- ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2016 [Senate Hearing 114-] [From the U.S. Government Publishing Office] ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2016 ---------- WEDNESDAY, MARCH 4, 2015 U.S. Senate, Subcommittee of the Committee on Appropriations, Washington, DC. The subcommittee met at 2:40 p.m., in room SD-192, Dirksen Senate Office Building, Hon. Lamar Alexander (chairman) presiding. Present: Senators Alexander, Murkowski, and Feinstein. U.S. NUCLEAR REGULATORY COMMISSION STATEMENT OF STEPHEN G. BURNS, CHAIRMAN opening statement of senator lamar alexander Senator Alexander. The Subcommittee on Energy and Water Development will please come to order. This afternoon we are having a hearing to review the President's fiscal year 2016 funding request and budget justification for the Nuclear Regulatory Commission. Senator Feinstein and I will each have an opening statement, and then each Senator may have up to 5 minutes for an opening statement, alternating between the majority and minority. Some Senators are fleeing before the snow comes, so I do not know how many will be here, but we are here. We will then turn to the witnesses for their testimony. We are glad to have so many of you here, and this is really an opportunity for us have to have a good discussion about nuclear power, the Nuclear Regulatory Commission. I would like to thank our witnesses and introduce them in this way. Mr. Stephen Burns is chairman of the U.S. Nuclear Regulatory Commission. Mr. Chairman, welcome. Kristine Svinicki, good to see you again. Thank you for being here. Mr. William Ostendorff, good to see you again, Commissioner. Thank you for coming, Commissioner. Mr. Jeff Baran, welcome to the hearing, also a member of the Commission, the Nuclear Regulatory Commission. We are here today to review the 2016 budget request for the Nuclear Regulatory Commission, which is an independent agency responsible for regulating the safety of our Nation's commercial nuclear power plants and other nuclear materials. It is the first time in a few years the subcommittee has had a hearing to examine the Commission's budget. It is also the first of several hearings that the subcommittee will hold this year on nuclear power. These hearings are important because nuclear power provides about 20 percent of our Nation's electricity and more than 60 percent of our carbon-free electricity, and I will have more to say about all that as we go along. I plan to focus my questions on four main areas: licensing nuclear waste repositories, which is a passion of Senator Feinstein as well as mine; number two, avoiding excessive regulation; number three, licensing for new and existing reactors; number four, making sure the Agency is running effectively. First on waste, we have to solve the 25-year stalemate about what to do with used fuels from our 99 nuclear reactors, as well as fuel from some that have already stopped operating. We have to have a place to put the used fuel in order to ensure that nuclear power has a strong future in this country. Later this year, I look forward to reintroducing with Senator Feinstein, and Senator Murkowski, and perhaps others, legislation that would create temporary and permanent storage sites for nuclear waste. Also, Senator Feinstein and I plan to again include a pilot program for nuclear waste storage in the water and appropriations bill as we have for the past 3 years. Her idea, I strongly support it. The new sites we would seek to establish through the legislation that we are reintroducing would not take the place of Yucca Mountain--we have more than enough waste to fill Yucca Mountain to its legal capacity--but would rather complement it. The legislation is consistent with the President's Blue Ribbon Commission on America's Nuclear Future, but my own view is that Yucca Mountain can and should be part of the solution. Federal law designates Yucca Mountain as the Nation's repository for used nuclear fuel. The Nuclear Waste Fund, which is money that utilities have paid the government to dispose of their used nuclear fuel, has a balance of about $36 billion, and there are still several steps to go in the licensing process for Yucca Mountain. The Nuclear Regulatory Commission has a balance of unspent funding that should be used to continue the licensing process. More resources will be required, so I think it is fair to ask why are those funds not requested in your budget. The Nuclear Regulatory Commission recently completed the safety evaluation report that said Yucca Mountain met all of the safety requirements through the ``period of geologic stability.'' The Commission and the Environmental Protection Agency define the ``period of geologic stability'' as 1 million years. To continue to oppose Yucca Mountain because of radiation concerns is to ignore science as well as the law. The next steps on Yucca Mountain include completing a supplemental environmental impact statement and restarting the hearings before the Atomic Safety and Licensing Board, which were suspended in September 2011. Money is available for these activities, and I would like to hear about your plans to use it. The second area of questioning is avoiding excessive regulation. A couple of years ago, Senator Mikulski and I, and Senator Burr, and Senator Bennett asked a group of distinguished higher education officials to look at the Federal rules and regulations governing higher education. They made their report a couple of weeks ago, and it was a startling report. And there are some--I would like for Senator Feinstein to hear this part because California has a terrific system of universities. The commission that Senator Mikulski and I, and Bennett, and Burr commissioned on regulation of higher education reported about what they called a jungle of red tape that is interfering with their ability to govern properly. Vanderbilt University hired the Boston Consulting Group to assess how much it cost Vanderbilt itself to comply with all the Federal rules and regulations on higher education in 2014. And the answer was $150 million, which is 11 percent of the university's operating revenue or expenditures, and adds $11,000 to each student's tuition. Now, you may wonder what does that have to do with nuclear power. It is the same kind of thing all throughout the government. None of these rules and regulations, or almost none, are put in by evil people, or intentioned. They just add up over time. And to the extent excessive regulation makes it more difficult for nuclear power plants to be extended and to be operated economically, that is something I would like to discuss. I wonder whether, for example, we know the answer to the question how much does it cost a utility. How much does regulation cost a utility for its operation? Then there is the question of the licensing of new and existing reactors. I proposed one time that we should build a hundred new reactors. People thought that was kind of over the top. But when you stop and think about it, we have the Center for Strategic and International Studies saying that by 2020, not long away, that as many as 25 of our 99 reactors may not be operating. We have the various factors that are making it less economic to operate nuclear reactors, such as the low price of natural gas, the subsidies for wind power, which permit wind producers in unregulated markets to basically pay the merchant utility to take the wind power, and then the producer can still make a profit. That means the nuclear power is less economic. Excessive regulation may be a factor. Carbon rules from the EPA that treat nuclear differently than other renewable sources may be a factor. And then we think about the fact that if about 20 percent of our current capacity from coal goes offline by 2020 as projected by the Energy Information Administration or is entirely replaced by nuclear power, it would require building another 48 new large reactors. So add to that, the third point, which are the number of aging reactors, those that are getting too old and which may not have their licenses extended. We might need a hundred new reactors just to replace the ones we already have, and I want to make sure that we do not end up surprised by that. Then we want to make sure that agencies run effectively. Congress appropriated in the year 2000 about $470 million for the Agency. The budget this year is $1 billion. Much of the increase was due to the significant number of new reactor licenses that were anticipated. However, most were never actually submitted, so it is fair to ask whether this additional funding is being used for unnecessary regulation. Finally, let me just make this observation, and I will ask Senator Feinstein then to take whatever time she would like. I do not want the United States of America 10, 20, 30 years from now to suddenly wake up and discover that we are a country without nuclear power, and I think it is possible that could happen. If CSIS says we may lose 25 reactors within the next 5 or 6 years, and big utility operators tell me they are not even thinking about asking for extensions of the time their reactors might stay online, say, from 60 to 80 years, because it is not economic to operate them, if we suddenly find ourselves without most of the 99 reactors we have, we know what will happen. We have seen what happened in Japan. We have seen what happened in Germany. And at a time when the President and many in America feel that climate change is an urgent challenge for the world and our country, the idea of deliberately allowing the 99 reactors which produce 60 percent of our carbon free emissions, to allow that number to decline I think would be serious malpractice by all of us involved, whether it is the Congress, whether it is the Commission, whether it is the Department of Energy. So it is with that spirit that I am going to be approaching this hearing and other hearings this year. I know that the Regulatory Commission is not the Department of Energy. Its job is safety, and it has a terrific record in that. I do not think and I am sure it is true--any other form of energy production in our country has a record of safety that exceeds nuclear power. But I am going to be asking questions about what can you also do to create an environment so that over the next 30 or 40 years at least, while we are doing research to find other sorts of clean energy, that we do not find ourselves without large amounts of renewable emissions and free electricity, which is what Japan suddenly found, and which Germany has found. And it does not work in a big manufacturing country given the current mix of power generation. So I welcome the commissioners. I thank you for your service, and I look forward to Senator Feinstein's comments. [The statement follows:] Prepared Statement of Senator Lamar Alexander We're here today to review the President's fiscal year 2016 budget request for the Nuclear Regulatory Commission, the independent Federal agency responsible for regulating the safety of our Nation's commercial nuclear power plants and other nuclear materials. This is the first time in many years that the subcommittee has held a hearing to examine the Nuclear Regulatory Commission's budget. It is also the first of several hearings that the subcommittee will hold this year on nuclear power. These hearings are important because nuclear power provides about 20 percent of our Nation's electricity and more than 60 percent of our carbon-free electricity. I plan to focus my questions today on four main areas: 1. Licensing nuclear waste repositories; 2. Avoiding excessive regulations; 3. Licensing for new and existing reactors; and 4. Making sure the agency is running effectively. licensing nuclear waste repositories, including yucca mountain First, we must solve the 25-year-old stalemate about what to do with used fuel from our nuclear reactors to ensure that nuclear power has a strong future in this country. Later this year, I will reintroduce bipartisan legislation with Senators Feinstein, Murkowski and perhaps others, to create both temporary and permanent storage sites for nuclear waste. Also, Senator Feinstein and I plan to include a pilot program for nuclear waste storage in the Energy and Water appropriations bill, as we have for the past 3 years. The new sites we'd seek to establish through the legislation Senator Feinstein and I are reintroducing this year would not take the place of Yucca Mountain--we have more than enough waste to fill Yucca Mountain to its legal capacity--but rather would complement it. This legislation is consistent with the president's Blue Ribbon Commission on America's Nuclear Future. But let me be clear: Yucca Mountain can and should be part of the solution. Federal law designates Yucca Mountain as the Nation's repository for used nuclear fuel. The Nuclear Waste Fund, which is money that utilities have paid the government to dispose of their used nuclear fuel, has a balance of about $36 billion and there are still several steps to go in the licensing process for Yucca Mountain. The Nuclear Regulatory Commission has a balance of unspent funding that you are supposed to use to continue the licensing process. But more resources will be required, so I think it's fair to ask the question: Knowing that there are additional steps and they will cost money, why would you not request additional funds in your budget? The Nuclear Regulatory Commission recently completed the Safety Evaluation Report that said Yucca Mountain met all of the safety requirements through ``the period of geologic stability.'' The commission and the Environmental Protection Agency define the ``period of geologic stability'' as one million years. To continue to oppose Yucca Mountain because of radiation concerns is to ignore science--as well as the law. The next steps on Yucca Mountain include completing a supplemental environmental impact statement and restarting the hearings before the Atomic Safety and Licensing Board, which were suspended in September 2011. Money is available for these activities, and I want to hear why there is no request to use it. avoiding excessive regulations Federal law requires that nuclear power plants be built safely, but the law doesn't say it should be so hard and expensive to build and operate reactors that you can't do it. A 2013 report by the Center for Strategic and International Studies found that up to 25 of our 99 nuclear reactors could close by 2020. The decision to close a reactor could be due to a number of factors, including the low price of natural gas, and the wasteful wind production tax credit, which is so generous that in some markets wind producers can literally give their electricity away and still make a profit. But the decision to close a reactor can also have to do with excessive and unnecessary regulations. I want to work with the commission to address this. licensing for new and existing reactors Over the next several decades, most of our 99 nuclear reactors will go through the commission's license renewal process to extend their licenses, which is critical to the future of nuclear power. I want to make sure that the commission is prepared for this additional work. I also want to make sure the commission has devoted the appropriate resources to the licensing process to keep new reactors--like Watts Bar 2 in Tennessee--on time and on budget. I have proposed that we build 100 new reactors, which may seem excessive, but not if about 20 percent of our current capacity from coal goes offline by 2020 as projected by the Energy Information Administration. If this capacity were replaced entirely by nuclear power it would require building another 48 new, 1,250-megawatt reactors--which, by the way, would reduce our carbon emissions from electricity by another 14 percent. Add the reactors we may need to replace in the coming decades due to aging and other factors, and my proposal for 100 may not seem so high. Additionally, the commission needs to move forward with new small modular reactors. This subcommittee has provided funding to help small modular reactors get through the Nuclear Regulatory Commission's licensing process. I'd like to get your views on what you need to continue your efforts. making sure the agency is running effectively One of the challenges for the Nuclear Regulatory Commission is to ensure that the agency is running effectively and focusing staff on the right goals. In fiscal year 2000, Congress appropriated about $470 million for the Nuclear Regulatory Commission. The budget request this year is more than $1 billion. Much of the increase was due to the significant number of new reactor licenses that were anticipated--however most were never actually submitted. So, it is fair to ask whether this additional funding is being used for unnecessary regulation. conclusion The best way to understand the importance of nuclear power is to look at the stories of three countries: Japan, Germany and the United Arab Emirates. Japan and Germany have recently experienced what happens when a major manufacturing country loses its nuclear capacity. In Japan, the cost of generating electricity has increased 56 percent and Germany has among the highest household electricity rates in the European Union-- both because they moved away from nuclear power. The United Arab Emirates has shown what a country can do when a country decides to take advantage of nuclear power. By 2020, the Emirates will have completed four reactors that will provide nearly 25 percent of its annual electricity. It will take building more nuclear reactors to avoid the path of Japan and Germany, and today's hearing is an important step to making sure the United States does what it must to unleash nuclear power. I look forward to working with the commission and our Ranking Member, Senator Feinstein, who I will now recognize for an opening statement. STATEMENT OF SENATOR DIANNE FEINSTEIN Senator Feinstein. Thank you. Mr. Chairman, thank you very much. I think that was an excellent opening statement. But I also want to thank you for the great privilege of working with you. We have worked as chairman and vice chairman. Both of us have been alternating. And I just want you to know I do not think I ever had a better person to work with in the Senate than you. Senator Alexander. Thank you. Senator Feinstein. We figure out when we disagree what we can do about that, and I give some of the time, and you give some of the time, and I really think that is in the best interest of our democracy and our country. So it is a great treat for me to be here. You set up this hearing. I think it is a real tribute to you that we have the chairman and three members of the Nuclear Regulatory Commission here today. My remarks are going to be a little different because I wanted to be on this committee because I am really concerned about the nuclear waste that is scattered all over this country, and I am going to talk a little bit about it. And I view the NRC as a critical agency to regulate the nuclear power plants and the use of radiologic and nuclear materials critical not only to industry, but to the safety of our people. So I want to make one other point. There is on the Pacific Coast such a thing as a ring of fire, of big earthquakes, that over the last several decades have been happening in Southeast Asia, southern South America. The latest of these is Fukushima, and Fukushima really caused me to open my eyes. And today's witnesses are appearing 4 years after that earthquake triggered a tsunami that flooded three Fukushima nuclear reactors, causing them to melt down. More than 300,000 people were evacuated from the surrounding area, and the disaster cost well over $100 billion. Some post-Fukushima analysis has argued that the Japanese regulatory structure was too close to nuclear industry, to the industry it was regulating, and that the dysfunction of that regulatory system contributed to the disaster. And I want to say we cannot allow that to happen in this country. To date, the NRC has issued three orders and one request for information and initiated a single rulemaking to codify those orders. Industry has undertaken some upgrades to back up safety equipment, spending around $4 billion on upgrades as required by the NRC. This is a substantial amount, but not that much when you consider the replacement value of the plants themselves, and just a fraction of how much a disaster on the scale of Fukushima would cost the United States. So I hope you will tell this subcommittee how your actions have made a Fukushima-like disaster substantially less likely in the United States, and provide us with some reassurance that the NRC is executing its role as the tough-nosed regulator it needs to be. A second issue of great concern to me, as I mentioned, is storage of nuclear fuel. Today, that fuel is piling up at reactor sites around the country. To date, we have 78 sites in the United States storing approximately 70,000 metric tons of spent fuel. Of this total, roughly 20,000 metric tons is in dry storage, and the rest in storage pools called spent fuels-- spent fuel pools. The United States nuclear plants continue to discharge about 2,100 metric tons of spent fuel per year. The United States taxpayers have paid $4.5 billion to utilities to store waste at reactor sites, in part because we lack a nuclear waste policy. And this is going to lead to an additional $23 billion in penalties in the coming years, which will be borne by taxpayers. This has driven the two of us to call together the chair and ranking member of the energy authorizing committee, and try to come up over--was it 3 or 4 years we have been working on it? Senator Alexander. Three years. Senator Feinstein. Three years to develop a spent--a nuclear waste policy for our country. We have none. Believe it or not, we came to agreement. We had in two Secretaries of Energy. We had in the Blue Ribbon Commission. We discussed a lot among ourselves. At the time, Senator Bingaman was chairman of the committee, and so he was replaced by Senator Wyden, and we had both of their support. And we had Senator Murkowski who has been with us from the beginning, and so we have a Nuclear Waste Policy Act now at the energy and water authorizing committee. The difficult part for me is that it has taken so long to generate activity. And candidly, I do not believe the nuclear industry itself has been as supportive of it as it should be. And for me, this is a real test of that industry because if nuclear power is, in fact, as the chairman indicated, to continue to be part of our Nation's energy mix, for me this situation is unsustainable. In August of 2014, the NRC issued a final rule on the continued storage of waste at nuclear power plants around the country. That rule stated that spent nuclear fuel could be stored indefinitely at nuclear sites. So just look at what continues to happen at Fukushima. The reactor containment vessels were breached during the accident, leaking the radioactive water into the ocean. Those vessels continue to leak to this day, even as the Japanese pump water into the vessels to try to keep the highly radioactive fuel cool. Efforts to contain the leaking water, such as building an underground ice wall, have proved insufficient. The spent fuel pools at Fukushima did not leak, but the temperature inside the pools increased, and water quickly evaporated, so that only 20 feet of water covered the fuel instead of the standard 40 feet. Fuel rods were damaged, and radiation was released to the environment. Water had to be sprayed from above to keep the fuel cool. By the NRC's own estimates, nearly all of the spent fuel pools in the United States are densely packed with spent fuel and will be at capacity in 2015. The Union of Concerned Scientists and others believe the risk of an accident and its impacts can be significantly reduced by expediting the movement of spent fuel from pools to dry casks, and I am inclined to agree. While the rule does not license storage of spent fuel at any specific reactor site, it appears to give a carte blanche to nuclear power plant operators to continue generating waste without a permanent solution. This is unacceptable to me. Previous waste confidence determinations were predicated on reasonable progress by the Federal Government in implementing a waste management program. However, the NRC has now stated that a permanent home for spent nuclear fuel is not necessary for the sustainment of growth of nuclear power. In my view, nowhere does this new rule provide the basis for such a startling reversal of a long-established regulatory framework. Instead, it seems to be a rule designed solely to keep the nuclear industry operating. I deeply believe we desperately need a new policy on nuclear waste, and this subcommittee has been committed to making progress toward that goal. And that is why I am so happy to be working with Senator Alexander on multiple fronts, including within this subcommittee, the re-introduction of the Nuclear Waste Administration Act. Mr. Chairman and members, I think you sit at an important juncture. The continued safe operation of nuclear power plants is an important source of carbon free electricity. We all understand that. But nuclear energy must be safe, and there must be a sound policy that addresses the waste stream it creates. And let me be candid with you. To me, storing this stuff at waste sites, candidly, is not acceptable. I mean, I look at San Onofre, two big reactors being de-conditioned, 2,800 rods in spent fuel pools in an area where six million people live and, of course, very close to the Pacific Ocean. Is that going to stay there forever? If I understand your policy, and please correct me if I am wrong, Commissioner Burns, but it could happen. And, you know, I look back at Fukushima. The spent fuel pools did not collapse, but what happened, as far as I related, and I believe is true. California is a very earthquake prone State, and the probabilities of a big earthquake in Southern California over the next 30 years are way up. I think it is over 60 percent probability now, so I feel I have reason to worry. And candidly, if it is true that your Commission is saying that it is perfectly fine to keep all this stuff at 78 different sites with all kinds of different geologic compositions and all kinds of propensities for geologic movement, I really cannot agree with that. So I wanted to just put my cards on the table and tell you precisely how I feel, and let you know that this is a very big issue for me. So I thank you, Mr. Chairman. Senator Alexander. Thank you, Senator Feinstein, and I thank you for your comments. I mean, there is nobody I would rather work with than you. I think as you can tell, we sometimes come at a problem from different directions, but we often end up pulling the wagon in the same direction, and nuclear waste is certainly one of them that we feel that way. So it is a great privilege for me to work with Senator Feinstein. Now, Mr. Chairman, why don't we start with you and ask you to summarize your testimony, if you will, in about five minutes. Then whatever the Commission protocol is, why do you not just go down the line, and we will look forward to hearing from the other commissioners after you. SUMMARY STATEMENT OF STEPHEN G. BURNS Mr. Burns. Thank you, Mr. Chairman, and thank you, Ranking Member Feinstein. My colleagues and I appreciate the opportunity to appear before you today to discuss our fiscal year 2016 budget request. As you said, the NRC is an independent Federal agency established to license and regulate the Nation's civilian use of radioactive materials at nuclear installations to ensure adequate protection of the public health and safety, to promote the common defense and security, and protect the environment. The resources that we are requesting in fiscal year 2016 will allow us to continue to ensure the safe and secure use of radioactive material in the United States. I want to emphasize this progress that the NRC and the industry have made in making safety enhancements at nuclear facilities across the United States in response to the Fukushima Daiichi Nuclear Power Plant accident in Japan. After the event, the NRC took immediate action to evaluate the lessons of the event, and to identify required enhancements at U.S. nuclear power plants. Our primary focus throughout this effort has been on the highest priority, safety significant enhancements to maximize the safety value for nuclear power plants. A key element of the strategy has been the NRC's 2012 mitigating strategies order, which required licensees to ensure that sites are prepared to respond to beyond design basis accidents. Last year, the first plants completed implementation of the mitigation strategy requirements, and more than half the plants are scheduled to achieve full implementation by the end of this year, and the remaining plants, with limited exceptions, will complete the necessary actions by 2016. New reactor licensing and oversight activities will continue in 2016. We expect in this year to continue reviewing a number of new reactor combined license applications, and to complete three of these reviews. Additionally, the NRC will continue to conduct inspections for new reactors under construction at the Vogtle site in Georgia and the VC Summer Plant in South Carolina. And we also will receive before us a recommendation with respect to the licensing of Watts Bar Unit 2, to be operated by the Tennessee Valley Authority. We also expect to review and begin the review of an application for a small modular reactor in fiscal year 2016. We acknowledge that we are in a changing environment. Since 2001, the Agency grew significantly to enhance security and incident response, and to prepare for the projected growth in the use of nuclear power in the United States. The forecast in the growth has been adjusted downward in responses to changes in the industry, and as is appropriate, the NRC is being scrutinized by stakeholders for its reasonable use of resources. The Congress has charged the NRC with a critical mission, and the NRC can never lose sight of that. Still, we can and should maintain focus on our mission while being responsible and taking a hard look at whether we are using our resources. Our budget reflects the efforts to demonstrate our responsiveness to this environment. Continuing with trends that began in fiscal year 2014, the fiscal year 2016 request reflects a reduction in both dollars and full-time equivalents in recent years, but still will provide the necessary resources to carry out our safety and security mission. As required by law, our budget request also provides for a 90 percent fee recovery less the amounts appropriated for certain specific activities. As a key step in our preparation to address our anticipated environment, the NRC initiated a project called Project AIM 2020 last June to enhance our ability to plan and execute our mission while adapting in a timely and effective manner to our dynamic environment. Through a staff initiative that was approved, the charter of which was approved by the Commission, internal and external stakeholders were engaged to forecast our future workload and operating environment. The staff's recommendations were recently provided to the Commission with a number of measures to transform the Agency over the next 5 years to improve our effectiveness, our efficiency, and agility. The report was provided to the Commission on January 30, and a couple of weeks ago we released it to the public and made copies available to our oversight and authorization committees. While my colleagues and I want to be timely in responding to the report, we want to do so deliberately and smartly. One other initiative I would like to mention before I close is that the NRC has undertaken over the last several years revisions to our rulemaking process to understand and, if possible, reduce the cumulative effects of regulation. We are continuing to engage our stakeholders on this subject, and we will receive further recommendations from our staff for additional improvements this spring. In sum, we are cognizant of our changing environment. We are committed to the safety and security mission of the Agency. And we are committed to taking a hard look at ourselves to ensure we are prepared for the future. This concludes my formal testimony on the budget. On behalf of the Commission, I thank you again for the opportunity to appear before you, and we look forward to your questions. And with that, I will turn it over to Commissioner Svinicki. [The statement follows:] Prepared Statement of Stephen G. Burns Good morning, Chairman Alexander, Ranking Member Feinstein and distinguished members of the subcommittee. My colleagues and I appreciate the opportunity to appear before you today to discuss the U.S. Nuclear Regulatory Commission's (NRC) fiscal year 2016 budget request. As you know, the NRC is an independent Federal agency established to license and regulate the Nation's civilian use of radioactive materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. The resources that we are requesting for fiscal year 2016 will allow the NRC to continue to ensure the safe and secure use of radioactive materials in the United States. The NRC's principal regulatory functions are to: establish regulatory requirements; issue licenses consistent with those requirements to facility operators and those who own, possesses, and use, radioactive materials; oversee these licensees to ensure they operate safely and securely, and are in compliance with NRC requirements; conduct research to support the NRC's safety and security mission; and respond to emergencies involving regulated activities. The NRC also participates in international work that is integral to the agency's mandate. The NRC regulates every aspect of the civilian use of radioactive materials. This includes all of the steps and the facilities involved in the nuclear fuel cycle, including extraction of uranium from ore, conversion of the uranium into a form suitable for enrichment, enrichment of uranium to a level and type suitable for nuclear fuel, and fabrication of uranium into fuel assemblies for use in reactors. When the fuel assemblies can no longer sustain efficient reactor operations, they are removed from the reactors and stored as waste. In fiscal year 2016, the NRC will continue licensing and oversight activities for 100 operating commercial nuclear power reactors, including the anticipated operation of the Watts Bar Unit 2 nuclear power station. The resources that we have requested for fiscal year 2016 also support completion of the highest-priority actions on the lessons learned from the Fukushima Daiichi Nuclear Power Plant accident, including seismic and flooding hazard reevaluations. I would like to take a moment to emphasize the significant progress the NRC and the industry continue to make in implementing post- Fukushima safety enhancements at nuclear facilities across the United States. The NRC's primary focus throughout this effort has been on the highest-priority, most safety-significant enhancements to maximize the safety impact for nuclear power plants. The NRC's expectation is that most licensees will complete implementation of the most safety- significant enhancements by, or before, 2016. A key element of the post-Fukushima safety enhancements is the NRC's 2012 Mitigating Strategies Order, which required licensees to ensure that sites are prepared to respond to beyond-design-basis events. These requirements include procuring additional equipment to maintain or restore core cooling, containment integrity, and spent fuel pool cooling for all units at a site. Last year, the first plants completed implementation of all mitigating strategies requirements. More than half of nuclear power plants are scheduled to achieve full implementation by the end of 2015, with the remaining plants to be completed by 2016. The one exception to this schedule is that some boiling water reactors are requesting schedule extensions for those parts of the mitigating strategies affected by the NRC's revision to the order on containment venting. During and after implementation of the mitigating strategies requirements, the NRC will conduct inspections to verify that nuclear power plants have put appropriate strategies in place to mitigate beyond-design-basis events. In the past year, both of the industry's National Response Centers (in Phoenix, Arizona and in Memphis, Tennessee) have become operational. Both centers contain multiple sets of emergency diesel generators, hoses, and other backup equipment that can be delivered to any nuclear power plant in the United States within 24 hours. These response centers address a key element of the 2012 Mitigation Strategies Orders, which was to provide sufficient offsite resources to sustain plant safety functions indefinitely. New reactor licensing and oversight activities are expected to continue during fiscal year 2016. In fiscal year 2016, the NRC planned to review nine new reactor combined license applications and to complete three of these reviews. Additionally, the NRC will continue to conduct inspections for new reactors under construction, namely, the Vogtle Electric Generating Plants, Units 3 and 4; and Virgil C. Summer, Units 2 and 3. The NRC also expects to receive and will begin to review a small modular reactor application. In fiscal year 2016, the NRC expects to complete the review of one construction permit application for a medical isotope production facility and conduct environmental and safety reviews of construction permits for two additional medical isotope production facilities. The NRC takes regulatory actions to ensure the safety and security of radioactive materials by licensing and overseeing medical, academic, and industrial and research users; nuclear waste and spent fuel storage facilities; certifying storage and transportation containers; responding to events; and overseeing decontamination and decommissioning activities. In addition, under authority provided in the Atomic Energy Act of 1954, as amended, the agency has agreements with 37 States under which those States assume regulatory responsibility for the use of certain radioactive materials. Combined, the NRC and the Agreement States oversee over 21,000 material licensees. The NRC further enhances its regulatory program through coordination and cooperation with other Federal agencies, States, Tribes, and international organizations and foreign governments. the changing regulatory environment Before I get into the specifics of the NRC's fiscal year 2016 budget request, I would like to take a moment to address the NRC's efforts to address the changing environment in which we now find ourselves. Since 2001, the agency has grown significantly to enhance security and incident response and to prepare for the projected growth in the use of nuclear power in the United States. That forecast in growth has been adjusted downward in response to changes in the nuclear industry. As is appropriate, the NRC is being scrutinized by its stakeholders for its responsible use of resources. The Congress has charged the NRC with a critical mission to ensure adequate protection of public health and safety and the common defense and security, and the NRC can never lose sight of this mission. Still, the agency can and should maintain focus on our mission while also taking a responsible and hard look at whether it is effectively using resources. The NRC has proactively taken steps to address these issues in its regulatory processes, budget, and fee collections. I start with the NRC's budget. The NRC's fiscal year 2016 proposed budget reflects the NRC's efforts to demonstrate its responsiveness to the new environment in which we find ourselves. Continuing with trends that began in fiscal year 2014, the fiscal year 2016 budget request reflects a reduction in both dollars and full time equivalents from budget proposals in recent years. In addition, the NRC's proposed fiscal year 2015 fee rule, which will be published for public comment in the coming weeks, will include estimates for reductions in licensee annual and hourly fees that we expect in our final fee rule. For power reactors, the estimated annual fees will be $4.75 million per reactor which is down 5 percent from fiscal year 2014. The NRC hourly rate is estimated at $268 in fiscal year 2015, a drop from $279 in fiscal year 2104. These decreases are primarily due to a reduced fiscal year 2015 Enacted Budget which allows the NRC to utilize prior year carryover funds providing available resources to meet the NRC's mission requirements. The fiscal year 2015 Enacted Budget also decreases 26.5 FTE from fiscal year 2014. These savings were realized from projected workload reductions and overhead efficiency measures. The fiscal year 2015 proposed fee rule will also reflect a positive increase in the agency's staff productivity assumption of 1,375 hours in fiscal year 2014 to 1,420 hours in fiscal year 2015. The NRC continues to focus on the transparency of the NRC Fee Rule and has recently received a benchmarking report to assist us in looking at the fee practices of other regulatory agencies. The NRC will hold a public meeting on the fiscal year 2015 proposed fee rule during the comment period to engage with stakeholders on our methodology and presentation of license fees. This is a priority for our Chief Financial Officer. Perhaps the most significant NRC undertaking with respect to the changing regulatory environment is Project Aim 2020. The NRC launched Project Aim 2020 in June 2014 to enhance the agency's ability to plan and execute its mission while adapting in a timely and effective manner to a dynamic environment. The Project Aim 2020 team gathered perspectives from internal and external stakeholders to forecast the future workload and operating environment in 2020. Based on analysis of these perspectives, and an evaluation of the NRC's current State compared to the anticipated future State, the staff identified key strategies and recommendations to transform the agency over the next 5 years to improve the effectiveness, efficiency, and agility of the NRC. The staff's efforts are reflected in its report that was provided to the Commission on January 30, 2015. The Commission considers this report to be the beginning of a dialogue about the future of the NRC. In that spirit, and in an effort to emphasize the NRC's seriousness, the Commission made the report available to the public on February 18. In addition, the Commission was also briefed by the NRC staff on the report in a public meeting that occurred on the same day. Advance copies of the report were also provided directly to our Congressional appropriations and oversight committees. I will not go into great detail on the Project Aim 2020 report except to note that it concludes that the NRC needs to function more efficiently by: right-sizing the agency while retaining appropriate skill sets needed to accomplish its mission; streamlining agency processes to use resources more wisely; improving timeliness in regulatory decisionmaking and responding quickly to changing conditions; and promoting unity of purpose with clearer agency-wide priorities. I speak for my colleagues when I tell you that each member of the Commission wants to be timely in acting on this report, but it also wants to do so deliberately and smartly. Although the NRC recognizes the need for change, it also is keenly aware that major organizational change, if not done wisely, can have a detrimental effect on the agency's mission and on the morale of its employees. The NRC has a critical mission and some of the most dedicated, knowledgeable, and highly-respected employees in the Federal Government. I can tell you from my own recent international experience, the NRC is respected as a world-class organization. I cannot emphasize enough that the NRC's ability to protect public health and safety and the common defense and security will always be our main concern. Nevertheless, we can and should take a hard look at how to ensure the agency carries out its mission effectively while also being more efficient and fiscally responsible. Project Aim 2020 is but one part of the self-assessment the NRC has undertaken in recognition of the changing environment. For instance, over the last several years, the Commission has revised its rulemaking processes to understand, and if possible reduce, the cumulative effects of regulations. These new processes include increased opportunities for stakeholder interactions and feedback, publishing draft supporting guidance concurrent with proposed rules, requesting specific comment on the cumulative effects of regulations in proposed rules, and developing better-informed implementation timeframes. In addition, the NRC has sought industry volunteers to perform case studies on the accuracy of cost and schedule estimates used in NRC's regulatory analyses. Based on those results, additional regulatory analysis process enhancements are planned to improve cost estimating. We believe that applying these process enhancements will result in a better understanding of the implementation costs associated with new regulations for operating reactors. With respect to cost benefit analysis, I note that the Government Accountability Office (GAO) recently completed a report that concluded the NRC needs to improve its cost estimating practices. Although the NRC did not agree with all of GAO's specific recommendations, it did agree generally that the NRC's regulatory analyses practices could be improved, and has started to take steps, as described above, to do so. In sum, as these examples have shown, the Commission is very cognizant of our changing environment and is committed to taking a hard look at itself to ensure that it is prepared for the future as it now appears to exist. fiscal year 2016 budget request The NRC's fiscal year 2016 budget request provides the necessary resources for to carry out the agency's mission for the American public. The NRC's proposed fiscal year 2016 budget is $1,032.2 million, including 3,754 full-time equivalents (FTE). To fully understand the fiscal year 2016 proposed budget in relation to the fiscal year 2015 Enacted Budget one must consider the unique funding scenario for the NRC in the Consolidated and Further Continuing Appropriations Act of 2015. The fiscal year 2015 Appropriation Act reduced the fiscal year 2015 budget request for salaries and expenses by $44.2 million to account for fee-based unobligated carryover and a recognition of reduced workload and agency productivity and efficiency gains. It also authorized the Commission to reallocate the agency's unobligated prior-year carryover to supplement its fiscal year 2015 appropriations. As a result, while the fiscal year 2016 Budget represents a $16.9 million increase over the fiscal year 2015 Enacted Budget, the NRC's total available resources in fiscal year 2015 are $1,049.5 million. For essentially the same workload with the exception of the University Grants program, the NRC's fiscal year 2016 budget request is $17.3 million less (including a reduction of 37.5 FTE) compared to the total available fiscal year 2015 resources. The NRC Office of Inspector General (OIG) component of the fiscal year 2016 proposed budget is $12.1 million, including 63 FTE. The OIG budget includes approximately $11.2 million for auditing and investigation activities for NRC programs, and $1.0 million for the auditing and investigations activities of the Defense Nuclear Facilities Safety Board (DNFSB). These resources will allow the OIG to carry out the Inspector General's mission to independently and objectively conduct audits and investigations to ensure the efficiency and integrity of NRC and DNFSB programs and operations, to promote cost-effective management and to prevent and detect fraud, waste, and abuse. Under the provisions of the Omnibus Budget Reconciliation Act of 1990, as amended, the NRC's fiscal year 2016 budget request provides for 90 percent fee recovery, less the amounts appropriated for, (1) waste incidental to reprocessing activities under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for fiscal year 2005, (2) generic homeland security activities, and (3) DNFSB activities. Accordingly, approximately $910 million of the fiscal year 2016 budget request will be recovered from fees assessed to NRC licensees. This will result in a net appropriation of $122 million. The NRC continues to look for cost savings at the agency and has taken cuts in overhead for the last 5 years. While the available resources are comparable for fiscal year 2015 and fiscal year 2016, the NRC's fiscal year 2016 workload changes and efficiency savings allows the agency to fund fact-of-life increases without an increase to the overall budget. The NRC's fiscal year 2016 budget request reflects the Office of Management and Budget guideline of a 1.3 percent increase in salaries and benefits for a cost of living increase and accommodates routine contract cost escalations.. The budget also adheres to commitments to the House Committee on Transportation and Infrastructure for NRC space usage. In fiscal year 2016, all NRC Headquarters employees will be located in the three buildings of the White Flint Campus and the Food and Drug Administration will occupy eight floors of the newest building. NRC will continue to occupy five floors including the Operations Center, Professional Development Center for staff training courses, and the Data Center as well as office space to support those programs. I would now like to highlight the following portions of the fiscal year 2016 Budget Request. nuclear reactor safety Operating Reactors The Operating Reactors Business Line encompasses the regulation of 100 operating civilian nuclear power reactors and 31 research and test reactors. The fiscal year 2016 budget request for Operating Reactors is $601.7 million, which represents an overall funding decrease of $10.4 million when compared with the fiscal year 2015 Available Resources.. This funding level supports completing work related to implementation of the lessons learned from the nuclear accident at the Fukushima nuclear power plant in Japan, work on topical reports, and reducing the number of pending licensing actions. New Reactors The New Reactors Business Line is responsible for the regulatory activities associated with locating, licensing, and overseeing construction of new nuclear power reactors. The fiscal year 2016 budget request for New Reactors is $191.7 million, which represents an overall funding decrease of $5 million when compared with the fiscal year 2015 Available Resources. The decrease is a result of delays in application submittals, and project slowdowns or suspensions. nuclear materials and waste safety Fuel Facilities The Fuel Facilities Business Line supports licensing, oversight, rulemaking, international activities, research, generic homeland security, and event response associated with the safe and secure operation of various operating and new fuel facilities such as conversion, enrichment, and fuel fabrication facilities, and nuclear fuel research and pilot facilities. The fiscal year 2016 budget request for Fuel Facilities is $51.5 million, which represents an overall funding increase of $0.8 million when compared with the fiscal year 2015 Available Resources. Nuclear Materials Users The Nuclear Materials Users Business Line supports the safe and secure possession, processing, handling, and the many diverse uses of nuclear materials, along with associated licensing, oversight, rulemaking, international activities, research, generic homeland security, event response, and State, Tribal, and Federal Program activities. The fiscal year 2016 budget request for Nuclear Material Users is $87.4 million, which represents an overall funding decrease of $1.7 million when compared with the fiscal year 2015 Available Resources. Spent Fuel Storage and Transportation The Spent Fuel Storage and Transportation Business Line supports licensing, oversight, rulemaking, international activities, research, and generic homeland security associated with the safe and secure storage and transportation of spent nuclear fuel and other radioactive materials. The fiscal year 2016 budget request for Spent Fuel Storage and Transportation is $43.8 million, which represents an overall funding decrease of $2.4 million when compared with the fiscal year 2015 Available Resources. The decrease is in the oversight, research, and rulemaking areas and does not represent a significant change in work scope. Decommissioning and Low-Level Waste The Decommissioning and Low-Level Waste Business Line supports licensing, oversight, rulemaking, international activities, and research associated with the safe and secure operation of uranium recovery facilities, removal of nuclear facilities from service and reduction of residual radioactivity to a level that permits release of the property and termination of the NRC license, and disposition of low-level radioactive waste from all civilian sources. The fiscal year 2016 budget request for Decommissioning and Low- Level Waste is $44.1 million, which represents an overall funding increase of $1.5 million when compared with the fiscal year 2015 Available Resources. The increase reflects greater resource needs to support oversight of decommissioning of power reactors and uranium recovery facilities licensing activities. closing Chairman Alexander, Ranking Member Feinstein, and distinguished Members of the Subcommittee, this concludes my formal testimony on the NRC's fiscal year 2016 budget request. On behalf of the Commission, I thank you for the opportunity to appear before you. I look forward to continuing to work with you to advance the NRC's important safety and security missions. I would be pleased to respond to any questions that you may have. Thank you. Senator Alexander. Thank you, Chairman Burns. Commissioner Svinicki. STATEMENT OF KRISTINE L. SVINICKI, COMMISSIONER, U.S. NUCLEAR REGULATORY COMMISSION Ms. Svinicki. Thank you, Chairman Alexander and Ranking Member Feinstein, for the opportunity to appear before you this afternoon. Our Commission's chairman, Stephen Burns, in his statement on behalf of our Commission has provided a description of the Agency's budget request as well as key Agency accomplishments and challenges in carrying out NRC's important mission, that of protecting public health and safety and promoting the common defense and security. In light of his summary, I will simply look forward to your questions. Thank you. [The statement follows:] Prepared Statement of Kristine L. Svinicki Thank you, Chairman Alexander, Ranking Member Feinstein, and members of the subcommittee, for the opportunity to appear before you. The Commission's Chairman, Stephen Burns, in his statement on behalf of the Commission, has provided a description of the agency's budget request, as well as key agency accomplishments and challenges in carrying out the Nuclear Regulatory Commission (NRC's) important mission of protecting public health and safety and promoting the common defense and security of our Nation. I look forward to your questions on these topics. Thank you. STATEMENT OF WILLIAM C. OSTENDORFF, COMMISSIONER, U.S. NUCLEAR REGULATORY COMMISSION Mr. Ostendorff. Good afternoon, Chairman Alexander and---- Senator Alexander. Commissioner Ostendorff. Mr. Ostendorff [continuing]. Ranking Member Feinstein. This is my first chance to testify before this committee, and I am grateful for the opportunity. I would like to acknowledge that this is Chairman Burns' first appearance before Congress in his new role as chairman, and we are very pleased to have him leading this Commission. The chairman has already provided an overview of the NRC's changing--the changing environment and steps we are taking to improve operations through Project AIM. I am in complete alignment with his testimony. I will, however, make three very brief points in the next few minutes. The first concerns the status of post-Fukushima safety enhancements. Along with Commissioner Svinicki, I have been involved in all of the Commission's decisionmaking related to what safety changes we should require as a result of the operating experience from Fukushima. I clearly recall visiting Watts Bar with Senator Alexander just a few weeks after the Fukushima event. Looking back over the actions NRC has taken over the past 4 years as a result of Fukushima lessons learned, I firmly believe the Agency has acted on a foundational basis of solid science and engineering. We have appropriately given highest priority to those tier one items associated with the greatest safety significance. I will not go in any details here, but will make two very brief comments. First, as a former Rickover era nuclear submarine officer, and I spent 16 out of 26 years on sea duty operating nuclear power plants on submarines, based on experience and my experience as a Commissioner, I am very confident in the NRC's safety actions we require post-Fukushima. And, second, as I compare our actions and approach to that of the broader international community, I am convinced we continue to be a world leader in nuclear safety. My second point relates to licensing of new reactors. When I was sworn in as a commissioner on April 1st of 2010, NRC was reviewing license applications for 26 reactors. As a member of the Commission these past 5 years, I have voted to approve the design certifications for the Westinghouse Safety 1000, the combined construction operating licenses for Summer and Vogtle. More recently, I voted to approve the GE-Hitachi Economic Simplified Boiling Reactor Design certification. But today we are in a different place, as Chairman Burns noted. Rather than reviewing 26 reactor applications as we were 5 years ago, today we are reviewing seven applications for a total of 11 reactors. I need not inform this committee of the significant fact of life changes the nuclear industry has faced since the heady days of a projected nuclear renaissance circa 2005-2008. The unexpected leap in shale gas reserves, concurrent plummet in natural gas prices, flat or declining electricity demand in certain areas, and other economic factors have dramatically changed the landscape for projected nuclear generation capacity. While fully supporting achieving greater Agency efficiencies in the Project AIM arena, both this Commission as well as this committee and the broader Congress need to work together to ensure that we do not lose those critical skill sets used by our highly technical staff to review and license new reactor technologies in the future. To do otherwise would negatively impact our Nation's ability to pursue nuclear technology options in the future. We should not let that happen. My third and final point concerns Yucca Mountain. As evidenced in your statement, Senator Alexander, Senator Feinstein, I know that you are very interested in our Nation's spent fuel and disposal challenge, and we appreciate your leadership in that area. I am very proud of our NRC's staff work to complete and publish the final safety and evaluation report for Yucca Mountain in January of this year. The Yucca Mountain Safety Evaluation Report involved highly technical and complex issues. Our staff successfully met the challenge and did its job. We now look forward to progress towards a long- term spent nuclear fuel disposal solution as mandated by the Nuclear Waste Policy Act or that act as it may be amended going forward. In closing, I appreciate the opportunity to be here today and look forward to your questions. Thank you. [The statement follows:] Prepared Statement of William C. Ostendorff Good afternoon Chairman Alexander, Ranking Member Feinstein and distinguished members of the subcommittee. This is my first time to testify before this Committee--I am grateful for the opportunity. I would also like to acknowledge that this is Chairman Burns first appearance before Congress in his new role as Chairman. We are very pleased to have him leading the Commission. The Chairman has already provided an overview of the Nuclear Regulatory Commission's (NRC's) budget, the changing environment, and steps we're taking to improve the operations of the NRC through project AIM. I am in complete alignment with his testimony I will make three brief points in the next few minutes that I believe are relevant to this Committee. The first concerns the status of post-Fukushima safety enhancements. Along with Commissioner Svinicki, I have been involved in all of the Commission's decisionmaking related to what safety changes we should require as a result of the operating experience from the tragic earthquake and tsunami in Japan 4 years ago. I clearly recall visiting Watts Bar with Senator Alexander just a few weeks after the Fukushima event. Looking back over the actions the NRC has taken over the past 4 years as a result of Fukushima lessons learned, I firmly believe the agency has acted on a foundational basis of solid science and engineering. We have appropriately given highest priority to the Tier One items associated with greatest safety significance. I will not go into any details here--the Chairman's testimony does that. I will make two comments. First, as a former Rickover era nuclear submarine officer who spent 16 out of my 26 years in the Navy operating submarine reactor plants, I am confident in the NRC's safety actions post-Fukushima. And second, as I compare our actions and approach to that of the broader international community, I am convinced we continue to be a world leader in nuclear safety. My second point relates to licensing of new reactors. When I was sworn in as a Commissioner April 1, 2010, the NRC was reviewing license applications for 26 reactors. As a member of the Commission these past 5 years, I have voted to approve design certifications for the Westinghouse AP 1000 design certification, Summer and Vogtle combined construction/operating licenses (or COL's) and more recently, I voted to approve the design certification for the GE-Hitachi Economic Simplified Boiling Water Reactor. The math is simple. Rather than currently reviewing 26 minus 4 or 22 COLs, we are reviewing 9 applications. I need not inform this Committee the significant fact of life changes the nuclear industry has faced since the heady days of a rumored nuclear renaissance circa 20052008. The unexpected leap in shale gas reserves and concurrent plummet in natural gas prices, flat or declining electricity demand in certain areas and other economic factors have dramatically changed the landscape for projected nuclear generation capacity. While fully supporting achieving greater agency efficiencies in the Project AIM arena, we--both the Commission and Congress--need to work together to ensure that we do not lose those critical skills sets used by our highly technical staff to review and license new reactor technologies, including Small Modular Reactors, as we proceed in the months and years ahead. To do otherwise would negatively impact our Nation's ability to pursue nuclear technology options in the future. We should not let that happen. My third and final point concerns Yucca Mountain. I know that this Committee is keenly interested in solving our Nation's spent fuel disposal challenge. I have spoken over the past few years to both Senator Alexander and Senator Feinstein and your staffs on the topic of spent fuel. I am proud of our staff's work to complete and publish the final safety evaluation report for Yucca Mountain in January of this year. The Yucca Mountain Safety Evaluation Report involved highly technical and complex issues--our staff successfully met the technical challenge and did its job. We now look forward to progress towards a long-term spent nuclear fuel disposal solution as mandated by the Nuclear Waste Policy Act. In closing, I appreciate the opportunity to share these thoughts with you today and look forward to your questions. Senator Alexander. Thank you. Commissioner Baran. STATEMENT OF JEFF BARAN, COMMISSIONER, U.S. NUCLEAR REGULATORY COMMISSION Mr. Baran. Thank you. Chairman Alexander, Ranking Member Feinstein, and members of the subcommittee, thank you for the opportunity to appear today before the subcommittee. It is a pleasure to be here with my colleagues to discuss NRC's fiscal year 2016 budget request and the work of the Commission. First and foremost, NRC is focused on our mission of protecting public health and safety, yet the Agency faces a different environment than what was expected just a few years ago when substantial new reactor construction was anticipated and no licensees had yet announced plans to shut down any reactors. To meet our responsibilities now and in the future, we need to enhance the efficiency, effectiveness, and agility of the Agency. In order to avoid disrupting the Agency's work, it is important to set a thoughtful trajectory to the appropriate resource and staffing levels over the next few years. We need to make sure that we do a good job matching resources to expected workload. Before I joined the Commission, my colleagues had the foresight to initiate Project AIM, the internal working group tasked with looking at the challenges-- or changes rather--NRC should make to prepare for the future. This is a valuable and timely effort. The results of the team's work were recently submitted to the Commission, and we are actively deliberating on the recommendations. While we work to increase the Agency's efficiency and agility, we need to ensure that NRC also maintains its focus on its ongoing safety work. Currently, five new reactors are being built in the United States, and five reactors recently ceased operations and are entering decommissioning. At the construction sites, NRC is conducting oversight to ensure that the new plants are built safely and in accordance with regulatory requirements. For the decommissioning plants, the Agency reviews requests for exemptions from some of the requirements that apply to operating plants. Meanwhile, the NRC staff is beginning a rulemaking to take a fresh look at a number of decommissioning issues. NRC is continuing to address post-Fukushima safety enhancements and lessons learned. Progress has been made in several areas, as my colleagues recognized, but we also recognize that more work remains to be done. NRC also is responsible for having an efficient and effective licensing process for new designs and facilities. While NRC continues its work on pending applications for new reactors, we need to be ready to accept and review applications submitted for new technologies. We are expecting to receive the first application for a small modular reactor in 2016. NRC is already reviewing an application for a new production facility for medical isotopes, and anticipates additional applications of this type in the future. Thank you, and I look forward to your questions. [The statement follows:] Prepared Statement of Jeff Baran Chairman Alexander, Ranking Member Feinstein, and members of the subcommittee, thank you for the opportunity to appear today before the Energy and Water Appropriations Subcommittee. It is a pleasure to be here with my colleagues to discuss Nuclear Regulatory Commission's (NRC's) fiscal year 2016 budget request and the work of the Commission. First and foremost, NRC is focused on our mission of protecting public health and safety. Yet the agency faces a different environment than what was expected just a few years ago when substantial new reactor construction was anticipated and no licensees had yet announced plans to shut down any reactors. To meet our responsibilities now and in the future, we need to enhance the efficiency, effectiveness, and agility of the agency. In order to avoid disrupting the agency's work, it is important to set a thoughtful trajectory to the appropriate resource and staffing levels over the next few years. We need to make sure that we do a good job matching resources to expected workload. Before I joined the Commission, my colleagues had the foresight to initiate Project Aim, an internal working group tasked with looking at the changes NRC should make to prepare for the future. This is a valuable and timely effort. The results of the team's work were recently submitted to the Commission and we are actively deliberating on their recommendations. While we work to increase the agency's efficiency and agility, we need to ensure that NRC also maintains its focus on its ongoing safety work. Currently, five new reactors are being built in the U.S. and five reactors recently ceased operations and are entering decommissioning. At the construction sites, NRC is conducting oversight to ensure that the new plants are built safely and in accordance with regulatory requirements. For the decommissioning plants, the agency reviews requests for exemptions from some of the requirements that apply to operating plants. Meanwhile, the NRC staff is beginning a rulemaking to take a fresh look at a number of decommissioning issues. NRC is continuing to address post-Fukushima safety enhancements and lessons learned. Progress has been made in several areas, but we recognize that more work remains to be done. NRC also is responsible for having an efficient and effective licensing process for new designs and facilities. While NRC continues its work on pending applications for new reactors, we need to be ready to accept and review applications submitted for new technologies. We are expecting to receive the first application for a small modular reactor in 2016. NRC already is reviewing an application for a new production facility for medical isotopes and anticipates additional applications of this type in the future. Thank you, and I look forward to your questions. Senator Alexander. Thank you, Commissioner Baran. We have been joined by Senator Murkowski, who is chairman of the Energy Committee. And, Senator Murkowski, Senator Feinstein and I have already commented on how we have worked with you on nuclear waste. And I wonder if you have a statement that you would like to make before we begin our questions. STATEMENT OF SENATOR LISA MURKOWSKI Senator Murkowski. Thank you, Mr. Chairman. I appreciate the opportunity to just say briefly a couple of words here. First, thank you for this hearing, as well as a series of others that relate to our nuclear oversight and what your subcommittee certainly has jurisdiction over. I am hopeful that I can attend more of these because I do feel that it is imperative that as we look to our energy portfolio as a Nation that we be working actively to advance the nuclear portfolio when it comes to our energy needs and our energy security. And, Commissioner Ostendorff, you mentioned kind of where we are currently in a post-Fukushima world with the low cost of natural gas and the direction that is moving things. This is something that I have long felt that the United States has started to take a back seat when it comes to our leadership role in advancing nuclear energy and the manufacturing end of it, the workforce development, and I do not think that we should be going backwards in this regard. I think we need to assert that leadership and do so in a way that is smart and safe, but again, really recognizing our full potential there. And that is one of the reasons why I have enthusiastically joined the Senator from California and the chairman of this appropriations subcommittee in trying to figure out how we do deal with the waste end of our nuclear situation and solution in this country. And I am hopeful that along with Senator Cantwell, we will be able to advance some of the constructive ideas that have come from the Blue Ribbon Commission that we have attempted to put into our legislation, build that out, and ensure that we continue to have a leadership role with regards how we address nuclear energy in this country. So I look forward to more of these conversations and look forward to the opportunity to ask a few questions this afternoon. Thank you. Senator Alexander. Thank you, Senator Murkowski. I know you have other commitments this afternoon, and thank you for making time to come. We know the difference between an authorizing committee and an appropriations committee, and we are the appropriations and you are the authorizing, and I am proud to also be a member of your committee. I would like for the Commission to know we are working hand-in-hand in this effort. While we have a nuclear waste proposal that will go through Senator Murkowski's committee, for the last two Congresses we have also had through our Appropriations Committee, of which she is also a member, a pilot project with her support and agreement to try to advance our nuclear waste efforts on two different fronts. So I appreciate her attitude, and we will look forward to working with her. Of course, Senator Feinstein's passion and urgency for getting the nuclear waste out of the sites in California where reactors are not operating in the 78 sites, getting it out of spent fuel and dry cask to a single--the easiest way to do that would be to take it all to Yucca Mountain. I mean, it is there, the law says that is where the waste is supposed to go, and the science now says it is safe. And the U.S. Court of Appeals for the District of Columbia in 2013--directed the Commission to resume its licensing activities for Yucca Mountain. YUCCA MOUNTAIN LICENSING So, Mr. Chairman, is the Commission complying with that ruling? Mr. Burns. Yes, Senator, I believe we are. As a result of the court ruling, the court directed the NRC to expend the-- what was in effect--carryover funds that it had remaining and had not expended at that respect, and to continue with Yucca Mountain activities. What the Agency did do is it completed the SER, I think as you noted during your statement. Recently, the Commission approved going forward to complete a supplemental environmental impact statement on certain issues. This was in part because the Department of Energy declined to do so. But with the funding we have left, and it was otherwise appropriate for us to do that EIS, and there are some other activities. I think that is on the order of something like about $4 million that is left from that funding, but at that point, we have no other funding. And as the court indicates, the funding, notwithstanding the authorizations in the Waste Policy Act, it does also depend on further appropriation of money to the various agencies. Senator Alexander. Is the next step after the environmental impact statement restarting the hearings before the Atomic Safety and Licensing Board? Mr. Burns. Yes, that is essentially correct. Senator Alexander. And what will that cost, and do you have the money to do that? Mr. Burns. I think the Agency, and I would ask my two colleagues who are here before I return to the Agency to correct me if I am wrong. I think the Agency has provided an estimate of something like $330 million for the completion of-- an estimate of completion of Yucca Mountain related activities. Mr. Ostendorff. I would just like to add to the chairman's statement, there are approximately 280 legal contentions that would need to be dispositioned by the Atomic Safety and Licensing Board. That dollar estimate is an estimate. It is not a precise number because the adjudication litigation process sometimes is difficult to predict. Senator Alexander. So to understand, you are saying roughly to complete all of the activities between now and opening of Yucca Mountain, it would be $330 million? Mr. Burns. For the decision, yes. For the decision on the licensing decision that the Agency is--which is part of our regulatory---- Senator Alexander. So the last step before the opening of Yucca Mountain is the issuing of a license. Is that right? Mr. Burns. Well, the license is a construction authorization. There is another--under the Waste Policy Act, there is another--basically an operating license. But to take it to a point toward construction---- Senator Alexander. Oh, okay. Is the $330 million just for the construction license? Mr. Burns. It is for, yes, this phase. Ms. Svinicki. I should note, Mr. Chairman, as well that I believe those are NRC's costs of $330 million. The applicant, which is the Department of Energy in this case, would have their own costs for supporting that adjudicatory proceeding. Senator Alexander. The President's budget estimates the Nuclear Waste Fund has a balance of $36 billion at the beginning of fiscal year 2016. How much of that Waste Fund paid in by utilities collected from electric bills could you use for these costs associated with completing Yucca Mountain? Mr. Burns. Well, the amounts that are collected in the Waste Fund have to be appropriated to the Agency. We do not have an authorization to just to tap the Waste Fund. Senator Alexander. So you need for us to act to be able to use those funds. Mr. Burns. You would need--yes, correct. PILOT PROGRAM FOR CONSENT-BASED STORAGE Senator Alexander. Let me shift gears just a little bit. If we were--if Senator Feinstein, and I, and Senator Murkowski were to include in the energy and water appropriation bill again this year a pilot program for consent-based storage of nuclear waste, are you prepared to act quickly if this becomes law? And give me a little idea about what has to happen if we-- assuming we pass--assuming that becomes law, then what happens? I think you have an application, for example. Mr. Burns. Well, for example, we have an application or are about to get an application from a private corporation that is interested in building a storage--above-ground storage facility in the western part of Texas. We have the capability---- Senator Alexander. So that could be--that could be a consolidated site, not a temporary? That could be a repository of the kind envisioned by the pilot program that Senator Feinstein talked about. Mr. Burns. As I understand it, it could be there. There are probably changes in the law in order to authorize it, but that is something you could address in your--in your legislation. Senator Alexander. Well, is the first step for it to then-- if that application were to come in, is the step then for you to give a rule on whether or not it gets licensed or not? Is that the---- Mr. Burns. Well, I think we would have a responsibility regardless of, I think, the change to review the application and make a decision on it. If there are other aspects because of other changes in statute that would affect how it could be used, we would certainly take those into consideration. Senator Alexander. Well, my time is up, but is there anything more that you could say to the three of us about, are you prepared if we pass the pilot program to do the Commission's part to implement it as rapidly as you could in a safe and reliable way? Mr. Burns. I do not think it is in the budget. We do not have funding in the budget or in our request, so that would-- you know, obviously that would have to be addressed. And I have to say, just if you would also give us the opportunity to look at it, and we could advise you in terms of what it means in terms of our processes. What I want to leave you with is, again, the basic idea we have the capability to do this kind of technical review. Senator Alexander. Thank you, Mr. Chairman. Let me go to Senator Feinstein. But I will ask staff to work with you and your staff to make sure that as we write language for the appropriations bill that we write it in a way that takes advantage of your technical advice so that we--so that we speed things up rather than slow things down. Senator Feinstein. Senator Feinstein. Well, thanks very much, Mr. Chairman. And, Mr. Burns, essentially what you are saying, if I understand it, is that there is now a voluntary proposal to provide a pilot nuclear waste facility in Texas. And so, there could be a place that is voluntary that people wanted if such a pilot facility were authorized by law. Is that correct? Mr. Burns. That is correct. We expect to get the--an application in the near future. Senator Feinstein. Good. Good. I am happy to hear that. So other than us authorizing it, there is nothing else that is necessary from the Federal Government. Is that correct? Mr. Burns. As I say, I think in terms of your authorization, I think you would need to look--part of that would be looking at the Nuclear Waste Policy Act, which I presume you would do, in terms of conforming changes. But off the top of my head, I cannot think of anything else. Senator Feinstein. Here is the thing. Pardon me? Senator Alexander. Mr. Baran---- Senator Feinstein. Oh, sorry, I did not see that. Please. Mr. Baran. No problem at all. I would just add, if what is contemplated in Texas is consolidated internal storage whereby the Department of Energy would contract with that eventual applicant to take the spent fuel from various locations around the country, then presumably the Department of Energy would also need appropriations from Congress to enter into that contract with the potential applicant we would have. That is not the NRC part of this, but it is a piece of it. Senator Feinstein. Right, and I think we understand that, so I appreciate your making it clear. That is good. Let me--for the past 30 years, it is my understanding that you have allowed the licensing of nuclear power plants based on the assumption that a permanent disposal site for waste would be available within a reasonable timeframe. And as I understand it, the Court of Appeals in 2012 required you to consider the health and safety impacts of the possibility that a disposal site might never be available. Is that correct? Mr. Burns. Yes, I think that is correct. Senator Feinstein. Okay. And so, the fact remains that the NRC in its final rule digressed from 30 years of regulatory precedent by allowing licensing actions to proceed without concrete plans for a disposal site in the foreseeable future. I gather that is correct. Mr. Burns. Well, the decision--the decision that was made after the court decision--what the court decision said is that in the context it faced then, that the earlier so-called waste confidence findings that the Agency had made since the late 1970s or the early 1980s, it would not satisfy. Recall, too, that the basic finding with respect to waste confidence or continued storage really deals with the Commission's environmental review. It is a piece of environmental review for individual licensing actions. What the Agency did is in the absence of a firm date, if you will, for a repository, it looked at the environmental impacts of continued storage at sites. And, again, it is not a decision that the Agency is making that that is the preferred way of going, but looking at it, that the impacts are small and did not prevent the continued licensing of facilities. That is essentially what it is. And in that decision, we recently acted on some petitions related to that position, and I believe we are probably going to be taken to court again on that. Senator Feinstein. Okay. And the rods now in spent fuels that you say are safe essentially forever, I guess, are you saying that they are safe for a millennium in spent fuels, and that you can predict that there will be no catastrophic earth movement, which has characterized planet earth over the millenniums? Is that essentially what you are saying? Mr. Burns. No. I think what I am saying is that with respect to storage, and storage at sites takes into consideration site characteristics, various phenomenon, part of our looking at, you know, seismic flooding, things like that, will take those issues into account. Eventually, spent fuel, it does decay. For example, part of the reason to move it is that some sites choose and choose fairly early on to move it to dry--what we call dry storage is that it no longer needs to be in a pool. But because of the decay, because of the characteristics of it, the staff and the Agency has made the determination it can be safely stored. Whether that, again, from a national policy perspective is the preferred long-term solution, I am not saying that. What, again, I am saying is we have made the technical judgment that it is safe as it is. Senator Feinstein. Okay, I understand that. My time is up. If there is a second round, I will---- Senator Alexander. There will be as many rounds as you would like to have. Senator Murkowski, if I may ask a clarifying question. I think I confused an issue. Mr. Chairman, is it correct that if this application from West Texas materializes, and the Nuclear Regulatory Commission approves the application, that that applicant can then begin to receive spent fuel from any of the 78 sites around the country without any further action by us? Mr. Burns. I believe that is correct, and, again, in accordance with the terms of the license that would be issued. Senator Alexander. So, Senator Feinstein, did you--I was confusing--if the Texas application is approved---- Senator Feinstein. Right. Senator Alexander [continuing]. They can go into business-- -- Senator Feinstein. Good. Senator Alexander [continuing]. Without any further action---- Senator Feinstein. Oh, that is good. Senator Alexander [continuing]. By us is the way I--is the way I understand it. Senator Feinstein. Even now without passing the bill? Senator Alexander. Even now without passing our bill, correct? Mr. Burns. That would be my understanding. Senator Feinstein. Good. Mr. Burns. I would note, for example, that the Agency had an application several years ago for a private--it did not--it was called private fuel storage. It was in Utah. Ultimately a decision was made not to build it. But the Agency licensed-- approved the licensing of that several years ago. It may have been a decade ago. Senator Alexander. That is important for us to know and understand, so if as we go along this afternoon there is a different answer to that, let us know. And we will go to Senator Murkowski. DOD TESTING AT YUCCA MOUNTAIN Senator Murkowski. I wanted to ask about something that has come up in the news recently about possible Department of Defense interest in conducting some tests at Yucca Mountain. I for one have concerns with the possibility that Yucca would be used for anything other than the statutory use as a repository for the spent nuclear fuel and our high level defense waste. Has anyone from DOD been in contact with you at the NRC regarding using Yucca Mountain for purposes other than as a repository? Mr. Burns. I am not aware of that. My executive director for operations, the chief officer is shaking his head no. I am not aware. Senator Murkowski. I am sure you have seen the same story. Mr. Burns. My information is what I read, probably the same thing you read in the newspaper. SMALL MODULAR REACTORS Senator Murkowski. Yes, okay. Well, I am trying to chase rumors, so if anybody has more detailed information, I think it would be helpful to know. I wanted to ask quickly about where we are with SMRs, small modular reactors. You have indicated that the Commission is preparing to review the license applications. Kind of give me some updates. What are the barriers right now, whether legislative or regulatory, that could delay approval of the SMRs? Mr. Burns. Well, we expect--as I said in my opening testimony, we expect to receive an application in 2016 from one of those who indicated an interest. Some of it has been, frankly, changing interest in terms of the market. I think a lot of these things are probably outside the NRC's ken in terms of what the interest is and potentially buying or procuring it. I mean, our staff--what I would say, Senator, is that our staff has engaged with those who have indicated interest in the technology. We had a paper that came up several years ago, actually before I left the NRC in 2012, to address some of the issues. I think there are some issues we need to work through, but I think we have been responsive in terms of assuring that we--both through the licensing process and also regulatory criteria. And particularly for what we are seeing, which are basically light water reactor based, the technology. What I have said in some of the public speeches and all, is looking down the path, to the extent you get smaller reactors or technologies in the non-light water reactor, what we call-- sometimes call generation four reactors, there is some work that needs to be done there. DoE has worked cooperatively with the industry. We are looking at a report related to that. And I think we are open to do that over the next few---- Senator Murkowski. Does that review also include then the export possibility and ensuring that the licensing process will make it easier to export our SMRs to other countries? Do you consider that? Mr. Burns. I might have to come back to you on the record for that. Senator Murkowski. Okay. Mr. Burns. What I would say is generally, and looking at the experience we have had with the larger reactor technology, for example, the Westinghouse AP1000, General Electric ABWR. We have certified those under our rules, and a lot of--the countries who have been interested, for example, Japan and China, who have built--have been building that technology, they often look to our certification to do that. So I think the basic subject or perhaps--I was thinking about some discussion with our staff. I think the basics there for export, the basic construct is there. And what often you find is that the NRC's design review is considered a seal of approval that is often recognized around the world. COMPLIANCE COSTS Senator Murkowski. With my remaining time, I wanted to touch on just the cost of compliance with the NRC regulations. As we speak to how we are going to move to this nuclear renaissance that we once talked about so freely, it is seemingly the cost of regulations that is the big barrier to market for new nuclear projects. So what aspects of the regulatory process can we modernize, can we streamline, can we just be more efficient? How can we do a better job with this? Mr. Burns. Well, one of the things the Commission started a few years ago, again, was an effort nominally called cumulative effects of regulation. And it was a way of trying to look at the impact as regulations are proposed or developed, and in terms of either staging, you know, the significance or the value added, if you will. And some of that effort has continued in communication with industry, and I think the Commission is going to receive a paper or some information from the staff later this month or next month that, again, includes comments from stakeholders, industry and others. One other thing I would do is that--we are trying to do as well is we had a GAO report that critiqued the Agency in terms of its cost benefit analysis. We might have some disagreements, particular areas of disagreement with it. But we are looking at that and doing things to improve our cost benefit analysis where that is appropriate in the regulatory sphere. Ms. Svinicki. Well, Chairman Burns did mention cost benefit analysis. Just to put a finer point on that, it had been pointed out to NRC that looking retrospectively at things that we had put in place and the Agency's own cost estimates for what it would cost the regulated community to put them in place. We were confronted with data from the industry that showed in some cases we were 10 orders of magnitude low. And, of course, this gets into an impact's cumulative effect of regulation so much because if our analyses of cost benefit are not accurate, then we will impose things where, if we had better cost estimates, we would find that the benefits do not exceed the costs. And so, I think one of the most basic things that regulatory agencies can do is to continue to refine and improve cost benefit analyses techniques. Senator Murkowski. Thank you, Mr. Chairman. Senator Alexander. I wanted to continue along Senator Murkowski's questions. I think your--I love the concept of cumulative--what did you call it? Mr. Burns. Cumulative effects. Senator Alexander. Well, that is true. I mean, we know that is true. It is just human nature. I mentioned the higher education report, Senator Murkowski, that we commissioned. I mean, eight reauthorizations to the Higher Education Act since 1965, eight groups of well-meaning Senators, eight groups of well-meaning legislators. Let us try this, let us try that, let us try this. And Vanderbilt does a study that shows it costs $150 million in 1 year for that one university to comply with all these rules and regulations. They just build up over time, and there is no countervailing discipline to remove them, and it adds a lot of costs. I mean, in the university case, it is $11,000 per student at that university on the tuition costs. So that could make a little difference in the ability of an operator--of a utility to say, will I extend a nuclear power plant license? Will I open one? What will I do? Let us take an example of that with the extension of nuclear power. We have 99 reactors, is that right, today operating? Mr. Baran. That is correct, 99 operating. Senator Alexander. And about how many of those are licensed to operate for 60 years? Mr. Baran. About 75. Senator Alexander. About 75. Mr. Baran. Yes. Senator Alexander. And some of the others are newer, so they would not yet be licensed. But a large number of those will be thinking about going--applying for permission to go for 80 years. Is that correct? Mr. Baran. There is interest in that, yes. Senator Alexander. And scientifically or based on what your Commission knows, is it true that a reactor can operate safely for 80 years? Mr. Burns. Again, if the technical criteria are met, I think the answer is yes. I think the Commission last year, and I might ask my colleagues who were engaged in this issue before I returned to the NRC. Senator Alexander. But if I am a utility operator, is the Commission generally of the disposition that a properly maintained reactor who meets the technical requirements should be able to operate for 80 years instead of 60 years? Mr. Ostendorff. I would just answer very briefly, Senator, and maybe Commissioner Svinicki would like to supplement my comments, because last year we were the two folks that were here that voted on the subsequent license renewable policy issue that came to the Commission last summer. And we determined that our current regulatory framework without modification is structured to allow an applicant to come in to ask to operate from 60 to 80 years. We require basically utilities to have an aging management program to look at such things as buried piping, electrical cables, the impact of neutron to radiation, reactor vessels, those types of material issues. But there can be a showing made, and so far industry has done that up to 60 years that they can monitor material degradation in a way that ensures safety. Senator Alexander. Commissioner. Ms. Svinicki. Just at bottom, Mr. Chairman, last year our Commission affirmed that our regulatory framework is adequate as it exists to evaluate 60 to 80 years. The demonstration will have to be made site by site of each applicant that comes in. They will have to provide the safety case. Senator Alexander. Has anyone yet applied for an 80-year license? Ms. Svinicki. No, they have not, but industry has indicated we might receive the first 60- to 80-year extension in the year 2018. Senator Alexander. Well, here is what I am getting to. If it is a legitimate concern of our country that we want lots of low cost, reliable carbon free electricity, and if the 99 reactors provide 60 percent of that today, and if we open five and close five in the same year, and if there are a number of forces that make it difficult to start big new reactors right now, a strategy for the President and the Congress, which might be the easiest way to make sure over the next 30 or 40 years that we have an adequate supply of reliable, clean, low cost electricity free of carbon emissions, would be to make sure that we do not have any unnecessary obstacles to a license application to go from 60 to 80 years, if that is a safe thing to do. And that might also be a good time. You just did your review about whether your regulatory structure allows that. It might be a good time to do a review about whether they are unnecessary obstacles in your regulations that would discourage utilities from doing that. Without naming names, I was a little surprised to learn from one utility executive that they were only planning on asking for a 60- to 80-year extension for 30 percent roughly of their reactors, when, in fact, the other 70 percent are good solid reactors. Now, there are a whole combination of reasons which make that uneconomic. But one of the reasons sometimes is the cost of regulations, so that might be an area where you could take a look and say it is in the public interest to make sure that we create a welcoming environment for those applications rather than an adversarial environment, and still meet all of your safety objectives. My time is up. Senator Feinstein, why don't you take the time you would like for your questions, and then I will ask some more. Do not feel constrained by any five-minute rule. WASTE STORAGE Senator Feinstein. Thank you. I appreciate that. If I understand what I have been told, the NRC has made the judgment that nuclear waste storage at the site of a reactor is forever safe, and that waste need not be moved. How do you expect communities to support further license extensions given that you are now allowing plant owners to keep waste on site indefinitely? Mr. Burns. Senator, the issue--I mean, from the regulatory standpoint, our job and our responsibility is to call the technical shots as we see them. The question I think on local support and those are issues that I fully recognize may have some concern. Our job is to assure that we have oversight of licensees to ensure that they are carrying out requirements that apply to spent fuel storage or to safe operation, and communicate to the public how we are doing that. That is, I think, what we can--that is what we can do, I think. Senator Feinstein. See, the problem is you have no way of knowing what might happen 200, 300 years from now, no way. I can think of a whole host of things that could happen that are not predictable. Now, if you only use the predictable, maybe you are right. But if you concede that there are things that happen that are not predictable, that is another subject. So it would seem to me that a public agency would want to protect the public above all, and not just the public today or 50 years from now, but the public that is forever going to be on adjacent land. Anybody want to take that on? Mr. Ostendorff. I would like to make a couple of---- Senator Feinstein. Okay. Mr. Ostendorff. Thank you for the opportunity. I want to make a couple of comments. One, NRC has not said let that waste sit there indefinitely without ever taking a look at it. Senator Feinstein. You said---- Mr. Ostendorff. We have not said leave it there and never take a look at it. Senator Feinstein. You have said it is safe. Mr. Ostendorff. We have said that it is safe and secure, but it also subject to ongoing monitoring programs. As one example, Senator Feinstein, one of the steps, again, and we are not as a Commission an advocate for indefinite storage onsite. There are certain responsibilities that the Department of Energy has in repository development under the Nuclear Waste Policy Act that are their responsibilities, not ours. But we have determined that this is fuel that is currently stored onsite in dry casks that are on concrete pads. That fuel is being stored safely and securely. If repositories were delayed in being developed for whatever reason, then there are steps that our staff has looked at to look at maybe after 100 years, there would be a replacement cask brought on board to move that fuel that, as the chairman had noted, would have undergone significant decay, move that fuel to a new cask. And there would be ongoing monitoring steps. As far as the other piece, I would tell you that in the Fukushima regulatory actions we have required, we have required seismic and flooding walk downs and hazard reevaluations. Those seismic reevaluations apply to those locations where we are storing spent fuel on sites today. Senator Feinstein. Well, I can only speak for myself representing a big State, highly earthquake prone with big reactors. We have not gone to Diablo yet. This really changes my support of the nuclear industry because if things are going to be built that they are going to be there forever and never moved, and subject to--I do not know what the monitoring regime would have to be. I do not know what provisions would have to be made for a real emergency, how you would move it out, you know. I do know that the CEO of PG&E has told me that they are prepared to move dry casks to a repository. And now you are saying, well, you do not need to do that particularly---- Mr. Ostendorff. Senator, I am not saying we should not do that---- Senator Feinstein. Let me just finish, sir. I would say particularly because of earth instability in that area, you would want to get the stuff out of there. So this is--I mean, it is hard for me to accept that you are saying one size fits all, and we believe this is safe. Well, let me go into this SMR that your Commissioner said was going to be licensed this year. How many SMRs are they, of what size, the new scale application? Mr. Burns. Well, we have not received the application as yet, and they would have to--what they are basically looking for, as I recall, is a design certification or design approval that you could--this is a design that could be applied. Right now, we do not have a particular site that we have been asked to license it at. Senator Feinstein. We hear that it is four at 40 watts. Did you say Idaho? To Idaho. Do you know anything about that? Mr. Burns. As I say, at this point, where the particular application might be, we do not have an application for the particular thing. Senator Feinstein. Okay, fair enough. Fair enough. Mr. Burns. And we would license it under--in terms of if we had a particular application to cite that design at a particular site, we take into consideration the natural phenomenon, the geology, soil structure, et cetera, that is at that site. Senator Feinstein. Okay. It is my understanding that these are only really cost effective if you can site a number in one place. In this case we could be wrong, but the information I have received, it would be four--no, it would be six 40-watt reactors sited at one place. I think it is on Federal land. What would be the requirements for storage, and where would they store the waste? Mr. Burns. Well, again, like other licensed plants, they would, absent a consolidated storage site or absent a repository where after the decay of fuel after it is done within the reactor, you would be talking about storage at the site. Senator Feinstein. Would this be underground? What would the requirements be? My understanding is it is underground. Mr. Burns. I think I have seen some--and I do not know all the details of the design. I understand some of the designs for the reactors themselves would be underground. I could not tell you in terms of I do not know enough, and would be happy to try to supplement for the record, what the expectation is with respect to, in effect, the spent fuel storage, at least in terms of temporary before potentially moving to like a dry storage situation. But I just do not know. STEAM GENERATORS AT SOUTHERN CALIFORNIA EDISON Senator Feinstein. Well, let me just--let me just ask you another thing because I am just a lay person, sort of a simple soul. At Southern California Edison, what I understand happened was not a like-for-like steam generator of one reactor, which began to have holes in it, and then the second reactor had the same problem. It was a Japanese designed reactor--Japanese designed steam generator. The thought was that the alloys in it were much more advanced and better to use. Do you consider that kind of thing when you approve an application as you will, for example, with the SMRs so that situations do not happen like what happened to Southern California Edison? Mr. Burns. Yes. We look at the technical aspects of equipment--the major equipment as well as the systems that are used to operate the facility. As you indicated, the replacement steam generators at San Onofre 2 and 3 had problems. Those were things that our inspectors also noticed with it. And from the standpoint both of the company making decisions with respect to conformance to their license about operability as well as the NRC in its oversight with respect to operability. So it is something we look at. The design and quality is something we do look at. Senator Feinstein. Did you approve those steam generators? Not you, but did the Commission? Did the Commission---- Mr. Burns. Well, I think my understanding is that the company, Southern California Edison, replaced the steam generators under provisions that allow for the exchange of equipment. And after that happened, and as you indicate, during some operation, they started finding anomalies consistent. And consistent with their license and licensing basis, they began to address that, identified that the quality was not there. Anomaly, as I say, we approve basically systems, and we approve the license and the conditions that they operate under. Senator Feinstein. Well, in one case I think there was a small--very small radioactive leak. This is why I am concerned about the underground SMRs. You put everything underground, it is pretty hard to get to it if you need to. And you can have equipment problems just as much as in a big reactor, it seems to me. Am I wrong? Mr. Burns. Well, again, what we license to is not that facilities will be perfect, that they are--will be perfect in every way, that we have to have--the notion of defense in depth, that thinking about if certain things go wrong how does the machine respond? How do the people who run it respond? How do we interact, interdict those potential problems? That is part of both the design philosophy and the approach both to the regulation and to oversight, because we do not license assuming, in effect, a perfect world. We assume that there may be things that go wrong, and if there are things that go wrong, how do you prevent and basically minimize the consequences of that in terms of designs. And that is--that carries through not only, I think, really from day one. Senator Feinstein. Okay. Nobody---- Mr. Baran. I have a slightly more succinct version of that. I think we do not know yet because we do not have the application of what the specific design will be. But if we get an application next for a small modular reactor design, if it is going to be underground or if it is going to have characteristics that are different from any other reactor design, or even if it did not have characteristics different from other reactor designs, they are going to have to demonstrate to the NRC that that design is safe before we certify it. SAN ONOFRE DECOMMISSIONING Senator Feinstein. Okay. The problem for me, and, again, just a simple problem, is that it is all out of sight. Now, I know there are technical ways of, I guess, bells ringing and that kind of thing, but it is all out of sight. And now, I mean, we have 2,200 megawatts going down. It is a huge amount of power. And as long as we are on it, Mr. Chairman, can you give us your take on where San Onofre is in the decommissioning process? Mr. Burns. Yes. The company has indicated what its plan is for decommissioning. It is going to a plan that over, I think, about a 20-year period, I think a little less than a 20-year period, they would--basically other than, as we discussed, the spent fuel pending removal to a continued or a consolidated storage site or repository. What would happen is they plan to take apart all the structures over that period. Senator Feinstein. They are going to remove the reactors. Mr. Burns. They are going to deconstruct the reactor buildings. And also, you may recall unit one, which was an early plant, is also on that site where they have done some of that work. Actually I think they have done a fair amount of that work, and then they would complete work that did not make sense to do until Units 2 and 3 were decommissioned. So they have communicated to the NRC its plans, and they have also made some plans in terms of the spent fuel storage on site. I think they have opted to use, in effect, instead of the stack that is above ground sort of an in-ground storage option, which they think has some advantages for them. Senator Feinstein. Well, so the only thing that will eventually be left for millenniums is the spent fuel. Mr. Burns. Well, again, that is assuming that there is never a repository built. I do not think that that is going to be the case, and you and Senator Alexander---- Senator Feinstein. That is where we are going. That is where we are going. And to me, I mean, this is almost diabolical that you leave, you know, six million people in the area without the benefit of power, but the spent fuel is there. And, you know, I say this respectfully, but I think the industry should think about this. I just do not think it is right, and that is one of the reasons why I think we have to press on and get repositories and get spent fuel. And you have questions of what is happening at Hanford. You have got waste up in Northern California, and that is just sort of my neighborhood, let alone other places. And, you know, it reminds me of old mines. I mean, we have like 50,000 mine wells that are not covered in the State. People can mine and walk off and leave the mess. And I really feel that that spent fuel has to have a place to go, so maybe it can be early in the line, I do not know. I think this is the dilemma for the industry. I do not know how many rods there will be, but there are 4,000 of them in spent fuel pools now-- 256,000 rods in spent fuel pools, as I understand it nationally. And I am told the prudent practice is to leave it in for five to seven years, and then move it to dry casks. And are you saying--I do not know, but are you saying in your rule that you can leave it forever in a spent fuel pool, or are you saying you should observe that five to seven years and move it to dry cask storage? Mr. Burns. Well, again, my understanding of the physical and the attributes of it is that you want it in a spent fuel pool for a certain number of years because the environment there assures against criticality and et cetera. Part of the reason utilities have moved to dry storage is you do not need the wet--in effect, the wet storage after that period of time. That is why you hear this term ``five to seven years.'' Senator Feinstein. Five to seven years. Mr. Burns. Five to seven years. And my guess it is also, from their standpoint, and I think you understand that as well. If you are having to deal with a longer-term storage, it may be more economical for them to dry storage as well. But essentially what you want is for this first years after it comes out of the reactor, in effect, until it cools in terms of its radioactivity. You keep it in the wet pool, and then you can move it to dry storage. DRY CASK STORAGE SAFETY Senator Feinstein. Well, let me ask you this. Is dry cask storage safer than spent fuel pool storage? Mr. Burns. I am not sure whether it is particularly safer. I think it has advantages over it. I think we have determined particularly--you know, particularly if you are looking at this window of time, you need to keep it in wet storage. I think there are advantages moving it to dry storage. It is, you know, fairly, I think, easily monitored. You know, you are concerned obviously with natural phenomena, but we have evaluated the equipment. We have evaluated the equipment against earthquake, you know, what happens in terms of the seismicity in a particular site against tornado missiles. In other words, you get a tornado moving through, things running out. So we evaluate the storage options against that. And as you say, it is an option many utilities have chosen to do because it is a safe option, and my guess is, from their standpoint, an economic option. POTENTIAL TERRORIST THREAT Senator Feinstein. Well, let me ask you. Do you evaluate a potential terrorist attack on the facility? Mr. Burns. I believe we--I believe we have, and at least from the standpoint of what can you--what can you do. So my understanding is that we have done that, yes. Mr. Ostendorff. Yes. If I may, Senator, that is a very good question on terrorist attack. Certainly there are a couple of things. After 9/11, our predecessors on the Commission required an aircraft impact rule for new reactors, and it was called B.5.b firefighting explosion type mitigation strategies for existing reactors. That was new after 9/11. With respect to--on an ongoing basis, we have exercises to evaluate the ability of a nuclear power plant to withstand a terrorist attack. I participated as a commissioner just last May in a hostile action based scenario at Diablo Canyon to look at a terrorist activity. How could the onsite security forces counter this terrorist attack? So we have a fairly sophisticated program in that area. We are glad to provide other briefings to you. If I could very quickly, you had asked a question earlier. I do not think we fully answered your question about the Idaho situation for small modular reactors. The new-scale concept, which Chairman Burns talked about, which we may receive a license application in 2016, would be for a number--the concept would be 45 megawatt reactors, perhaps four of those clustered as one group of four reactors. These would be underground designed theoretically to replace coal plants that would be retired. The underground concept has advantages from a security standpoint from the avoidance of missile hazards. So I just wanted to make sure that we provide that information to you, and we can provide more. Senator Feinstein. Thank you. I appreciate that. Thank you very much. Thank you, Mr. Chairman. YUCCA MOUNTAIN Senator Alexander. No, thank you, Senator Feinstein. Very interesting questions. Mr. Chairman, I think you have testified that you are doing everything the courts ordered you to do in terms of proceeding towards completing Yucca Mountain, correct? Mr. Burns. Correct. Senator Alexander. And is it true that if Yucca Mountain were open, we could take all of the casks, all of the used fuel out of California and Tennessee and everywhere else? We have the 78 sites, and it could all be contained in Yucca Mountain? Mr. Burns. As you alluded in your opening statement, Mr. Chairman, I am not sure if you took all the spent fuel currently--that currently exists that would be ready to be put in a repository, that it would all fit in the Yucca site. Frankly, I do not know the answer. Senator Alexander. A lot of it would. Mr. Burns. Well, yes. NUCLEAR REACTOR SAFETY Senator Alexander. I have been told all of it would, but maybe a lot of it would or most of it would, but that is the obvious way to me to get rid of it. I mean, for 25 years that has been the law. We are told often, ``pay attention to science.'' Science has now told us it is safe. You are doing an environmental review. There are several other steps you need to take, but if we want to get this fuel off these sites, that is one way to do it. Now, let me ask Mr. Ostendorff a couple of questions. The Commission has held that used fuel can be safely stored on the sites where it is produced, correct? Mr. Ostendorff. Yes, sir. Senator Alexander. And they have said it is safe whether it is in pools or in dry storage. Mr. Ostendorff. That is correct. And if I could, Senator, last year--actually in 2013 our staff did a study on the spent fuel pool looking at resilience against earthquakes, looking at the experience in Japan, looking at what we understand about spent fuel pool structures in this country. And we determined that there is not a need from a safety standpoint to more quickly move fuel from spent fuel pools to the dry casks. Senator Alexander. But you are not saying that utilities should not move it. Mr. Ostendorff. No, sir. Senator Alexander. You are just saying you have asked the question whether it is safe or not, that based on scientific standards it is safe. Mr. Ostendorff. Yes, sir. Senator Alexander. Now, you have a lot of experience with reactors having served in the Navy. We have had Navy reactors for, what 60 years? Mr. Ostendorff. Since 1954. Senator Alexander. Yes. How many deaths have we ever had a result of the operation of a Navy reactor? Mr. Ostendorff. None. Senator Alexander. How many deaths have we ever had in the United States as a result of the operation of a commercial reactor? Mr. Ostendorff. None. Senator Alexander. How many people were hurt at Three Mile Island, which is the most celebrated nuclear accident we have had? Mr. Ostendorff. None. Senator Alexander. Does any other form of energy production in the United States have that sort of safety record? Mr. Ostendorff. I cannot speak to solar or wind, but I would say that with respect to oil, gas, coal, it is my understanding that nuclear has a better safety record. Senator Alexander. Yes. Golden eagles do not like the safety record of windmills. I know that. But the fact is that no form of energy production in the world really has a safety record that exceeds the production of nuclear power in the United States, and I think it is important that we emphasize that. And as far as finding a place to put the waste, I mean, the problem with that is not you. It is us. It is the politicians who are keeping Yucca Mountain shut, and it is the politicians who are not opening new consolidated repositories, as Senator Feinstein and I have proposed for the last 3 years. If Congress would act on that and the President would sign it, why I am sure that the first priority would be sites where plants are closed, such as those in California, and to move the stuff off there. So I think, we ought to look in the mirror when the time comes about--it is not the industry saying to us they would like to keep it there. They would like to get rid of it. The industry is collecting money--$35 billion from rate payers--and it is not being used for the purposes being collected. We've got electric bills all over the country that are too high. We've got concerns from Senators like Senator Feinstein about unused fuel in her State. But the obstacles here are the United States Congress and the President of the United States. That is us. So I think it is very important for us to---- Senator Feinstein. It is not you, and it is not me. FUKUSHIMA Senator Alexander. No, but it is some people we know, but we are working on that. Now, I have just a few more--I want to underscore that. And let me go to Fukushima. Fukushima was a terrible problem from a very simple cause. Mr. Ostendorff, the problem at Fukushima was a very simple problem, was it not? I mean, power failed, and there was no water to cool the reactor. Mr. Ostendorff. Yes, sir. Senator Alexander. That was it, right? Mr. Ostendorff. Caused by a very significant tsunami resulting from the earthquake. Senator Alexander. But the only problem---- Senator Feinstein. Caused by siting them so close together, you know, where they were sited. Senator Alexander. But the bottom line is the only problem you need to solve is you need water to cool the reactor, and you need the power to pump the water. And I was at Watts Bar 2, which is being opened in Tennessee, and they are taking action based upon the rules that you have provided. They have got a variety of ways to have power to pump the water in the event of almost anything, and I do not think there is a terrorist anywhere that could get into that building that they have got that houses those redundant steps. So based on what I have seen so far, at least at that site, and what I have reviewed, you are taking steps to learn even from the Fukushima incident. You are focused on trying to make sure that all of our sites, you have got power to pump the water to cool the reactors. Is that correct? Mr. Ostendorff. Yes, sir, and 3 years ago, and Commissioner Svinicki joined me in this when we were working together because other commissioners had departed. But basically in early 2012, we approved orders to require mitigating strategies to deal exactly with the issues you are talking about: additional cables to run power, additional pumps, portable diesel generators, portable pumps, other ways of providing makeup water. WATTS BAR II Senator Alexander. Now that I have wandered back to Tennessee a little bit, what is left to do before the Nuclear Regulatory Commission can approve the operating license in Watts Bar 2? Mr. Burns. Senator, we expect a report from our staff that would come this spring, April-May timeframe. I think the Tennessee Valley Authority has projected a June fuel load date. We would need to make a decision on the staff's final recommendation with respect to the licensing. Senator Alexander. But if the staff's final recommendation were positive, could the reactor start and power be generated during 2015? Mr. Burns. That is possible. That depends on their testing program, you know, their fuel loading and their testing program. And forgive me, Senator, I do not recall exactly what TVA's, you know, planning schedule is at, but I think it is towards the end of 2015. Senator Alexander. Do you have sufficient resources at the Commission to complete the licensing activities for Watts Bar II this year? Mr. Burns. Yes, we do. COLLEGIALITY AT THE NUCLEAR REGULATORY COMMISSION Senator Alexander. I have one last question. I used to be on another committee, which was the Energy and Public Works Committee. That was the last time I saw the whole Commission at once. Two of you were there, Commissioner Ostendorff, Commissioner Svinicki. It was a very unusual hearing because at the time, collegiality was not a word that was being used at the Nuclear Regulatory Commission. There was an enormous lack of it. Let me ask the two of you since you have been there for a while. What about collegiality at the Nuclear Regulatory Commission? We were concerned in the Senate a few years ago that the absence of that was causing operational problems. What is it like today? Mr. Ostendorff. I would add, Senator, that we had a very challenging hearing before unit colleagues in December of 2011. I would say that once we had a collegiality issue that was related to, from my personal view, to one individual who is no longer on the Commission. When that individual--when Allison Macfarlane came in as chairman in July of 2012, those issues went away. And I would say since that time period we have had an extraordinarily positive collegial relationship amongst us, and there is not any issues at all. Senator Alexander. Commissioner Svinicki, what do you think? Ms. Svinicki. Well, I would note much as we have seen a demonstration from the dais today that there is collegiality of a body, and then there is collegiality between individual members, I would say that even in some of the difficult periods on this Commission, there has been tremendous one-on-one collegiality. And I think the proof of that is in the fact that the Commission's work and the Agency's work, I think, did not suffer, and our important mission was always paramount amongst the Commission. And I think I credit also the Agency staff for not being distracted by issues that were occurring at the Agency level. At no time did I feel that our mission of protecting public health and safety was in any way compromised, but it is wonderful to have the colleagues that I have around me today. Thank you. Senator Alexander. Well, thank you. And, Mr. Chairman, I would say that when the Senate functions, which it occasionally does, it does so because of collegiality such as that exists between the Senator from California and me. It makes life a lot easier for everybody. And your functioning is essentially important to this country. I welcome you as chairman. Your background in France really should provide you with a good perspective of how that country operates nuclear power and lessons we might learn from there. And just as one Senator, I want to help create an environment in which you can succeed. I would like to encourage you to proceed with your review of the cumulatively piling up of regulations without any embarrassment because it happens to every single agency, and there should be a disciplined approach toward doing that. I hope that you will take a look at the importance to this country of the license extensions for reactors that want to go from 60 to 80 years. That is the easiest, least expensive, most important way to get carbon-free electricity from carbon-free emissions, at least during this bridge period of time while we decide what else we need to do. And I think it is appropriate that you think about reducing your budget since the large number of applications that might have been expected a few years ago is less than expected. I hope you will continue to be open to the small reactor application when it comes. And I think Senator Feinstein, I can speak for her on this I know. I am especially interested in the application from West Texas or from anywhere else like that because since--if you approve the application, that repository can go into operation and begin to receive used fuel from sites around the country. And if there were one or two of those, that could happen even before our pilot project passes and becomes law. If it does become law, which we hope it does, we hope you will help us implement it as rapidly as we can because we both want nuclear waste property stored in this country as we know you do. ADDITIONAL COMMITTEE QUESTIONS Senator Feinstein, do you have anything else you would like to add? Senator Feinstein. I do not, except thank you, lady and gentlemen, for being so game and answering these questions, and I hope you accept it as a positive challenge. So thank you very much for being here. [The following questions were not asked at the hearing, but were submitted to the Department for response subsequent to the hearing:] Questions Submitted to Stephen G. Burns Questions Submitted by Senator James Lankford Question. The rules governing the Commission allowed for a former Chairman to keep his fellow commissioners poorly informed and pursue a personal agenda without ever, technically, breaking laws or procedures. What has the NRC done, if anything, to prevent such an abuse in the future? Answer. The existing laws governing the Commission provide a framework for effective agency governance by a collegial Commission. Section 201 of the Energy Reorganization Act of 1974 provides that each member of the Commission shall have full access to all information related to the performance of his or her duties and responsibilities. Further, Section 2(c) of the Reorganization Plan No. 1 of 1980 provides that the Chairman is responsible ``for insuring that the Commission is fully and currently informed about matters within its functions.'' The Commission's internal procedures have been updated in recent years and set forth the procedures governing the conduct of business by the Commission consistent with these legal requirements. The specific procedures may be changed or waived by a majority of the Commission, and questions regarding implementation and interpretation are decided by the Commission as a collegial body, consistent with existing law. The internal procedures are periodically reviewed by the Commission and approved by majority vote. Question. Senator Vitter and Representative Terry have proposed codifying organizational operation procedures for the Commission, which include explicitly making the Chairman responsible for keeping the other Commissioners fully informed ``about matters within the functions of the Commission''. If a majority of the other Commissioners determine the Chairman has not been acting appropriately, this legislation would provide a way to report that and allow Congress to evaluate whether a change in leadership is needed. Would such a policy safeguard against future abuses? If this type of policy is not needed, how can the American public and the regulated community be assured that one member of the Commission is not legally able to drive the agenda without informed consent of the other Commissioners? Answer. As discussed above, the law currently requires the Chairman and the Executive Director for Operations, through the Chairman, to keep the Commissioners fully and currently informed about matters within their functions. Further, each Commissioner is required to have full access to all information relating to the performance of his or her duties. In this context, the Chairman is also ``governed by the general policies of the Commission, and by such regulatory decisions, findings, and determinations . . . as the Commission may by law, including this Plan, be authorized to make.'' The internal Commission procedures reflect these provisions. In addition, the Consolidated and Further Continuing Appropriations Act, 2015 (Public Law 113-235) established a requirement that the NRC Chairman inform the Commission and the Congress should he or she begin performing functions under the emergency authority provided for in section 3 of Reorganization Plan No. 1 of 1980. Question. With regard to the power reactor fees, the NRC takes the amount of fees to be recovered and simply divides by the number of reactors. In light of the reductions to the number of reactors--four have gone offline in the past 2 years, with another one slated to go offline soon--has the Commission revisited how they collect fees? Answer. The agency has considered how fees are assessed to reactor licensees. The NRC calculates the 10 CFR Part 171 annual fee based upon the requirement of the Omnibus Budget Reconciliation Act of 1990 (OBRA- 90), to fairly and equitably collect fees in order to recover approximately 90 percent of the agency's budget authority. The budgeted resources for power reactors constitute approximately 86 percent of the NRC's overall recoverable fee budget. The current methodology is used, in part, to provide industry with a predictable annual fee cost while also implementing the agency's responsibility to equitably assess fees. Additionally, the NRC publishes its proposed fee rule annually, taking public comment before issuing its final rule. Question. Is the Commission concerned that with the competition of other relatively cheap power sources, such as natural gas, this rather arbitrary increase in fees is encouraging nuclear plants to close sooner than they otherwise would? Answer. While the Commission is aware of the economic pressures resulting from competition in the energy sector generally, the Commission's role as a regulator is to ensure that the Nation's nuclear plants operate safely, consistent with the agency's health and safety mission. The NRC formulates its budget based on estimates of the activities that will be required to license and regulate safe and secure use of nuclear materials during the year of execution. The agency is concerned with carrying out its mission in the most efficient way possible and is continually engaged in identifying how to fulfill that mission with the appropriate level of resources. ______ Questions Submitted by Senator Jeanne Shaheen Question. As you know, the nuclear plant operator, NextEra, has applied to renew its operating license for the Seabrook Station in Seabrook, New Hampshire for an additional 20 years. Their current license expires in 2030, which means if approved, Seabrook will have a license to operate until 2050. Seabrook Station has, however, encountered concrete degradation issues due to alkali--silica reaction (ASR). Throughout the re- application process NextEra has taken actions to understand and monitor the extent of the plant's concrete degradation; however, I have heard concerns from constituents about the testing being conducted to test the long-term impacts of ASR, and I want to make certain it is being conducted in a way that ensures precise results about the plant's structural integrity. For example, it is my understanding that NextEra is using a combined crack indexing (CCI) measurement as the primary criterion for assessing the progression of ASR. However, I have also heard that steel reinforcement bars embedded in the building structure may reduce the growth in the width of the cracks in the concrete. Moreover, in the August 9, 2013 inspection report, NRC noted inconsistencies found in tests at Seabrook between NextEra's CCI results and other measures of concrete expansion due to ASR. Given these variances in measurement, can you please explain NRC's determination process to allow CCI testing as opposed to any other, generally accepted methods of assessment to quantify the progression of ASR? Answer. In its license renewal application for Seabrook Station, NextEra has proposed combined crack indexing as a method for assessing the progression of alkali-silica reaction. However, the NRC is still reviewing this proposal. As part of the ongoing review, the staff issued requests for additional information noting that it is not clear how combined crack indexing accurately correlates cracking due to alkali-silica reaction to structural degradation of affected structures. The requests for additional information ask the licensee to ``(1) demonstrate the adequacy of the parameters [cracking] proposed to be monitored or inspected by the program to manage the effects of aging due to alkali- silica reaction; and (2) clearly establish the link between the parameters that will be monitored and how monitoring these parameters will ensure adequate aging management such that the intended function will be maintained during the period of extended operation.'' The licensee is currently expected to respond to these requests in June 2015. The staff will evaluate the responses against guidance and industry standards to ensure that the proposed monitoring program is adequate to detect alkali-silica reaction and to properly correlate alkali-silica reaction progression with structural degradation. Question. I also understand that NextEra has commissioned replica studies at the University of Texas in order to determine the long-term effects of ASR on the power plant walls. However, I have heard concerns that the concrete materials used in the study do not precisely mimic the environmental conditions of the Seacoast region or the materials used to build the Seabrook plant. Can you describe the Commission's involvement in the replica studies and what the NRC is doing to ensure the efficacy of the testing? Answer. The NRC staff continues to monitor NextEra's testing activities at the University of Texas as part of our oversight of Seabrook Station, including conducting multiple inspections of these activities. The inspections focused on how information gathered from NextEra's test program is considered for applicability to the current conclusions regarding alkali-silica reaction-affected structures at Seabrook Station. While NextEra chose to conduct a large-scale testing program at the University of Texas as a possible basis for developing future actions to address the alkali-silica reaction issue, the NRC has neither directed nor approved this test program. If the licensee determines that future test results provide a technical basis to resolve this non-conforming condition, the NRC would expect NextEra to provide the results to the agency for our review and approval. Any submittal by NextEra would need to demonstrate that the test program and results accurately reflect conditions at the Seabrook Station. ______ Question Submitted to William C. Ostendorff Question Submitted by Senator James Lankford Question. Has anything materially changed regarding the volume and quality of communication between the Chairman's office and your own since 2010? Answer. Yes. Since Chairman Macfarlane's arrival in July 2012, the challenges we had as a Commission with the previous Chairman have gone away. We are operating in an independent, impartial, collegial, and professional manner and in accordance with the Commission's legal obligations. This environment has continued with the arrival of Commissioner Baran and Chairman Burns. SUBCOMMITTEE RECESS Senator Alexander. Thank you. The hearing is adjourned. Mr. Burns. Thank you. [Whereupon, at 4:24 p.m., Wednesday, March 4, the subcommittee was recessed, to reconvene subject to the call of the Chair.]