EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97

Section 7

Cite as EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97, s. 7 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) In this section, “production facility” means any work used in association with a well to, (a) produce oil or gas, (b) store oil, gas or other hydrocarbons in a geological formation, (c) dispose of oil field fluid in a geological formation, (d) conduct solution mining, or (e) conduct a CAES project. O. Reg. 22/00, s. 4; O. Reg. 237/18, s. 5; O. Reg. 151/22, s. 6 (1). (2) The operator of a well shall notify the Minister within 15 days after any change in the following: 1. The name, address or telephone number of the operator, operator’s agent, if any, or any emergency contact persons. 2. The status of the well. O. Reg. 22/00, s. 4. (3) Subject to subsection (4), the operator of a production facility shall submit to the Minister, within 30 days after completion of the production facility, a scaled drawing or map showing, (a) the name, address and telephone number of the operator, operator’s agent, if any, and emergency contact persons; (b) the location of each work in the production facility by tract, lot, concession and geographic township; and (c) a list of the type, quantity and operating status of each work in the production facility, including storage tanks or pits, heaters, treaters, separators, compressors, flares and pipelines, and a brief description of the technical specifications of each such work. O. Reg. 22/00, s. 4; O. Reg. 151/22, s. 6 (2). (4) Subsection (3) does not apply to the operator of a production facility that is used to conduct a CAES project in a porous rock reservoir if, (a) the information referred to in clauses (3) (b) and (c) was submitted to the Minister as part of the project plans included in the application for a licence or permit in respect of works that are part of the CAES project; (b) the production facility was completed in accordance with the project plans referred to in clause (1) (a) as those plans existed at the time the licence was issued; and (c) the operator of the production facility submits the information referred to in clause (3) (a) to the Minister, within 30 days after completion of the production facility. O. Reg. 151/22, s. 6 (3). (5) The operator of a production facility shall submit revised information to the Minister within 15 days after any change in the information described in subsection (3) whether that information was submitted to the Minister in accordance with subsection (3) or in the manner described in subsection (4). O. Reg. 151/22, s. 6 (3). (6) This section does not apply with respect to special projects. O. Reg. 424/23, s. 12.
Read the EXPLORATION, DRILLING AND PRODUCTION on e-Laws ↗

Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.