Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- THE STATE OF POSITIVE TRAIN CONTROL IMPLEMENTATION IN THE UNITED STATES [House Hearing, 114 Congress] [From the U.S. Government Publishing Office] THE STATE OF POSITIVE TRAIN CONTROL IMPLEMENTATION IN THE UNITED STATES ======================================================================= (114-23) HEARING BEFORE THE SUBCOMMITTEE ON RAILROADS, PIPELINES, AND HAZARDOUS MATERIALS OF THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE HOUSE OF REPRESENTATIVES ONE HUNDRED FOURTEENTH CONGRESS FIRST SESSION __________ JUNE 24, 2015 __________ Printed for the use of the Committee on Transportation and Infrastructure [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Available online at: http://www.gpo.gov/fdsys/browse/ committee.action?chamber=house&committee=transportation ___________ U.S. GOVERNMENT PUBLISHING OFFICE 95-230 PDF WASHINGTON : 2015 _________________________________________________________________________________ For sale by the Superintendent of Documents, U.S. Government Publishing Office, Internet:bookstore.gpo.gov. Phone:toll free (866)512-1800;DC area (202)512-1800 Fax:(202) 512-2104 Mail:Stop IDCC,Washington,DC 20402-001 COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE BILL SHUSTER, Pennsylvania, Chairman DON YOUNG, Alaska PETER A. DeFAZIO, Oregon JOHN J. DUNCAN, Jr., Tennessee, ELEANOR HOLMES NORTON, District of Vice Chair Columbia JOHN L. MICA, Florida JERROLD NADLER, New York FRANK A. LoBIONDO, New Jersey CORRINE BROWN, Florida SAM GRAVES, Missouri EDDIE BERNICE JOHNSON, Texas CANDICE S. MILLER, Michigan ELIJAH E. CUMMINGS, Maryland DUNCAN HUNTER, California RICK LARSEN, Washington ERIC A. ``RICK'' CRAWFORD, Arkansas MICHAEL E. CAPUANO, Massachusetts LOU BARLETTA, Pennsylvania GRACE F. NAPOLITANO, California BLAKE FARENTHOLD, Texas DANIEL LIPINSKI, Illinois BOB GIBBS, Ohio STEVE COHEN, Tennessee RICHARD L. HANNA, New York ALBIO SIRES, New Jersey DANIEL WEBSTER, Florida DONNA F. EDWARDS, Maryland JEFF DENHAM, California JOHN GARAMENDI, California REID J. RIBBLE, Wisconsin ANDRE CARSON, Indiana THOMAS MASSIE, Kentucky JANICE HAHN, California TOM RICE, South Carolina RICHARD M. NOLAN, Minnesota MARK MEADOWS, North Carolina ANN KIRKPATRICK, Arizona SCOTT PERRY, Pennsylvania DINA TITUS, Nevada RODNEY DAVIS, Illinois SEAN PATRICK MALONEY, New York MARK SANFORD, South Carolina ELIZABETH H. ESTY, Connecticut ROB WOODALL, Georgia LOIS FRANKEL, Florida TODD ROKITA, Indiana CHERI BUSTOS, Illinois JOHN KATKO, New York JARED HUFFMAN, California BRIAN BABIN, Texas JULIA BROWNLEY, California CRESENT HARDY, Nevada RYAN A. COSTELLO, Pennsylvania GARRET GRAVES, Louisiana MIMI WALTERS, California BARBARA COMSTOCK, Virginia CARLOS CURBELO, Florida DAVID ROUZER, North Carolina LEE M. ZELDIN, New York (ii) Subcommittee on Railroads, Pipelines, and Hazardous Materials JEFF DENHAM, California, Chairman JOHN J. DUNCAN, Jr., Tennessee MICHAEL E. CAPUANO, Massachusetts JOHN L. MICA, Florida CORRINE BROWN, Florida SAM GRAVES, Missouri DANIEL LIPINSKI, Illinois CANDICE S. MILLER, Michigan JERROLD NADLER, New York LOU BARLETTA, Pennsylvania ELIJAH E. CUMMINGS, Maryland BLAKE FARENTHOLD, Texas RICK LARSEN, Washington RICHARD L. HANNA, New York STEVE COHEN, Tennessee DANIEL WEBSTER, Florida ALBIO SIRES, New Jersey TOM RICE, South Carolina RICHARD M. NOLAN, Minnesota SCOTT PERRY, Pennsylvania ELIZABETH H. ESTY, Connecticut TODD ROKITA, Indiana GRACE F. NAPOLITANO, California JOHN KATKO, New York JANICE HAHN, California BRIAN BABIN, Texas PETER A. DeFAZIO, Oregon (Ex CRESENT HARDY, Nevada Officio) MIMI WALTERS, California LEE M. ZELDIN, New York BILL SHUSTER, Pennsylvania (Ex Officio) (iii) CONTENTS Page Summary of Subject Matter........................................ vi WITNESSES Sarah Feinberg, Acting Administrator, Federal Railroad Administration: Testimony.................................................... 5 Prepared statement........................................... 45 Charles Mathias, Associate Chief, Wireless Telecommunications Bureau, U.S. Federal Communications Commission: Testimony.................................................... 5 Prepared statement........................................... 51 Frank Lonegro, Vice President of Service Design, CSX Transportation, Inc.: Testimony.................................................... 5 Prepared statement, including white paper from Association of American Railroads entitled ``Positive Train Control Implementation Challenges,'' June 22, 2015................. 56 Donald Orseno, Executive Director and Chief Executive Officer, Metra Commuter Railroad: Testimony.................................................... 5 Prepared statement........................................... 95 Russell Kerwin, Deputy Project Manager of Positive Train Control, Southern California Regional Rail Authority (Metrolink): Testimony.................................................... 5 Prepared statement........................................... 100 SUBMISSIONS FOR THE RECORD Report, ``San Francisco/Silicon Valley Corridor Investment Strategy for High-Speed Rail,'' June 2009, by San Francisco County Transportation Authority, et al., submitted by Hon. Jeff Denham, a Representative in Congress from the State of California..................................................... 108 ADDITIONS TO THE RECORD Letter of June 23, 2015, from Eric Garcetti, mayor of the city of Los Angeles, to Chairman Jeff Denham and Ranking Member Michael E. Capuano, Subcommittee on Railroads, Pipelines, and Hazardous Materials...................................................... 136 [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] THE STATE OF POSITIVE TRAIN CONTROL IMPLEMENTATION IN THE UNITED STATES ---------- WEDNESDAY, JUNE 24, 2015 House of Representatives, Subcommittee on Railroads, Pipelines, and Hazardous Materials, Committee on Transportation and Infrastructure, Washington, DC. The subcommittee met, pursuant to call, at 10 a.m., in room 2167, Rayburn House Office Building, Hon. Jeff Denham (Chairman of the subcommittee) presiding. Mr. Denham. The subcommittee will come to order. Good morning. Welcome to the Subcommittee on Railroads, Pipelines, and Hazardous Materials. Our hearing today will focus on the implementation of PTC, Positive Train Control, in the United States, one of the most complex and costly safety mandates ever taken by the railroad industry. Positive train control is a radio or GPS-based [Global Positioning System-based] system designed to automatically control trains to follow speed limits and avoid train-to-train collisions. Following the deadly commuter train crash in southern California, Congress mandated the installation of PTC on lines where certain hazardous materials are carried and any line on which passenger or commuter rail services operate. The recent tragic Amtrak crash in Philadelphia has reminded us that, while these accidents are rare, they can happen, and PTC will make our rail network safer. This mandate was included in the Rail Safety Improvement Act of 2008, and Congress set an implementation deadline of December 31 of this year. From the beginning, the PTC mandate was going to be a daunting undertaking to consider. What completely implemented PTC will require is 38,000 wayside interfaces, 18,000 locomotives to be upgraded, and 12,000 signals will need to be replaced. While similar systems exist in Europe and on some portions of Amtrak's Northeast Corridor, PTC has never been implemented on such a scale and has never required such a high level of interoperability. Since the 2008 mandate was enacted, freight, passenger, and commuter railroads have spent the last 7 years working to implement PTC. According to the Association of American Railroads, freight rail has spent $5.7 billion to date on PTC and is expected to spend a total of $9 billion to fully implement it. The American Public Transportation Association has estimated that commuter and passenger railroads will have to spend nearly $3.5 billion on PTC. In addition to the sheer cost and complexities of the system, there have been many unexpected delays. The process of approving PTC poles along railroad right-of-way was delayed significantly when the Federal Communications Commission mandated that each pole go through an extensive review process. The FCC eventually created a more streamlined process for those approvals, and we will hear from them today about how it is working. Commuter and passenger railroads have also struggled to buy the necessary radio spectrum for PTC, especially in our dense metropolitan areas. Today we will discuss how long it will take to get PTC implemented across the country and what it will take to meet this current deadline. In closing, I look forward to hearing from our witnesses regarding these issues. I would now like to recognize Ranking Member Michael Capuano from Massachusetts for any opening statement he may have. Mr. Capuano. Thank you, Mr. Chairman. I want to welcome the panel. I am looking forward to your testimony and the discussion we have. I think the chairman has said pretty much everything there is to say about PTC from our end of it. Honestly, this is long overdue, in my estimation. And, honestly, I would like to find out--we all know where we are today. Tell me how we get to where we want to implement as quickly as we can because that is what America wants, that is what I want. And if you think you need Federal assistance, please say so. Be clear. I say that because we have our own differences of opinion in the House and the Senate as to whether we should be putting funds up or not. And if you think we should, you should say so. I would like to hear that. With that, I yield back. And I look forward to the testimony. Mr. Denham. I now call on the full committee chairman, Mr. Shuster. Mr. Shuster. Thank you, Chairman Denham, for holding this hearing today. I think it is important to start off by saying that the number-one top priority of this committee and the Department of Transportation is safety. In general, rail safety trends have gone in the right direction over the past years. However, the terrible Amtrak incident in Philadelphia last month showed us that we should always remain focused on our efforts to improve rail safety. As Chairman Denham said--and I believe it is worth repeating--Positive Train Control is one of the most ambitious, complex, and costly safety enhancements the railroad industry has ever undertaken. I was the ranking member of the subcommittee in 2008 when Congress enacted the PTC mandate. We knew the mandate would be challenging, but we hoped that railroads would be able to meet that deadline 7 years into the future. Unfortunately, we know today that that will not be the case. With a few exceptions, most railroads, including the largest Class I freight railroads, will not meet December's deadline. This has happened for a few reasons. Technology has been more complicated especially to ensure interoperability between the railroads. Spectrum has been harder to acquire particularly for commuter railroads that serve in densely populated metro areas. And, finally, the Federal Communications Commission's approval process for new telecommunication poles was not set up to handle the tens of thousands of poles needed to deploy PTC. So I am looking forward to hearing from you today, the witnesses, where the PTC implementation stands, and your testimony will help us to consider how we move forward to deal with the mandate in an appropriate fashion. With that, I yield back. Mr. Denham. And I will call on Mr. DeFazio for any opening statement he may have. Mr. DeFazio. Thank you, Mr. Chairman. Are you sure your microphone is working? I couldn't hear you. Jeff doesn't need a microphone, the chairman. Thank you, Mr. Chairman. Thanks for holding the hearing. We are going to focus on the extension of the deadline today. It is clear that the Class I's aren't going to be able to meet the deadline. Some passenger rail is not going to be able to meet the deadline. But this was not a knee-jerk reaction to Chatsworth, and this has been something that has been a very, very long time in the making. It was 45 years since NTSB [National Transportation Safety Board] first recommended the idea of Positive Train Control. And they have had it on their most wanted list for many years. It was temporarily removed after the passage of the legislation in 2008, but it was put back on when it was clear that the deadlines weren't going to be met. Just to revisit why we did this, Chatsworth actually took place right before the House and Senate had acted. And it was a compilation of accidents over the years, including, in particular, one in 2005 that was a release of chlorine gas. Five thousand people were evacuated. Eight people died. Five hundred fifty-four were injured. And the NTSB at the time said they had never seen anything like it, this was caused by human error--improper alignment of a switch--and, had PTC been installed, it wouldn't have happened. And then they went back over a litany; this again is, at the time of passage: 145 accidents, 296 fatalities, and 6,700 injuries over the past 45 years since their first recommendation would have been prevented with PTC. So we passed it. Chatsworth took place, actually, right before House passage, which led the Senate to change its position. They started out, I believe, with 2018 as the deadline, and they were pushing, at the behest of the two California senators, 2014. We compromised on 2015 as something that could be achievable. Unfortunately, we aren't going to meet that deadline in many cases. Congress was helping some of the passenger rail folks with grants. The President has asked for $1 billion. We got one $50 million grant. But, since 2010, nothing has been allocated by Congress. Now, for freight, it is a heavy expense, but at least it is a business expense. For nonprofit passenger rail, you know, it is an expense which is hard to pass on to the customers, but that is pretty much what they have to do, or the local operating jurisdiction. So grants could be helpful, I believe, and we hopefully will hear more about that today. And yet, our colleagues on the Appropriations Committee--it doesn't quite take the same view of these issues as we do--we are a little more enlightened on this committee--actually cut Amtrak's capital grants by $290 million the day after the accident. And among other things that those grants fund is Positive Train Control in addition to other critical infrastructure, which is likely to cause other accidents, derailments, bridge collapse, tunnel collapse. The system is decrepit, needs an incredible amount of investment. Very, very shortsighted. So I have observed that we got a man to the moon after President Kennedy issued the challenge. It only took 8 years, and that was 1 year after the NTSB first asked for Positive Train Control. I know we can do it. We just need to hear today what impediments remain and what can we do to expedite the installation across all of the system in the critical categories. We defined toxic-by-inhalation routes included in addition to the passenger and the other very heavily used routes. So I look forward to the testimony. And, if necessary, I would urge the committee to take further action if we hear testimony today that says we need to take steps to get this done. Mr. Denham. Thank you, Mr. DeFazio. I would now like to welcome our panel of witnesses. First, Ms. Sarah Feinberg, Acting Administrator of the Federal Railroad Administration, FRA. And I want to pay a special thanks. You have continued to come before this committee. There have obviously been a number of big issues that this committee is addressing, and you have not wavered as far as coming before us and answering some very difficult questions. So we thank you for being here again with us this morning. Also, Mr. Charles Mathias, Associate Chief, Wireless Telecommunications Bureau, Federal Communications Commission, FCC; Mr. Frank Lonegro, vice president of service design, CSX Transportation; Mr. Donald Orseno, executive director and chief executive officer of Metra Commuter Railroad; and Russell Kerwin, deputy project manager of Positive Train Control, Southern California Regional Rail Authority (Metrolink). I ask unanimous consent that our witnesses' full statements be included in the record. Without objection, so ordered. Since your written testimony has been made part of the record, the subcommittee would request that you keep your statements limited to 5 minutes. With that, Ms. Feinberg, you are recognized. TESTIMONY OF SARAH FEINBERG, ACTING ADMINISTRATOR, FEDERAL RAILROAD ADMINISTRATION; CHARLES MATHIAS, ASSOCIATE CHIEF, WIRELESS TELECOMMUNICATIONS BUREAU, U.S. FEDERAL COMMUNICATIONS COMMISSION; FRANK LONEGRO, VICE PRESIDENT OF SERVICE DESIGN, CSX TRANSPORTATION, INC.; DONALD ORSENO, EXECUTIVE DIRECTOR AND CHIEF EXECUTIVE OFFICER, METRA COMMUTER RAILROAD; AND RUSSELL KERWIN, DEPUTY PROJECT MANAGER OF POSITIVE TRAIN CONTROL, SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK) Ms. Feinberg. Thank you. Chairman Denham, Ranking Member Capuano, Chairman Shuster, Ranking Member DeFazio, and members of the subcommittee, thank you for the opportunity to appear before you to discuss the implementation of Positive Train Control in the United States. PTC technology is arguably the single most important railroad safety development in more than a century. The technology is not new, though. Elements of PTC have existed since the early 20th century. In fact, regulators and safety advocates have been calling on the rail industry to implement some form of PTC for many decades, the NTSB, since 1969. The Rail Safety Improvement Act of 2008 required the current functionality of Positive Train Control to be fully implemented by December 31, 2015. PTC is required on Class I railroad main lines where any poisonous or toxic-by-inhalation hazardous materials are transported. It is also required on any railroad's main line where regularly scheduled intercity or commuter rail passenger service is conducted. Following passage of the PTC mandate in 2008, railroads submitted their PTC implementation plans in 2010. These plans laid out a path forward that would allow each railroad to meet the deadline. As I have stated to this committee before, safety is the Federal Railroad Administration's top priority. The rail system is not as safe as it could be without the full implementation of PTC. A safe rail system requires the full implementation of Positive Train Control, and that is why FRA will enforce the December 31, 2015, deadline for implementation just as Congress has mandated. For several years, FRA has been sounding the alarm that most railroads have not made sufficient progress in implementing PTC. In the 7 years since passage of the PTC mandate, FRA has dedicated significant resources and worked closely with the railroad industry in order to assist and guide implementation. We have hired staff to assist and oversee implementation. We have worked directly with the FCC to resolve spectrum issues and improve the approval process related to PTC communication towers. We have built a PTC system test bed at Transportation Technology Center in Pueblo, Colorado. We have provided approximately $650 million in grant funds to support PTC implementation. This includes American Recovery and Reinvestment Act grants as well as Amtrak grants and other annual appropriations. We have requested $825 million to assist commuter railroads, and we have issued a $967 million loan through the RRIF [Railroad Rehabilitation and Improvement Financing] program to New York Metropolitan Transportation Authority, the Nation's largest commuter railroad. I have also established a new PTC task force team within the FRA. That team is aggressively managing and monitoring each individual railroad's progress, tracking data, ensuring we have the most accurate and up-to-date information, and reporting in to me multiple times per week. This team is working in close collaboration with the many individuals at FRA based here in Washington and in offices around the country already working on this challenge. But, unfortunately, despite FRA's financial support, technical assistance, and warnings, many railroads have stated publicly that they will still not meet the December 31 deadline. Recently, FRA received updated information about PTC implementation from 32 of the 38 railroads that we are currently tracking for enforcement purposes. Initial analysis indicates that Class I railroads have completed or partially completed installations of approximately half of the locomotives that require PTC equipment, deployed approximately half of the wayside units, replaced approximately half of signals that need replacement, and completed most of the required mapping for PTC tracks. By the end of the year, AAR [Association of American Railroads] projects that 39 percent of locomotives will be equipped, 76 percent of wayside interface units will be installed, 67 percent of base station radios will be installed, and 34 percent of required employees will be trained. According to APTA [American Public Transportation Association], 29 percent of commuter railroads are targeting to complete installation of PTC equipment by the end of 2015. Full implementation of PTC for commuter lines is projected by 2020. FRA continues our work to finalize an enforcement strategy for those railroads that will miss the deadline. As with any regulatory enforcement posture, our ultimate goal is to bring all railroads into compliance as quickly and as safely as possible. Starting on January 1, FRA will impose penalties on railroads that have not fully implemented PTC. Fines will be based on FRA's PTC penalty guidelines, which establish different penalties depending on the violation. The penalties may be assessed per violation per day. The total amount of penalty each railroad faces depends upon the amount of implementation progress the railroad has made. FRA is also planning for what will come after the January 1 deadline. In both 2014 and 2015, the department and FRA asked Congress to provide FRA with additional authorities that would address the safety gap that will exist on many railroads between January 1, 2016, and each railroad's full PTC implementation. These additional authorities would provide FRA with the ability to review, approve, and require interim safety measures for individual railroads that may fail to meet the PTC deadline. These interim safety requirements would be to ensure railroads are forced to raise the bar on safety if they miss the deadline, but will not and cannot be used to replace or extend the deadline. In conclusion, I want to extend my thanks and appreciation to this committee for its attention and focus on achieving implementation as efficiently and quickly as possible. We look forward to working with you. And I am happy to respond to your questions. Thank you. Mr. Denham. Thank you, Ms. Feinberg. Mr. Mathias, you may proceed. Mr. Mathias. Thank you. Thank you, Chairman Denham, Ranking Member Capuano, Chairman Shuster, Ranking Member DeFazio, and distinguished members of this subcommittee. Thank you for inviting me to testify here today. Mr. Denham. Can I ask you to pull your microphone a little closer. Mr. Mathias. Promoting the safety of life and property through the use of wire and radio communication is a top FCC priority. As the Nation's communications agency, the FCC helps coordinate spectrum acquisition by freight and passenger railroads. We also manage the statutorily required historic preservation and environmental reviews of the poles, antennas, and associated infrastructure used to support Positive Train Control, or PTC, systems. Because the FCC was given no mandate to set aside spectrum for PTC purposes, the FCC has been working closely with the railroads since 2008 to identify available spectrum on the secondary market. The FCC has acted swiftly upon request to approve multiple spectrum transactions, including the freight railroads' acquisition of spectrum nationwide, Amtrak's acquisition of spectrum in the Northeast Corridor, as well as requested waivers to better enable and test PTC deployment. To be clear, the Commission plays no role in designing or assessing the railroad's choice of PTC technology. The railroads are responsible for PTC design and deployment. The country's major freights have led the way in securing spectrum for PTC. Through private transactions, they acquired nationwide spectrum in the commercial 220- to 222-megahertz spectrum band just months before the act became law. These railroads quickly focused on utilizing this spectrum when the PTC mandate was established. When they did, the freight railroads effectively drove other railroads, including Amtrak and commuter rails, to spectrum in and around the 220-megahertz band for their PTC operations as well. For most of the country, this strategy appears to have been successful. The FCC has proactively facilitated and continues to facilitate freight and passenger railroads' successful acquisition and lease of spectrum on secondary markets. We have also granted the railroads extensive technical waivers, more transmitter power, for example, to facilitate the use of this spectrum for PTC purposes. Spectrum acquisition in the Northeast Corridor differs from the rest of the country because Amtrak and the freights are deploying two different PTC systems that were not from the outset engineered to be compatible in the same spectrum band. So unlike in a market such as Chicago, where the freight railroads tell us that 11 different railroads can share the same block of spectrum using a single PTC system, in the Northeast Corridor, the choice to deploy 2 systems requires 2 blocks of spectrum far enough apart to avoid interference. FCC staff will continue to work with Amtrak, the commuter rails that use the Amtrak system in the Northeast Corridor, and the freights to help identify solutions to these problems. PTC infrastructure deployments are also a priority. Federal environmental and historic preservation law requires the FCC to assess the potential impacts of agency ``undertakings,'' including potential impact on properties significant to tribal nations. To facilitate this process, in May 2014, the Advisory Council on Historic Preservation issued streamlined rules for future PTC pole deployments. Under this streamlined approach, the majority of proposed rules are exempt from historic preservation review. The Commission has the capacity to receive 1,400 exempt and nonexempt pole applications from the major freight railroads every 2 weeks. By the middle of June, the freight railroads could have submitted as many as 40,000 poles for review. In fact, the railroads have only submitted around 8,300 poles, or about 21 percent of our total capacity. Going forward, issues in the Northeast Corridor remain complex and pose significant challenges. We stand ready to work with Amtrak, the commuter rails, and the freight rails there and across the country to help them meet their evolving deployment needs. We appreciate this subcommittee's commitment and leadership on this issue and its efforts to ensure the successful deployment of PTC systems. The FCC is committed to working collaboratively with Congress, our Federal partners, and the railroads to get the job done. I look forward to answering any questions you may have. Thank you. Mr. Denham. Thank you, Mr. Mathias. I would now like to call on the representative from Florida, Ms. Brown, to introduce our next witness, Mr. Lonegro. Ms. Brown. Thank you, Mr. Chairman. I am pleased to introduce Mr. Frank Lonegro--and you can correct that name, Frank, when it is your time--who will be testifying today for CSX railroad located in my hometown of Jacksonville, Florida. Frank has worked for CSX since 2000, focused on technology issues, and has taken the lead for the Class I Positive Train Control initiative. CSX is an employer that plays a major strong role in the Jacksonville community. The company and its CEO, Michael Ward, have been a long advocate for veterans in Florida and throughout the United States. Let me just say that I am very proud of the Wounded Warrior program. They gave the first million dollars, and they have received 2 years in a row the top award from the President for over 33 percent of their employees are veterans. So, with that, I want to welcome Frank and the other panelists. And thank you for joining us today. Mr. Lonegro. Thank you, Member Brown. And, Mr. Chairman, Mr. Ranking Member, members of the committee, thank you for the opportunity to be here. I am Frank Lonegro, vice president of service design at CSX. And since the passage of the PTC mandate, I have been the project owner for PTC at CSX. I also chair the industry committee that is tasked with achieving PTC interoperability across 60,000 miles of railroad. Given the recent Amtrak tragedy and remembering all of those who have been impacted by PTC preventable accidents, I believe four issues are presented for resolution by this committee: Number 1, why are most railroads unable to meet PTC by 2015? Number 2, why are a few railroads able to make 2015 while the remainder cannot? Number 3, what happens if a PTC extension is not passed? Number 4, what is the path forward? Since PTC was mandated, accidents have happened that were PTC-preventable. A turnkey system did not exist in 2008 and had to be created by the rail industry. That task continues. As one of the many railroaders working on PTC every day, let me reflect briefly on accountability. I am ultimately responsible for PTC at CSX. And, unfortunately, it will not be completed by the deadline. This is not the result of lack of will or lack of commitment. To the contrary, CSX has provided people, allocated ample funding, and ensured executive support. We are hundreds of millions of dollars over budget, yet CSX has never hesitated to provide the required capital. With these ingredients of success, companies do not fail at delivering projects that are achievable from the outset. Congress shares in this responsibility. The 2015 PTC deadline was not grounded in fact. It was a political compromise reached after Chatsworth. Various constituencies in the House and Senate advocated for 2012, 2014, and 2018. The compromise halfway between those extremes gave us 2015, a political date, not necessarily an achievable date. Other responsible stakeholders are FRA, FCC, and the supplier community. The industry has thousands working on PTC. The FRA has about a dozen. The PTC final rule was published in August of 2014, hundreds of pages of regulations, 6 years after the mandate. FRA is requiring significant documentation, validation, safety assessments, and fault analyses. All are geared toward deploying a safe and reliable system, but also require a tremendous amount of time and effort on both sides. No one anticipated the regulatory requirements relating to PTC towers. When FCC realized they would have to clear 20,000 towers, they imposed a moratorium to develop a better process. That moratorium impacted the PTC timeline by over a year. The resulting review process appears to be working. FCC has also recently approved the antenna height waiver, J Block swap, and Canadian border agreement. While each of these is complicated, we do need a greater emphasis on speed, given that much work remains, especially solving the PTC radio interference in the Northeast. Lastly, given the complexity of the technical task, our supplier partners have yet to hit a major deadline or deliver software that is free from defects. In the beginning, I think we all believed PTC was further along. A few railroads have indicated that they will make 2015, most notably, Metrolink in the L.A. Basin and Amtrak in the Northeast Corridor. Importantly, both railroads have previously promised completion in 2012. I remind us of that not to denigrate their great work, but to illustrate the challenges of PTC even for small deployments. Successful completion in 2015 will be a testament to 7 years of hard work by those railroads and great leadership by PTC veterans like Darrell Maxey and Keith Holt. There are two main reasons why some railroads will make 2015 while others will not. The first is scale. The Amtrak and Metrolink deployments are very similar in size, 100 to 150 engines and 300 to 500 miles of railroad. In contrast, deployment at CSX involves 3,900 engines and 11,000 miles of railroad, about 25 times larger. More engines and more miles means more time. The second is the state of the legacy infrastructure. PTC is brandnew technology that does not interface with legacy signaling and dispatching systems. At CSX, PTC is requiring us to completely replace 7,500 miles of wayside signals, geospatially map 21,000 rail miles, and enhance our dispatching system to a precision of one ten-thousandth of a mile, all while delivering the Nation's freight and passengers. Once we are finished, it will no longer be our fathers' railroad. If no extension is passed, the railroads have a serious legal dilemma. Does the PTC mandate make it illegal to transport TIH/PIH [toxic by inhalation/poisonous by inhalation] commodities irrespective of our common carrier obligation? Similarly, we are also required to allow commuter and interstate passenger agencies to run on our lines. Which law should we violate? The passenger requirement or the PTC mandate? If we cannot transport TIH/PIH commodities or passengers by rail, the outcome is not good for the American people or the American economy. If we continue to haul the commodities and the passengers which trigger the PTC mandate, we will be in violation of the law and run the risk of regulatory enforcement, potential uncapped liability, and questionable insurance coverage, an untenable situation for CSX and its employees and shareholders. The need for an extension is clear. The question is how to fashion the extension that recognizes the enormity of PTC, rewards railroads that will make 2015, hold the remaining railroads accountable to complete the project expeditiously, and provide legal certainty for shippers, passengers, and railroads alike. We look forward to working with you to forge that path ahead. Thank you. Mr. Denham. Thank you, Mr. Lonegro. Mr. Orseno, we have met several times already. But if I have butchered your last name as I have twice already and been corrected by colleagues, please let us know. Mr. Orseno. OK. Thank you. Thank you, Mr. Denham, and members of this subcommittee. I would also like to thank Congressman Lipinski. You are our representative on this subcommittee, and we appreciate your championship for transportation. I am Don Orseno, executive director/CEO of Metra as well as the chair of the APTA Commuter Rail Committee. I was lucky enough early in my career to be a card-carrying engineer that I was very proud of. I operate trains every single day. It is an enormous responsibility that I didn't take lightly, as no engineer does. A few years ago I was appointed executive director/CEO of Metra, and I took those experiences with me early in my career to my position now. Let me be clear. Safety is paramount at Metra and, to that end, we are committed to implementing PTC. But let me also be clear on another item. It is not without challenges. Metra is one of the largest commuter rail systems in the country. Last year we provided over 83.4 million passenger trips. We primarily serve customers commuting from the suburbs to work in Chicago. We operate 11 lines with 241 stations. Four of those lines are owned and operated by the UP [Union Pacific Railroad] and the BNSF [Burlington Northern Santa Fe Railway]. Chicago is the Nation's busiest rail hub and the most complex, with six of the seven Class I railroads operating throughout the network. Coordination of PTC implementation must include all of these railroads. The BN and UP were further along with PTC installation than us. So we directed all of our resources to put equipment on the trains that will be operating on the BN and the UP so we could be compliant when they were. Those lines, once they are operational, will be--40 percent of Metra's fleet will be PTC-compliant, covering 50 percent of our passengers. The BN equipment installation will be complete September of 2015, with the UP following closely behind it, the second quarter of 2016. We have also made significant progress on Metra-owned lines. To date, we hired a system integration team, Parsons Transportation Group, awarded contracts to engineering firms to design signal system upgrades, and continue to hire the necessary staff, including leadership positions in the field installation crews. Even though we have made substantial progress, challenges still remain: the limited number of signal design systems, spectrum availability. In Chicago, it is undetermined if we have enough spectrum for PTC needs in the region. We won't know that answer until the spectrum study is completed. Continuous verification and validation is part of the testing process to test the reliability and accuracy of PTC. So far, only testing of individual segments has taken place. The FRA must also review and certify the railroad's plans. Interoperability is a huge challenge for Chicago, given the complexity and the integration of the system. Metra's costs are approximately $350 million. APTA estimates approximately $3.5 billion for all commuter railroads. We receive $150 million per year in Federal formula funds. These are the same sources of funds that are used for other safety-related critical infrastructure projects, such as bridges, tracks, and rolling stock. Metra has allocated $133 million over the last 2 years for PTC between our State and Federal partners. The Metra board approved a $2.4 billion modernization plan last year, which included $275 million to complete PTC, which is a combination of borrowing and fare increases. The balance would need to come from our State and Federal partners, which is uncertain at this time. There is also a significant operational and maintenance cost. These are estimated to be $15 million annually for Metra. Given these substantial challenges, it is no surprise that no commuter rail system has fully implemented PTC today. Metra is estimating 2019 for full implementation. Metra, along with APTA, is asking Congress to provide FRA the authority to grant individual waivers for the deadline as long as the agencies show a good-faith effort as determined by the FRA. Metra is also asking for funding from Congress. On that note, I would like to thank Representatives Lipinski and Quigley for introducing H.R. 1405, which reauthorizes the safety technology program for PTC, which is $200 million annually for the next 5 years. Even though PTC will not be fully implemented by the deadline, Metra, however, has taken significant steps to provide safeguards for our passengers. For example, we have reviewed the FRA 2015-03 safety advisory and are in the process of implementing automatic notifications through our GPS system. This system will notify the conductor in advance where the speed is reduced by greater than 20 miles per hour for a bridge or curve. The conductor will then communicate and remind the engineer of the restriction. We have also instituted the C3RS program, which is the Confidential Close Call Reporting System, in conjunction with our labor unions at FRA. Before closing, I wanted to bring to the committee's attention that, recently, a question was raised at the APTA Rail Conference with regards to the commuter rail industry's ability to continue to operate past the PTC deadline as it relates to insurance liability. The commuter railroads are currently investigating this matter. It is Metra's commitment, along with the rest of the commuter rail industry, to implement PTC as expeditiously as possible. With that said, we ask Congress to grant the FRA authority to provide waivers based on good-faith efforts and the funding to support the implementation of PTC. I want to thank the committee for inviting me here today, and I will be happy to answer any questions. Mr. Denham. Thank you, Mr. Orseno. Mr. Kerwin, you may proceed. Mr. Kerwin. Thank you. Good morning, Chairman Denham, Ranking Member Capuano, and members of the committee. My name is Russell Kerwin, deputy project manager of Positive Train Control for the Southern California Regional Rail Authority, a.k.a. Metrolink. I appreciate the invitation to testify today to update the subcommittee on the most significant investments Metrolink is making to increase the safety of our passengers--PTC. I am proud to report that, as of June 14, Metrolink has fully implemented PTC in revenue service demonstration, RSD, across the entire 341-mile network of Metrolink-owned lines. In addition to this major accomplishment, we will submit our PTC safety plan to the FRA next week, on June 30, seeking FRA certification by the end of the year in accordance with the Rail Safety Improvement Act of 2008. Metrolink operates on 7 routes through 6 counties in southern California, carrying over 43,000 weekday riders. We are also a dispatching hub for about 350 trains that traverse Metrolink property on a daily basis, including trains from BNSF, UP--Union Pacific, that is--and Amtrak. Metrolink's PTC program is a locomotive-centric overlay system based upon the interoperable electronic train management system, a.k.a. I-ETMS software. The full build-out and testing of Metrolink's PTC infrastructure was completed over the past 6 years, which includes PTC onboard equipment installed and tested on all 109 locomotives and cab cars, all antennas, wayside devices, and PTC radios installed and operational, a robust communication network built out and tested, and a new hardened dispatch and operations facility for PTC constructed and put into service under the project. In addition to our network of owned lines, we are also working closely with our railroad partners--BNSF, Union Pacific, Amtrak, and the North County Transit District--to ensure PTC implementation is achieved throughout the region. We have been very fortunate to have tremendous support from our local freight partners, and we appreciate the many challenges to implementing PTC, most of which have also impacted our program. They include the prolonged nationwide development of this interoperable technology and the need for ongoing software upgrades, development of our back-office server and dispatching systems, relentless testing, impacts to operations, challenges in acquiring spectrum, and funding constraints. In regards to spectrum, Metrolink has been working with the FCC through many challenges to secure approval of the spectrum that we entered into purchase agreement for in 2010. Currently, Metrolink is trying to follow the same procedures under which the FCC's Wireless Telecommunications Bureau recently granted Amtrak's application. Through our partnership with the freight railroads, Metrolink has been fortunate to execute a 5-year lease for spectrum from PTC-220, LLC. This lease enables us to meet our near-term needs. However, for long-term needs, we are attempting to acquire our own spectrum. Our current PTC program costs the agency $216.4 million. To put that in context, it is roughly equivalent to Metrolink's entire annual operating budget of $221 million. The majority of our PTC funding, about 85 percent of it, came from State and local sources. The investment in our PTC program has been very significant for the agency. However, it was the priority of the Metrolink board and our funding partners to implement this lifesaving technology. Moving forward, the agency will be required to continue to prioritize funding as we transition into operations. The ongoing costs for project staff, contractors, consultants, and vendors to operate and maintain PTC will increase our budget costs. Metrolink is proud to be leading the industry on PTC implementation. Despite the many challenges, we have maintained our unwavering focus on advancing our PTC program. I would like to thank Chairman Denham and Ranking Member Capuano for the opportunity to testify and share our experience. I will close my remarks by stating that, at Metrolink, we continue to believe that safety is foundational and our investments in PTC as well as a number of other safety technologies are evidence of this unyielding commitment to the safety of our passengers. Thank you. Mr. Denham. Thank you, Mr. Kerwin. Our first round of questioning will be 5 minutes. I would ask members to keep their questions to 5 minutes. I will start things out this morning, first of all, with Ms. Feinberg. Again, let me thank you for your response. The last committee meeting, we did something somewhat out of the ordinary and asked you for a quick response with some of the questions that this committee had on the Amtrak crash. I think that those issues are important to resolve and understand quickly. And this committee thanks you for your rapid response. We are getting those answers to those questions back out to committee members this morning. But I did want to continue on an exchange that you and I have had several times now. I pressed FRA on: If Positive Train Control is such a big priority, why are you not using California high-speed rail dollars to upgrade not only the corridor, but those connecting routes in California? In California, obviously, where PTC was started, it is a big concern for those that ride the rail in California. It is a big concern for those that live by rail in California. You know, this is a national issue. But in our home State, we are looking to provide leadership to resolve the safety concerns that people have quickly. And the California High-Speed Rail Authority continues to have its challenges. And certainly, by their current burn rate of dollars, they do not appear to be able to spend the money that has been allocated to them by the deadline. And so, in our ongoing exchanges, what else could you use that money for? Could it be used for safety in California? And I got your written response that it wasn't possible, but I wanted to bring one issue to your attention. Under California High-Speed Rail Authority's investment strategy for phase 1, they specifically state, ``Electrifying the entire Caltrain corridor so as to replace outdated diesel technology with electric locomotives or electric multiple-unit train sets and introducing Positive Train Control will not only speed up Caltrain's service, but pave the way for high-speed rail. Positive train control is a Federal mandate that will reduce the potential for train-to-train collisions and improve signaling at crossings so as to allow increased train frequencies while enhancing safety.'' This money was taken from California high-speed rail. They approved the grant agreement to put it in a different corridor to upgrade Caltrain and put PTCs. Obviously, by their own words, this is a priority for them. Also, previously FRA has diverted funding from the Central Valley with $400 million that went to the Transbay Joint Powers Authority to construct the foundation for high-speed rail service at the Transbay terminal. Again, you are moving money out of California's Central Valley hours away to where it may connect some day, if it ever gets built, to San Francisco and to L.A. through Caltrain. And under the High-Speed Intercity Passenger Rail Program, the following activities are expressly eligible for grants, as noted in the Federal Register: acquiring, constructing, improving or inspecting equipment, track and track structures, highway rail grade crossings, improvements related to intercity passenger rail service, including communication and signalization improvements. That sounds a whole lot like PTC to me. Positive train control affects each one of those areas. So I understand by this they would be able to use these same dollars. So I know from your response you say the grantee would have to approve this process. The grantee in this case would be the California High-Speed Rail Authority. But, again, if they are not spending the money and they already have the precedent of transferring money and safety is all of our number-one concern, why would we not take money that is available to be spent in a corridor that is available to be spent under Prop 1A and address safety for our State? Ms. Feinberg. Mr. Chairman, we have gone back and forth about this a lot, and I am happy to continue to go back and forth with you, and I know our staffs have had many conversations about it as well. As I said in my letter to you earlier this week, we do not believe that we can take California high-speed rail money and put it in other priorities. I explained---- Mr. Denham. But you have done that a couple of times already. They requested that you change the grant approval, and you have granted that request. And they have done it several times for PTC, for Caltrain, and for the Transbay Joint Powers Authority, $400 million, $171 million, and another grant for PTC. It has been done several times already. Ms. Feinberg. I join you in a concern that the California High-Speed Rail Authority is not burning through ARRA [American Recovery and Reinvestment Act] money in a sufficiently fast manner, and we are working with them very closely to make sure that they meet all of their obligations to do so. Our legal analysis of where we are at this moment is that we cannot shift money that has already been obligated to California high-speed rail and move it to another priority. Even if we were willing to take money away from California High-Speed Rail Authority, it would go back to the U.S. Treasury. But we will continue to engage with you on this and talk through it with you. Mr. Denham. Thank you. That appears to be a change in policy, since it has already happened several times. I would understand if you need them as the grantee to make the request to FRA, then my question would be to the California High-Speed Rail Authority: If they have already spent money on PTC, why, if this is a priority for FRA, the administration, and the California High-Speed Rail Authority, are they not improving safety in California? Ms. Feinberg. I do not believe it is a change in policy, but we can continue the conversation. Mr. Denham. Thank you. My time is expired. We will have a second round because I have got many other questions from a more national perspective. But, as you know, California is a big concern of mine and so is California high-speed rail. I now go to Mr. DeFazio for 5 minutes. And I would recognize the fact that Mr. Capuano once again has been very gracious to our colleagues on the other side to skip his time so that others may go first. Mr. DeFazio. I don't think ``Capuano'' and ``gracious'' go together in the same sentence, but certainly I would defer to your judgment, Mr. Chairman. Ms. Feinberg, you heard what CSX raised about the potential conflict with the hard deadline and whether or not their continued carriage of inhalable and other hazardous and passenger--can you resolve that or do we have to statutorily resolve that? Ms. Feinberg. The Congress is going to have to act. I cannot make a legal decision for CSX based on their liability. Mr. DeFazio. And you can't give relief because of the hard deadline that was set. Ms. Feinberg. I cannot extend the deadline. Mr. DeFazio. OK. Now, you talked about enforcement and you talked about penalties, and I would just like to get a little insight into that. We are looking forward now, and there is a lot of history here, a lot of questions about how we got to this point and how some people are much closer to meeting the deadline than others, et cetera. So are you looking at penalties that exact funds from the railroads? You know, wouldn't it be better if you mandate everybody puts together a schedule that you would approve or not approve in terms of how quickly they can implement, put in benchmarks, and then look at assessing penalties going forward? Ms. Feinberg. Well, that would really be extending the deadline. That would be our view. I mean, the deadline is the deadline. And if we then communicate to railroads, ``If you don't like the deadline that we have, why don't you come up with a plan that involves a new deadline for yourself,'' that would actually, in my opinion, be extending the deadline. Mr. DeFazio. OK. Ms. Feinberg. So we would not want to go about that. But in terms of the penalties, there is, you know, three or four pages of specific fines and penalties that were finalized back in 2010 that, you know, go from everything from not equipping a locomotive to failure to have PTC in a certain segment, so quite detailed in the public realm. Mr. DeFazio. Yeah. But what I am trying to get at here is everybody here wants to get this done as quickly as possible. There is a lot of history. And in order to go forward, I am wondering if we give you flexibility from the deadline, but we give you a mandate that it will be implemented as soon as technologically and physically practicable, you know, by each of those who do not meet the deadline and then you set benchmarks and then they violate the benchmarks, that is when I think fines might be appropriate. Would that be a way to go forward? Ms. Feinberg. Well, you know, I take my cues from the Congress, and I enforce what the Congress mandates. So if the Congress instructs us to enter negotiations like that, we would do that. But, again, my concern would be entering into brandnew negotiations with each individual railroad based on what they would like their new deadline to be. Mr. DeFazio. Well, I am not thinking so much what they would like. I am saying that is why as soon as practicable physically and, you know, I mean, not something that meets their convenience or their capital outlays or whatever. It is just like--anyway, this is a difficult issue. Quickly to the FCC, you now have the capacity to deal with these pole applications and approvals in a streamlined way. And, as I understand it, there are quite a few that have not been applied for and you aren't pushing your capacity here. Is that correct? Mr. Mathias. That is correct, sir. Thank you. Since our streamline process was put into place, we have had the capacity to review about 40,000 poles. To date, we have only received applications to review about 8,300. So we are ready for more work. Mr. DeFazio. OK. That is something to take into account as we are moving forward. This is off the subject, but I have got to ask you very quickly. Mr. Mathias, 5.9 gigahertz--part of the problem here was you have to go out and buy spectrum and negotiate and Amtrak had to negotiate and I am really concerned about what you might do with the 5.9 gigahertz for smart cars and communication between vehicles of the future. There are some proposals to maybe parcel that up a little bit, which might lead to interference, which might lead us to a point where smart car manufacturers of the future are going to have to go out and buy spectrum as opposed to having something reserved. And I just hope you would take that under advisement. Mr. Mathias. Thank you, sir. Mr. DeFazio. Yeah. OK. And then to CSX, how soon can you get it done? Mr. Lonegro. At CSX, our plans call for us to be hardware- installed, meaning all of the wayside interface units, all the, you know, obsolete signal replacement work that we are doing, all the locomotives equipped, all the technology hardware installed by the end of 2018 with full deployment by 2020. And, as I say that, though, I think it is important to know that, by the end of 2018, we will have a significant portion of the system operable. So it is not as if we get to 2020 and then we turn on the 11,000 miles that we have under our PTC footprint. It is a very methodical, you know, almost linear implementation pretty much from here on out. We will have about 500 miles in place by the end of the year, which is about the size of the corridor and about the size of the Metrolink deployment. And then we get into the thousands of miles per year that ramps us up through 2020. Mr. DeFazio. Well, again, that seems like a long time. And that is why I was proposing the idea that the Administrator--I don't think we should be giving people a blanket exemption till 2020 because some people are going to take till 2020 who don't need to. Maybe you do. But I think there needs to be some level of review of that, and I think that is something the committee will be looking at. Thank you. Thank you, Mr. Chairman. Mr. Shuster [presiding]. I thank the gentleman. Ms. Feinberg, you have testified and others at FRA have testified before Congress that, if the December 31 deadline is not extended, that you will use all the enforcement powers, including warnings, emergency orders, enforcement fines, to encourage PTC to be adopted. But will you share with Congress a transparent policy with regard to how you will determine who the good actors are, the bad actors are? I think you have categorized them that way. And what I am looking for is metrics. Are there ways to measure it so that it is not arbitrary, so everybody knows going into this? And I see you have some bullet points I have here on things you intend to do, but I am really looking for how we measure CSX versus BNSF versus UP versus Metrolink to be able to determine that. Ms. Feinberg. Absolutely. And we would not want to be arbitrary or subjective. We would want this to be quite black and white so that railroads would know what to expect and that the Congress would know what to expect. What was summarized in my oral testimony was an attempt to be quick and to move through the 5 minutes quickly. But our plan is to take the penalty and fine schedule that is already laid out and to be very transparent about what our approach will be and to communicate it both to the Congress and to railroads so that everyone knows what to expect. Mr. Shuster. Will that be seen? Will we be able to see that shortly? When do you expect to have that done? Because the deadline is getting awfully close and we want to make sure that there is a transparent--because, again, I have seen agencies in the past be very arbitrary, don't like one person over another. Ms. Feinberg. No. No. That would not be our approach, and that would not be the way we would go about it. We will be very transparent about it. We owe the Congress an update on PTC implementation on how railroads are doing in implementing PTC. Due to recent feedback we have gotten back from the Congress, it is clear that the Congress would like that report to also include very specific information about how each railroad is doing individually, but also what our enforcement strategy will be. So we are now including that in the report and plan to get it to you as quickly as possible. Mr. Shuster. And if you could go to levying fines against people, will that be on a daily basis? Monthly? Weekly? How would you levy those? Ms. Feinberg. The statute lays out that it can be per violation per day, but there is some amount of discretion there. Mr. Shuster. And would you consider shutting down a railroad? Ms. Feinberg. I think that would be actually up to--the railroad's own lawyers would probably make the determination. We have certainly heard from railroads that their lawyers are making that determination based on both their liability and the likelihood of the magnitude of fines and penalties. Mr. Shuster. Thank you very much. And in terms of transit systems and commuter rails, my understanding is you folks are having a very difficult time. I know that SEPTA [Southeastern Pennsylvania Transportation Authority] down in the Southeast has to make some real tough decisions on whether they are going to repair, replace cars, track, because there is just only so much money in the budget. Can you tell us a little bit about Chicago? Mr. Orseno. Yes. Thank you, Chairman Shuster. That is definitely a major challenge for us. As I stated earlier, we get about $150 million through our Federal formula funds. PTC alone is $350 million to $400 million. You know, we have to balance using that money for other safety-sensitive concerns like bridges. I mean, bridges are very important. We have got many bridges that were built in the 1800s, and we are in the process of doing those projects. It is very important for us to find the funding and make sure we can get this implemented. It is a very significant safety enhancement. There is no question about it. But it also competes with every other safety issue that we have. Mr. Shuster. And you have got to be the most challenged of all the systems because you have all Class I's coming in around Chicago. So that interoperability--is that a significant challenge or is that something you are moving towards working out? Mr. Orseno. That is a huge significant challenge for us because you have got six of the seven Class I railroads coming in and out of Chicago that have to communicate between each train, all the signal locations, and the back office. That has been probably one of the most significant challenges for the industry, is the interoperability. Mr. Shuster. Thank you very much. Now go to Ms. Brown. Ms. Brown. Thank you, Mr. Chairman. Ms. Feinberg, first of all, let me just say that every last one of us supports safety in the industry, but I think you are leaving me when you talk about daily fines. The industry itself has spent over $5 billion on Positive Train Control, and I don't feel that the Federal Railroad Administration or the U.S. Federal Communications Commission-- we have had daily--not daily--but we have had meetings where we have discussed spectrum, and we don't think--I don't think that the administration has done all they need to do to move us forward. And to sit here and say that we are going to have daily fines and we may have to shut down the industry is not going to fly. And so I would like for you to respond to that Ms. Feinberg. Ma'am, I was responding to the question about what our authority is in terms of fining. We are now working on our enforcement strategy and will communicate it to you. Ms. Brown. No. No. I am not talking about enforcement. I am talking about support, what we have done to help the industry, for example, with the spectrum. Amtrak had to purchase it. How come we did not provide it for the industry? But I--and they had a hard time getting it, and that delayed the projects. Ms. Feinberg. I will let the FCC answer the spectrum question, but I can tell you from the FRA's perspective, we have hired a significant staff. One of the witnesses previously said there is only a dozen staff at FRA working on PTC. That is absolutely incorrect. We have staff in Washington and across the country. We have offered loans. We have asked for grants. We have offered financial assistance. We have offered assistance across the board. We are still waiting for safety plans to come in from railroads based on implementation---- Ms. Brown. I hear what you are saying. But as far as I am concerned, you all have been the caboose as far as helping and assisting us moving forward. And I don't mean it in a negative sense, but we have had--you haven't been here the entire time-- we have been going over this for years. And we just have not gotten the administration where it needs to be as far as assistance moving forward. I mean, when we say Positive Train Control, it is a combination. What happened at Amtrak, it wasn't just: didn't have Positive Train Control, didn't have the proper equipment as far as the cars are concerned, had to purchase the spectrum. It is just a whole list of things that I feel that the administration should have worked--and I don't mean this administration, I am saying it has been a multiplicity of administrations that haven't done everything that they need to do to get us where we need to be. Now, even if they come up with, well, here we are, even if they come up with it in 2018, then it still would take 2 or 3 years to determine whether or not the system is working together. Ms. Feinberg. Ma'am, I can only speak for this administration. I can't speak for previous administrations. But this administration has done a great deal to try to bring railroads along and into compliance with a mandate that was passed by this Congress in 2008. And we have been sounding the alarm for years about our concern that railroads were not going to meet the deadline. And so I believe this administration has done a great deal of work to bring railroads along, but we have not seen the progress that we need to. Ms. Brown. All right. I am just letting you know you are leaving me. But go ahead to the next person. Mr. Mathias. You are asking about the question of the Amtrak spectrum? Ms. Brown. Yes, sir. Mr. Mathias. Thank you. The way the railroads approached this process initially, they selected a spectrum band in the 220 to 222 megahertz, I am sorry to get technical on you. But it is a part of the spectrum that was already owned by other people. It has licensees. Unfortunately, in that case what we would have had to do to give that spectrum to anyone else is we would have had to have taken it away from the existing owners through a process that would have required compensation, finding them additional spectrum, and also potentially would have led to litigation. So what we thought would be a more productive approach would be to actively work with Amtrak to find spectrum on the secondary market that they could use for PTC in the same spectrum block. Ms. Brown. Well, as we move forward, that is an issue that the Congress needs to address. My next round I will go to you, Frank. Thank you. Mr. Denham [presiding]. Thank you, Ms. Brown. Mr. Rice, you are recognized for 5 minutes. Mr. Rice. Thank you, Mr. Chairman. Ms. Feinberg, and you may not have been around when all this started, but why is there the need to create this new system? I mean, it seems to me that there are so many systems that are similar to this that would be incredibly cheaper and quicker to institute. Why did we settle on creating this entire new system? Ms. Feinberg. Well, I think PTC is actually an overlay of some other systems. But if you are referring to ATC [Automatic Train Control] and some of the technologies we have talked about in this committee previously, it is basically a step beyond that. But it would assist in taking human factors off the table. It is one of the most important technologies that we believe can be implemented for rail safety. Mr. Rice. Mr. Kerwin, I am going to switch over to you because maybe you know more about the technical aspects. You are a project manager, right, you are putting this stuff in. Mr. Kerwin. Yes, sir. Mr. Rice. I know that there are GPS systems out there that you can buy for a thousand dollars that will control the motion of a vehicle, right, stop it, start it, and all that kind of thing. Mr. Kerwin. It tells you where you are at, but as far as controlling the vehicle---- Mr. Rice. I have had one on my boat that cost $900 that would steer my boat to a point. Why is this so much more difficult than that? Mr. Kerwin. The key to PTC is it is not a specific technology as much as a specification that it prevents train- to-train collisions---- Mr. Rice. Well, I mean, as long as the GPSs were connected, it seems to me that it could do that very, very easily. I mean, this seems to me that this is light years easier than a Google car, or whatever you call the thing, because a Google car has got to sense people walking in front of it and obstructions appearing, and this doesn't have to do any of that. This just has to control motion. I mean, all it can do, it can't steer, it has got to go how fast, how slow, or stop, right? Mr. Kerwin. Yeah. Mr. Rice. It is not that complicated. Mr. Kerwin. I understand and appreciate your point. It is much more complicated than it would seem. One of the key factors is interoperability. The PTC mandate requires seamless transition from one railroad to another railroad's property and the communication between different railroads. Mr. Rice. No, I understand that. But, I mean, this GPS technology exists today. Mr. Lonegro, I am going to switch over to you. Do you have technology today before this technology we are talking about here that you know where all your locomotives are? I mean, can you tell where they are at any time when they are running? Mr. Lonegro. We have had GPS on our locomotives for, I would say, the last half a dozen years or so. But I think it is important to understand GPS is one of, I will say, 100, just for raw numbers, inputs into PTC. It simply provides one input, and that is where the train itself is. It is not an indicator of speed, it is not an indicator of grade, it is not an indicator of where the red signal is, it is not the indicator of where the work zone is. And I could go on and on, but I know you don't want me to. But that is just one input into it. The technology you referred to earlier about ACSES [Advanced Civil Speed Enforcement System] is based on a cab signal method of operation. At CSX we only have about 400 of the 11,000 miles uses cab signal as a method of operation. And then ATC is built on top of that, and the ACSES system that Amtrak is using is built on top of that, and it is not a system that we utilize to run our trains. Mr. Rice. All these other guys up here are dealing with taxpayers' money and you are not. Did you all do an analysis of whether it would be cheaper to use some of these legacy systems that could control the train or to create this entire new system? I think this says they are doing 23,000 locomotives that cost $9 billion. That is about $400,000 a locomotive. Did CSX do an analysis to determine whether it would be cheaper to modify the existing legacy systems or to create this entire new system? Mr. Lonegro. So there are a couple answers to your question. In the beginning, yes, we did an analysis about whether we should go the Amtrak route and the ACSES system or whether we should go with the system that the freight railroads had been working on since the mid-1990s which the precursor was known as CBTM, which was Communications-Based Train Management. The thing that is important to know is that there are generally three or four methods of operations that freight railroads use to navigate their trains. A very small proportion of that is cab signal, as I mentioned, signal territory, and then nonsignal territory, and there are permutations of all of that. The only thing that ACSES works on is that first method of operation, which is cab signal territory. So we would have had to change the entire method of operation of the entire railroad to cab signal which would have required both wayside changes, technology changes, as well as locomotive changes. And, yes, we did look at the two and believe that I-ETMS or the freight version of PTC was the right way to go, and still believe that today, sir. Mr. Rice. Thank you, sir. Mr. Kerwin, you said you spent $216 million on PTC. You have got it fully installed now? Mr. Kerwin. We have it fully deployed on our network of owned lines. We are working with our freight partners and Amtrak to get those systems in service. Mr. Rice. How many locomotives do you have? Mr. Kerwin. 109 locomotive and cab cars that need to be equipped. Mr. Rice. OK. So you spent about $2 million per locomotive then? Mr. Kerwin. Our total cost is--our budget is $216 million and we have spent about $200 million of that. That is not just installations on locomotives. There is a tremendous amount of back-office components and wayside components as well. Mr. Rice. Sounds ridiculously expensive to me. He is messing with his dollars, I believe, if he says he did the analysis that came in cheaper that way, I understand. Thank you. Mr. Denham. The gentleman's time has expired. The gentleman, Mr. Lipinski, is recognized for 5 minutes. Mr. Lipinski. Thank you, Mr. Chairman. Thank you for holding this hearing. Obviously, we all want to make sure that we do everything we can for safety. It has been a very difficult issue. I want to thank Ms. Feinberg for her work on this and other things. A very difficult time coming into the position as Administrator here. I just want to first make sure that we are all clear. You are saying that FRA doesn't have the authority to shut down railroads. It is the fines that are what the FRA is able to level if the mandate is not extended. Ms. Feinberg. Ultimately, if we needed to take the action to shut down a railroad, I think we could do that. But my point was that I think what we are hearing from railroads is that is a decision that they are making in consultation with their lawyers on how they would operate on January 1 if they are not fully implemented. Mr. Lipinski. That makes sense to me. Mr. Lonegro, Mr. Orseno, I don't know if you want to add anything to that in regard to the fines and the impact that they could have on you. Mr. Orseno. Yes, thank you, Congressman Lipinski. Being in the commuter side of the industry, we depend very heavily on tax dollars. What the commuter rail industry has advocated for was an extension, not a categorical extension, but an extension based on good faith efforts based on the railroad's ability to complete PTC. I don't think, personally, it would be in the public's best interest to fine railroads that typically don't have the funding to implement PTC. I think we need to find a solution where we can implement PTC as expeditiously as possible and not fine the railroads, because it is just coming right out of our pot that we use for bridges and cars and everything else it takes to operate the railroad. Mr. Lipinski. Thank you. Mr. Lonegro, do you have anything you---- Mr. Lonegro. Yes, sir, if I may. It doesn't matter how big the bear chasing you is or how big the cattle prod is, if you are running as fast as you can, you can't run any faster. And so the fines--I mean, we have spent $1.2 billion. We have got 1,000 people working on the project. It is hard to say that we haven't put the best foot forward that we possibly could. And so we have supplied the FRA with both an aggregate level of information in terms of where we have been. We have done that on an annual basis since the end of 2012. The NTSB has asked for it in the interim 6 months. We have provided that information. We have given a prognosis on a railroad-by- railroad basis about when we will be done. Mr. Lipinski. I don't have much time, and I don't want to-- -- Mr. Lonegro. So I don't believe the fines would be helpful. Mr. Lipinski. All right. First of all, we all want to sit up here and find villains. And in this situation I think it is very complex, and there are not easy answers to this. We just want to move forward as quickly as possible. I have been in favor, I have tried, I have worked on getting more Federal funding, especially for commuter rail. Mr. Orseno, so you are saying about $350 million to finish by 2019. Is that the---- Mr. Orseno. That is correct. That is a conservative number, as we get moving into the process further along, as all these things have a tendency to change. But that is a conservative number. Mr. Lipinski. And did you receive any funding from the Railroad Safety Technology Grant Program or any other FRA grant programs? Mr. Orseno. No, we have not. Mr. Lipinski. And would additional Federal funding help expedite the safety efforts and help Metra invest in its infrastructure? Mr. Orseno. There is a very strong possibility that additional funding would help us move the project along faster. But I also want to be very clear that there is only a limited number of resources that are available for installation and purchasing things and the supply and demand chain. We definitely can look at moving it quicker, and if we had Federal funding we could take the funding that we are using for that right now for other things. Like I explained before, we have got cars that are 60 years old. We have got bridges that were built in the 1800s. We could address some of those issues. Mr. Lipinski. I just want to also make the point that Metra has significantly increased--has needed to increase fares as a long-term plan of increasing fares. So you are doing your part in regard to that. Very quickly, before I conclude, I want to touch on one other safety-related issue with Administrator Feinberg. Regardless of whatever plan FRA chooses or is mandated to use moving forward, I hope your agency keeps careful tabs as I do on CN's [Canadian National Railway's] PTC efforts and the reports they submit. We already know from CN's reports that they have the least ambitious and aggressive timeline for finishing their PTC installations and some other issues we have had with them, which we have discussed, and I think we need to make sure we follow up and keep the rails as safe as possible. Thank you. I yield back. Ms. Feinberg. Certainly. And if I could just make one point in response to the back and forth, we have asked for a sum total of $2 billion to go towards PTC implementation and technologies, $825 million in GROW AMERICA, but altogether $2 billion. So we are absolutely in favor of additional Federal funding going to PTC implementation. Mr. Denham. Thank you. Thank you, Mr. Lipinski. Mr. Perry, you are recognized for 5 minutes. Mr. Perry. Thank you, Mr. Chairman. Good morning, Ms. Feinberg. I have got a question here for you. Start out with a little bit of a statement. Just to make sure I am clear, it is my understanding the FRA--and this comes from testimony--FRA will use all its enforcement powers, including warnings, emergency orders, and enforcement fines to encourage PTC adoption. Do we know how the FRA would assess the fines? Would they be assessed daily? Is there a policy that has been defined yet regarding that? Ms. Feinberg. So the goal of our enforcement actions, and I think probably any safety regulator's enforcement actions, is to bring about compliance and implementation as safely and efficiently as possible. Mr. Perry. I understand the goal. Do you have a policy? Do we know what is coming? Ms. Feinberg. As we discussed a little bit earlier, we are finalizing that now. Most of the enforcement policy is public and has been public since 2010. There are various fines and penalties based on whether it is locomotives or segments of track. But most of it has been public since 2010. And we are, in response to the Congress' request, finalizing our strategy now so that we can be completely transparent about what railroads and the Congress can expect. Mr. Perry. So it might be daily, it might be otherwise? Ms. Feinberg. That is correct. Mr. Perry. OK. So a few weeks ago when you were here shortly after the horrible mishap in Philadelphia, I asked you how much of the $1.3 billion in stimulus money that was received some time ago--because it was such an issue, right, and there were questions about Congress and one particular party not being responsive and cutting money for PTC--so how much of the stimulus money, when everything was in one hand in this town, was spent on PTC for Amtrak, in particular in the Northeast Corridor, right? Do you remember that question? Ms. Feinberg. I do remember that question, and it is $400 million of ARRA went towards PTC. That is not Amtrak specific. And, I am sorry, I didn't realize you wanted just Amtrak specific. But it is $400 million total. Mr. Perry. $400 million. All right. Ms. Feinberg. I believe it is $36 million for Amtrak. Mr. Perry. OK. All right. So right now, and that is Federal funding, we are looking at $9 billion is what the estimated cost of freight railroads. Right? We spent---- Ms. Feinberg. Total. Mr. Perry. Yeah. Total. Right? With this deadline. But you can see the dichotomy, you can see the difference, right? We don't have PTC where we have money, and we are asking for exponentially more. We're not asking---- Ms. Feinberg. We are asking. Mr. Perry [continuing]. But it is the requirement for, right, investor owned? This is private money, $9 billion. Let me ask you about the arbitrary--the deadline. I am calling it arbitrary. What is your opinion about the deadline? Does it take into account the technical aspects? Does it take into account the frequency spectrum aspects? Does it take into account the timeline where the FRA took nearly a year to approve one of the single plans, one of the plans that is required by each railroad? Does it take into account those things, the deadline? Ms. Feinberg. It is your deadline. It is the Congress' deadline. Mr. Perry. I am asking your opinion. Ms. Feinberg. I believe it is a good deadline. And, in fact, it was the deadline that was reached during negotiations. It was preferred by the railroads. Mr. Perry. I understand. So you say it is good, but does it take into account those things? Ms. Feinberg. I believe that in 2008, when you passed this deadline, you took those things into account. Mr. Perry. You think we did. OK. And we foresaw all the things that might occur or not occur regarding frequency spectrum, regarding approvals, regarding finances. That was all known. There was no political solution to the two sides, one wanting earlier, one wanting later. Ms. Feinberg. I think there was an understanding in 2008 that while this would be complicated, it had been called for since 1969 and would not be so complicated it would be missed. Mr. Perry. OK. Well, I asked for your opinion. I appreciate it. So under the Consolidated Appropriations Act of 2015, FRA was directed to provide a report to Congress on implementation within 180 days. Do you know what the status of that is? Ms. Feinberg. Yes. Previously we had a quick discussion about it. It was due to the committee, I believe, a week ago. In recent weeks we have gotten additional requests from the Congress about additional information they want in that report. We are updating it now and should have it to you in days. Mr. Perry. But was it on time or wasn't it? Ms. Feinberg. No, sir, it was due last week, 1 week ago. Mr. Perry. So it is not in yet? Ms. Feinberg. That is correct. It is supposed to be an update on where the railroads are in implementation. Mr. Perry. I understand. But Congress also approved that, gave 180 days. Everybody agreed. There was a negotiation. Ms. Feinberg. But Congress has asked for it to now include our enforcement strategy and railroad-by-railroad information. Mr. Perry. Things changes, right? Things change. So who should we fine at the FRA when they are not timely? Ms. Feinberg. You can feel free to hold me accountable for the fact that the report is a week late. Mr. Perry. What should the fine be? Ms. Feinberg. I will leave that to you. Mr. Perry. Thank you, Mr. Chairman. I yield back. Mr. Denham. Thank you, Mr. Perry. Mr. Sires. Mr. Sires. Thank you, Mr. Chairman. You know, I travel on the Northeast Corridor constantly back and forth, and I am still trying to get this idea with the spectrum, how we end up with two. And places like Chicago, they only have 1 and more than 11 companies use it. I just don't understand why we just can't come up with one system. Now we have to worry where one is going to interfere with the other? To me, it just doesn't make sense when other parts of the country use one system. Could somebody address that? How did we get to this? How did we get to this point? Mr. Lonegro. I think it goes back to the conversation we had a few minutes ago where the ACSES system for Amtrak was really developed for passenger rail, and specifically for high- speed passenger rail. There is a certain way that passenger railroads run their operation, and they utilize certain technologies to run their trains, dispatch their trains, and the freight railroads have, literally, a different way of running the railroad. And so those two systems---- Mr. Sires. But is this a company not making a concession to the other or Amtrak not making a concession to you? I mean, I don't understand it. Mr. Lonegro. Well, we are all making concessions, candidly. Mr. Sires. Well, how did we end up with two if we are all making concessions? Mr. Lonegro. The systems are separate. They rely on communications as a fundamental aspect. And so what we are really doing is the data transmission is using two radios, which are going to use two separate but close pieces of spectrum, and the closer those pieces of spectrum are the more interference there can be. But I would say that we are actively working between Amtrak, the Northeast commuters, as well as the FCC to solve that problem, and we believe we have line of sight to that. I don't know if Mr. Mathias would like to comment on that. Mr. Sires. The FRA states that 40 percent of all accidents are a result of human performance failures. The railroads, however, claim that PTC would only prevent 4 percent of all accidents, inferring that the cost outweighs the benefits. How did we come up with 4 percent? Mr. Lonegro. We looked at all of the accidents over, I believe it was either a 10- or a 12-year period, all accidents. Right? And I am not sure that the FRA looked at all accidents. They may have looked at a subset of all accidents. Accidents are generally caused by a couple of things, either the conditions or the behaviors. Right? The conditions could be track related, signal related, how the car operates or some of the components on that, and the same on the locomotive side, and then you have behavioral based. So is there something that happened in the cab of the locomotive, the human factor side of things. We looked at the entire portfolio of accidents and did the math on things that we thought were PTC preventable and were not, and came up with that 4 percent. At CSX it is actually only 2 percent. Mr. Sires. Two percent? Mr. Lonegro. Yes, sir, 2 percent of all accidents PTC preventable. Mr. Sires. So, in other words, in your eyes you don't think it is worth it to make this investment? Mr. Lonegro. You know, I think we are well past that conversation, to be honest with you, Member. We have already spent $1.2 billion on it. We have good line of sight to completion of the hardware by 2018 and full deployment by 2020. I think we are well past that conversation. Mr. Sires. All right. Thank you, Mr. Chairman. Mr. Denham. Mr. Hardy, you are recognized for 5 minutes. Mr. Hardy. Thank you, Mr. Chairman. Ms. Feinberg, I read your testimony clear through, and it states in your testimony it seems that FRA is ready to act, directing penalties on PTC if not implemented. Also you state that FRA is ready to act in the interim to bring railroads into safety compliance. You suggest that Congress should authorize FRA to require railroads to use alternative safety technology on specified lines. You also say, and I quote: ``These requirements will likely be costly to railroads.'' Can you share with me your ideas on this alternative technology? Ms. Feinberg. Sir, what I was referring to was what I would refer to as the safety gap that will exist between January 1, 2016, so the day after the deadline, and when PTC is actually implemented by each railroad, and what, if anything, should be done to raise the bar on safety during that gap. So whether it is additional communication between crewmembers, an additional person in the cab, we have not made final determinations. I think they would be railroad-by- railroad specific. But it would be how do you increase safety between the date of the deadline that is missed and when PTC is actually implemented. Mr. Hardy. In your testimony you stated that these will be costly to railroads. So you have clearly run the numbers on how much it will cost. Can you share with me those calculations or how you come to that point with that statement? Ms. Feinberg. We just frequently hear from railroads that items like additional crewmembers are quite costly. That is based on that assertion. Mr. Hardy. OK. Mr. Orseno, with safety being paramount, I would like you to delve into the costs a little more. In your testimony that the commuter and the freight rail industries will have spent over billions of dollars on PTC implementation, although progress has been substantial, but it remains to be done before PTC can be safely implemented nationwide, companies, on how much money have they spent out of pocket, do you believe these costs will be passed down to consumers, which is naturally what happens, but I just want to hear from you. Mr. Orseno. In my opinion, yes, they would be passed down to consumers. When we raise our fares in order to cover PTC costs and other items, we have to pass those costs on, and we only have X amount of State and Federal funding. The challenge that we have on the commuter rail side is the higher you raise the fares, the less likely you are going to retain all of your ridership. At a time when we want to get more people on our trains and off the roads, that is a big challenge for us. So it is a very difficult balancing act to still be able to provide safe, valuable service for our customers. Mr. Hardy. Do you believe that we have done all that we can as a committee, as Congress, to help move this process forward? Do you feel like you are being penalized for our lack of action or inaction or FRA's actions or inactions? I would like to hear your opinion on that also. Mr. Orseno. That is a challenging question. Mr. Hardy. Yes, it is. Mr. Orseno. The answer is this is a very expensive proposition for all railroads, especially commuter railroads where we don't have the type of funding that we need. I believe that Congress needs to fund the PTC project. It is important. It is important for the safety of our customers, our employees, and the communities we operate through. So it is very important to me that the Federal Government supply some funding for it. Mr. Hardy. Thank you. Mr. Lonegro, you made the statement that the immediate impact of the deadline will be that RSIA [Rail Safety Improvement Act] has the potential of making certain rail operations illegal. Can you discuss these ramifications a little bit more, if you would, please? Mr. Lonegro. Yes, sir. We are in a legal dilemma, as I mentioned in the opening testimony. We have a law that requires PTC to be implemented on lines that carry passengers and lines that carry certain commodities, TIH and PIH commodities. And so the transport of those after January the 1st of 2016 would run in contravention to the Rail Safety Improvement Act. Yet we also have a common carrier obligation that requires us to haul freight that is tendered on reasonable requests and at reasonable terms and conditions. And so we are in a situation of which law do we violate. And we have that same conundrum on the passenger side. I mean, Amtrak runs over us, a law that is 40, 45 years old, and so we are required to allow Amtrak to run as well as a number of other commuters, including Mr. Orseno. And we also have this obligation under the Rail Safety Improvement Act which requires us to complete PTC on those same lines. And so if we are not able to meet it on those lines, do we need to tell Mr. Orseno that he can't run? I mean, these are the challenges that many, many lawyers right now are trying to resolve, and we don't have the answer to that quite yet. Mr. Hardy. Thank you. My time has expired. Mr. Denham. Thank you, Mr. Hardy. Ms. Esty, you are recognized for 5 minutes. Ms. Esty. Thank you, Chairman Denham, and thank you for, remarkably gracious Ranking Member Capuano, for waiting so long. I want to thank both of you for holding today's hearing. This subcommittee's work is extremely important to the thousands of folks in my district in Connecticut who ride these rails every day and to the businesses who rely on the freight service, as well, in northwest and central Connecticut. And I hear from a lot of those commuters that they are very concerned about rail safety, as you can imagine, with the last 2 years. And we have been talking about, ever since the fatal collision in 1969, we have been talking about Positive Train Control. And as you can sense from today's hearing, there is increasing impatience and concern about how long that is taking. Now, I think we really need to get down to brass tacks of what are the carrots and sticks? What are the incentives at this time, recognizing the difficulty with spectrum, the difficulty with interoperability, and with the budget challenges, what do we do now to move this forward as expeditiously and safely as possible? And that is where I would like to start from. The past is the past. We are here now. We are in June of 2015. How do we get this moving forward to keep people safe? So first, Acting Administrator Feinberg, again, thank you for your patience and your transparency and your exceptional availability to us on the committee. We value that quite a lot. In your testimony, you noted that you think FRA needs the authority, given the situation right now, over PTC control systems, to test them, as well as to provide for interim safety measures when they do not meet that deadline, which it is all very clear most of them will not be meeting that deadline. Could you expand and say what should we be doing in this committee, what should this committee of jurisdiction be doing to give FRA authority, and why? Ms. Feinberg. Thank you for the question. I think the most important thing that we can do starting now and going forward is to provide railroads with the resources that they need to implement PTC. So this administration has asked, the FRA has asked for significant resources for the commuter railroads so that they can implement PTC. I think that is the most important thing that can happen. But additionally, in terms of our authority, the statute is quite narrow. And so, as others have discussed, we really do run into a problem on January 1 where the law is the law, and despite the preferences of railroads, I can't give waivers, I can't base waivers on good faith, I can't extend the deadline, and I won't extend the deadline. And so we have to figure out how to move forward past January 1 to make sure that passengers, folks who live near and along rail are safe. And so I am happy to continue to work with the Congress on that, but the most important thing is to make sure that we are providing resources so that we can actually bring this technology online quickly. Ms. Esty. A quick followup question. Do you believe that the railroads that fail to meet that deadline, and I am asking now under current law, will be subjected to increased tort liability? Because the insurance issues were already raised here today. That is obviously a very, very big stick that, again, I think this committee needs to understand what is the legal opinion of FRA about that as well as the railroads. Ms. Feinberg. The opinion of the FRA--look, I don't want to give the railroads legal advice, and I am probably the only person in this room who is not a lawyer, but we are certainly hearing from the railroads that they absolutely believe that they are increased liability as of January 1, and we would--we agree with them. Ms. Esty. Well, I think we need to get to work on that because that is not in anybody's interest as we move forward. Mr. Mathias, good to see you. We went to college together. So thank you for being here. I am hearing from the railroads, and particularly in the Northeast Corridor, we hear other Members reference this, the difficulty about spectrum. What is it from your perspective, from the FCC's perspective, that we can do, particularly in a very congested space--and that is spectrum space, as well as physical space--that we should be doing to expedite the safety in the Northeast Corridor, the most heavily trafficked area in the country? Mr. Mathias. Thank you. And it is good to see you too. Thank you for your question. We have an increasingly good news story in the Northeast Corridor with regard to spectrum. It is my understanding that currently Amtrak has the spectrum it needs to deploy, which would be relevant for Connecticut. In addition, we currently have in front of us a proposed transaction that would provide the MTA additional spectrum to provide coverage between New York and New Haven, which would fill a gap in their spectrum coverage, and we also understand that the MBTA has the spectrum that we need. So what our job will be is to ensure that we are working as quickly as we can and are fully engaged to make sure that those transactions are completed as quickly as possible as soon as we have the information and to be ready in case something changes. Ms. Esty. Thank you very much. Mr. Denham. Thank you. Mr. Mica. Mr. Mica. OK. Let's go right to Mr. Mathias. You were talking about the Connecticut connection, putting PTC in from Boston to New Haven. Isn't that most of what Amtrak doesn't own? Mr. Mathias. No, sir. The Amtrak has spectrum---- Mr. Mica. But that is where it was installed. It is installed there, isn't it? Last hearing you gave us a map, and that one was--that was pretty much complete. Mr. Mathias. Yes, sir. Mr. Mica. Right. But that is really mostly under a private operation. Amtrak runs trains over it. They don't own that part of the line. I am telling you that they don't own it. I know. OK? All right. Just interesting that they could get it done. OK. Let's go to the Acting Administrator. Here she is back asking for money again. And last question I asked, how many RRIF loans had been given since 2012, and first I got an answer of until last year two, and then add one, we got to three. Is it still three RRIF loans since 2012? Ms. Feinberg. Yes, sir. Mr. Mica. OK. How many of those were for PTC? Ms. Feinberg. One. Mr. Mica. One. OK. You could say 33 percent of them. It sounds more impressive. Ms. Feinberg. Good idea. Mr. Mica. Let's go back to our communications guy. There was an 11,000 backlog you took care of. At one time I thought there were as many as 20,000 applications. Mr. Mathias. We understand from the railroads that their total deployment would be approximately 30,000---- Mr. Mica. What is your number of applications approved and what is your backlog at this point? Mr. Mathias. We have had before us for review 8,300. We have no backlog today. Mr. Mica. No backlog. They are all approved. And you are expecting more. In the past, and I gave you credit, before your average processing was about 2,000 a year. Is that correct or did I lie? Mr. Mathias. I think we are able to do more. Mr. Mica. OK. Where is my guy from--OK, Metrolink. When was the accident at Metrolink? Mr. Kerwin. 2008 was the Chatsworth. Mr. Mica. 2007? Mr. Kerwin. 2008. Mr. Mica. 2008. Mr. Oberstar, we did the bill. You still don't have Positive Train Control in all of Metrolink service, or do you? Mr. Kerwin. We have our entire system of Metrolink-owned lines in service. Mr. Mica. By what? Mr. Kerwin. Metrolink-owned lines are all in service. Mr. Mica. With Positive Train Control. Mr. Kerwin. With Positive Train Control. Mr. Mica. OK. What is missing then? Mr. Kerwin. The lines that we run on with our freight partners are not currently PTC operational with our trains. Mr. Mica. But Ms. Feinberg, we will go back to here, she just testified she is going to hammer those freight people and the hammer is coming down the end of the year. Right? Is that what you said? I heard you in the beginning. Ms. Feinberg. I said we would enforce the deadline. Mr. Mica. You are going to enforce it, right. Well, that is kind of interesting because then I see you submit a budget that proposes a 6-year schedule, 2016, of funding commuter railroads to implement PTC. So is it going to take another 6 years? Last I checked, there are not a lot of passengers on freight trains. Isn't that right? I mean, most of them I know they are carrying freight not people. But I would think people would be pretty important. Most of those people that were killed out there in that incident were people. It might have disrupted some freight traffic, but it was people. So is this the new policy: On people and commuters we are going to take 6 years, but we are going to hammer those freight people, aren't we? Ms. Feinberg. Well, no. So, first of all, we will enforce the deadline against all the railroads, not just the freights. Mr. Mica. OK. But then we have a plan to go forward with-- -- Ms. Feinberg. If they can implement it sooner, that would be great. Happy to use those resources for other items. Mr. Mica. Cameras. Metrolink, you got them? Are there cameras in the cabs? Mr. Kerwin. Yes. Mr. Mica. All of them? Mr. Kerwin. We have all inward facing cameras in all of our cabs. Mr. Mica. OK. Because that has been a recommendation of NTSB for some time since that accident, and I cited all the other times back to 1973, and they weren't implemented in most instances. Mr. Kerwin. Ours have been implemented since 2009. Mr. Mica. OK. Last thing. Is TIFIA [Transportation Infrastructure Finance and Innovation Act] eligible for use of installation of Positive Train Control? Does anybody know? Ms. Feinberg. TIFIA, not RRIF? Mr. Mica. Yes. Do we know? Does anybody know? Staff know or anybody? Come on. Some of you guys are brilliant on the other side. You don't know? It is? OK. They think it is. So that is a mechanism for funding. But let me tell you the last thing before I conclude. I have 7 seconds. I was flying up here and I met a guy on a plane. I didn't know him from Adam's house cat. ``What are you doing on the plane, Mr. Mica?'' ``Well, I am coming back to DC.'' I said, ``Why are you coming back to DC?'' He says, ``Well, I am with some kind of a project, and we finance projects.'' And he says, ``It took us between 60 and 90 days to get approval for financing under TIFIA, the private sector.'' I said, ``Well, what are you doing here?'' He says, ``It has taken us a year.'' He says, ``These guys are screwing around with the paperwork for a year.'' So you can go out and get private sector financing while they screw around in DOT, and here is a mechanism that may be available and is available, and you have huge capacity at RRIF, and both of them don't work. Did you want to respond on your own time, because I am over? Ms. Feinberg. Sure. I believe that under Secretary Foxx both of those programs have moved along much faster than they have previously. There is always room for improvement. Mr. Mica. Mr. Chairman, I have got to go to the medical center. Mr. Denham. Thank you, Mr. Mica. And the previous chairman did say that the witness' time was also the Member's time today. Ms. Hahn, you are recognized for 5 minutes. Ms. Hahn. Thank you, Mr. Chairman, for holding this hearing. Thank you to my colleague Mr. Capuano for yielding to the rest of the committee. First of all, I want to commend Metrolink, the second- largest rail system by size in the country, for the outstanding work that they have done in meeting our PTC deadline. I like it that you worked closely with your railroad partners, BNSF, Union Pacific, Amtrak, to make sure that their technologies were interoperable and worked hard to acquire the funds needed to fund the implementation of your system. I want to point out that 85 percent of the funds that Metrolink used to fund the rollout were from the State of California and local sources, only 15 percent were Federal. PTC is clearly a top priority for me, and it really is for the American people. I think when the American people hear that we can prevent train accidents and deaths of people by the implementation of PTC, they are also very frustrated that many railroads are not going to be meeting our deadline. But I will say, I would like to go on record and agree to disagree with Chairman Denham, that I don't think we should take money from the California High-Speed Rail Authority to pay for PTC. The California High-Speed Rail Authority has it within their budget to make sure that there is PTC on the California high-speed rail project. We need to find money for both. I am going to ask Mr. Mathias my first question, and we have heard from testimony a major part of the process to implement PTC is acquiring the spectrum. According to Metrolink, the process of acquiring spectrum has been trying and prolonged. It purchased the license for spectrum 5 years ago, and before they can use it, they need FCC's approval. In order to meet the deadline, Metrolink is currently leasing spectrum at the rate of $50,000 per year from freight railroads while awaiting the approval. I think everyone is going to want to know, why has it taken 5 years to approve the use of spectrum? Is this normal? And shouldn't we have, in light of the recent accidents and in light of this urgency to prevent future accidents, shouldn't there be an expedited process for approval for projects that deal with our public safety? Mr. Mathias. Thank you for that good question, and I can appreciate your concern. We are very glad that Metrolink actually has been able to negotiate a lease and that they will be able to have spectrum necessary to provide the PTC service. We understand their concern and frustration that the spectrum that they had intended to purchase has taken so long to acquire. Unfortunately, it has been mired in Federal litigation, as well as in a closed proceeding at the Federal Communications Commission, so unfortunately I can't provide details. But what we are trying to do is as much as we can to keep that process moving. We have taken the extraordinary step of taking the spectrum that they wish to acquire out of our closed proceeding so that we can move forward. They have several waiver requests that they need that would facilitate their use of the spectrum that are pending before us. We understand they need to update those. We look forward to receiving that information. Ms. Hahn. Thank you. But, again, I think the American people are not going to be very sympathetic with excuses for the FCC not approving spectrum applications as quickly as possible. And I sort of agree with my colleague Ms. Brown on it is sort of difficult to be fining and enforcing the deadline when some of our own agencies are not moving as quickly as most of us would like. So I am just going to say that. OK. Mr. Kerwin, you are a model, as I said. I am very proud of Metrolink in California. Maybe since you have been able to meet the deadline and you have been able to jump over obstacles and through the hoops to actually make this happen, what advice would you give other commuter rail lines in this country who are trying to meet the deadline by the end of the year? Mr. Kerwin. Sure. Thank you for that question. I would like to actually thank Mr. Lonegro for his shout- out to our project director, Darrell Maxey, who has been just diligent in pushing this project forward. That sentiment has come all the way from the top ranks of Metrolink. The board, our grantors have made a very, very strong commitment to this project. So the funding that they provided has been really the crucial element in getting this project going, along with that adamant support from our board to really get this project started. So we started early and made a very concerted effort, around the clock been working very hard at it for many years. So it is hard to give--I wouldn't say there is a silver bullet for other commuter railroads to accomplish it. It has been a very challenging process. So we do sympathize with the many challenges which we have also encountered. So I would say that the funding is a key element and having a close working relationship with your freight partners that you operate with, because really that was the other key element for us, was the strong support that we had from our freight partners. Ms. Hahn. Thank you. And, again, you have been a model for the country, and we applaud you. Mr. Denham. Thank you. Mr. Duncan, you are recognized for 5 minutes. Mr. Duncan. Thank you very much, Mr. Chairman. I am sorry I had to be at another hearing until just a few minutes ago. But, Ms. Feinberg, maybe you have covered this, but let me ask you this. It has taken these railroads several years to get to the point where they are now, and apparently there is still a pretty good ways to go. And I am wondering, do you have any estimate of how long it is going to take your agency to certify a railroad after this process? Ms. Feinberg. So the step is first a safety plan is submitted to us. So it is basically the railroad's plan for how they will implement PTC and how they will ensure that the system is working. We have received one of those and have turned it back around to the railroad. They take a while to go through because you are not only reading the plan, but you are in close consultation with the railroad talking through it, offering edits and changes to make sure that the system is going to work. So it takes a while. But we feel pretty confident that as they roll in, we will be able to staff up and turn them around in the kinds of time periods that we have laid out for the railroads. But as of now, we have just received one. Mr. Duncan. Are you satisfied with the progress that the railroads have made thus far? Ms. Feinberg. I am not satisfied. I would not be satisfied unless the deadline were going to be met. Mr. Duncan. My dad told me years ago, and I don't remember what he was talking about at the time, but he said everything looks easy from a distance. And I was reading over Mr. Lonegro's testimony. Just for CSX it says the tasks are still monumental. And it said CSX has to do ``a complete airborne-laser imaging survey of our entire 21,000-mile network'' to have ``all assets mapped to within 7 feet of their precise location, installation of 5,202 wayside units, replacing signals along 7,500 miles of track, installing 1,285 base stations, equipping 3,900 locomotives, training 16,000 employees.'' I mean, these tasks, monumental is being conservative when you say that. And, Mr. Lonegro, tell me about the safety record of CSX so far. Mr. Lonegro. We have been an industry leader for the last 2 or 3 years in safety, sir, and the whole industry, if you go back and look at especially the train accident statistics, has seen significant, 40 to 50 percent reductions in train accidents since the 2000 time period. Safety is a core value of CSX. Safety is a way of life. It is the first core value that we have, and it is very similar at every other railroad. So, I mean, every day we live and breathe safety, whether it is to improve conditions along the railroad, the track infrastructure, the signaling infrastructure, the equipment side of the house, cars, locomotives, and the human factor side of the house, the training efforts that we do. We have a technology called ERAD [Event Recorder Automated Download], which is a virtual road foreman that looks exactly how that train was handled to figure out whether there are any anomalies in that train handling and then have a coaching session with that employee. If they were over speed, right, we have a conversation with them. If they happen to breach a red signal, they are taken out of service and decertified. We have lots of things that we are doing. We are starting down the inward facing camera path a la Metrolink to understand the exact behaviors in the cab that contribute to accidents. So I would say we are doing an awful lot on safety, sir. Mr. Duncan. Well, the committee staff gave me a statistic a few minutes ago, and they said that the freight rail system is 99.995 percent safe based on the number of trips that are taken. I don't know, that seems to me to be a phenomenal safety record. My staffer Don Walker told me a short time ago that the Wall Street Journal said that 2014 was the safest year ever for the rail industry. Now, I mean, everybody has tremendous sympathy for these families that lost loved ones in the Amtrak accident, but, my goodness, now we are going to be spending billions, already have spent billions and going to be spending billions more to try to make something that is already one of the safest things in the entire world. And I am thinking that we would be far better off to spend those billions in many, many other ways, cancer research and everything else. My time is up. Thank you, Mr. Chairman. Mr. Denham. Thank you, Mr. Duncan. Mr. Capuano. Mr. Capuano. Thank you, Mr. Chairman. Mr. Denham. Thank you for being so gracious with your time. Mr. Capuano. Gracious. Get that Pete? Gracious. Mr. DeFazio. Yeah. Twice. Mr. Capuano. I want to thank the panel too. Ms. Feinberg, we are all here today because we think PTC can save lives. I think everybody agrees with that. If you are a week or two or a month late with a report, does anybody die? Ms. Feinberg. No, sir. Mr. Capuano. Are there any major property losses? Ms. Feinberg. No, sir. Mr. Capuano. OK. If one of the major railroads came to you and said, ``We are not going to make December 31, but we are going to make January 15, we are going to make February 1,'' are you likely to be imposing big fines on somebody who is going to be a few weeks or a month late? Ms. Feinberg. Highly unlikely. Mr. Capuano. I didn't think so. Mr. Kerwin, it cost roughly $200 million, a little over $200 million to institute the PTC on your system. Is that right? Mr. Kerwin. Yes, sir. Mr. Capuano. How much did the Chatsworth accident cost? Mr. Kerwin. In excess of that amount, I would say. Mr. Capuano. So in hindsight, knowing what that accident cost versus what the system cost, the system has already paid for itself. Mr. Kerwin. Yes, sir. Mr. Capuano. If it has paid for itself on your line, do you think it is a reasonable thing to say that it would pay for itself on any other line in avoided accidents? Mr. Kerwin. Yes, I would agree with that. Mr. Capuano. I think so too. I guess nobody here believes--nobody wants any fines. There is no reason to have fines. We all understand that, Mr. Orseno. We have a commuter rail system too. We get that. But at the same time, we are sitting here 7 years later with some of the major railroads having done virtually nothing. How would you suggest, let's assume that we could come together as a Congress--by the way, Ms. Feinberg, who set this December 31 deadline? Ms. Feinberg. The Congress. Mr. Capuano. And are you empowered to ignore that? Ms. Feinberg. No. Mr. Capuano. Are you empowered to change that deadline? Ms. Feinberg. No. Mr. Capuano. So it is only us? Ms. Feinberg. Correct. Mr. Capuano. OK. I think that any reasonable person here understands the deadline is not going to be met. Any reasonable person understands the deadline has to be extended. We are not looking to do fines. Now, if we don't, I would not ask Ms. Feinberg or anyone else to ignore the law. I would hope that Congress can come together and do this. At the same time, once we do it, how do we avoid a bad actor from simply ignoring it again for any reasonable period of time, 2 years, 3 years, 5 years, 10 years, without a stick? Mr. Orseno. And I don't want the fines, but how do I do it any other way? Mr. Orseno. Well, I think, as was brought up here today on many occasions, I believe that at the onset from the 2008 Rail Safety Improvement Act, that was a date that was agreed upon. I think once we got into the significant challenges that it---- Mr. Capuano. I understand how we are today. Let's assume today, right now, if I said to you write a law that says in some period of time, some reasonable period of time, 2, 3, 5 years, pick a timeframe, we are going to have this done, how do I then enforce it if I don't have fines? Mr. Orseno. Well, I think we would need to look at it at that time. But I think the key issue is right now we aren't going to meet the deadline. And it is not from lack of effort. If it was from lack of effort---- Mr. Capuano. I respect that. But the bottom line is I don't know any other way to enforce it amongst bad actors. Good actors don't need an enforcement, bad actors do, which is why fines are in place. My presumption is you have contracts with suppliers that give them fines if they don't meet their requirements. We have to have the same thing if we really think that PTC is important. By the way, I also fully agree that we should--the Federal Government should be participating in paying for this. But we are having that argument. You know the arguments we are having here. I am with you, but I need 217 other Members to agree with that. In the meantime, we can't do anything. So I think that it is pretty clear to me that we have to do something, but to pretend that we do nothing or to pretend that somehow goodness will simply overcome the lack of goodness is ridiculous and unenforceable. We need to come up with a reasonable timeframe. We need to allow Ms. Feinberg to enforce the law, whatever it might be. I don't expect you to break the law. I also don't want to fine anybody. So we have to act. And we can do it all day long, we can play games, we can dance around, we can point fingers, we can show what happened 5 years ago, 7 years ago, 10 years ago. But since 1969, according to the NTSB, according to their own figures, preventable accidents have killed 296 people and it injured 6,732. And I don't know how much money has been lost because no one has put that number together. If the cap, the $200 million cap, which, by the way, would have cost Metrolink more if it wasn't for the cap, it is hard to tell, but it seems to me just rough numbers, it looks like the cap probably would have cost--even with the cap, it would have been about $20 billion that these accidents would have cost. This is a doable action, and it is an action that pays for itself as proof positive by Metrolink. Help us work with you to get it done. And by the way, Mr. Mathias, earlier you said you had 8,500 poles agreed to, but that doesn't count the 11,000 that you did previously. It is my understanding you are closer to 20,000 poles across the country that have been approved. Now, that 20,000 is about out of 30,000, 35,000 that they will need. So we have already got two-thirds of the locations approved and ready to go. Is that right? Mr. Mathias. Correct. Mr. Capuano. Thank you. And thank you, Mr. Chairman, for your indulgence. Mr. Denham. Thank you, Mr. Capuano. Mr. Barletta. Mr. Barletta. Thank you, Mr. Chairman. Safety is my first priority, there is no question, and Positive Train Control is a necessary tool to improve safety. But the fact of the matter is that most railroads will not have the technology installed by the December 31, 2015, deadline. Today I am wondering what happens on January 1, 2016, if the deadline remains. Mr. Lonegro, today Ms. Feinberg again committed to hold the railroads accountable for not meeting the PTC deadline, including potential fines and restrictions of service. If the deadline is not extended, what actions will the railroads likely take? I want to know what is going to happen on January 1. Mr. Lonegro. Well, sir, there is one way to be compliant with the deadline, and that is not to move TIH/PIH commodities or passengers, which is an untenable situation if you are a passenger agency or a TIH/PIH shipper. So the railroads right now are in a very difficult place with a deadline that can only be congressionally moved. So we again have a lot of folks that are evaluating how we look at the common carrier obligation, how we look at the PTC mandate to, in essence, figure out is there a way to navigate through breaking the law on one hand or breaking the law on the other hand. And we have a very similar situation with Amtrak and the commuter agencies where we are required to move the passengers or allow them to move their passengers over our lines. And again, we have a PTC mandate and we have a passenger requirement, and I hate to say which--we are being backed into a corner in terms of which law should we violate. And it may be that the path forward really does involve cessation of service. But we are all looking at that. We are all evaluating. You heard a Member earlier talk about increased tort liability. We certainly worry about that as well. So it is an untenable situation, as I mentioned in my opening statement. Mr. Barletta. Mr. Orseno, in your testimony you mention concerns within the APTA Rail Conference about the ability of commuter rail to operate past the PTC deadline as it relates to liability and coverage. Can you further describe what liability and coverage issues would prevent commuter rail that doesn't meet the PTC deadline from operating? Mr. Orseno. Well, when we were at the conference a question was raised on whether we can operate or individual agencies can operate past the deadline because you would be operating outside the confines of the law and there may be restrictions in some of the liability coverages. And all the commuter railroads are now going back with their risk and legal teams to take a look and see if that is the case. Mr. Barletta. You have already said that Metra won't make the December 31, 2015, deadline, and in Pennsylvania, SEPTA will not make the deadline either. If the worst-case scenario occurs and commuter rail does not receive any flexibility on the PTC deadline, how would commuters who rely on Metra or other commuter rail like SEPTA be impacted by operation changes? Mr. Orseno. That would depend on to the degree of what actually happens. If railroads were forced to close down because of liability reasons and insurance reasons, for us alone that would put 300,000 passengers on the roads already that are congested, and that wouldn't be a good solution. Mr. Barletta. In Pennsylvania, SEPTA is furthest behind in the on board vehicle/locomotive system installations. You also cited in your testimony that one of the biggest PTC challenges is onboard software, and that final production release date is not yet known. Can you tell us why this has been such a challenge? Mr. Orseno. I don't have that technical knowledge, but I believe Mr. Lonegro does. Mr. Lonegro. PTC, in the very beginning, was somewhat theoretical in the way that the regulation was published in terms of what it had to accomplish and how it had to accomplish that. And so we took a system that was much smaller, much less complicated, and much less mature, and through the period of the last 7 years are really working to the point where it can comply with all of the regulations and the functionality that has been required. I would tell you that from a software perspective, we are getting closer, meaning, arguably, the end of the year we could have a piece of software that is very, very close. At the same time, we have committed to not implement software that has any critical defects or severe defects, but yet we are willing to deploy software with medium or minor defects, right. So we are not really trying to get to perfect necessarily, but we are making sure that it can provide all the functionality and doesn't create a situation where a safety problem is introduced. Just in the last month or so, we have found a safety- critical defect in the onboard software which has to be corrected, has to be retested, has to be taken back to the field, and the same holds true for the back-office software. So these are people in the supplier community, this is their business, right, this is what they do for a living, and if they are unable to tackle the technical challenge that has been put in front of all of us, that gives you some understanding of the complexity of the challenge that we have because that is just one piece of the puzzle. Mr. Barletta. Thank you. Thank you, Mr. Chairman. Mr. Denham. Thank you. And I would like to recognize Ms. Brown. If you will indulge me just for a second, though, I am going to turn it over to Mr. Rokita, but I did want to enter one piece of information for the record, without objection. This was prepared in association with the California High-Speed Rail Association. This is their June 2009 request for funding. [The ``San Francisco/Silicon Valley Corridor Investment Strategy for High-Speed Rail'' can be found on page 108.] Mr. Denham. On their request, they request $230 million from the ARRA Investment Strategy from those funds that have been allocated to California, $230 million. Here is a map here where it shows exactly where those improvements would be. Can you zoom that in? Move it up. This corridor here, Positive Train Control, $230 million. The California High-Speed Rail Authority thinks that it can do it. They have requested it. This is in California. We want to have the safety improvements there. Here is a good funding source to do that. Ms. Feinberg. Mr. Chairman, understood. My staff passed me a note during the hearing that states that ARRA high-speed rail funding has been at $328 million. So we will follow up with you and look at those two numbers together and respond. Mr. Denham. Thank you. And I will have a staff member bring that down just for your record as we continue this ongoing exchange. And with that, I would like to recognize Ms. Brown for our second round of questioning. Ms. Brown. Thank you, Mr. Chairman, but would you indulge me for a minute, because when I was out of the room, Mr. Mica said that Amtrak had not implemented Positive Train Control from New Haven to Boston. Not only did they implement it, it was the first in the country, and I want to submit that for the record. Mr. Denham. Without objection. Ms. Brown. Thank you. Now, Metrolink, who I visited with several times in California, and I just want to mention that you had the support of the State, the local recovery money. And funding is the issue for all of the commuter lines, and let's don't sit here and act like it is not, and a lot of the local resources are not available for the other lines. With that, I want to go on to Frank, because you and I want to say all those great things about CSX, but you are the one that is here representing the Class I railroad, and they said that there are some positive players and there are some who are not. Would you give us an update, because we need an extension. The idea that we are going to start fining people, and then where is that money going? Against this reduction? I want the money to go into the system. So would you tell us who are these negative players that they are talking about? Mr. Lonegro. Thank you, Member Brown. There are no bad actors here. This technology is very difficult to implement. The scale proposition that we each have is very challenging, as one of the Members mentioned earlier in terms of the scale of the CSX deployment. For at least the major U.S. Class I's, the scale is about the same, right, we all have that major challenge. The Canadian railroads have a slightly smaller footprint because they don't run as much in the United States and there is no PTC mandate in Canada, so their footprint is slightly smaller. So at least in the Class I world, there are no bad actors. We are all going about this with all---- Ms. Brown. That is not what I heard, though. And are you all working with the commuter lines also? Mr. Lonegro. We are. Each of us has a different set of commuters that we work with. So on the CSX footprint, we have commuters in and around DC, we certainly have commuters in Chicago, and then we have a full spectrum of commuters on Amtrak that run, in essence, from Baltimore up to Boston. So we are in active discussions with them literally all of the time. We hosted a summit in Chicago at Mr. Orseno's facility where we brought in the Class I's in the committee that I chair at the industry level, we brought in all the commuters and all the short lines, and did our best to try to help educate folks on the state of the technology, some of the challenges that we face, so they wouldn't have to face the same challenges as they deployed on their railroads. We had, I think, a good dialogue, and Mr. Orseno can certainly chime in. I think we had a good dialogue. We have kept that dialogue up. We have another meeting planned for later in this year where we can reengage and reassess where we are both individually and collectively. Ms. Brown. What is the drop-dead amount of time that you need, Frank? Mr. Lonegro. As an industry, one of the things that we come forward with is the ability to be hardware complete by 2018 and completely rolled out by 2020. And again, I want to make sure that everybody understands, by the end of 2018, OK, we will have as an industry 87 percent of the PTC footprint installed and implemented, meaning we are operational with PTC, and that is based on current plans, plans that were in place certainly before the Amtrak tragedy, and then the remaining 13 percent is really what comes in those last 2 years. So literally, we are starting to deploy PTC in operational mode right now, right, and then it ramps up from here fairly linearly, but ramps up from here through the end of 2020. Ms. Brown. Ms. Feinberg, how long will it take you all to inspect? If they complete it in 2018, you have some work to do. How long will it take you to verify the system? Ms. Feinberg. Well, they would submit to us a plan, which we would then turn around to them. Then they would complete implementation, and I think things would move quite quickly. The issue there would be that you would be 3 years past the deadline at that point. Ms. Brown. Yes, we understand. Everybody understands that. And we understand that the deadline is not realistic and nobody is going to meet it, and we have some concerns about the fines. Mr. Mathias, I have a real concern about your spectrum, and we have talked a lot about it, even when it is implemented. What about the local responders? We need to be able to talk to each other; 9/11, we discovered that we couldn't talk to each other. And then Katrina, we are still not talking to each other, and even though they are implementing something and Amtrak is implementing something. And then you have those local responders. How come we don't have a dedicated system for emergencies for this country? Mr. Mathias. Thank you for that question. I think that Congress has worked very hard and diligently to create an infrastructure for a national interoperable public safety communication system, and I think that is being addressed in that way, and it is in a separate spectrum band and being handled in a separate process. But that is on the way. Ms. Brown. Mr. Mathias, failure is not an option. We really need to get it done. Thank you. Mr. Rokita [presiding]. I thank the gentlelady. The gentlelady's time has expired. I will recognize myself for 5 minutes. I appreciate everyone's testimony. Mr. Lonegro, I had a couple of questions for you about the two people in a cab situation. In our last hearing, NTSB Chairman Hart testified that having two-person cabs didn't necessarily improve safety, and he was on a panel with several union members and others. I wonder what your thoughts are on that kind of statement. Mr. Lonegro. We have two people in the cab of our locomotives on all our main line trains. We certainly over, I would say, the period of years, if not decades in the future, we will look for the opportunity to reduce the crew size from two to one if the technology supports that and we are able to negotiate an appropriate agreement with our labor unions. I mean, there is a path forward for that, again, when the technology gets to the point where having two people in the cab really is no longer necessary. Mr. Rokita. Roger. Last hearing Ms. Feinberg stated that the FRA is looking at having a two-person crew situation as an interim solution along with probably some additional backstops as well until PTC is implemented, before deadline, after deadline, whenever that is. Would you be supportive of that? Mr. Lonegro. Well, on the freight side I think it is not necessary. We already have it. I think maybe she was referring to the commuter side of the house and the Amtrak side of the house which generally operates with one person in the cab, although they certainly have crewmembers in the train itself. But we already have two. Mr. Rokita. Same question, this is the last question to you, Mr. Orseno. Mr. Orseno. We operate our trains with one person in the cab and two people in the body of the train that are both rules qualified. Two members up in the cab doesn't necessarily mean it is a safer situation. There have been many instances where there have been accidents when two people have been up in the cab. We don't support that initiative. Mr. Rokita. Thank you, sir. Mr. Kerwin, same question to you. Mr. Kerwin. Yeah, we have also evaluated this in the past, and we will continue to monitor the recommendations from the FRA and NTSB on this issue. Mr. Rokita. OK. Thank you. And back to you, Mr. Lonegro. You said you currently have two people in a cab on all routes that will require PTC by 2016 or---- Mr. Lonegro. Correct, all main line routes, yes, sir. Mr. Rokita. OK. So CSX having a two-person crew as an interim solution until PTC is fully implemented on PTC-required routes is logistically doable. Mr. Lonegro. It is already being done. Mr. Rokita. OK. So then would industry be supportive of having two-person crews as an interim solution until PTC is fully implemented, thus, theoretically you would be complying with the requirements of PTC if you had two people in a cab? Mr. Lonegro. Well, there is no requirement for two people in the cab today in the way---- Mr. Rokita. But as an interim solution. Mr. Lonegro. Well, we already have it, and any time we would want to go from two to one, we would certainly have to work with FRA to get approval to do that. So it is just not necessary, at least with respect to the freight railroads, given where we are and the steps that we would have to go through to remove one member of the crew. Mr. Rokita. OK. Thank you. And the only thing I would add for the record is that in addition to any of the other things Ms. Feinberg may or may not have been blamed for today, she now has apparently sent Mr. Mica to the hospital, which obligates me to have to go visit him. Add that to your stack. And with that, my questions are done, and I don't see any more questions from Members. So on behalf of Chairman Denham, let me thank you each for coming again today. We thank all the members of the audience for their attention today. We move forward. And with that, hearing no other business before the committee, this hearing is adjourned. [Whereupon, at 12:15 p.m., the subcommittee was adjourned.] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]