WELLS, R.R.O. 1990, Reg. 903

Section 14.9

Cite as WELLS, R.R.O. 1990, Reg. 903, s. 14.9 · current to November 11, 2026 · consolidated from January 1, 2020 · read from e-Laws on November 16, 2026

The text

(1) Before the structural stage of a well is completed, the person constructing the well shall test the yield of the well in accordance with section 14.10. O. Reg. 372/07, s. 15. (2) Subsection (1) does not apply to a minor alteration of a well or the installation of a pump. O. Reg. 372/07, s. 15. (3) Subsection (1) does not apply to a test hole or dewatering well if the person constructing it, (a) measures the static water level in the well by means of a plastic or metal tape, an air line or an electrical device; and (b) ensures that any part of the tape, air line or electrical device that comes into contact with water in the well is clean. O. Reg. 372/07, s. 15. (4) Subsection (1) does not apply to an alteration of a well that involves only, (a) the removal of the casing above the ground surface so that the casing is flush with the ground surface; (b) the addition of casing above the ground surface; or (c) the creation or removal of a well pit. O. Reg. 372/07, s. 15.
Read the WELLS on e-Laws ↗

Made under Ontario Water Resources Act, R.S.O. 1990, c. O.40.