Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- THE STATUS OF ADVANCED NUCLEAR TECHNOLOGIES [Senate Hearing 114-474] [From the U.S. Government Publishing Office] S. Hrg. 114-474 THE STATUS OF ADVANCED NUCLEAR TECHNOLOGIES ======================================================================= HEARING BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE ONE HUNDRED FOURTEENTH CONGRESS SECOND SESSION __________ MAY 17, 2016 __________ [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] Printed for the use of the Committee on Energy and Natural Resources Available via the World Wide Web: http://fdsys.gov ___________ U.S. GOVERNMENT PUBLISHING OFFICE 23-127 WASHINGTON : 2017 _______________________________________________________________________________________ For sale by the Superintendent of Documents, U.S. Government Publishing Office, http://bookstore.gpo.gov. For more information, contact the GPO Customer Contact Center, U.S. Government Publishing Office. Phone 202-512-1800, or 866-512-1800 (toll-free). E-mail, [email protected]. COMMITTEE ON ENERGY AND NATURAL RESOURCES LISA MURKOWSKI, Alaska, Chairman JOHN BARRASSO, Wyoming MARIA CANTWELL, Washington JAMES E. RISCH, Idaho RON WYDEN, Oregon MIKE LEE, Utah BERNARD SANDERS, Vermont JEFF FLAKE, Arizona DEBBIE STABENOW, Michigan STEVE DAINES, Montana AL FRANKEN, Minnesota BILL CASSIDY, Louisiana JOE MANCHIN III, West Virginia CORY GARDNER, Colorado MARTIN HEINRICH, New Mexico ROB PORTMAN, Ohio MAZIE K. HIRONO, Hawaii JOHN HOEVEN, North Dakota ANGUS S. KING, JR., Maine LAMAR ALEXANDER, Tennessee ELIZABETH WARREN, Massachusetts SHELLEY MOORE CAPITO, West Virginia Colin Hayes, Staff Director Patrick J. McCormick III, Chief Counsel Benjamin Reinke, Ph.D., Congressional Fellow Angela Becker-Dippmann, Democratic Staff Director Sam E. Fowler, Democratic Chief Counsel Rory Stanley, Democratic Legislative Aide C O N T E N T S ---------- OPENING STATEMENTS Page Murkowski, Hon. Lisa, Chairman and a U.S. Senator from Alaska.... 1 Cantwell, Hon. Maria, Ranking Member and a U.S. Senator from Washington..................................................... 3 Daines, Hon. Steve, a U.S. Senator from Montana.................. 4 Risch, Hon. James E., a U.S. Senator from Idaho.................. 5 Crapo, Hon. Mike, a U.S. Senator from Idaho...................... 5 WITNESSES DeWitte, Dr. Jacob, CEO and Co-Founder, Oklo Inc................. 6 Gilleland, Dr. John, Chief Technical Officer, TerraPower......... 14 Hopkins, John, Chairman and Chief Executive Officer, NuScale Power.......................................................... 18 Kuczynski, Stephen, Chairman, President and Chief Executive Officer, Southern Nuclear Operating Company, Inc............... 26 Peters, Dr. Mark, Director, Idaho National Laboratory............ 42 ALPHABETICAL LISTING AND APPENDIX MATERIAL SUBMITTED Cantwell, Hon. Maria: Opening Statement............................................ 3 Crapo, Hon. Mike: Opening Statement............................................ 5 Daines, Hon. Steve: Opening Statement............................................ 4 DeWitte, Dr. Jacob: Opening Statement............................................ 6 Written Testimony............................................ 9 Questions for the Record..................................... 81 General Atomics: Statement for the Record..................................... 116 Gilleland, Dr. John: Opening Statement............................................ 14 Written Testimony............................................ 16 Responses to Questions for the Record........................ 88 Hopkins, John: Opening Statement............................................ 18 Written Testimony............................................ 20 Responses to Questions for the Record........................ 91 Kuczynski, Stephen: Opening Statement............................................ 26 Written Testimony............................................ 28 Responses to Questions for the Record........................ 97 Murkowski, Hon. Lisa: Opening Statement............................................ 1 Peters, Dr. Mark: Opening Statement............................................ 42 Written Testimony............................................ 44 Responses to Questions for the Record........................ 108 Poneman, Hon. Daniel: Statement for the Record..................................... 113 Risch, Hon. James E.: Opening Statement............................................ 5 THE STATUS OF ADVANCED NUCLEAR TECHNOLOGIES ---------- Tuesday, May 17, 2016 U.S. Senate, Committee on Energy and Natural Resources, Washington, DC. The Committee met, pursuant to notice, at 10:05 a.m. in Room SD-366, Dirksen Senate Office Building, Hon. Lisa Murkowski, Chairman of the Committee, presiding. OPENING STATEMENT OF HON. LISA MURKOWSKI, U.S. SENATOR FROM ALASKA The Chairman. Good morning. The Committee will come to order. Senator Cantwell will be joining us, but I understand she is stuck behind a motorcade. We come to order this morning to begin the hearing on the status of innovative advanced nuclear technologies. We are holding this hearing because nuclear energy must be a national priority. It provides about 20 percent of our nation's electricity and 63 percent of our emissions-free electricity. It is safe, and it is extremely reliable. When cold winters hit the Northeast and the flow of natural gas is restricted, nuclear plants can continue to provide electricity to residents, literally saving lives. When the wind is not blowing and the sun is not shining, nuclear is still providing essential base load capacity. For any number of good reasons, nuclear has to remain part of the energy mix. In addition to supporting the current nuclear fleet, I have long supported the research, development and deployment of next generation nuclear technologies, including small modular reactors, micro-reactors, Generation IV reactors and future fusion reactors. That support appears to be growing here in Congress which is a good thing for our country. We are entering a new era for nuclear power. The opportunity for innovation in nuclear technologies has not been this great since the 1960's. Despite the many difficult challenges associated with full deployment, technical-- financial, bureaucratic and license-related--there is unprecedented interest from both the public and private sectors. We can help by removing barriers and optimizing our public-private partnerships. Despite the clear benefits of nuclear energy, the industry is at a crossroads. The current operating fleet faces a number of challenges due to political decisions, or state market designs and regulations that skew the value of nuclear to the grid. Moreover, the President's greenhouse gas regulations do not value the contribution of nuclear-generated electricity on a level footing with the other sources of emissions free electricity. In order to facilitate the emergence of advanced nuclear technologies, we adopted the Nuclear Energy Innovation Capabilities Act, which was sponsored by Senator Crapo, as an amendment to our broad, bipartisan energy bill. Senator Crapo is with us this morning. Thank you, Senator, for your contributions on this important issue. That amendment was adopted by a vote of 87 to 4, highlighting the value placed on nuclear innovation on both sides of the aisle. The House has passed a nearly identical bill which we hope, when signed into law, will be a valuable step in getting advanced nuclear technologies to the market. As these technologies are developed they will face further challenges. To give one example, they will have to navigate a complicated and expensive NRC licensing process as they come closer to deployment. I am pleased to have joined, as a co-sponsor, Senator Inhofe's bipartisan bill, the Nuclear Energy Innovation Modernization Act. In many ways that bill compliments the provisions within our energy bill. It helps reform the NRC in smart ways without compromising safety, and I am hopeful that it will be reported quickly out of the Committee on Environment and Public Works. Beyond new legislation we must also continue our fiscally responsible support for nuclear research and development. In that vein, I was pleased that we were also able to increase the authorizations for both the Office of Science and ARPA-E within our energy bill. I believe that removing bureaucratic barriers to public- private partnerships, reforming the licensing structure, and continuing responsible funding for nuclear science RD&D will help drive these innovative technologies to revolutionize the industry and provide robust economic growth. Our nation deployed the first commercial nuclear power plants, and our regulatory structure is still considered the gold standard. Our universities and national labs are world leaders in education and research. I see advanced reactors as the next chapter of America's leadership in this field. This is critical because we must remain the go to country for nuclear know how, especially as many foreign nations increase investment and try to challenge our dominance in this industry. Our nation must continue to be the major player on the world stage for nuclear energy, and we must be able to deploy our innovative advanced reactors here at home. I am pleased to welcome our very esteemed panel of witnesses. We have representatives from a great cross section of advanced reactor technologies at different stages of commercialization, a national laboratory that has been a nuclear leader for decades, and a utility that has consistently supported current and advanced nuclear technologies. I welcome all of you here today. With that I will turn to Ranking Member Cantwell, welcome. STATEMENT OF HON. MARIA CANTWELL, U.S. SENATOR FROM WASHINGTON Senator Cantwell. Thank you, Madam Chair, and thank you for calling this important hearing on advanced nuclear technology. I would also like to thank the panel for being here today and for their work in this important field. The group of witnesses will provide us with a comprehensive viewpoint needed to explore the current state of advanced nuclear technology in this country. Nuclear energy has provided nearly 20 percent of electrical generation in the United States over the past two decades and currently produces 60 percent of American's carbon free- electricity, but the 99 reactors licensed to operate today in the U.S. will not last forever. If nuclear power is to remain part of our energy future, we need to develop and demonstrate the next generation of nuclear power. For me, we also need to deal with the challenges of nuclear waste. I should say, we all need to deal with this. It is something that presses every day for us in the State of Washington. The lack of a comprehensive set of solutions has hampered both commercial nuclear development as well as our defense waste cleanup efforts in this country. Secretary Moniz has worked hard to break the log jam, and I think this Committee will ultimately play a key role in crafting a path forward on this very technically challenging issue. Meantime, we should also acknowledge that while nuclear power has a record of operating safely and cost effectively, there is also potential for catastrophe like we have seen at Fukushima, Three Mile Island and Chernobyl. If nuclear power is to have a future, the problems that we have consistently been plagued by in the past must be met with innovation and effectiveness. New designs must be safer, cheaper and efficient, and proliferation resistant. In addition, we must have licensing and regulatory systems that ensure nuclear power is not only safe but accepted by the public so transparency and open communication by the industry and government is also important. The Department of Energy and private industry have been working to address these problems. There are several designs being considered here in the U.S. and globally that have promising features to address some of these long standing issues. I look forward to hearing from the witnesses today on those specific technologies. Advanced nuclear may, someday, make a real contribution to advanced manufacturing in Washington State and the Northwest Region. I am pleased to have here TerraPower, NuScale and the Idaho National Laboratory. The Pacific Northwest National Laboratory is also making important contributions in advanced nuclear development. The Northwest has proven to be an exciting place for the development of advanced nuclear technologies, and NuScale Energy, Energy Northwest, Utah Associated Municipal Power Systems are all partnering to construct and operate the country's first small modular reactor. In addition, TerraPower and the Chinese National Nuclear Corporation signed a memorandum of understanding to develop TerraPower's traveling wave reactor. So it is clear that making a dent in the global carbon emissions will require cooperation between U.S. and China which may prove to be one of the biggest nuclear-energy markets as well as a testing ground for advanced nuclear. TerraPower's engagement with China is an important example being set for advanced reactor technologies. In order to be a part of the new wave of nuclear energy, the U.S. must be a strong exporter of advanced proliferation resistant nuclear materials and technology. So the advancement of nuclear technology is an important pathway for the global community to move away from carbon emitting technologies. It is vital that the U.S. continue to lead in this area of clean energy, and nuclear solutions may prove to be a key component of our overall efforts. Again I thank the Chair for holding this important hearing, and I look forward to hearing from the witnesses. The Chairman. Thank you, Senator Cantwell, and thank you to our witnesses. We attempted to schedule this earlier in the year and unfortunately you got bumped. Thank you for your flexibility and your willingness to come back before the Committee. At this time, I will introduce a few of the witnesses, and we have a couple members here who would like to do more detailed introductions of some of our witnesses this morning. Our panel this morning will be lead off by Dr. Jacob DeWitte, who is the Co-Founder and the CEO of Oklo, welcome this morning. Dr. John Gilleland, who is the Chief Technical Officer at TerraPower, which Senator Cantwell has just mentioned. Mr. Hopkins will be introduced by Senator Daines this morning, as we understand that he is a fellow Montanan, but I also know that he is a pretty strong fisherman that comes up to Alaska occasionally. So, welcome to the Committee. Senator Daines? STATEMENT OF HON. STEVE DAINES, U.S. SENATOR FROM MONTANA Senator Daines. Well it is my honor to have John Hopkins here from Superior, Montana. He is the Chairman, CEO of NuScale, and it is great to have him with us here today. I am very much looking forward to his testimony and very excited about the innovation coming out of this group of panelists, specifically from John Hopkins' group, on these modular nuclear reactors as part of the solution going forward here with our all-of-the-above energy portfolio. Welcome, John. Mr. Hopkins. Thank you, sir. The Chairman. Thank you, Mr. Hopkins, for being here. After his testimony we will welcome Steve Kuczynski to the Committee. He is the President, CEO and Chairman of Southern Nuclear Operating Company, welcome. It is good to have you here. And Dr. Peters will be introduced by Senator Risch. STATEMENT OF HON. JAMES E. RISCH, U.S. SENATOR FROM IDAHO Senator Risch. Thank you very much, Madam Chairman. Dr. Peters, welcome. I would like to introduce Dr. Peters, who is relatively new at the Idaho National Laboratory. Dr. Peters comes to us from Argonne, where he was an Associate Lab Director, and prior to that he had been employed as a scientist at Los Alamos. He has a deep background in nuclear energy. It is fitting that he comes to Idaho which is the flagship and lead nuclear energy laboratory in America, which we are very proud of. And that is for good reason. Most people do not realize that the first light bulb lit by civilian energy from nuclear power happened in Idaho at the Idaho National Laboratory. We are very proud of that, and we maintain that position. So, Dr. Peters, we are glad to have you. I am sure we will see you frequently here at this Committee. With the Chairman's permission I would like to introduce my colleague and friend, Senator Crapo. Senator Crapo, although not on this Committee, grew up in the shadow of Idaho National Laboratory in Eastern Idaho. He remains engaged and interested. He and I partner on virtually everything that we do over there. In fact, right now we are partnering on a couple of pieces of legislation which we just dropped. With the Chair's permission, I would like Senator Crapo, maybe, to just give us a couple of sentences on those two pieces of legislation which we are introducing. Mike? The Chairman. We are happy to invite you before the Committee, Senator Crapo, and I am happy to have had an opportunity to join you all out at the Idaho National Lab. Senator Risch. That is true. That is right. The Chairman. Very, very informative, and a very necessary, a very necessary, tour for so many of us. Senator Crapo, if you would like to say just a couple of words? Senator Crapo. I know this is not the usual procedure, so I will be very quick---- The Chairman. I do not think you are being picked up by the record. Senator Cantwell. We are happy if you sit on our side of the dais. Senator Risch. Yes. [Laughter.] The Chairman. There you go. Senator Risch. I can assure you he is not very comfortable over there. [Laughter.] Senator Cassidy. Can we get a photo of that? [Laughter.] Senator Crapo. No, not with the sign. [Laughter.] STATEMENT OF HON. MIKE CRAPO, U.S. SENATOR FROM IDAHO Senator Crapo. Well thank you very much. I know this is unusual. So thank you, Senator Risch and Madam Chairman, for allowing me to just say a few sentences. Actually, Madam Chairman, you identified the legislation that Senator Risch just referenced in your introductory comments. So I won't elaborate further on that. We've got NEIMA and NEICA, the two major bills that will reform both the process and create the new emphasis for going into our new advanced nuclear reactors and helping to make them much more aggressively facilitated. I am excited about all of this, and I look forward to working with all of you. Thank you for letting me, kind of, join the Committee for a moment. The Chairman. We appreciate it. Thank you for your leadership on this, Senator Crapo. With that, let's begin with our panel of witnesses. Dr. DeWitte, if you would like to lead off, please? STATEMENT OF DR. JACOB DEWITTE, CEO AND CO-FOUNDER, OKLO INC. Dr. DeWitte. Thank you. Chairman Murkowski, Ranking Member Cantwell and distinguished members of this Committee, I want to thank you for holding this hearing and for giving me the opportunity to testify. I'm honored to be here today, and I'm excited that you are holding this hearing because I've been passionate about nuclear technology since my childhood. I was born and raised in Albuquerque, New Mexico, where my Saturdays as a young boy were often filled with my father taking me to get donuts followed by a visit to the National Nuclear Science Museum. And during those trips I recall being captivated by the science and technology and physics of nuclear power, and I knew from a young age that I wanted to work on nuclear reactors. So I am Jacob DeWitte, the CEO and Co-Founder of Oklo. Oklo is a Silicon Valley-based company developing a very small, advanced reactor that produces two megawatts of power. That's very small relative to without the nominal size of a thousand megawatts. We like to call it sometimes a micro-reactor or a nuclear battery and it is designed to bring distributed, clean, affordable and reliable power in small packages to the market. These reactors fit into containerized systems that can power a wide variety of markets both domestically and internationally which do not have access to affordable and reliable power and in some cases, do not have access to power at all. Our reactor operates purely on natural forces with very few moving parts in the entire system, and it is designed to operate for 12 years before refueling. It will produce reliable, affordable, safe, emission-free power wherever it is needed and the reactor is sized appropriately to open up new opportunities for clean and safe nuclear power in remote and rural communities as well as industrial and military sites in areas that are too small for larger reactors. The Oklo reactor has the potential to reduce these customers' energy bills by up to 90 percent. Furthermore, our reactor is up to 300 times more fuel efficient than current reactors and can actually consume the used fuel from today's reactors as well as depleted uranium stockpiles around the nation. In fact, our reactors and others like them, could power the world for 500 years with the global inventory of used fuel and depleted uranium, all while reducing the radioactive lifetime of those materials. Our reactors can also assist with plutonium disposition by consuming excess cold war materials and turning them into clean, peaceful energy. We started Oklo because we believe advanced reactors will be a significant part of the energy mix of the future, and we wanted to make that future a reality as quickly as we could. So advanced reactors can provide clean, affordable, reliable and extremely safe, carbon free power that can be deployed on a global scale. They offer the promise to realize the energy future envisioned by the intellectual giants upon whose shoulders we all stand. Fermi, Weinberg, Wigner, Seaborg, and others all saw the potential that next generation reactors have. Some of the key attributes of advanced reactors include a competitive economics due to reduced capital cost and shortened construction times, multiple energy output streams ranging from electricity to process heat, improved fuel efficiency and the ability to consume used nuclear fuel, flexible operations such as load following and grid stabilization to couple with renewables, and passive inherently safe designs producing walk away, safe technologies as well as flexible siting independent of access to cooling water. Additionally, advanced reactors enable a broad diversity of reactor sizes. Micro-reactors like ours can bring affordable and reliable nuclear power to areas that cannot support larger plants. Alaska and Hawaii are good examples. But there are a number of places in the continental U.S. as well as other U.S. territories that are excellent candidates for these reactors. The size and characteristics of our reactors also enable us to reach markets that are underserved by existing energy technologies. Looking farther afield, advanced reactor technologies can fuel mankind's ambitions of navigating the stars. We need energy to explore the heavens and nuclear energy will power future trips to our neighboring planets and beyond. This is not science fiction. This is work that is actually happening today. Dozens of startups and large companies are now working to commercialize advanced reactor technologies in the United States. Nuclear innovation is alive and well and advances in computational simulation and modeling, along with an injection of talented, young, creative, hungry engineers into the nuclear industry have fueled much of this growth. Federal efforts to attract students into nuclear engineering programs over the last decade are paying dividends and there is more to come. This activity has also attracted over $1 billion in private investment. And these investments are supporting advanced reactor companies because of their massive market potential as well as the environmental benefits of next generation reactors. And while the capital invested so far is significant, there is still much more that can and will be invested in advanced reactor projects, especially if some of the remaining hurdles are cleared. Advanced reactor developers face a variety of hurdles and challenges to deploying their technologies. One such challenge is the regulatory process which is significant and necessary challenge, but it's a challenge that advanced reactor developers must navigate. Unfortunately, the regulatory process, as it exists today, is not a good fit for these new technologies and the venture finance models that fund them. On the other hand, I must emphasize that the widely held belief that advanced reactors cannot be licensed today is also mistaken. We have found clear licensing pathways for our technology, but at the same time there is room for significant improvement and modernization. We laud the recent work done by the Department of Energy and by this Committee and by the Senate as a whole both supporting the recent legislation that passed into the Energy bill as well as the pending legislation for regulatory reform. These are crucial steps to help us seize the tremendous opportunities in front of us, to advance nuclear power and also the massive opportunities that we have to be the leader at the global stage. Thank you. [The prepared statement of Dr. DeWitte follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Dr. DeWitte. Dr. Gilleland, welcome. STATEMENT OF DR. JOHN GILLELAND, CHIEF TECHNICAL OFFICER, TERRAPOWER Dr. Gilleland. Thank you. My name is John Gilleland. I'm the Chief Technical Officer, as was mentioned. I'm, sort of, CEO Emeritus, I suppose. It is a nuclear design company based in Bellevue, Washington. I'd like to thank you, Chairman Murkowski and the members of the Committee, for the invitation to testify here today and to extend my particular thanks to our home state Senator, Maria Cantwell, who has been a strong supporter of our operations. Thank you. TerraPower's goal is to bring our technologies to markets globally as sources of clean, non-emitting, affordable, base load energy and electricity. TerraPower is the developer of the traveling wave reactor, a full size, sodium cooled, fast reactor. We are also working with Southern Company, Oak Ridge National Lab and the Electric Power Research Institute in the early R & D phase of a very high-potential additional generation for a reactor. We won a DOE-advanced reactor concept award for this activity in January. Today I would like to talk about the traveling wave reactor because we've come a long way and we'd like to convey the lessons we've learned over the last ten years. We've been at this for ten years. In 2006 Bill Gates, our Chairman, convened a group of colleagues from the world of science and technology to address two issues, energy poverty and climate change. Many inhabitants of developing countries have little access to affordable base load electricity. Living standards cannot rise without electricity. Hospitals cannot function without access to reliable power. A child cannot do homework without light to read. It's been known for a long time that access to electrical energy is essential to human development, but the global consensus of scientists is that climate change requires us to radically reduce carbon emissions. Since developed countries and now developing countries are meeting the population's demands for base load power by burning large amounts of fossil fuels, the resulting emissions are locking us into a deteriorating spiral of climate change and damage to our environment. Ten years ago Bill Gates and his colleagues looked at the entire menu of low carbon energy solutions. They concluded that nuclear power is an essential element of any credible, low carbon emissions solution. For the right uses and the right venues, wind and solar will play valuable roles but nuclear is the only known technology that can provide the needed huge amounts of energy with minimum impact on our land use and thus, on the natural world. Nuclear power has already demonstrated its ability to generate large scale, dependable electricity without emissions at affordable prices, and the new nuclear plants now being constructed are setting new standards for accident prevention. We, at TerraPower, are now ten years and hundreds of millions of dollars into our advanced reactor development. As we've guided those efforts there have been many lessons learned. When I talk to students I usually talk about eight to ten of these lessons. For this Committee, I think there are two main lessons. First, TerraPower is already using Federal facilities such as the Idaho National Laboratory. Like other companies TerraPower pays to access the government's highly qualified, skilled researchers and advanced equipment. Ours is already an example of public/private partnership. The bulk of the funds I just mentioned, all from private visionary investors, have gone to universities, businesses and the national laboratories. This is in the spirit of the recent Paris meetings, and we are an early prototype for the breakthrough Energy Coalition's Mission Innovation goals. Neither the national labs, nor private enterprise could have accomplished what they have done without each other. The recent White House summit on nuclear energy endorsed this approach. The Gateway for Accelerated Innovation in Nuclear, or GAIN, aims to integrate the capabilities of the private sector, universities and laboratories. So the first big lesson taught to us over the last ten years is that programs like GAIN do work. That's what we've been doing for ten years. The second big lesson is the government needs to supplement and help the private sector with appropriate and solid oversight functions. We've had good experiences over the last ten years. One of the effective coordination--one is the effective coordination of TerraPower's international activities with the Department of Energy's National Security, Nuclear Security Administration and the Department of State. Another is the helpful set of consultations we've had with the Nuclear Regulatory Commission (NRC). But the lesson learned, as we look into the future and we lay out our particular plans, is that it is increasingly clear that Congress must ensure the NRC has sufficient know how and funding to license this country's next generation of nuclear plants. In closing, I would say our efforts on the TWR and MCFR, which is a Molten Salt Reactor we're doing with Southern Company and others, are but two designs. So we encourage exploration of other innovations such as was talked about by the gentleman to my right. It is only by working together that we will achieve the breakthroughs we need to make advanced reactors in a better world, a reality. The United States possesses unique strengths, technical and cultural, that can make astonishing accomplishments, if and only if we have the wisdom to unleash them. Thank you. [The prepared statement of Dr. Gilleland follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Dr. Gilleland. Mr. Hopkins, welcome. STATEMENT OF JOHN HOPKINS, CHAIRMAN AND CHIEF EXECUTIVE OFFICER, NUSCALE POWER Mr. Hopkins. Thank you, Senator. NuScale Power is currently the leading developer of American small modular reactor technology. This technology has been in development for more than 15 years. Our company is based in Corvallis, Oregon and majority owned by the Fluor Corporation. We are advancing a unique and innovative SMR design which offers the safest light water reactor nuclear technology that is near term deployable. Our design is uniquely safe. We have solved one of the most vexing problems of the nuclear industry with what we call the triple crown of nuclear safety. In a case of a loss of all sources of electricity at the plant, the NuScale Power module shuts itself down and cools for an unlimited period of time. With no operator action required, no need for additional water and no electricity. The NuScale Power module uses simple properties of physics, convection, conduction and gravity to drive the flow of coolant in the reactor. The thermal hydraulic properties and capabilities of technology have been demonstrated through an extensive test program inspected by the U.S. Nuclear Regulatory Commission and which are protected by patents issued or pending since 2011. The NuScale Power module is an ideal option for carbon-free electricity generation. The NuScale design is dramatically smaller than today's pressurized water reactors and eliminates need for safety-related, electrically-driven pumps, motors and valves necessary to protect the nuclear core. It can be factory-manufactured and transported to a site via rail, truck or barge. We are preparing for our first deployment project, known as the Utah Associated Municipal Power Systems Carbon Free Power Project, which will be sited in Idaho and possibly a location on the Department of Energy's Idaho National Laboratory site. We expect to deliver our first project of 12 modules in a 600 megawatt plant to UAMPS for an overnight price of less than $3 billion with commercial operation commencing in 2024. Energy Northwest which operates the Columbia Generating Station in Washington State, has joined this project and holds a first right of offer to operate the UAMPS project. In December 2013 the Department of Energy selected NuScale as the sole awardee for funding in round two of the DOE Small Modular Reactor Licensing Technical Support Program focusing on providing a cost share grant in support of licensing expenses. NuScale may receive up to $217 million of matching funds over five years. We are the only near-term deployable SMR developer receiving DOE funding support, and we are proceeding at full speed toward long-term commercialization. With support from this funding NuScale has expanded its workforce to include more than 600 engineers and has made substantial progress on the engineer and analysis and tested needed to complete the design certification application for submittal to the NRC by the end of 2016. Successful completion of the DOE-funded SMR cost share program depends on sustained congressional support through continued appropriations. We appreciate your past support, and we ask that you continue to prioritize small modular reactor programs in a tight budgetary environment. A risk to the delivery of our technology as currently planned is the uncertainty of the time and process for the NRC design certification and combined operating license efforts. In order to meet our customer needs to deliver carbon free electricity to their grids, we must be positioned for commercial operations in 2024. NuScale has been engaged with the NRC in pre-application review efforts since April 2008. We are on schedule to submit our design certification application by the end of this year, and the NRC plan currently reflects a 40-month review process. We are currently working with senior staff at NRC to complete the final issuance of the new scale design specific review standard expected by the end of June 2016 which provides the acceptance criteria for their review of our DCA. We appreciate the quality interactions we continue to have with the Office of New Reactors and their dedication to a thorough and timely review. It is important that sufficient NRC resources are assigned to review in a NuScale application to ensure completion within the 40-month schedule so that we can be in position to meet the growing marketplace demands for our carbon free energy source. I'd like to thank the Committee for holding this important hearing. And I look forward to any questions you may have. Thank you. [The prepared statement of Mr. Hopkins follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Mr. Hopkins. Mr. Kuczynski, welcome. STATEMENT OF STEPHEN KUCZYNSKI, CHAIRMAN, PRESIDENT AND CHIEF EXECUTIVE OFFICER, SOUTHERN NUCLEAR OPERATING COMPANY, INC. Mr. Kuczynski. Welcome. Good morning, Chairman Murkowski, Ranking Member Cantwell and members of the Committee. My name is Steven Kuczynski. I'm the Chairman, President, CEO of Southern Nuclear Operating Company. We operate a fleet of six nuclear power reactors at three sites and are constructing two state of the art AP1000. That's Advance Pass of 1000 reactors at Plant Vogel near Augusta, Georgia. It's an honor to appear before this Committee to share my views on advanced nuclear technologies, an area that is pivotal to our nation's future and worthy of this Committee's interest. I currently serve as Chairman of the Nuclear Energy Institute Advanced Reactor Working Group, or ARWG, an industry initiative created with the understanding that today's decisions about nuclear energy, research and development will enable a nuclear fleet of the future. Today the U.S. fleet of 100 commercial reactors which provides 20 percent of the nation's electricity is comprised exclusively of light water reactors. They are called light water reactors because they use ordinary water for cooling purposes and to moderate the nuclear chain reaction. In some other countries, such as Canada, deuterium oxide is the main coolant to moderator. Deuterium oxide is heavier than water which is why these reactors are commonly known as heavy water reactors. Taken together light water and heavy water reactors have proven to be the safest, most efficient, cost effective means of electricity generation. Within the ARWG we see tremendous promise for even better, more innovative nuclear reactors, and we are actively working toward achieving demonstration of multiple advanced reactors by 2025. We believe commercial deployment is feasible by 2035. Advanced reactors are often called non-light water reactors because they do not use water as a coolant or a moderator but neither do they use heavy water. Instead, advanced reactors under consideration in the United States are being designed around the use of liquid metals, salts, gases or other advanced techniques. At Southern Company we are actively engaged in researching and assisting in deployment of advanced reactor technologies including the prismatic block high temperature gas cooler reactor which is expected to be significantly more efficient than current operating reactors and the molten chloride fast reactor which we are exploring under the DOE Advanced Reactor Concepts Program alongside TerraPower, Oak Ridge National Laboratory, the Electric Power Research Institute and Vanderbilt University. We are very proud to be working with these distinguished organizations. So one might ask, why support advanced reactor research and development? We know that significant new electric generating capacity will be required in the decades ahead to meet the nation's growing energy needs. Nuclear power is an attractive option for meeting this demand with reliable, affordable, clean sources of base load electricity with zero emissions. And advanced reactors will be even more efficient, produce less by product material, have enhanced safety features, require even a smaller geographic footprint, come at a lower cost to customers and be capable of using a broad range of fuel types. In addition, advanced reactors are expected to be scalable, meaning they can be constructed in varying sizes, and able to adjust output to meet variable demands or supplement intermittent renewables. They will also provide a valuable source of process heat for a wide range of industrial customers, and we see tremendous promise for military installations to use these technologies to generate electricity and provide energy to meet other needs. In addition to the work we're doing with Gen IV reactors, Southern Nuclear is engaged with the industry's effort to bring small modular reactors to market. In closing I'd like to highlight five key points for the Committee. First, collaboration between the Federal Government and the private sector will be critical to promoting nuclear energy innovation in the United States. As was true in the early days of nuclear technology development, the national labs will need to play a central role. Importantly, the national labs have the resources and facilities, as well as the flexibility within the existing regulatory structure to accomplish significantly more advanced R and D work than a private U.S. company or university could do alone. Second, the Federal Government needs to move forward with innovative licensing frameworks and regulatory structure tailored for advanced reactors. The current regulatory system with its exemption based licensing approach built around light water reactors will be ineffective for licensing non-light water technologies, makes it difficult to attract private investment. Southern Company is taking a lead role in industry led licensing modernization initiatives. Third, innovation benefits from competition which is why the Federal Government should support advanced reactor programs without picking the ultimate winners and losers at this point. Fourth, the U.S. must remain the global leader in nuclear energy technology, as we have been in the past. Many nations are currently working on advanced reactor designs. Our nation should not cede leadership in nuclear power innovation to others. Finally, the ARWG's goal of commercial deployment by 2035 is, in my view, achievable. With the current fleet of reactors, it took just a decade to progress from a concept to commercial operation. This required innovation, collaboration, leadership from forward thinkers like Admiral Rickover and the strong support of Congress and the Executive Branch. Our nation has the knowledge and expertise to make this kind of technological progress in nuclear energy happen again. As before, innovation and collaboration will provide the keys to success. Again, thank you for allowing me to appear before your Committee, and I look forward to your questions. [The prepared statement of Mr. Kuczynski follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Mr. Kuczynski. Dr. Peters, welcome to the Committee. STATEMENT OF DR. MARK PETERS, DIRECTOR, IDAHO NATIONAL LABORATORY Dr. Peters. Thank you. Thank you, Chairwoman Murkowski. Thank you, Chairwoman Murkowski and Ranking Member Cantwell and members of the Committee for this opportunity to speak to you today. I am Mark Peters, Director of the Department of Energy's Idaho National Laboratory (INL), the lead national laboratory for nuclear energy. I'm pleased to participate in this most distinguished panel before the Committee, and I'll request that my written testimony be made part of the record. The Chairman. It will be included. Dr. Peters. Before I begin my testimony, I'd like to thank Senator Risch for his support of INL and for co-sponsoring the Nuclear Energy Innovations Capability Act, authored by Idaho Senator Crapo, Senator Booker and Senator Whitehouse. This legislation, as part of the Senate Energy bill, is the companion to the House measure of the same name. The House and Senate legislation are important enablers to much of what I will discuss today. The U.S. is widely recognized as a world leader in the development of advanced nuclear reactors; however, leadership is earned, not granted and other nations are investing to develop the facilities, capabilities and people necessary to excel. The U.S. has the opportunity to regain domestic manufacturing and supply chain capabilities lost when we did not build new reactors during the last 30 years. Small modular reactors and advanced nuclear reactors can be entirely sourced in the U.S. creating new advanced manufacturing facilities vital for economic growth. The value proposition for U.S. nuclear energy has never been stronger. There are strong global and domestic interest in nuclear energy due to the recognition that safe, secure, reliable and affordable energy is the engine for economic growth, prosperity and quality of life. The U.S. cannot meet increasing electricity demand and stringent clean air goals with renewable energy alone. In this effort nuclear and renewables become complementary. Safe and reliable nuclear energy provides 19 percent of total electricity and 63 percent of the U.S. electricity sector's carbon-free generation today. We are on the cusp of a fundamental transportation in nuclear energy. The existing light water reactor fleet will serve as a bridge to SMRs and advanced reactor technologies. We have developed tremendous expertise in operating light water reactors at the highest level of safety and efficiency and that expertise is relevant to advanced reactor design and operations. Our conversations with advanced reactor developers indicated challenges in two main areas: resolving technical and licensing challenges at an early stage and addressing remaining technical licensing and economic questions at the demonstration and deployment phase. In November the Administration announced formation of the Gateway for Accelerated Innovation in Nuclear, the GAIN Initiative. GAIN will provide the people and facilities to develop and test key components and mitigate uncertainty while allowing developers to fine tune their designs. Resolving technological risks can give investors the confidence to move forward with increased financing for an advanced reactor design. As a core part of GAIN, INL and our national laboratory and university partners are the portal for designers and developers interested in a wide range of DOE nuclear energy related capabilities and expertise. For the later stage commercialization, companies may access INL and other government sites for demonstration and deployment capabilities which can reduce costs and improve performance of their design as it moves to full commercialization. An example of this is the recent announcements related to potential siting of a NuScale SMR in the INL site which will provide a near-term opportunity to provide a demonstration platform for innovative nuclear technologies. New types of industry partnerships are also driving strategic investments. For instance, INL is working cooperatively with TerraPower to build new capabilities to provide R and D support for the traveling wave reactor concept Dr. Gilleland discussed earlier. The experimental fuels facility at INL's materials and fuels complex has gone a transformation in recent years to expand capabilities for the traveling wave reactor. Madam Chair, we are creating a new paradigm in nuclear innovation and nuclear energy. This paradigm involves new ways of working with the diverse nuclear community that includes utilities, startups, large nuclear suppliers, government entities, non-profits and everyone on this Committee. We are your national laboratories, and we're open for business. Recent White House and DOE initiatives as well as congressional legislation and funding are setting the stage for research, development and deployment of new and advanced nuclear energy systems. The end result will mean cleaner, more plentiful energy with the potential for lifting billions out of energy poverty. Thank you for inviting me to testify, and I look forward to your questions. [The prepared statement of Dr. Peters follows:] [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you all, I appreciate the testimony this morning and your leadership in these areas. Thinking about the exciting developments and the prospects, and Dr. DeWitte, your focus on micro-reactors is really quite exciting for a place like Alaska where we are not connected to anybody else's grid. You have to have some level of scalability. You have to be able to take it down to small communities or perhaps with our military installations. I look at this and see there is room for extraordinary potential. As with any good idea though, you have situations relating to the financing and you have a regulatory process; so I want to start with my questions this morning on the regulatory aspects. Mr. Hopkins, you probably have as much experience as anybody with NuScale in terms of the process that you have gone through. You have been underway for about 15 years working with the NRC since 2008. As you have outlined it, my take away is you think that you are able to work within the NRC licensing process as it is. Mr. Kuczynski, you have suggested that there are some real challenges within the process as it exists today taking these new technologies and basically trying to make them fit within a structure that has been designed for basically a different model or a different approach. I would like to have a more full discussion on this issue of whether or not we need to see this licensing framework restructured, to be more adaptable to recognize that we have a whole range of different technologies that we are considering right now. Recognizing that time is money, what do we do with the regulatory process as it exists now? I kick that out for general discussion. Mr. Hopkins, Mr. Kuczynski, go ahead. Mr. Hopkins. Senator, we have been working with the NRC, since 2008. However, there are differences between our small modular reactor and a large plant. There are exceptions. As an example, we don't have any hydrogen production because we're oxygen starved in our reactors; therefore, we don't need a hydrogen re-combiner. So there are things that we are working with the NRC, which takes a lot of time and effort, to get them understanding what those differences are. We typically do what's called topical reports. So any of these variances that we see we write a technical paper for review by the NRC. And so far, I think we've submitted eight or nine of these topical reports. I believe we have 15 to submit. But we view our opportunity here, as was mentioned earlier, to help pave the way for the next Gen IV advanced reactor because as the NRC stays focused and understands the nuances and change. Although we are a light-water reactor, which they've known the technology for 50 years, there are nuances that are different in small modular reactors. Our hope is, as we go through this process which we budgeted right now in the neighborhood of $50 to $60 million, to go through design certification application, we'll also be able to enhance the advanced reactors going through, as you mentioned, the gold star or the gold plate of the NRC. The Chairman. So you are paving the way for others, but I am sure that there are a lot of others sitting back and watching the NuScale process going forward saying maybe we do not want to be number two, maybe we want to wait until the process is a little more complete, having to produce these assessments or these analyses every step of the way. Mr. Kuczynski, you have mentioned that Southern is looking into a more innovative licensing process. What are you recommending? Mr. Kuczynski. Yes, let me clarify and thank you for that question. I'll tag onto what John has to say. In my opening remarks I talk about light-water technology, and the SMR that NuScale is building is a light-water technology, just a different type. So the existing regime is probably more suitable than it will be for advanced reactors. And so, my comments are around what we are all calling now, modernizing the regulatory, kind of, regime. And through a lot of work with a lot of groups, we've all, kind of, landed on, I think, kind of, four cornerstones of what we think needs to be done in the regulatory arena. One, it does need to be modernized to accommodate fuels that are completely different, designs that are completely different, outside of our knowledge base. So there are really four things we're talking about. First being a more performance-based, meaning just set the expectation of what these products need to deliver and let the innovators figure out how to do it versus a really prescriptive approach. Second is bringing a more risk informed basis into the whole regulatory regime. The third one is really around a staged process and there's a number of reports out there that talk about trying to retire the technical risk in a more staged process instead of all the upfront investment without certainty of whether those kind of design concepts will be approved. And then the fourth one is really modernize a framework to be technology inclusive so that it doesn't focus just on light water technology. What is very good though is as we progress in the SMR licensing activities, it really builds on our Generation 2, our advanced passive reactors, and that there are some generic issues that, we believe, will be resolved through the SMR licensing process that has a direct relationship to advanced reactors. Things like the emergency planning zones, containment, security, control room staffing, those are very good generic issues that, as John said, can pave the way for resolving some of these before advanced reactors need to be put together. The Chairman. Alright, thank you. Dr. Gilleland, I am well over my time, but if we have an opportunity to continue this, I would like to gain more information. Senator Cantwell, please go ahead. Senator Cantwell. Thank you. Thank you, Madam Chair. Dr. DeWitte, on behalf of Senator Alexander and myself, since you mentioned visiting museums as a young child, we invite you to visit the Manhattan Project, the B reactor in the State of Washington. I am sure Senator Alexander will extend his own invite to you. The reason I am bringing that up is because, I think, you crystallized in your testimony the opportunity, how big of an opportunity, this was in the past. And, as you said, the giants that we stood on like Fermi. My question is really to you if you want to weigh in, but also to Dr. Gilleland and Dr. Peters. This China market which I am a big fan of the U.S. trying a clean energy strategy just because they're 40 percent of the energy use. So anything we do together helps accelerate the deployment. They are now 73 percent dominated by coal. Could you talk about the market opportunity for the new reactors? Dr. Peters, could you also talk about this new materials development, the research and development on new materials that would help us on our current, the development of new materials and how that helps us in reaching this market opportunity? Dr. Gilleland. Well, certainly working with China is a good thing for the United States because it is the huge market. It's the dominant market in the world. They're going to build tons of reactors and maybe someday hundreds. Our motive, of course, was to work with China because it would make the most difference on the emissions front and they are set up to proceed with actually trying out these new reactors. So we have a joint venture which we're about to sign the CNNC to proceed with a prototype. Our motive here also has been to keep the United States in the game, as it were, because I think we have this unique combination of capabilities between the national labs and our way of doing things rapidly and entrepreneurially and innovatively. And so, that combination is, I think, very, very powerful. Now the agreement would involve us being equal partners. Whatever gets built in China can be built in the United States. In the 2030's when we must replace the coal plants, I would hope to see a wave of construction and activity back in the United States. So it is a way for us to participate in the dominant market, make the biggest difference and equip ourselves to do the right thing in the United States. Senator Cantwell. The expertise of the labs helps us leverage this technology. So I want to bring in Dr. Peters here, that it is the labs that helps keep the supply chain in the United States, our skill level, our innovation, our technology. The supply chain would? Dr. Gilleland. Yes, there's nothing that keeps you more focused than trying to build something. Your dogma goes out the window because you're trying to solve real problems with a new type of reactor. And we have engaged about 50 institutions in the United States in a very focused way. And most of that hundreds of millions of dollars has gone to those institutions. It is the building of the supply chain, a very advanced supply chain. And I think in the future almost all of our advanced reactor activities will be international in nature. That's just the way the world is working right now. You look around the world where the energy is needed and where the emissions must be low and that's the message to us. So we have to get in there and try to lead. That's what this is all about. Senator Cantwell. Dr. Peters? Dr. Peters. Yes, thanks, Senator. So first and foremost let me completely support what you said that actually the national labs and universities in the U.S. are a differentiation and they remain a differentiation for us, as a country. Granted, manufacturing has wavered but the world still looks to us for that expertise. And so, that is an advantage that we still have. A couple of examples, and this isn't just at INL, I would also mention Oak Ridge, Los Alamos and PNNL as being/having expertise. But two examples. In the fast reactor space, much like what TerraPower is developing, you have either a metal or an oxide fuel depending upon how you want to manage your safety case. But we still have world leading expertise in both of those fuel types. That's some of what is being brought to bear in the case of the collaborations with TerraPower as they're developing a metal fuel for a sodium fast reactor. But also for high temperature gas reactors, Steve mentioned those TRISO fuels, so silicon carbide particle fuels. Oak Ridge has a world leading position there, and we support that as well. So when you look at the advanced fuels for these reactors, the expertise sits at the U.S. national labs. Senator Cantwell. Thank you. Thank you, Madam Chair. The Chairman. Senator Cassidy? Senator Cassidy. Thank you, Madam Chair. Mr. Hopkins, the SMRs, I was looking at your thing. You are still going to have it surrounded by 7.4 million gallons of water. I did not have time to do the math, but it still seems like although it is small and modular, it is only small relative to the current. But it is really still a substantial footprint, I presume? Mr. Hopkins. Actually sir, to your point, it's 7.2 million gallons. That's the ultimate heat sink that the module sits in. The actual footprint for a 600 megawatt plant is nominally about 32 acres. So you could expand that out to, let's say, 100 acres or 150 acres, but the footprint itself is only 32 acres. So our sweet spot, we believe, in the United States quite frankly, is for coal replacement. So if you think of the majority of coal here in this U.S, it's been 300 to 600 megawatts. We're hoping, in fact our first project is actually for coal replacement, is to be able to put in with the existing infrastructure a 600 plant, 12-module facility. Senator Cassidy. Now let me ask, I live near Entergy River Bend Nuclear Power Plant in Louisiana. I went and toured it, and they literally have a paramilitary force on hand for security with video surveillance of the fences. Every now and then they catch a raccoon trying to sneak in, that sort of thing. Will that be required for the SMRs? Mr. Hopkins. We're currently in discussion with the NRC. If you look at the actual footprint of the plant itself, the reactor building is a rectangle box. And so we believe if you look at the minimal number of entrances and exits, we could reduce that security plan, but that's still something we're in discussion with the NRC. So our general belief is the answer is yes, we can reduce that security force. To what number? We don't know at this time. Senator Cassidy. But would it still require 24/7 security? Mr. Hopkins. Yes, sir. Senator Cassidy. With AK---- Mr. Hopkins. Well, there's new technologies that are out that we're looking at right now that are non-lethal technologies that some of the labs are currently working on. So we're exploring different options. But we---- Senator Cassidy. Mr. DeWitte, would you require that same sort of security footprint? Because I can imagine you are someplace desolate, if there is a desolate place in Alaska. I am sure there is not. [Laughter.] Where you have this, sort of, small operation, but nonetheless it is radioactive material. Could somebody helicopter in, grab it and take off with it and make a dirty bomb? Dr. DeWitte. That's a great question. First, that leads me to just think the work that NuScale is doing to help answer some of these questions and leading the way on these things because the discussions they're having will inform how we approach this. Because fundamentally, when you think about what we're doing and our size, it's very similar to research and test reactors that are at college campuses across the country. They're very safe, very secure. Their security intervention usually involves relying on campus or local police to get there in a certain time period because the amount of material is so small. Fundamentally that's, kind of, the same approach that we believe we can take and still meet all the objectives, not to mention the fact that the material is very heavy and hard to get at and hard to deal with in order to actually divert to do something with it. Senator Cassidy. Okay. Mr. Kuczynski, you had mentioned, you used the word ``affordable.'' But what I understand about what Southern Company is doing with nuclear, it is quite unaffordable. I asked an energy company why they were not doing what you all were, and they said listen, we can make ten natural gas plants for the cost of what they are doing, and they are cheaper to operate. Now I have learned to say what I have been told, not what I know. So I say that not to challenge, but just to say what someone else has said. Your thoughts about that? That natural gas, the economics of nuclear, at least the scale that you are doing right now does not work with natural gas? Mr. Kuczynski. Yeah, I would respectfully disagree about the economics and our working. Essentially our project, when we certified it about six years ago, we anticipated a 12 percent rate increase to our customer base. Currently today we expect that to be less than seven percent, maybe around six and a half percent. So this is a $14 billion project that's actually going to come in on a lower rate impact where customers, when we're completed, then when we start it, we think that's a phenomenal achievement. And---- Senator Cassidy. I do not know how all this works in your business model, so again, I am asking not to challenge, but to learn. If somebody had built the equivalent number of natural gas powered plants at today's fuel prices, would it have cost $14 billion to generate the same? I think you have 2,000 megawatts. Mr. Kuczynski. Yes, of course it would be less. But you make a big assumption about today's fuel prices. If you take a levelized approach, equalize it over 40 to 60 years, there isn't anybody that would give you a contract on 40 years on gas prices. So we diversify our fuel mix in an effort to do clean, safe, reliable and affordable energy for the long-term and you need a diversification of fuel supply. We cannot be all gas. In fact, our fleet has now transformed itself from less than 20 percent gas to over 55 percent gas by just fuel switching. So our ability to switch fuels based on the economics is a tremendous advantage for Southern Company, and that's why electricity rates are among the lowest in the country and reliability is the highest. And that's why we're able to attract economic development in our part of the country. So we're huge proponents of nuclear. It's stable, strong, reliable. And this plant is going to be around for 60, likely 80, years, with very, very stable cost bases. Senator Cassidy. If I might ask though, the $14 billion that you are, for the 2,000 megawatts, how much would it have cost to do that with natural gas-fired plants? Mr. Kuczynski. Yeah, I'm not an expert at that at this point in time. I can get back to you afterwards. Senator Cassidy. Please. Mr. Kuczynski. But essentially you have to look at it not on today's fuel prices. And we've done the economic analysis with nine different scenarios and nuclear. Continuing our project is, by far, the most economic result to date for our project. Senator Cassidy. Thank you. I yield back. The Chairman. Thank you. Senator Heinrich? Senator Heinrich. Madam Chairman, I want to thank you for this hearing. I think it is important that we look at advanced fission technologies. I also want to suggest that it might be useful, at some point, to have a second hearing on the status of nuclear fusion research as well where there are some pretty exciting developments, particularly around new materials developments and super conducting magnets at places like MIT. I want to start with Dr. DeWitte. First off, where did you get your donuts? I think that is an important question. Dr. DeWitte. Johnson Donuts. [Laughter.] Senator Heinrich. Excellent, very good answer. More to the point today, can you talk a little bit more about the design that you are pursuing, where you are in that process? And then what are the implications for things like fuel and spent fuel or waste, I should say, because you mentioned you are using spent fuel as your fuel source? So what does your waste stream look like and what are the challenges of dealing with spent fuel which is, obviously, highly radioactive? Dr. DeWitte. Sure. Thank you for the question, Senator. So a couple things. We launched in 2013, and we've been working on this for a few years prior. And the reason we started on this very small concept is because we surveyed the field and saw that the economic opportunities of going small and starting off grid were very favorable, economically, for doing nuclear at these sizes, as well as the fact that it was a manageable approach to a new technology from a start ups perspective. Starting something small like that gave us a vector on how to tackle these issues. So we've completed our confirmatory testing on what we're aiming to do with the system and completed verification and validation testing on full scale heat transport. We're moving into building an exact scale non-nuclear prototype later this year that will complete our transient testing on other things, much, similar, very similar, to the work that NuScale did several years ago building up the prototype testing plant. One nice thing about us though is we're so small we can do everything at the exact scale. So that helps. We anticipate submitting a license to the NRC sometime around 2018/2019, a license application, I should say. And what we would like to do is have our first reactor deployed in the very early 2020s. And we'd love to go as fast as we can to do that. But that's, kind of, the nominal targets we've set. In terms of dealing with the fuel, we anticipate the very first reactors will be fueled with normal enriched uranium, low enriched uranium. Because of the difficulties in dealing with spent fuel, we don't really want to add that risk into the very first one. When I say risk, I mean technological risk, into the first reactor. Senator Heinrich. What kind of enrichment level? Dr. DeWitte. It's on the order of about 15 percent. Senator Heinrich. Okay. Dr. DeWitte. And mind you, these are very small reactors, so it's a small amount of fuel. But we do, we are interested in opportunities to help with the plutonium disposition issue going on with, specifically related to the MOX plant in South Carolina. Senator Heinrich. Right. Dr. DeWitte. That would not be as much of a technological reach and it would prove out a lot that we'd like to do with spent fuel. And there are some interesting technologies that we anticipate using to accelerate getting spent fuel into reactors for destruction and transmutation because what we do is we can fission all of the actinides over time. And what you're left with are fission products that normally have a half-life of about 30 years. So they're more or less gone in about 300 as opposed to the tens to hundreds of thousands with actinides. Senator Heinrich. Okay, thank you very much. I want to get back to this issue that Senator Cassidy raised about general economics. Dr. Gilleland, I think you mentioned affordable nuclear power, and certainly Mr. Kuczynski, you walked through this a little bit. But I am having a hard time reconciling a number of information points. I did a little bit of Google research this morning about this that is in the news, and one of those stories that came up was around two large reactors in Illinois that have light water reactors that have lost about $800 million over the past six years. I am trying to figure out what kind of unsubsidized, levelized costs per kilowatt hour is everybody targeting to ensure that these advanced technologies are actually competitive in the marketplace? For any of you really. Dr. Gilleland. Well certainly, as Bill Gates said all the way through from the beginning, if you can't afford it, it's all theory. But the fact of the matter is in the case of the traveling wave reactor. Since you eventually do away with enrichment and you never need reprocessing, since the reactor would reduce the amount of waste produced by about a factor of five, since the basic fuel would be depleted uranium which is already mined, there's enough at Paducah to power the United States' fleet for hundreds of years. You add all those things up and you end up with a lower price of electricity. I'm not a great economist, but if you don't have to do something it's less expensive. Senator Heinrich. Sure, but---- Dr. Gilleland. And so the---- Senator Heinrich. There is going to be---- Dr. Gilleland. Levelized carbon. Senator Heinrich. A target in terms of a cost per kilowatt hour that makes sense. I mean, we are seeing PPAs now at ridiculously low prices compared to what we saw a few years ago. So I assume all of you have a goal for where you need to get to, to make sure that ten years from now as some of these technologies continue to come down the cost curve, that you are ahead of that. Dr. Gilleland. Yes. And our levelized costs, I don't have those right in my head right at the moment. They're in the range of seven to eight cents per kilowatt hour, that kind of range, roughly speaking. And we often compare to alternatives and since our system is so much simpler and since the waste produced is so much less and since the fuel is right now considered waste, that goes a long way. Some people confuse depleted uranium with spent fuel. Spent fuel is what's been used and it's now radioactive and is sitting around the country waiting for disposition. Depleted uranium is that vast quantity of uranium sitting behind enrichment plants. It's never seen a reactor. It's never been in one. Ninety something percent of all uranium mined is not useful as fuel. And our objective was to take a look at Paducah and these other fuels of uranium and say, if you can burn that you're up a factor of ten in your fuel supply, it's already mined. There's no CO2 in mining it. If you can burn it very efficiently with burn ups of 30 percent, several--an order of magnitude higher than present fission plants, then basically you're extending the fuel supply by about a factor of 40 to 50. And that's done without need for a proliferation prone processes such as reprocessing. The Chairman. Thank you. Senator Risch. Senator Risch. Well thank you very much, Madam Chair. Dr. Gilleland, your understanding of economics is a lot like a lot of us Americans but you need to spend a little more time with the government. [Laughter.] Senator Risch. When the Government was shut down here they told us by not doing it, it was going to cost us more than doing it. So it gets very complicated when you get into government economics as opposed to just plain old common sense economics. Dr. Peters, the advanced test reactor which is certainly one of our important facilities at the INL has been used for testing fuels for the Naval Nuclear Propulsion Program, and it has been very important in that regard. There has been some talk about how the ATR could be used to support the gateway for accelerated innovation for nuclear initiative. Could you talk about that for just a minute for us, please? Dr. Peters. Sure, thank you, Senator, thank you for the question. Good to see you. So as you already said the advanced test reactor has been operating since the 60s, and its core mission to this day is to support the nuclear navy and that continues. And also note that we have a line of sight to this machine being operating as far as 2050, if not beyond, to continue to support that mission. But there's already an existing part of the ATRs mission that's a part of the National Science User Facility that DOE funds that actually funds university researchers and industry researchers and other lab researchers to use some of the irradiation time at ATR to do work on our current nuclear energy system and also advanced nuclear reactor systems. So really, yes, it will be a part of the test bed. It's a good example, actually. ATR and the High Flux Isotope Reactor at Oak Ridge are two good examples of test reactors that will be an important part of the GAIN test beds. So and we're continuing to look to ways to, sort of, expand the capability of ATR to be able to be more responsive to industry needs. Senator Risch. Thank you, I appreciate that. I recently met with the people who founded the Transatomic Power where they are dealing with these new molten salt reactors which, I guess, is kind of new to me and probably not to you people who work in this on a daily basis. But what can you tell us about that briefly, about this technology? Dr. Peters. It's an exciting technology. Actually, the founders were at school with Jake, at the same time with Jake at MIT. So it's another example of some of these exciting startups that are emerging from the university community. It's a molten salt technology. It operates at high temperatures. It's a very exciting technology. It's early in its development, but it's a perfect example of an early stage company that needs access through things like GAIN to capabilities at the laboratories to be able to do testing and evolve their design. But, I mean, yes. There's--48 companies. Jake's being one, Transatomic being another that are out there with advanced concepts both fission and fusion, actually. And so the whole idea is to try to make sure that the labs are open to helping all of those companies at whatever stage of maturation they're in. But there's reasons to be very excited about Transatomic. Southern's, for example, working with Oak Ridge about molten salt technology as well. But when you look at the laboratories, the reactor technology sort of grew up through the laboratories in different ways. And actually the resident expertise in the laboratory system in molten salt tends to sit at Oak Ridge National Laboratory. They have a prominent capability there. Senator Risch. Thank you. Last, every time I visit the INL there is always a discussion about new talent coming into the pipeline. There does not seem to be as much interest as there should be in young students wanting to take on nuclear physics. Can you talk for a minute about the partnerships that the INL has formed with our universities in Idaho to try to nurture this and resolve this issue and move it along? Dr. Peters. Yes, sure. So we have partnerships with, close partnerships, with Idaho State University, University of Idaho and Boise State, but in the nuclear energy area, particularly with Idaho State University, and the University of Idaho. And so we're working actively with them to bring students to the laboratory so that the students are not only getting training/education at the institution but also understanding doing research at the laboratory and a lot of back and forth between the university and the lab. Also working with them to help devise their curricula in a more effective way to train the next generation. And that's a great partnership, but also, as part of the partnership that manages the laboratory, as you're aware, we have a national partnership. So we have other universities that are a part of that, part of the partnership that includes MIT, NC State, Ohio State, and University of New Mexico and Oregon State as well. And so there's a national picture as well. But I should say that, I mean, witness the guy at the end of the table down here. There's a change. The young people that are coming out today out of undergrad and grad school are looking to save the world and they're realizing that nuclear has got to be a part of it. I didn't feel like that was there, say 15 years ago, so I'm just really excited about it. Senator Risch. That is good to hear. Thank you so much. Thank you, Madam Chairman. The Chairman. Senator Manchin? Senator Manchin. Thank you, Madam Chair, and thank all of you. I will start with you, Mr. Kuczynski, since you are in the utility business. Do you agree with the EIA's forecast as far as an energy mix is going to be needed through 2040? And I guess, depending on whether the Clean Power Plan goes into effect or no, it does not. But they have, I think I can go a few figures. They had coal at 30, 32, 33 percent. You had natural gas at 30, 31, 32. Renewables at 18 and nuclear at 16. And even with the Clean Power Plan nuclear still stays at 16. That does not make sense to me. But do you agree with the forecast? Do you all see that? Mr. Kuczynski. We look at a number of forecasts whether they're out at APRI or EIA. We do know that we're headed to, I think, a carbon constrained future. That seems to be embedded in every, kind of---- Senator Manchin. Do you all have concerns as Southern about the reliability of this system? Mr. Kuczynski. We do not have concerns about the reliability of the system. We have an extremely robust system. Part of being in a regulative, regulated vertical we are able to invest significantly in our systems. So despite, you know, severe weather in our area we have tremendous functionality in our transmission distribution. We do believe nuclear is going to play a role, and we think some studies show nuclear playing a much stronger role. And that is why we're participating in this area of advanced reactors because not only do we have a deployable, large scale base load that we have solved the engineering, regulatory and almost all the construction risk already with the AP1000. Senator Manchin. Let me ask---- Mr. Kuczynski. It is ready to go. Advanced reactors could even expand us further. That's why---- Senator Manchin. Will advanced reactors, will you be able to ramp up and ramp down as power demands? Mr. Kuczynski. Many of the advanced reactor designs---- Senator Manchin. Because right now I do not think they do that, do they? Mr. Kuczynski. Are designed to do that. In fact, they could couple very nicely with the renewable energy sources. Senator Manchin. That is what has been so attractive with the natural gas because gas is easy to ramp up and ramp down and the others are not quite. Mr. Kuczynski. Right. Each energy resource has its own features. Senator Manchin. Okay. Does anybody else want to comment on that? Dr. DeWitte. I'll just add---- Senator Manchin. Go ahead. Dr. DeWitte. Advanced reactors changed the paradigm for load following and responding to the grid needs. I mean, our system operates fairly easily between 10 and 100 percent power and fairly quickly. So it's an important feature, and it's going to change the economics, long-term, of what advanced nuclear reactors can bring to the table. Senator Manchin. You all are very much involved as far as in the development of the new technologies as far as how nuclear will be used or could be used within the system, correct? I mean, all of you, I think, are in some form of that. I am sure you have looked at other sectors and mine, in West Virginia, as you know, we do not have any nuclear power plants in West Virginia but we have a tremendous amount of coal-fired plants. We think that we do it as clean as possible and would like to even do it even more but we have no investment or no buy in at all from the Federal Government that is helping us to advance the technologies. Have you been looking at some of that or do you see some advancement in that arena? Again, I know you all have done---- Mr. Kuczynski. We, as a company, are investing in clean coal technology. Senator Manchin. Coal. Mr. Kuczynski. With our Kemper facilities. You know, we are deeply embedded in trying to assure that that fuel source can meet our future energy sources. Senator Manchin. Yes, and we are watching you all, but your cost overruns are pretty substantial. Mr. Kuczynski. Yes, it's true. You know, first of a kind big projects. Senator Manchin. Right. That could be a cutting project for us to be able to use a dependable fuel, a reliable fuel such as coal for many years. Mr. Kuczynski. So as we get over those hurdles the technology will---- Senator Manchin. Southern, I believe, has coal in the mix for quite some time, right? Mr. Kuczynski. Oh yeah, we, that was our predominant energy source for many years. It no longer is. Gas is our predominant energy source. Senator Manchin. Okay. It is my understanding that China will add 23 nuclear reactors by 2020 increasing its capacity from 2 percent to 15 percent. I am interested to know more about your company of TerraPower, Mr. Gilleland, and its agreement with China's National Nuclear Corporation to build traveling wave reactors, or TWRs? Can you tell me what's so attractive about this contract or how it is going? Dr. Gilleland. It's going well. We've been at it for ten years. We're a few hundred million dollars into the effort. We have used about 50 institutions in the United States, including national laboratories, in this development. The State Department negotiated an agreement with us so we could freely exchange information with China, and that's going to be possible for other nations as well on the traveling wave reactor. The reason they did that for us is because eventually enrichment will not be needed and reprocessing will never be needed. That's where you take spent fuel and rework it again. People who analyze weapons proliferation risk say those are the two things that represent the greatest risk. So our goal was to come up with a reactor which could be universally and ethically exportable, as one professor put it. We are about to sign an agreement with CNNC to have a joint venture---- Senator Manchin. Do you all plan on manufacturing in America or manufacturing overseas? Dr. Gilleland. It will be both places. Generally, the first of a kinds are predominantly built here. Certainly the research and the leadership and the management of the joint venture will be the United States. We plan to have the beginning of construction in 2018 or thereabouts with the first prototype plant going into operation---- Senator Manchin. Yes. Dr. Gilleland. In 2025 or 2026. The first commercial units will come a few years after that. The important role that the national labs are playing here is in the materials, development and testing. So are the universities. Senator Manchin. My time is running out, sir. I am so sorry to cut you short on that. Dr. Gilleland. Okay, sorry. Go ahead. Senator Manchin. But if I could just ask one question? Do you all believe that coal along with nuclear power is going to be needed for quite some time to guarantee the base load that is needed for this country? Do you all have any opinion on that at all? Anybody, just really quickly, if I may ask? Mr. Kuczynski. In our long-term study, coal still is a factor in our long-term generation mix. Senator Manchin. As far as base load, you've got coal. Mr. Kuczynski. Correct. Senator Manchin. Coal and nuke, right, for base load? Mr. Peters, do you agree? Dr. Peters. Well yes, I think, but I'd also put in the plug for clean coal and continued---- Senator Manchin. Oh no, no, no, we're---- Dr. Peters. Yeah, no, but innovation, including going to carbon capture and sequestration. Senator Manchin. So basically for the reliability of the system---- Dr. Peters. Right. Senator Manchin. Coal is going to be needed the same as nuclear is going to be needed, correct? Dr. Peters. As a bridge to a future that, I think, looks quite different. Senator Manchin. Okay. Dr. Peters. It's probably a very long bridge. Senator Manchin. You are talking about beyond 2040, 2050. Dr. Peters. Yes, 2040, 2050. Senator Manchin. Maybe you all could talk to the Administration and make them understand that. We would really appreciate it if you could. Thank you. The Chairman. Thank you, Senator Manchin. Senator Alexander? Senator Alexander. Thanks, Madam Chairman, and thanks to the witnesses for coming. Mr. Kuczynski, we have a couple of questions from Senators about cost. It costs TVA about $8 million to build 860 megawatts, and they built it in a year, I think. So it is costing you $14 billion to build 2,000 megawatts, right? That is a lot more expensive. The gas plant probably lasts 20 or 30 years. Is that about right? And the nuclear plant could last up to 80 years. Mr. Kuczynski. Up to 80, correct. Senator Alexander. And then you have the long-term cost of fuel which we do not know about, except we do know it has been a lot higher not long ago. So my point is that even though at first $14 billion for 2,000 megawatts of nuclear does not compare very well with $2 billion for 2,000 megawatts of gas, if you take the length of time the plants might last and the importance of diversity in a big utility like yours, it does make sense to go with nuclear power. Mr. Kuczynski. We fully agree with, kind of, that summary. And 14 is full carrying cost, not overnight costs so---- Senator Alexander. Let me ask you something else. Senator Heinrich mentioned the Illinois plants that were losing money. Exelon probably owns those plants. They are a merchant utility, right? And you are an investor-owned utility, is that correct? Mr. Kuczynski. Well they're investor-owned also, they're just in an unregulated market---- Senator Alexander. They are in an unregulated market, and you are in a regulated market. Mr. Kuczynski. Correct. Senator Alexander. Exelon has testified that because of the size of the subsidy for wind power that basically, at some times, the wind producers in its region can give away its power to Exelon and still make a profit forcing Exelon to buy the wind power and not the nuclear power, making the nuclear power less viable. Is the big wind subsidy that has been on the books for 23 or 24 years a deterrent to the expansion of carbon free nuclear power? Mr. Kuczynski. Yeah, I think the industry, you know, supports Exelon's position in those markets where it's not a true competitive market, and I think those of us that support nuclear believe we can compete in a levelized market that has an equal playing field. I think in Illinois there is an over capacity. There's a lack of low gross and of subsidies and the massive growth in wind has just changed the dynamics of that market, and it's had unintended consequences with regards to those reactors. Senator Alexander. Let's talk for a moment about the amount of money. Here we have a number of people who are engaged in clean energy research. We are talking about carbon free electricity that is reliable and at a reasonable cost. We have seen what has happened in other big countries, Germany and Japan, when they did not use nuclear power, and we saw the consequences on their manufacturing capacity. But coming back here, we spend, according to the Congressional Budget Office, about $9 billion last year and this year on subsidies for wind, $9 billion. We spend about $5 billion on energy research, as a government. Mr. Gates and others, including me, think we should double the amount of money we spend on energy research from $5 billion to $10 billion as rapidly as we can. That would permit people like you, or that would encourage people like you, to create new forms of clean, carbon free electricity. We might even find a way to have an economical method of capturing carbon from a coal plant or a gas plant which would be the Holy Grail, it seems to me, of carbon free electricity. But even if you do not do that, my question to any of you is, wouldn't it be a better idea to phaseout this wind subsidy after 40 years, it is a mature technology according to the last Energy Secretary, and spend that $5 billion a year on energy research? We could instantly double the amount of money the United States spends on energy research if we did that. Wouldn't that be a better use of our money? Dr. DeWitte. I'll jump in and say---- Dr. Peters. Senator, they're going to ask the national lab guy to answer that question. [Laughter.] So I guess I'm going to beg off on the part about where the money comes from. Senator Alexander. Well don't do that. I want an answer to the question. Dr. Peters. Alright. Senator Alexander. Are you going to continue to waste $5 billion a year on subsidies for that technology, or if somebody else wants to answer that, or are we going to spend it on encouraging people like you to create advanced reactors and small reactors or other forms of clean---- Dr. Peters. Senator, I think that if we increase the clean energy research funding, I have no doubt that we will unleash innovation and we will transform the energy sector. Senator Alexander. Yes. Dr. Peters. So increasing clean energy funding absolutely has to happen, but again I think it's outside of my purview to comment on where the money comes from. Dr. Gilleland. Being a very unpolitical guy, the answer is yes. Senator Alexander. Thank you. Thank you, Madam Chairman. [Laughter.] The Chairman. Dr. DeWitte, did you want to jump in there? Dr. DeWitte. I was just going to say what John said, yes. The Chairman. Okay, you got your answer. Senator Franken? Senator Franken. I would yield my time right now to Angus. The Chairman. Thank you. Senator King? Senator King. First, Senator Alexander, my understanding is that the wind PTC that was extended in the last deal at the end of the year phases out over five years. I think what you are seeking is actually happening. That is my understanding. I may be incorrect about that. Senator Alexander. Well that may be true. But in the next two years it is $5 billion a year, and that is exactly the amount of money we would like to have to double our energy research. Senator King. I guess it is a question of what does phasing mean? It is phased out over a period of time. That was what was decided at the end of the year. Anyway, I was very interested in Mr. Kuczynski, is it? You said you wanted to play on a level playing field. Are you advocating today that we repeal the Price Anderson Act and the nuclear industry should have to pay the full cost of insurance? That is what you said, I think, you want a level playing field. Mr. Kuczynski. Yes, I was more recognizing, kind of, the current subsidies that are in play and---- Senator King. And Price Anderson is not a subsidy? Of course it is a subsidy. Mr. Kuczynski. We don't necessarily consider it a subsidy. It's not been utilized---- Senator King. It walks like a duck, it is a duck, it is a subsidy. If you had to buy that insurance it would cost you a fortune, is that not correct? Yes or no? Mr. Kuczynski. The industry pulls---- Senator King. No. Yes or no? If you had to buy insurance on the commercial market for your plants would it not cost you a lot of money? Mr. Kuczynski. I have not researched on exactly what that price would be. Senator King. Okay, so if you are not too worried about it then will you tell the Committee you think we should have repealed Price Anderson? Mr. Kuczynski. I think Price Anderson has been a valuable part of our energy strategy for 50 years. Senator King. I will say it is, but it is a subsidy. Now in your $14 billion for your plant, were there any other subsidies? Mr. Kuczynski. We have utilized---- Senator King. Do you receive subsidies from the Federal Government? Mr. Kuczynski. Yes, we have utilized, the way we believe subsidies ought to be utilized and for emerging technologies to get them restarted. So subsidies are---- Senator King. How much of the $14 billion was Federal subsidy? Mr. Kuczynski. Well, we have not taken any direct subsidies. The only thing we have used to this point is loan guarantees which is technically not a subsidy, it's a financing mechanism that the Federal Government will be reimbursed for all financing costs. Senator King. Okay. Mr. Kuczynski. So we have not used any other subsidies, directly, for our projects. Senator King. I am inclined to agree with you on that. There were no direct subsidies of that $14 million. That is your testimony? Mr. Kuczynski. Correct. Senator King. Okay. Dr. Cassidy is gone, but as I do the calculation, pretty straight forward, $7 million a megawatt for your plant. Two thousand into $14 billion. Wind, which I know something about, $2 million a megawatt. Gas, between $600,000 and $700,000 a megawatt. So a huge differential. I am not anti-nuclear. I like Maseratis. I just cannot afford them. I do not understand any economic theory other than assumptions about natural gas prices that your power is going to be economic in the immediate future. Now if you do an 80- year calculation and you assume very high gas prices and no problems with disposal and waste disposal and all those kinds of things, I suppose you can make it work. But frankly, I just, again, I am not anti-nuclear, I just do not know how we can afford it. Can anybody answer that question? The numbers do not work. Seven million dollars a megawatt? That is verses half a million or three quarters of a million, I mean, per megawatt for gas and $2 million for wind? Dr. DeWitte. I think there's a couple things that are important to highlight there. Senator King. I know the cost of gas is a factor, and that has to be. I clearly understand that. Dr. DeWitte. Right, that and the fact you have capacity factors that do matter. Nuclear having excellent performance capabilities, delivering about 90 percent of their--capacity which is a big difference from what you see with typical renewables. Senator King. Sure. Dr. DeWitte. But it's also not nuclear verses renewables. I think that's an all too often, I think, pitted argument. Senator King. No, no. That is why I put gas into the mix. I am just taking a range. Dr. DeWitte. Right. And I'll say the other thing I would add to that is that advanced reactors do have the opportunity to fundamentally shift the economic paradigm of nuclear power. The advanced reactors usually don't operate at high pressures, use far less steel, far less concrete and they have a huge economic potential in terms of achieving costs that are more competitive. Senator King. I agree with that. I think one of the great mistakes we made in this country in the nuclear industry was having each plant being an individual plant with its own unique design rather than a standardized design. Is this something we are moving toward is some kind of standardized design? You are nodding. Is that? Could you? Dr. Peters. The industry, the industry and NRC have already moved to that, Senator. And that would be part of the continued reform of the licensing process. When we go to advanced reactors the idea would be to not have it every design, you know, you have a design certification process up front, then you're simply licensing a site, constructing the same reactor. Senator King. Right, and you can modularize. Dr. Peters. Yeah, yeah. Senator King. And standardize parts and those kinds of things. You are now nodding. Is that correct? Is that where we're headed? Mr. Hopkins. Yes, sir, that's the intent of the small modular reactor is people ask often why we limit our size to 50 megawatt electric because still a lot of our testing on seismic and etcetera, the height of the containment and the reactor itself, we wanted to ensure that it lent itself to a standardization of design so we could build these in a factory, both containment and the reactor. So what you have in the field is really a civils project, concrete to steel. Senator King. Exactly. Do we have any price? Do we have any per megawatt numbers on this new approach? Mr. Hopkins. Well, Senator Cassidy mentioned earlier about we do have a customer. They have to prove their economics before they go before their membership. If you were looking today at Henry Hub prices of gas at less than $2 per million BTU, a levelized cost of engineering and combined cycle plant is nominally in the range of about $55 per megawatt hour. Senator King. Yes. Mr. Hopkins. We're right now, with small modular reactors at today's prices, based on the economics, about $72 per megawatt hour. The question becomes if you look and it was mentioned earlier, in the West there's not a lot of gas. You have to bring the gas in. You have to go through the permitting process. But the question becomes with LNG exports and other things and moderate production right now where it was over capacity. There was a lot of people moving in are now leaving the gas. What will the gas be in five to seven years? Senator King. Sure. Listen, and once you do nuclear you have fixed your energy costs and your fuel costs. I understand that. That is true of hydro, wind, other. The difference is nuclear is base load. I understand that distinction. The question is can we get that initial capital cost down to a place where it makes sense? I think that is the challenge and that is what we are talking about here. Mr. Hopkins. Well, what we're looking at right now is we have to be commercial viable for these to exist; otherwise there is no market. And if you look at the small modular reactor, each of these units, of 12 of them, are independent. So you could put two or three and get them operational to stop--to start offsetting the cost of putting the additional plants in. So from a finance ability when you could put 600 megawatts for less than $3 billion U.S. Those are financeable. Senator King. Yes. Mr. Hopkins. And those are, you can put those on a balance sheet. And we currently have banks coming to us now, you know, saying here's how we think we can finance your project. So that's a big step. Senator King. It is a big step. Again, I hope that we can work, get to the place where we have economic capital costs and that then the technology can provide enormous fossil fuel free, carbon free energy. Thank you. Mr. Hopkins. Absolutely. The Chairman. We are going to move to Senator Franken here. Thank you. Senator Franken. Thank you. Wait, what did you want to say, Dr. Peters? Dr. Peters. I was just going to re---- Thank you, Senator. I was just going to re-emphasize that when you look at the research and innovation agenda for Generation IV reactors, a big part of what we're focused on is, in fact, addressing the cost, getting down the cost curve. Senator Franken. Okay. Dr. Peters. At the early stage as well. So it is pushing the envelope on safety, burning the fuel more efficiently, but also going after design features that will help reduce capital cost because that is clearly a huge obstacle, I would say, to getting to commercialization. Senator Franken. Okay, that is enough. [Laughter.] Senator Franken. It has been five years since Fukushima, so it is important that we keep safety in the forefront when we are discussing nuclear power. I want to ask about these small modular reactors and advanced nuclear technologies and how they could potentially enhance safety if they are designed to operate without the need for external power to cool the reactors after all was loss of backup power from generators at the Fukushima plant that caused the cooling systems to fail. Mr. Hopkins, can you give us an overview of the major safety concerns with traditional nuclear power and how SMRs improve safety such as by removing the need for backup power? Mr. Hopkins. Yes, sir. Actually two weeks ago I was in Japan and had this conversation. If you recall what happened at Fukushima, it wasn't the earthquake, it was the tsunami that resulted in knocking out the electrical which therefore knocked out the cooling pumps and the plant couldn't cool itself down. The small modular reactor passive safety systems. And this actually came about 15 years ago under a DOE program called Multiple Application of Small Modular Reactors. And the intent in the objective was to design a reactor with safety in mind. It wasn't about economics. So even prior to Fukushima a lot of passive safety systems that were going on research at Oregon State University and Dr. Jose Reyes had to deal a lot with what the problems that occurred in Fukushima. So our plan in passive safety, we refer to as the triple crown. If you were to have a station black out situation, the way that the reactor is designed it will cool itself down. You don't need operator intervention. You don't need additional electricity nor do you need additional water for this particular reactor to cool down. And thinking this core is 120th the size of the large reactor. And so part of what we have at our Technical Advisory Boards that are made up of Senior Chief Nuclear Officers from 23 utilities and technical staff is to--and these are actual operators to look at those sequences. How would this reactor cool itself down? How can you circumvent a Fukushima event? And we believe the science is there and that's what we're currently working with the NRC with. Senator Franken. Okay. Mr. Gilleland? Dr. Gilleland. Yes? It's the same. Senator Franken. What are the safety benefits of advanced nuclear designs like TerraPower's technology? Dr. Gilleland. It's a very similar answer. The reactor is designed in such a way that the heat is efficiently conducted from the fuel out through the coolant, and it's because we use metal fuel and metal coolant. Long story short, if you had a Fukushima there's no problem. You can have no internal or external power and the heat will be conducted to the outside world after the reactor, because of the way the physics works, shuts itself down. There's no need for a computer or a human to decide anything. In addition, the mother of all accidents is that you also, not only lose that power for cooling, but you fail to put the control rods back in which is not what happened. This is worse than Fukushima. In that case the reactor also reduces automatically, its power to a very low level and can remain in that state indefinitely. So that was the starting point for much of what our design effort was about. That first aspect of being able to use that type of reactor to shut itself down when there is loss of cooling was demonstrated at Idaho many, many years ago, the walk away reactor. So this gentleman's elderly people saw it done. Senator Franken. Okay, good. Let me ask a question about the need for base load, because that has been brought up here. To what extent does advanced storage technology one, make the smaller reactors actually, maybe, a good idea since you do not need to necessarily be the base load? To what extent does better storage speak to that? And to what extent does better storage and real advances in storage decrease the need for the kind of base load that we have needed throughout our history? Dr. Gilleland. Well in my opinion, storage does not decrease the need for base load. It's a huge amount of energy, and load following which has been mentioned before would be very useful in these plants. You wouldn't have to have storage. But at a certain point running a reactor steady state at full power for 90 percent of the time, that's a very economic way to operate a nuclear plant or power facilities. But people usually use the term energy storage in the context of renewables which are inherently intermittent like wind and solar. There it would be helpful in the dispatching of that energy when you need it versus when the sun is shining or the wind is blowing. Senator Franken. That is what I am talking about. Dr. Gilleland. I beg your pardon? Senator Franken. That is what I am talking about. Dr. Gilleland. Oh, but you're still stuck with the fact that the solar constant is a constant and that even if you were to provide free energy storage you still have to think about the fact that you're going to have to rate the system to produce, in a short period of time, the energy you want to deploy over a longer period of time. What that adds up to is a lot more acres, a lot more square miles going into solar panels or into sites for wind. Senator Franken. Okay. Dr. Gilleland. So there's a fundamental logic that says storage will help renewables but it's not going to get around the inherent problems associated with intermittency and the amount of energy density that's available from the sun or the wind. Senator Franken. Okay. Does anybody else have an---- Dr. DeWitte. I would just add that storage also can couple well with the nuclear power plants as well because you can charge those up at night and then discharge them in the day to either match up with renewables or match the curve. So there are opportunities for storage innovation improvements to partner well with nuclear technology. Dr. Peters. But the investment in storage is absolutely vital. You know, it doesn't replace. Everything that they said was--I totally agree with, but innovation in storage is really an important thing to continue to support from the government. Senator Franken. I see a lot of nodding. Dr. Peters. Yes, really, really important to support. Senator Franken. Like for me too. I am nodding that my time is up. [Laughter.] The Chairman. I agree on both counts. [Laughter.] The Chairman. Storage and your time is up. Let me turn to Senator Alexander, if you would like to pose a second question in the second round? Senator Alexander. Well thanks. This is very interesting and I thank you all. On Senator Franken's point and Dr. DeWitte, I think that is very important. The disadvantage of nuclear power is that you cannot turn them on and off, but the use of them and the demand goes way up in the afternoon. So if we had a really good storage system, probably the greatest beneficiary of a really good storage system would be nuclear power because it produces so much electricity. The second thing, on Dr. Gilleland's point, we use about a quarter of all electricity in the world in this country. So we're not going to run the country on windmills. I have said many times that is like going to war in sailboats when the nuclear navy is available. I mean, it is useful. It is helpful. Third, on the subsidies, the Senator from Maine asked about the Pricewaterhouse. Well, the nuclear industry self-insures $3.75 billion which has never been used for accidents. So the first money comes from the nuclear industry. I think that would be important to point that out, Mr. Kuczynski, next time he gets asked about that. On top of that, then the government might come in. But we come in from many emergency and disasters well before that. That would be our responsibility and it has never been used. As far as the phase out of the wind subsidy, I mean, let's think about this. It has been going on for 24 years. The last energy secretary was a Nobel prize winner, and in testimony before this Committee he said it is a mature technology. Now small reactors are not a mature technology. For the last five years we have been trying to pay for the government's part in helping that get off the ground. Advanced reactors are not a mature technology. That is where we might actually deal with climate change. We might actually deal with it there. Here we are wasting $4 or $5 billion a year, and the point that it is phased out, that is a trick. That is a trick. It has been phased out more than a dozen times. That is called an extension. Now they have just extended it for a longer period of time and called it a phaseout, but it costs $4 or $5 billion a year. It is not $40 or $50 million, it is $4 or $5 billion. That is the amount of money that would double what we could spend on energy research. So I think it is time for us to become rational about our energy policy, and rational to me means create an environment of government support through short-term support for new technologies. For example, there is a production tax credit for nuclear which, I guess, Mr. Kuczynski, you will take advantage of. But it is capped at 6,000 megawatts. The wind is uncapped. That is another big difference next time that question comes up. So I favor, Madam Chairman, short-term support for new technologies and then they are on their own. The reason solar is about to be competitive is it does not have that kind of support. They have had some support, but nothing like these generous production taxes credits. As a result the cost of solar has been coming down, down, down, and it is about to get competitive as a supplement to the huge base load power that we need. We need for the same thing to happen, not just with wind power, it needs to be on its own. I mean right now we have got a big company trying to build big towers to destroy the landscape in Tennessee where the wind blows 18 percent of the time. That is absolutely absurd. TVA has said we don't need any more new electric base load power for 20 years, and we have taxpayers spending money they could be spending on clean energy research to build wind turbines in a place where they would just spoil the environment and where the power is not needed. That is really bad policy. I would like to see, as far as NuScale's support, the support for advanced reactors. The whole idea there is that support will end and you will be competitive or you won't exist, right? I mean, you have said that to us in testimony if I am not mistaken. Mr. Hopkins. Correct. Senator Alexander. So, I think that is the approach, Madam Chairman, we should take with any of these new technologies where they are promising we should invest heavily in research, perhaps even support jump-starting a new technology like advanced reactors or maybe some, I mean, like small reactors, maybe some advanced reactor. But get out of the way, and then see what can survive. Solar is about to survive. We hope NuScale will survive. We hope some of these new advanced reactors will have that as well. Let wind power survive too, then maybe some of these Illinois nuclear plants won't close because of negative pricing. You have been very generous to let me extemporize here at the end, and I thank you for it. The Chairman. Well, Senator Alexander, I know you have been occupied on the floor moving through education bills and our first appropriations bills, but we miss you in the Committee. Your contribution is not only important, but just a good reminder to us of the role that government should be playing as we help to facilitate this. I think one of the things that I have enjoyed as I have learned more about these advanced reactor technologies is just the whole smorgasbord that is out there. We are not talking about one approach, one technology. There is a diversity now that I think we recognize. How we figure out how we encourage that rather than doing what we do around here, which is deciding who the winners and who the losers are going to be, and hoping that we bet on the right one. So your comments about this, I think, are very important on the level of support that we should be providing at the Federal level. I want to ask one more quick question, and then we will wrap up. I appreciate everyone giving us so much time this morning. This is directed to you, Dr. DeWitte, because I am very curious about the true potential for what you are describing with micro-reactors and the potential in remote areas. Whether it is a place like Alaska or you think about some of our islands and our territories. I have been going back and forth a lot with the folks in Guam about what we are going to do. We have military buildup there, but basically you are an island that is still powered by diesel. CNMI is still powered by diesel. Look at Puerto Rico, and the financial mess that they are in. So much of that comes to them because they have not been able to figure out how they deal with their energy. I look at some of these areas as just a perfect opportunity or environment to have these smaller scaled technologies. But how you deploy them out--and let's use Alaska. Let's take an area like Bethel. You've got about 4,000 people out there. You are not attached by road. It is expensive in the first place. How do you deploy? How do you deal with, you mentioned in response to, I believe it was Senator Cassidy, some of the issues about how you deal with the proliferation? You are sitting out there in Bethel, and I think you indicated that this is heavy, difficult stuff to move. Realistically how could something like this work in remote, high cost areas with small populations? Dr. DeWitte. Thank you for the question, Senator. That's exactly the market that we are targeting is to bring power to save money in places like Bethel where we would build probably between two and four reactors. And they work in a neat way because they're designed in a containerized fashion such that we would ship basically two shipping containers nominally out per reactor that would go. So in the case of four reactors, we'd have eight containers that would go up. In four of those containers are the reactors themselves, the reactor module. We would then bury that in a hole that we'd dig, not very deep, about 20 feet deep. And then on top we would put the other container which contains the power---- The Chairman. We want to talk to you later about permafrost and how we deal with that, but yes. [Laughter.] Dr. DeWitte. Fair. So in those situations we can actually mound up and it works above. Good point though. But and that actually adds a nice benefit for a couple reasons, permafrost itself, but that's a separate conversation. But anyway, you put the reactors there and then the process works that you can then tie up to either a microgrid solution or whatever the local grid system is there. And advances in power electronics actually enable us to do even more things in terms of grid matching and harmonizing with demand curves in small communities that are islanded from other grids effectively. And we would produce power for 12 years before refueling. And these systems use low enriched fuel, so they're not weaponizable material. They're also fairly small. I mean, you talk about fitting a shipping container. That also means there's not much fuel in there. But they're also not small enough that you can just throw it on the back of your pickup truck and drive away. They weigh 30 plus tons. And you don't have equipment left there that would be able to move them, as well as the emplacement that goes on top of them. To the point that then the reactors themselves really aren't attractive, you know, targets to say to go after and try to get materials. Plus, from the intervention side and security, like Senator Cassidy mentioned and asked, you know, we have a staff. We'll plan on having security staff and personnel inside but it's also something we can respond to just like we have those plans in place for research and test reactors in other places. It's something that we can manage and definitely secure and make sure that it is not presenting a problem. And the important thing though is that this provides a level of energy security and reliability that these communities have never really seen before, right? They no longer have to rely on diesel. We've talked to some folks in certain communities that talk about bringing diesel in on dog sled. Those costs get super expensive very quickly. We eliminate those problems. On top of that it's not just electricity we can provide, it's also process heat, right? So we can heat community centers or even local, if we tied into the infrastructure that is in place, district heating. And we could tie into that and supply for that. And the important thing is that this saves a lot of money over diesel fuel, and it opens up, basically, larger portions of energy to be used by those populations to help overcome a lot of the challenges that they're stuck with which is, you know, constrained by limited access to power. And in terms of operations, you know, we have these things operated, the small crew, because they're cooled purely by natural forces. We wanted to design something that's very robust such that it doesn't require much intervention or maintenance or monitoring. So you kind of operate this thing sort of like you think of an oil rig where you have crews going in and off, and that's basically how we provide that infrastructure and then produce power in these areas. And it gives us the opportunity to be able to put these nearly anywhere. So that's really the objective that we're trying to go after. The Chairman. We have talked a fair amount about public- private partnerships and working with the national labs, working with universities. How much has been done with the Department of Defense? They obviously have not necessarily a renewable mandate, but a goal toward reduced emissions on military installations. At one point in time the community of Galena, along the Yukon River, was actually looking at small nuclear as a potential for not only that community, but what, at that time, remained of a military installation. How much discussion is going on with DOD for military installations, particularly in more remote areas whether it is Guam or whether it is Eielson Air Force Base? Dr. DeWitte. We've engaged with different groups in the Department of Defense who've been interested in this. I think the big issue is they understand, generally, the need profile, but I think where we are and where we need to get to is to show that this is a mature technology that works. And I don't think the DOD is necessarily the right place to, well, let me rephrase that. The way they've looked at it is not necessarily the right place to start. I think that can change as they see this going, and I think there's opportunities and partnerships between DOD and private industry like with what we're doing in possibly DOE in showing that this can work. But DOD has been hesitant to, I would say, take the lead on doing these reactor technologies because I think they still perceive them to be more on the developmental stage and not quite as ready for deployment. And we're hoping to change that perception very soon. The Chairman. Mr. Hopkins, do you have any comments on that aspect of it or just the applicability of the small reactors? Mr. Hopkins. My understanding, Senator, is that in fact the DOD are looking now at small modular reactors. I think one thing that helped us all is the Administration's Executive Order on Alternative Energy last year came out and included SMRs as part of alternative energy which could open the brand with four Federal facilities. If you look at your state in an area of Fairbanks, we have quite a few military installations, Fort Richardson, Fort Greeley, a large air force base. If you could work out a PPA with the local utility to provide the military installation reliable energy of which they need, not only for the military installations but also the surrounding community where the support staff is and where these people live. I envision that I could see applications for micro or small modular reactors in those types of instances. The Chairman. I appreciate that. Very interesting discussion this morning. I appreciate the contributions of all of you and your leadership in this area which, again, I believe very, very strongly, needs to be a robust part of our energy portfolio. So thank you for your contributions. And with that, we stand adjourned. [Whereupon, at 11:59 a.m. the hearing was adjourned.] APPENDIX MATERIAL SUBMITTED ---------- [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] [all]