PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24

Section 11

Exception, electricity projects

Cite as PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24, s. 11 · current to November 11, 2026 · consolidated from November 3, 2026 · read from e-Laws on November 16, 2026

The text

(1) Sections 7 to 10 do not apply to, (a) establishing or changing a generation facility that is constructed only for the purpose of providing electricity to the site where the generation facility is located in the event of a failure of a distributor to deliver electricity to the site; (b) establishing or changing a generation facility that uses biogas, biomass, landfill gas, natural gas or waste biomass as its primary power source, if the facility has a name plate capacity of less than or equal to 25 megawatts, and, (i) the ratio of the facility’s output energy to its input energy is greater than 0.60, or (ii) none of the electricity generated by the facility is sold by the generator through the IESO-administered markets and none of the electricity generated by the facility is sold by the generator directly to persons who use the electricity at a location other than the site on which the facility is located; (c) establishing or changing a transmission line or transmission station associated with a generation facility described in clause (a) or (b); (d) with respect to a generation facility that uses coal, hazardous waste, liquid industrial waste, municipal waste or oil as its primary power source, making a change to the facility that would result in, (i) the facility using less coal, hazardous waste, liquid industrial waste, municipal waste or oil and not using more of any of those power sources, and (ii) the name plate capacity of the facility being less than the maximum name plate capacity determined in accordance with the following formula, A = B + ((C − D) × 0.5) where, A = the maximum name plate capacity of the facility after making the change, B = the name plate capacity of the facility before making the change, C = the capacity of the facility to generate electricity from coal, hazardous waste, liquid industrial waste, municipal waste or oil before making the change, D = the capacity of the facility to generate electricity from coal, hazardous waste, liquid industrial waste, municipal waste or oil after making the change; (e) making a change to a generation facility that was changed in the manner described in clause (d) if making the change would result in the facility no longer using coal, hazardous waste, liquid industrial waste, municipal waste or oil as its primary power source; (f) making a change to a generation facility, transmission line or transmission station that was constructed before April 23, 2001 if, (i) no approval under section 5 of the Act, as it read on April 23, 2001, was required to construct the thing, and (ii) the change, together with any other change made since the thing was constructed, is not a significant modification; (g) a project that is designated under Part IV of this Regulation as a project to which Part II.3 of the Act applies; (h) a project that is designated under paragraph 2 or 3 of subsection 16 (1) as a project to which Part II.3 of the Act applies; (i) an undertaking of a type to which an approved class environmental assessment applies; or (j) establishing or changing a renewable energy generation facility. (2) Despite clause (1) (j), sections 7 to 10 apply to a project described in that clause if any of the following criteria are met: 1. The renewable energy generation facility uses water power as its primary power source. 2. The renewable energy generation facility has a name plate capacity of less than or equal to 500 kilowatts and on an annual basis, less than 90 per cent of the electricity generated at the facility is generated from a renewable energy source. 3. The renewable energy generation facility has a name plate capacity of greater than 500 kilowatts and on an annual basis, less than 95 per cent of the electricity generated at the facility is generated from a renewable energy source. 4. The renewable energy generation facility is a thermal treatment facility as described in paragraph 12 of subsection 9 (1) of Ontario Regulation 359/09 (Renewable Energy Approvals under Part V.0.1 of the Act) made under the Environmental Protection Act. 5. The renewable energy generation facility, i. changes or was changed from a generation facility that uses or used coal as its primary power source, and ii. has a name plate capacity of greater than 500 kilowatts and on an annual basis generates at least 95 per cent of its electricity from biomass within the meaning of Ontario Regulation 160/99 (Definitions and Exemptions) made under the Electricity Act, 1998. 6. Before September 24, 2009, any of the following criteria were met: i. The proponent was authorized under Part II or II.1 of the Act to proceed with the project. ii. The proponent issued or published a notice of completion in respect of the renewable energy generation facility and entered into a power purchase agreement with the Ontario Power Authority in respect of the supply of renewable energy from the facility. iii. A statement of completion was filed with the Director of the Environmental Assessment and Approvals Branch in respect of the renewable energy generation facility and all of the approvals, permits and other instruments mentioned in subsection 47.3 (1) of the Environmental Protection Act that are required to construct, install, operate or use the facility have been obtained. (3) In this section, “distributor” has the same meaning as in the Electricity Act, 1998; (“transporteur”) “generator” has the same meaning as in the Electricity Act, 1998; (“producteur”) “IESO-administered markets” has the same meaning as in the Electricity Act, 1998. (“marchés administrés par la SIERE”)
Read the PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS on e-Laws ↗

Made under Environmental Assessment Act, R.S.O. 1990, c. E.18.