Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- [H.A.S.C. No. 114-18] AIR FORCE PROJECTION FORCES AVIATION PROGRAMS AND CAPABILITIES FOR FISCAL YEAR 2016 [House Hearing, 114 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 114-18] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2016 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED FOURTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES HEARING ON AIR FORCE PROJECTION FORCES AVIATION PROGRAMS AND CAPABILITIES FOR FISCAL YEAR 2016 __________ HEARING HELD MARCH 4, 2015 [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ______ U.S. GOVERNMENT PUBLISHING OFFICE 94-220 WASHINGTON : 2015 ----------------------------------------------------------------------- For sale by the Superintendent of Documents, U.S. Government Publishing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512-1800; DC area (202) 512-1800 Fax: (202) 512-2104 Mail: Stop IDCC, Washington, DC 20402-0001 SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES J. RANDY FORBES, Virginia, Chairman K. MICHAEL CONAWAY, Texas JOE COURTNEY, Connecticut STEVEN M. PALAZZO, Mississippi JAMES R. LANGEVIN, Rhode Island BRADLEY BYRNE, Alabama RICK LARSEN, Washington ROBERT J. WITTMAN, Virginia MADELEINE Z. BORDALLO, Guam DUNCAN HUNTER, California HENRY C. ``HANK'' JOHNSON, Jr., VICKY HARTZLER, Missouri Georgia PAUL COOK, California SCOTT H. PETERS, California JIM BRIDENSTINE, Oklahoma TULSI GABBARD, Hawaii JACKIE WALORSKI, Indiana GWEN GRAHAM, Florida RYAN K. ZINKE, Montana SETH MOULTON, Massachusetts STEPHEN KNIGHT, California John Sullivan, Professional Staff Member Phil MacNaughton, Professional Staff Member Katherine Rember, Clerk C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Forbes, Hon. J. Randy, a Representative from Virginia, Chairman, Subcommittee on Seapower and Projection Forces................. 1 WITNESSES Holmes, Lt Gen James M. ``Mike,'' USAF, Deputy Chief of Staff for Strategic Plans and Requirements, Department of the Air Force.. 2 LaPlante, Dr. William A., Assistant Secretary of the Air Force for Acquisition, Department of the Air Force................... 1 APPENDIX Prepared Statements: Courtney, Hon. Joe........................................... 17 Forbes, Hon. J. Randy........................................ 15 LaPlante, Dr. William A., joint with Lt Gen James M. ``Mike'' Holmes..................................................... 18 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: Mr. Forbes................................................... 35 Questions Submitted by Members Post Hearing: Ms. Bordallo................................................. 42 Mr. Forbes................................................... 39 Mr. Larsen................................................... 41 . AIR FORCE PROJECTION FORCES AVIATION PROGRAMS AND CAPABILITIES FOR FISCAL YEAR 2016 ---------- House of Representatives, Committee on Armed Services, Subcommittee on Seapower and Projection Forces, Washington, DC, Wednesday, March 4, 2015. The subcommittee met, pursuant to call, at 2:05 p.m., in room 2212, Rayburn House Office Building, Hon. J. Randy Forbes (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. J. RANDY FORBES, A REPRESENTATIVE FROM VIRGINIA, CHAIRMAN, SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES Mr. Forbes. We want to welcome everybody today to our hearing on the Air Force Projection Forces Aviation Programs and Capabilities for Fiscal Year 2016. The unfortunate thing, as we all know, they are going to schedule votes or have scheduled votes anywhere from now to maybe 2:30, so we are going to waive our opening remarks. Mr. Courtney and I both have agreed to that. And with that, we want to get right to our witnesses so they can make whatever comments they would like to make to the members. I have told them previously, Mr. Courtney has agreed to this, of course, that all their written remarks will be made part of the record. You can refer to those if you would like or you can just talk off the cuff, but we are just glad to have both of you here. As you know, we have Dr. William LaPlante here. He is the Assistant Secretary of the Air Force for Acquisition for the Department of the Air Force. Dr. LaPlante, thank you so much for joining us and for all the work you do for our country. We also have Lieutenant General James M. ``Mike'' Holmes, who is the Deputy Chief of Staff for Strategic Plans and Requirements for the Department of the Air Force. General, thank you again for your service, and to all those people who serve with you and below you. We appreciate their service to our country. And with that, Dr. LaPlante, I think you are going to start us off, and then we will go the General. So the floor is yours. [The prepared statements of Mr. Forbes and Mr. Courtney can be found in the Appendix beginning on page 15.] STATEMENT OF DR. WILLIAM A. LAPLANTE, ASSISTANT SECRETARY OF THE AIR FORCE FOR ACQUISITION, DEPARTMENT OF THE AIR FORCE Dr. LaPlante. Thank you, Chairman Forbes, and thank you, Ranking Member Courtney, and the rest of the distinguished ladies and gentlemen of the committee. I appreciate the work you do and support you give us in the Pentagon and to the warfighter. And what you do is very important. And we hope we can answer all your questions and have a good discussion today. General Holmes and I both have a joint prepared statement that we submitted for the record. I am not going to go through that statement here. I will just make a few remarks and then turn it over to General Holmes. I will start by saying that, you know, the challenge we have in our jobs in an acquisition and programming strategy is quite simple. It is that we have got these two competing problems. We have modernization, that is, that is the airplanes, in your case, the mobility airplanes, the bombers, that we are using today, and literally using in the fight today. And the pilots flying these airplanes are flying airplanes that are older than they are and keeping that going. At the same time, we have to modernize for the future. Those two are linked, of course, because if we mess up the modernization, then we just put more at risk, those pilots flying those airplanes. So that is our challenge is between those two things. And our job every day, General Holmes and I, the Chief, the Secretary, our whole team, is keeping that all together, keeping it together with a strategy. Oh, and by the way, in a budget that is, to say the least, very, very challenging. So all our discussions we have is about the trades between those two categories, and then making sure that we keep the modernization programs, the KC-46, the next tanker, the next bomber, that we keep those programs on track and don't lose our eye on the ball while we keep the modernization going. And it is a difficult trade, but that is what--what we are here to talk to you about. I look forward to your questions. I will just stop at this point and then let General Holmes give his remarks. [The joint prepared statement of Dr. LaPlante and General Holmes can be found in the Appendix on page 18.] Mr. Forbes. General. STATEMENT OF LT GEN JAMES M. ``MIKE'' HOLMES, USAF, DEPUTY CHIEF OF STAFF FOR STRATEGIC PLANS AND REQUIREMENTS, DEPARTMENT OF THE AIR FORCE General Holmes. Thank you, Dr. LaPlante. Chairman Forbes, Ranking Member Courtney, gentlemen and ladies of the committee, thank you for your continued support to the United States Air Force, our airmen, and their families. Our Air Force remains the most globally engaged air force on the planet, and we continue to do our best to deliver global vigilance, global reach, and global power for America every day. Our Air Force today is the smallest in our history, and we see no end to the incredible demand for the capabilities that we deliver. This demand, coupled with an increasingly challenging global situation and an uncertain budget environment, drives us to make some very difficult choices. The 2016 President's budget took some steps to improve our situation, and it allowed us to maximize the contributions to the total force, to reinforce investments in nuclear deterrence and space control, to emphasize our long-range and global and non-permissive capabilities, and to preserve our top three procurement programs: the F-35, the KC-46, and the Long Range Strike Bomber, two of which fit into your committee's portfolio. The President's budget added money above the BCA [Budget Control Act] caps because the administration believes additional spending is necessary to meet the requirements of the strategy, and it gives us the ability to halt reductions in our total force end strength, to continue our efforts to regain full-spectrum readiness, and to lay the groundwork for future innovation with some seed investments. However, we face shortfalls in our ability to meet all the requirements of the strategy even at those levels. In shortfalls in capacity first. I will talk about capacity, readiness, and modernization. Shortfalls in capacity mean we must accept some risk in our ability to meet all the requirements of the strategy. Shortfalls in readiness are driven by previous funding levels and a continued high ops [operations] tempo and demand for Air Force forces which exaggerate the effect of the capacity shortfalls. And then shortfalls in modernization mean potential adversaries, who have had 20 years to watch the way the American military does business and take steps to address it, are closing the capability gaps that separated the U.S. military from potential foes. This narrowed gap adds future risk to both mission and forces. When forced to choose on where to take the risk and to spread our dollars, the Department of Defense directed us and all the services to take risk in our current capacity in order to preserve readiness and the investments required to be ready in the future. As we look at the forces that we bring to you in this committee, primarily our bomber, tanker, and transport forces, I think that our bomber investment portfolio is in pretty good shape. There are about $3 billion invested to make those airplanes both compliant, to let them keep working in the airspace system, and then to modernize them and make sure they continue to do the things we require until the Long Range Strike Bomber is brought on board in the numbers that we need there. On the tanker side, although we have a very old fleet, the investments are in place there to keep those systems compliant and keep them out there, and the KC-46 program is in place to replace them. Bringing me then to the airlift side, the C-17, we thank Congress and the committee for your tireless efforts to get us that modernized airplane. It is one of our greatest airplanes, and it is in shape for the future. We have some investment in 2016 to make sure that we protect that investment in the airplane. And then the C-5 modernization program is coming to an end, and we are very happy with the results there. So what I am left with and that I am most concerned about, and I know that many members of the committee share that concern, is our C-130 fleet as we advance into the future. How do we make sure those airplanes remain safe, that they are compliant with the requirements of both the national and the international airspace system, and then that we modernize them to last through the service life that we need, particularly the H models, to exist. We know that we have had years of discussion with you and with the committee on the best way to go forward. We have reached the position now that I am concerned that we will not be able to keep the aircraft compliant to meet the deadlines that the FAA [Federal Aviation Administration] has set basically by the end of this 5-year defense plan. And if I was going to put all the money required into the AMP [avionics modernization program] program to get it done in time to get those airplanes compliant, I see the bill as coming to about $2.8 billion over the 5-year defense program. And Mr. Chairman, that $2.8 billion is kind of equivalent to retiring the KC-10 fleet for the FYDP [Future Years Defense Program], or retiring the C-5 fleet over the FYDP, or retiring about 150 KC-135s. On the combat Air Force's side, it is equivalent to the A-10 retirement that we had to take, or the entire B-1 fleet, or a reduction, and a significant reduction in 40 or so F-35s. So what we hope to do is to be able to work with the members and with the committee to be able to move out and to provide the compliance capability that those airplanes need. We think that we need to move out quickly to provide them with the radios that are required, 8.33 kilohertz radios with cockpit video recorder and a digital flight recorder with ADS-B [automatic dependent surveillance-broadcast] Out with enhanced Mode S [mode select] and with an enhanced Traffic Alert and Collision Avoidance System. We think we can do that for about $2.5 million per airplane, and that we can get that done, if not by 2020 but shortly after 2020 if we can gain concurrence with you to move forward. Now, we know that leaves us a modernization piece, and we know those airplanes have to be modified. We know that you have restricted us from pursuing modification if it is not the AMP program. And what we hope to do is work with you to lay out the details of a more affordable modernization program that we can afford to buy over multiple FYDPs, but that will make those airplanes able to continue to do their mission in an increasingly challenging environment into the future. Thank you again for the support that you have given the Air Force, for the support you give our airmen and families. Thank you for taking the time and inviting us to come speak to you today. The world is not becoming less safe or less stable. We think the world will continue to require on the capabilities that your committee manages and that the Air Force provides, and we thank you very much for being here. We are happy to take your questions. [The joint prepared statement of General Holmes and Dr. LaPlante can be found in the Appendix on page 18.] Mr. Forbes. Thank you, General and Secretary. The ranking member and I have decided to defer our questions so we can get as many member questions in as possible. I have no right to ask you to do this, but I am going to do it anyway. If you can keep your questions to about 3 minutes, as short as possible, just so we can get as many member questions in as possible. And with that, I recognize the gentlelady from Missouri for 5 minutes. Mrs. Hartzler. Thank you, Mr. Chairman. Thank you, gentlemen. I appreciate the tough job that you have. Quickly, I appreciate all you are doing and have done for the B-2 Stealth Bomber. Certainly the modernization program and everything is very, very important. You mention in your testimony that you are going to continue to pursue a number of sustainment initiatives to improve aircraft supportability, increase aircraft availability. I know that is something that I have been visiting with you all about as part sustainability and how--can you expand on some of the things that you are doing there to try to ensure that we have the parts we need for the B-2? Dr. LaPlante. Well, in general, in sustainability, what we are recognizing even more so is that, in fact, a lot of the money we can save in acquisition is actually in the sustainment part. So we are keenly, keenly interested in that. The B-2 case, you know, we continue to have the program to bring--do cost-effective maintenance of the airplane, particularly in the, for lack of a better word, the materials area, and you know what I am talking about. So that is a very important program for the B-2, because in fact, one of the biggest contributions to the availability challenge is for that airplane is maintenance of that--those materials. That is actually something that is going in the right direction. The availability of that airplane is actually getting better because of that work, so that I would call out that specific initiative, and I think it is very important. The other thing that we are doing, as you indicate, is we are modernizing the B-2. An important program for the B-2, and I would like this committee to recognize this, is a program that is really a defensive military systems program, DMS is the acronym, but the thing what it does is that B-2, we think of it as an advanced weapons system, which it is, but in fact, if we don't do DMS, it is not going to be--have the capabilities to operate in a modern contested environment. We have to do that program. It is funded, as General Holmes said. So those are two things I would call out, but you know, the B-2 is a very, very important program. Mrs. Hartzler. Just to follow up on the computer software program that I understand is being developed, be able to project the parts that would be needed to help them in advance be able to get in, do you have an update on that? Dr. LaPlante. I don't have an update on that specific program. Do you? General Holmes. No, ma'am, I don't. I know we are pursuing about 20 projects that help us manage the signature and the parts supply and that help us increase the availability rate on the airplane, but we will have to respond to you---- Mrs. Hartzler. Sure. LT Gen Holmes [continuing]. On that one. Dr. LaPlante. Be happy to look into that and get back to you on that. Mrs. Hartzler. Thank you for all that you do. I yield back. Mr. Forbes. I thank the gentlelady. The gentlelady from Guam is recognized for 5 minutes. Ms. Bordallo. Thank you very much, Mr. Chairman. And Secretary LaPlante and General Holmes, thank you for your testimony today. As we proceed with the engineering development of the LRS-B [Long Range Strike Bomber], what are some of the strategies that have gone into developing the $550 million average procurement needed cost cap that you have set? Are you expecting to pursue an arrangement similar to the KC-46, utilizing a fixed price procurement vehicle? And though the program is one of the Air Force's top three acquisition priorities, in fiscal year 2016 you have requested approximately $1.2 billion for development. What effects would we see to this program if Congress does not repeal sequestration? Dr. LaPlante. Let me answer the last point first. The effects of sequestration on all these programs is there. We in the Air Force have done our best, and so far we have been successful. Even in the sequester years that we have had, we protected, for the most part, F-35, the tanker, KC-46A, and LRS-B. We will continue to do it, but I will say this: I think the sequester happens, a lot of these programs, once again, are going to be put under tremendous stress. The munitions programs will be put under tremendous stress. But we try our best to protect those big three, but we can't promise that they will be protected. Let me get at some of the other parts of the LRS-B. The one question that you asked essentially was in the development, we are in the development, or about ready to start the development part of that program, are we going to go for a fixed price development program like the tanker, or not? I think the short answer is, and now I am going to talk generically in acquisition theory, if you can bear with me. The theory behind when you do fixed price and say development versus cost plus, which is kind of the classic thing, tends to come down to how confident are you in the technologies you are developing, and it--fundamentally, you are cost estimating on those technologies. To be very simple, if you are developing something that is very cutting edge, it is very hard to estimate how much it is going to cost because you are actually developing something cutting edge. That is why we tend to go cost plus. If you are developing something that is based heavily on, say, a commercial item, something we have high confidence that we know how much it should cost, then we feel much more comfortable going to fixed price development. Now, here is why it matters. If you are in a fixed price contract, it is really important to have a good estimate of what you think it is going to cost. If you get--if you are wrong on that, let's say you are wrong 50 percent one way or the other, somebody is going to really get hurt, right? If you are wrong, if the contractor ends up 50 percent over in a fixed price, they are very hurt, they may not survive. The program may not survive. The opposite, we would get rightfully criticized to say why are you giving a windfall buying something for twice the price that it cost. So you really want to have a good idea on the cost estimate in development. So the question then comes down to, for KC-46, the government made a decision that said, look, this is based as much on a 767. We think we have a pretty good idea on what the cost estimate should be. We are going to go a little--we are going to do a fixed price. That is not--it is actually unusual. Most development programs are cost plus. Okay. My belief on the LRS-B is it is going to be more traditional in the sense that we are doing a little bit more cutting edge. It is not based upon a commercial item, and so I think more likely it is going to be in the cost plus regime. But here is the important point. You brought up the $550 million number, and there has been some in the press on this. I would like just to make a couple of points on this. The first thing is, there's been a lot of studies on why acquisition goes wrong. What they constantly come down to are some very much fundamental principles you have to do at the beginning to do it right. The first is you have to fix your requirements, understand the requirements and fix them, don't change your requirements, number one. Number two, it has often been said why isn't cost built in as a requirement when you start a program? Why do we always say, well, maybe we will have a target? Number three, what we also see when programs don't do well, is we typically try to put too much into the program, and the program usually gets slid to the right, more then gets put in, and you end up in this circle. So what we have done with our LRS-B--and it wasn't me or General Holmes, it was our predecessors--back in 2010, they set the program up to exactly address all of those issues. Number one, they said we are going to make the cost a requirement. We are going to make the cost a requirement. We are going to pick a number after analysis, $550 million, the document was signed in 2010, that is why it is 2010 dollars, and people say, well, you didn't take into account inflation. You can go to the Internet, run an inflation calculator and find out that $55 in 2010 is $57 or $58 today, so we know that. But we put it in as a requirement. To build 100 airplanes, it is going to cost $550 million. What that does is, that drives the design. Industry has to design to that number, and we are going to assess against that number. That is why we did it. And the second thing is we are building an adaptable architecture as well to address some of these other issues. And final point, we have not changed the requirement on it. Ms. Bordallo. General, my time is up. I do have a question, if I could place it on the record. Mr. Forbes. Certainly can, and submit it for the record. Ms. Bordallo. Thank you. Yield back. Mr. Forbes. The gentleman from Oklahoma is recognized for 5 minutes. Mr. Bridenstine. Just out of curiosity, they called votes; is that correct? Mr. Forbes. That is correct, and so we only have minutes left. Mr. Bridenstine. Okay. Mr. Forbes. And we will have--get your question in because I don't think our members will be coming back---- Mr. Bridenstine. Okay. Mr. Forbes [continuing]. After this, so yours will be the final question. Mr. Bridenstine. I will try to be brief. For Dr. LaPlante, did Congress authorize an appropriate funding for the C-130 Avionics Modernization Program in fiscal year 2012? Dr. LaPlante. Yes. Mr. Bridenstine. And were those funds obligated in fiscal year 2012? Dr. LaPlante. As far as I know. Mr. Bridenstine. They were not. Dr. LaPlante. 2012 they were not. Mr. Bridenstine. They were not. Dr. LaPlante. Not in 2013 or 2014 either. Mr. Bridenstine. Okay. So in fiscal year 2013, as you mentioned, it was authorized and appropriated by Congress, and those funds were not obligated---- Dr. LaPlante. That is correct. Mr. Bridenstine [continuing]. In 2013. Dr. LaPlante. Or 2014. Mr. Bridenstine. Or 2014. Dr. LaPlante. That is correct. Mr. Bridenstine. Where it was authorized and appropriated but not obligated in 2014. Dr. LaPlante. That is correct. Mr. Bridenstine. And in 2015, is it authorized and appropriated for 2015? Dr. LaPlante. Well, with the--I believe---- Mr. Bridenstine. The answer is yes. The question is---- Dr. LaPlante. With---- Mr. Bridenstine [continuing]. Do you intend to obligate those funds this year? Dr. LaPlante. Oh, yes. Our plan is--if we get the approval, our plan is to take the money that has been obligated that we have and obligate it by the end of this fiscal year. Mr. Bridenstine. To the AMP program? Dr. LaPlante. Our plan is to do it towards the compliance items that General Holmes described. Mr. Bridenstine. So did you read section 134 of the fiscal year 2015 NDAA [National Defense Authorization Act]? Dr. LaPlante. We all have seen that language, yes. Mr. Bridenstine. Did you read the report language as well? Dr. LaPlante. Yes. Mr. Bridenstine. The report language says, ``We are specifically directing the Secretary of the Air Force not to transfer or repurpose funds authorized and appropriated for the AMP program to execute such additional modernizations unless the modifications are included as a part of the AMP program of record.'' Are you going to authorize the funds as part of the-- are you going to obligate the funds as part of the AMP program of record? Dr. LaPlante. We are not--I think as I said, we are going to obligate those funds towards the compliance items that General Holmes described. Mr. Bridenstine. No, but the AMP program of record is what--that is specifically the report language in the NDAA from fiscal year 2015. Dr. LaPlante. We have a different--we have different interpretations of what that language means. Mr. Bridenstine. Okay. Well, Congress is clear. The Air Force can do ADS-B Out, as you indicated. Dr. LaPlante. Right. Mr. Bridenstine. But it cannot take the money from AMP. That has to be within the AMP program. The Air Force can do CNS/ATM [communications, navigation, surveillance/air traffic management] or other program---- Dr. LaPlante. Correct. Mr. Bridenstine [continuing]. In CNS/ATM, but it has to be part of the AMP program of record. Are you aware of the limitation placed on the Secretary of the Air Force's budget in section 134? Dr. LaPlante. Yes, and Congressman, let me make sure I am understanding. I think--I think we are doing exactly what you are saying. We are--we are using the money for this--CT--ATM/ CNS, we are using it for the ADS-B Out and the radios as General---- Mr. Bridenstine. As part of the AMP program of record? Dr. LaPlante. It is going to be that money, yes. Mr. Bridenstine. Okay. So it needs to be part of the AMP program of record by law. Dr. LaPlante. I am not sure what that means, but--well, I am not sure what the--maybe we are doing exactly what you are saying. We are taking that money and we are going to buy those items. Mr. Bridenstine. So you are familiar with this. I just read--it was the fiscal year 2015 President's budget request, C-130, CNS/ATM program. It looks like you guys have changed the name of it to the VAAP [Viability and Airspace Access Program] program, Increment 1; is that correct? Are you familiar with this, the VAAP program, Increment 1? General Holmes. Yes, sir. Mr. Bridenstine. Is that what you intended? Did you change the name or are you changing the program and how is this working? Because the law is pretty clear. General Holmes. Sir, our lawyers believe that when certified by the Secretary of Defense, and the Secretary of Defense delegated that to Mr. Kendall, that when Mr. Kendall says it is necessary for us to spend money from those accounts that were previously obligated---- Mr. Bridenstine. A couple of things. I get that. I understand in 134 there is that out, but also in section 134, it fences 15 percent of the Secretary of the Air Force's money until the Air Force obligates fiscal year 2015 and prior years' funds to the AMP program of record. There is no exception made to this limitation provision. There is no limitation. So if you want to say that we are going to go forward with a different program under a different name, that means you are saying that we are going to cut 15 percent of the Secretary of the Air Force's operations and maintenance budget. Are you--do you understand that is what you are doing? That is in the law. General Holmes. Yes, sir, it is, and we have--our lawyers-- -- Mr. Bridenstine. Are you going to follow the law is my question? General Holmes. We are going to follow the law as interpreted by the general counsel. Mr. Bridenstine. And for the chairman of this committee, if we follow the law and you go forward under the program that I understand you are going forward with in the President's budget request, you are, in essence--we on this committee are required to make sure that the Secretary of the Air Force uses 15 percent of her operations and maintenance budget. Now, this--this is in the law. I just want to make sure everybody here understands this. Dr. LaPlante. Yeah. And Representative, we hear you. I just want to make sure that we have to do what our legal experts read the law tell us we can do and so---- Mr. Bridenstine. So you tell me. You can't make it any more clear. It is written---- Dr. LaPlante. Well, I am not a lawyer, but yes. Mr. Bridenstine. Sure. A couple of other things. In the 2014 NDAA, you know, section 133 prohibits the Air Force from using any funding to initiate---- Mr. Forbes. I am sorry to cut the gentleman off, but we have votes we have to go to, as time has expired. So if you would like to follow up with any written questions, we can do it. General, we also would like for you to respond, if you could, on the details of that modernization program. I apologize to everybody that we have only got a couple of minutes left for this vote. [The information referred to can be found in the Appendix on page 35.] Mr. Bridenstine. Sure. Mr. Forbes. But with that, Mr. Courtney has agreed we are adjourned, and we will follow up with any written questions. And if you would be so kind as to answer them for the record, we would appreciate it. With that, we are adjourned. [Whereupon, at 2:25 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X March 4, 2015 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD March 4, 2015 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING March 4, 2015 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MR. FORBES General Holmes. The Air Force continues to work towards the safety, compliance and modernization of our legacy C-130 fleet. Because of the cost and time required to conduct the modernization of the legacy C-130 fleet, we believe, and DOD has certified, that we need to fund the airspace compliance modifications first. The Air Force intends to follow the Fiscal Year 2015 National Defense Authorization Act guidance and we want to work with the Congress and our Total Force partners to develop an affordable C-130 modernization program. [See page 10.] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING March 4, 2015 ======================================================================= QUESTIONS SUBMITTED BY MR. FORBES Mr. Forbes. Knowing that the KC-46 tanker contract is fixed-price, how important is it to maintain funding stability for the program and what are the risks to the program if funding gets interrupted? Dr. LaPlante. Funding stability is extremely important to the success of the KC-46 program. Funding stability ensures the Air Force fulfills its contractual obligations required for Boeing to deliver 18 operationally-ready aircraft by August 2017 (Required Assets Available (RAA)). The fixed-price contract caps government Engineering & Manufacturing Development liability at $4.9B and provides 13 planned, on-contract procurement lots at Firm-Fixed Price or Not-To-Exceed levels. While these planned procurements provide a range for variable order quantities, a variation in production quantity affects the lot- to-lot pricing. Additionally, while the government and Boeing have successfully met all contractual obligations to date, the program is entering its most challenging part in flight test. For these reasons, RDT&E funding stability remains important to ensure necessary funds are available to address remaining program content, as well as program risks that may materialize. Production funding stability remains important to enable Boeing's achievement of RAA and ensure the government does not pay additional per aircraft costs due to quantity variations. Any government-induced issues or delays could lead to a Boeing request for equitable adjustment and potentially re-open the contract. Mr. Forbes. In the past year, Boeing has experienced wiring problems in building the first two KC-46 tankers which has delayed the development schedule. What impact will this delay have on initial operational capability in August 2017? Dr. LaPlante. Internal Boeing schedule events have shifted due to the delays in the first flights of the Engineering & Manufacturing Development aircraft. However, the final contractual milestone, Required Assets Available (RAA), has not shifted. RAA will still require Boeing to deliver 18 operationally-ready aircraft by August 2017. These delays eliminate the margin Boeing built into their original schedule, to include all schedule margin to the RAA contractual milestone date. Mr. Forbes. A recent draft GAO report noted that the original KC-46 schedule planned to have 13 months of testing on two aircraft before the October 2015 low-rate initial production decision. Now, due to delays resulting from wiring problems, the program will have only one aircraft in test for a three-month period before the October 2015 low- rate initial production decision. How will the Air Force ensure that key aerial refueling capabilities are demonstrated before the October 2015 low-rate initial production decision? Dr. LaPlante. Development testing required for the Milestone (MS) C Low Rate Initial Production (LRIP) decision consists of a combination of ground and flight testing, both which have commenced. Ground testing began in November 2014 and flight testing began with EMD #1's First Flight on 28 December 2014. The flight testing required for MS C is modest and can all be executed on one aircraft. The other three EMD aircraft will be used throughout the remainder of the program for full requirements verification and operational testing, both which are required for the Full Rate Production decision in CY2017. Finally, MS C is an event-driven milestone, the program continues to make measurable progress each and every day toward a successful MS C, and the AF will not ask the Defense Acquisition Executive for a decision to enter LRIP until all pre-coordinated entrance criteria are complete. Mr. Forbes. The Air Force has ignored congressional intent for the past three budget cycles and does not plan to obligate the $47.0 million in funding authorized and appropriated in fiscal year 2014 for the C-130 Avionics Modernization Program (AMP), The Air Force has sunk $1.5 billion in developing and successfully testing this program, but now plans to shelve that investment. If the Air Force does not intend to utilize AMP, can you explain how the Air Force intends to address the growing obsolescence and diminishing manufacturing sources (DMS) of the C-130H fleet? Dr. LaPlante. The Air Force continues to work towards the safety, compliance and modernization of our C-130H fleet. Because of the cost and time required to conduct the modernization of the C-130H fleet, we believe, and DOD has certified, that the AF must primarily address airspace compliance modifications. The Air Force intends to comply with the FY15 NDAA and work with Congress and Total Force partners to address avionics modernization efforts for the C-130H fleet. Mr. Forbes. USTRANSCOM has stated a requirement for 567 aerial tankers to meet its steady-state and contingency surge requirements, yet the Air Force only has an inventory of 454 tankers. What risk is the Air Force incurring by not having the sufficient number of tankers in the inventory to meet USTRANSCOM's requirements? General Holmes. The Air Force is incurring significant risk with the current fleet of 455 aerial refueling tankers. KC-46A deliveries improve risk to ``moderate'' once the fleet reaches the USTRANSCOM amended requirement of 479 aircraft (aligning with the Mobility Capability Assessment-2018 (MCA-18) analysis in their 2 February 2015 report to Congress on ``KC-10 Aerial Refueling Aircraft Force Structure''). This will match the level required against the updated scenarios, strategies, concept of operations, assumptions, and capabilities determined by the MCA-18. Mr. Forbes. If the Air Force is required to execute fiscal resources at Budget Control Act sequestration levels, what operational risk do you incur by having to divest the entire KC-10 tanker aircraft fleet? What other programmatic options would you have to execute if Congress prohibited the retirement of KC-10 aircraft? General Holmes. The KC-10 represents 13 percent of our tanker fleet and 30 percent of our air refueling capacity. If held to Budget Control Act level funding, we will be compelled to divest the KC-10 across the Future Years Defense Plan. According to the Mobility Capability Assessment-2018, divesting the 59 KC-10s would delay achieving a moderate risk level force structure by three years (from Fiscal Year 2018 (FY18) to FY21). If forced to retain the KC-10 without the funding associated with its operations, the Air Force would have to find other sources to offset $2.8 billion--the equivalent of roughly 150 KC-135s, which represents 30 percent of our tanker fleet and 33 percent of our air refueling capacity. Mr. Forbes. Knowing that the KC-46 tanker contract is fixed-price, how important is it to maintain funding stability for the program and what are the risks to the program if funding gets interrupted? General Holmes. Funding stability is extremely important to the success of the KC-46 program. Funding stability ensures the Air Force fulfills its contractual obligations required for Boeing to deliver 18 operationally-ready aircraft by August 2017 (Required Assets Available (RAA)). The fixed-price contract caps government Engineering & Manufacturing Development liability at $4.9B and provides 13 planned, on-contract procurement lots at Firm-Fixed Price or Not-To-Exceed levels. While these planned procurements provide a range for variable order quantities, a variation in production quantity affects the lot- to-lot pricing. Additionally, while the government and Boeing have successfully met all contractual obligations to date, the program is entering its most challenging part in flight test. For these reasons, RDT&E funding stability remains important to ensure necessary funds are available to address remaining program content, as well as program risks that may materialize. Production funding stability remains important to enable Boeing's achievement of RAA and ensure the government does not pay additional per aircraft costs due to quantity variations. Any government-induced issues or delays could lead to a Boeing request for equitable adjustment and potentially re-open the contract. Mr. Forbes. The Air Force is required by law to maintain a B-1 combat-coded inventory of 36 aircraft, for which the Air Force is complying with. However, the subcommittee understands that for three of those 36 aircraft, they do not have the same crew ratio or flying hours programmed against them as the other 33 B-1 combat coded aircraft. Can you explain to the subcommittee the reason for this difference, and what risk do you incur in meeting combatant commander requirements if all 36 combat-coded B-1 aircraft were required to meet presence and operational requirements? General Holmes. Since 33 aircraft meets current combatant commander requirements, the Air Force reduced flying hour and manpower funding on the three aircraft to fund other higher priorities. If combatant commanders' presence and operational requirements necessitates the full fleet of 36 aircraft, the Air Force will satisfy this requirement by using other combat-ready aircrews/maintainers as required to man/ maintain the remaining three combat-coded aircraft under reduced manning. Aside from potential increased risk in training operations, the Air Force expects no increased risk in meeting combatant commander requirements. Mr. Forbes. New START treaty requires a reduced number of deployed nuclear weapons, which in turn, will require the Air Force to decertify a certain number of B-52 aircraft. What is the projected number of B-52 aircraft that you will decertify in order to meet New START requirements? And, are these aircraft modifications reversible if ever needed to increase nuclear bomber capability in the future? General Holmes. The Air Force will modify a total of 42 B-52H aircraft to a conventional-only role by permanently removing the nuclear code enable switch and associated equipment, and installing tamper-resistant blocker panels where the equipment used to reside. Of the 42 aircraft, 30 are Active Duty/AF Reserve B-52H's and the remaining 12 B-52H's are currently parked at the Aerospace Maintenance and Regeneration Group (AMARG) B-52 located at Davis-Monthan AFB. Once a B-52H is converted to a convention-only role, it is not reversible. Mr. Forbes. FY16 PB proposes to cut the number of C-130s from 358 today to 308 by the end of FY20. Can you tell us what that number is based on and what kind of risk it poses? General Holmes. Pursuant to the language in the Fiscal Year 2013 (FY13) National Defense Authorization Act, the Air Force conducted an analysis of mobility assets to determine the appropriate number of aircraft required to fulfill contingency, humanitarian and homeland defense missions. This analysis, presented in the Mobility Capabilities Assessment (MCA) study determined ``there is no surge scenario associated with the current defense strategy--even one in which a significant homeland defense event occurs concurrently with two warfights--that requires a fleet of 358 C-130s.'' Rather, the analysis concluded the C-130 fleet size requirement ranges between 248 and 320 aircraft. Driven by fiscal constraints, yet recognizing the important role of intra-theater airlift in homeland defense and disaster response, the FY15 President's Budget (FY15 PB) reduced the C-130 fleet to 328 aircraft by FY19. This force structure continued to exceed the MCA's recommended level. Secretary of Defense Chuck Hagel stated in July 2013 that ``the Air Force could reduce tactical aircraft squadrons-- potentially as many as five--and cut the size of the C-130 fleet with minimal risk.'' In order to reduce excess capacity in the C-130 fleet and improve allocation of scarce resources, the Air Force made the decision to more closely align the C-130 fleet structure with the findings and recommendations of the MCA. The FY16 PB reduces the C-130 force structure to 300 total aircraft, balancing operational requirements and the realities of Budget Control Act constraints. These reductions allow the Total Force to invest in the remaining C-130 force and other requirements to counter existing and emerging national security threats. A fleet size of 300 presents a moderate risk force that can accomplish the operational requirements defined in the MCA. Mr. Forbes. Last year, the Air Force began a new program to upgrade the C-130 fleet called the Viability and Airspace Access Program, also known as ``VAAP.'' We understand the VAAP is currently planned for two increments with Increment 1 modifying 172 C-130Hs with new radios, updated transponders, and an updated cockpit voice recorder and digital flight recorder. VAAP 2 is undefined at the point. What viability and airspace access programs are planned for VAAP 2? Will the VAAP keep the C-130H fleet viable to 2030 and beyond? General Holmes. The Air Force continues to work towards the safety, compliance and modernization of our legacy C-130 fleet. Because of the cost and time required to conduct the modernization of the legacy C-130 fleet, we believe, and DOD has certified, that we need to fund the airspace compliance modifications first to include new radios, updated transponders, and an updated cockpit voice recorder and digital flight recorder. The Air Force intends to follow the Fiscal Year 2015 National Defense Authorization Act guidance and we want to work with the Congress and our Total Force partners to develop an affordable C-130 modernization program. ______ QUESTIONS SUBMITTED BY MR. LARSEN Mr. Larsen. The FY16 proposed budget shows an increase to $1.246B in funding for LRS-B. Does the increase reflect additional costs, an effort to shorten the program schedule, a combination of both or something else? Dr. LaPlante. The FY16 budget request reflects the schedule for the development phase of the program. There have been no cost increases to the program and the overall schedule remains on track. Mr. Larsen. It is my understanding that Boeing is actively marketing the KC-46 to allies. Does the Air Force have a view on this activity? General Holmes. ``The USAF is constantly educating our allies on the importance of establishing and maintaining certain capabilities, such as airborne refueling. We encourage our allies desiring an airborne refueling capability to purchase the KC-46 in order to provide: the best receiver air refueling platform, an increase in airlift capability, an airframe of improved force protection and survivability, multi-point air refueling, capable of both day and night operations, while providing rapid, global capability and interoperability between U.S., Joint, Allied, and Coalition forces.'' ______ QUESTIONS SUBMITTED BY MS. BORDALLO Ms. Bordallo. Where do we stand on the development of the concept of operations for employing the LRS-B? Should we expect a similar basing arrangement for the LRS-B as our current bomber fleet? General Holmes. The LRS-B Concept of Employment has been developed at the classified level and has been approved by Air Force senior leadership. Basing decisions for LRS-B have not yet been made; however, the Air Force anticipates going through the traditional staffing and approval processes for these decisions and will start this activity at the appropriate time to allow for any needed infrastructure changes. [all]