EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97
Section 6.2
Cite as EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97, s. 6.2 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) The operator of a CAES project in a porous rock reservoir shall comply with the operating standards in Parts 3, 4, 5, 6, 8, 11, 12 and 13 of the Provincial Standards for Oil, Gas and Salt Resources. O. Reg. 151/22, s. 5.
(2) The operator of a well that is part of a CAES project in a porous rock reservoir shall conduct and submit well bore surveys to the ministry in accordance with the operating standard in section 1.9.3 of the Provincial Standards for Oil, Gas and Salt Resources. O. Reg. 151/22, s. 5.
(3) Despite subsection (1), the operator of a CAES project in a porous rock reservoir may depart from the operating standards referred to in that subsection if,
(a) it is reasonable to do so in the circumstances;
(b) the operator takes measures to prevent or limit damage that provide a standard of protection that is equal to the standard established in the Provincial Standards for Oil, Gas and Salt Resources;
(c) a qualified person has certified in writing that the criteria for the departure set out in clauses (a) and (b) are satisfied and the certification is provided to the Ministry; and
(d) the operator obtains prior written approval from the Ministry of the details and circumstances of the proposed departure. O. Reg. 151/22, s. 5.
(4) The qualified person referred to in subclause (3) (c) shall hold a licence or temporary licence in good standing under the Professional Engineers Act or possess such other qualifications as may be permitted under the Provincial Standards for Oil Gas and Salt Resources. O. Reg. 151/22, s. 5.
(5) Subsections (1) and (2) do not apply with respect to special projects. O. Reg. 424/23, s. 11.
Read the EXPLORATION, DRILLING AND PRODUCTION on e-Laws ↗
Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.