Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- DISCUSSION DRAFTS ADDRESSING HYDROPOWER REGULATORY MODERNIZATION AND FERC PROCESS COORDINATION UNDER THE NATURAL GAS ACT [House Hearing, 114 Congress] [From the U.S. Government Publishing Office] DISCUSSION DRAFTS ADDRESSING HYDROPOWER REGULATORY MODERNIZATION AND FERC PROCESS COORDINATION UNDER THE NATURAL GAS ACT ======================================================================= HEARING BEFORE THE SUBCOMMITTEE ON ENERGY AND POWER OF THE COMMITTEE ON ENERGY AND COMMERCE HOUSE OF REPRESENTATIVES ONE HUNDRED FOURTEENTH CONGRESS FIRST SESSION __________ MAY 13, 2015 __________ Serial No. 114-40 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] Printed for the use of the Committee on Energy and Commerce energycommerce.house.gov ____________ U.S. GOVERNMENT PUBLISHING OFFICE 96-986 WASHINGTON : 2016 ________________________________________________________________________________________ For sale by the Superintendent of Documents, U.S. Government Publishing Office, http://bookstore.gpo.gov. For more information, contact the GPO Customer Contact Center, U.S. Government Publishing Office. Phone 202-512-1800, or 866-512-1800 (toll-free). E-mail, [email protected]. COMMITTEE ON ENERGY AND COMMERCE FRED UPTON, Michigan Chairman JOE BARTON, Texas FRANK PALLONE, Jr., New Jersey Chairman Emeritus Ranking Member ED WHITFIELD, Kentucky BOBBY L. RUSH, Illinois JOHN SHIMKUS, Illinois ANNA G. ESHOO, California JOSEPH R. PITTS, Pennsylvania ELIOT L. ENGEL, New York GREG WALDEN, Oregon GENE GREEN, Texas TIM MURPHY, Pennsylvania DIANA DeGETTE, Colorado MICHAEL C. BURGESS, Texas LOIS CAPPS, California MARSHA BLACKBURN, Tennessee MICHAEL F. DOYLE, Pennsylvania Vice Chairman JANICE D. SCHAKOWSKY, Illinois STEVE SCALISE, Louisiana G.K. BUTTERFIELD, North Carolina ROBERT E. LATTA, Ohio DORIS O. MATSUI, California CATHY McMORRIS RODGERS, Washington KATHY CASTOR, Florida GREGG HARPER, Mississippi JOHN P. SARBANES, Maryland LEONARD LANCE, New Jersey JERRY McNERNEY, California BRETT GUTHRIE, Kentucky PETER WELCH, Vermont PETE OLSON, Texas BEN RAY LUJAN, New Mexico DAVID B. McKINLEY, West Virginia PAUL TONKO, New York MIKE POMPEO, Kansas JOHN A. YARMUTH, Kentucky ADAM KINZINGER, Illinois YVETTE D. CLARKE, New York H. MORGAN GRIFFITH, Virginia DAVID LOEBSACK, Iowa GUS M. BILIRAKIS, Florida KURT SCHRADER, Oregon BILL JOHNSON, Ohio JOSEPH P. KENNEDY, III, BILLY LONG, Missouri Massachusetts RENEE L. ELLMERS, North Carolina TONY CARDENAS, California LARRY BUCSHON, Indiana BILL FLORES, Texas SUSAN W. BROOKS, Indiana MARKWAYNE MULLIN, Oklahoma RICHARD HUDSON, North Carolina CHRIS COLLINS, New York KEVIN CRAMER, North Dakota Subcommittee on Energy and Power ED WHITFIELD, Kentucky Chairman PETE OLSON, Texas BOBBY L. RUSH, Illinois Vice Chairman Ranking Member JOHN SHIMKUS, Illinois JERRY McNERNEY, California JOSEPH R. PITTS, Pennsylvania PAUL TONKO, New York ROBERT E. LATTA, Ohio ELIOT L. ENGEL, New York GREGG HARPER, Vice Chairman GENE GREEN, Texas DAVID B. McKINLEY, West Virginia LOIS CAPPS, California MIKE POMPEO, Kansas MICHAEL F. DOYLE, Pennsylvania ADAM KINZINGER, Illinois KATHY CASTOR, Florida H. MORGAN GRIFFITH, Virginia JOHN P. SARBANES, Maryland BILL JOHNSON, Ohio PETER WELCH, Vermont BILLY LONG, Missouri JOHN A. YARMUTH, Kentucky RENEE L. ELLMERS, North Carolina DAVID LOEBSACK, Iowa BILL FLORES, Texas FRANK PALLONE, Jr., New Jersey (ex MARKWAYNE MULLIN, Oklahoma officio) RICHARD HUDSON, North Carolina JOE BARTON, Texas FRED UPTON, Michigan (ex officio) C O N T E N T S ---------- Page Hon. Ed Whitfield, a Representative in Congress from the Commonwealth of Kentucky, opening statement.................... 1 Prepared statement........................................... 3 Hon. Bobby L. Rush, a Representative in Congress from the State of Illinois, opening statement................................. 4 Hon. Frank Pallone, Jr., a Representative in Congress from the State of New Jersey, opening statement......................... 5 Hon. Fred Upton, a Representative in Congress from the State of Michigan, prepared statement................................... 156 Witnesses Paul R. Lepage, Governor of Maine................................ 7 Prepared statement........................................... 9 Answers to submitted questions............................... Ann F. Miles, Director, Office of Energy Projects, Federal Energy Regulatory Commission.......................................... 13 Prepared statement........................................... 15 Answers to submitted questions............................... Donald F. Santa, President and CEO, Interstate Natural Gas Association of America......................................... 74 Prepared statement........................................... 76 Answers to submitted questions............................... Carolyn Elefant, Member of the Board, The Pipeline Safety Coalition, Principal, The Law Offices of Carolyn Elefant....... 88 Prepared statement........................................... 90 John Collins, Managing Director of Business Development, Cube Hydro Partners................................................. 97 Prepared statement........................................... 99 Richard Roos-Collins, General Counsel, The Hydropower Reform Coalition...................................................... 111 Prepared statement........................................... 113 Answers to submitted questions............................... Randy Livingston, Vice President, Power Generation, Pacific Gas and Electric Company........................................... 121 Prepared statement........................................... 123 John J. Suloway, Board Member, National Hydropower Association, Principal, Water and Power Law Group, PC (On Behalf of the Hydropower Reform Coalition)................................... 130 Prepared statement........................................... 132 Submitted Material Discussion draft on FERC Process Coordination \1\................ 3 Discussion draft on Hydropower Regulatory Modernization \2\...... 4 Statement of the Edison Electric Institute, submitted by Mr. Whitfield...................................................... 158 Statement of the American Public Power Association, submitted by Mr. Whitfield.................................................. 159 Statement of Trout Unlimited..................................... 162 Statement of the Modesto Irrigation District and Turlock Irrigation District of California.............................. 167 ---------- \1\ Available at: http://docs.house.gov/meetings/IF/IF03/ 20150513/103443/BILLS-114pih-DiscussionDraftonFERCProcess.pdf. \2\ Available at: http://docs.house.gov/meetings/IF/IF03/ 20150513/103443/BILLS-114pih- DiscussionDraftonHydropowerRegulatoryModernization.pdf. DISCUSSION DRAFTS ADDRESSING HYDROPOWER REGULATORY MODERNIZATION AND FERC PROCESS COORDINATION UNDER THE NATURAL GAS ACT ---------- WEDNESDAY, MAY 13, 2015 House of Representatives, Subcommittee on Energy and Power, Committee on Energy and Commerce, Washington, DC. The subcommittee met, pursuant to call, at 10:03 a.m., in room 2123 of the Rayburn House Office Building, Hon. Ed Whitfield (chairman of the subcommittee) presiding. Members present: Representatives Whitfield, Olson, Barton, Shimkus, Pitts, Latta, Harper, McKinley, Griffith, Johnson, Long, Ellmers, Mullin, Hudson, Rush, McNerney, Tonko, Green, Sarbanes, Loebsack, and Pallone (ex officio). Staff present: Nick Abraham, Legislative Associate, Energy and Power; Charlotte Baker, Deputy Communications Director; Will Batson, Legislative Clerk; Leighton Brown, Press Assistant; Allison Busbee, Policy Coordinator, Energy and Power; Patrick Currier, Counsel, Energy and Power; Tom Hassenboehler, Chief Counsel, Energy and Power; Ben Lieberman, Counsel, Energy and Power; Brandon Mooney, Professional Staff Member, Energy and Power; Chris Sarley, Policy Coordinator, Environment and Economy; Christine Brennan, Democratic Press Secretary; Jeff Carroll, Democratic Staff Director; Caitlin Haberman, Democratic Professional Staff Member; Rick Kessler, Democratic Senior Advisor and Staff Director, Energy and Environment; and John Marshall, Democratic Policy Coordinator. OPENING STATEMENT OF HON. ED WHITFIELD, A REPRESENTATIVE IN CONGRESS FROM THE COMMONWEALTH OF KENTUCKY Mr. Whitfield. I would like to call the hearing to order this morning. Today we are going to have another discussion on a discussion draft addressing hydropower regulatory modernization, and the FERC process coordination under the Natural Gas Act. As you know, we have had a series of meetings and hearings on drafts that we want to incorporate in an overall energy bill, and today, as I said, we are going to be focusing on hydroelectric power and natural gas. And our goal is to help unleash the potential of these affordable domestic energy sources by modernizing the applicable regulatory process at FERC. If ever there were such a thing as a bipartisan energy source, it is certainly hydroelectric, and natural gas would be at the top of the list. So I look forward to working with all of my colleagues to minimize the red tape and maximize the benefits of these two sources for the sake of affordable energy, the environment, national security, job creation, and certainly economic growth. Hydroelectric is a source of clean, reliable, and affordable power, yet the federal process for licensing new capacity or relicensing existing capacity is considerably more cumbersome than for other renewable sources. For example, I have been told that it is not unusual that these hydropower projects to obtain the permits sometimes takes on average maybe up to 5 years, and I know we are going to hear today about a process that has taken 15, 16 years. But on the other side of the coin, for wind and solar projects, the Administration is so focused on moving those that you can get permits in 18 months, and then also you get exemptions from the Migratory Bird Act and also the Eagle Protection Act. So there is a lot of favoritism in those areas. So this discussion draft will establish FERC as the exclusive authority on hydroelectric licensing, and includes several provisions to eliminate redundant and unnecessary requirements, and put the review process on a reasonable schedule. It also encourages the creation of new hydroelectric power from existing non-powered dams by providing a licensing exemption for qualifying facilities. In all cases, all cases, the environmental and safety requirements for these facilities will be maintained. So we are not taking away any power from the agencies that have that responsibility. A few weeks ago, we had a hearing and I talked about Dire Straits, they had a song, Money for Nothing, Chicks are Free. Today, we have the words of Woody Guthrie in his song, Roll on Columbia, and it goes like this, and up on the river is the Grand Coulee Dam, the mightiest thing ever built by man, to run these great factories and water the land, it is roll on, Columbia, roll on. So we want to help Woody Guthrie keep this water rolling, produce this hydropower. Now, he didn't talk about natural gas, but FERC is also involved in the approval process for interstate natural gas pipelines, and the problems are much the same as with hydroelectric power: a slow and unpredictable approval process that is out of touch with America's energy needs today. This is particularly true of natural gas, given the tremendous increases in domestic output over the last decade. So getting that gas to the power plants and factories and consumers that need it will require new pipelines as well as upgrades of existing pipelines. In fact, this was a major point in the Department of Energy's Quadrennial Energy Review. It was clear that a more streamlined permitting process will help to build these pipelines. So that is out goal. We want an efficient, quick process, but we want to protect the environment and make sure that we provide adequate protections for safety and everything else. So that is what our hearing is about this morning. I am really delighted, we have two panels of witnesses, and I will be introducing our first panel in just a minute. At this time, I would like to recognize Mr. Rush for his opening statement. [The prepared statement of Mr. Whitfield follows:] Prepared statement of Hon. Ed Whitfield This morning we will discuss two additional components of our bipartisan energy package that deal with hydroelectric power and natural gas. Our goal is to help unleash the potential of these affordable domestic energy sources by modernizing the applicable regulatory process at the Federal Energy Regulatory Commission (FERC). If ever there were such a thing as bipartisan energy sources, hydroelectric and natural gas would be at the top of the list, so I look forward to working with all of my colleagues to minimize the red tape and maximize the benefits of these two sources for the sake of affordable energy, the environment, national security, job creation, and economic growth. Hydroelectric is a source of clean, reliable, and affordable power, yet the federal process for licensing new capacity or relicensing existing capacity is considerably more cumbersome than for other renewable sources. Congress has long recognized the need to upgrade the process in order for hydroelectric power to meet its full potential. But as it is, even relatively small hydroelectric projects, including ones that would electrify existing dams with negligible environmental change, are often subjected to years of delays that can prevent these projects from getting off the ground. And relicensing of existing hydroelectric facilities can be more of a hurdle than it needs to be. The discussion draft establishes FERC as the exclusive authority on hydroelectric licensing and includes several provisions to eliminate redundant and unnecessary requirements and put the review process on a reasonable schedule. It also encourages the creation of new hydroelectric power from existing nonpowered dams by providing a licensing exemption for qualifying facilities. In all cases, the environmental and safety requirements for these facilities will be maintained. In the words of Woody Guthrie in his song, ``Roll on Columbia'': And up on the river is the Grand Coulee Dam, The mightiest thing ever built by a man, To run these great factories and water the land, It's roll on, Columbia, roll on. This discussion draft helps carry on Woody Guthrie's work. Now Woody Guthrie never sang about natural gas, but FERC is also involved in the approval process for interstate natural gas pipelines, and the problems are much the same as with hydroelectric power--a slow and unpredictable approval process that is out of touch with America's energy needs today. This is particularly true of natural gas given the tremendous increases in domestic output over the last decade. Getting that gas to the power plants and factories and consumers that need it will require new pipelines as well as upgrades of existing pipelines. In fact, this was a major point in the Department of Energy's Quadrennial Energy Review (QER). The QER was clear that a more streamlined permitting process will help to build this new natural gas infrastructure. In particular, the current approval process is especially hampered by the involvement of multiple agencies and no clear deadlines. A December 2012 study conducted by the INGAA Foundation found that delays of more than 90 days have risen 28 percent after EPAct's permitting reforms, while delays of 180 days or more have risen 20 percent. The discussion draft puts FERC firmly in charge and gives it the authority to enforce firm deadlines. Additional provisions prevent other unnecessary delays. And, as with the hydroelectric provisions, this discussion draft aims to modernize the review process in a manner that maintains all existing environmental and safety standards. The hydroelectric and natural gas pipeline projects enabled by these discussion drafts will create a great many construction jobs. In addition to, the affordable energy produced by them will create still more jobs. It is time for the U.S. to make full use of our energy bounty, and these two discussion drafts are a strong step in that direction. [The discussion draft on the FERC Process Coordination is available at: http://docs.house.gov/meetings/IF/IF03/20150513/ 103443/BILLS-114pih-DiscussionDraftonFERCProcess.pdf.] [The discussion draft on Hydropower Regulatory Modernization is available at: http://docs.house.gov/meetings/ IF/IF03/20150513/103443/BILLS-114pih- DiscussionDraftonHydropowerRegulatoryModernization.pdf.] Mr. Rush. I want to thank you, Mr. Chairman. Mr. Chairman, before I begin, I want to ask for unanimous consent that we hear you sing the Woody Guthrie song, you know. Mr. Whitfield. Well, thank you. I will do that a little bit later. OPENING STATEMENT OF HON. BOBBY L. RUSH, A REPRESENTATIVE IN CONGRESS FROM THE STATE OF ILLINOIS Mr. Rush. I want to thank you for holding the hearing. Unfortunately, Mr. Chairman, we are once again holding a hearing on two unrelated issues that each deserve their own separate consideration in their own right. The FERC process coordination under the Natural Gas Act is an updated version of H.R. 161 and H.R. 1900, which the subcommittee has previously examined, and is an attempt to expedite the FERC process for permitting natural gas pipelines. The biggest concern I have, Mr. Chairman, is one that I brought up in each of my previous attempts to modify this process, which is that this bill is simply a solution in search of a problem. Mr. Chairman, FERC data shows that between 2009 and 2015, over 100 million natural gas pipeline projects were approved, spanning over 3,700 miles in 35 states, and with a total capacity of over 45 million cubic feet per day. Additionally, Mr. Chairman, while the average time from filing to approval was under 10 months, an overwhelming 91 percent of applications were decided within 12 months. Even the GAO has concluded that FERC's pipeline permitting process is both predictable and consistent, and pipelines are being built in a timely manner. In fact, Mr. Chairman, in testimony from stakeholders, ranging from the Interstate Natural Gas Association of America to Dominion Energy, this subcommittee has heard repeatedly that the current permitting process works well, and FERC has done a good job of deciding permits within a reasonable time period. So, Mr. Chairman, the question remains, is there really a problem? As far as the second and unrelated part of this hearing of dealing with the licenses of hydropower, I must say, Mr. Chairman, that this is the first time this subcommittee has even held an oversight hearing on this issue in at least the last 3 Congresses. Since I began as ranking member of this subcommittee in 2001, this is the first time we have even looked at this issue. And today's hearing does not have one single witness from any of the agencies who can testify on the impact that this draft legislation would have on any of our other natural resources that the citizens of this nation depend on in our waterways. Mr. Chairman, there is not one single representative from the Department of Interior, or commerce, or any of the state agencies who can testify on how this bill might impact our shorelines, our rivers, or our streams in regards to protecting the general public interest outside of the narrow consideration of providing hydropower. Mr. Chairman, there is not a single witness on either panel who can provide this subcommittee with expert testimony on how taking authority away from other agencies, and consolidating power and decision making authority solely within FERC might impact the public interest in matters regarding environmental protection, or families visiting a lake having a sufficient access to boat, fish, hike, or swim. Mr. Chairman, before we make it easier for private companies to take control of the use of the waters belonging to the people in this great nation, we should at least hear from the experts within those agencies that are responsible for protecting those interests. Thank you, Mr. Chairman. I will yield back my time. Mr. Whitfield. Gentleman yields back. Mr. Upton is not here this morning. Is there anyone on our side of the aisle would like to make a statement? If not, then at this time I recognize the ranking member, Mr. Pallone, of New Jersey for 5 minutes. OPENING STATEMENT OF HON. FRANK PALLONE, JR., A REPRESENTATIVE IN CONGRESS FROM THE STATE OF NEW JERSEY Mr. Pallone. Thank you, Mr. Chairman. As I have said before, the reality of the energy picture in the United States is changing rapidly. As the committee of jurisdiction over national energy policy, it is eminently reasonable and appropriate for the committee to look closely at our new energy reality. So much has changed since the House last considered an energy bill, and it is our responsibility to carefully consider proposals to help us develop the energy policies of the future. Two weeks ago, I expressed concern cramming two completely unrelated subjects into a single, two-panel hearing, and again, we are here examining two subjects; natural gas pipeline permitting and hydroelectric licensing, that are important and warrant not only separate legislative hearings, but they also should be proceeded by a thorough oversight. It has been years, and in the case of hydroelectric licensing, an entire decade since this committee has conducted oversight of either of the programs that these drafts aim to reconfigure. From my perspective, this committee should not be writing legislative solutions before members have a chance to examine the state of play, or even confirm that a problem actually exists. While hydroelectric power can be an important source of no- emission base load generation, it also potentially poses major harm to fish and wildlife populations, water quality, and other important resources. Hydroelectric power depends on rivers for fuel, and those rivers belong to all Americans, not just those who sell or buy the power generated from it. The Federal Power Act requires FERC to balance those competing interests in issuing a license because no one use of a river for power, drinking water, irrigation, recreation, or other use, should automatically take precedence. For instance, if a license might impact a protected resource such as a wild and scenic river, a national wildlife refuge, or a national park, then the appropriate federal agency responsible for that resource can put conditions on the license to ensure that the resource is protected. Unfortunately, the draft proposal before us completely throws out decades of policy and case law in one fell swoop. There is nothing subtle about the draft's changes. It undermines the key provisions of current law that exist to conserve our natural resources and protected areas, and ensure a balanced approach to the use of our nation's rivers. This legislation will only result in greater confusion, time- consuming litigation, and exacerbated and unnecessary delays of hydropower licenses. So I sincerely hope the majority will consider holding proper oversight hearings to inform members, and help facilitate constructive discussions on hydropower reform. With regard to the other issue, the natural gas pipeline selling legislation, like the previous iterations of this bill. The draft is yet another solution in search of a problem. According to FERC, more than 91 percent of pipeline applications are reviewed within 1 year. I think that is pretty remarkable. And GAO concluded that the current FERC pipeline permitting process is predictable, consistent, and actually gets pipelines built. We have even heard pipeline companies testify that the process is generally very good. So this legislation, in my opinion, is unnecessary and would disrupt the perfectly functioning permitting process. Instead, it imposes a laundry list of prescriptive, duplicative, and potentially harmful requirements on FERC and every agency involved in the permitting process. This would only slow down, rather than speed up the approval of interstate natural gas pipelines. The draft positions FERC as a policing agency charged with micromanaging other agencies in consideration of application, even determining the scope of their environmental review, and FERC doesn't have the expertise or resources to make those types of decisions. More problematic, the draft purports to address this resource issue by allowing applicants to provide extra funding for FERC staff or contractors to aid in the speedy review of pipeline applications. And this provision is troublesome and could lead to inappropriate relationships between applicants and FERC staff. So, Mr. Chairman, I can't support either of the drafts before us today, and I urge the majority to rethink their proposals. Instead, I would like to work with you on energy legislation that benefits consumers as well as producers, promotes American jobs, protects our environment, and builds upon past successes to propel us into a better future. I yield the balance of my time. Thank you, Mr. Chairman. Mr. Whitfield. The gentleman yields back, and thank you very much for those statements. And that concludes the statements. So as I said, we have two panel of witnesses, and on the first panel, we have the Honorable Paul R. LePage, who is the Governor of Maine. Governor, we appreciate your taking time to be with us today, and thank you for being willing to participate. In addition, we have Ann Miles, who is the Director of the Office of Energy Projects at FERC. Ms. Miles, thank you very much for joining us. And each one of you will be recognized for 5 minutes for your statement, and then we will open it up for questions. So, Governor, I will begin with you, and you are recognized for 5 minutes. And the little box on the table has the lights which--red would mean stop, but if you are in mid-sentence, you can go on and complete it. Thank you. And turn your microphone on also, thank you. STATEMENTS OF HON. PAUL R. LEPAGE, GOVERNOR OF MAINE; AND ANN F. MILES, DIRECTOR, OFFICE OF ENERGY PROJECTS, FEDERAL ENERGY REGULATORY COMMISSION STATEMENT OF PAUL R. LEPAGE Governor LePage. Good morning, Chairman Whitfield, Ranking Member Rush, and members of the subcommittee. Thank you for the opportunity to testify today, and the efforts that this committee will take to modernize our federal permitting process for energy infrastructure. Natural gas and hydropower can provide competitive and clean energy for our economy. We need infrastructure, we plead with you, from pipelines to transmission lines, to take advantage of these plentiful resources. The people of New England want these projects done, but bureaucracy is preventing timely action. Bureaucracy has hijacked democracy. Natural gas. New England has transitioned to natural gas to generate electricity. We have gone from 15 percent to almost 50 percent in the last 15 years. Our infrastructure has simply not kept up. Our pipeline cannot transport enough gas from Pennsylvania. This has caused prices to spike from $3 per million BTUs to $20 per million BTUs; some of the highest prices in the world. This has dramatic consequences for New England. In Maine, we lost two major employers. Electric bills for residential customers have skyrocketed. The average electric price in our region is now 17.3 cents per kilowatt hour. In some areas, bills have increased by as much as 100 percent. We need a sense of urgency at the federal level to permit natural gas infrastructure. States must step up to prioritize these projects. Together, it can get done. It makes no sense to me why it should take 3 to 5 years to build a pipeline. We built several hundred miles within our state in 18 months. The legislation before you today would help empowering FERC to make deadlines for other federal agencies. As far as I am concerned, Washington could use a lot more deadlines. Hydropower. The committee's proposal regarding hydropower is encouraging. This country has ignored the benefits of hydropower. New England knows that hydropower is necessary to provide clean, predictable power. New England governors met last month to discuss infrastructure and transmission line to Canada. The committee must work to overhaul our cross-border permitting laws. Maine shares a huge border with Canada. I am concerned when cross-border permitting becomes politicized, like it has with the Keystone Pipeline. This is not how we should be doing business with our neighbors to the north; Canada. The committee draft legislation would exempt existing non- powered dams from the Federal Power Act if it does not significantly alter the dam. This is very sensible. We should remove roadblocks for getting power out of existing dams. Maine has a potential of 70 megawatts of additional hydropower available for non-powered dams. Gentlemen, overzealous activists are taking advantage of federal bureaucracy. I can give you a number of examples. They are blocking affordable energy for our citizens and our businesses. Congress must back our country. We must take it back from the bureaucracy of Federal Government. I often say, you have heard the saying, too big to fail, well, I say Washington is getting too big to work. Congress must act. And I thank you for your time. [The prepared statement of Governor LePage follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. And, Governor, thank you very much for that statement. And at this time, Ms. Miles, you are recognized for 5 minutes for your opening statement. STATEMENT OF ANN F. MILES Ms. Miles. Thank you. Chairman Whitfield, Ranking Member Rush, and members of the subcommittee, my name is Ann Miles and I am the Director of the Office of Energy Projects at the Federal Energy Regulatory Commission. The commission is responsible for siting infrastructure for nonfederal hydropower projects, interstate natural gas pipelines and storage facilities, and liquefied natural gas terminals. I appreciate the opportunity to appear before you to comment on the discussion drafts. As a member of the commission's staff, the views I express in this testimony are my own, and not those of the commission or any individual commissioner. I will first comment on the discussion draft addressing hydropower. It has the important goals of improving transparency, accountability, and timely decision-making. Because the hydro draft is extensive, I will only highlight a few sections in my oral testimony. In Section 1302 of the draft, which adds a new Section 34 to the Federal Power Act, or FPA, I support the development of procedures to lower the time, effort, and expense needed to develop hydropower projects at existing non-powered dams. However, it is not always the case that a small capacity project has only minor environmental impacts. Therefore, removing federal jurisdiction for qualifying facilities that are 5 megawatts or less could result in unintended consequences for environmental resources. I am also concerned about some of the specifics of the proposed new FPA Section 34, including, for example, the extent to which it could be read as elevating economic and operational concerns over other public interest considerations. In Section 1303, I do not support the amendment to Section 33 of the FPA to require the commission, rather than the secretaries, to determine whether a licensed applicant's alternative condition under Section 4(e) or Section 18 of the FPA would protect the federal agency's reservation. Further, shifting oversight of the trial-type hearings required in the new Section 35 to the commission would not eliminate the substantial expense and time associated with such hearings, as I understand is the current situation. Instead, Congress may wish to consider eliminating them entirely, and allowing the commission to address disputes on the material facts of the proceeding earlier in the commission's licensing process. Finally, in Section 1304, I am supportive of the intent of the amendments to Section 308 and the new Section 313 to bring certainty and timeliness to the hydro-licensing process. However, without a method to enforce any established schedule, the goals may not be achieved. I will now turn to comments on FERC process coordination under the Natural Gas Act, or NGA, which has the commendable goal of improving transparency and predictability for federal and state permitting agency actions by adding more coordination, reporting, issue resolution, and accountability. The Energy Policy Act of 2005 provided additional authorities and responsibilities to the commission in Section 15. The proposed legislation includes existing practices the commission added to its regulations in response to EPAct 2005. However, the proposed changes would move some of the activities to later in the process than is the case under current commission practice; thus, lessening efficiency. There are two aspects of the draft that bear particular attention. First, in Section 15(c)(6), if an agency does not meet the 90 day or otherwise approved schedule, the federal agency head must notify Congress, which would provide some accountability. Second, in Section 15(e), I see value in requiring the commission to make available on its Web site the schedule established with other federal agencies, and the status of federal authorizations, because that information is now scattered in various filings. Overall, the current process for siting natural gas facilities is timely and efficient, and results in fair, thorough, and legally defensible documents. I am concerned that codifying the commission's practices too rigidly might have the unintended consequence of limiting the commission's ability to respond to the circumstances of specific cases, to changes in the natural gas industry, and to the nation's energy needs. Finally, commission staff would be happy to provide technical assistance, and to work with other stakeholders to help refine both the hydropower and gas discussion drafts. This concludes my remarks. I would be pleased to answer any questions you may have. [The prepared statement of Ms. Miles follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Well, thank you, Ms. Miles. And thank both of you once again for coming and giving us your perspective on this discussion draft. Governor, we have had a lot of hearings, obviously, on energy issues, and one of the recurrent themes that we hear about is that in the Northeast particularly, there are a lot of problems with electricity--adequate electricity supplies. I mean some of the nuclear plants are being closed. And one of the problems is, as you--this Administration particularly, is trying to transform the way energy is being produced in America, going more to renewables, less coal, and so forth, and when you push the country so quickly in one direction, it does create some capacity problems, and I think that is what you were referring to. And is this argument that we hear about the Northeast, that they really do have capacity problems, and the polar vortex, the impact of that, do you think it is a realistic problem or is it just something that is hyped too much? Governor LePage. Well, let me put it this way. If you own a home in Montreal, a home in a major city, and you don't heat with electricity, an average home will cost you about $34 a month in your electricity bill. If you do that in Maine, it is about $90. If you heat in December, January, and February in Montreal, it will cost you about $100 a month if you are using electricity. In Maine, you have to get a bank loan. So, sir, it is a capacity issue, and it can be resolved with about a 40-mile transmission line to connect into Quebec Hydro and bring it right into Maine. Quebec Hydro right now has 48,000 megawatts. 48,000 megawatts. Muskrat Falls in Lower Labrador is going to be coming online in a couple of years with another 3,800 megawatts of hydro power. We don't need to build dams up in Maine, although I think the the few dams that are already in place, if you put a generator on, you could generate 70 megawatts. But my point is very simply this, there is plenty of electricity, affordable energy, but we can't get to it. Mr. Whitfield. And so what needs to be done to get to it? Governor LePage. We need a transmission line in the western part of Maine, about 40 miles to go to the border, and the Canadians are waiting to hook on. Mr. Whitfield. And is that a project that you have been very much involved in, and---- Governor LePage. It is a project that we have been developing. There are three states that are willing--well, two out of three New England states are willing to do transmission at this point is Vermont is willing to transmit power from Canada into New England, and Maine is willing to transport power from Quebec into New England. The problem is getting through the bureaucracy. Mr. Whitfield. And how long have you all been working on this project? Governor LePage. I am in my fifth year of being governor. Mr. Whitfield. And was it started before you became governor? Governor LePage. Yes. New Hampshire had started it before I even came in, and that has been at a standstill ever since. Mr. Whitfield. Well, could you be even more specific on precisely what the impediment has been? Governor LePage. It has been state and federal. Mr. Whitfield. State and federal. Governor LePage. Yes, state and federal, meaning the State of New Hampshire, they have been working with Hydro Quebec for years and years and years, and frankly, we don't know where it is going. Mr. Whitfield. But---- Governor LePage. I believe that by July or August, the Canadians are going to be looking elsewhere, looking to the other two states, and that is why it is very timely that I be here and say we need your help. Mr. Whitfield. But you and your legal authorities have looked at this draft, and you do support this particular draft---- Governor LePage. Yes. Mr. Whitfield [continuing]. That we have before you? Governor LePage. Absolutely. We believe that it is very, very important. For instance, there are several projects being proposed to bring natural gas from, let's say, Pennsylvania to Dracut, Massachusetts. We have the infrastructure in the ground in Maine. We have put in several hundred million dollars' worth of pipeline in the roads of Maine, but we have empty pipes because we can't connect to the source. And so we need the resource to come to at least Massachusetts, and four of the New England states are working together to try to make that happen. Mr. Whitfield. Yes. Yes. Well, we are not trying to upset the applecart with this discussion. We have heard from so many different interests that there are some significant problems. And, Ms. Miles, I appreciate your testimony. There are certain parts of this bill that you think are reasonable, and other parts that you are willing to work with us on. But, you know, it is not only FERC but we are talking about the Corps of Engineers, the Department of the Interior, Bureau of Land Management Fish and Wildlife Service, we have all these federal agencies that have a part in this, and if they drag their feet, there is really not a lot that can be done about it. So we look forward to working with you both and others in trying to simply have a more balanced approach to help solve some of these capacity problems that we face. At this time, recognize the gentleman from Illinois, Mr. Rush, for 5 minutes. Mr. Rush. I want to thank you, Mr. Chairman. Director Miles, are there any instances of a natural gas permitting application being delayed because an applicant has not submitted all of the necessary information, and if so, how would this legislation expedite the process in those cases where agencies are not provided with timely and complete information necessary to perform congressionally mandated project reviews, and what recommendations would you make to help address this particular issue? Ms. Miles. Congressman Rush, I believe FERC has a very structured, efficient process for addressing natural gas pipeline projects. It consists of the first stage where the applicant will actually investigate whether there is a need in the area to transport gas, and then we encourage all of our applicants with major pipelines to enter into what we call pre- filing. That was established quite a while ago, and we have found some more significant rules around that came in in 2005. Anyway, during that period of time, we work with all stakeholders who have an interest in the pipeline, we work with all agencies who have responsibilities for issuing permits, and the goal of that pre-filing is to figure out what the issues are and what information is needed for not only FERC staff, but the other agencies to do their environmental reviews of siting such a pipeline. Most applicants are very accommodating and they are interested in providing us with the information that is required in all of our resource reports. If, per chance, we don't have it at the time the application is filed, then we will ask further for it. Mr. Rush. How would this legislation impact and expedite the process in those cases where agencies are not provided with timely and complete information which is necessary for you to perform your congressionally directed processes? Ms. Miles. We are able to move forward with our environmental document. As long as we have the information we need. Should some agencies need something after us, they then will have an opportunity to get that before they issue their permits. As far as the legislation goes, the one thing that seems to be in the gas legislation is that the head of the agency would report to Congress if there is any delay. Mr. Rush. Have you had any extraordinary complaints from applicants about the time that it takes you to approve an application? Ms. Miles. As I said in my testimony, we are issuing the majority of our findings in the natural gas facilities with-- about 92 percent within 1 year. There are a few more complex projects that are more contentious, where it may take slightly longer, and we do hear sometimes if it takes a bit longer than that. Mr. Rush. Would you characterize the purpose of this hearing is to deal with the 8 percent that is not granted approval? It seems to me that if you granted 92 percent, then maybe we have--in this subcommittee maybe we have finally come up with the problem, and the purpose of this subcommittee is to find out what is happening with the 8 percent that are not approved and--because 92 percent of all the applicants are approved within a timely manner, so maybe we are concerned about the 8 percent, Mr. Chairman. But, Mr. Chairman, I yield back the balance of my time. Mr. Whitfield. Gentleman yields back. At this time, recognize the gentleman from Illinois, Mr. Shimkus, for 5 minutes. Mr. Shimkus. Thank you very much. Governor, welcome. I have been fortunate to be a member of the committee for a long time. And does New England still rely heavily on heating oil--and I think that is part of this debate, isn't it? Governor LePage. Yes, it is for us. In 2010, when I took office, roughly 80 percent of the homes in Maine were heated with heating oil. We have managed to get it down to about 62 percent this past winter. Most of it has been with heating pumps and pellets. In the rural areas, we can do pellets, heat pumps, that technology works pretty well, but in order to really make a difference, we really need natural gas to get into the infrastructure that we have in our state in order to be able to take the--while we call metropolitan areas or urban areas of Maine, you would call them---- Mr. Shimkus. My district. Governor LePage [continuing]. Very rural. Mr. Shimkus. You would call them my district, so---- Governor LePage. Yes, right. Mr. Shimkus. I represent 33 counties in southern Illinois, the largest community being 33,000 people, but we are connected. Natural gas is our predominant heating ability in fuel. In New England, it is not, and in fact, from my colleagues here, we set up what is it called, a heating oil reserve, because of a crisis years ago, to make sure that there would be heating oil for New England---- Governor LePage. Right. Mr. Shimkus [continuing]. Which now we kind of manage. So I would hope just as a national policy that we would help move natural gas to New England. Governor LePage. I would certainly encourage Congress to look at this. In 2014, the State of Maine paid a premium of $2 billion--1.3 million people paid a premium of $2 billion because of spikes and the high cost of energy in the winter months. This past winter, while it was a severe winter, we got a break, we only paid a little over $1 billion premium. And Maine is not a wealthy state. The per capita income just broke $41,000. So we are putting an inordinate amount of pressure on Maine families, and we could do so much better. Mr. Shimkus. And I think in New England, there are some small hydro--I am talking about New England as a whole, as a region, and there--I am told there is some concern of the possible inability to relicense some small hydro in New England as a whole, which would increase the challenges, would it not? Governor LePage. Absolutely. Like I said earlier, we have small dams that if we could put power on them, we could generate 70 megawatts, which doesn't sound like a lot in Washington, but in Maine, that is a lot of power. Mr. Shimkus. Right. Ms. Miles, thank you for your testimony. I was talking to the staff, and we actually employ government employees here many, many times. I don't think I have sat through one that has been so specific and so precise on what you like and what you dislike. So I find that very refreshing, and I appreciate that. So I want to address one of the ones that you addressed. Your opposition to amending Section 33, I think that is on page 16 of the testimony. And the concern is, we have had Commissioner Moeller here a couple of times, where he specifically stated that what we are trying to address would be very, very helpful, which would seem to be contradictory to what you have stated. He has quoted if Congress chooses to address the situation, changes in various statutes could require that resource agencies meet certain deadlines in their statutory role in reviewing such products. Another approach would be to provide the commission with the authority to rule on whether the conditions that resource agencies submit appropriately balance the benefits and costs that these projects provide. Again, this would require significant change in the various environmental laws for the relevant resources agencies. Can you comment on that? Ms. Miles. Yes. I think there is a little bit of an innuendo. Shared decision-making is absolutely one of the biggest challenges for licensing hydropower projects. That is the way Congress established the statutes, and we have worked many years to try to, through regulation and through some statute, get us all working in the same direction and in a timely--obviously, we all would like a very efficient, timely, low-cost process for hydropower. As I understood the Section 33 change, it was a very specific part that was put into the statute that allowed applicants to come up with an alternative, and then the agencies to address that through trial-type hearings and through alternative conditions. What I am trying to say is, I believe the agencies need to give us what their bottom line condition is that they believe is needed to protect their reservation. That is what their mandate is under their statute. If Congress were to choose to then, once the commission had all those, to say that it is the commission's responsibility to do a more balanced look across those, then I can't speak for Commissioner Moeller, but I think that is a bit of a distinction. Mr. Whitfield. The gentleman's time has expired. At this time, recognize the gentleman from California, Mr. McNerney, for 5 minutes. Mr. McNerney. Well, thank you, Mr. Chairman. Thank you, Governor and Ms. Miles, for coming and testifying this morning. You know, I think the intent of the bill sounds good; streamlining permitting so that we have things operating in parallel instead of in series. We want an efficient process, but I am not sure that we are heading down the right path in order to achieve that goal. Regarding the pipeline question, my estimate is it might actually make things worse. For example, FERC data shows that the average time for filing to approval is under 10 months, and FERC decides 91 percent of certificate applicants within 12 months. So are we actually going to make things better by enacting this kind of rule? So, Ms. Miles, what, if any, are the potential benefits of simply mandating pre-filing, trying to bring federal agencies to the table sooner on every permit? Ms. Miles. I believe in most cases, federal agencies are coming to the table early during pre-filing. Mr. McNerney. Two thirds, approximately. Ms. Miles. Pardon me? Mr. McNerney. Two thirds. Ms. Miles. I don't have a specific number on that. I could look into it. For liquefied natural gas facilities, pre-filing is mandated under the statute. It is not mandatory for pipeline and storage projects, however, we do meet with applicants before the pre-filing were to begin, and we recommend and many choose to use it because they find it a very valuable time to get everyone to the table early. We also work with those federal agencies to have them be cooperating agencies in our environmental document. So---- Mr. McNerney. So how long does the pre-filing stage last? How long does it typically---- Ms. Miles. It is mandated for 6 months for liquefied natural gas facilities. Some applicants choose longer. The real goal of pre-filing is that the time the application is filed-- -- Mr. McNerney. Right. Ms. Miles [continuing]. All the information is available for FERC and other agencies who have permits to issue to be able to do their environmental documents and move toward issuing their permits. So some companies will choose to stay in pre-filing a little longer to make sure that the information is going to be available. Mr. McNerney. So pre-filing takes as long as the applicant wants it to take. Ms. Miles. Yes. Mr. McNerney. In your experience, what are some of the reasons other permitting agencies don't always respond in a timely manner? Ms. Miles. Are you speaking particularly about natural gas? Mr. McNerney. Correct. Ms. Miles. As I said, you know, the majority are responding in a timely manner---- Mr. McNerney. Yes. Ms. Miles [continuing]. For gas. Mr. McNerney. Well, it seems to me that a 90-day requirement is arbitrary because some projects are very complicated and some projects are very simple. Simply saying that we have to have all the agencies meet a 90-day requirement may actually tie their hands and force them to say no on applicants where, if they actually would have had more time, they could have approved it. Is that a correct assessment? Ms. Miles. That could be. My understanding is that also it could be 90 days or a schedule that is negotiated with the other agency. Mr. McNerney. So it might be more reasonable to have a negotiated timeline for every application, rather than just saying 90 days for every application. Ms. Miles. It could be. The other thing that was a bit of concern is, we feel like using the pre-filing is very--that is the place where it is important that a lot of steps and cooperation and agency identifications begin, and I would not want anything to move later in the process that could be a complication for us, and I have mentioned that in the testimony. Mr. McNerney. So then to reiterate, I am going to just sum up by saying it might be beneficial to encourage more applicants to go through the pre-filing process, and then have a negotiated period instead of a 90-day strict requirement for federal agencies to respond. Ms. Miles. Certainly go through the pre-filing process. Ninety days seems a reasonable time to me. Mr. McNerney. OK. Ms. Miles. It could be negotiated in some particular instances. Mr. McNerney. All right, thank you, Mr. Chairman. I yield back. Mr. Olson [presiding]. The gentleman yields back. As fate would have it, the chairman has to run off for a little opportunity, so 5 minutes for some questions. And first of all, welcome. Good morning. Thanks for coming. Governor LePage, just when we talked earlier about Maine, and what I know about Maine is you have a lot of water, lots over very powerful water, because my brother surfs in York, Maine, every winter. Really cold, and apparently gets some tubing, some really big waves, much bigger than Galveston, Texas. So I want to learn more about your issue of hydropower. I understand you have done a study on hydropower recently. Can you talk about those findings and what are some of the benefits of hydropower challenges that this bill may fix? Governor LePage. Well, right now in Maine we have a number of small dams throughout the state. So that you get the picture of Maine, Maine is 35,000 square miles, 90 percent is water and forest. So it gives you a sense that we have an awful lot of natural resources. And we are very proud of it and we take care of it, and one of the things that we do is we are very strong in tourism. We believe that we have the resources to be self- sufficient, and we could do it in a timely manner. Now, I have heard some talk about liquid natural gas. When I was elected in 2010, there was a project for liquid natural gas to be in Maine, and what happened now it has been canceled. So the point is--what I am saying is, if we were able to energize a lot of these little dams that we have, we could generate 70 megawatts of power for the Maine people, and lower the costs that we are currently paying. Mr. Olson. And how are we blocking that, sir? How is Washington, D.C., blocking your efforts to have those little smaller dams---- Governor LePage. Because every application has to go through FERC. Mr. Olson. OK. Governor LePage. Whether it is 2 megawatts, or 500 kilowatt hours, it has to go through. And earlier on in my career, of course, it is a long time ago, it took years to be able to get little dams, and now I hear that we don't even bother because it is just too costly. Mr. Olson. And switching to pipelines, sir, some people think pipeline reform--we have the permitting process, is something just for big oil, those companies, and that is something they only have to worry about. My first question is simple on this issue. What do you worry about as the Governor of Maine with these pipeline issues not being approved as quickly as possible? Governor LePage. Well, like I said, we lost two major employers. We lost one this past winter. And folks, let me tell you some reality here, 500 jobs in a paper company, and the premium on oil, the premium going from gas to oil in the winter months between November and May was $20 million. They closed their doors. And now it is being dismantled. That is why I am pleading for you to do something because we need those jobs. Now, I spoke to the chairman of Airbus a couple of years ago and this is what he told me. Governor, what is the cost of your energy? I said, we are the cheapest in New England. He said, well, how do you compare with Alabama? He says, Alabama is 4 cents. Folks, at the time, we were 14 \1/2\. Now the region is up to 17. And he said, you may be a good governor but you are very naive on how much energy it takes to assemble a jet. Mr. Olson. And we can fix that here in D.C. My questions, Ms. Miles, to you are, your testimony described how FERC acts on gas pipelines, but next panel, Mr. Santa, his testimony mentions that the GMO has analyzed the major pipelines, the approval process, they have found that FERC takes up to 2.5 years for a certificate. That averages 558 days. Of course, that does include all the delays from other agencies being involved in this process. Can you talk about some of these delays on this larger pipeline project, and how FERC is addressing these long, long, long delays? Ms. Miles. I haven't looked, actually, at the details of how the numbers were calculated for the GAO report. I do think that there are some projects that are very long and complex and more controversial, and they may take slightly longer to both gather the information that is necessary to do a solid evaluation of the potential effects of the project. I remain though very convinced that the majority of projects go through fairly quickly. It is a quite efficient process, and I think most have been extremely successful. Mr. Olson. Well, I encourage you to read the report, ma'am, because it says you average 558 days for approval process, 2.5 years. That is unacceptable. I yield back, or yield to the gentleman who is up here. Voice. Mr. Green. Mr. Olson. Mr. Green from Texas is recognized for 5 minutes. Mr. Green. Thank you, Mr. Chairman. And, Governor, thank you for being here, and also, Director Miles. Director Miles, thank you for testifying, and I know FERC has a lot of on its plate and I think many of us believe the commission is doing as good a job as possible on natural gas space reviewing applications and issuing decisions. Today, I would like to talk about the FERC process of coordination for natural gas pipelines. In your testimony, you seemed to encourage more accountability in the pre-file review process. First, when you write natural gas project applications, what do you mean? Are you including every application, or are you including LNG operation and maintenance, or just new construction, or are you using all of them? Is that---- Ms. Miles. All of them. Mr. Green [continuing]. All applications? Ms. Miles. Yes. Mr. Green. OK. In your testimony you said that FERC is able to act 92 percent on natural gas applications in a year. What percentage of new construction projects has FERC approved in less than a year? Do you know? Ms. Miles. I do not know, but I would be glad to get back to you on that. Mr. Green. OK. I know for an LNG, import facility now, we used to try and export, but now we are big on importing. I know FERC just approved one for Corpus Christie---- Ms. Miles. Yes. Mr. Green [continuing]. Just in the last few days, and I appreciate that, but I know it takes typically about 18 months for an LNG import facility, and that is not even considering what the Department of Energy needs to do with the--although in the case of Corpus Christie, Department of Energy moved very quickly on it. Can you explain what type of projects that are included in the other 8 percent of that 92 percent, and what makes these projects different? Ms. Miles. I would think it is the larger projects that have more issues. It sometimes can be the need to gather further information---- Mr. Green. OK. Ms. Miles [continuing]. From the company so that we are clear that we understand exactly what the potential effects are and we can analyze that. Mr. Green. And some of those issues, I know I have heard and it is--in earlier questions, are these issues with other federal agencies or issues with state-level agencies having to respond or not responding timely for FERC to FERC? Ms. Miles. I would think most of those are actually FERC trying to gather the information that it needs. We are typically cooperating with other federal agencies and state agencies who have federal authorizations. We will also work with them to review our documents. In our opinion, that is the best way to efficiently operate, is to have all federal agencies reviewing at the same time. Mr. Green. OK. Do you think that there ought to be some time limits on federal agencies, or if you have a problem sometimes in working with you, and I am talking about both the pre-review or the pre-filing review or during the process, do you think there needs to be some time limits on these other agencies responding to FERC's offer of--your offer to them? I know right now you can't tell an agency, Fish and Game or anyone else, what to do, but do you think there would be some good idea to have some time limits on them? Ms. Miles. Do you mean for being a cooperating agency---- Mr. Green. Be cooperative. Ms. Miles [continuing]. Choosing to be a cooperating agency? I think it can't hurt. Mr. Green. OK. I know the staff invites these other agencies to participate in the NEPA process. What type of response time from the agencies after receiving this information, do you have that---- Ms. Miles. I don't have that, but I would be glad to get back with you on that. Mr. Green. And what if they just don't respond? Ms. Miles. Well, at that point then they would not be a cooperating agency---- Mr. Green. OK. Ms. Miles [continuing]. With us. Mr. Green. So could they hold up a permit from, say, for example, a transmission line from Canada, although I know that is a State Department issue, but they could hold up a pipeline coming across Massachusetts. Ms. Miles. We can proceed without the federal agency being a part, and then they would need to do their responsibilities under their own volition. And it could occur after the certificate is issued. Mr. Green. OK, but until they participate, we are not going to get the natural gas to Maine. Governor, I want to thank you for being here. I know the frustration, and believe me, I am from Texas and I would love to send you some natural gas, but we do have some pipelines that go to the Northeast, but they have a lot of customers already. And I think the closest natural gas you will get is from my friends in Pennsylvania. But we would sure like to get there because again, you shouldn't have to have a paper mill shut down. I will have to admit, I had two paper mills over the last 30 years shut down in my district, and it wasn't because of the high price of electricity. Governor LePage. I have had three since I have been Governor. Mr. Green. Yes. So, Mr. Chairman, I know I am out of time, but thank you. Mr. Whitfield. At this time, recognize the gentleman from Pennsylvania, Mr. Pitts, for 5 minutes. Mr. Pitts. Thank you, Mr. Chairman. Director Miles, I come from a position on this committee as a member who is currently dealing with the issue of permitting a 42-inch natural gas pipeline currently in the application review stage, and my district in Pennsylvania is home to some of the most pristine farmland, conservation space in the country, and my constituency has basically run the gamut of issues relating to the proposed pipeline from eminent domain to Indian burial grounds. One issue that keeps coming up is that of pipeline safety. As noted in your written testimony, FERC plays an inspection role during pipeline construction, but the Department of Transportation has jurisdiction to establish pipeline safety regs for operating reliance. So my question is can you tell us about the coordination you engage in with DOT to ensure that pipelines will meet their regulations, and ensure that nothing falls through the cracks as jurisdiction transitions from FERC to another agency? Ms. Miles. Yes, as you state, the Department of Transportation sets the standards, and when we review the applications we are checking to make sure that they meet those, and any analysis that needs to be done, we will do that, looking at volumes of flow and safety aspects of that. We do work with PHMSA, regularly coordinate with them on making sure we are clear on their standards, and that they are addressed through our evaluation. Mr. Pitts. One issue of concern to some of my constituents is the independence of FERC. Some perceive FERC as being captured by the industries it deals with, rubberstamp, if you will, and they point to statistics that reveal that virtually all of the applications that run the entirety of the FERC process are approved. Can you please speak to that concern? Ms. Miles. Well, I would say that many applications that come before us that we are looking at during the pre-filing period change dramatically through alternative routes, alternative systems, before we get to the point where the commission makes a decision on the appropriate project; whether to go forward with it, and if so, what conditions to include in it. So the commission takes into account and listens very carefully to comments from the public, from Indian tribes, from other state and federal agencies. Those are taken into account in trying to work through, what is the appropriate--looking at both engineering and environmental consequences of a project. Mr. Pitts. Now, in your written testimony, you stated that the discussion drafts addressing FERC process coordination has commendable goals, improving transparency, predictability of the agency actions, in particular. My question is, might these transparency efforts in the bill help alleviate concerns that FERC is a rubberstamp for the industry? Ms. Miles. I believe we are quite transparent already, but any time we could add something to improve on that, we are most willing to. I think one of the things that this bill does is to make available on a Web site at the commission the established schedules and expected completion dates, and that type of information that many may be aware of. Mr. Pitts. Now, some outside groups have urged my constituents to work outside the FERC process to oppose pipeline construction, given their perception of FERC's independence. And oftentimes, these groups advocate a turn to politics. My question is, can you please tell me how my constituents can best have their voices heard during permitting process? Ms. Miles. Yes, I certainly would hope that they would attend our scoping meetings. I would hope that they would file written comments also so that we clearly understand what their issues and concerns are. I would also ask them to subscribe through our electronic system to the project that they are concerned about, and they can keep up with what is going on with it every day. I would ensure them that commission staff is looking very carefully at everything as we go through the analysis, and that the commission in the end, when it makes its decision, will look at the entire record that has been developed for that project. Mr. Pitts. Thank you. My time has expired. Mr. Whitfield. Gentleman's time has expired. At this time, recognize the gentleman from New Jersey, Mr. Pallone, for 5 minutes. Mr. Pallone. Thank you, Mr. Chairman. My questions are of Ms. Miles. First, on the hydropower. Does FERC have a statutory mandate to protect water quality? Ms. Miles. Our mandate is to protect all developmental and non-developmental resources, and that would include the range of environmental resources of which water quality is certainly one. Mr. Pallone. And how about statutory mandate to protect access to public lands? Ms. Miles. We do have a responsibility to provide for recreation and access at projects, as it is appropriate for specific projects. Mr. Pallone. And what about a mandate to protect fish and wildlife? Ms. Miles. Yes, that is also a part of or comprehensive development and need to take into consideration all environmental and non-environmental resources. Mr. Pallone. My concern is that the discussion draft appears to grant FERC near-exclusive statutory authority to enforce state and federal mandates under the Clean Water Act, the Endangered Species Act, and agency Organic Acts, and even though you say you have some authority, my concern is that that is not your primary authority. Is FERC seeking this authority at the expense of states and the Departments of the Interior, Commerce, and Agriculture respectively? I mean, obviously, they have authority over these same things that I have asked about. Are you actually seeking this authority at their expense? I am only asking you the questions, not the Governor. I mean are you initiating that? Are you asking for it? Ms. Miles. No. Mr. Pallone. OK. Let me ask about--buried in the language of the draft there is a two-word change to Section 4(c) of the Federal Power Act, and the words of the existing statute, shall deem, are replaced by the single word, determines. The context of this change is the mandatory conditioning authority of the resource agency. You follow what I am asking you? Is this a significant change from current law? Ms. Miles. I don't think I can---- Mr. Pallone. Answer? Ms. Miles [continuing]. I quite follow the details of that. Are you referring to the alternative conditions? Mr. Pallone. The mandatory conditions, sorry. Ms. Miles. The mandatory conditions? Mr. Pallone. Yes. Ms. Miles. I think I said earlier that my sense, and I am speaking for myself, is that the agencies should provide--they are the ones that were given by Congress the responsibility to provide their mandatory condition for their reservation, whether it is land under the federal land-managing agency, or Section 18 for fishway prescriptions. Mr. Pallone. But---- Ms. Miles. I believe that is their responsibility. Mr. Pallone. But what would be the practical effect of this change on the ability of the resource agencies to protect and manage things under their jurisdiction? Can you answer that from a practical point of view? Ms. Miles. I believe that the draft discussion document is very complicated, and I am not sure that I have digested exactly what the goal is and the intent of each word. I am generally supportive of some aspects of it, and I am certainly supportive of any ability to move quicker and less costly in developing hydropower in this country, and an efficient system. The actual meaning of each word in the bill, I can't talk about today, but I would be happy to discuss that further. Mr. Pallone. OK. Let me just ask you a question about the natural gas pipeline regulation. My colleagues have said that we need the deadlines in this bill to hold federal agencies accountable, and ensure that they don't just sit on applications. You mentioned in your testimony that since 2005, the commission has authorized nearly 10,500 miles of interstate natural gas transmission pipelines, and GAO has concluded that FERC's pipeline permitting is predictable and consistent, and gets pipelines built. In your experience, are there significant delays in the review of natural gas pipeline applications at the commission? Ms. Miles. I think the majority of pipeline applications are moving at a reasonable pace. Mr. Pallone. All right, so just the last thing, Mr. Chairman. So of the small number of applications that take a little longer to review, are these delays due to slow walking on the part of FERC staff? I would assume that more complex applications would and should take longer to review. So what is the reason for those that are not---- Ms. Miles. They tend to be more complex, more controversial, probably the larger projects that require more information-gathering. Mr. Pallone. OK. Thank you. Thank you, Mr. Chairman. Mr. Whitfield. Gentleman's time has expired. I know the Governor wanted to interject at one point. Did you want to make a comment? Governor LePage. Yes, a couple of points I wanted to make. As I understand, the draft of the bill is for small, non- producing hydro facilities. It is not the large project, it is the small, little dams that are not being produced, the less megawatt, maybe 3 to 4 megawatts, which is really not a real problem in our state. Believe me, there are so many that would just jump at doing that opportunity, and I don't believe it has any impact to the Federal Government. The only ones that are concerned about it are the people here in Washington, not the people in Maine. People in Maine see that as an extra few megawatts of power. So I don't see the impact. But I will say this, to go to your point about do other agencies have an impact, I will give you a real example. We have in Maine the Canadian lynx. The Canadian lynx is called Canadian lynx because it is primarily in the real northern reaches of Quebec. The very southern border might cross over into Maine because we have a few on top of the State of Maine. It took 7 years, because in the United States, it is an endangered species but it is not native to the United States, but it took 7 years to get an incidental taking permit, which we just got a year ago. My predecessor put it in several years ago. And U.S. Fish and Wildlife just sat on it for several years. And so my point is, the importance of what we are trying to accomplish here, at least from the State of Maine, is very simply this. You have rules. No problem. We have no problem with that. Tell us what they are, give us a timetable, we get it done or we don't get it done. But the danger is this. The reason the lyn permit took so long is they gave us a set of things to do. We did them. Then they gave us more things to do. We did them. They gave us more things to do. We did them. And it dragged on for 7 years. If that was tied to a hydro project, it is done, or if it is tied to natural gas, it is done, because no one, for these small projects that I am talking about, 500 kilowatt hours up to a megawatt or 2 megawatts or 3 megawatts, are going to spend their resources, the amount of money and time to permit such a small facility. So we are talking about small, little dams in our state that really are not--we are not talking the Boulder Dam here, we are talking about little, tiny projects along little streams, rivers that are already there, the dams are already there. It is just a matter of putting generation on it. So it is a totally different--we have gotten away from what I think the whole purpose is. Mr. Whitfield. Well, thank you, Governor, for that comment. At this time, recognize the gentleman from Mississippi, Mr. Harper, for 5 minutes. Mr. Harper. Thank you, Mr. Chairman. And thanks to both of you for being here. And, Governor, thank you for your insight, and we certainly--it is not the first story we have heard about difficulties. And it almost appears that the delays are built in to keep others from trying to even go through the process, to make it so time-sensitive and so expensive that people just decide it is not worth the effort. Do you believe that? Governor LePage. That is exactly what I am talking about. For these smaller, little projects, it is all about you delay them until they get discouraged and they have spent enough money. Mr. Harper. Thank you very much. If I may ask you this, Ms. Miles. I am aware of four pending hydropower projects at my State of Mississippi. These proposed projects are below dams that already exist, there would be no new dam or impoundment, and the projects propose to make beneficial use of the water resources to generate clean electricity. Generally, how long does it take for that process? In general terms, how long should it take? Ms. Miles. The timeline for hydropower projects varies dramatically. For small projects like what the Governor may be talking about, where there aren't any environmental resources that there is much concern about, we have issued licenses in as short as 6 months from the time we have a complete application. For a complicated project---- Mr. Harper. Define complicated. Ms. Miles. Well, where there are many issues. There may be endangered species, it could be any number of aspects of the environment---- Mr. Harper. OK. Ms. Miles [continuing]. And it would be a larger project with more construction. Mr. Harper. The examples I am using in Mississippi, for instance, that there is no new dam or impoundment, you would consider that a less complicated situation, I am assuming? Ms. Miles. Yes, I would. And I don't know the situation with your individual projects, but one of the things that is going on is there is a DOE report that talks about a large amount of hydropower potential in the U.S., that there are 80,000 dams, and there is only a very small percentage of them that have hydropower on them. And it also lists the top projects where you are going to get your best bang for your buck, where they have the potential to have maybe a 30 or 40 megawatts of power added. Many of those are Corps of Engineers or Bureau of Reclamation Dams, and one thing that is in my testimony is perhaps a suggestion for trying not to have duplicative federal agencies, is that those agencies whose dams those are take on the responsibility for siting the nonfederal projects at their dams and remove FERC's---- Mr. Harper. OK. Well, you raised---- Ms. Miles [continuing]. Jurisdiction. Mr. Harper. You raised an interesting point there. I know that certainly FERC employs a large number of fish biologists and other scientists. Would it not be possible for FERC to just adopt other agencies' environmental analysis into the appropriate documents? Ms. Miles. With the hydropower projects, we are the lead agency, so those other agencies would cooperate with us or adopt our analysis. Mr. Harper. Certainly, but other cases, you would defer to others, I would assume. Ms. Miles. We could. Mr. Harper. OK. The Natural Gas Act grants FERC authority to set deadlines for the various permits required to construct the natural gas pipeline. When is a final decision on a federal authorization due after the commission issues its final environmental document? Ms. Miles. Currently it is 90 days. Mr. Harper. OK. How did FERC arrive at a 90-day deadline? Ms. Miles. Gosh, was that in the statute? I can't remember. Mr. Harper. If you know. Ms. Miles. I don't know for certain. I---- Mr. Harper. Well, we would assume if you don't know, probably no one---- Ms. Miles. Well, others will know. Mr. Harper. OK. Ms. Miles. I believe it was in--I don't know if it was in the statute or it was established through our regulations. Mr. Harper. That is fine. Have there been specific instances that you are aware of where other agencies were aware of the deadline set by FERC and simply failed to comply? Ms. Miles. There are times I am sure where they have not. Mr. Harper. Do you know how long that some agencies have failed to meet deadlines set by FERC? Ms. Miles. I do not. Mr. Harper. Could you obtain that information to us if---- Ms. Miles. I am not---- Mr. Harper [continuing]. It is available? Ms. Miles. I am not certain. I will look into it. Mr. Harper. OK, thank you very much. And my time has expired. Thank you, Mr. Chairman. Mr. Whitfield. Thank you. At this time, recognize the gentleman from New York, Mr. Tonko, for 5 minutes. Mr. Tonko. Thank you, Mr. Chair. Ms. Miles, this bill provides that all other agencies that participate in the pipeline review process must give deference to the scope of environmental review that FERC determines to be appropriate. In other words, the bill before us would apparently have FERC tell other agencies what to consider when writing and issuing their permits, as required by federal law. That would require FERC to duplicate the expertise of the EPA, the BLM, the Fish and Wildlife Service, and the Army Corps of Engineers. That does not sound feasible to me. So I ask, does FERC have the necessary expertise to determine the appropriate scope of environmental review for these coordinating agencies? Ms. Miles. We have a very technically adept staff, however, for the other agencies with permitting responsibilities, we discuss with them what the scope of the analysis that they believe is necessary for them to issue their permits would be, and try to accommodate that as much as we can in our environmental documents. Mr. Tonko. So having those necessary bits of expertise may not necessarily be in place as we speak? Ms. Miles. FERC's has a wide range of expertise. We are 340 people. We are made up of scientists who cover all the resource areas that come before us in analyzing projects, as well as engineers who can do that analysis. So I feel very comfortable with our technical expertise. I do believe the other agencies have responsibilities under their mandates, and what we do is to try to work with them, understanding what each other's goals are. Mr. Tonko. And further, does FERC have the resources to carry out the requirements of this provision? Ms. Miles. Currently, we have the resources we need to do our work. If we are given significant extra responsibilities, we would need to examine whether we do. Mr. Tonko. Thank you. And finally, as you mentioned in your testimony, and I quote, ``The comission staff gives deference to these agencies' opinion of the scope of environmental review needed to satisfy their NEPA obligations, as they are best equipped to determine what information satisfies their statutory mandates.'' So the language of this scoping provision would effectively reverse the current coordinating practice at FERC, would it not? Ms. Miles. Yes, we do have some concern that it has more of an oversight responsibility than we have right now with more of a cooperative relationship. Mr. Tonko. All right. And then would this provision improve or expedite, in your opinion, the current pipeline permitting process existing at FERC? Ms. Miles. My concern is, as I have said in my testimony, is that it moves some aspects of what we do now under our regulations, later in the process, and I don't believe that is valuable. I believe it needs to be done early in the process. Mr. Tonko. Yes. Ms. Miles. And there are a few other things. Mr. Tonko. OK. There are a number of gas pipeline projects underway in my home State of New York. Some of these are multistate pipelines, some are expansion projects. We consume a lot of gas in New York and in other states in the Northeast, so I believe we need additional infrastructure to ensure reliable service for gas customers. Of course, as with any large infrastructure project, there is opposition. Some absolute and firm, some can be satisfied with alterations to a given project to address specific concerns or problems. But that times time. The public is often less organized, and slower to the table than industry, perhaps with less resources, and states and local communities have concerns and want to participate. That, again, takes time. My understanding is that most of these applications, when they are complete, are approved within a year or two. Is that correct? Ms. Miles. Yes. Mr. Tonko. OK. So, frankly, that seems to be very reasonable. In fact, some of my constituents would probably want more time for deliberation in this process. I am concerned that shortening this process further could lead to compromises in safety, in fewer environmental benefits, and in more resistance to these projects by the public and local communities. Is this process indeed too long? Ms. Miles. The current process, as I have said, is--with-- according to our statistics, we are doing the majority of the projects within 1 year, which is--seems a reasonable period of time. Mr. Tonko. And do we not need to provide sufficient time for the public to weigh-in on projects that will operate for what could be decades? Ms. Miles. Yes, it is very important, and it is built into the process, that the public has adequate opportunity to participate. Mr. Tonko. With that, I thank you very much. And my time has---- Mr. Whitfield. Time has expired. Thank you very much. At this time, chair recognizes the gentleman from West Virginia, Mr. McKinley, for 5 minutes. Mr. McKinley. Thank you, Mr. Chairman. I gather that the genesis of this legislation and this hearing are all about grid reliability. We have had numbers of meetings here and hearings about grid reliability, and this is one way to do it, either hydro or gas, to be able to expedite that. There is a study, I know, done by the University of Minnesota that talks about the concern for grid reliability because they say in the Midwest annually we have about 92 minutes per year that we lose power, and you in the Northeast and in New England the average is 214 minutes are lost annually, as compared to Japan, Japan only has 4 minutes a year in grid reliability. So my concern is, with a lot of these regulations that are being imposed on us, is that things like the EIA has come out and said that if we continue on with this, we are going to lose 25 percent of our coal-fired generating capacity within the next couple of years. The PJM came out with a report in 2014 that said after the polar vortex, that we came within 500 megawatts for 5 minutes; 700 megawatts for an hour, that we came that close to having a massive power shortage in America. And that compliments what FERC's Commissioner Moeller came out and he said that we had better be concerned about this because we are going to have more blackouts, rolling brownouts in the Midwest by 2017 if we don't do something. So my question to you, Ms. Miles, is--and thank you--you have been with the FERC now for 30 years. I understand you joined in 1985, so you have seen quite a change perhaps within the group. Do you think that there is a real grasp of this situation of where we could be faced with brownouts? Do you think--was Moeller correct that should be concerned about this by the next 2 years, if we continue with these regulations that we are going to have shortages? Ms. Miles. I can't speak to reliability issues. That is not a part of my purview. I can speak to the issues that are here on the bills that are before us today, and that my office does which--with making sure that we do the best we can under the statutes that we have to provide a process that is as efficient and provides opportunity for everyone to comment and to address the issues. Mr. McKinley. Do you think--but under your purview, do you have--are you concerned about brownouts? Ms. Miles. As I said, that is not a part of my responsibility. Mr. McKinley. So you have no opinion at all on whether or not brownouts could occur in this country? Ms. Miles. My responsibility---- Mr. McKinley. OK, I guess that may or may not be under your control, but our concern is we are building back on this grid reliability that we have had so many hearings about. This is a positive aspect coming out of this legislation that we are going to be able to provide more. If coal is going to be diminished in its use, at least we ought to be able to come back with hydro and gas. And when we have had roundtable meetings back in northern West Virginia, that is the biggest concern we hear from the drillers. They can't get their gas to market. So I am hoping that this legislation can be advanced so that we can get the power to the Northeast, we can get the power to the east coast so we can have LNG. So I am very concerned that FERC seems to be perhaps slowing things down a little bit. And I just want to be sure, because that is what you were saying, you don't know anything about brownouts, but unfortunately, I hope that you can go back and ask some other members of FERC what these--if I have misunderstood something, but I think we are facing some real concerns in this country if we don't get legislation like this adopted so that we can avoid the brownouts and help our industry. Ms. Miles. I want to make clear that I believe that a--good parts of these legislation that are going to--toward the intent of making sure that the FERC process is efficient and timely are important. Mr. McKinley. Sounds like a great answer in Washington, doesn't it? I yield back the time. Mr. Whitfield. Gentleman yields back. At this time, recognize the gentleman from Maryland, Mr. Sarbanes, for 5---- Mr. Sarbanes. Thank you, Mr. Chairman. Thanks to the panel. So I mean I think your last answer was actually a pretty good one in terms of the desire to have things move efficiently and timely, and I don't begrudge my colleagues' aspiration for all of this process to happen more quickly. The problem is that if you put some of these fixed timelines in place, not only is there the issue that Congressman Tonko mentioned, which is where maybe FERC is being asked or compelled to substitute its expertise for that of other agencies in some instances, but if there is a timeline being put in place, that is a process thing, but it can have an impact on the substantive issues that need to be addressed. Most of the conversation here has related to the relationship between FERC and other federal agencies in terms of trying to get whatever review they are undertaking as part of a project done in a timely way, and the goal here is to give FERC the ability to kind of ride heard over that process and kind of corral the other agencies into a more expedited time frame. But as I understand it, Ms. Miles, it also has implications for state-level reviews and permits that would be issued as well, is that correct? Ms. Miles. Yes, there are several federal authorizations that are carried out by state agencies, like the water quality certification under the Clean Water Act. Mr. Sarbanes. Right, and my concern is that states are doing their best in a lot of these instances where they have been given responsibility on the environmental front, certainly, to make sure that these projects are being done in a way that don't negatively impact the environment there in the state. And that capacity is being pulled away from them if there is some kind of a requirement that the whole process be finished within a certain period of time. And what I don't quite understand is oftentimes, our colleagues on the other side are complaining about when the Federal Government gets in the way of the states being able to carry out things at the state level that they think are important to them, but the effect of this statute or bill, if it were to be passed, would actually supplant a lot of the states' ability to fulfill its obligations to its own residents to make sure things are being put in place. Specifically, there is a project in Maryland right now, the Conowingo Dam, where certification from FERC has been forthcoming, but there is still some review that the Maryland Department of the Environment needs to do to make sure that the water quality standards are being met, and the ultimate relicensing is conditioned upon that permit being issued. And Exelon Corporation, which owns the Conowingo Dam, has undertaken to do a study. They have agreed to do that. That process is moving forward. If we had the kind of regime that is contemplated by this statute in place, there could be the potential situation where, because Maryland wasn't moving fast enough to adhere to some time frame that was being imposed upon them by FERC, Exelon would have the opportunity to come in and sue as a result of them failing to meet that timeline. And then you are undermining the concerns of Maryland residents in terms of the environment. So I just wanted to point out that it has significant implications for the kind of state-level review that is important to conduct. And, Governor LePage, I thank you for your testimony. I understand the frustration, if you are looking at like a small dam and you just want to get generation put on top of it, as you said, and the process seems to go on and on forever. But I think the agency--Ms. Miles spoke to the fact that projects that are less complex can be handled in a more expedited way. We can maybe look at how to help with that dimension of things without imposing across the board this kind of time restriction, which could either have the effect of the agency saying, you know what, we can't get done in time so we will just say no, which wouldn't be good as a result, or issuing some kind of permit without really there being a good basis for it, and then there be consequences down the line. So I think we have to be very careful about that. Governor LePage. Well, there are two things about that. Number 1 is, on the pipeline we are talking one thing, which are usually much larger. Give you an example of what we are talking about, these little dams. Take a farmer who is farming 100 acres of potatoes, and he has a little pond, he has a little dam on his property to have pond for irrigation, he could put a little generator on that and use the power from the dam for his irrigation. FERC has to be involved in that. That power is going to be used on the farm. It is like a little windmill on your farm. That is all we are asking about. Don't believe FERC should be involved in that. I will also say one other thing. I can't speak for the other 49 states, but I guarantee you in the State of Maine, we will beat the Federal Government every time in getting permits. Mr. Whitfield. OK. At this time, recognize the gentleman from Texas, Mr. Barton, for 5 minutes. Mr. Barton. I just want to say amen to the Governor of Maine. Move to Texas. We like your attitude. Mr. Chairman, I am going to concentrate on the section of the proposed draft that deals with the Natural Gas Act. Back in 2005, we passed a major energy bill called the Energy Policy Act of 2005, and in that, we gave the agency, the Federal Energy Regulatory Commission, additional authority to review pipeline applications. With all due respect, it doesn't look to me like the agency is using that authority. If we are going to shut down all these coal plants, Mr. Chairman, we are going to have to replace them at some point in time with some other kind of plant, and in most cases, that is--it could be a solar plant, it could be wind, but in a lot of cases it is going to be natural gas. So to get the gas to the plant, we are going to have to have more pipelines. The good news is that we have lots of natural gas to send, to use in electricity generation. The bad news is we have to get those pipelines built to get it there. So my first question to the gentlelady from the FERC, does your agency really want to be the lead agency, because it doesn't look to me like you do? Ms. Miles. I believe that we have taken the role of lead agency. We have established regulations to carry out what was in EPAct 2005, that the commission is the lead agency and it does establish the schedule. And we do have a consolidated record. Whether the applicant chooses to take anyone to court, that is really their decision and not FERC's decision. Mr. Barton. Well, but the proposed draft takes what we did in 2005 and gives the FERC some additional enforcement authority, not you personally, but your agency doesn't appear to want. Would you rather we took all that away and give it to the Department of Energy, or the Department---- Ms. Miles. I don't---- Mr. Barton [continuing]. Of Commerce? I mean you are either going to be the lead agency or you are not, and my preference would have FERC be the lead agency. Number 1, you are smaller, the staff of the FERC tends to be more results-oriented, I think is a fair way to say it, so there are a lot of reasons to give you additional authority, but you have to want to use it, there has to be a culture at the FERC that you don't mind--if you are going to be the lead, that means you are actually going to lead. Sometimes you can collaborate, sometimes you can consult, but every now and then you have to say this is the way it is going to be, let's get it done. So I am serious when I-- the draft as it is currently structured gives additional enforcement and enhanced authority to the FERC. Is that something that the agency is comfortable with, or would you rather we not and we give to some other--make you the non-lead agency? It is a fair question. Ms. Miles. The overall question, I think we are very well positioned to be the lead agency. I think there are some aspects of the discussion draft that we would like to have conversations about. There are aspects that I think are very good. One of the main situations is, is there accountability or enforcement if someone does not comply with this. In this bill, you do have the aspect, which I have not seen before, of having the heads of other agencies, who many not have complied with the schedule, report to Congress. That is a measure of accountability that has---- Mr. Barton. Well---- Ms. Miles [continuing]. Some potential. Mr. Barton [continuing]. My time is about to expire, Mr. Chairman, but I support the discussion draft's increased authority for the FERC if the FERC will use it, and if we can get assurances that it is something they are comfortable with. And I understand, when you are an independent agency and you don't have a lot of people, it is difficult to deal with some of these other federal agencies that are much larger and have more staff, much more bureaucratic, but the good news is if you are the lead agency and you will use that authority, the Congress will back you up, and will get more pipelines built and will get more energy produced, and will create a better economy. So there is an endgame that is a positive, if your agency will use the additional authority. And with that, Mr. Chairman, I yield back. Mr. Whitfield. Gentleman's time has expired. At this time, recognize the gentleman from Virginia, Mr. Griffith, for 5 minutes. Mr. Griffith. Thank you, Mr. Chairman. Governor, I know you have to get power, and that is a problem for a lot of states as we press forward. I will assure you that we can ship you all the coal from southwest Virginia that the Federal Government will allow you to use. And Ohio. Can't leave out my good friend, Mr. Johnson. And West Virginia, and for my colleague who spoke earlier. That being said, we have, in my opinion, unreasonable regulations on the use of coal, unreasonable timetable on a number of the new regulations coming into effect. And so the natural gas companies, I understand why they are doing it. They are proposing all kinds of pipelines be built, not just in your area, but they have a number that are coming through western Virginia. And so, Ms. Miles, that raises a lot of questions that I have for you this morning. The pre-filing review phase is not mandatory for natural gas pipelines. Should it be? Ms. Miles. You are correct, and that is something that we actually have wondered about ourselves. I think that there are any number of small pipelines that it is not necessary to have it, so should the Congress decide that is a place they want to go, we would need to have the ability to have the smaller projects not involved in it because that would slow it down for projects---- Mr. Griffith. Perhaps---- Ms. Miles [continuing]. That don't need it. Mr. Griffith. Perhaps you can make a suggestion and that can be incorporated into this draft in that regard. As a part of that, you are holding scoping meetings. In my district, as well as in others in western Virginia, it has come to our attention that--and I know it is a longer section of pipeline, but the greater population is perhaps in the Roanoke and New River Valleys, and FERC only had two for the Mountain Valley Pipeline--two public hearings or scoping meetings in the Roanoke and New River Valleys, had four in West Virginia. The Roanoke Board of County Supervisors has requested an additional one. And I would say to you that Congressman Goodlatte and myself have submitted a letter requesting that you all hold another scoping meeting in regard to the Mountain Valley Pipeline, and would appreciate if you would look into that. As you know, I represent from Roanoke, all the way through the west of southwestern Virginia, the Allegheny Islands, and Southside. Congressman Goodlatte represents that area from Roanoke north, including Mary Baldwin, where I understand that you are an alumni. Ms. Miles. Yes. Mr. Griffith. But it is concerning. One of the pipelines actually goes through Augusta County. And so we have 2 that are currently on the drawing board, I think a third is about to be there. There may be a fourth. This morning in the Roanoke Times, there is an op-ed piece by Rupert Cutler, and he indicates that as a part of your commission, that preparation of a single regional environmental impact statement, incorporating all of the pipelines in the region, should be done. Are you all doing that with these various pipelines, because it is of concern to the region because not only do you have the typical problems, but you have the Blue Ridge Parkway, the Appalachian Trail, a number of national forestlands that have to be crossed by these various pipelines? Ms. Miles. I am not prepared to discuss particular projects this morning, but we certainly will take all comments into consideration when we make decisions about them. Mr. Griffith. Is Mr. Cutler, a former member of the Roanoke City Council and an environmentalist, is he correct that it is a part of your charge though to prepare a single rational environmental impact statement incorporating all of the regional pipelines? Ms. Miles. Our responsibility is to analyze all the pipelines, and it is not defined how we do it, but under the National Environmental Policy Act, we need to analyze the issues, give everyone the opportunity to comment on them, display that so the public can comment on it before making any decision. Mr. Griffith. He also asserts that you all have to look at the marketplace, and with all of the different pipelines being proposed now in an attempt to figure out a way that by 2020, we have to start replacing coal if the Clean Power Plan continues to go forward as expected, are you all looking at whether or not we have pipelines stepping over each other, and that we will have a greater capacity than is necessary? Is that part of your charge, and I am going to ask for a yes-or-no answer on that, is it just part of your charge? Because I am running out of time? Ms. Miles. Yes, we need to look at whether there are shippers that have been--have signed up for the capacity to move that---- Mr. Griffith. OK. Ms. Miles [continuing]. Transportation. Mr. Griffith. And then one of the concerns I have is, we have had a lot of people upset by these various pipelines, and particularly in the Mountain Valley Pipeline. It started off coming through Montgomery and Floyd and Henry in my district, and part of Robert Hurt's district in Franklin County. Now it is looking like it is going to go through Craig and Roanoke Counties, and then go through Franklin and Henry. A lot of folks have been distressed because it looks like they just put a line on the page. Can you encourage the companies to do a little more preplanning, and not have such large shifts? We are not talking about just within a small border, we are talking about, you know, completely different counties being involved, different Board of Supervisors, different folks who have to be involved. Could you please encourage that as they move forward, they try to figure out exactly where they want to go? Or when I say exactly, I mean within a reasonable corridor---- Ms. Miles. Yes. Mr. Griffith [continuing]. Before they start putting a lot of folks in distress whose land may be taken under eminent domain. Ms. Miles. That is a part of the pre-filing process is to work through with the companies where they are, and to work with the public and their thoughts and understanding of where is the appropriate siting. Mr. Griffith. OK. I appreciate it very much. I yield back. Mr. Whitfield. At this time, chair recognizes the gentleman from Ohio, Mr. Johnson, for 5 minutes. Mr. Johnson. Thank you, Mr. Chairman. I appreciate it, and thank our panel for being with us here this morning as well. Director Miles, one of the concerns that you raise on page 17 of your testimony regarding the trial type hearing and the provisions under the discussion drafts to move all of these to FERC administrative law judges has to do with administrative costs, but isn't it true that FERC recovers all of its administrative costs for the hydro program from licensees under annual charges required by the Federal Power Act? Ms. Miles. Yes, that is true. Mr. Johnson. OK. All right. And, Director Miles, I represent eastern and southeastern Ohio which, as you well know, we have been blessed with the Utica and Marcellus Shale in that part of the state, which hold an abundance of natural gas reserves. One concern that I hear routinely from the folks who are employing my constituents to produce this resource, and recover this resource, is that if we don't have adequate pipeline to get the natural gas to the market, these jobs are very much in jeopardy. In your testimony, you note that the draft pipeline reform legislation has unintended consequences that could slow down the process. So my question to you--things like moving some activities to later in the process. So my question to you is, would you be in favor of moving those things closer up so that they can be expedited? Ms. Miles. I would like to look at what that would look like, and have the opportunity to comment on it. Mr. Johnson. OK, and are there other changes that you think the committee could make to the legislation to speed up the process so that the permitting can get done quicker, and we can make sure we save these jobs for those hard-working people? Ms. Miles. I don't have anything else to suggest right now. I do have some concern that we want to maintain some ability for flexibility, and not get too strict so that we can't work a little differently with projects that are smaller and may go even quicker than this. Mr. Johnson. Yes. Ms. Miles. So, you know, if you do too much on the outside end to try--we want to make sure we are not messing up the ones that are moving through really quickly, so---- Mr. Johnson. Sure. Well, you may have heard recently in our region of the state, our region of the nation, the Appalachia region of the nation, that, as many times often at the back of everybody's mind in Washington, D.C., we have had it announced that a projected cracker plant coming into eastern Ohio. Thousands and thousands of construction jobs, and thousand permanent jobs, multibillion dollar, 5-year project. It is a game changer when you are talking about manufacturing coming back to our region and those kinds of things. So the pipeline, to get that gas to these processing plants, and then to send that raw material to manufacturers, it is critically important to the economic viability of our region. So I appreciate that you would consider those things. Let me ask you one other. Your testimony states that since the EPA Act of 2005, the commission has been able to act on 92 percent of natural gas project applications in less than 1 year after the application is filed. What do you mean by act? How many of these actually received all of the required federal authorizations, and how long did that take? Ms. Miles. What I mean by act is that the commission has acted. Mr. Johnson. But have they approved them---- Ms. Miles. Many---- Mr. Johnson [continuing]. Have they gotten all the way through the process? Ms. Miles. They have completed the process at the commission. Some orders that are issued may require an authorization from another federal agency. Those usually come through fairly timely. Mr. Johnson. But you have done your part of it---- Mr. Whitfield. Excuse me just one minute. Ms. Miles. We did our part, yes. Mr. Johnson. OK. Mr. Whitfield. Excuse me one minute. When you say--are you talking about--that the FERC application has been granted, or-- -- Ms. Miles. Yes. The---- Mr. Whitfield [continuing]. The certificate has been---- Ms. Miles [continuing]. Commission has authorized it and included in it the conditions that---- Mr. Whitfield. OK. Thank you. Ms. Miles [continuing]. The company needs to apply. Mr. Johnson. Thanks for that clarification, Mr. Chairman, and I yield back. Mr. Whitfield. At this time, recognize the gentleman from Oklahoma, Mr. Mullin, for 5 minutes. Mr. Mullin. Thank you, Mr. Chairman. And I appreciate the witnesses for being here. And, Ms. Miles, I must say, we have a lot of directors, secretaries that come in here, and a lot of times their demeanor is, in my opinion, almost despicable, and I want to commend you on how you are handling yourself today. I think all of us will say that we are wanting to work with you, we are wanting to work with the Governor, we are wanting to get issues resolved, but we are having a hard time understanding where FERC is going. And I understand you control, you know, a small piece of that pie, but we all are having problems. I mean one of the most common complaints I have in my district, I represent the eastern part of Oklahoma, the entire eastern side of Oklahoma, and we have many lakes and several of them are controlled by FERC, and it seems like FERC is growing in their influence in our state. In particular on the shorelines. And, Ms. Miles, you mentioned on page 13 in your testimony that the Federal Power Act determined that matters related to shoreline use, such as recreational flood control and environmental protection, are sometimes more of a local concern and, thus, should be resolved by an entity that is required to consider the overall public interest. Could expand on that comment a little bit more? Ms. Miles. Yes. Congress established the regime in the Federal Power Act that, in exchange for the use of the public waters of the United States, that licensees need to satisfy public interests, and the public interest might be recreation, it might be the environmental values of the area. Mr. Mullin. But what I am trying to get to, are you saying that that should actually be determined by FERC, it shouldn't be determined by the state? Ms. Miles. That is the regime that was established by Congress. The commission only has responsibility over the lands that are owned or controlled by the licensee. It does not have any responsibility over lands that are under private control. So the shoreline management plans that you are referring to would only cover that licensee-owned portion of the project. Mr. Mullin. Completely agree with that, but I represent an area called Grand Lake which is very similar to the Lake of the Ozarks, and also--and Missouri, obviously, and there was an issue going on in--it was either Lake of the Ozarks or Table Rock Lake, I think it was Lake of the Ozarks, where, basically, FERC has come up onto the shorelines and was redrawing the boundary. And last year, I sat in the chairman's office and we asked FERC about this, and they basically described the situation saying that, well, we are using different boundaries now because, back then we used basically the stick surveying mark, and now we are using GPS, and the old boundaries basically aren't acceptable anymore. And so FERC is injecting themselves on telling people how big their house can be on the shoreline, which they own, telling people how many boat slips they can have, and telling them that the existing structures that was built inside the boundaries are no longer acceptable and have to be torn down. And it threw a whole big mess on the shorelines that now we are having the same issue in Grand Lake. And I thinking, well, FERC doesn't even have the ability to control what they have. I mean we are talking about pipelines, we are talking about infrastructure, we are talking about things that you already have and you can't control it, and now you are inserting yourself farther onto the shorelines. And the way I am understanding it is that you are in agreement with that, that you should be inserting yourself farther on to the shorelines, when actually, the states would be more capable of controlling that. Wouldn't you agree with that? Ms. Miles. I can't speak to the individual project that you are raising. Mr. Mullin. I understand you can't speak to it, but if I am understanding it that you are saying that FERC should probably take control of that area, but what I am saying is don't you agree that maybe the state should? I mean you can't handle what you are getting to right now. You don't have the manpower or the capability to even do something that is as simple as permit gas lines. Ms. Miles. What I am saying is that Congress basically authorized the regime that the license includes the land that is necessary for project purposes, which includes the generation of electricity as well as the protection of both developmental and non-development or environmental resources. Mr. Mullin. So how can I help you get this off your plate then? What would you like to see Congress do with this regime, as you are referring to, because we refer to the FERC a lot as the regime too, and so how do I help you get rid of this regime that you are talking about? Ms. Miles. If Congress wants to change the balance, then we certainly would be---- Mr. Mullin. Would you be supportive of it? Ms. Miles. I would need to see what it looked like. Mr. Mullin. OK, thank you. Mr. Chairman, I yield back. Mr. Whitfield. Gentleman yields back. And that concludes the questions for the first panel. Once again, Governor, thank you for being here. Ms. Miles, thank you for being here. We look forward to working with both of you as we continue our efforts to develop an energy package. And thank you again for your time, and we will be in touch. At this time, I would like to call up the second panel. On the second panel today, we have 6 witnesses. I am not going to introduce everybody immediately, but I will introduce you as you are recognized to give your opening statement. And so if you all, when you get time, would have a seat. I want to thank all of your for joining us today, and we appreciate also your patience. And our first witness this morning will be Mr. Donald Santa on the second panel. He is the President and CEO of the Interstate Natural Gas Association of America. Mr. Santa, thanks again for being with us. And each one of you will be given 5 minutes for your opening statement, and then we will open it up for questions. So, Mr. Santa, you are recognized for 5 minutes. STATEMENTS OF DONALD F. SANTA, PRESIDENT AND CEO, INTERSTATE NATURAL GAS ASSOCIATION OF AMERICA; CAROLYN ELEFANT, MEMBER OF THE BOARD, THE PIPELINE SAFETY COALITION, PRINCIPAL, THE LAW OFFICES OF CAROLYN ELEFANT; JOHN COLLINS, MANAGING DIRECTOR OF BUSINESS DEVELOPMENT, CUBE HYDRO PARTNERS; RICHARD ROOS- COLLINS, GENERAL COUNSEL, THE HYDROPOWER REFORM COALITION; RANDY LIVINGSTON, VICE PRESIDENT, POWER GENERATION, PACIFIC GAS AND ELECTRIC COMPANY; AND JOHN J. SULOWAY, BOARD MEMBER, NATIONAL HYDROPOWER ASSOCIATION, PRINCIPAL, WATER AND POWER LAW GROUP, PC (ON BEHALF OF THE HYDROPOWER REFORM COALITION) STATEMENT OF DONALD F. SANTA Mr. Santa. Good morning, Chairman Whitfield, Ranking Member Rush, and members of the subcommittee. My name is Donald Santa, and I am the President and CEO of the Interstate Natural Gas Association of America, or INGAA. INGAA represents interstate natural gas transmission pipeline operators in the U.S. and Canada. Our 24 members operate the vast majority of the interstate natural gas transmission network, which is the natural gas industry analogue to the interstate highway system. The approval and permitting process for interstate natural gas pipelines has become increasingly challenging. While this has been a good, albeit complex process, there have been some trends in the wrong direction. What was once orderly and predictable is now increasingly protracted and contentious. Most energy experts agree that we will need more gas pipeline infrastructure to connect the new supplies of natural gas made available by the shale revolution, and to support increased demand for gas from manufacturing and petrochemical sectors, electric generators, and other end-users. We need a process that balances thorough environmental review and active public involvement with orderly, predictable, and timely approval and permitting of necessary energy infrastructure. If enacted, the draft bill before the subcommittee today would modestly improve the permitting process by introducing additional transparency and accountability for federal and state permitting agencies. We support these steps, but continue to urge Congress to create real consequences for agencies that fail to meet reasonable deadlines. Entities proposing to construct or expand or modify an interstate natural gas pipeline must seek a certificate of public convenience and necessity from the Federal Energy Regulatory Commission. While the Natural Gas Act provides FERC with exclusive authority to authorize the construction and operation of interstate natural gas pipelines, a variety of other permits and authorizations are necessary in order to construct and operate such a pipeline. And I think as evidenced by Mr. Johnson's question a few minutes ago, while a lot of the dialogue this morning has been about the timeliness of FERC's action under the Natural Gas Act, the focus of the draft bill really is the timeliness of these other permits and authorizations that are necessary before a pipeline can be constructed. The Energy Police Act of 2005 provided FERC with new authority to oversee the pipeline permitting process. First, Section 313 of EPAct 2005 clarified that FERC is the lead agency under the National Environmental Policy Act for interstate natural gas infrastructure projects. Second, this section empowered FERC to establish a schedule for all other federal authorizations. In other words, all federal and state permits required under federal law. Section 313 stated that other federal and state permitting agencies ``shall cooperate with the commission and comply with the deadlines established by the commission.'' The draft legislation would codify the FERC rule that established a deadline 90 days after the completing of FERC's NEPA review for all agencies acting under federal authority to make their final permitting decisions. The beginning of the 90-day permitting deadline would not be the first time a permitting agency would have seen an application from a pipeline developer. By the time FERC completes its NEPA review, it reasonably can be expected that the pipeline project developer will have been engaged in a dialogue with the various permitting agencies for 12 to 18 months, or perhaps even longer. Consequently, permitting agencies will have had ample time to review a proposed project, suggest changes and modifications, and render a final decision. Although EPAct 2005 authorized FERC to establish a deadline for permitting agencies, it did not create a mechanism for FERC to enforce such deadlines. Instead, a pipeline project developer may challenge a permitting agency's tardiness or inaction in federal court. Doing so, however, is both time- consuming and risky, and this option seldom has been exercises. The lack of permitting schedule enforceability has become the Achilles' heel in the pipeline approval and permitting process. Agencies are free to ignore FERC's deadline in what is currently a consequence-free environment. Why is the timely approval of pipeline permits important? Pipeline infrastructure is a necessary predicate for fully realizing the benefits of America's natural gas abundance. Abundant natural gas spurred by shale development already has had a profound effect on the United States' economy. We hope that Congress will ensure that there are consequences associated with pipeline permitting delays so that this critical energy infrastructure can be constructed on a timely basis. Transparency is certainly important, yet it needs to go hand-in-hand with clear accountability for agency inaction or delay. Thank you for the opportunity to testify today. [The prepared statement of Mr. Santa follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Mr. Santa, thank you very much for that opening statement. Our next witness is Ms. Carolyn Elefant, who is a Member of the Board of the Pipeline Safety Coalition, and Principal of the Law Offices of Carolyn Elefant. So thank you for being with us, and you are recognized for 5 minutes. STATEMENT OF CAROLYN ELEFANT Ms. Elefant. Thank you, Chairman Whitfield. Thank you, Chairman Whitfield, and good afternoon to you and to Ranking Member Rush, and the members of the subcommittee. As you mentioned, my name is Carolyn Elefant. I am on the Board of the Pipeline Safety Coalition, which is a nonprofit organization that serves as a clearinghouse for factual and objective information to increase public awareness about pipelines, and also to promote environmental and public safety. In addition, in my capacity as an attorney, I represent landowners, conservation trusts, community governments, and other entities that are directly impacted by pipeline infrastructure. My testimony today will highlight two of the coalition's concerns regarding the draft legislation, which essentially requires federal and state agencies with permitting authorities over pipelines to adhere to deadlines established by FERC. First, the coalition believes that the legislation is unnecessary. There is little evidence to suggest that it is actually the state and federal permitting agencies that are responsible for delays in development of pipeline infrastructure. And to the extent that they are, companies already have a mechanism in place to enforce those deadlines, which is through bringing suit in federal court; a mechanism that has only been used twice since it was enacted 10 years ago in the Energy Policy Act. Second, the coalition's greater concern is that the proposed legislation's approach to expediting the permitting process, such as requiring federal and state permitting agencies to confine the scope of their environmental review to those issues identified by FERC, would subordinate the regulatory mandates of FERC's sister federal agencies, as well as state agencies implementing delegated federal authority under statutes like the Clean Water Act, the Clean Air Act, and the Coastal Zone Management Act. So the first issue I wanted to discuss as to why this legislation isn't necessary relates to the delays, and from our perspective it is not clear that these state and federal permits are holding up the process. The way the INGAA has defined delay in its 2012 report that it commissioned is a situation where a state or federal permit is not completed within 90 days after FERC completes its environmental review. But there are many reasons for why this can happen. And first of all, the processes are not always properly aligned. So a company may not initiate the state permitting process until several months after it started the FERC certificate process, and that can lead to a misalignment at the end. In addition, state agencies also have--the statutes provide them with a year, in some instances, to act on a permit. So if you start the process late, it is going to run over at the end. The second issue related to delay is that many times a delay may occur because there is a change in the root, or a different alternative is proposed down the line. And there are instances where a company knows about this initially, but rather than trying to accommodate and negotiate that issue, they will hedge their bets and figure that if they ignore it, it will go away. And it comes back to bite them at the end of the process. I have been involved in at least two proceedings where issues raised by state agencies early on in pre-filing were ignored for years later, and when it finally came time to issue the permit, and it appeared that the state permit wasn't going to issue, those issues had to be dealt with and it created some delay. And last, as I mentioned, to the extent that there is delay, there is a mechanism that Congress put in place 10 years ago; the ability to bring suit in District Court. I would respectfully disagree with my colleague, Mr. Santa, as to the difficulty of this. It has been used twice. I was involved, representing interveners in one of those proceedings. It is extremely expedited, it is about 3 months, and the company in this particular situation received relief very quickly. And even with this expedited schedule, I, representing a group of landowners, was still able to participate. So that is an option that is highly underutilized, and suggests to me that perhaps companies don't believe that they have enough of a case to be able to bring to court to show delay. And so they are not using this provision because it isn't as necessary as has been suggested. As I mentioned before, really from our perspective, the most troubling aspect of the legislation is it seeks to eliminate delay really be eliminating differing perspectives. For example, one of the provisions that has been discussed is that, when making a decision with respect to federal authorization, the federal and state agencies shall defer to FERC's scope of the environmental issues. And this is very troubling because state agencies and federal permitting agencies have different mandates. They evaluate different things in the environmental process. And you will sometimes see that they may be identifying issues that FERC considers not relevant to the certificate process. And that makes sense, but these are different mandates. So we don't see that there is any justification to compel a federal or federally backed agency to subordinate its regulatory mandates to the goals of the Natural Gas Act, and indeed, we can't think of any other federal industry or federally regulated industry that has been granted a similar trump card. So those are some of the concerns that we have, and I look forward to participating in the rest of this hearing. Thank you. [The prepared statement of Ms. Elefant follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. All right, thank you very much, Ms. Elefant. At this time, our next witness is Mr. John Collins, who is the Managing Director of Business Development at Cube Hydro Partners. You are recognized for 5 minutes, Mr. Collins. STATEMENT OF JOHN COLLINS Mr. Collins. Good morning, Chairman Whitfield, Ranking Member Rush, and distinguished members of the subcommittee. My name is John Collins, and I am the Managing Director of Business Development for Cube Hydro Partners, a small, women- led business that owns and operates hydroelectric plants in several states. The company also engages in new hydropower development through the building of new plants at existing dams. I have over 25 years of experience in the energy industry, including previous experience in the development of over 3,500 megawatts of merchant power natural gas-fired plants during my career at Constellation Energy. I spent over 22 years with Constellation Energy Group in various leadership positions, including Chief Risk Officer, Chief Financial Officer, and Senior Vice President of Integration. I am pleased to have the opportunity to appear before you this morning to discuss the importance of modernizing and improving the hydropower licensing and relicensing process to make it more efficient and transparent, while supporting environmental protections. Cube Hydro's current portfolio of hydrogenation assets consist of 13 plants that comprise over 106 megawatts. The company is committed to developing, owning, and operating hydropower facilities across the United States. We are actively pursuing the potential development of new projects on existing dams. The National Hydropower Association and the Oakridge National Laboratories cite the potential to retrofit more than 54,000 dams in the United States, bringing more than 1,200 megawatts of new renewable energy onto the grid, while creating hundreds of thousands of new jobs, and mitigating 40 million tons of greenhouse gas emissions annually. These opportunities are tremendous. However, the length, expense, and uncertainty of the hydro licensing approval process significantly disadvantages development. Licensing can extend for nearly a decade, and such a long, protracted, and uncertain regulatory process hampers investment by increasing regulatory risks, financial risks, and implementation risks, thus, driving up the cost of new hydropower at existing dams. The time and energy to secure the licenses and permits contributed to development costs that can be between 25 and 30 percent of the overall cost of the project. Cube Hydro experienced these regulatory challenges firsthand while developing its 6 megawatt Mahoning Creek Hydroelectric Project in western Pennsylvania. The overall regulatory process for the project spanned almost 10 years, causing significant difficulties in obtaining financing, and securing a long-term power purchase agreement. Although the end result is and continues to be a success story, the development process was a significant challenge. To facilitate hydropower development, the regulatory process should be streamlined to eliminate redundancies and provide developers and investors with added certainty. Removing duplication in the process, and placing a single agency in charge of managing the entire approval process is needed. Such accountability is an essential attribute of efficient management and good government. The implementation of a streamlined regulatory process also needs to look to standardize the requirements associated with issuing a license to eliminate any competing requirements. We are particularly supportive of the provisions that will minimize duplications of studies and license proceedings, simplify the regulatory process for smaller projects, authorize new studies only when the FERC determines that additional data is necessary, weigh the cost-benefit analysis of licensing requirements, implement a use-it-or-lose-it provision for submitting a pre-application document within 3 years, as opposed to the current system which allows up to 8 years without developing the project. The end result is the establishment and enforcement of project timelines. These and other initiatives would help to simplify licensing requirements, and facilitate hydropower project development and relicensing. We believe that hydropower is, and should remain, an important component of and environmentally sustainable U.S. energy policy. Providing the ability to invest private capital to upgrade, modernize, and stabilize this resource is critical to maintaining and growing the currently installed base, which is the largest of any renewable resource in the United States. Hydropower is clean, renewable base load energy that helps to stabilize our electric grid. Federal policies should be adopted to encourage the development of this vast resource. Cube Hydro believes the draft legislative proposals under consideration by the subcommittee today are a reasoned and responsible modernization of federal licensing legislation to allow for increased development of this important resource. I thank the subcommittee for this opportunity to testify on hydropower's role in meeting our nation's energy and economic objectives, and look forward to answering your questions. [The prepared statement of Mr. Collins follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Well, thank you, Mr. Collins. And our next witness is Mr. Richard Roos-Collins, who is General Counsel for the Hydropower Reform Coalition, and Principal in the Water and Power Law Group, and he is testifying on behalf of the Hydropower Reform Coalition. So you are recognized for 5 minutes, Mr. Collins. STATEMENT OF RICHARD ROOS-COLLINS Mr. Roos-Collins. Thank you, and good afternoon, Mr. Chairman, ranking minority members. My name is Richard Roos- Collins. I appear on behalf of the Hydropower Reform Coalition. Our conservation groups represent two million people who fish, boat, and hike on the lands and waters of these hydropower projects. Since 1992, our coalition has reached 170 settlement agreements with licensees, including Pacific Gas and Electric, and also New York Power Authority. We worked with the National Hydropower Association and other stakeholders to negotiate the 2005 integrated licensing process which FERC uses, and the 2013 Hydropower Regulatory Efficiency Act. We support the goal of expedited licensing consistent with the quality of the license. We do not support specific mechanisms in the discussion draft that would undercut cooperation between FERC and other agencies. Under the draft, FERC would control the schedule for the work of other agencies, determine facts relevant to fishways and federal reservations, and exclusively administer a license once issued. This would disrupt the cooperative approach that has succeeded under the Federal Power Act since 1935. Section 10(a) of that Act requires that each license must be best adapted to a comprehensive plan for power, flood control, water support, fish, and recreation. This mandate is achieved through cooperation. FERC determines overall how to advance the public interest, and it issues the license. Other agencies write specific articles for fishways, federal reservations, and water quality. FERC and those other agencies work hard to manage the tradeoffs between competing uses of waters, looking out two generations. In the modern era, licenses have increased power capacity by 4 percent, relative to the original licenses, and are providing billions of dollars of regional economic benefits associated with non-power uses. At one project alone, recreation, including family recreation, will produce more than $330 million in such benefits over the next 30 years. Now, let me turn to time. A licensing process is expected to take 5 years or less. Why that period? The license is based on the studies conducted to evaluate how best to manage trade- offs over two generations. Should licensings end on time? Yes. And, in fact, most do. Are some licensings delayed today? Yes. Roughly \1/4\. Do delays occur merely because agencies, other than FERC, write license articles? No. Let me give an example. Under the 2005 Energy Policy Act, the federal agency that prescribes a fishway must provide a trial on disputed issues. These trials have consistently ended on time; 6 months or less. The assigned judges did this by knocking heads. Section 1303 of the discussion draft would move these trials to FERC. Would that save time? No. It would just transfer the authority to resolve those triable issues. We support commonsense mechanisms that save time and money by improving coordination between FERC and other agencies. Cut red tape? Yes. So let me make four suggestions. First, there should be a joint environmental document in each licensing. Today, there tend to be several. That is because FERC requires an agency cooperating in FERC's own document to forego the right to be a party. Faced with that catch 22, states tend to prepare their own documents for their water quality certifications. Half of the delayed licensings are in California, and that is largely why. Second, a joint study plan should provide the information necessary for all license articles. Third, there should be a comprehensive schedule, and an agency dragging its feet should be subject to a judicial mandate. And lastly, we support the procedure used by former FERC Chair, Pat Wood, in the early 2000s. He held an annual hearing solely to address delayed licensings. He grilled his staff and parties alike to isolate and fix causes for delay. The backlog shrank very quickly. We are committed to work with this committee, industry, agencies, and other stakeholders to develop reforms that expedite licensings consistent with the public interest in enhancing power and other beneficial uses of our nation's waters. Thank you for the opportunity to testify. I look forward to your questions. [The prepared statement of Mr. Roos-Collins follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Thank you, Mr. Roos-Collins. And our next witness is Mr. Randy Livingston, who is Vice President of Power Generation, at Pacific Gas and Electric. And you are recognized for 5 minutes. STATEMENT OF RANDY LIVINGSTON Mr. Livingston. Good morning, and thank you. PG&E is one of the nation's largest combined electric and natural gas utilities, with more than 22,000 employees serving 16 million Californians. We are also the owner and operator of America's largest investor-owned hydro system. With 26 FERC licenses, we are regularly in the process of relicensing, and in fact, today, we have seven projects in one phase or another of relicensing. Our system generates 3,900 megawatts of safe, clean, reliable, and affordable power for millions of Californians. It has been crucial in integrating other renewable energy sources. In addition, it provides water supply, recreation, flood control, taxes, and other benefits. Hydropower is an invaluable resource. It is one that our country can and should do more to capitalize on. We appreciate all the efforts done to date by past Congresses to advance hydroelectric generation. We believe this Congress has taken a very important step with the release of the discussion draft on hydropower regulatory modernization, and by holding today's hearing. PG&E believes it is critical for hydroelectric power generators to be able to move through the relicensing processes more efficiently, more affordably, so we can implement the environmental protections, community improvements, and facility upgrades more quickly than we can today. We believe the discussion draft accomplishes this fairly and effectively, while maintaining important environmental protections and community interests. In particular, it does this by clarifying FERC's exclusive authority to balance beneficial uses, and to enforce, amend, or otherwise administer all aspects of a FERC license. It improves the licensing process by allowing FERC to establish standards and deadlines for federal authorizations, it clarifies the scope of federal agencies' authority under Sections 4(e) and 18 of the Federal Power Act, and required those agencies to explain the effects of their conditions or prescription on other recognized benefits, such as energy production, flood control, and water supply. And it allows the licensee to seek a review of federal authorization or delay an issuance in the Federal Court of Appeals. We believe the commonsense and basic reforms can make hydropower more efficient, while keeping in place the environmental protections and other benefits that we all agree are critical. PG&E places a priority on using collaborative process to relicense a facility, as both understanding and incorporating the interests of stakeholders is critical. However, as it stands today, the current process is complex, protracted, leading to higher costs and delayed implementation of improvements and upgrades. To put this into perspective, PG&E's recent experiences, even for a medium-sized license, it consistently takes over 7 years to renew an existing license for an existing facility, and often well over 10 years. The cost just to complete the process for the continued operation of a facility can run over $50 million, and implementing the requirements of the new license can run into $100 million. All of these are costs that are ultimately born by the energy consumer. Relicensing process involves numerous federal and state agencies, and stakeholders with interests that may not always align. Therefore, we believe the process should be improved to focus on the following. Ensure environmental protections and preserve hydropower, achieve the multiple benefits of relicensing sooner, reduce cost, improve predictability, and enhance the collaborative process to be results and solution- oriented, and avoid conflicting license conditions. We would recommend a number of very specific improvements to address these license--these licensing matters, including improving coordination between federal and state environmental reviews, including an enforced discipline schedule for all parties involved, better defining the extent of authorities by federal agencies, improving federal and state agency coordination and transparency, and finally, by establishing a process for a single challenge opportunity before FERC to resolve issues or conflicting license restrictions. For example, in California, we are working to help our State Water Board environmental review follow a parallel path with the federal reviews, including relying on the same data and studies. To date, even though our State Water Board participates in relicensing, this process has generally been sequential and separate, at times resulting in conflicting license conditions. Today, it is up to the licensee to try and resolve those. As such, conditions have sometimes extended to private lands where there is no clear nexus to the project. The discussion draft being debated here would accomplish many of these objectives. Given the focus of this committee on crafting and advancing energy policy for the 21st century, you and your colleagues have an important opportunity to bring meaningful change to the hydropower relicensing process, and to assure that it is consistent with needs and opportunities today and many years ahead. PG&E looks forward to working with you. [The prepared statement of Mr. Livingston follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Thanks, Mr. Livingston. And our next witness is John Suloway, who is Board Member of the National Hydropower Association, and you are recognized for 5 minutes. STATEMENT OF JOHN J. SULOWAY Mr. Suloway. Good afternoon, Mr. Chairman, Ranking Member Rush, members of the subcommittee. My name is John Suloway. I appear today on behalf of the National Hydropower Association. I am on the Board of Directors, serve as Secretary of the Executive Committee, and I was President of NHA about 10 years ago. NHA appreciates and commends the work this committee and Chairman Upton, and also the discussion drafts proposed by Representative Kathy McMorris Rodgers. I am honored to be here today to discuss this issue, particularly with the focus on hydropower regulatory modernization. Let me tell you a little bit about myself. I grew up in the electric utility industry. I have focused my entire career on project development, licensing, and environmental research. Most of that time was with the New York Power Authority. I retired from NYPA at the end of the year as the Vice President of Project Development Licensing. I loved my job, I loved the power authority, and I particularly loved working in hydropower. As you can tell from my written testimony, NYPA is one of the leading producers of electricity in the State of New York, and we have one of the largest hydropower systems in the entire country. My job and my group focused on project development and licensing of both generation and transmission projects. We worked a great deal on hydropower, but also I developed combined cycle plants and simple cycle turbine projects that burn natural gas, and also high voltage transmission lines. In my testimony, I am trying to convey four basic points. Number one, hydropower is a great technology. It has a proven track record of being a dependable and cost-effective source of generation. Also, in today's world where the norm is change, hydropower is a crucial tool for maintaining the reliability of the changing electrical grid, while helping to address climate change. These characteristics made hydropower very attractive for economic development. There is a significant potential for increased hydropower capacity which is not being realized. Point two, the development of more hydropower should be a key component of America's energy portfolio. We have thousands of megawatts that can be developed at existing dams that are not being developed, in part because the hydropower licensing process is protracted, costly, and risky. And us folks in the electrical utility industry tend to be risk-adverse. Point three, we, and I mean the big we here, industry, regulators, nongovernmental organizations, and Members of Congress, we have been working since the 1990s to improve the hydropower licensing process. We have made progress. There have been improvements in the licensing and administration of hydropower, but additional work needs to be done to make the process more efficient so a significant portion of that undeveloped capacity can be developed. My fourth point. The goals and objectives expressed in the discussion draft bills would help to make hydropower more attractive to developers and investors, while ensuring careful consideration of environmental values and the protection of natural resources. Protecting the environment and natural resources is important, and is a commitment that the hydropower industry takes seriously. In conclusion, I have made a career of navigating these archaic processes. And that being said, I have come to the conclusion that we have a very important opportunity here that we should not miss. Like I mentioned before, incremental changes in the FERC process have improved the process, and as part of making those changes, we have created relationships, we have created friendships, and we can build on that communication improvements as we move forward. But when you stand back and you look at the fundamental question that is in front of us, why shouldn't we be able to license a hydropower project for the same amount of time and the same amount of money as it does for a combined cycle plant that is burning natural gas? And when you look that question in the face, you know we have more work to do. So thank you for providing me this opportunity to testify on behalf of hydropower's role in meeting our nation's environmental, energy, and economic objectives, and I look forward to answering your questions. [The prepared statement of Mr. Suloway follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Mr. Whitfield. Well, thank you, Mr. Suloway. And thank all of you for your testimony. And at this time, I will recognize myself for 5 minutes of questions. It is obvious to everyone that the two subject matters we are looking at is natural gas pipelines, and we are looking at hydropower. And, Mr. Roos-Collins, I think I know where everybody stands on this draft. You focused on hydropower. You indicated--are you--did you say that you believe that there are some problems at FERC relating to licensing and relicensing of hydropower that need to be addressed, or I know that you are opposed to this particular draft, but are there some areas that you do think needs to be addressed? Mr. Roos-Collins. Yes, Mr. Chairman. Mr. Whitfield. OK. Thank you. I just wanted to clarify that. And, Mr. Livingston, would you say that from your perspective at PG&E, is licensing more of an issue or is relicensing more of an issue? Mr. Livingston. Well, for us it is relicensing. I think as we look at our portfolio, we are going through a significant period of relicensing and are regularly involved in it. The licensing is a critical issue for development of the new resources on, for instance, non-power dams---- Mr. Whitfield. Right. Mr. Livingston [continuing]. And for the licensing potential for pump storage development to help integrate other---- Mr. Whitfield. Right. Now, you said you had seven active relicensing projects right now, I believe, and I think your testimony talked about the cost would be $20 to $50 million. And I think you mentioned $100 million. What was that about? Mr. Livingston. That is about license implementation costs. So not only do you have the cost to get the new license, then you have to comply with all the new terms. Mr. Whitfield. And my understanding, I am not an expert, but my understanding, the relicensing is almost as cumbersome as the licensing process, is that correct? Mr. Livingston. Yes, it is the same. Mr. Whitfield. It is the same, OK. OK. And, Mr. Santa--well, back to you, Mr. Livingston. I have heard about one relicensing project that you all have been involved in that has gone on for a number of years. I don't know specifically the information about it, but could you give us a recent example of a challenging and cumbersome hydropower licensing proceeding that you are going through that has been particularly frustrating? Mr. Livingston. Well, I think just our most recent work is on our Desalba-Centerville Project. It is a 26 megawatt project. Lots of important resource issues there to work through. That process is currently in its eleventh year. We are well over $26 million, well over $1 million per megawatt, to go into relicensing. And we are--just got a water quality certificate--a proposed water quality certificate that has competing license conditions with everything that we have been talking about for the previous 11 years. And we are going to have to work to--now to resolve those before a final license can be---- Mr. Whitfield. So is it this primarily a federal issue or a state issue, or---- Mr. Livingston. It is combined. The State Water Board is working under the Clean Water Act. Mr. Whitfield. OK. Mr. Livingston. The concept that I think many of us are trying to work through is how we can make the same set of studies, the same---- Mr. Whitfield. Right. Mr. Livingston [continuing]. Time frame, and the same process all come together at the end so---- Mr. Whitfield. And how many years have you been involved in this project? Mr. Livingston. It started its relicensing 11 years ago. Mr. Whitfield. Eleven years ago. And it is still not resolved. Mr. Livingston. It is still not resolved. Mr. Whitfield. OK. Mr. Santa, Mrs. Elefant had mentioned in her testimony that from her perspective, there is really no need for change, and she specifically said if you have a problem, you can file this lawsuit. I am assuming that you don't view that as a practical solution because of cost. Mr. Santa. No, we don't view that as a practical solution, Chairman Whitfield. For example, Ms. Elefant mentioned two instances in 10 years that someone had availed themselves of that; one of which was resolved reasonably quickly, but the other one involved multiple years, two trips to the U.S. Court of Appeals for the Second Circuit, and ultimately, the project applicant ended up walking away from the project after investing years and significant resources in trying to develop that project. I think it is important to remember here that the current law would compel the applicant to sue the very agency from which it is trying to get the permit. Is that going to incline that agency to be more cooperative? Not to mention that same applicant may have other applications on other projects pending before that same agency. Mr. Whitfield. You had mentioned this GAO report, I believe it was in your testimony, but it basically said that the average length of time on one of these pipeline certificates is like 5 years, I believe. Mr. Santa. It was 558 days. Mr. Whitfield. 558. The 5 years, I guess, was the pre- filing and the other agency permits and so forth. Mr. Santa. Yes, sir. Yes, I think it was if you took into account the time from project inception, the pre-filing process---- Mr. Whitfield. Right. Mr. Santa [continuing]. The FERC process, the other permits---- Mr. Whitfield. Right. Mr. Santa [continuing]. And construction, the 5-year period is---- Mr. Whitfield. Yes. Mr. Santa [continuing]. A reasonable estimate. Mr. Whitfield. Yes. And I point that out just because it does appear that there is an issue here. I mean some people are indicating that they don't think there is an issue, and that is why we have these hearings to hear all sides. So my time has expired. At this time, recognize the gentleman from Illinois for 5 minutes. Mr. Rush. Thank you, Mr. Chairman. Ms. Elefant, as a former FERC lawyer, do you believe that requiring other agencies to defer to FERC on the scope of environmental review would help expedite the natural gas permitting process and leading to fewer or more lawsuits, and are FERC's staff equipped to determine the scope of environmental review over and above the experts in other agencies with jurisdiction over these issues? Ms. Elefant. I don't think that it would expedite anything. The problem is when you are looking at the scope of environmental review, it relates to what the agency's mandate is. So, for example, I have seen cases where FERC has determined, for example, that it will not consider cumulative impacts related to fracking because that is something that FERC has determined is not causally connected to pipeline certification. And that is a decision that has been affirmed by the Second Circuit. There are other state or federal agencies for which this issue of fracking is more closely related to their mandate, so they might consider that within the scope of the issues they address when they are granting a permit. Unless you change the underlying regulatory mandate of those related state and federal agencies, that is the only way you can eliminate consideration of those issues. They look at different issues, that is why they are different agencies and they have different mandates. Mr. Rush. Yes. Mr. Roos-Collins, I know that you are not an agency expert on how this bill would impact commercially mandated environmental protection laws, but I don't see anybody else on the panel who is an agency expert either, nor did I see anyone on the previous panel who is an agency expert, but I just want to get your opinion, if I could. How would this bill impact issues relevant to the Department of Commerce, Department of the Interior, and the Department of Agriculture who are the very agencies that are responsible for protecting water quality, America's fishways, federal reservations, and other of our nation's natural resources? Can you give me an opinion on that? Mr. Roos-Collins. I do. The discussion draft would transfer much of the authority to FERC. And I will leave aside pre- licensing, which is what our testimony has addressed. Let me briefly mention post-licensing. The opening page of the discussion draft provides that FERC will have exclusive authority to administer a license---- Mr. Rush. Yes. Mr. Roos-Collins [continuing]. Which is to say that it will have exclusive authority to administer those terms of a license that derive from a water quality certification. That is trouble, in terms of actually protecting the beneficial uses of our waters. And to be clear, Ranking Minority Member, I believe that FERC is a very capable federal agency. Mr. Rush. Yes. Mr. Roos-Collins. I respect Ms. Miles and her staff. They are competent. This is not about competency; it is about on- the-ground knowledge. In a typical proceeding, FERC staff will visit the project a few days. By contrast, the staff for the State Water Agency, or for the Fish and Wildlife Service and NIPS, or the Forest Service, will have walked those grounds dozens, if not hundreds of times. That on-the-ground knowledge is what Congress respected in the 1935 Federal Power Act, which delegated to them limited authorities to use that knowledge to protect certain resources. Mr. Rush. Well, it seems to me as though, Mr. Roos-Collins, that we are at a position that the question--when shifting the responsibility for holding trial-type hearings on any disputed issue of material fact from the secretaries of the same departments, Interior, Agriculture, or Commerce, to FERC, would that, in your opinion, do anything to expedite or will it be akin to a rat running around a maze, no way out, in terms of the permitting process, would this help us at all expedite? Mr. Roos-Collins. My opinion is that it would not expedite, and it--indeed, it could delay. And if I might give one brief example. The National Marine Fishery Services uses administrative law judges assigned from the Coast Guard. Those judges conduct a trial as though they were onboard a ship. At a pretrial conference, they once looked at the attorneys and they said, you have pending motions, if you argue those motions I will cut you off, and if I cut you off I will probably rule against you. You want to argue on the motions? And, of course, all of the parties said no. Well, that pretrial conference was over in 15 minutes. My experience with the judges assigned by Interior and Commerce and Agriculture is that they are tough and fair, and as a result, I don't think moving this to FERC would expedite decisions. Mr. Rush. Mr. Chairman, I yield back. Mr. Whitfield. At this time, recognize the gentleman from Virginia, Mr. Griffith, for 5 minutes. Mr. Griffith. Thank you, Mr. Chairman. Appreciate it. Mr. Santa, I believe you may have heard my questions with the prior panel, and so you know that I am concerned about placement of gas pipelines, but I want to talk to you about the need for gas pipelines because that is the driving force behind all of this, particularly in those areas that have relied on coal to produce their electricity. With the myriad of different regulations that the EPA has proposed, many of those power generating companies, the electric company as we know it back home, are having to turn to natural gas, isn't that true? Mr. Santa. Yes, sir, that is true. Mr. Griffith. And as a result of that, and looking forward at the impact of the closing of many coal-fired power electric generation units, many of those, particularly in the Southeast and the East, are looking at using natural gas instead, isn't that also true? Mr. Santa. That is correct, sir. Mr. Griffith. And as a result of that, there are some serious concerns across the industry that if the natural gas pipelines are not built in a quick manner, or brought to bear fairly soon, we will have a problem with either rolling brownouts or possibly even blackouts in many parts of the East and Southwest, is that not also true? Mr. Santa. Many parties have expressed that in connection with the Clean Power Plan. We are confident that gas and gas pipelines ultimately can meet that need, but INGAA too, in our comments on the Clean Power Plan and at the FERC technical conferences noted the timing issues in terms of the time needed to develop infrastructure versus the compliance deadlines. Mr. Griffith. And, of course, it is one of the reasons why I support legislation that would cut the Clean Power Plan off until the litigation is over because it is going to create huge problems for electric generation companies across the United States, but particularly in the Southeast and the East. And I have serious questions about the legality of the EPA's interpretation--I should say their new interpretation, not their original interpretation of Section 111(d). And so that is one of the big drivers and the reason that right now there are as many as four, I know of at least two, a third that I have heard about, and a fourth that has been indicated in an article today, looking at gas pipelines in my region, and that is what is driving all of this, isn't that what you would indicate to us? Mr. Santa. It is a significant driver. There is also industrial demand that is part of the demand for those pipelines. Mr. Griffith. Well, and the natural gas pipeline--the natural gas price being low is a factor to be considered in that, and that is what is driving that new manufacturing demand as well, isn't it? Mr. Santa. That is correct, sir, yes. Mr. Griffith. And so if we are going to have more good- paying jobs, if we are going to have electricity in our homes, whether I agree with the EPA's regulations or not, we are going to need natural gas pipelines, isn't that correct? Mr. Santa. Yes, sir. Mr. Griffith. Now, that being said, how can we do this in a better fashion because--and I would submit one of those would be to give a better timeline on the EPA regulations, if they are found legal, which I don't think they will be, but what can we do to do a better job, because the decision on the ground suddenly has folks in their yard trying to figure out where they are going to place a pipeline, and one month it is in one county, and the next month it is in another county. And it has really got a lot of folks, I think, legitimately upset that they are about to lose their family farm or their home, or their area of concern, nearby them. And how can we allay those fears for the general public? Mr. Santa. You are right that this does acutely affect landowners, it affects their major investment, their home, their farm, their property. It also is occasioned by the fact that we have prolific gas supplies in places that, at least in recent history, haven't been prolific supply areas, and so it has created the demand for more pipelines to get that to the market. I think that overall, the FERC does a very good job with its process. I know that INGAA and its member companies are committed to this because, beyond going through the construction and siting process, these landowners will be our neighbors for years. I think that the legislation today is intended to try to make that process more efficient and yet still respect the rights of landowners and environmental concerns, and also as part of the Administrations' Quadrennial Energy Review, the first installment focused on infrastructure, they focused on improving the permitting process. Mr. Griffith. And I am assuming that my region is not alone in having a number of proposals being made because we are going to have to move a lot of gas around the country. And of course, we had the Governor of Maine in here, requesting that we facilitate that somehow to get the gas to them, or to allow them to hook-up to electricity either at the hydro side or from Canada. Ms. Elefant, do you think FERC is equipped to take a look at the big picture and decide if they need to have two, three, or four pipelines passing through the western part of Virginia? Ms. Elefant. I think at some point somebody has to take a look at the big picture. The Natural Gas Act, although it is not imbued with the same public interest standard as the Federal Power Act governing hydro, does issue certificates for public necessity and convenience. If you look at the history of the Act in some of the older cases, FERC or the Federal Power Commission played a larger role, and they would look to see if there was a need for three or four pipelines, and try to take a programmatic view of what the public need was. In addition to development of multiple pipelines, there are other ways to increase efficiencies of existing pipelines to capture additional natural gas. FERC, in fact, just last month, implemented a policy which would incentivize existing pipeline developers to address leaks in the pipeline. And there was a study shown recently in the Boston area that if you could capture all that leakage, you could increase the pipeline capacity by almost 30 percent. So I think that in addition to looking at just building more, we need to take a more robust approach and also look at some creative solutions, for example, making pipelines safer and addressing leaks, which is really a win-win for everybody, including the pipeline, which gets incentive payments to do that. Mr. Griffith. My time is up. I yield back, Mr. Chairman. Mr. Whitfield. Gentleman's time is up. At this time, recognize the gentleman from California, Mr. McNerney, for 5 minutes. Mr. McNerney. Thank you, Mr. Chairman. And I want to welcome Mr. Livingston here to the committee this afternoon, now. PG&E has done a lot of creative things with respect to the grid, and it has taken a lot of steps in terms of pipeline safety and leakage, so I want to make sure you get credit for that. Are there particular federal agencies that are having trouble coming to the table on the hydro issue in a timely manner? Mr. Livingston. I think each of the agencies, they have very dedicated folks and they are doing their best, but in a lot of cases, what we are looking at is agencies that have single or a few resource focus. Right? So if you are working in the water area or around land, or in other issues on fish, the same thing with some of the other stakeholders in this who might be interested in recreation or fishing, and it is really all of that coming together. What one agency versus another one would do as far as a prescription is--might interfere with what--another one. So the real point is trying to come together in a way that there is a decision-maker, there is one set of decisions. So it is not one particular agency, it is when we have sequential decision-making going on and having an agency that can balance all the beneficial uses, and right now the only federal agency in the hydrospace that has that in statute is FERC. Mr. McNerney. Are problems with regard to timing and responsiveness exacerbated by the drought in California now? Mr. Livingston. Sure. I think, particularly since we are in the fourth year of drought, and with the Governor making sure that we are taking decisive action on that. There is a lot of focus on trying to deal with the issues associated with water supply in the state, and many of the same folks and many of the same agencies are devoting their focus, rightly so, to that, and that does recently have an impact on---- Mr. McNerney. OK. Mr. Livingston [continuing]. Agency timing and so on. Mr. McNerney. Mr. Santa, you indicated in your testimony that a number of reasons for potential delays to permits, including lack of agency resources, which I am sort of getting from Mr. Livingston as well, cooperation with FERC and applications being deemed incomplete. Could you talk a little bit about the cooperation with FERC? I am not sure what that means. Mr. Santa. I think that I would have to go back and look specifically at the report, but I think it gets to the issue of--and a lot of what is attempted to be addressed in the discussion draft, of other permitting agencies being involved early in the process with the FERC in working cooperatively. For example, there have been some instances where agencies will not begin their process until some other action has been taken. So rather than things occurring concurrently, they may occur sequentially. That adds to the time. Mr. McNerney. Yes. Mr. Santa. I think it was trying to address things like that. Mr. McNerney. OK. Thank you. Do you think there is a chance that if this law or this bill were passed and enacted into law, that it would make delays longer or give rejections of applications because the agency didn't have time to complete the study? Mr. Santa. Well, two things. Number one, Ms. Miles, I think, had some good comments on the draft where she noted that there were parts of it that could be interpreted to inhibit FERC's ability to try to resolve some of these things earlier in the process, rather than later. And I would certainly commend the subcommittee to take a look at that and see if that could be addressed. The issue of whether it might lead to rejections as the way for the agency to act, that is actually something that we talked about last year at a hearing in conjunction with Mr. Pompeo's legislation. I know that concern was expressed. And I think on behalf of INGAA's members, we made the point that, quite frankly, we would prefer the definite answer, even if it is a negative answer, to be engaged in a protracted process of waiting for an answer. Mr. McNerney. Well, I think what you have indicated is there have been increases in federal authorization that failed to meet the 90-day deadline. Do you think that is because there are more applicants, because there are more projects being approved, because there is more capacity being approved in the process? Mr. Santa. That is a good question. I don't know. The one thing I would say is that the study that we pointed to in our testimony was released in, I believe, 2012, so it dealt with projects that were 2012 and earlier. That was before really the wave of projects and infrastructure we have seen proposed in response to the shale revolution and all of the new supply coming to the market. So I am not sure that those delays really had to do with the number of projects being proposed to the agencies, but that is a good question. Mr. McNerney. OK. Thank you, Mr. Chairman. I yield back. Mr. Whitfield. Gentleman's time has expired. I have a couple of other questions I would like to ask, and if any of you all want to ask any others, fine. But, Mr. John Collins, one question I want to ask you is, do you think hydropower is disadvantaged by this current regulatory process? Mr. Collins. Yes, I do. I believe that the time it takes to license and the expense of licensing new hydropower or relicensing hydropower puts it at a distinct disadvantage relative to other renewable technologies. Mr. Whitfield. Yes, I mentioned in my opening statement that there are certain renewables like wind and solar that get precedence, that get preferential treatment, and are even exempted from some federal laws. But OK, I just wanted to clarify that. And then, Mr. Suloway, and maybe Mr. Roos-Collins might want to comment on this as well, but you stated that other federal resource agencies have the authority to impose mandatory environmental conditions on the FERC license, and that that seems to contribute to delay and additional cost. Am I reading something into your statement, or is that accurate what I have said that you believe? Mr. Suloway. No, they do employ mandatory conditions that do increase the cost of owning a FERC license. That---- Mr. Whitfield. OK. Mr. Suloway. That is a fact. Mr. Whitfield. Do you want to make a comment on that, Mr. Collins--Roos-Collins? I mean you don't have to, I was just---- Mr. Roos-Collins. Mr. Chairman, yes, the license articles required by other federal agencies have increased cost in terms of implementation. The question that we ask is, are the benefits worth the cost? And so to take New York Power Authority's St. Lawrence FDR Project as a for instance, the federal and state agencies alike use these very authorities through settlement. I dare say that the result for the power authority may have been more expensive than what would have happened if FERC had exclusive authority. Mr. Whitfield. Right. Mr. Roos-Collins. I think it is also fair to say that the benefits---- Mr. Whitfield. Yes. Yes. Mr. Roos-Collins [continuing]. Were significant. Mr. Whitfield. Yes, well, I think that is important because sometimes there are additional costs, but maybe the benefits outweigh that. But also let me ask this question. Do these mandatory conditioning authority of other federal resource agencies frustrate FERC's ability to balance or modify the public interest? Do any of you have a thought on that? Mr. Livingston. I don't think anyone disputes the rights of a federal agency to prescribe what happens on its land. I think part of the question goes how far does that authority go? Should it apply to neighboring lands, should it apply to private lands, should it apply to lands that are far away and have no clear nexus? So I think it is really getting down to having Congress define the extent of where that authority goes and how it is used, rather than any recognition that they don't have the right to prescribe how somebody who is a guest on their land should treat the land. And I think we all agree with that. It is just---- Mr. Whitfield. OK. Mr. Livingston [continuing]. A matter of extent and where. Mr. Whitfield. OK. Well, thank you. Mr. Green is recognized for 5 minutes. Mr. Green. Thank you, Mr. Chairman. I apologize. Typically, on a Wednesday up here, there are so many issues going on and so many hearings. Ms. Elefant, you mentioned in your testimony that you are not aware of any federal agency that allows a trump card. In the LNG export permitting process, FERC requires the bulk of the NEPA analysis with nothing but a concurrence from the DOE. Why is deference to FERC not acceptable? Ms. Elefant. Well, I think that the provision with deference to DOE doesn't necessarily have to do with the resource review. The LNG review authority still expressly preserves the power of states to issue permits under the Clean Water Act, the Clean Air Act, and the Coastal Zone Management Act, and so I think that that statutes have such unique relationship to protecting those resources and having sort of an established procedure that deferring to FERC could encroach on the policies that were intended to be protected by those other laws. Mr. Green. Well, what we are trying to do is get more coordination between the federal agencies, but you mentioned also that you are concerned about public participation. Would a 30-day notice and comment period regarding issue resolution alleviate some of those concerns? Ms. Elefant. I think that the provision related to issue resolution, I have said I didn't think that something like that was necessary because there are multiple opportunities for issues to currently be resolved. For example, in one case that I have that I think would be accurately characterized as a delay case, the state agency and the Corps of Engineers, very early in the pre-filing process and again in the application process, expressed some concerns and reservations about where the project was going to go, and also asked for additional information on certain resources. And it seemed to me that there were many opportunities to resolve those along the way rather than have it be done in this pressured 30-day period, like the statute prescribes. There are still opportunities for the agencies to cooperate, and that does happen from time to time. Mr. Green. Well, and I know the pre-filing work, I don't know if we have exhausted the success of that, but that is a goal to do it, to get the Corps and different agencies together so the applicant will know what the problem is and can deal with that early on, and so that is our goal, I guess. Mr. Santa, in your testimony, you state that challenging a permitting agency's tardiness or inaction is time-consuming and risky. Where do most companies focus on their challenges? Is it a state agency or a federal agency? Mr. Santa. It varies because in some instances, it is a state agency acting pursuant to delegated federal authority. Mr. Green. Yes. Mr. Santa. For example, I think in both of the cases where pipelines have availed themselves of the judicial review provisions, they have been challenging state agency actions. Mr. Green. What state would that be? Mr. Santa. I believe one of them was Connecticut, and I believe the other one was Maryland. Ms. Elefant. Maryland was a delay case. Mr. Green. OK. So it depends on the area, I guess. Mr. Santa. That is correct, yes. Mr. Green. I was wondering if that was a problem with Texas. OK. Would arbitration better serve that approval process? Mr. Santa. I really don't know. That is an interesting question, Mr. Green, as to whether or not that would be something that might work. I think that the provisions that are in the draft now in terms of a dispute resolution process, I think are intended to kind of go in the direction of how do we resolve these disputes. I have not heard of arbitration being suggested before in the context of a permitting agency, an applicant, and the other stakeholders. Mr. Green. Right. That would get you to a decision though. Mr. Santa. That is correct. Mr. Green. And that is the problem. Mr. Santa. Yes. Mr. Green. The time frame keeps getting extended because the decision is not there. Mr. Santa. Yes. Mr. Green. Isn't that the role though for the pre-filing review is to try and get that information out before during the pre-filing? Mr. Santa. I think that is the goal of the pre-filing is to try to get these issues on the table early to begin to resolve them, and also to deal with them in a context before you have got a FERC application, in which case the ex parte rules and various things come to attach that tend to make it more cumbersome and more difficult to resolve. So yes. Mr. Green. OK. Well, Mr. Chairman, I have run out of time, but I appreciate it. But I also know that in the--because obviously, where I come from, the LNG exporting permits are an issue, and it is not necessarily FERC, it is also DOE. And I said it earlier, the Corpus Christie permitting for both FERC but also with DOE was very quick, and--comparatively, but obviously, we have a whole bunch more in line because most of those permits will probably come from Louisiana and Texas instead of the east or west coast. Thank you, Mr. Chairman. Mr. Whitfield. You are welcome. Recognize Mr. Rush. Mr. Rush. Mr. Chairman. Thank you, Mr. Chairman. Mr. Chairman, the Ranking Member Pallone asked this question of the previous panel, and I want to ask Mr. Roos-Collins the same question. Mr. Roos-Collins, buried in the language of the draft is a two-word change to Section 4(e) of the Federal Power Act. The words on the existing statute ``shall deem'' are replaced by the single word ``determines''. The context of this change is mandatory conditioning authority of the resource agencies. I have three questions. Is this a significant change from current law? What would be the practical effect of this change on the ability of resource agencies to protect and manage things under their jurisdiction? And lastly, will this change result in more or less litigation, in your opinion? Mr. Roos-Collins. In my opinion, the change in those two words is not significant, and here is why. I think the intent of the discussion draft is to change from a verb, deem, that has lots of discretion to determine, which sounds like it must be more rational and based in the record. That is what these agencies already must do. There is a case called Bangor Hydro, decided by the D.C. Circuit in 1996, that expressly held that a federal agency cannot have a field of dreams justification for a condition; it must have a rational basis and state a specific goal. And so with respect to those two words, what I see is an intent to recognize the holding of that case, and similar cases that followed. Mr. Rush. Thank you. Mr. Chairman, thank you so much. Mr. Whitfield. Well, that concludes the questions, and concludes the hearing. And once again, I want to thank all of you for taking your time and coming and sharing your views and experiences with us. We look forward to working with all of you as we move forward trying to develop an overall energy package. And we will keep the record open for 10 days. And I would like to ask unanimous consent that the following statements and letters be submitted for the record. A letter from the Edison Electric Institute in support of the hydropower regulatory modernization discussion draft, and second, a statement from the American Public Power Association in support of both the natural gas pipeline permitting reform and hydropower regulatory modernization discussion drafts. Voice. Without objection. Mr. Whitfield. Without objection, so entered. [The information appears at the conclusion of the hearing.] Mr. Whitfield. And thank you all once again. And that will conclude today's hearing. [Whereupon, at 1:08 p.m., the subcommittee was adjourned.] [Material submitted for inclusion in the record follows:] Prepared statement of Hon. Fred Upton The work on our bipartisan energy legislation continues, and to date the areas of agreement have significantly outweighed the areas of disagreement. I expect that trend to continue today as the subcommittee addresses two key topics, hydropower and natural gas pipelines, where I believe there is common ground on the direction the nation should be taking. The Department of Energy's Quadrennial Energy Review (QER) set the stage by highlighting the transformative potential of American energy as well as the need for permitting reform in order for that potential to be realized. The administration's report noted the economic, energy security, and environmental benefits of energy sources like hydropower and natural gas, particularly when it is efficiently delivered through modern infrastructure. The QER recommended changes to existing policies in order to achieve these goals, and I believe the two discussion drafts today fit in well with the message from the administration. Hydropower and natural gas are both critical sources of energy and jobs in Michigan and across the country, but the federal process of licensing hydroelectric facilities and permitting interstate gas pipelines has grown far more cumbersome than necessary. The discussion drafts clear away the red tape and add increasing amounts of transparency so all stakeholders are aware of the process, which will help to pave the way for additional needed energy from these sources. Both discussion drafts place the Federal Energy Regulatory Commission (FERC) in charge, and require it to set clear deadlines that all other agencies involved must meet. The end result is a more timely and certain permitting process for hydroelectric power and gas pipeline approvals. At the same time, all environmental and public safety provisions are left intact. There will surely be points of debate, but I am also sure that we will be able to achieve resolution to most differences. That is what is what these hearings are for, and I look forward to continued progress on our energy bill. ---------- [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] [all]