MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854
Section 209
Cite as MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854, s. 209 · current to November 11, 2026 · consolidated from July 1, 2025 · read from e-Laws on November 16, 2026
The text
(1) A mine shaft shall,
(a) be designed in accordance with good engineering practice;
(b) have a means to guide each shaft conveyance to prevent contact with another shaft conveyance or shaft furnishings;
(c) have underwind clearances that exceed the stopping distance of the shaft conveyance when travelling at the maximum speed permitted by the hoist-controls, except,
(i) during shaft sinking, or
(ii) when chairs are used to land a skip during loading; and
(d) where a friction hoist is installed, have tapered guides or other such devices above and below the limits of regular travel of the shaft conveyance and counterweight, arranged to act as a direct physical brake to decelerate and stop the counterweight and shaft conveyance in the event of an over-travel. R.R.O. 1990, Reg. 854, s. 209 (1).
(2) A barrier or obstruction to prevent a shaft conveyance from being lowered into water in the shaft bottom must be installed in the shaft except,
(a) when the shaft is being sunk; or
(b) where a friction hoist is installed. O. Reg. 779/94, s. 9.
(3) A probe indicating the high water level shall be installed below the lowest working level in a shaft in which natural drainage is not provided and in which flooding may occur due to equipment failure. O. Reg. 779/94, s. 9.
(4) The probe shall be installed so that it can be read by the person in control of the hoist. O. Reg. 779/94, s. 9.
(5) The probe shall be installed so that,
(a) it enables the person in control of the hoist to prevent a shaft conveyance from being lowered into water; or
(b) it prevents a shaft conveyance from being lowered into water. O. Reg. 779/94, s. 9.
(6) If a probe is installed, a procedure must be established to prevent a conveyance with occupants from being lowered into water. O. Reg. 779/94, s. 9.
(7) The employer shall establish the procedure in consultation with the joint health and safety committee. O. Reg. 779/94, s. 9.
(8) The procedure shall be implemented when the probe indicates that there is water at the high water level. O. Reg. 779/94, s. 9.
Read the MINES AND MINING PLANTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.