Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- OIL AND GAS PIPELINE INFRASTRUCTURE AND THE ECONOMIC, SAFETY, ENVIRONMENTAL, PERMITTING, CONSTRUCTION, AND MAINTENANCE CONSIDERATIONS ASSOCIATED WITH THAT INFRASTRUCTURE [Senate Hearing 114-470] [From the U.S. Government Publishing Office] S. Hrg. 114-470 OIL AND GAS PIPELINE INFRASTRUCTURE AND THE ECONOMIC, SAFETY, ENVIRONMENTAL, PERMITTING, CONSTRUCTION, AND MAINTENANCE CONSIDERATIONS ASSOCIATED WITH THAT INFRASTRUCTURE ======================================================================= HEARING BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE ONE HUNDRED FOURTEENTH CONGRESS SECOND SESSION __________ JUNE 14, 2016 __________ [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Printed for the use of the Committee on Energy and Natural Resources Available via the World Wide Web: http://fdsys.gov ______ U.S. GOVERNMENT PUBLISHING OFFICE 21-990 WASHINGTON : 2017 ----------------------------------------------------------------------- For sale by the Superintendent of Documents, U.S. Government Publishing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512-1800; DC area (202) 512-1800 Fax: (202) 512-2104 Mail: Stop IDCC, Washington, DC 20402-0001 COMMITTEE ON ENERGY AND NATURAL RESOURCES LISA MURKOWSKI, Alaska, Chairman JOHN BARRASSO, Wyoming MARIA CANTWELL, Washington JAMES E. RISCH, Idaho RON WYDEN, Oregon MIKE LEE, Utah BERNARD SANDERS, Vermont JEFF FLAKE, Arizona DEBBIE STABENOW, Michigan STEVE DAINES, Montana AL FRANKEN, Minnesota BILL CASSIDY, Louisiana JOE MANCHIN III, West Virginia CORY GARDNER, Colorado MARTIN HEINRICH, New Mexico ROB PORTMAN, Ohio MAZIE K. HIRONO, Hawaii JOHN HOEVEN, North Dakota ANGUS S. KING, JR., Maine LAMAR ALEXANDER, Tennessee ELIZABETH WARREN, Massachusetts SHELLEY MOORE CAPITO, West Virginia Colin Hayes, Staff Director Patrick J. McCormick III, Chief Counsel Tristan Abbey, Senior Professional Staff Member Angela Becker-Dippmann, Democratic Staff Director Sam E. Fowler, Democratic Chief Counsel Rich Glick, Democratic General Counsel C O N T E N T S ---------- OPENING STATEMENTS Page Murkowski, Hon. Lisa, Chairman and a U.S. Senator from Alaska.... 1 Cantwell, Hon. Maria, Ranking Member and a U.S. Senator from Washington..................................................... 2 WITNESSES Black, Andrew, President and CEO, Association of Oil Pipe Lines (AOPL)......................................................... 4 Eisenberg, Ross, Vice President, Energy and Resources Policy, National Association of Manufacturers (NAM).................... 11 McGarvey, Sean, President, North America's Building Trades Unions 21 Parfomak, Dr. Paul, Specialist in Energy and Infrastructure Policy, Congressional Research Service (CRS)................... 28 Peress, N. Jonathan, Director of Air Policy, Environmental Defense Fund (EDF)............................................. 33 ALPHABETICAL LISTING AND APPENDIX MATERIAL SUBMITTED American Gas Association: Letter for the Record........................................ 106 American Petroleum Institute: Statement for the Record..................................... 113 Supplemental Statement for the Record........................ 115 Black, Andrew: Opening Statement............................................ 4 Written Testimony............................................ 7 Responses to Questions for the Record........................ 75 Cantwell, Hon. Maria: Opening Statement............................................ 2 Eisenberg, Ross: Opening Statement............................................ 11 Written Testimony............................................ 14 Response to Question from Senator Franken.................... 63 Interstate Natural Gas Association of America: Letter for the Record........................................ 120 McGarvey, Sean: Opening Statement............................................ 21 Written Testimony............................................ 24 Murkowski, Hon. Lisa Opening Statement............................................ 1 Parfomak, Dr. Paul: Opening Statement............................................ 28 Written Testimony............................................ 30 Peress, N. Jonathan: Opening Statement............................................ 33 Written Testimony............................................ 35 Responses to Questions for the Record........................ 77 Supplemental Letter for the Record........................... 125 Stupp Corporation: Statement for the Record..................................... 129 (The) Williams Companies, Inc.: Statement for the Record..................................... 132 OIL AND GAS PIPELINE INFRASTRUCTURE AND THE ECONOMIC, SAFETY, ENVIRONMENTAL, PERMITTING, CONSTRUCTION, AND MAINTENANCE CONSIDERATIONS ASSOCIATED WITH THAT INFRASTRUCTURE ---------- TUESDAY, JUNE 14, 2016 U.S. Senate, Committee on Energy and Natural Resources, Washington, DC. The Committee met, pursuant to notice, at 10:09 a.m. in Room SD-366, Dirksen Senate Office Building, Hon. Lisa Murkowski, Chairman of the Committee, presiding. OPENING STATEMENT OF HON. LISA MURKOWSKI, U.S. SENATOR FROM ALASKA The Chairman. Good morning, everyone. The Committee will come to order so we can begin our oversight hearing this morning on our nation's oil and gas pipeline infrastructure and the economic, safety, environmental, permitting, construction and maintenance considerations that are associated with it. Infrastructure is one of those things that everybody claims to be in favor of. We all support infrastructure. Who could be against it? It is only when you get down to the details of where that infrastructure is located, what the infrastructure will be transporting and how that infrastructure will be built--that is where you run into the controversy. In the world of oil and gas pipelines, known in the industry as the midstream, this is actually not a complicated question. At point A, you have the immense resources, whether it is places like the NPRA, the non-wilderness portion of ANWR, in the Bakken, in the Marcellus or in the Eagle Ford. At point B, you have the refineries. You have the chemical facilities, the power plants and other consumers. The infrastructure that we will be hearing about today is necessary to move the resources from point A to point B. It is pretty simple. Without infrastructure we cannot move these vital resources from one place to another. While some would contend otherwise, we know for a fact that pipelines are the safest and the most efficient way to move these resources. In the world of economics, experts debate about direct impacts, indirect impacts and induced impacts. We know that pipelines directly create jobs in their construction, maintenance and operation, and we know that these are good jobs. We also know that pipelines indirectly create jobs because it is a materials intensive industries. These are also good jobs. We also know that all of this induces economic growth and additional job creation. So I am big into bumper stickers and trying to distill down all that we do here in Washington into some simplistic notions. If we have got to place a bumper sticker here this morning, it is that ``Jobs are good, energy is good and energy jobs are great!'' In Alaska we are very proud of an infrastructure network known as the Trans-Alaska Pipeline System, or TAPS. The system stretches 800 miles, runs across all sorts of terrains, two mountain ranges, huge mountain ranges, from Prudhoe Bay down to Valdez. An estimated 70,000 people helped build this pipeline from 1969 to 1977 with the actual construction phase taking just over three years. I cannot overstate the positive impact this project has had on the State of Alaska. Without it, I can tell you for a fact we would not be able to fund our state's government. Energy is the lifeblood of our state. We have to continue to fight to boost the throughput of that pipeline which is vital to the energy security of this country, particularly the West Coast where the refineries are optimized to process North Slope crude. TAPS, in many ways, I refer to as the gold standard. And I question, honestly, whether or not we could build it today. Certainly not in three years as we were able to do four decades ago. We know new infrastructure is still the best way to deliver affordable energy to places that need it. We know the pipeline permitting process should be streamlined, yet those who opposed to building oil and gas infrastructure, often the same people, likely to be up in arms when prices get too high or service quality suffers. I think we have got some cognizant dissonance here. How we can expect affordable energy if we cannot move the energy? You have to be able to move it. Since I released my Energy 20/20 Blueprint in 2013 and follow on white papers on energy insecurity, the power grid, exports and the energy/water nexus, I have emphasized five principals that our nation's energy policy should embody. They are pretty simple. Energy needs to be affordable, abundant, clean, diverse and secure. Infrastructure is really at the heart of all five of those principals. Without proper infrastructure, energy will be unnecessarily unaffordable. It will be scarce. It could be dirty, limited and insecure. So as we welcome today's witnesses and begin this hearing, I will tell you all to look for more from this Committee on these issues in the upcoming future. With that, I turn to Ranking Member Cantwell, for your comments and I appreciate your work in getting us here as well. Thank you. STATEMENT OF HON. MARIA CANTWELL, U.S. SENATOR FROM WASHINGTON Senator Cantwell. Thank you. Thank you, Madam Chair and thank you for holding this hearing and to our witnesses today for talking about issues associated with natural gas and oil pipelines. Domestic production of natural gas and oil has reached record levels, and this increased production requires a network of pipelines and other modes of transportation to ensure that natural gas and oil can be moved from the point of extraction to the point of consumption. In many instances, new pipelines will be required. But it is also important to note that we are talking about transporting toxic, highly flammable materials hundreds, if not thousands of miles across the United States. So new pipelines must meet Federal and state standards so that the public health and safety can be addressed. We can always look to improve the efficiency of the pipeline siting process, but we have to remember not to take short cuts. The Senate Energy bill attempts to enhance the coordination between FERC and other Federal agencies with responsibility for issuing permits before a new pipeline is built. In contrast, the House bill passed proposed to give FERC just 90 days to make a final decision on permit applications no matter the complexity of the proposed pipeline or the potential impact on people and the environment. This is something that we cannot do. In addition to the potential impacts to public health and safety, leaks of methane from natural gas and oil pipelines can also have a dramatic impact on our climate. In the first two decades after methane is released into the environment, it is 84 times more potent as a greenhouse gas than carbon dioxide. The recent leak at the Aliso Canyon Natural Gas Storage Project in California is estimated to have caused more damage to the environment than any other leak in gas history. The project emitted more greenhouse gases than even the Deep Water Horizon explosion in the Gulf of Mexico. Most new interstate natural gas pipelines require multi- billion dollar investments. These investments are recovered through rates charged to consumers signing on to long-term contracts. Obviously I am concerned that these multi-year contracts may delay the transition to non-fossil fuel alternatives. Natural gas is a very important bridge fuel helping to reduce our reliance on coal while bringing online greater amounts of intermittent renewable energy such as wind and solar power. We are in the middle of a revolution and advances are made every day in technologies, the way that we can create and use energy, that will further reduce the demand for fossil fuels. We undoubtedly will need some traditional natural gas capacity. I have often mentioned to the Chair my interest in support of a natural gas pipeline in Alaska. But as the Department of Energy Quadrennial Review suggests, we should focus on using existing pipelines more efficiently and making sure that the certificate process for new pipelines explores better ways to utilize existing capacity and mitigate issues and make sure that we are making the right decisions. I want to mention, because of the health and safety issues, we were unfortunate enough on June 10th, 1999 to have a gas line explosion in Bellingham, Washington killing three children who were playing in Whatcom Creek. We have made some improvements in pipeline safety, but we can never forget the importance of these issues as we continue to move forward on this. I look forward to hearing what the witnesses have to say today, Madam Chair, and look forward to our discussion. The Chairman. Thank you, Senator Cantwell. Again, welcome to the witnesses. We appreciate you making the effort to be with us today and for what you will contribute to the conversation. We will lead off this morning with Mr. Andrew Black, who is the President of the Association of Oil Pipe Lines. He will be followed by Mr. Ross Eisenberg, the Vice President of the National Association of Manufacturers. Mr. Sean McGarvey is with us as President of the North American Building Trades Union, welcome. Dr. Paul Parfomak is the Specialist at the Congressional Research Service, CRS. Mr. Jonathan Peress will wind up the panel. He is the Air Policy Director for Natural Gas at the Environmental Defense Fund. We welcome all of you this morning and thank you. I will let colleagues know that we are scheduled to have a vote at 11 o'clock, so hopefully our witnesses will be able to get through all of their testimony prior to that time. It may be that we jump up, go take a vote and then come back to ask questions. With that, Mr. Black, if you would like to lead off and welcome. STATEMENT OF ANDREW BLACK, PRESIDENT AND CEO, ASSOCIATION OF OIL PIPE LINES (AOPL) Mr. Black. Thank you, Madam Chair, Senators. The Association of Oil Pipe Lines represents transmission pipeline operators who deliver crude oil, refined products like gasoline, diesel fuel and jet fuel and natural gas liquids such as propane and ethane. The U.S. pipeline network plays a critical role in delivering energy needed by American workers and families. Pipelines help American drivers get the gasoline and diesel fuel they need to drive their cars and trucks. Propane delivered by pipeline allows farmers to dry crops and warm livestock barns and is essential to heating millions of homes. American workers rely upon pipelines to deliver the raw material feedstocks needed for good paying, manufacturing jobs. Just last week Shell Chemical announced it will build a multi- billion dollar petrochemical plant in Pennsylvania. That new plant turning raw ethane into polyethylene will employ 6,000 workers in construction, 600 permanent plant workers and provide economic benefits for the entire region. This is made possible by a liquids pipeline delivering 100,000 barrels per day of ethane to the plant. Pipeline operation also supports other good paying jobs. The TransAlaska Pipeline System, for example, employs 2,500 men and women delivering crude oil to world markets. Alaska's oil and gas production, much of it delivered at some point by pipeline, provides 110,000 Alaska jobs and supports one third of Alaska's work force. Pipelines are an exceedingly safe way to deliver the energy America needs. A barrel of crude oil petroleum products reaches its destination safely greater than 99.999 percent of the time. Liquid energy pipelines are also getting safer. Since the year 2000, pipeline incidents impacting the public or environment are down 55 percent. Since 2000, corrosion-caused incidents are down over 70 percent. Pipeline safety is spurred by a combination of government regulation and industry-wide safety improvement efforts. The U.S. Pipeline and Hazardous Materials Safety Administration, or PHMSA, contributes to pipeline safety by providing minimum pipeline safety standards, accountability for pipeline safety shortfalls and an independent source of pipeline safety. PHMSA is proposing and finalizing several new pipeline safety regulations. Last summer PHMSA proposed a new Federal rule raising training requirements for pipeline personnel performing pipeline safety related tasks and details on a new requirement for prompt notification to authorities of pipeline incidents. Last fall, PHMSA proposed a large set of new regulations on liquid pipeline systems to expand inspections of pipelines after extreme weather events, expand the number of pipeline segments requiring intensive inspection, shorten timelines for performing pipeline maintenance and expand requirements for pipeline leak detection. Congress has taken action to improve pipeline safety by increasing funding for over 100 new PHMSA personnel, many of them for inspections and enforcement. Congress also, just within the last few days or hours, passed new pipeline, bipartisan safety regulations. The Pipes Act, passed by the House last week and the Senate last night, will ensure pipeline operators receive timely, post inspection information from the government. Thank you to Senator Daines for inspiring that, to allow them to maintain and improve their safety efforts. It will ensure that product composition information is quickly provided to first responders after an incident and improved protection of coastal areas, marine waters and the Great Lakes. The bill was passed in large part on legislation passed by the Senate in March and negotiated in advance with Senate Republican and Democratic staff, along with their House counterparts. AOPL thanks the Senate for adopting this bipartisan bill last night. Even though pipelines are one of the safest modes of energy transportation, the pipeline industry believes it is important we are proactively improving pipeline safety further and have set a goal of zero incidents. Through the AOPL and American Petroleum Institutes' pipeline safety excellence initiative, pipeline operators have engaged nearly a dozen industry-wide groups to improve pipeline operations and safety. Together we're funding research and development on pipeline inspection technologies, enhancing our threat detection and response capabilities, expanding safety culture and management systems and boosting our response capabilities. Last year liquid pipeline operators developed industry-wide programs to improve our ability to detect cracking, integrate safety data, manage safety efforts holistically, manage leak detection programs and better plan for and respond to pipeline emergencies. This year we will complete a new program for comprehensive management systems, complete expansion of industry-wide guidance on river crossings, develop a new recommended practice for construction quality management and update our recommended practice for pipeline inspection and preventative maintenance. As you can see, there's a lot going on to improve pipeline safety, and pipelines continue to provide benefits to American workers and consumers. Thank you. [The prepared statement of Mr. Black follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Mr. Black. Mr. Eisenberg. STATEMENT OF ROSS EISENBERG, VICE PRESIDENT, ENERGY AND RESOURCES POLICY, NATIONAL ASSOCIATION OF MANUFACTURERS (NAM) Mr. Eisenberg. Thank you, Madam Chair, Ranking Member Cantwell, members of the Committee for having the NAM here today to talk about pipelines and what they mean to manufacturing. Our message today is simple and direct. Manufacturers' already high demand for oil and gas is going to increase dramatically over the next ten years, and we're going to need adequate pipeline infrastructure to ensure that the nation's ample supply of these resources are delivered efficiently, safely and securely to the manufacturers who need it. We have, essentially, a math problem. Over the next decade natural gas demand is going to grow about 40 percent, and that's generally from the power sector and manufacturing, so 40 percent increase in demand for natural gas. On the flip side, we're predicting about a 48 percent supply increase. So we've got more than enough to meet the demand which is fantastic. What is uncertain is the amount of pipes and really the geographic distribution of the pipes to get the gas from point A to point B to the end users who need it. We're going to need a lot more of those. Manufacturers use a third of the energy consumed in the United States. We've got--we've historically had an outsized reliance on oil and gas. Manufacturers use oil for fuel and as a feed stock and we use natural gas for a great many things, drying, melting, process cooling, machine drive and refrigeration, heating, ventilation, A/C, in boilers to produce steam and electricity and finally as a feed stock for refining chemicals in primary metal sectors. Because of this reliance our members have asked us and we recently retained IHS Economists to examine our oil and gas pipeline needs and the challenges and opportunities that exist for manufacturers. The challenges are what IHS calls a mismatch geographically in the growth in natural gas demand and supply in the U.S. lower 48. The rapid growth of low cost production out of the Marcellus and Utica plays has created a bottleneck as producers are unable to find pipeline capacity to move gas from the well to consumer markets. IHS believes that some of the pipeline capacity can be achieved by re-engineering the existing pipelines and changing the ones that are coming in and turn them and make them go out so that that low cost gas can go to some of these regions. However, the potential for reversal of these pipelines is going to be exhausted at some point and we're still going to need to build more. The only way to do that is by committing to building new pipeline capacity. And when pipelines aren't available manufacturers do suffer. The EPA's recent boiler MACT regulations, generally speaking, have forced most manufacturers to switch their boilers to natural gas. But several struggle to meet the boiler MACT imposed deadlines because they have trouble getting authorization and approval to get the gas to their plants. In the Northeastern United States, where this is happening, some manufacturers are basically having to turn to truck CNG to their facilities because they can't get a pipeline which places them at a disadvantage relative to other places like the Gulf, who could just have the gas. The opportunities, on the other hand, are significant. When pipelines are built it means jobs across the manufacturing supply chain. IHS estimates the construction of new natural gas transmission lines meant more than 347,000 jobs in 2015 with almost 60,000 of them manufacturing products like steel pipe, coatings, construction equipment, compressor motors, gauges and instruments and sand and gravel. On the oil pipeline side, at least 66 different manufacturing subsectors benefited from the construction of crude oil pipelines in 2015 and these include iron and steel, fabricated metal, cement, machinery and paints and coatings. As with most studies of the energy renaissance the numbers, the big numbers, are very, very big. Real GDP increased by $190 billion and 1.4 million more jobs in 2015 because of shale gas. The average family had about $1,300 in their pockets that they would not otherwise have had because of the shale renaissance. But I'd like to spend a few minutes talking about the stories behind this which are really pretty remarkable in the manufacturing sector. Stories like ACME Brick Company, the largest brick manufacturer in the U.S., with facilities in Minnesota, Arkansas, Oklahoma, Texas and Colorado. ACME produces a product that is heavy bricks, so moving natural gas via pipelines to where the bricks are made is far more efficient than moving the heavy bricks long distances. CF Industries uses natural gas to make enough fertilizer to nourish ten percent of the corn planted nationally. Covestro uses natural gas as a raw material to manufacture energy efficient products like polyurethane insulation. UPS has more than 6,500 alternative fuel and advanced technology vehicles in operation, more than half of which operate on natural gas. Caterpillar and CNH Industrial, they make the equipment to support the construction of the pipelines and the operation of them, but they also use natural gas as a fuel for their own operations. And small manufacturers like Marble King in West Virginia, a 28-person manufacturer, and Biad Chili Company, a New Mexico manufacturer who grows and processes chili peppers. They credit local pipelines as their key to staying competitive in the face of growing international competition. As our pipeline network grows so does manufacturing opportunity. It's imperative that the oil and gas pipeline system keep pace with supply and demand growth. So much new capacity is going to be needed over the next decade that prolonged delays could cause major problems for manufacturers. The NAM appreciates the attention this Committee is giving this issue and stands ready to support any efforts to ensure that pipelines are built in a timely fashion to meet our sector's growing energy demand. Thank you. [The prepared statement of Mr. Eisenberg follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Mr. Eisenberg. Mr. McGarvey, welcome. STATEMENT OF SEAN McGARVEY, PRESIDENT, NORTH AMERICA'S BUILDING TRADES UNIONS Mr. McGarvey. Thank you, Madam Chair. It is an honor to join you today to discuss our nation's energy infrastructure. As many of you know North America's Building Trades Unions is comprised of 14 national and international unions representing three million skilled craft professionals in the United States and Canada. On behalf of our members I welcome the opportunity to explain how our value-based business model and our world class training capacity play an integral role in the construction and maintenance of oil and gas infrastructure. But our expertise and exposure to the energy industry does not end there. Building Trades members can be found working in extraction sites, power plants, carbon capture and sequestration facilities and export facilities. Currently we estimate that 50 percent of our membership is employed by energy-related industries. I also wanted to take a moment to thank the members of this Committee on both sides of the aisle who have voted to retain prevailing wage protections in the construction industry. By helping safeguard these community standards and promoting training, we are protecting and preserving some of the few remaining occupations that cannot be outsourced to foreign countries or decimated by low road business models that are centered upon low wage, low skilled and easily exploitable work force. In any successful organization, labor or otherwise, being the best means setting high standards and maintaining and exceeding those standards. We harbor no illusions that our success is predicated on anything other than delivering the safest, most highly trained and productive skilled craft work force found anywhere in the world. That's why our rank and file members and our signatory contractors collectively fund, to the tune of roughly $1 billion a year, a nationwide network of 1,600 local joint labor management apprenticeship training programs, or JATCs. They are regulated by Department of Labor or State Apprenticeship Councils and they are governed by a Board of Trustees made up of equal numbers of contractors and labor representatives. If the building trades system which includes both apprenticeship level and journeyman level training was a degree granting college or university, it would be the largest degree granting college or university in the United States, over five times larger than Arizona State University. If it was a K through 12 school district, it would be the fourth largest school district in the U.S., only behind New York, Los Angeles and Chicago. And there's no taxpayer money involved in this system. Our members contribute a portion of their hourly wage, and our contractors contribute out of their own pockets. We are successfully working with community leaders to leverage both public and private investments in capital construction projects to create structured career training opportunities for historically underserved communities such as women, minorities and veterans. Through these efforts and others, we now boast over 100 pre-apprenticeship programs to ready students for the academic and real world challenges of being in a union apprenticeship program. Specific to the topic of today's hearing I want to highlight the International Union of Operating Engineers Pipeline Training Fund. Many of the work opportunities in the natural gas industry require specialization within the pipeline crafts. For example, most operating engineers run traditional heavy equipment such as bulldozers, backhoes and cranes and excavators. However, the pipeline industry has a unique set of skill requirements and the operating engineers maintain a robust training program in partnership with the Pipeline Contractors Association to meet the industry's needs. For example, during the natural gas renaissance, the OEs developed a new curriculum and course work in directional drilling to add to their existing pipe bending and pipe lifting classes, maintenance and rehabilitation in rock drilling classes. The OE currently offers more than 130 classes in different areas of the pipeline sector alone. In real terms it means in right to work states like South Dakota specialized operating engineers average $35 an hour, and that means workers are able to provide for their families while receiving union provided health care and pension benefits. But it is not easy to make it--it's not as easy as we make it sound. Every single large energy project is subjected to years of regulatory environmental study. And to be sure, pipeline infrastructure has failed to keep pace with the increased production which has caused several regions of the country to experience shortages and severe price spikes. New England is a perfect example of how the lack of sufficient pipeline infrastructure can have an adverse effect on both businesses and consumers. In 2000 only 15 percent of New England's electric generation was from natural gas fuel- power plants. By 2015 that number was nearly 50 percent but the pipelines need to feed these plants with natural gas, presumably from the Marcellus shale region, had not kept pace. It isn't for lack of trying. Less than two months ago New York State denied the Constitution pipeline after it had already received FERC approval and the company had been working with the state for three years to mitigate environmental concerns. The permit denial will delay about 2,400 direct and indirect jobs that will be created during pipeline construction generating $130 million in labor income for the region. That decision could also cost local governments approximately $13 million in annual property tax revenue. Other recent delays which have essentially put the pipeline industry into a tail spin include the Jordan Cove LNG export terminal and associated gas pipeline was rejected by FERC in March and then granted a rehearing; in April Kinder Morgan's withdrawal of the Northeast Energy Direct Pipeline application with FERC due to opposition; the New Jersey Department of Environmental Protection's review of the final section of the Transco Leidy Pipeline is significantly delayed due to pending litigation; the Dakota Pipeline received revocation of its permit from the U.S. Fish and Wildlife Services; the Rover Pipeline from the Marcellus shale region to the Midwest continues its lethargic approval process; and Dominion's Atlantic Coast Pipeline route has been rerouted a number of times to address concerns. The bottom line is that pipelines are the safest mode of transporting natural gas and the U.S. Department of Transportation's statistics show that underground pipelines transport natural gas far more safely than ships, rail cars or trucks. All the major pipelines I listed above will employ the most advanced technology and monitoring systems to make it even safer with 24/7 safety measures and regular pipeline safety plans. To look at it from a different angle there are three components to every pipeline project: industry, labor and government. Industry wants to grow, labor wants to create jobs and the government wants safety and environmental concerns adequately addressed. But the third leg of this stool is proving to be adversarial. Instead of an advocate for the first two, comments out of the Administration such as eliminating the ``dash for gas'' are only superseded by the lack of support for gas to back up intermittent renewables and a less than ambitious support system for carbon capture and sequestration at power plants and industrial facilities and a virtual vendetta against hydraulic fracturing and enhanced oil recovery and of course, the denial of Keystone XL. Our country cannot afford an energy policy that is all hat and no paddle. North America's Building Trades Unions stand ready to work with this Committee and Congress to find innovative funding mechanisms, sensible regulations and collaborative tripartite relationships between government, labor and industry to bolster America's leadership in the energy industry and put a floor under the middle class while creating millions of jobs. Madam Chairwoman, while we talk about the various components of an energy project we cannot neglect to mention the impacts of the local community. Many of our small communities across the country welcome infrastructure investment. In just the pipeline industry alone, we're talking about 800,000 jobs. The income from these jobs goes directly to our members and local training programs and, in turn, supports the tax base of Main Street and those seeking employment in the construction industry. This is truly how we can invest in America without spending a single Federal dollar. The Chairman. Mr. McGarvey, I am going to ask you to wrap up here. Mr. McGarvey. I apologize, Madam Secretary. Thank you for your invitation and opportunity to address the Committee. [The prepared statement of Mr. McGarvey follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you. I am sorry to cut you off. Your full statement will be included as part of the record. Mr. McGarvey. Thank you. The Chairman. We are just trying to stick to our five minutes here. Mr. McGarvey. Gotcha. The Chairman. Dr. Parfomak, welcome. STATEMENT OF DR. PAUL PARFOMAK, SPECIALIST IN ENERGY AND INFRASTRUCTURE POLICY, CONGRESSIONAL RESEARCH SERVICE (CRS) Dr. Parfomak. Good morning, Chair Murkowski, Ranking Member Cantwell and members of the Committee. My name is Paul Parfomak, Specialist in Energy Policy at the Congressional Research Service. CRS appreciates the opportunity to testify about oil and gas pipeline infrastructure today. In accordance with our enabling statute CRS takes no position on policy or legislation. The United States pipeline network is integral to the nation's energy supply and provides vital links to other critical infrastructure such as power plants, airports and military bases. Recent growth of domestic natural gas and crude oil production has resulted in an unprecedented expansion and reconfiguration of this network. From an energy market perspective continued expansion of U.S. pipelines has the potential to improve the efficiency of gas, oil and refined products transportation linking new producing regions with traditional consuming markets more directly with greater capacity and reliability. Such linkages may lower average transportation costs and may reduce regional price differences for energy commodities, especially in the case of crude oil that may also reduce the volume shipped by rail, truck and barge. Pipeline expansion may also support jobs in energy production and pipeline construction and may create economic benefits among industries that rely on oil and gas as key inputs. However, the future operation and expansion of the pipeline network also face significant challenges related to safety and security, emissions regulation, price volatility and public perception which I will now discuss. Pipelines are a comparatively safe means of transportation compared to other modes. Nonetheless, a single, uncontrolled pipeline release can be catastrophic in terms of human life, property damage and the environment. Uncontrolled releases in Michigan, Arkansas, California and other states have raised congressional concern about pipeline risks and increased local intervention in pipeline development. Over the last 15 years Congress has acted repeatedly to strengthen Federal oversight of pipeline safety and security. Additional safety regulations are being finalized and new safety legislation is pending. Congress is likewise examining the Federal oversight of pipeline security addressing both physical threats and the growing threat of cyber-attacks. New safety regulations and evolving security guidance are intended to reduce overall pipeline network risk but their associated costs and practical impacts have yet to be determined. In 2015 the Environmental Protection Agency finalized its Clean Power Plan to regulate greenhouse gas emissions from existing power plants. Last month, the EPA also issued new regulations to reduce emissions of methane and volatile organic compounds from the oil and gas industries including pipelines. The Clean Power Plan is currently under litigation. If implemented, it may encourage natural gas-fired generation to replace coal-fired generation and to firm up renewable power. Such an outcome could increase demand for pipeline capacity and could potentially increase gas and power interdependency. Regulations to reduce pipeline system direct emissions will likely effect how pipelines are operated and maintained with implications both for the environment and public safety. Energy markets are in a period of significant price volatility. In January, for example, the price of Brent crude fell below $29 per barrel, dropping over 45 percent in about three months. Last week, Brent crude traded back above $50. Likewise, since 2012, Henry Hub natural gas prices have fluctuated from under $2 to over $6 per million BTU. Such price volatility adds significant risk premiums to capital investment decisions for pipeline developers. One result of these uncertainties may be greater caution among developers before committing additional capital to new pipeline projects or the cancellation of existing projects such as the Northeast Energy Direct Pipeline which failed to attract enough customers. The oil and gas sectors tend to have a long-term perspective on infrastructure investment, often 20 years or more. So a short-term price volatility may not change their long-term plans, but the timing and location of their pipeline investments may have important implications for regional markets. Public perception of pipeline infrastructure has long been a consideration in pipeline development, but its importance seems to have intensified over the last several years. Public concern about pipeline safety has prevented new pipeline siting in certain localities and increased development time and cost in others. Controversy surrounding the Keystone XL pipeline and the Constitution pipeline are just two recent examples of projects heavily influenced by public opinion, even where there is Federal siting authority state and community stakeholders retain many statutory and regulatory avenues to affect siting decisions. Consequently, public perception is likely to be an ongoing priority in planning and policy related to pipeline development. Thank you for the opportunity to appear before the Committee. I will be happy to elaborate on my opening remarks and address any questions you may have. [The prepared statement of Dr. Parfomak follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Dr. Parfomak. Mr. Peress, welcome. STATEMENT OF N. JONATHAN PERESS, DIRECTOR OF AIR POLICY, ENVIRONMENTAL DEFENSE FUND (EDF) Mr. Peress. Chairman Murkowski, Ranking Member Cantwell and members of the Committee, thank you for providing this opportunity for the Environmental Defense Fund to discuss challenges and opportunities associated with natural gas pipeline infrastructure. Pipelines play a critical role in our economy and in the ongoing transformation of the energy system to reduce air pollution and deploy renewable energy resources. In this regard natural gas is particularly well suited to provide flexible reliability services like fast ramping in response to variable wind and solar output. The challenge we face is that the natural gas market design is no longer in sync with contemporary supply and demand dynamics. Market price signals for the kinds and amounts of new midstream gas infrastructure are not focused and as discussed in my written testimony, are likely to result in more pipeline capacity than we need. And because pipelines are so expensive to build and operate excess capacity will impose billions of dollars in unnecessary costs to energy customers. At a time when energy customers have new data-driven tools and smarter control over energy consumption decisions, the natural gas market design is comparatively dumb, especially in comparison to the wholesale electricity markets. Electricity markets balance supply and demand continuously and they financially settle. In other words, they price and set the value of electricity and reliability services every five minutes, every 15 minutes at the most. Natural gas pipelines, on the other hand, are compensated based almost entirely on fixed charges to reserve capacity through long-term contracts, 20 years or more for new pipelines, not fees based on how much gas is delivered and not the value of gas delivery services at times during the day when pipeline customers most need gas. As a consequence, pipeline operators are somewhat financially indifferent to whether their pipelines are fully utilized. Nationally, 46 percent of available pipeline capacity goes unused according to a recent Department of Energy study. In other words, almost half of the money being paid by the pipeline customers, often retail and energy consumers, is for annual capacity that they are not using. Likewise, pipelines have muted incentives to provide flexible delivery services in response to customer needs. Gas-fired electric power generators, now the largest pipeline growth customer, simply do not operate in a steady state. What generators and most pipeline customers desire is the flexibility to get gas deliveries when they need gas and this flexibility need is increasing in a more flexible dynamic and controllable system. Flexibility then, in general, is not offered and is not priced by the pipelines. In some regions it may be that what is needed is more natural gas storage, more LNG storage, electric storage or price responsive demand response or it may be more pipelines. Without the market creating targeted price signals, gas consumers and regulators can't determine the least cost solutions. We empathize with the challenges being brought to the Committee's attention by the National Association of Manufacturers. NAM needs better gas deliverability but because pipelines are paid for capacity, not services, the price for that deliverability has not been clarified. And paying for more annual capacity is not necessarily a cost investment, cost effective investment, for NAM's members to make, otherwise they would be making it. Those are the economic underpinnings to the math problem that Mr. Epstein mentioned earlier. FERC understands this problem. They asked the pipeline industry to voluntarily develop faster, more responsive services, but the pace of change is too slow. EDF, at its core, believes that well-structured markets efficiently allocate capital and resources and will benefit-- and will foster beneficial environmental outcomes. In the context of efficient outcomes, I want to touch on methane emissions which when leaked into the atmosphere constitute waste. Waste which not only adversely effects energy customers but also which goes to the heart of natural gas as an environmental solution. Earlier this year we had a glaring example of that waste. The leak at Aliso Canyon was the largest ever measured in U.S. history forcing thousands to flee from their homes, releasing enough methane to supply 60,000 homes for a year. Methane is a potent climate forcing agent, and this disaster was preventable through basic, well construction, operation and inspection practices. Aliso Canyon amounts to a failure of voluntary measures and of regulatory oversight. The extent of preventable leaks raises legitimate questions about the propriety of substantial further gas infrastructure expansion. Thank you for the opportunity to present our perspectives which my written testimony discusses in greater detail. [The prepared statement of Mr. Peress follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The Chairman. Thank you, Mr. Peress. I thank each of you for your testimony here this morning. Again, I mention that we will likely see a vote around 11 o'clock, so we will be moving in and out here but do not let that reflect a lack of interest. I think the fact that we have seven members from each side of the aisle here today indicates a clear interest in understanding more of our infrastructure issues, the capacity issues and I think really, the math problem that you have mentioned, Mr. Eisenberg. Mr. Peress, I think you are the only one here on the panel who thinks that we might possibly be suffering from over capacity. More of what I hear is a concern that we lack capacity, not only for the immediate term but moving forward and understanding what those needs will be, recognizing that building a pipeline today is extraordinarily expensive and extraordinarily costly from a time perspective. I mentioned the fact that the construction of the TransAlaska pipeline was a three-year construction process. But getting us to that point, I think we will recall the history, was much longer than that. Mr. Black, nobody has really talked about the permitting issues and some of the siting challenges. Maybe it was you, Dr. Parfomak, that spoke to the disincentive, if you will, for investment in pipeline siting things like the regulatory issues, the siting concerns, the permitting. Mr. Black, can you give us some discussion here on how long permitting is taking for an oil pipeline in the United States? I know we are talking a lot about natural gas here, but can you please talk to me a little bit about the time involved with permitting a pipeline? Mr. Black. Thank you, Senator. It's taking longer to site many liquids pipelines. The Chairman. Define longer. Mr. Black. I don't have that. By a period of years, sometimes, pipelines are taking longer. Of course, Keystone XL is a great example of a pipeline review process that took longer. Liquid pipelines are sited under state laws so state processes like in Minnesota for the Sand Piper pipeline have been lengthened years beyond what they should be. And then for Federal issues we need to go through Federal lands agencies if we pass Federal lands or if we need construction-related environmental permits. And in many cases we're able to get through those processes, and we've built more than 20,000 new miles of pipe in the last ten years but it's taking longer and that process adds to the cost of the projects and those costs can ultimately be passed on to the consuming public. The Chairman. I want to switch over to jobs for just a moment. I will probably have an opportunity for a second round here, but there has been some push back, if you will, when we talk about the jobs numbers. Several of you have laid some significant and some impressive numbers out there that come with the construction of a pipeline. But we hear repeatedly the challenge that you are only creating jobs for that specific period of construction; and therefore, these are considered just temporary jobs. We heard that replayed a lot with the Keystone XL. Mr. McGarvey, can you speak to the jobs issue? Mr. Eisenberg, you talked about, kind of, the broader impact when you create a pipeline it is not just the pipe that is bisecting an area but the implications for broader job creation. Mr. McGarvey, if you can start, please. Mr. McGarvey. Thank you. You know, that's the language that's been used around that has been a little aggravating. I don't--people don't really understand the construction industry. The Hoover Dam was a temporary job, the Golden Gate Bridge was a temporary job, and the new Freedom Tower in New York that rose in place of the Twin Towers was a temporary job. That's the nature of construction. People, through the course of 30 or 40 years, maintain their position in the middle class going from construction project to construction project. I'm not aware of a project where somebody starts on their first day and ends their career 40 years later on a construction project. So that temporary job thing is a real itch for us. It bothers us greatly. It bothers our members when they talk about these career construction craft professionals just being temporary jobs. The Chairman. Because they are professional jobs, most clearly. Mr. Eisenberg, can you speak very quickly to that in terms of the jobs impact and what it means beyond the actual construction of laying the pipe? Mr. Eisenberg. Absolutely and thank you for raising this. Obviously, through the Keystone process, I mean, where there was a lot of inflamed rhetoric from every side, it was frustrating to hear that there just wouldn't be many, many jobs. I mean, obviously, there's the jobs for the men and women who are going to be making the pipe and building this facility and operating and maintaining it and then the manufacturing jobs that from rolling the aluminum and the steel and the things like that, that actually go into the inputs here, the compressor stations, things like that. Our studies actually looked at this and added up both the-- and analyzed both the construction and the operations and maintenance. And so, just, I mean, I pulled up the oil study. In 2016 when you add those together oil pipelines, both construction and maintenance, will contribute 243,167 jobs. Twenty-eight thousand of them, 28,438, will be in manufacturing. So the operations and maintenance piece is obviously smaller than construction. These are gigantic construction infrastructure projects, but they're there and you have to maintain these things. You have to keep them safe, you have to keep them secure and you have to keep supporting them. Between 32 and 37 percent of that is going to be from the manufacturing side of it, so these are real jobs. They matter to our members, and obviously, we care about them continuing. The Chairman. Thank you. Senator Cantwell. Senator Cantwell. Thank you, Madam Chair. Mr. Black, oil being transmitted by pipeline, typically, is it treated to reduce volatility and vapor pressure? Mr. Black. The pipelines are designed for crude oils of all volatility. Many of the products that we deliver have a higher volatility than even light crudes, so the volatility is not really an issue for pipeline transportation which operates mostly underground and does not have the risk of the product coming to an abrupt stop like it does on another transportation mode. Senator Cantwell. So there is no regulation, you are saying? Mr. Black. Well there's certainly regulation about worker safety. Senator Cantwell. What is it? Mr. Black. And about pipeline safety, but there are not additional regulations dealing with product volatility---- Senator Cantwell. What do you---- Mr. Black. Because anything that covers gasoline would certainly cover a light crude from the Bakken. Senator Cantwell. What do you think the volatility is for most pipelines shipping oil? Do you know? We will follow up with you on a question for the record. Mr. Black. Sure. Senator Cantwell. I don't want to put you on the spot about vapor pressure and pipeline volatility, but it is certainly a subject I have gotten up to speed on in the last year. Mr. Peress, I want to go back to your comments about natural gas market changes. I don't want this Committee to get into a debate that we often have now about nuclear power, which is about we have got to change the way it is regulated because nothing can get built. I don't want to have the same discussion about natural gas, because I would actually like to see natural gas. But you are basically saying that the market has changed and that we need to have different signals if we want to improve the utilization of the pipelines that we have today. So what do you think those signals are? Shorter contracts? What it is that will allow gas to continue and flourish as a bridge fuel source? Mr. Peress. Right now the market is completely based on bilateral contracts between pipelines and their customers for capacity. Capacity does not necessarily equal deliverability. What customers need is they need to get fuel delivered to them. And because that deliverability is not priced because what--pipelines are totally compensated based on capacity. We see inefficiencies within the way that the pipelines are operated. We are suggesting that pipelines should be able to earn premium revenues for providing enhanced deliverability and flexibility services so that they're not just getting paid for capacity so that the market calls forth the right types and amounts of resources for customers to get gas when they need it. Customers don't need capacity. Customers need gas. There's a difference. Senator Cantwell. How do you think we make this transition, because I am assuming the companies that invested in these pipelines need to recoup their investments. Obviously, there has been a structural change in gas pipeline contracts. I do not know if this came about because we used to use natural gas primarily for heating and now it is for electricity? And the electricity markets are what they are today. I mean, there has been a big change in the market. Is that what we are dealing with here? Mr. Peress. Yes, Senator. It came about in the early to mid-90's when FERC, I think, prudently decided that they were going to turn both the interstate transmission companies on the electric side and the interstate pipelines into common carriers and take them out of the supply business. And part of the deal that they struck in order to take the pipelines out of the supply business, in other words, pipelines are not selling gas molecules, they're selling transportation services, was to come up with a compensation scheme that would keep them interested, engaged and investing capital. And that compensation scheme was based on the value of capacity. And by and large, that compensation scheme and that market design has been highly successful. Fast forward 20 years. At this point in time it's--there's a need for that compensation scheme to evolve. Virtually every customer or company that Mr. Epstein mentioned currently has arrangements to buy firm capacity off of a pipeline. If they wanted to buy more firm capacity, they can invest their money and get more firm capacity. But they don't want to do that. What they want to do is enhance deliverability. Paying for capacity is not a cost effective investment. Why? Because you're paying for that capacity every day of the year, 24/7 over the term of that contract whether or not you use it. What we think needs to happen is there needs to be a shift in the rate design so that as pipelines are incented to provide more flexible delivery services they can earn and garner revenues from those services which are actually the services that customers need. Capacity does not equal deliverability and FERC understands this. Senator Cantwell. Well, I know my time is about expired, but I will say I definitely support the Senate version that we worked out on siting. I am not against siting of new pipelines, but we have to meet safety standards in the law. But I think this issue that you touched on today is a really big issue. I want safety. I also do not want to get caught short in the long-term because the market has changed and we are not building capacity. I think it is a very interesting conversation here about how we move forward, so I hope we will continue this conversation. The Chairman. Thank you, Senator Cantwell. Senator Daines. Senator Daines. Thank you, Chair Murkowski and Ranking Member Cantwell for holding this important hearing. I come from the State of Montana. It is a place where we have some of the country's most pristine wild spaces along with an abundance of natural resources, including robust oil and natural gas industries which support the employment of 43,000 people. At the same time our scenic mountains, our rivers, our elk, our trout and so forth are the main motivator one might want to stay in our state. In fact, tourism is an industry that is nearly $6 billion and employs over 53,000 Montanans. That is why, I think, we strike the right balance with the Safe Pipes Act. I was pleased to help author it, and it passed the Senate unanimously last night. Among other provisions this bill reauthorizes PHMSA through 2019. That takes some of the uncertainty out of the equation. It also helps safeguard the environment by improving inspection report turnaround times. I look forward to seeing the President sign this into law soon. Mr. Black, I would like to start with the Safe Pipes Act which passed unanimously last night. In your experience in the industry how do you see the Safe Pipes Act making our pipelines even safer? Mr. Black. Well thank you, Senator, for your role in that bill and in pipeline safety. I remember the field hearing you convened in Montana through your role on the Senate Commerce Committee. I'd like to single out the provision that you helped author on quicker inspection results. Pipeline operators want to hear for the purpose of improving safety if a PHMSA inspector finds something on his or her visit. Sometimes, unfortunately, we were having a period of even more than a year or two years for that safety inspector to tell the pipeline operator about those concerns. We're in the business of learning from each other and continually improving our pipeline safety programs, and we want that input quickly. I want to thank you for that provision that encourages/directs PHMSA to give a post inspection briefing to a pipeline operator much more quickly so that we can get about the business of addressing whatever that PHMSA inspector finds. That's one way it's going to improve pipeline safety, and it was a great bill that we were happy to support. Senator Daines. Thanks, Mr. Black. I want to shift over to Mr. McGarvey. I was struck by your comments about temporary jobs. I grew up in the construction industry. My dad is still building houses. If you keep food on the table in construction, it is by stringing together a series of temporary jobs to stay employed. I was struck by the inconsistency on the battle on the Keystone pipeline. Why is it those were temporary jobs but when we are building bridges and highways and infrastructure, those are jobs? I think it is hypocrisy, frankly. That is how you stay employed through a lot of temporary jobs in construction. Thank you, Mr. McGarvey, for that point. It is clear we need to invest in our energy future and expand our energy infrastructure in order to keep up with demand. Projections in the next 25 years, we are going to add two billion people to the planet. Energy demand is going to increase 85 percent from where we stand today, almost doubling in the next 25 years. The question is how are we going to meet that demand and what role will America play in that? However, it appears that the Obama Administration is not listening to the unions. I am glad to have a union leader here today, Mr. McGarvey. They are not listening to associations and the families that are most affected by these anti-energy policies. The denial of the Keystone pipeline was a big loss for Montana workers and families and teachers and unions. Seventy million dollars of tax revenues every year in the State of Montana because that pipeline comes into Montana first. By the way, it is not just about Canadian oil. One hundred thousand barrels a day of Montana/North Dakota oil was part of the Keystone pipeline. It was just one of many denials and delays by this Administration. I appreciate your comment too. You are speaking my language when you said, all hat, no cattle. As a Montanan, I know exactly what you meant by that. Mr. McGarvey, in your testimony you state that the denial of the Constitution pipeline in New York will delay thousands of jobs that would generate millions in income for families in the region. Can you elaborate on how this denial, like the Keystone XL pipeline and others around the country, is hurting our economy, our unions, our energy security and the families that most need it in this very lethargic economy that we have today? Mr. McGarvey. Yes, Senator, I'll do my best. These denials of these pipelines which are the most advanced, technologically advanced, safest pipelines, you know, in the history of the world. In the case of the New York pipeline, which was already approved by FERC, it really got bogged down which, I believe, was in local politics. There were very strong, anti-pipeline, activist groups in the State of New York. There's a--just last week, I think it was the State of New York just passed a pretty big bill on green energy which proving that pipeline would have been moved in the opposite direction in the view of some of those folks. But the bottom line is when it comes to our natural resources, oil and gas, the manufacturing that comes about once we get the pipeline system in place, speaking of the Shell cracker, you know, $6 billion project in Southwest Pennsylvania and New York State hasn't been able to take advantage of any of that. It doesn't have the infrastructure in place when it comes to transporting gas and oil through the state. On top of that, my skilled professionals that I represent, men and women who've gone through, you know, three to five years worth of training, 6,000 to 10,000 hours, to be that safest, most productive craft work force in the world, aren't getting the opportunity to apply their skills. And they're being told that the green energy future is where we're going to need your skills. And I would note that the DOE's Quadrennial Report pointed out that the average medium wage for a solar installer in the United States is $16.01 an hour. And my membership that I represent currently is making substantially more than that and their families are depending on those higher income levels that are paid, particularly in the oil and natural gas and petrochem industries, to maintain their place in the middle class. So it has a devastating impact when they don't have the opportunity to go to work and apply their skills. In some cases, they have to travel from their homes to places where work is available, be away from their families, their children. And that puts a separate hardship on a family. But you do what you have to do in the construction industry, and that's why it's called journeyman's card because you go where the work is. But a reasonable, rational policy in New York State and through the United States on energy, settling most of these differences and continuing the arguments where we need to have them. Listen, I'm insulted sometimes when people talk about the safety issue because I represent men and women, three million of them, and their families. And if you've ever had a member get killed in a construction accident and you're responsible to go and meet with that family and explain what happened and explain what their future looks like and how you're going to be able to help take care of them. We put a preeminent focus on safety. That's why we're so safe. And that's why the industry, also, mostly publicly traded companies, put that emphasis, you know, on making sure that they're building those safe pipelines, that they're maintained safely and that they continuously get good ratings and good returns for their investors and the people that live in the communities in which those infrastructure projects go through. So-- Senator Daines. Yes, and to that point we are out of time, but I know the energy jobs in Montana pay twice, twice, what our state averages are. Thank you. Senator Barrasso. [presiding]: Thank you, Senator Daines. We will start with Senator Manchin and the roll call vote has begun. Senator Manchin. Thank you very much. Thank all of you for your testimony today. I wanted to say, Mr. McGarvey, basically, I think you know the State of West Virginia pretty well. We have been a heavy, heavy lifter for many years and produced an awful lot of energy for this country. We are an exporter of energy, and we have been heavy in fossil with coal and now we have a natural gas with Marcellus shale coming on and the wet gas with ethane which has been very instrumental in our state. We have very high unemployment right now because of the demise of the coal industry, if you will. With that being said, we are looking for more opportunities in jobs. I know through your apprentice programs you have been trying to get more of our labor force in there. Can you give me a little update quickly on what you have done so far for some of our laid off miners and some of these people with the skill sets because of the shift in our energy in West Virginia or have you been able to identify that? Mr. McGarvey. Yes, Senator, we are in one instance across the United States in my testimony talked about apprenticeship readiness programs. They're usually a 6- to 12-week program that's an introduction to the construction industry. So you would take women, communities of color, veterans and bring them into apprenticeship readiness programs, also displaced workers, for instance coal miners in West Virginia. We have a program just starting in---- Senator Manchin. They have a high priority, I am saying. Mr. McGarvey. Right in Southwest Pennsylvania on the border with West Virginia. Senator Manchin. Right. Mr. McGarvey. Which will give opportunities for lots of West Virginia. Senator Manchin. Well, the cracker plant is going to be tremendous for all of us. Mr. McGarvey. That's right. Working in conjunction with Shell we put that program together. Just kicking it off. So they move from apprenticeship readiness into apprenticeship. They'll get credit for skill sets from other occupations they already had, move them further up the economic ladder in the apprenticeship and quickly into journeyman status in a new career that's self-sustaining in the middle class. Senator Manchin. I have been advocating for a three state solution which would basically be the Mid Atlantic energy hub, the same as the Southwest hub. The three states of West Virginia, Ohio and Pennsylvania should be building the loop to keep the ethane, to keep basically the gas, natural gas, supply to attract more businesses to that area. I think this would be a tremendous opportunity for all of us, and hopefully you all can support that. Mr. Peress, I think that your group is basically opposed to the XL pipeline. I would just like to hear your explanation. We have had a train blow up in West Virginia. We had trains blow up everywhere. Why are you all opposed to the line? Mr. Peress. Senator Manchin, I'm not aware that---- Senator Manchin. EDF? Mr. Peress. EDF opposed the XL. Senator Manchin. Let me read it to you. Do you want me to read it to you? You're--you didn't know that your president? Mr. Peress. Well, I work on natural gas issues, Senator Manchin. If you---- Senator Manchin. Well, here is what it says. It says, ``The Keystone pipeline was not the right path for America. President Obama deserves credit for rejecting the project. As a nation we have turned the corner and now recognize that we need to consider the impact of energy projects on climate pollution.'' Mr. Peress. Senator, maybe I can address it in the policy context in which you are asserting it? Senator Manchin. And that was by Mr. Fred Krupp. Mr. Peress. Would that be okay if I---- Senator Manchin. Sure, anyway you want to do it. Mr. Peress. So anytime there is a large investment in infrastructure that's a bet. That's a bet because infrastructure is so costly and so expensive, in the billions of dollars. Senator Manchin. Can I interrupt? I am going to have to move on because we are running out of time. I want to hear this, but I have never known of a company that would make this type of investment unless they had a market. You are saying they are building these projects on spec whether it be a pipeline or a transmission line, they are building on spec, hoping it will come. Build it and they will use it? Mr. Peress. No, I'm saying that companies that invest in infrastructure are making a bet that there's a market for that infrastructure over the long period of time it takes to pay down that infrastructure. And from our perspective and what we know, and I can only speak to this on the gas side, not the oil side because my area of expertise is on gas. The gas industry itself, in recent filings, is suggesting that renewable energy, like wind and solar, will be taking market share away from them, that those will be an increasingly lower cost energy sources. Senator Manchin. But the EIA basically predicts that fossil, as far as gas and coal, is going to be a major player with almost 70 percent of the play, up until 2040. Seventy percent of the energy produced for this nation is going to come from, those resources. Mr. Peress. The EIA also predicts increasing amounts of wind and solar---- Senator Manchin. That is great, I am saying but it is not going to be baseload. You agree to that, right? It will not be baseload. Mr. Peress. I do agree with that. Senator Manchin. So you are going to have to have baseload. Mr. Peress. I don't agree with that. Senator Manchin. You do not agree about the need for baseload generation? Mr. Peress. No. Senator Manchin. So you like intermittent power? You are okay with---- Mr. Peress. I think an optimized system uses the lowest cost resources in consideration of public policy elements. Senator Manchin. And you think those could make it without the subsidies that we have given? Mr. Peress. Are you referring to pipelines or? Senator Manchin. I am referring basically to renewables and everything else that we have done. Mr. Peress. I think once we start opening the door on who is subsidized, how much that becomes a much more assurance. Senator Manchin. Sure, I agree. I think, Mr. Black, I have one question for you here, real quickly. Do you agree that the type of hub, shale basically, with what Shell is doing up there in the play? Do you believe that type of a hub would attract greater manufacturing infrastructure investment to our region? How do you see something like that developing? It took quite a while for Shell to make a decision on that hub up there, the cracker hub. Do they have the supply in place to do that? Mr. Black. Well, we're going to need enough pipelines to move ethane to those plants. That's a tremendous decision that Shell made that's going to help the region, as you said. That's a lot of ethane coming out of the Marcellus, very rich, wet gas. We need enough pipelines. If the hub is the way to do it, that's great, because without it there are workers and consumers that are just not getting those benefits. Senator Manchin. Okay. I am sorry, we are off to go vote. Everyone has left. I think it is time to vote. Thank you all. Senator Barrasso. Thank you, Senator Manchin. Senator Cassidy. Senator Cassidy. Well, thank you all. I am really enjoying the testimony. I love the all hat, no cattle. People say that for jobs but they do not support something which clearly will create jobs. Mr. Eisenberg, I think it was you. You pointed out that not only, I think Mr. Black and Mr. Eisenberg, that part of the power of this is that it leverages the creation or the preservation of other jobs. Senator Franken, who is not here, has once asked what has the shale revolution done for Minnesota? I was able to quickly find something that it had done but I think you, Mr. Eisenberg, pointed out that ACME Brick still produces because they can get gas shipped there and that energy intensive, low cost input allows them to preserve those jobs. Mr. Eisenberg. That's correct. Senator Cassidy. Now I am sure that is one example, but there will be many more too, I am sure. Mr. Eisenberg. There are many, many more in the State of Minnesota and everywhere else that when you invest in manufacturing, a dollar invested in manufacturing, creates $1.40 in economic benefits across the economy. Senator Cassidy. Then you pointed out, going back to Mr. McGarvey, that the nature of these jobs are not low paid, service jobs. Rather, they are well paid jobs and although they may be temporary, that is the kind of temporary jobs that preserve somebody's position in the middle class with good benefits. Mr. Eisenberg. That is absolutely correct. Senator Cassidy. Yes, I thought that was all very well done. By the way, for the record we should point out that the State Department said that if the Keystone XL pipeline were built, it would result in greater safety to current modes of transportation, a lower carbon footprint and more lives saved. So just for the record, that is the State Department that has pointed that out. Now, I really enjoyed your testimony. It was very technical in economics, and it is something that although I suspect one to pass on in disagreement, I thank you for that analysis. But I could not help but thinking as you mentioned that we have an increased capacity, and we are specifically speaking of the Northeast that I gather during the cold, the polar vortex, they are actually shipping in LNG from the Caribbean and burning heating oil--very carbon intensive and a lot of emissions. So isn't part of our capacity, kind of, like an interstate highway system which usually it is easy to travel at three in the morning, but it is rush hour that we need the capacity? It seems as if that capacity is not just for the incremental or the base load, it is also for that spike when you have a polar vortex or when you do an economic development and you need to have another energy intensive enterprise move and create jobs to a region therefore you could say oh, yes, we have the capacity to provide your energy needs. How would you respond to that? Mr. Peress. Thank you very much for that question. And incidentally, I spent seven of the last ten years on the Participant's Committee of the New England Power Pool and have been deeply engaged in discussions around gas capacity into New England. The issue that they've--that's been addressed in New England is focused on getting gas during those peak days, as you put it. And---- Senator Cassidy. May I also interrupt? We have also looked at that. It also seems that there has been a tremendous substitution with both petroleum oil as well as coal with natural gas. The amount of natural gas growth in the Northeast has been remarkable. I am sure that was allowed because there was already existing capacity. Mr. Peress. And indeed I think it's pretty clear that that shift in natural gas has provided benefits. But the real question and the issue that I raised in my testimony is when you're in a region like New England where you're facing a peak challenge. That is there are 15, 30, 40 days a year when you need to get gas deliverability that arguably, and there's some data that suggests that the pipelines are being used to capacity during those days, is building new capacity and paying for that capacity every day of the year for the other 340 days, the most cost effective way to overcome that problem. Rational, commercial actors, power plants, industry have decided that pipeline capacity is not the most effective way to address that problem. And indeed, it has been relieved over the past several years. And it's been relieved by those actors making a decision that there are, just in time fuel availability to lower customers---- Senator Cassidy. But that may be a more carbon intensive method of production, right? It would be cheaper to use petroleum oil to heat, but frankly if we are concerned about greenhouse gases that would be a worse way to do it. Mr. Peress. There's no doubt that natural gas, at least at the burner tip, emits less greenhouse gases than oil does. The question is when you considered the limited amount of time where they face these peak issues is that a material difference? And thus far, the numbers suggest that it is not a material difference. And in fact, LNG which is, which provides for just in time delivery, people are not paying for capacity. They're paying for the fuel that they use because the ability to get LNG to these power plants is not costly, unlike new power plants, has also been a large part of the solution. And what my testimony suggests is that when we call forth the competition for solutions to address those deliverability challenges, markets will provide the most cost effective outcomes. Senator Cassidy. I am over time. I yield back, and I thank you all for really intriguing testimony. The Chairman. [presiding]: Thank you, Senator Cassidy. Senator Barrasso. Senator Barrasso. Thank you very much, Madam Chairman. Mr. Peress, you are the Air Policy Director for Natural Gas at the Environmental Defense Fund. In that role you focus on midstream, downstream areas of the natural gas supply chain such as the interstate pipeline system. I understand you also represent the Environmental Defense Fund in proceedings before the FERC, the Federal Energy Regulatory Commission. Recently a different environmental group which calls itself Beyond Extreme Energy has engaged FERC albeit using, I believe, highly questionable tactics. For example, in February of this year this group sent mail protesting FERC's decisions to the homes of the FERC's commissioners, not to their office, but to their homes. The group even went so far as to hand deliver its protest mail to the homes of FERC's commissioners and then post the commissioner's home addresses online. Last month this group announced that it would again target FERC's four commissioners at their homes, directly at their homes. The group issued a press release saying it would, ``visit the four FERC commissioners at their homes to hold them accountable for their decisions.'' Now, I find these tactics in today's world to be extremely troubling, very dangerous. Other environmental activists recently drove the Chairman of FERC, Norman Bay, from the stage at an event in Albany, New York. They reportedly stormed the stage and accused FERC of genocide. Do you believe that physically intimidating public officials at a time like this or any time and their families is an appropriate protest tactic? Mr. Peress. Senator Barrasso, the way that we, as a society---- Senator Barrasso. Yes or no? Mr. Peress. Well, I'm not going to speak for the Environmental Defense Fund. I will speak for myself. I think it's highly unfortunate. Senator Barrasso. Then why hasn't the environmental community stood up to denounce these tactics? Is it waiting until a public official of FERC confirmed individual or his family or her family, if they get hurt? Is that the plan? Mr. Peress. What I can tell you, Senator Barrasso, is that any tactics that constrain civil discourse to come up with solutions to complex problems are not valid tactics in my personal opinion. Senator Barrasso. Because your organization, the Environmental Defense Fund, has worked with the group Beyond Extreme Energy on legal initiatives. Last fall, your group and Beyond Extreme Energy and other organizations co-signed a letter to Attorney General Loretta Lynch. I imagine you did not deliver that to her house. Did you? Mr. Peress. I would hope not. Senator Barrasso. So tell me, why is your organization now linking arms with a group who believes that physically intimidating public officials and their families is acceptable behavior? Mr. Peress. I'm not really sure what precipitated that sign on letter. Sign on letters go around our community all the time. Senator Barrasso. Mr. McGarvey, do you believe that blocking the construction of an oil and gas, natural gas, pipeline is a smart and effective way to regulate hydraulic fracturing? Mr. McGarvey. No. Senator Barrasso. Do you believe that blocking the construction of oil and gas pipelines is a smart and effective way to reduce greenhouse gas emissions? Mr. McGarvey. No. Senator Barrasso. So what happens to American workers and their families when environmental activists succeed in blocking the construction of oil and gas pipelines? Mr. McGarvey. Well I think our greatest example was when the rest of the country and most of the world was going through the great recession in the construction industry, we were going through a great depression where in many states we were north to 25 percent unemployment. Our unemployment is still double the national average, and where there was an opportunity to put thousands upon thousands of people to work on one pipeline, it was blocked. And unfortunately, many people lost their homes, health care, unemployment insurance ran out. In some cases, suicides amongst our membership spiked because of people's inability to take care of their most important asset, their family, to financially provide for them. So the effects of those kinds of actions in energy infrastructure have a serious, serious economic impact on the members that I represent. Senator Barrasso. Thank you. Thank you, Madam Chairman. The Chairman. Thank you, Senator Barrasso. Several of you made a reference to energy renaissance, natural gas renaissance, shale renaissance. Would we have had a renaissance, would we have had this uptake in the economy, to use your terms, Mr. McGarvey, and we were in a depression effectively? Would we have had that if we had not had infrastructure in place to avail ourselves of the technology that allows us to go after this resource? This resource just did not appear there overnight. It has been sitting there. It has been our ability to access it through the technologies that have come about. It is a pretty generic question to you all, but it again speaks to the critical issue that we are talking about here which is making sure that we have adequate capacity within our infrastructure. Mr. Black, can you speak to that? And Dr. Parfomak, given the research that you have done at CRS, can you also speak to that? So, Mr. Black first. Mr. Black. Thank you, Senator, for hitting the key point that you need pipeline infrastructure to make this happen. You discussed the importance of getting product from point A to point B, whether it's crude oil to refineries where it's lower costing or natural gas liquids that get to a petrochemical plant. It wouldn't be possible without the pipeline infrastructure. It's absolutely necessary and it wouldn't happen without it. The Chairman. Dr. Parfomak. Dr. Parfomak. There's no question that the unprecedented developments in shale gas were reducing the price of natural gas, you know, from $15, if you remember just a few years earlier, to $2 to $3 to $4 range created a host of economic benefits. It lowered home heating costs so folks had more money to spend on discretionary expenditures. It lowered manufacturing costs, as others have stated in the past. It made electricity cheaper. And so there are a host of benefits now. You know, economics tells you supply and demand. Cheap commodity, you're going to increase demand for it and we have this, sort of, you know, cyclical nature in the energy industry as we always have had. What is interesting to me as an analyst is that we are just, in my view, in the beginning of a huge transition infrastructure wise from an economy where natural gas is produced in certain regions, consumed in certain regions to a physical reshuffling of that, as I stated in my testimony, and continued transition in the way that natural gas is being utilized. From my point of view, it sort of requires constant vigilance as to how are things going regulatorily, construction wise, the price of fuels which are influenced not only by developments here but internationally. So it requires a lot of attention to all of these factors, and unfortunately, it's a lot more complicated that it used to be. The Chairman. Let me ask about that, the fact that it is more complicated because we speak about the benefits to consumers whether it be lower energy cost. We certainly recognize that the jobs benefit, just the overall benefit, that comes to the broader economy as a whole. Yet we have this nimby attitude where okay, I want to make sure that I have access to that natural gas. I want to make sure that I have access to this resource, but just don't put it within my eyesight, don't put it in my state, put it in somebody else's backyard. If the benefits are so apparent and again, I look at you, Mr. McGarvey, because I think from a jobs perspective it is just bold and in your face, why is there this disconnect? I think I called it a cognitive dissonance here. What are we not doing right in conveying to the American public, the consumer, that there is clear benefit here? By the way, if you want to have more affordable, accessible, clean, diverse, secure supplies, you are going to need the infrastructure. What are we doing wrong? Are we not conveying to the work force the importance of this? Mr. McGarvey. My work force understands the importance of it for sure. It's just ironic that, again, it goes back to our discourse. We can't have an honest conversation where, in a region or in a local area, we have to have outside groups come in and gin up the scare tactics and other things why people should be frightened and opposed. I mean, it's gotten so bad that ironically even in the State of Vermont, I think, in its last legislative session, I think the Vermont Senate passed a bill out. I don't know that it's made it all the way through to ban but put a moratorium on more windmills in the State of Vermont. We've already closed our nuclear plant up there. I don't know how they're going to do the power generation. But again, if we could have a rational conversation about the benefits, about not ceding our position as the economic super power to China, about real middle class jobs, families sustaining middle class jobs and what they mean. And for the most part, there's always exceptions to the rule, but for the most part, you know, private investment wants to work with local communities to make it work for them so that it works for all the parties that are involved with it. And then in my testimony I talked about the three-legged stool government, labor and industry all working together to make sure that we're building safe infrastructure. It's aesthetically pleasing as it can be, as far away from inhabited home sites as it can be and keeps the country moving forward. It goes back to everything else that's going on in our country right now. There's just not, we can't have an honest conversation about what's important. The Chairman. I would like to think that here at the Committee we can help move forward on honest conversations. So thank you for bringing that up. Senator King. Senator King. Thank you, Madam Chair. Sorry about the herkey jerky nature of this. When they call a vote we have to go. I have a long-term question and a short-term question and perhaps some of this might be for the record. The short-term question touches on the question that Mr. Peress talked about which is the capacity versus deliverability issue and peaking needs. It has often occurred to me that we build energy infrastructure, and this goes for the electric distribution lines as well, for the hottest day of the year or in the case of natural gas, the coldest day of the year. It is like building a church only for Christmas and Easter and on an off day in April there are not many people there. Right now in New England, 57 percent of our electricity is being generated by natural gas. My question is where is that going in New England? I know we are going to lose at least one nuclear power plant and probably one or two coal plants. Mr. Peress, you have talked about this. Isn't there going to be a need over the next 10 to 20 years for additional base load capacity? We will talk about peaking after this. Mr. Peress. First of all let me say that what we have seen in the markets is that the markets, in particular, New England, but throughout the country, they're getting peakier. That means the average load to peak load, that ratio, is growing which suggests that base load resources are not what is going to be needed in the future. And in fact, there are many trends that suggest that base load resources are not what's needed in the future. If you look at my testimony I speak in depth about the fact that few, if any, natural gas-fired power plants run as base load resources, less than six percent nationwide. And that's based on recent EIA data. So the question is less about whether we need to install capacity to meet base load needs and what are the most cost effective means to provide for that flexibility and that deliverability in a more peakier dynamic. Senator King. Well let's transition then into my second question which is about peaks. Mr. Parfomak, I would like you to comment. What are the practical alternatives to building excess capacity to deal with peaks? Are we talking LNG storage tanks? How can we deal with this issue of a peak demand in two or three weeks in the year and pretty adequate capacity the rest of the year? Dr. Parfomak, what are your comments? Dr. Parfomak. There are alternatives on the supply side and the demand side. And so, as examples in the electric utility world, there are programs that have been around for a long time to try to reduce peak---- Senator King. Demand response. Dr. Parfomak. Interruptible power supplies, now the smart grid is putting meters on people's dishwashers and clothes washers to turn them off on August afternoons automatically without the consumer having to make a decision and compensate them for that. So there are probably a number of ways and maybe more ways to be thought of to try to moderate certain types of demand, interruptible rates for natural gas users. But some of them can't do that, so there's a limit to the flexibility in demand. On the supply side, there is that---- Senator King. Well the demand response works for the electric side, but it does not necessarily work for a factory that needs the gas---- Dr. Parfomak. Right, some of them can't do that, right. Some of them can stop a shift without penalty and make it up, you know, the following week. Some of them can't. They can't power down that way. But in terms of supply there are, of course, use something other than natural gas. We talk about it in the vehicle world using electricity to run cars instead of gasoline. We can use other fuels rather than natural gas and we can use electricity for a process, that sort of thing. Of course, it's hard to build transmission lines to get electricity into some of these regions too. Senator King. But if you charge your car at night there is a lot of excess capacity on the electrical transmission and distribution at night. Dr. Parfomak. That's right. Senator King. A huge amount of excess capacity. Dr. Parfomak. And that's again, that's a practice of capacity utilization and trying to reduce peak loads. LNG, as you mentioned is another option, but that presents its own challenges. Senator King. Mr. Eisenberg, your clients, your members, will pay for this new capacity. Are you concerned about paying for excess capacity? Mr. Eisenberg. So I'm not hearing that from my members at all. There's a chart on page two of my testimony that shows our natural gas usage. It's trending up. It's about three times higher than about any other fuel we've got. Manufacturers need always on energy and natural gas can give us that, always has given us that. So when our members are looking to invest in these contracts, my sense is they're looking long-term and they're looking for a secure fuel for a very, very long-term. Again, we don't really hear a lot about rates from them. It's not something that is a top tier issue for our organization because they're handling it at the state level. But what we do hear is that they need the pipelines to fix some of the geographic issues, the distribution that's going on there. Senator King. Thank you, Madam Chair. I will mention I have a friend in the construction business whose family-owned company has been providing temporary permanent jobs since 1928, so I understand that discussion. Thank you. The Chairman. Thank you, Senator King. Senator Hirono. Senator Hirono. Thank you, Madam Chair. I thank all of the witnesses. Mr. Peress, I found your testimony very interesting and talking about excess capacity and the fact that pipeline owners, I suppose, operators are paid for capacity rather than distribution or deliverability. You noted that there is a potential for gas and electric rate payers to be stuck paying the bill for pipeline infrastructure that may not be needed. What is the typical time for payback for pipeline, new pipeline, infrastructure to justify the cost of building the pipelines? What is the length of time that they generally look to? Mr. Peress. I don't know the answer to that question off hand because it all depends on what the application and use of that natural gas is and the circumstances in the individual market. But what I can say is that customers that make a rational decision to sign up to buy capacity for and long-term contracts, make that calculation and that's what drives their decisions. Senator Hirono. It could be 20, 30, 40 years and so that commitment will also commit the rate payers to paying for basically the cost of building the pipeline would go to the rate payers. Can you expand on your suggestions for what Federal and state agencies should do to support a more accurate forecast of the need for new pipelines? Mr. Peress. Yes. What we are suggesting and what the FERC is moving forward in doing is to by enhancing coordination between the gas and electric industries and by adding flexible services and pricing flexible services on the gas side. What they're doing is they're fostering competition amongst all different sorts of resources to address the individual needs of customers. And to the point that the gentleman to my right just made, there are multitude different options and alternatives that customers have to meet those needs unless and until there is a mechanism for comparing those and pricing those, then it's difficult to make those decisions as detailed in my testimony. So what the Commission is trying to do is to harmonize and to some extent foster competition amongst all those different resources so that we get a better sense of how to make least cost procurement decisions for long lived expensive infrastructure. Senator Hirono. This is something that FERC is undertaking? Mr. Peress. FERC has been moving in this direction through several dockets. What they most recently did was asked the industry to try to do this voluntarily. EDF has been deeply involved in that, as has the entire industry. I can tell you that the progress is going very slow and I will characterize the fact that the pipelines, in general, are not seeking to change the current market design. Senator Hirono. Thank you. This question is for the full panel. In Hawaii the gas utility, which is not the largest utility entity in Hawaii, it's the electric company, has proposed a project to import natural gas using a floating offshore terminal and an undersea pipeline to connect to its existing onshore pipeline network. None of you may be particularly familiar with the details of the specific proposal, but can any one of you speak to the performance, safety and cost of other natural gas projects using floating terminals or undersea pipelines? Can anybody comment on either kind? Dr. Parfomak. Actually I can deal a little bit with LNG issues. The advantages of using a facility of that type which is not onshore is that two fold. One is of safety. It removes the--a large quantity of volume from populated areas. LNG at sea presents much, much lower risk to surrounding communities than a land-based LNG facility would, and LNG doesn't represent a hazard to the water necessarily because it wouldn't work to escape it. It would just evaporate or burn off, unlike an oil tanker might. There are also cost and siting advantages. Obviously it's a lot simpler and faster to develop a turn type system offshore than to develop a facility on land where you have to secure the property rights and go through a FERC siting process and take a lot of those considerations into account. The primary cost then is a vessel that's capable of doing that, and that's considerably more expensive rather than just have a thermos which is moving LNG around and re-gasifying it onshore. You have to have all of that on a vessel that's capable of moving around. And that, I haven't done an analysis on the relative costs of that. But there's certainly, there have been a few LNG import terminals in Boston Harbor that were terminals that were not used for economic reasons but, you know, were sited and approved by the Federal Government. Senator Hirono. This is also not an inexpensive proposition because our gas company is looking to spend some $200 million in order to set up this system. Thank you very much, Madam Chair. The Chairman. Thank you, Senator Hirono. Senator Franken. Senator Franken. Well, thank you, Madam Chair. I am very concerned about the safety and integrity of our pipelines in the face of climate change. In coastal regions enhanced storm surges from sea level rise threaten the stability of existing infrastructure and elevates the risk of pipeline corrosion from sea water intrusion. In the Northern Great Plains extreme precipitation can lead to land subsidence that damages pipelines and causes devastating leaks and spills. And as I am sure the Chair of our Committee could tell you, in Alaska thawing permafrost can severely impair pipeline foundations. But what concerns me the most is that many pipelines in the U.S. were designed, of course, without considering the impacts of climate change. In fact, according to several Federal studies many of the pipelines in Alaska that sit on permafrost were designed using climate conditions from the 50's, 60's and 70's during which time we did not have as clear an understanding of climate change as we do today. Mr. Black, you say in your written testimony, and I quote, ``The pipeline industry believes it is important we're proactively improving pipeline safety.'' How does your industry consider climate change as you build new pipeline, or for that matter, repair existing pipeline? Mr. Black. Thank you, Senator. Any new and existing pipeline today needs to consider its operating environment. They need to understand the possibility of local flooding, of erosion and to take those issues into account whether it's in the design of the pipeline or the protection of an existing pipeline. So they're required right now to assess those risks, and if there's any hardening that needs to be done, to do it. We had the flooding in Hurricane Sandy in that area the pipelines continued to operate in that environment. The only issue there was the power was cut to terminals and to pipelines, but the pipelines continued to operate safely. And then afterwards, learned lessons to be ready for the next time to make sure they're ready. Senator Franken. Thank you. Mr. Peress, how can we make sure that our pipeline infrastructure is prepared for the impacts of climate change? Mr. Peress. The PHMSA, the Pipeline Hazardous Materials Safety Administration, actually has initiated a fairly significant proposed rulemaking to address safety for the interstate pipeline system. And in fact, one of the focal points of that is enhanced threat identification and enhanced data acquisition. It's a positive step forward that PHMSA is taking but far more needs to be done. One of my fellow panelists spoke about safety management systems that are evolving and advancing in the context of threat identification, and it is important for the agency to continue to focus on this aspect. And really this is the first time in certainly recent memory, if not ever, that they have brought these sorts of programmatic elements to the interstate pipeline system, outside of just the most populated, densely populated areas. So it is happening but more needs to be done. Senator Franken. Thank you. Mr. Eisenberg, I appreciate the discussion in your written testimony regarding the important role of steel in pipeline construction. In a recent study the National Association of Manufacturers found that natural gas pipeline construction contributed to 1,085 jobs at iron and steel mills. By the way, Mr. McGarvey, I was a member of a multi- employer plan as a writer in the writer's guild and as an actor on TV, so I know those are jobs. Jobs are jobs. I, kind of, I got a little PO'd during the whole Keystone discussion about, ``They're just temporary jobs.'' Well yes, of course, every job in construction is a temporary job. Anyway, I am back to you, Mr. Eisenberg. As you may know much of the iron ore or taconite that is used in domestic steel production comes from the iron range of Minnesota. Unfortunately for many years now our home grown steel has had to compete with illegally dumped steel from China. While I am happy the government has recently been successful in combating illegal dumping by imposing new tariffs on Chinese steel, we need to do more. Mr. Eisenberg, do you agree that we should be using domestic steel in new pipeline construction and not illegally dumped steel from China? Mr. Eisenberg. Well, we obviously are concerned about dumping as well. Our trade team, led by Linda Dempsey in my office, we actively engage with groups like the Iron and Steel Institute, the Aluminum Association, who are doing their best to try to level the playing field here to make sure that U.S. manufacturers have robust trade remedies available to them. We're hopeful that it will work itself out. There were some positive--there were some impacts there. The good news is that you mentioned that our study had a thousand jobs. Well, those are real numbers based on real pipelines and real jobs, so we're still creating the jobs here. There's a lot of upside in building more pipelines for the iron and steel industry. We'd obviously like to see as much of that in the United States as we can. Senator Franken. I obviously would like to see as much of that. So your answer is yes. You prefer American steel. Mr. Eisenberg. We officially do not have a preference on that. I apologize. Our trade folks can follow up with you on that. [The information referred to follows:] [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Eisenberg. But obviously we are concerned about dumping, and we'd like to see trade remedies taken. Senator Franken. Well, I am sorry you do not have a position on that, and I think we should be using American steel in our pipelines. Thank you. The Chairman. Thank you, Senator Franken. Senator Lee. Senator Lee. Thank you, Madam Chair, and thanks to all of you for being here today. I am increasingly worried about the politicization of infrastructure projects. What we are seeing has allowed increasingly vocal anti-development environmental movement that has set its sights on run of the mill pipeline infrastructure projects. This does not represent everyone in the United States. It does not represent even most who are concerned about the environment. It is a fringe movement, but it is a fringe movement not to be ignored. It recently killed the Northeast Energy Direct Pipeline and the Constitution pipeline which would have supplied natural gas to a number of states on the East Coast. Now Utah is one of the fastest growing states in the country. Our population is expected to double by 2050. There are not a lot of states that can claim that particular distinction. I am generally worried that the endless litigation that we are seeing and the political pressure campaigns that we are seeing waged by anti-development, fringe activists will inhibit Utah's growth by preventing the construction of necessary pipeline infrastructure. Without that and other types of infrastructure, you cannot have growth, growth that Utah would otherwise be experiencing. So, Mr. Eisenberg, I would like to know. How can Utah grow if we cannot provide heat and reliable electricity for residents, particularly for our new residents moving into the state? Mr. Eisenberg. Well, and I would add the manufacturing sector as well, right? I mean, we are the foundation of communities and we need the energy as well. I mean, we all, kind of, get what's going on here. But there's a group of people right now meeting in Atlanta to try to figure out how to make this process more difficult, the pipeline siting process, the permitting process more difficult. That's not going to change. There are--it's just the world we live in. It's unfortunate because the FERC process that generally through laws, through the Energy Policy Act of '05 and '07, has gotten some remedies that will allow it to move a little bit quicker than some of the big infrastructure projects. But it's two steps forward and one step back and now we're dealing with some of these challenges that some of the folks in the industry are saying are adding years to the project. We just want to see them get done, right? We have a real--we have a math problem. We need, we're going to need, a lot more energy for the power sector and for industry in Utah and elsewhere over the next decade. We just need the pipes in place. You can regulate them. Do whatever you need to do, but let's get them built so that we don't have a real log jam for us. Because otherwise, you don't have manufacturing. Senator Lee. No, I think that is right. Well, in addition to that, we have government regulations like the Clean Power Plan and MATS that are forcing a transition away from coal-fired electric power generation to natural gas. The same groups that forced the transition to natural gas are now successfully scuttling the chief way to transport natural gas which is by pipeline. In other words, without pipeline infrastructure you cannot rely on natural gas as a way to generate electricity. Mr. Eisenberg, I am at a loss over this one. Mr. Eisenberg. We are as well. I mean, manufacturers need base load generation. We need power, right? And that generally comes from fossil fuels or nuclear power. And obviously there are other things taking up an increasing portion of the grid, but that's it. That's where you get base load power from. We're losing our nuclear power plants, we're losing our coal-fired power plants and now we're having this existential discussion about whether we need natural gas. We need natural gas in the manufacturing sector. We don't have much left after that to keep us going, and if we don't have it, we've got a real problem. Senator Lee. Yet this problem is particularly acute in states like mine where the majority of the land is owned by the Federal Government. Other people in other parts of the country are dealing with a lot of regulatory hurdles, but those hurdles are magnified. They are compounded to a very significant degree in a public land state like mine. In Utah, business looking to build a pipeline should expect to deal with some combination of the Advisory Council on Historic Preservation, the Bureau of Indian Affairs, the Bureau of Land Management and the Army Corps of Engineers in addition to the EPA, the Fish and Wildlife Service, the Forest Service and the Federal Energy Regulatory Commission. Mr. Black, could you walk me through what a permitting process in the West looks like and how this process could be improved, particularly within public land states like mine? Mr. Black. Well thank you, Senator. You're right. There's a lot of agencies that we need to work with, and we're ready to do that but we hope we can do that in a timely manner. Pipelines are subject to many of the same requirements as other Federal agency actions in the West such as a NEPA review or permitting across Federal lands, like you said. In practice, a pipeline has a minimal impact on the environment. A recent NEPA review of a large pipeline project found that the alternative would have less impact, the pipeline alternative would have less impact than all alternatives including no action. That's because the energy demanded by the public will reach market by some other mode, by truck, by train, pipeline, barge. They don't have barges in Utah, and pipelines have the least environmental impact. The Federal workers at local offices in the West are, as we understand, generally working hard to complete that review work. We see permit reviews slow down when maybe Washington outside forces get involved and/or when local field offices don't have the resources to process those applications. One recommendation is just to make sure those local field offices have enough resources, enough leeway to make the decisions that we need to be made to get those pipelines sited in Utah and elsewhere in the West. Senator Lee. Thank you. Thank you, Madam Chair. The Chairman. Thank you, Senator Lee. Senator Warren. Senator Warren. Thank you, Madam Chair. Last month the Massachusetts Supreme Judicial Court ruled that the state is not on track to meet its legal obligation to reduce carbon emissions from fossil fuels. And while Massachusetts has been a leader in deploying renewable energy, the Commonwealth continues to rely on fossil fuels for the majority of our power. We think the path forward is clear. Massachusetts will need to aggressively expand renewable energy generation and increase conservation to meet our carbon emission goals. And yet, in New England big new pipelines have been proposed to bring natural gas into the region. Now, state leaders like Attorney General Moira Healy, have questioned the need for these new pipelines and she has said and I quote here that, ``the region is unlikely to face electric reliability issues in the next 15 years and additional energy needs can be met more cheaply and cleanly through energy efficiency and demand response.'' In fact, even the gas pipeline companies have testified to FERC that a long-term shift toward renewable energy calls the economic viability of new pipeline infrastructure into question. So Mr. Peress, the trend toward cleaner forms of energy is just a fact. Given this trend away from fossil fuels, is investing in new, high capacity natural gas infrastructure a smart, long-term investment for New England? Mr. Peress. The evidence suggests that in New England it is not. And just to clarify the record, when Kinder Morgan canceled the Northeast Energy Direct project, they canceled it because they did not get enough customers to sign up to commit for that capacity over 20 years. It had absolutely nothing to do with opposition. And of course, the reason they couldn't get those customers to sign up for that capacity is because both the grid and state energy policy in New England and in Massachusetts are moving more toward more dynamic renewables, more energy efficiency and the resources that Attorney General Healey, through a detailed analytical analysis found to be the most cost competitive reason. Senator Warren. Let me pick up on that point about how it is that these pipelines are financed. Traditionally they are financed by the companies that are actually going to burn the gas, industrial manufacturers, gas distribution companies, gas-fired plants, who enter into long- term contracts with the pipeline company. The companies finance the pipelines because they analyze the projected gas use over time and decide that the costs of the pipeline are more than offset by the subsequent savings in gas prices that they are going to get from adding this new capacity. It is just basically how markets work. Mr. Peress, have these companies been willing to pony up to cover the costs of big new pipelines in New England? Mr. Peress. They have not been willing to do so in New England because they found that it's not in their economic interest to be paying for pipeline capacity every day when their needs are limited and only during certain specific periods of the year. Senator Warren. Right. So these companies are saying they do not want to pay because they are not sure that these pipelines make any economic sense, but they would sure be happy to see the pipelines if the state would make the electricity customers pay the cost of these new contracts. Now in Massachusetts, the Department of Public Utilities authorized the electric utility companies to finance these new pipelines on the rate payers' dime even if they otherwise made no economic sense. The Department said the electric utilities could pass the cost off to Massachusetts families, who do not have the option to say no. Mr. Peress, does it make sense to force families to pay for these pipelines when we might not need them and no one else is willing to pay for them? Mr. Peress. A 1.2 billion cubic foot pipeline would cost customers $14 billion over 20 years. And that's money that's paid for by people, by businesses and otherwise, under a scheme that tries to impose those obligations on someone other than the beneficiaries of that pipeline capacity. That, in our view, is the definition of a bubble, imposing costs on captive entities that are not the beneficiaries of that, those costs. So we would suggest that it does not make sense. Senator Warren. Alright. And it is also very anti-market, I should add here. I appreciate your testimony. Energy costs are a big deal in New England and throughout the country but giant pipeline companies that cannot make an economic case for these projects should not be allowed to force someone else to pay for them. As places like Massachusetts work to modernize our energy system and try to keep the prices affordable for families and businesses, it is urgent that we upgrade aging infrastructure and invest in clean technologies of the future. But we should keep the focus on that, not on a big giveaway to the oil companies and gas companies. Thank you, Madam Chair. The Chairman. Thank you. I am so tempted to engage in debate. I do not know how we focus on the aging infrastructure if we cannot make sure those companies that build the pipelines have the certainty that they need to do exactly that. I have already done second round. I want to give my colleagues an opportunity. Senator King, you were next up if you would like to ask a second round of questions. Senator King. I think to clarify this discussion there is a project or, I do not know quite how to characterize it, a proposal in New England that the taxpayer or the rate payers of the utilities take up the burden of the capital cost. The argument is that the pipeline has become, essentially, part of the electrical system because so much of our electricity is generated with natural gas. I think that is what Senator Warren is talking about. The real question is who bears the risk? The Chairman. Right. Senator King. I think Senator Warren's point is if the private sector is not willing to, does that tell you something about it? In fact, our Maine Public Utilities Commission staff studied this question and just last week recommended against the state committing funds to the underwriting of the pipeline because they found it uneconomic. I do not know the details of that study, but our commission will be looking at it. The issue is whether these costs should be borne by the customers or by the electric rate payers and how the risk is allocated. The Chairman. Right. Senator King. It is not an easy question. The Chairman. Yes. Senator King. And clearly we need the infrastructure, but are there other ways to skin the cat other than building an entirely new pipe, such as LNG storage, demand response, again because of the problem of, in some cases, in New England anyway, we have enough capacity today. But we will not have enough capacity in January and how do we deal with that? The second question is what will we need in 20 years? I do not want to close the door to new infrastructure if, in fact, the demand in New England for natural gas continues to decline. That gets us to the question is what is our energy mix going to look like in 20 years? So it is not an easy question. If you guys can find a question buried in there somewhere, you are welcome to it. [Laughter.] Dr. Parfomak. Senator, the point you raised and the comment you made is a really insightful one. The notion that, to what extent is the natural gas system becoming part of the electricity system? And that's the interdependency issue that I raised in my testimony. Something FERC has been very, very interested in and has spent a lot of time thinking about in the context, in particular of New England, where it's particularly evident, but in other places. And most of the, I shouldn't say most of them, the major driver of future demand for natural gas growth is expected to be the electric power sector. And so, clearly, anything that happens in the electric power sector to reduce its requirements for natural gas in the future will mitigate the needs, especially peaking needs, for natural gas infrastructure as well. So I just say that to point out that things like electricity storage, the efficiency of renewables, the requirement for natural gas to firm up renewables, all of that has a direct relationship to the issues that we're discussing today. Going forward I mentioned earlier that this is, it's getting more complicated. The interdependency between electricity and natural gas, especially in certain parts of the country like the Northeast, are yet another level of complication that I personally have to pay a lot of attention to. If somebody comes up with an incredibly efficient electricity storage mechanism it could change this discussion radically, really affect how natural gas develops going forward and where it needs to go. Senator King. But one of the problems is we are all trying to predict the future and the only thing we can say with certainty, that we will be wrong. [Laughter.] But if we bet that there will be new alternatives and changes and then there are not, then we end up with an infrastructure shortage and particularly given the length of time it takes to permit new infrastructure. So there are no easy answers here. But I think what I want to do is have more data and more understanding about long-term electricity demand. You mentioned, I think, Mr. Eisenberg, a 40 percent increase in demand nationally over the next 20 years. Mr. Eisenberg. Next decade, actually. Senator King. Next ten years. But then you have to get underneath that and say, okay, when is that happening and what is the necessity for additional infrastructure? I keep coming back to this Christmas and Easter and the church. Could you build a tent on Christmas instead of building a church that is empty two-thirds of the time? Mr. Eisenberg. I mean, the only thing that I think is worth adding to that is that the manufacturing end user is fundamentally different than the residential end user. And I think we, sort of, get caught up in, you know, families and homes and we absolutely should be but manufacturers use of energy is very, very, very different. And so our gas needs are going to be pretty consistent. So if you want us there, we need the pipes. I mean, it's really that simple. All the new, you know, there's so much new manufacturing coming to the United States because of natural gas and because, particularly, of the feed stock elements of natural gas. But where is it happening? It's happening in the Gulf. It's happening in Texas---- Senator King. But the test of that is whether your members are willing to step up and sign 20 year take or pay contracts. Mr. Eisenberg. Completely agree. Senator King. To support the building of the infrastructure. Mr. Eisenberg. Agree. Senator King. That is the issue. Thank you. Thank you very much, Madam Chairman. Fascinating hearing, thank you for calling it. The Chairman. Yes it is very good, thank you. Senator Hoeven. Senator Hoeven. Thank you, Madam Chairman, and thank you to our witnesses. Today's hearing focuses on the importance of oil and gas infrastructure and the ways in which energy is transported from the places where it is produced to where it is consumed. While energy moves via truck, rail and barge, pipelines are the most efficient and the safest way to transport oil and gas. One highlighted example. In North Dakota in September 2011 we were supplying almost a third of the natural gas we produce, 36 percent. The State Industrial Commission set a goal to get that down to nine percent by 2020. We are currently now down to ten percent. So we have gone from 36 percent down to ten percent and we produce 1.0 million cubic feet of natural gas per day. The biggest barrier that we had was building gas gathering systems and also then building the intrastate pipeline and then building the interstate pipeline because we not only wanted to capture that gas and get revenue for it, it also is better environmentally than flaring. So the key for us is getting through these barriers to building the pipelines whether it's gas or oil or other products. I will start with Mr. Black. To what extent does current Federal regulatory policy discourage this private investment? I mean, to what extent does it discourage it and what are the one, two or three things we can do to encourage that private investment, get it going? Mr. Black. Well, you're right, Senator, that it was a success building those additional pipelines to capture that gas that had been flared in North Dakota. There's economic value that helps the people of North Dakota and then those who would be consuming that product. And of course, it's further downward pressure on prices which helps consumers. On the liquid pipelines we face issues as well of serving new areas, and we know there are benefits locally including North Dakota, your state, when we get additional pipelines built. We need Federal Energy Regulatory Commission, FERC, policies that continue to encourage pipeline construction. We watch that closely; we need the federal agencies that need to give lands permits and construction permits to do that on a timely basis; and then we need states where liquid pipelines are sited under to make decisions timely. A key issue in your state and you know well, Sand Piper Pipeline going east to the--through Minnesota, that would be a tremendous outlet for Bakken to get to market and would help consumers and workers in many places. But that process has really been lengthened beyond how it should be. And that has been, frankly, distorted. We need states to make those decisions in order to help the Americans benefit like they can from pipelines. Senator Hoeven. Talk for a minute about some of the new safety features because isn't it the case if we can empower this investment and build the new gathering systems and pipelines, we are going to have new technology that is going to increase environmental safety? Mr. Black. Well, as you said the pipeline is the safest mode. The product isn't going to get to market if the pipeline isn't built. And like you said, rail, pipe--rail, truck, barge, some other mode. There are increased fatalities, increased releases associated with other modes, and we need to get them sited. Senator Hoeven. So you would say building a pipeline is a win in terms of more energy, a win in terms of jobs and a win for the environment because it is the safest way to transport energy? Mr. Black. Yes, Senator. Senator Hoeven. Alright. Mr. McGarvey, would you give me your thoughts in turn, and I appreciate your efforts to help us build the necessary energy infrastructure. Your thoughts both on what has to happen with Federal policy in this area, not just pipelines but transmission lines, road and rail. We need it all to have the energy infrastructure to move this energy safely from where it is produced and cost effectively to where it is consumed. What has to change, in your opinion, in Federal policy? And what are the ramifications for the work force? Mr. McGarvey. Well, I would say, Senator, and it's crossed the line, Senator Warren just left, but we've been trying to get windmills permitted off Cape Cod and Martha's Vineyard for 20 years. We're ready, willing and able to build those. Can't seem to get those built or permitted either. Again, I think it's going to take people on this Committee, that the Chairwoman has talked about this Committee working together to come up with sensible, long-term energy policy. There's been some legislation that's been passed on the permitting infrastructure from the United States Senate, the House, and I believe the President signed it. There needs to be predictability on, you know, investments that the private sector is going to make, on work force development that we can participate in that drives the middle class, growing middle class economy in the United States. And my great fear, as this energy revolution happens for us in the United States, if we're not able to take advantage of it, you know, again, we're going to cede our economic super power status to China because I don't see them getting bogged down in the discussion, in the environmental concerns, in looking out for the planet that we do. And rightfully so in the United States and looking at the long-term interest of the American people and in my case, the construction industry work force, both union and non-union. They all need jobs in the United States. So policymakers, I think, have good ideas. I think it's coming to the middle, sitting down and putting together good, strong, long-term energy policy for the United States. I'm hopeful with the leadership of this Committee and the people on this Committee that they can be a catalyst to work with the next Congress and the next Administration to really get it done because I think we're missing a golden opportunity if you look through from the industrial revolution forward. Here's this opportunity for this generation in the United States. Really take advantage of our natural resources and get that lift that our economy so desperately needs. Senator Hoeven. And you see it as a significant job creator for the people you represent? Mr. McGarvey. I will just tell you, Senator, you know, the job opportunities in the oil and gas sector and petrochem manufacturing it comes. I mean, we never, sitting at a bargaining table arguing with people over the cost of wages and fringes in those industries because they're profitable industries when they get their infrastructure built. They're willing to pay. There's no lowest common denominator where we're scrounging for a fifty cent raise here or taking a ten cent cut back there. These industries pay. And if you look across the United States, I just looked at some statistics yesterday about different age brackets and what the medium income is for people in those age brackets, it's unbelievable when you compare them to oil, gas and petrochem in construction. When we're talking about where the middle class jobs in the United States are, they're in these industries. These people are willing to pay those prices and there's more than tens of thousands, hundreds of thousands of Americans who want to take advantage of the opportunities to get into the middle class through those industries and through those occupations. Senator Hoeven. And that energy production makes us competitive in other key sectors, right, like manufacturing, construction, all those other industry sectors that create good jobs as well, wouldn't you say? Mr. McGarvey. Without question we're going, we're building a, right now, 50 miles from here we're building a gas and LNG export terminal for Dominion. I've got 2,500 people on that site. Senator Hoeven. I see. Mr. McGarvey. Right now we're going to build the Shell Franklin Cracker. There's another cracker we're looking at in West Virginia. There's another one in that loop that Senator Manchin was talking about. Three crackers, potentially $20 billion of investment within 50 miles of each other that will create somewhere in the neighborhood of 2,500 high-paid, permanent jobs and about 20,000 construction jobs over a three or four-year construction period. The opportunities are endless. Senator Hoeven. Good to hear. Thank you, Mr. McGarvey. Thank you, Madam Chairman. The Chairman. Thank you, Senator Hoeven. I would like to thank each of you for your comments. What you have provided the Committee here today, I think, it has been very informative as Senator King has said. Very instructive. I think we heard very clearly that when it comes to the jobs side of it, these energy jobs are good for families, good for our communities and good for the country. I think we recognize that trying to divine the future is not easy around here, but Mr. McGarvey, you speak about putting together a longer-term vision, a view of our energy policy for this country. We have been working as a Committee, I think, very constructively to try to move the ball on that and have advanced an updated energy reform piece of legislation that has moved not only through the Committee strongly but through the Senate strongly. We would like to go to conference on that so we can actually do more than just talk about how we move it through a process, but actually see some of these changes enacted into law. It does not solve all of our problems, not by a long stretch of the imagination, but when you recognize that we have not done anything to update our energy policies for close to nine years now, you have to get started somewhere, sometime, and we think that that time is now. I think reminding folks that we are not done with this yet, that we need to go to conference and we need to work things out with the other body so that the President has something that he can embrace that will be good for the whole country. A little bit of a self-serving comment here toward the end, but I think it does speak to the need to make sure that we are updating our energy policies on a more frequent basis, something that we just simply have not done. And when you don't do it, you get behind. Thank you for giving us a little bit of a forward look and what you are doing to help us in this decision-making process. With that, the Committee stands adjourned. [Whereupon, at 12:13 p.m. the hearing was adjourned.] APPENDIX MATERIAL SUBMITTED ---------- [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] [all]