In looking at the scenario we had today, each of you 
 spoke about where we are today with the President's budget for 
 2017, and then the NDAA that was passed both by the House and 
 the Senate, and the appropriations bills for national defense, 
 one here in the House, one soon to be taken up there in the 
 Senate. Those all have us at higher overall spending levels....
We can debate back and forth about how many of those dollars are 
 OCO [overseas contingency operations] but how many dollars are 
 in the base budget, but overall an increase. And each you all 
 spoke to that and how that increase is helpful to you in 
 regenerating readiness. And where we are today is just 
 preparing the conditions to reestablish that readiness, so it 
 is not even getting on that steep glide slope of rebuilding, it 
 is just setting the conditions.................................
Give me your perspective in that element of setting the 
 conditions, of what a CR this year would do to you in getting 
 where we need to be, in reestablishing that aviation readiness, 
 and Lieutenant General Davis, I will begin with you............
General Davis. Thank you, sir, for the question..................
We talked about stable funding, and I think the hard work the 
 Marines put forth this last year, to recover from what I 
 consider to be the lowest ebb of Marine aviation readiness in a 
 long time. F-18 pilots on average 8.8 hours a month last year. 
 That is about half what they should be flying..................
Now we are about 9.8 for those that aren't deployed. That is 
 still way below where we should be. So we are eking out inch by 
 inch a progressive recovery out there. So the recovery, and the 
 budgets, while good, we need to make sure they stay whole, sir. 
 Why is that? We need to procure the new airplanes that are--a 
 lot of our old F-18s and 53 Echos are really old and we are 
 running out of service life and it is really hard for those 
 marines to keep them going.....................................
So, buying the new--putting the readiness recovery money into the 
 platforms, we have like 53 reset, allows us to extract maximum 
 value out of any risk to those funding profiles puts that 
 recovery at risk. And I would say we are in a period of risk 
 right now in Marine aviation to recover to get back to full 
 warfighting formations to be the force in readiness that this 
 body told us we have to be.....................................
Mr. Wittman. Very good...........................................
Lieutenant General Mangum........................................
General Mangum. Mr. Chairman, the greatest risk for CR to Army 
 and Army aviation is in training. We have programmed to 
 kickstart our readiness recovery with increased flight hours to 
 get us from--to start the journey from platoon-level collective 
 readiness to company-level collective readiness................
We would remain at platoon-level readiness funding under the CR, 
 as well as putting further constraints on our modernization 
 programs that are already at the floors for multiyear 
 procurement. So, it would definitely constrain our ability to 
 start our journey to readiness recovery........................
Mr. Wittman. Very good...........................................
Major General West...............................................
General West. Yes, sir. I would echo the same comments, that if 
 we are faced with a continuing resolution this year, as has 
 happened in the past, we will be capped at previous spending 
 levels, which prevents us from realizing the benefit of having 
 increased funding levels in fiscal year 2017 to address 
 readiness......................................................
When we are capped at previous year's funding levels, we 
 prioritize. Our first priority is to support troops in combat. 
 Second, those that are forward deployed to assure our allies, 
 which means the bill-payer for training are those that are here 
 in the United States. So, it exacerbates the issue not only 
 that we not be able to begin to slow the rate of decline, it 
 delays the start of us being able to stop the rate of decline 
 of our readiness...............................................
Mr. Wittman. All right. Thank you................................
Rear Admiral Manazir.............................................
Admiral Manazir. Thank you, sir. The neat thing about being last 
 is I get to capture all the comments, and agree and summarize..
You spoke of that increase, and I would like to complement the 
 teamwork that we have had in all the services and especially 
 your committee on building this case for readiness. You spoke 
 of that increase, so the President's budget was an increase. 
 The various bills are increases. If we go with a CR, all of 
 that increase gets wiped out...................................
Additionally, each year, as was spoken by Scott West, we program 
 to a set of operations in a year. So, more deployments for 
 Navy, different deployments, different length of deployments, 
 different employment of the force. Our request reflected that 
 operations, maintenance, and training for fiscal year 2017.....
It is a deeper request because we have to recover the readiness 
 and support those maintenance and support. So therefore, if we 
 stay with a CR, it will not reflect the request that we sent 
 over from our budget...........................................
Mr. Wittman. Very good. Thank you................................
We will now go to Ms. Bordallo...................................
Ms. Bordallo. Thank you very much, Mr. Chairman..................
General Davis, could you explain the consequences for current 
 Marine Corps aviation readiness of not executing a reset 
 program to bring all equipment to readiness standards, as the 
 Army did for nearly two dozen major units during OIF [Operation 
 Iraqi Freedom] and OEF [Operation Enduring Freedom] instead of 
 waiting until now, as the Marine Corps has done?...............
General Davis. Well, I think the community that was particularly 
 impacted was the CH-53 Echo. And we have--had low numbers of 
 CH-53 Echo.....................................................
The reset is not the only reason for the low readiness. We have 
 a--I would say a very debilitating ``not mission capable-
 supply'' problem in CH-53. But the reset will allow us to 
 basically get our aircraft back up to speed, while, you know, 
 in the timeline--an ability to order the parts we need to get 
 our supply bins full so we can get maximum value out of the 
 airplane.......................................................
But the CH-53 was about one-third of the CH-53s we have in the 
 inventory we are able to fly, maybe even a little bit less. 
 Recovering that now, the flight time was very low. A lot of 
 those units now, the flight time has about doubled what it was 
 last summer. So, we are recovering in CH-53, but the reset is 
 essential to do that now.......................................
So we copied a playbook out of the Army. We had an independent 
 readiness review that looked at what was wrong with the CH-53 
 and why we couldn't get our readiness out of that aircraft. We 
 also did it with Harrier. The Harrier has recovered its 
 readiness. We are generating the numbers we need to out of that 
 airplane. It is serving, again, really great in combat and we 
 are able to track the training missions we need to out of that.
CH-53 is going to take a longer time to recover. It will take us 
 until about 2019 to 2020 to get all of our CH-53s back up in 
 the battery that they should be and the numbers they should and 
 a highly reliable airplane. It is a good airplane now, but it 
 will be highly reliable. So, we should have done that before, 
 we didn't, and we are doing it now.............................
And also, too, we have to address the not mission capable-supply 
 problem, which the low inventory masked how bad that really 
 was............................................................
Ms. Bordallo. Thank you. Thank you, General. I have another 
 question for you and General Mangum. In your opening 
 statements, both of you discussed trends in Class A mishaps, 
 which result in loss of property and/or life. Could you discuss 
 your findings and whether you believe there is currently a 
 correlation between degraded readiness, whether due to 
 maintenance failures or inadequate training?...................
And the other witnesses, I welcome your remarks as well. So, 
 begin with you, General........................................
General Davis. Ma'am, I will tell you that we don't fly any 
 aircraft that is unsafe. I will say that my pilots across the 
 Marine Corps are not getting the flight time they need. With 
 the exception of the F-35; we are generating our hours in that 
 new airplane. They are not getting the hours they need to be as 
 proficient as they should be...................................
So, while historically, our Class A mishap rate is higher--is 
 high--it is high, but it is actually kind of on par where it 
 has been in the past. But I--smaller number of flight hours, 
 every mishap makes that bump up a lot..........................
What I will tell you is we are seeing a spike, almost double the 
 number of Class C mishaps than we had last year and we are 
 trying to look at why the reason for that is...................
What I will tell you is kind of hard to take a look at from 
 today's standpoint, but we are flying less, getting less 
 experience. So my flight leads 2, 3, 4 years from now are not 
 going to be guys with 1,000 hours or 1,500 hours, like I had. 
 And you have got a youngster on your wing that is having a 
 problem, you go, do this or do that. The flight leads coming 
 back now, because they are not getting the flight time they 
 need, will have 500 or 600 hours...............................
They don't have that looks at the ball like my compadres talked 
 about that will say, this is what you should do. So, I think we 
 could see future mishap spikes in the Class A realm because of 
 the low flight time and the low experience our guys are getting 
 right now......................................................
So, while the numbers are steady, they are unacceptable. We 
 should be driving those numbers down. And it is something we 
 need to work on and I--it is hard to tie the low flight time to 
 a Class A mishap rate right now, but we are seeing the high 
 OPTEMPO [operations tempo]. The deployment-to-dwell I think has 
 an impact for sure on our Class C mishap rate, which impacts 
 our readiness to a great degree. If--again, 100 percent 
 increase from last year in the Marine Corps in Class C mishap 
 rate...........................................................
Ms. Bordallo. General............................................
General Mangum. Ma'am, this year, our Class A accident rate for 
 manned systems is down, and not to historically low levels, but 
 we continue to trend down. So, correlation between the hours 
 and our accident rate is a bit tenuous.........................
However, more repetitions is better. Practice makes perfect, and 
 as we increase our flying hour program to achieve higher levels 
 of collective readiness, that gives our flight crews more 
 repetitions, it gives our maintainers more repetitions.........
However, as we start to go to higher levels of collective 
 training, say at the National Training Center or Joint 
 Readiness Training Center, as we ask those crews to do some 
 things they had not been doing to the same level, we will face 
 increased risk as we increase the flight hours.................
That is a bit counterintuitive but I guess to specifically answer 
 your question, ma'am, we don't see necessarily a correlation 
 based on them being isolated events. This year, we have had 
 1.16 accidents per 100,000 hours which is the military and 
 industry standard to measure those against which is down from 
 last year......................................................
We are seeing a spike in our unmanned systems and those are still 
 under investigation to try to determine what the root cause of 
 those are......................................................
Ms. Bordallo. General West.......................................
General West. Yes, ma'am. We have not--we analyzed our mishap 
 rates over the last 10 years, which we keep the data for. We 
 can't find that there is a correlation between our trend in 
 mishap rates and our readiness levels..........................
Our mishap rates still are at the same rate that they have been 
 over the past 10 years. I would expect, because of our 
 readiness concerns and deployment-to-dwell issues that we might 
 see some trends related to human factors.......................
Either operators that are complacent when they are back in the 
 United States or maintainers that may fail to follow tech order 
 guidance in the maintenance of aircraft. But we haven't seen 
 that and I think that is emphasis on professionalism that we 
 don't sacrifice airworthiness or safety standards to recover 
 readiness......................................................
Same thing in our depots; the workforce that sustains systems, 
 some over 50 years old require more time to be able to complete 
 the work in the depots and they take the time necessary to 
 provide airworthy and safe systems to be able to operate.......
I think that has contributed to the fact that we have not seen an 
 increase in material failures in older systems. However, 
 separating mishaps and the fact that right now we are having 
 the same decreasing trend in mishap rates does not mean that we 
 don't have a readiness issue...................................
We still have a readiness issue, it is just not manifesting 
 itself in our mishap rates.....................................
Ms. Bordallo. Admiral............................................
Admiral Manazir. Ma'am, thank you. We do not see our mishap rates 
 manifesting themselves from a lack of readiness. Our Class B 
 aviation mishaps are down this year over the last 2 years and 
 our Class As are consistent....................................
We looked at the Class A mishaps and they were a very small-
 number to see if they were proficiency-based. In other words, 
 not enough flight time or aircrew executing operations that 
 they were not proficient for. And in fact, that was not the 
 case...........................................................
The aircrew involved--and I won't go into the causal factors 
 because they are privileged--were well-experienced and they 
 were proficient at their trade. The Class C mishaps, we have 
 seen an increase to nearly double what it was since 2008, so 
 similar to General Davis' testimony............................
We are diving hard with the safety center to see what the causal 
 factors would be for an increase in Class C mishaps, ground 
 mishaps, were the mistakes made because of inexperience, were 
 there procedures that were not followed........................
This might be an indicator at the lower level of our mishap 
 classes of potentially some effects from readiness. But when we 
 asked to look at the way that we put causal factors against 
 mishaps there were none that stood out as low readiness, low 
 currency, lack of familiarity with procedures for our aircrew 
 or our maintainers.............................................
But we continue to look at that Class C mishap rate to see if 
 there might be a problem. I will endorse the comment made by 
 several of my compadres here that we probably won't see the 
 effects of a critical underfunding of readiness, critical 
 underflying, critical lack of experience, for several years....
As people are now put in leadership positions and they are 
 leading larger flight operations or they are leading squadrons 
 and with a lack of experience, that lack of exposure, you might 
 start to see some effects on the units that they lead because 
 of the lack of flying several years ago in different positions.
So it could have a lagging effect in the future. We are worried 
 about that.....................................................
Ms. Bordallo. Thank you..........................................
I have one further question, Mr. Chairman........................
To any of you, though both situations would be ideal, which 
 fiscal remedy would help build back readiness most effectively 
 over the long term? Increased funding or stable predictable 
 budgets?.......................................................
General..........................................................
General Davis. Can I say both, ma'am.............................
[Laughter.]......................................................
Obviously, stable budgets are key. As you know, we are in 
 recovery so we have a little bit more requirement for that. We 
 have kind of held off, we are right now in the heyday of our 
 procurement, our recapitalization in the Marine Corps..........
We are only about--we are just starting now our TACAIR [tactical 
 air] recapitalization so all the Harriers and Hornets have to 
 be replaced and our 53s have to be replaced. Stable funding is 
 best...........................................................
But also, too, it is if you are funding below the minimum 
 required then--if you are funding below the requirement--you 
 have got a requirement--you are going to end up with something 
 that is--I am no math major, but that is a recipe for disaster 
 and kind of where we are right now.............................
Ms. Bordallo. General............................................
General Mangum. Ma'am, the answer is both. Stable predictable 
 funding; we have brought down our modernization counts to the 
 floors of our multiyear contract. So we have slowed our 
 modernization to a snail's pace................................
And if our predictable funding keeps at platoon- or company-level 
 collective readiness, we are not on the recovery path that we 
 need to be.....................................................
Ms. Bordallo. General West.......................................
General West. Yes, ma'am the answer is both here, as well. Given 
 an--I will give a response for the need for stable predictive 
 funding based on the effects on industry.......................
If you operate a fleet that is decades old, you have to be able 
 to give the business case--make the business case--of why 
 should you stay in this business to make a reasonable profit, 
 given that we don't know if we are going to have a predictable 
 level of funding to be able to warrant you being in this 
 business. That has an impact on older systems..................
As to the top line for increased funding, that is also important 
 because we have to balance the discussion topic here today, 
 which I define a little bit separately from modernization, 
 because we will have a bow wave of issues of modernized 
 projects to come up in the next decade that we will have to 
 address........................................................
Otherwise, the things that we are readying today will be 
 irrelevant in combat given the gaps that our near-peer 
 competitors are closing technologically........................
Ms. Bordallo. And finally, Admiral, do you agree with your 
 compadres?.....................................................
Admiral Manazir. Ma'am, I say it is stable and predictable 
 budgets but only after you have increased the budget to buy 
 back the readiness deficit that we have built. So we have to 
 get back at--buying that whole back and then you can probably 
 decline that level and get to stable and predictable so that we 
 can stay with the readiness capability of our force............
Ms. Bordallo. Thank you..........................................
And I yield back, Mr. Chair......................................
Mr. Wittman. Thank you, Ms. Bordallo.............................
And now I will go to Mr. Scott...................................
Mr. Scott. Thank you, Mr. Chairman...............................
Gentlemen, thanks for being here and I want to go back to what 
 Chairman Thornberry said that is one of my great frustrations 
 is that, you know, some political strategist somewhere 
 determines that it is going to be popular to say that we have 
 drawn down a certain number of troops..........................
And so we are sending the pilots and not the maintainers and in 
 fact, we are actually paying more for the equipment to be 
 maintained by contractors. And all over something that reaches 
 a political target and has absolutely nothing to do with 
 winning the war................................................
With that said, I hear your comments about the continuing 
 resolutions and the other issues. I want to encourage you, as I 
 have in private meetings, and I want to do it publicly, to meet 
 with members that are not on the Armed Services Committee......
The term ``readiness'' is not something that, if you are not on 
 this committee, that you would normally hear. And I think the 
 majority of the members of this committee will vote to support 
 you in the things that you need. In order for us to win that 
 vote, we have to have votes from members that are not on that 
 committee--on this committee and I would encourage you to meet 
 with them as well..............................................
But General Scott, under the Budget Control Act, the funding 
 levels--what are the hardest readiness choices you will have to 
 make in the Air Force fleet? And what impact do these have on 
 your ability to meet mission requirements, national defense 
 strategy, both today and in the future? And I would appreciate 
 it if you could be specific on that............................
General West. Today your Air Force is able to support nuclear 
 deterrent operations. We are growing our cyber capability. We 
 are able to conduct space operations. We will have to continue 
 to modernize in space. And we have grown and will continue to 
 grow our ISR [intelligence, surveillance, and reconnaissance] 
 capability.....................................................
To get to those four areas of operations, we had to make trades 
 in people and our conventional air forces. We downsized 252 
 aircraft, 10 squadrons' worth of fighter squadrons to--and made 
 people trades that today has resulted in our first readiness 
 issue and that is to address critical skills...................
That is mainly in maintenance. We need an increase of 4,000--up 
 to 4,000 to be at end strength of 321,000 for the Air Force. 
 And that is the first readiness hurdle that we need to be able 
 to have support, and I think we do have that to get after our 
 readiness recovery.............................................
Because that takes up to 7 years to build the maintainer of the 
 future we want, which is not just freshly out of high school 
 and trained, but has experience on how to trouble-shoot the 
 aircraft, particularly those that are older. That timespan 
 means we can start later on increasing weapon systems 
 sustainment, improving our range infrastructure, adding to the 
 flying hour program, and last, working within the Department of 
 Defense to reduce our operations tempo. So our first--the first 
 criteria--first thing we would ask for is for a modest increase 
 in end strength................................................
I didn't quite answer your question, sir. Let me go back to where 
 our concern is. What our concern is not that we can't conduct 
 counterterrorism operations today, nuclear operations, space, 
 cyber, and ISR. We do that. We rotate through the Middle East 
 and we support our joint partners. Where we have concern is to 
 have the time and the resources available to train when not 
 deployed, for full-spectrum combat. That is the concern........
Mr. Scott. Is it accurate to say that the fleet--the Air Force 
 fleet is older today on average than it has ever been?.........
General West. Yes, sir, it is. I had an anecdote that a B-17 that 
 flew in World War II, which they were made shortly therefore. 
 If it had flown in Desert Storm, the aircraft bombers we are 
 using today are older than those B-17s would have been. It is 
 an aged fleet..................................................
Mr. Scott. And how many fewer men and women do you have today 
 than you had in the first Gulf War?............................
General West. It is on the order of thousands. I will get you 
 that. I will get you the data, but if I could put it in terms 
 of fighter squadrons, we had 134 fighter squadrons at the 
 beginning of the Gulf War. Today we have 55....................
Mr. Scott. One hundred and thirty four at the beginning of the 
 Gulf War and today we have 55..................................
General West. Fifty-five. Yes, sir...............................
Mr. Scott. Could you touch briefly--I am down to about 30 
 seconds--on the status of the Air Force depots and how they 
 contribute to the increased readiness of the Air Force?........
General West. It is critical. They find--they weigh--they sustain 
 the older systems that are decades old that we use and operate 
 today. Our KC-135 mishap--reliability rate is outstanding to 
 me, and I think it is on the backs of professionals that work 
 in our depots..................................................
Mr. Scott. Gentlemen, thank you for your service and I look 
 forward to working with you to resolve these issues............
Mr. Wittman. Thank you, Mr. Scott................................
We will now go to Mr. Peters.....................................
Mr. Peters. Thank you, Mr. Chairman..............................
Thank you, gentlemen, for being here.............................
General Davis, you may have answered this question in response to 
 Ms. Bordallo, but I wanted to sort of explore the mitigation 
 strategies that the Marine Corps might have in the event that 
 the F-35 squadron transitions take longer than the expected 2 
 years, or if the F-35s continue to experience technical delays.
General Davis. What we are seeing right now, sir, the F-35 is 
 exceptional capability. Marine Fighter Attack Squadron 121 
 [VMFA-121] ran their, you know, their kind of an operational 
 readiness inspection; knocked it out of the park. We just 
 finished the Weapons and Instructor Course [WTI], VMFA-211 
 stood up. And we actually have three airplanes over in the 
 United Kingdom [U.K.] right now getting ready to do the 
 Farnborough and Riyadh Air Show................................
A lot of excitement over in the U.K. We are very excited about 
 the airplane. I can tell you we just ran a transition board for 
 F-35 and everybody that can put in to fly the F-35 is--to 
 include my oldest son who is getting ready to fly that 
 airplane; youngest one would like to do it, too................
We are not seeing a problem right now. The production line is 
 ramping up to full-rate production. What we have to do is keep 
 our F-18s and our Harriers going, sustain them properly to make 
 our F-35 bridge. Right now, we are seeing no problems with that 
 airplane. What we are seeing is high readiness rates and 
 incredible capability..........................................
We just ran a WTI drill where normal scenario that we would have 
 with our legacy aircraft out there. I was a CO [commanding 
 officer] at the weapons school. Generally about half the 
 airplanes that go into the across the--ROMO [range of military 
 operations], the high-end threat, Prowlers, Hornets, Harriers, 
 and generally about half to a third of the airplanes don't make 
 it through.....................................................
The F-35s, 24 to zero kill ratio. It killed all the targets. It 
 is--it was like Jurassic Park, watching a Velociraptor. It 
 kills everything. It does really well, so we can't get that 
 airplane fast enough into the fleet, sir.......................
Mr. Peters. Okay, I know we are putting some hangars up at 
 Miramar. Hangars are the least of your worries, I think, so....
General Davis. Actually, hangars are essential. A lot of our 
 infrastructure in our bases is World War II-vintage. And so 
 Miramar--what we are building is a two-squadron hangar out 
 there at Miramar. So we are really happy to get the support on 
 that...........................................................
We are very tightly aligned with the United States Navy on the F-
 35 program. We are going to procure four squadrons of F-35C, 
 the tailhook variant of the airplane. And when the first 
 tailhook-capable carrier for F-35C moved from the east coast to 
 the west coast, we had planned on standing that squadron up on 
 the east coast. Now we have moved it to the west coast.........
A lot of help from you guys; worked inside the Marine Corps on 
 green dollar budgets to build a hangar out there at Miramar and 
 got that done so we can actually be ready to take that airplane 
 when it comes. It is not just the hangar. It is the training 
 facilities and everything else that goes with it. So a lot of 
 excitement at Miramar to get that airplane out there...........
Mr. Peters. Okay, terrific.......................................
One other question about training. You have discussed the hours 
 and in terms of experience, and it has been reported in the 
 press, General West, that the Air Force Research Laboratory's 
 secure live virtual constructed advance technology environment, 
 advanced technology demonstration--that is a simulator. Does 
 that help address the gap? And tell me kind of what advantages 
 that offers? And where it leaves you short.....................
General West. Well, sir, in general there is a right balance 
 between what training we can conduct in simulators versus what 
 training we need to conduct and do conduct on live ranges. And 
 the balance is this. In simulation, you can train operator or a 
 maintainer to do certain tasks very well. You can integrate 
 operations between different operators.........................
But what you don't do in a simulator is assess the entire 
 performance of the system: do the sensors work, because--for 
 example, because the sensors are replicated in simulation......
So you have to have a balance between stressing and training the 
 entire system, maintaining, generating the sortie, loading the 
 weapons and actually performing against threat replicators in a 
 live range to see how the sensors work--do they work as they 
 are supposed to do--and crews make decisions on what to do, 
 versus what you can replicate in simulation which doesn't 
 stress the entire system but gives you great capacity to train 
 the human being................................................
Mr. Peters. In terms of the simulator part of the budget, do you 
 think that we have adequate resources to stay on track and keep 
 the program goals?.............................................
General West. Yes, sir...........................................
Mr. Peters. So that it is after the simulation that you are 
 concerned about the training primarily?........................
General West. Yes, sir. It is getting the right mix between 
 simulation and supporting the funds necessary to upgrade our 
 ranges to replicate what threats airmen are going to face in 
 the future, which are closing the gap, if you will, on our 
 technological advantage that we have right now and also 
 sustaining our ability to employ and train and test weapons, 
 and you need live ranges to be able to do that.................
Mr. Peters. Okay.................................................
Thank you, Mr. Chairman, for having the hearing. And I yield 
 back...........................................................
Mr. Wittman. Thank you, Mr. Peters...............................
We will now to go Ms. Stefanik...................................
Ms. Stefanik. Thank you, Mr. Chairman............................
My first question is for General Mangum. As you mentioned in your 
 testimony, the Army aviation community is blessed with agile 
 and adaptive leaders. I have seen this firsthand with the 10th 
 Combat Aviation Brigade at Fort Drum in my district............
My question is, how will certain force structure reductions 
 combined with such a heavy demand for aviation assets impact 
 overall readiness? We know the Army prioritizes operational 
 readiness, but where does it assume risk for the future?.......
General Mangum. Ma'am, currently, we have 11 combat aviation 
 brigades in the Active Component and 12 aviation brigades in 
 the Reserve Component for a total of 23. Twelve of those 
 twenty-three brigades have elements deployed overseas today. So 
 the--that fine balance between consuming readiness and our 
 ability to rebuild it, we are on the edge......................
And again, I think we have all used the word fragile, there is 
 some fragility into this system. So we are, again, about at the 
 tipping point. Several years ago, we did a study that 
 determined that we needed 15 or 16--between 15 and 16 combat 
 aviation brigades in the Active Component. We are on glide 
 slope to go to 10, the National Commission for the Future of 
 the Army recommended maintaining an eleventh...................
So we are--again, we are at the tipping point. The National 
 Commission for the Future of the Army recommendations are--
 Secretary Fanning and General Milley will consult with 
 Secretary Carter here soon, but all of those recommendations 
 come with no resources.........................................
Ms. Stefanik. My next question is for Admiral Manazir............
Earlier this year, I had the opportunity to embark on the USS 
 Harry Truman with my colleague Mr. Peters. How will the recent 
 30-day extension of the USS Harry Truman's deployment impact 
 future carrier deployments? And is there a concern that future 
 deployments could be extended? And what is the impact on the 
 carrier air wing?..............................................
Admiral Manazir. Yes, ma'am. First of all, thank you for going 
 out to Harry S. Truman and seeing what our great Americans do 
 on that flight deck and around the carrier strike group........
The Harry S. Truman, as you read from the press and saw the 
 reports--maybe on a classified level--had a superb deployment, 
 both in the Arabian Gulf and the Mediterranean Sea and 
 demonstrated the power of mobile sea-based aviation............
We build into our Optimized Fleet Response Plan the capability to 
 continue to deploy or to extend the deployments of our carriers 
 once they go on deployment. The model is 7 months for the 
 deployment, but we build in some surge capability on the 
 carrier when the Nation calls, as in this case, they did.......
The particular impact is--required more readiness dollars to keep 
 the carrier strike group out there for an additional month. So 
 we had to pay for that. That caused some impacts to the 
 training--the forces in training down the road. But it didn't 
 impact the Truman strike group, particularly because we had 
 already planned for that, both the air wing, the ship, and the 
 accompanying ships.............................................
Ms. Stefanik. Thank you very much................................
I yield back.....................................................
Mr. Wittman. Thank you, Ms. Stefanik.............................
We will now go to Mr. Ashford....................................
Mr. Ashford. Thank you...........................................
Just a comment--a question to General West. First of all, 
 General, thank you for and thank the Air Force for moving 
 forward on the restoration of the runway at Offutt. I think it 
 is a great improvement for the 55th and I appreciate that......
I have a couple questions related to the ISR mission, 
 specifically the 55th, that is the mission that I am most 
 familiar with. I have visited in Qatar and just recently at 
 Mildenhall and several visits at Offutt. The nature of that 
 mission is obviously an ISR mission, a highly--high-tech 
 mission. The vast majority of the military personnel on those 
 airplanes are not pilots, they are actually back in the back 
 working on the computers and intercepting the information that 
 they are getting...............................................
The concern that I always get from them, and you have really 
 talked to it, not specifically on this issue, but is the 
 training. And I know during the time prior to 2015, there was a 
 great deal of concern about training in language proficiency 
 and--which is a major part of the mission. How do you see that 
 improving? And I know there are some languages where there--we 
 need more proficiency..........................................
At Mildenhall, I was able to visit the training center there 
 where they are doing great work and getting people up to 
 proficiency and continuing to move forward into their testing 
 regimens and so forth. But how do you see that evolving? And 
 what impact would it have if we were to go back prior to 2015, 
 specifically on the language issue as it relates to the 55th 
 and other related missions?....................................
General West. Thank you, sir. I am not familiar with the language 
 issue to which you refer.......................................
Mr. Ashford. Just the proficiency in the various languages, which 
 is the--you know, the central core of that 55th mission........
General West. Yes, sir...........................................
Well, I would say this. The 55th has capabilities that are 
 absolutely necessary if we had to go to combat versus a near-
 peer, state-to-state combat. The training that the 55th and 
 operations that the 55th conducts now down range, as they did 
 for me in Afghanistan and others in other places, doesn't place 
 the demand signal on proficiency that training would for other 
 scenarios......................................................
So providing not only just the maintainers that we need, which is 
 mainly for--not for the big wing ISR at Offutt but other 
 platforms, but providing the weapons system sustainment, these 
 are older platforms............................................
Mr. Ashford. Right...............................................
General West. The training range infrastructure that includes 
 simulation that we can upgrade to replicate what is now not 
 only possessed, but being exported by near-peer competitors, 
 and working with our Joint Staff partners on deploy-to-dwell 
 issues so we have got more time to be able to train with the 
 flying hour program............................................
All of those have to be synchronized in order to start to recover 
 readiness. It is not just one individually can work it.........
Mr. Ashford. Right...............................................
And I--my point, I guess, is to--is that I was--it is very 
 impressive to see what has been achieved in the last year and a 
 half in upgrading the training and getting more people trained 
 in specific line language, and obviously, the maintainer issue 
 is always--is also a big issue.................................
But the gaps that existed prior to 2015, to a great extent, have 
 started to be extinguished on the training side on language 
 specifically. But I just--the comments that you have made 
 regarding readiness generally and training generally and 
 maintainers generally applies, I think, to the language sector 
 as well. And I just applaud the Air Force for moving quickly to 
 fill those gaps................................................
Thank you, Mr. Chairman. I yield back............................
Mr. Wittman. Thank you, Mr. Ashford..............................
We will now go to Mr. Cook.......................................
Mr. Cook. Thank you very much, Mr. Chairman......................
A couple of my questions--a little bit different. I want to talk 
 about the--maybe the F-35. And airspace, particularly on the 
 west coast and particularly in California and--training time, I 
 think, is essential. And we have some issues that I think 
 everybody, all four services, are impacted by the FAA [Federal 
 Aviation Administration], and I am talking about the corridor 
 that goes into the Los Angeles area............................
I am a ground guy, so I can't even spell air. But the problems 
 that we are going to have with the F-35 in the envelope and 
 they even effect ground weapons, such as the HIMARS [High 
 Mobility Artillery Rocket] system at Fort Irwin. And some of 
 the paths that they have to take affects Mugu, it affects the 
 Air Force base that--all the ranges are basically in my 
 district, and most of them in San Bernardino. China Lake, I 
 don't have the headquarters, but I got all the ranges..........
I have got obviously Fort Irwin, and the--some of the 
 restrictions that are coming out would have a major impact on 
 the training of all four services. And if you could address 
 that or how concerned you are about this because I just think 
 it is going to get worse and worse and worse. This is not the 
 old aircraft, and that is--but the F-35 is--operates in a 
 different area and some of these newer weapon systems..........
So if you could comment on that, please..........................
General Davis. Sir, I will take that question to start. We are 
 very concerned about it. And as you know, I am a guy who joined 
 the Marine Corps not knowing they had airplanes. So, rifleman 
 first, aviator second always. Hoorah...........................
Mr. Cook. Thank you..............................................
General Davis. That should probably scare you a little bit, that 
 I am running Marine aviation right now.........................
But bottom line is the F-35 is a qualitatively different 
 airplane, both in capabilities and also watching the way the 
 Marines are flying it. They fly Twentynine Palms, Yuma, out 
 there. They are using a lot more airspace to extract maximum 
 value out of that airplane. And I can't talk about all the 
 numbers because they are classified, but it is more and it is 
 different. I think those ranges are national assets and we have 
 to do our level best to protect them...........................
The Marine Corps, like the Army, the Navy, and the Air Force, are 
 all trained to fight not today's fight, but also tomorrow's 
 fight. And it is a very high-end fight and at the end of the 
 day, we cannot be caught short because we didn't have this much 
 altitude or this much range space to bring these qualitative 
 advantages that you are providing for us and our marines, 
 soldiers, sailors, and airmen are fighting and flying with.....
We need airspace. You need to spread out, train against the near-
 peer competitor. It is not what we have been doing for the last 
 15 years in the aggregate. It is very different. And all of us 
 need to train and be able to do that, and we need the space to 
 move out and train.............................................
We are seeing that with the Air Force out there at Nellis and the 
 Navy up at Fallon and even at the National Training Center and 
 our ground forces. Long-range rockets that--we need the ability 
 to fight at range, see at range and dominate at range and kick 
 anybody's butt that is out there at range. And we need the 
 airspace and the ground space to do that, sir..................
Mr. Cook. Thank you..............................................
Anyone else?.....................................................
Admiral Manazir. Sir, OPNAV [Office of the Chief of Naval 
 Operations] has an office inside of the Director of Air Warfare 
 that works directly with the FAA on encroachment issues. I 
 would echo what General Davis said. Our ranges are crown jewels 
 in our ability to train........................................
We have worked with the FAA on airspace corridors. There are 
 limited places to go supersonic, especially in the West. There 
 are small corridors. It is--the airspace is very dear. 
 Connecting the ranges between Nellis and Fallon, Point Mugu, 
 the sea ranges over to China Lake is something that we already 
 do.............................................................
But encroachment is a gigantic issue. So, not only the airspace, 
 but encroachment on the ground towards our training ranges for 
 peaceful issues like wind farms and the partnership with wind 
 farms all the way to nefarious threat countries who would try 
 to buy property in close so they can monitor what we are doing.
The F-35 is different. I would offer to you that our networked 
 way of warfare, the way we are going to do warfare with fifth 
 generation would take up about three quarters of the United 
 States if we could have it. And so that goes to the value of 
 what General West talked about, which is this live virtual 
 constructive training..........................................
So, when we have to go to the high-end fight using fifth 
 generation and full, full capabilities, it is not just the 
 geography of the airspace which is getting limiting for F-35, 
 but also our ability to practice how we are going to really 
 fight. And so we have to tailor what we do in the air..........
Mr. Cook. I appreciate that comment. I am not always sure that 
 the FAA is on the mindset of a lot people in this room here in 
 terms of readiness, readiness, readiness, combat readiness. And 
 they might have other priorities that are not the same. And 
 obviously, I think this is a battle that is going to be a 
 bureaucratic battle just like you fight about the budget and 
 everything else................................................
Just one last question I have, and that is on tempo of ops, and 
 it has always been my concern that we overload that box. The 
 planners, we are going do this, this, this, this, this. You can 
 only do so much. And I think, yes, but the big wars and 
 everything like that, but you are going to see more and more 
 come-as-you-are parties. And maybe that is a bad phrase. But 
 you never know what is going to--and you have got to be ready 
 to go when the balloon goes up.................................
And any comments on being overloaded with tempo of ops, which I 
 think are always going to be there?............................
General Davis. If I could, sir. The demand from the combatant 
 commanders is strong. Again, we go back, I think the demand is 
 reasonable and if you got the assets that you need to go do the 
 job right. Right now, we are shy on the number of platforms we 
 have. So, the Marines are working really hard to make ends 
 meet...........................................................
So, I think the dep [deployment] tempo of 1:2 is manifested or 
 made more deep, and the fact that they just don't have enough 
 of the assets to go around so they are working harder to make 
 ends meet......................................................
Right now, the world is a pretty dangerous place and we have got 
 marines forward deployed at sea and at shore, and all of them 
 are very gainfully employed. So we are doing our level best to 
 try to pull some of that--try to do a little bit better with a 
 little less to reduce the number of assets we have forward 
 deployed, but it has met with not a lot of positive effects 
 from our combatant commanders right now........................
Mr. Wittman. Thank you, Mr. Cook.................................
We will now go to Mr. Veasey.....................................
Mr. Veasey. Thank you............................................
I wanted to ask Admiral Manazir a question about training and 
 transitioning from F-18s to F-35s, including the training and 
 re-training of pilots and the maintenance personnel. How will 
 this transition affect the availability of units for 
 deployments?...................................................
Admiral Manazir. Sir, we are going to initial operational 
 capability the F-35C in August of 2018. There is some risk to 
 that date, but we are planning to that date and on path working 
 with the Joint Program Office to do that.......................
The first squadron will be ready for deployment shortly after 
 that initial operational capability. We will then go through a 
 heel-to-toe transition of units from generally the F-18C, but 
 some F-18Es and F units will transition through a process that 
 we have mapped out already. And they will do that at Naval Air 
 Station Lemoore in California..................................
The transition takes about a year to do it. We have that planned 
 into our master aviation plan, which is laid out to support all 
 the deployments necessary to support the combatant commander. 
 So, the simple answer to your question, sir, is that the 
 transition to the F-35C will not affect our ability to provide 
 the combatant commander with the forces that he needs as we go 
 forward to source the global force management plan.............
Mr. Veasey. Thank you very much..................................
And wanted to ask Lieutenant General Davis a question also about 
 the F-35. I was just curious, what is the plan to follow on 
 development of modernization for F-35s to ensure that the 
 aircraft continues to have the upgrades necessary to maintain a 
 capability advantage over threats through the life of the 
 aircraft?......................................................
And--the same thing, I wanted to also--if you could just touch on 
 just the transitioning, as well, as you move from the F-18s and 
 the AV-8s and how that is going?...............................
General Davis. It is F-18s, AV-8s, and EA-6Bs; we have two 
 Prowler pilots flying the airplane very successfully right now. 
 One, in fact, is an instructor in VMFAT-501 [Marine Fighter 
 Attack Training Squadron 501] and we picked four EA-6B pilots 
 this last board to transition out of the 16s. So, a quarter of 
 the guys we picked are Prowler pilots to basically make maximum 
 use of the electronic warfare capability of that airplane......
The transition is going well. Again, we just stood up our second 
 operational squadron. We will stand--the next one will be an F-
 18 squadron that will shut down VMFA-122, will move to Yuma, 
 Arizona, and stand up as an F-35B squadron; then VMFA-314, 
 which will be the first Charlie squadron, in Miramar in 2019...
So, the transition is going well. What we are doing is we are 
 managing the inventory of our AV-8s and our F-18s. The good 
 news, on our readiness recovery, we solved some of the problems 
 we had with Harriers. We have actually burned some--built some 
 margin in Harrier that can keep the Harrier going a little bit 
 longer if we need it to, so we can balance between F-18 and 
 Harrier, which, you know, we sundown next to make those--to 
 make our transition............................................
Right now, VMFAT-501 in Beaufort, South Carolina, is scheduled to 
 get bigger to handle more students. And so, that is growing. 
 And the production line, really sir, and the spare parts that 
 flows with that, is getting ready to go up to 20 aircraft a 
 year, which we need, just on Bs alone, which we need very 
 desperately....................................................
So, the transition is going well. We are managing that inside the 
 Marine Corps. We are making a little bit of our own luck with 
 better readiness in Harrier, which is good, and then working 
 very closely with the Navy to extract maximum value out of the 
 legacy F-18....................................................
And on Block four--I am sorry--Block four, I think is was you are 
 talking about the capability modernization development. I 
 worked that very closely with Admiral Manazir and my Air Force 
 counterparts to make sure we are getting the very best combat 
 capability for the country.....................................
I think we are close to slapping the table and all that we have 
 put into that modernization program out there but it is 
 actually very exciting. We compete and push to see what we want 
 to put in there in the timeline we get it. We broke it up into 
 four chunks, which is smart to go do...........................
And bottom line is bring in the great capabilities that the Block 
 4 upgrades to the airplane as quickly as we can................
Mr. Veasey. Over the last several years, the numbers of the 
 squadrons that you have, have dropped from about 70 to 55, or 
 so.............................................................
General Davis. Yes, sir..........................................
Mr. Veasey. Is that hampering the transition at all, or----......
General Davis. Well, what we are--sir, we--right now, we are at 
 20 TACAIR squadrons and we, like the Air Force, came down after 
 Desert Storm. I think we are about 28 TACAIR squadrons during 
 Desert Storm. And over time we are down to 20..................
And right now I am 19 because one of my Reserve squadrons is 
 cadred. So making our own luck with F-18 and the Harrier, 
 keeping them robust will allow us to make that transition......
But right now, we are executing a transition in stride and we 
 will shut down--you know, we have basically worked out a long-
 term training and deployment plan for the Marine Corps so that 
 we can sundown our squadrons and stand up in stride............
And we just did that with VMFA-211, so VMFA-211 came back from 
 combat deployment. There is--the VMFA-121 was a F-35 squadron 
 in Yuma. It grew to be larger than a normal F-35 squadron and 
 then what we did is when 211 stood up, they split off their 
 airplanes they were supposed to have and the maintainers and 
 the pilots so they can be a going concern from the beginning...
We will do that for the rest of the squadrons itself. I will say 
 that the ramp for F-35 in the Marine Corps has been very slow. 
 We are looking very much forward to getting a faster ramp and 
 be able to stand squadrons up faster and still making all of 
 our operational commitments....................................
Mr. Veasey. Thank you............................................
General Davis. Thank you, sir....................................
Mr. Veasey. Chairman, thank you..................................
Mr. Wittman. Very good, thank you Mr. Veasey.....................
We will now go to Mr. LoBiondo...................................
Mr. LoBiondo. Thank you, Mr. Chairman............................
General West, I know that you know this but some of the others in 
 the room may not, that the 177th Fighter Wing that I represent 
 has a state-of-the-art infrastructure including state-of-the-
 art alert hangars that can accommodate the F-35 and we hope 
 will, someday..................................................
Admiral, if you have or having challenges with the FAA, I would 
 appreciate knowing a little more about it. I chair the Aviation 
 Subcommittee which has oversight with the FAA. I certainly 
 would be happy to weigh in and get their attention on this if 
 there is something we can do...................................
And General Davis, a short while back maybe 4, 6 weeks ago, there 
 was a report on one of the cable channels about the 
 cannibalization. Are you familiar with that?...................
General Davis. Are they talking about the F-18, sir?.............
Mr. LoBiondo. Yes................................................
General Davis. I am, sir.........................................
Mr. LoBiondo. They had to go into a museum and get parts and so 
 on and so forth. So is--are we going to see more of that?......
What is the status of that? Is it more than just in the Marine 
 Corps? Anybody else or--was pretty disturbing report...........
General Davis. What I will tell you, sir, is on that--we were 
 looking for a hinge for a nose gear of an old model, A model F-
 18, no longer in production. And a lot of those airplanes were 
 built in lots and they are all different.......................
So we do, we have done that in the past, go out and look at a--
 for a part. And it just so happened that one of the squadron 
 members was out there looking; said hey, that is as close to 
 the bureau number..............................................
It didn't match up but the good news to it in that is there was 
 no part to be had so we 3D-printed the part and then 
 manufactured the part, Okay? And so they--so the company was 
 able to make that part for us..................................
You also heard on the news that the Marines are also going into 
 the boneyard to get F-18s. We are doing that, sir. We took I 
 think 23 out of Davis-Monthan. But those are 23 airplanes we 
 had put in in 2007 to kind of preserve the life................
We--they are low flight hour F-18s now we will basically--we are 
 bringing them back into service now to go fly them, to go make 
 our operational commitments and it goes back to how we manage 
 the F-18 life to the end of its service life, extract maximum 
 value..........................................................
We would like to recapitalize faster, that is what we need to do, 
 that is what we want to do. By the--until that time, we are 
 going to do what we have to do to make our operational 
 commitments with our F-18s and our Harriers....................
Right now, my two communities at greatest risk for making their 
 flight hour goals and making their readiness goals is CH-53 
 Echo and the legacy F-18.......................................
Again, 53 Kilo will replace the Echo and is doing great in tests 
 and the F-35 is going great in its production and its tests and 
 its initial operating capability development out there.........
So replacing our F-18s with F-35s as quickly as we can is our 
 strategy.......................................................
Mr. LoBiondo. Mr. Chairman, I yield back.........................
Mr. Wittman. Thank you, Mr. LoBiondo.............................
We will now go to Mrs. Hartzler..................................
Mrs. Hartzler. Thank you, Mr. Chairman...........................
Thank you, gentlemen, for being here today on this very important 
 hearing dealing with aviation readiness........................
Rear Admiral Manazir, I would like to start the question with 
 you. So the committee has heard testimony in prior hearings 
 about a strike fighter shortfall and some of the issues you 
 have to manage as a result.....................................
So how have training hours for Navy and Marine Corps pilots been 
 impacted and do you see an impact to pilot readiness due to the 
 shortfall now or in the future?................................
Admiral Manazir. Ma'am, I will let General Davis answer the 
 Marine Corps question because the impacts to both services 
 while founded in the same challenge are different in how we 
 train..........................................................
Strike fighter shortfall we now term as inventory management, so 
 if you have a shortfall that means your supply doesn't equal 
 your demand and so you have to manage that force...............
The proximate cause of the strike fighter inventory challenges 
 particularly in the F-18 and the JSF [Joint Strike Fighter] is 
 the JSF sliding to the right. General Davis testified that he 
 wants to see a faster ramp to F-35, to the new, fifth 
 generation fighter.............................................
We want to make sure that there is no delay to the F-35C 
 arriving. But it has slid several years. That has caused two 
 problems. The first one is that we have had to induct more of 
 our F-18 A through D legacy force into the depot...............
We didn't plan to do that maintenance and when we opened those 
 airplanes up they had significant corrosion that we did not 
 plan for. And so that created a depot load that we had to 
 change the process and how we manage that. That created 
 shortfalls on the flight line..................................
The second effect it had was we were over-flying our F-18s, Super 
 Hornets, Es and Fs. We didn't plan to fly them this much nor 
 this early in their life. So it is accelerating the life use on 
 the F-18 Es and Fs.............................................
And in fact, our unfunded priority list--the number one priority 
 from the Chief of Naval Operations is 14 Es and Fs to help 
 cover the gap that we never foresaw between the F-18 C and the 
 F-35...........................................................
We are taking--as you know, we do what is called tiered 
 readiness, it is phase-based tiered readiness, I explained it a 
 little bit in my written statement, where the deployers are 
 full up ready to go for any high-end mission. And then the next 
 to go are also trained at the intermediate, advanced level.....
Where we see the effects on training, ma'am, are in the early 
 training phases leading up to advanced training and then it is 
 sustainment when they come home from extended deployment. You 
 will see some of the resources having to be moved to the next 
 deployer.......................................................
So on either end of that deployed cycle, that is where we see 
 those hits. That aircraft availability, just exactly what 
 General Davis says, that limited aircraft availability--
 especially early in the phase--doesn't allow us to train those 
 aviators that are in that phase. And we have to steepen the 
 training ramp to get them up to speed before they deploy. Those 
 are the effects................................................
Mrs. Hartzler. How many hours short are you, would you say, for a 
 normal training? If you have optimal training for all tiers to 
 be fully trained, how many hours more are--you need?...........
Admiral Manazir. So it is a--that is a difficult calculation 
 because we--it is almost area under the curve. There is a 
 certain number of hours at the very low maintenance level, its 
 currency hours is just 11 hours per pilot per month............
And then it goes up to the fully deployed to about 27 hours per 
 pilot per month in each type model series. The fiscal year 2017 
 President's budget request does give us a readiness level that 
 is executable because of the numbers of airplanes..............
Sometimes people will say, hey, you need to fly more hours and so 
 we are going to give you more flying hour money. One of the 
 causes of why we are where we are today is money went into 
 flying hours but the underlying accounts, the enabling 
 accounts, were underfunded.....................................
So the airplanes weren't available to fly. So I would rather not 
 tell you that I need more hours. What I need is the fiscal year 
 2017 submission and the bills that the chairman talked about to 
 get that readiness level up so that we can increase the flying 
 in those lower stages of training..............................
Mrs. Hartzler. As you know, we have got the 14 extra F-18s in the 
 NDAA and we are going to try and bring that across the finish 
 line. Is that enough? Would you like more if you could?........
Admiral Manazir. In the 2017 budget, that 14 remains the request. 
 CNO Greenert testified earlier in 2015 that we need two to 
 three squadrons to fill the gap in our total force with a 
 tiered-readiness model.........................................
We haven't quite got to that point of having all of those 
 squadrons and all of those numbers. As we continue to use the 
 airplanes that we are using, I think you are going to see 
 repeat requests for Super Hornets as we go forward in future 
 year budgets...................................................
Mrs. Hartzler. Sure..............................................
Nineteen seconds General Davis--has pilot readiness been 
 impacted?......................................................
General Davis. I will tell you exactly, we are 6 hours--about 6 
 hours per month per pilot short on the TACAIR fleet, 
 specifically F-18. We fixed the Harriers; they are doing better 
 right now......................................................
We have got one squadron that is in Bahrain that is flying a lot, 
 about 800 hour a month for a 10-plane squadron, so those guys 
 are doing well. But on average, low. We have asked for two F-
 35Cs and two F-35Bs to help fill our coffers out there.........
Our plan is to put our guys in an 8,000-hour airplane, the F-35B 
 and C, and basically take advantage of that full ramp. We have 
 been having a lot of help from Boeing Corporation to help fix 
 our legacy airplane............................................
So four things that F-18s--legacy F-18s are down for. They are in 
 the depot. They are--need an in-service repair, which is too 
 much maintenance for my marines to fix. They need the special 
 permissions to go do that. Not mission capable-supply or -
 maintenance. A large number of our legacy F-18s were on the 
 flight line, needed a minor repair that my marines aren't able 
 to do it, same thing with the sailors..........................
So we didn't have enough depot artisans to do that work so we 
 took some depot artisans and put them up at Miramar and that 
 has had a palpable and positive impact on my flight line 
 readiness for F-18 in Miramar. We basically hired Boeing--Navy 
 blessed Boeing Corporation folks to go do that ISR [in-service 
 repair] work. It makes sense, they built the airplane, and 
 bottom line is we are getting much better readiness out of the 
 Beaufort effort, as well.......................................
That just started................................................
So taking those in-service repair airplanes, a large slug of our 
 airplanes, if we could get at that would actually help on my F-
 18 readiness as they are doing that now. So hats off to Boeing 
 and using the OEMs [original equipment manufacturers], not just 
 for the F-18 but across the spectrum to help increase our 
 readiness wherever we can......................................
Mrs. Hartzler. Hats off to all of you for taking a difficult 
 situation and making the best of it............................
Thank you, Mr. Chairman..........................................
Mr. Wittman. Thank you, Mrs. Hartzler............................
We will now go to Mr. Gallego....................................
Mr. Gallego. Thank you, Mr. Chair................................
This question is for the Navy-Marine Corps team. Recently, the 
 Marine Corps announced plans to rotate another amphibious 
 readiness group [ARG] or Marine expeditionary unit [MEU] in the 
 Pacific by 2019................................................
However, when the announcement was made it was acknowledged that 
 sourcing plans had yet not been worked out. While the Navy-
 Marine Corps continued to maintain a forward presence through 
 aircraft carriers and MEUs for example additional requirements 
 such as two special purpose MAGTFs and this proposed ARG-MEU 
 continued to place additional requirements on the force during 
 a time of constrained resources................................
So my question, very simple: How much more operational stress can 
 the Navy and Marine Corps aviation enterprise take within what 
 I described? And also, can we continue to extend our presence 
 under the current readiness projections?.......................
General Davis. I can answer part of that. The special purpose 
 MAGTFs--we have one in Spain and one in the Central Command 
 area of responsibility. The reason we did that, 12 V-22s and 4 
 C-130s, is because we didn't have the amphibious shipping we 
 needed to put out there........................................
So I could cover down on the requirement with four V-22s if I had 
 an amphibious ship to embark those marines on, but they have 
 got to fly, a lot of times 2,000 miles. So the beauty of sea-
 based assets, whether it is on a carrier or an amphibious 
 carrier, is you can move that ship around and put it to close 
 proximity of the action and get out there without a tanker. It 
 could fly there without a tanker...............................
So the fact that we don't have the ships does add to wear and 
 tear on airplanes like the V-22 and C-130s. So I would have 
 more amphibious ships. I know this is an aviation hearing. I 
 would have a--my guys go off the ships and off the 
 expeditionary bases ashore. But that helps us get closer to the 
 objective area, so more of that would be certainly helpful, 
 sir............................................................
Admiral Manazir. Okay, Mr. Gallego, the Navy works closely with 
 the Joint Staff to source a global force management plan. We 
 currently are resourced to deploy two amphibious readiness 
 groups and two carrier strike groups. It will take us to about 
 the end of this Future Year Defense Plan, 2020 to 2022, to be 
 able to resource a third deployed amphibious readiness group. 
 So our current capacity is two amphibious readiness groups.....
Mr. Gallego. Excellent, thank you................................
General Davis, we spoke a little bit earlier under--from 
 questions from another Member of Congress regarding parts. But 
 you have advocated for resizing the spare parts account to 
 increase readiness. Such a change would ensure more parts are 
 on hand instead of waiting on the supply chain. Can you 
 describe how much additional funding you think it will require 
 in future years, and whether this would demand a policy change 
 in how spare parts programs are maintained?....................
General Davis. I can get you the exact number, sir, but that is 
 something we are looking at. This year, you can see from our 
 unfunded priorities list that we ask for help on spare parts, 
 specifically F-35. They have been underfunded and that has an 
 impact not just in the year of execution, but it is 3 years 
 later when those parts are supposed to be there to make sure we 
 get maximum value out of that..................................
But I think in the aggregate, we could look at how we spare our 
 programs in the Department of Defense. I don't know any airline 
 out there that has got a not mission capable-supply target 
 anything other than zero percent. So we have these great 
 airplanes, but we put a marine out there or a sailor, soldier, 
 airman, and they don't have enough parts.......................
If your target is 10 percent non mission capable-supply, I am 
 worried about that 10 percent. Where do they get that part? It 
 has usually got a bureau number written on it..................
And then airplanes like the CH-53, we had marines for a number of 
 years who would go to an airplane that couldn't fly and take 
 the part off the airplane. These are great maintainers. I worry 
 about the pilots and retaining pilots. I worry about my 
 enlisted marines, my enlisted maintainers. Those are the guys 
 if I have got to focus on retaining anybody, I am going to 
 retain them; give them the tools, not just the tools in the 
 shop, but the pubs, but also the parts they need to be--to 
 extract maximum readiness out of the platforms we have.........
I will come back to you, sir, and tell you exactly what I think 
 they would cost, but it is the cost of low readiness is, I 
 think, something our Nation can't afford. And if having that 
 airplane, as great as the airplanes we are all procuring out 
 here, to not have a part for it is kind of crazy...............
Mr. Gallego. Thank you...........................................
Mr. Wittman. Thank you, Mr. Gallego..............................
We now go to Mr. Lamborn.........................................
Mr. Lamborn. Thank you...........................................
We have all known for some time that readiness is a big problem 
 and including a recent focus by this committee, under the 
 leadership of Chairman Thornberry and Chairman Wittman.........
So from an Air Force perspective in particular, recently the 
 Thunderbird crash in my district, along with the tragic loss of 
 life in the Blue Angel crash the very same day, really got 
 people's attention.............................................
These tragic events, along with other recent crashes, have caused 
 the American people to ask a lot of questions including: Why 
 did these crashes happen? And what can we do to prevent this in 
 the future?....................................................
The answers to these questions are undoubtedly complex. But 
 getting the right answers and taking the right action is 
 vitally important. The very lives of our aviators depend on it. 
 And also how well prepared we are to fight a war if necessary..
So I know it is your job in the military to make the most of what 
 you have and to carry on with the mission regardless, but I 
 really ask for the maximum frankness and being candid on your 
 part...........................................................
So, General West, what are the trends in Air Force mishaps over 
 the past 8 to 10 years?........................................
General West. Thank you, sir. We haven't seen a correlation 
 between mishap rates and our readiness concerns now over the 
 last 10 years..................................................
Mr. Lamborn. We have or haven't?.................................
General West. Have not. Our mishap rate is about the same, 
 trending down, as it has been over 10 years. That doesn't mean 
 that the goal for mishaps is not zero. We don't want to lose a 
 single airman or lose equipment. But we don't have a 
 correlation because of our readiness issues that would seem to 
 indicate that either human factors, largely driven by 
 complacency, operations or maintenance, or material failures of 
 operating systems that are decades old, are having--they have 
 an affect on readiness.........................................
But we haven't seen that the trend data shows that they have had 
 an affect on safety. That doesn't mean we don't pay attention 
 to safety. In every case, we do conduct two investigations 
 afterward--one safety for the safety privilege reasons; the 
 other for legal purposes. And those--the legal one is public 
 knowledge. The safety one under privilege is meant to uncover 
 things with privilege so that we can take action quickly, if 
 necessary......................................................
Mr. Lamborn. Okay, well let's focus then on readiness in 
 particular now. How many hours did the average pilot fly 10 
 years ago versus today, as far as you know? And is there a 
 difference in either flight hours or maintenance or the age of 
 aircraft 10 years ago versus today? How would you summarize 
 that?..........................................................
General West. Yes, sir. Well the--I don't mean to be flippant at 
 all, sir. They are 10 years older, the aircraft, obviously. And 
 that comes with the challenges of when you perform depot work, 
 you are going to discover things that weren't anticipated 
 because the original service life wasn't intended to be this 
 many decades old. And we make choices of sustaining legacy 
 systems within a certain amount of budget, with modernizing for 
 the future.....................................................
So the longer we sustain systems that are older, then the closer 
 we get to where they will no longer be relevant in combat 
 because of other systems that are fielded by potential 
 adversaries. So we have to make choices........................
Mr. Lamborn. Now if the replacement rate is equal to the rate at 
 which they are being mothballed, there would not be--the 
 average would not be 8 or 10 years older. It would be constant.
General West. Yes, sir...........................................
Mr. Lamborn. But you are saying that that is not the case; that 
 the average rate is now 10 years older versus 10 years ago, of 
 the aircraft?..................................................
General West. That is the way it is going to be outside of the 
 ISR [intelligence, surveillance, and reconnaissance] community, 
 which MQ-1s and MQ-9s are a brand new weapon system. But we 
 continue to operate A-10s, F-16s, B-52s, B-1s, B-2s, KC-135s, 
 KC-10s. It is the same fleet that we have operated successfully 
 for years......................................................
We will have a large modernization effort that will come forward 
 in the 2020s, B-21, KC-46, the bulk of the F-35s, et cetera, 
 for a long period to come. But right now the fleet is aging....
Mr. Lamborn. Now as aircraft reach their expected life, or exceed 
 their expected life, what happens in terms of maintenance or 
 flying hours and things like that?.............................
General West. We conduct a service life extension program to 
 extend the life of the aircraft. It varies by aircraft what 
 that entails technically. But we extend it by some number of 
 thousands of hours, and we work at how long we want to extend 
 the service life based on when we expect a replacement to come 
 into play......................................................
If I could go back to your question about hours. The hours are a 
 concern for training, but more important than just the hours 
 that crews get, are the intensity of training during those 
 hours. Our crews get excellent training to be able to go down 
 range and conduct ISR, strike, airlift, close air support, 
 electronic warfare.............................................
What we are not able to do with the training hours we get in the 
 United States is sufficiently prepare them for combat with that 
 near-peer competitor. That is a different level of intensity 
 that requires investments along five different fronts, first 
 starting with the maintainers to be able to do it..............
And that is a different dynamic from events when you are training 
 versus just hours. Our crews get a lot of hours down range. But 
 that is not the same level of intensity........................
Mr. Lamborn. Thank you very much.................................
Mr. Wittman. Lieutenant General Davis, I wanted to follow up on 
 some of the comments that you have made concerning training 
 hours. You have talked about making sure that you had 
 maintainers that were capable and that you were short in the 
 amount of seat time that pilots had, real flying time, not 
 simulator time, and talked about needing to have that ready 
 bench, and that when you lack aircraft to train pilots and 
 train maintainers that ready bench gets pretty thin, and in 
 some instances non-existent....................................
I wanted to, and you spoke earlier about Class A mishaps. I do 
 want to try to drill a little bit deeper. We know about a year 
 or so ago, there was a tragic CH-53 accident off the coast of 
 Hawaii; challenging conditions. But that being said, in talking 
 about those shortfalls that you have there in making sure 
 maintainers have what they need, making sure pilots have that 
 seat time. And I know that the investigation for that accident 
 is coming to its completion....................................
Can you maybe talk a little bit specifically about that? Do you 
 believe that the elements that you spoke about in the training 
 side, both maintainers and pilots, could have had any impact in 
 that particular accident?......................................
And I know we can look at rates, but I want to be able to look at 
 specific recent instances, because I think that is what Mr. 
 Lamborn had spoken about, what we are hearing from folks about 
 the concern about that particular situation....................
And whether it is the tragic accident with the Blue Angels pilot, 
 the Thunderbirds pilot, whatever it may be, the question 
 becomes as we highlight these shortfalls, what association 
 might that have with this? And I want to ask you specifically 
 about that incident because I know there are a lot of different 
 conditions there that were at question.........................
General Davis. Yes, sir, thank you for the question. As you know 
 that investigation is still underway and I don't want to do 
 anything to get out in front of what they might tell us........
I am highly confident that that crew was flying good airplanes, 
 that both crews were flying good airplanes, they were properly 
 maintained, and it is a tragedy................................
I mean this is a real tragedy, all of our losses to include the 
 Blue Angels, tragedy. Here is what I worry about the most, if I 
 had to kind of step back from this. That crew was safe but that 
 crew could have been a lot more proficient at the combat 
 mission that it is on task to go execute. So I don't know how 
 well trained they would be to go fight the high-end fight......
They were doing what was a pretty straightforward mission that 
 night. Tragedy though. I worry about my young aviators that 
 aren't getting the number of hours they need to. And so it is 
 the mishap that looms on our bow that we don't see coming just 
 now............................................................
I remember that as a young guy I had a couple close calls; as I 
 young guy I had some close calls. I do not know how I would do 
 having the amount of flight time that my youngsters get. And I 
 have got two sons that fly Marine airplanes....................
They're not complainers, but as a dad I worry about it. They're 
 just not getting the looks at the ball that I got. So when that 
 bad thing happens to them, or when they're a flight lead, and 
 they're trying to take somebody out there and a bad thing is 
 happening to the youngster that they're leading, man or woman, 
 will they have the experience to keep that bad thing from 
 happening?.....................................................
Saying I see this, I know this, I feel this--I know the science 
 of aviation but you have me up here, General Neller has me, to 
 understand the intuition and the sense of aviation as well. We 
 are not where we need to be. So we are proficient but we are 
 not as good as we need to be because we don't get the number of 
 hours that we need to get because there is just not enough 
 inventory there................................................
You know, the old days when I was a lieutenant, it was 75 percent 
 mission capable rates, those were all the numbers we knew. I 
 will tell you that in order to get to 75 percent mission 
 capable, I would need about another 366 airplanes in the Marine 
 Corps that, they are there, they don't exist, they don't have 
 parts, they are stuck in a depot, or they are on a production 
 line someplace coming to us. I think I can--I can't make a 
 direct line to the Class A, but there is risk there by not 
 flying and not building the experience out there...............
It has not been borne out in an investigation. It doesn't mean 
 that a mishap investigation 3 years from now isn't going to say 
 that this person here did not have the experience they needed 
 to get as a young captain and now he is a major or she is a 
 lieutenant colonel, squadron commander, and she just didn't see 
 this before because she didn't have the experience. So I would 
 worry about the stuff that looms in our bow sir................
Mr. Wittman. Thank you General Davis, and I want to kind of tie a 
 string between each of these instances that you all have 
 highlighted today. And we will start there in the Marine Corps. 
 You have spoken about the shortfalls that are there with 
 maintainers, aircraft to maintain, the ability for that 
 experience with our maintainers and with our pilots all 
 manifesting themselves in different ways.......................
General Mangum, you spoke about the same thing. Situation where 
 if a helicopter is deployed in Afghanistan, maintainer is back 
 home. That creates an atrophy there in that force in that 
 capability that not only will we see today, but as you spoke 
 of, we will probably see in years to come. General West you 
 spoke of the same thing there..................................
A shortage of maintainers in the Air Force. Making sure too, that 
 we have the senior NCOs [noncommissioned officers] there in the 
 Air Force that are the backbone of training, the new airmen 
 that come in to be able to maintain those aircraft. Making 
 sure, too, we are transitioning from maintainers that are on an 
 A-10 aircraft to the new F-35 aircraft. You know all of that, 
 creating a challenge, a deficiency I would say within the realm 
 of what we need to have........................................
Admiral Manazir, you spoke of, too, the element there of what you 
 are dealing with today, going from a backlog of 12 F-18s to now 
 nearly 200, with legacy aircraft and Super Hornets, getting 
 them to that depot.............................................
We have flown those aircraft more than we expected, therefore 
 when they get to the depot we are having to do much deeper 
 maintenance, maintenance that really wasn't originally designed 
 to be done at the depot level, but you all are managing to get 
 that done......................................................
There is a common theme here we see across the realm here, we are 
 pushing harder, we have fewer resources, we have fewer of the 
 skilled people in the necessary positions to do all the things 
 that we need to do to make sure that we are not just rebuilding 
 that readiness, but maintaining the current level of readiness.
To me, that is a very, very deeply concerning issue. I know the 
 chairman and myself, as well as members of the committee and 
 the ranking member all have a deep level of concern............
And while it may not show itself directly today in the rate of 
 mishaps, I do believe it exhibits itself in additional risk for 
 the brave men and women that serve in our Air Force, our Navy, 
 our Army, and our Marine Corps. And to me, that is deeply, 
 deeply disturbing..............................................
And as you know, that bow wave that happens with that many times 
 doesn't manifest itself until months or sometimes years into 
 the future. I think our obligation on this subcommittee, as 
 well as the full committee, is to make sure we understand the 
 full scope of that, understand the challenges that you all face 
 which you have very eloquently stated to us today, but then 
 make sure that we get from you what do we need to do?..........
Now, we talk about preparing the conditions to restore readiness. 
 I mean, that is just building the foundation so you can 
 actually begin to build the house, as I put it. You know, this 
 is about building that two-story house. We are just right now 
 building the foundation. We can't even talk about the materials 
 that we need to actually build the structure of the house......
That is my concern and we need to understand not only what we 
 need to do to continue that effort, but where do we go and 
 where do we make sure we get there in the shortest amount of 
 time possible..................................................
This is also an issue not only of resources, but also of 
 capacity. You know, even if we were tomorrow able to write the 
 check, which we at this time can't, but if we were, the issue 
 is of pipeline capacity. Even if we wanted to, there is only so 
 much that you can do to get to that particular point. So you 
 know, our thrust from this hearing is to make sure we get from 
 you not only where those shortfalls are, but what do we need to 
 do to continue on that path of creating the conditions to 
 rebuild readiness and then how we expect to get there as 
 quickly as possible because the shorter time it takes for us to 
 get there, the less reverberation of effects that we will see 
 years down the road............................................
And we absolutely want to be able to prevent that with everything 
 that we have and we have to be able to, as Mr. Scott spoke 
 about--we have to be able to communicate this with folks that 
 are not on the Armed Services Committee. I think most of the 
 folks on the Armed Services Committee get it, they understand 
 the concept of readiness.......................................
But other members don't, so we have to be able to take from you 
 the headlines that they read about mishaps or shortfalls in 
 aviation across the spectrum and say okay, what are the things 
 that we need to do to be committed as a Congress to get those 
 things done? Maintainers, pilots, air time, experience in 
 maintaining, all those elements, and I think people intuitively 
 get that as long as we can provide them the specifics of that..
So our challenge is to make sure that we get from you, as an 
 outcome of today's hearing, in order to be able to do that. And 
 I know Mrs. Hartzler has another question that she wants to ask 
 that I think is within that realm and I want to make sure that 
 we give her that opportunity...................................
Mrs. Hartzler....................................................
Mrs. Hartzler. Thank you, Mr. Chairman for the additional time. 
 Well said. The purpose of this hearing and the importance of 
 this hearing, not only for our current readiness but also as we 
 look to the future and future platforms that are being 
 developed, maybe lessons learned and that is where my question 
 is focused.....................................................
The excellent airmen at Whiteman Air Force Base know a little bit 
 about readiness, and certainly, they have done an amazing job 
 in keeping the B-2 aircraft viable and mission-capable even 
 though there are only 20 aircrafts and they have had issues 
 with parts, sustainment and now, they are doing the DMS 
 [Defensive Management System] modernization all at the same 
 time. But yet, they are doing a great job......................
And I just wonder, as we look to the B-21, this question is for 
 General--Major General West--as we look to the B-21 being 
 developed, what lessons learned are you gleaning from the B-2 
 that can be a part of the sustainment plan for the B-21 going 
 forward?.......................................................
General West. I would say--I am not that closely connected to the 
 B-21 program. But we want the systems that we procure in the 
 future to the max extent possible to use proven technologies 
 that reduce the amount of time it takes to field and reduce the 
 cost as efficiently as possible, while at the same time, 
 fielding systems that are going to be relevant in combat for 
 years..........................................................
And there is risk with both to be able to do that. We want to 
 make them as maintainable as possible. We have made great 
 strides in maintaining stealth from the original platforms to 
 F-117 to F-22. Now, F-35 is much more maintainable; it will be 
 in the future. We are going to have to be able to share and 
 fuse information for B-21 crews just the same as we are going 
 to be able to do with the F-35.................................
And long-term lifecycle costs have to fit within our requirement 
 to have to modernize many other systems, KC-46, F-35s, weapons 
 associated with platforms to go with it. It all has to fit 
 within a certain top line......................................
So the lessons--not necessarily from B-2, but just in general 
 is--it is the entire life cycle and it has got to be able to 
 perform in combat for decades because it is likely we will 
 operate the B-21 just like we have other platforms and they 
 have to be relevant for a long time............................
Mrs. Hartzler. Certainly, having an increased number of airplanes 
 manufactured will be a big help. At this point, we are 
 projecting 100, from what I have read. But yet, I have also 
 read that that is a little bit short, that other people are 
 saying that we need about 174 to 205 B-21s.....................
Do you have any insights into that issue?........................
General West. No, ma'am. I don't. I will have to take that for 
 the record.....................................................
[The information referred to can be found in the Appendix on page 
 85.]...........................................................
Mrs. Hartzler. Okay. Well, thank you for what you do.............
Thank you, Mr. Chairman. I yield back............................
Mr. Wittman. Thank you, Mrs. Hartzler............................
I want to thank all of our witnesses today, General Davis, 
 General Mangum, General West, Admiral Manazir. Thank you so 
 much...........................................................
I also want to thank, too, the officers from your staff that are 
 here. I know they are extraordinarily valuable in things that 
 they do to provide the information collectively to us today. So 
 I want to thank each and every one of you......................
I assume we have some junior officers here today, too, so they 
 are certainly seeing and hearing things that they will be 
 dealing with in the years to come..............................
So we appreciate everyone here. Thanks--thank you so much for 
 your leadership and providing us a perspective that we need to 
 make sure that we are making the right decisions to support the 
 great job that you do..........................................
Please thank all of your great airmen, marines, soldiers, and 
 sailors for the job they do in maintaining our aircraft and the 
 job that they do in keeping those aircraft in the air and the 
 job they do in piloting those aircraft. We have absolutely the 
 best in the world and please thank them on our behalf for that.
And with that, our subcommittee is adjourned.....................
[Whereupon, at 11:51 a.m., the subcommittee was adjourned.]......

 
=======================================================================

 A P P E N D I X

 July 6, 2016

 
=======================================================================

 PREPARED STATEMENTS SUBMITTED FOR THE RECORD

 July 6, 2016

=======================================================================

 
 
 [GRAPHICS NOT AVAILABLE IN TIFF FORMAT]

 
=======================================================================

 WITNESS RESPONSES TO QUESTIONS ASKED DURING

 THE HEARING

 July 6, 2016

=======================================================================

 

 RESPONSE TO QUESTION SUBMITTED BY MRS. HARTZLER

 General West. The Air Force is currently conducting a 
congressionally-mandated study to determine the appropriate B-21 fleet 
size. We expect to submit the results of this study to Congress in late 
2016/early 2017. [See page 36.]

 
=======================================================================

 QUESTIONS SUBMITTED BY MEMBERS POST HEARING

 July 6, 2016

=======================================================================

 

 QUESTIONS SUBMITTED BY MS. TSONGAS

 Ms. Tsongas. Rear Admiral Manazir, during the February 2nd, 2016 
Tactical Airland Subcommittee hearing on Naval Aviation, you noted that 
you were focused on driving down the rate of physiological incidents 
experienced by F/A-18 pilots. Has that occurred? Has the rate of 
incidents decreased since we last spoke?
 Admiral Manazir. The Department has not yet seen a decline in the 
rate of reported F/A-18 physiological incidents. We are continuing 
efforts to educate our aviators about the risks of physiological 
events, and encouraging them to report even minor events which will aid 
in more accurate tracking of the incident rate and diagnosing the 
problem.
 Ms. Tsongas. Rear Admiral Manazir, during the same February 2nd, 
2016 Airland Subcommittee hearing, Rear Admiral Moran noted that 
addressing the physiological incident rate in the F-A/18 fleet was not 
a question of resources. Do you still feel like that is the case?
 Admiral Manazir. The F/A-18 Physiological Episode Team does not 
have any efforts or mitigations that have not been pursued or that have 
been put on hold due to a lack of funding. All reasonable efforts to 
reduce Physiological incidents are being pursued and are currently 
funded.
 Ms. Tsongas. Rear Admiral Manazir, during the same February 2nd, 
2016 Airland Subcommittee hearing, Rear Admiral Moran also indicated 
that the Navy was looking into extending the capacity of the backup 
oxygen system in order for pilots to have longer access to pure oxygen 
in the event of an emergency or if they felt the onset of a 
physiological event. Can you tell me where the Navy is in those 
efforts?
 Admiral Manazir. The Navy is in the process of awarding a contract 
in the fourth quarter of Fiscal Year 2016 for the developmental 
engineering design to increase the NACES seat kit emergency oxygen 
capacity by adding an additional oxygen bottle to the seat pan. The 
Navy will field the solution immediately following successful 
development and testing of the system.
 ______
 
 QUESTIONS SUBMITTED BY MR. PETERS
 Mr. Peters. The Secure LVC Advanced Training Environment ATD will 
provide a technology framework for LVC integration into 4th and 5th 
generation aircraft for a 2022 Program of Record. This program is 
intended to help meet increasing demand for higher fidelity, contested 
environment combat training and maintain a critical technology and 
training advantage. Given the significant cost savings and higher 
fidelity training SLATE ATD will help deliver, please provide an 
estimate of additional program resources to achieve all identified 
program goals including physical cockpit integration and testing, 
encryption, and 4th and 5th generation interoperability.
 General Davis. At this time, information regarding additional 
resource requirements has not been determined due to the immaturity of 
SLATE ATD. USAF-led efforts to test and field SLATE ATD will continue 
to be monitored with interest and no financial burden to the USMC. If 
the program matures over time and is determined to meet USMC LVC 
training capability requirements, then efforts to join the program may 
begin. In the meantime, the USMC will continue to research this and 
other LVC training options.
 Mr. Peters. The Secure LVC Advanced Training Environment ATD will 
provide a technology framework for LVC integration into 4th and 5th 
generation aircraft for a 2022 Program of Record. This program is 
intended to help meet increasing demand for higher fidelity, contested 
environment combat training and maintain a critical technology and 
training advantage. Given the significant cost savings and higher 
fidelity training SLATE ATD will help deliver, please provide an 
estimate of additional program resources to achieve all identified 
program goals including physical cockpit integration and testing, 
encryption, and 4th and 5th generation interoperability.
 General Mangum. The Secure Live, Virtual, Constructive (LVC) 
Advanced Training Environment (SLATE) Advanced Technology Demonstration 
(ATD) system is not an Army program of record for our aviation assets 
nor, is it on any transition path for any Army training aids, devices, 
simulations or simulators.
 Mr. Peters. The Secure LVC Advanced Training Environment ATD will 
provide a technology framework for LVC integration into 4th and 5th 
generation aircraft for a 2022 Program of Record. This program is 
intended to help meet increasing demand for higher fidelity, contested 
environment combat training and maintain a critical technology and 
training advantage. Given the significant cost savings and higher 
fidelity training SLATE ATD will help deliver, please provide an 
estimate of additional program resources to achieve all identified 
program goals including physical cockpit integration and testing, 
encryption, and 4th and 5th generation interoperability.
 General West. The SLATE program team has developed and coordinated 
a set of priorities, focus, and a revised timeline for an extension to 
the SLATE ATD to align with the availability of an F-35 aircraft for 
flight testing. The extension timeline would cost $48M and would add 
2.5 years to the schedule. In addition to testing SLATE components and 
models on the F-35, the extension expands the capabilities of the 
baseline demonstration with a larger number of sensor models, cyber 
vulnerability assessments of the SLATE infrastructure, and additional 
trades on range infrastructure, form factor processors, radios, MILS 
devices and 4th and 5th gen integration.
 The Air Force considers it essential that the potential for a 
timely training capability remain the practical imperative of the SLATE 
ATD program.
 Mr. Peters. The Secure LVC Advanced Training Environment ATD will 
provide a technology framework for LVC integration into 4th and 5th 
generation aircraft for a 2022 Program of Record. This program is 
intended to help meet increasing demand for higher fidelity, contested 
environment combat training and maintain a critical technology and 
training advantage. Given the significant cost savings and higher 
fidelity training SLATE ATD will help deliver, please provide an 
estimate of additional program resources to achieve all identified 
program goals including physical cockpit integration and testing, 
encryption, and 4th and 5th generation interoperability.
 Admiral Manazir. The Department of the Navy (DON) is collaborating 
with Department of the Air Force as a supplemental contributor to Air 
Force led Secure LVC Advanced Training Environment (SLATE) ATD efforts. 
DON hopes to gain a better understanding, through advanced or 
experimental waveforms, of how to improve data transfer capabilities 
driven by future aircraft training requirements. However, as a 
supplemental contributor DON defers specifics of SLATE ATD program 
goals and resourcing to the lead service.

 [all]