WELLS, R.R.O. 1990, Reg. 903

Section 14.10

Cite as WELLS, R.R.O. 1990, Reg. 903, s. 14.10 · current to November 11, 2026 · consolidated from January 1, 2020 · read from e-Laws on November 16, 2026

The text

(1) If the yield of water from a well is tested, (a) the water level in the well shall be measured and recorded on the well record for the well, (i) immediately before commencement of pumping, (ii) at one minute intervals or more frequently during the first five minutes of pumping, (iii) at five minute intervals or more frequently during the next 25 minutes of pumping, (iv) at 10 minute intervals or more frequently during the next 30 minutes of pumping, (v) at one minute intervals or more frequently during the first five minutes after pumping stops, (vi) at five minute intervals or more frequently during the next 25 minutes after pumping stops, and (vii) at 10 minute intervals or more frequently during the next 30 minutes after pumping stops; (b) the water level in the well shall be measured by means of a plastic or metal tape that is clean or an air line or electrical device that is clean; (c) water shall be pumped from the well at a steady rate, continuously for at least one hour; and (d) the rate of pumping during the test shall be recorded on the well record. O. Reg. 372/07, s. 15. (2) Clauses (1) (a) and (b) do not apply if the design of the well does not allow for the water level in the well to be measured during the test of water yield from the well. O. Reg. 372/07, s. 15. (3) If water cannot be pumped from the well continuously for one hour in accordance with clause (1) (c), no further measurements are required under clause (1) (a) and there shall be recorded on the well record, (a) the reason pumping was discontinued; (b) the rate of pumping and the length of the pumping period; and (c) the water level measurements made. O. Reg. 372/07, s. 15.
Read the WELLS on e-Laws ↗

Made under Ontario Water Resources Act, R.S.O. 1990, c. O.40.