CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 32
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 32 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) During the construction of a building, temporary or permanent flooring shall be installed progressively as the building is erected. O. Reg. 213/91, s. 32 (1).
(2) Temporary flooring,
(a) shall consist of material that, without exceeding the allowable unit stress for the material used, is capable of supporting,
(i) any load to which it is likely to be subjected, and
(ii) a load of at least 2.4 kilonewtons per square metre;
(b) shall be securely fastened to and supported on girders, beams or other structural members that are capable of supporting any load likely to be applied to the flooring without exceeding the allowable unit stress for the structural members; and
(c) shall extend over the whole area of the surface on or above which work is being carried out. O. Reg. 213/91, s. 32 (2).
(3) Temporary flooring shall not be subjected to a load in excess of the load that it is designed and constructed to bear. O. Reg. 213/91, s. 32 (3).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.