(1) An engineer shall ensure that a tower crane’s structural elements, its electrical, mechanical and hydraulic components, and its control systems, are inspected in accordance with the performance standards for inspecting a tower crane as prescribed by Ontario Regulation 260/08 (Performance Standards) made under the Professional Engineers Act, and that any defects are identified, at the following times:
1. For a tower crane other than a self-erecting tower crane,
i. before the crane is erected at a project,
ii. after the crane is erected and before it is used, and
iii. thereafter at intervals not greater than 12 months or as often as is recommended by the crane manufacturer, whichever is more frequent, while the tower crane is erected at a project.
2. For a self-erecting tower crane,
i. before the crane is put into service for the first time, and
ii. thereafter at intervals not greater than 12 months while the crane is in use at a project, after every 12 erections of the crane or as often as is recommended by the crane manufacturer, whichever occurs first. O. Reg. 241/23, s. 14.
(2) The inspection of structural components must include non-destructive testing to ensure the structural integrity of the crane. O. Reg. 241/23, s. 14.
(3) The engineer conducting the inspection or under whose direction an inspection is done shall prepare a written report of the inspection and test results in accordance with the performance standards for inspecting a tower crane as prescribed by Ontario Regulation 260/08, including confirmation that all components are in adequate condition. O. Reg. 241/23, s. 14.
(4) A tower crane shall not be used until,
(a) any defects identified in the inspection have been corrected or repaired in accordance with the instructions of the tower crane manufacturer or an engineer; and
(b) the tower crane has been inspected by an engineer and the engineer has prepared a written report of the corrections, repairs and results of the inspection confirming that any defects identified have been corrected or repaired and that the corrected or repaired components are in adequate condition. O. Reg. 241/23, s. 14.