CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 282

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 282 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) An adequate barrier that is at least 1.1 metres high shall be provided around the top of an uncovered shaft. O. Reg. 213/91, s. 282 (1). (2) A barrier around the top of an uncovered shaft that is more than 2.4 metres deep, (a) shall consist of a top rail, an intermediate rail and a toe-board; and (b) shall be made of thirty-eight by 140 millimetres lumber securely fastened to vertical supports that are spaced at intervals of not more than 2.4 metres. O. Reg. 213/91, s. 282 (2). (3) A barrier shall be kept free of splinters and protruding nails. O. Reg. 213/91, s. 282 (3). (4) A gate in a barrier around the top of an uncovered shaft shall be kept closed and latched. O. Reg. 213/91, s. 282 (4). (5) The ground adjacent to a barrier around the top of a shaft shall be sloped away from the barrier. O. Reg. 213/91, s. 282 (5).
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.