REHABILITATION OF LANDS, O. Reg. 35/24

Schedule 1

Cite as REHABILITATION OF LANDS, O. Reg. 35/24, Schedule 1 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

Schedule 1 STANDARDS FOR REHABILITATION 1. If a certified alternative measure set out in a closure plan applies instead of a standard, procedure or requirement set out in the Code, a reference in this Schedule to the Code that would include the replaced standard, procedure or requirement shall be read as including the certified alternative measure instead. 2. The following standards apply with respect to a project that is in a state of temporary suspension: 1. All reasonable measures shall be taken to restrict access to the site and all buildings and other structures to authorized persons only. 2. All mine openings that are potentially dangerous shall be protected against unauthorized or inadvertent access. 3. All electrical systems shall be protected from inadvertent access. 4. All mechanical and hydraulic systems shall be maintained in a no-load condition. 5. All physical, chemical and biological monitoring programs shall be continued. 6. All contaminated effluents shall be controlled. 7. All waste management systems and sites and petroleum products, chemicals and waste shall be made secure. 8. All explosives shall be disposed of or removed from the site. 9. All rock piles and stockpiles of ore, concentrate, overburden and other materials and all tailings, water and other impoundment structures shall be maintained in a stable and safe condition. 10. All other reasonable measures shall be taken to prevent personal injury or property damage that is reasonably foreseeable as a result of placing the project in a state of temporary suspension. 3. (1) The following standards apply with respect to a project that is in a state of inactivity: 1. All reasonable measures shall be taken to restrict access to the site and all buildings and other structures to authorized persons only. 2. All shafts, raises and stopes open to surface shall be secured. 3. All portals of adits and declines shall be secured. 4. All other mine openings to surface shall be stabilized and secured. 5. All surface and subsurface mine workings shall be assessed for stability in accordance with the Code. 6. All mechanical and hydraulic systems shall be maintained in a no-load condition. 7. All essential electrical systems shall be protected from inadvertent access and non-essential electrical systems shall be de-energized. 8. All tailings, rock piles, stockpiles of ore, concentrate, overburden and other materials, landfill sites and other waste management sites and systems shall be monitored and maintained, removed or rehabilitated. 9. All petroleum products, chemicals and waste, including polychlorinated biphenyls (PCBs), shall be removed, disposed of, isolated or otherwise managed on site. 10. All explosives shall be disposed of or removed from the site. 11. All impoundment structures shall be maintained in a stable and safe condition. 12. All materials, or conditions created as a result of mining, that produce or may produce acid rock drainage or metal leaching shall be dealt with in accordance with the Code including with any applicable management plan required under the Code. 13. All other reasonable measures shall be taken to prevent personal injury or property damage that is reasonably foreseeable as a result of placing the project in a state of inactivity. (2) The proponent shall inspect the site at least once every six months to ensure that all required protective measures are in place. 4. The following standards apply with respect to a project that is being closed out: 1. The following mine features and disturbances shall be treated in accordance with the Code: i. All shafts, raises and stopes open to surface, portals of adits and declines, and any other openings to surface. ii. All surface and subsurface mine workings, including any crown pillars. iii. All tailings dams and other impoundment structures and areas. iv. All tailings, rock piles and stockpiles of ore, concentrate, overburden and other materials. v. All project infrastructure, including, A. buildings, B. concrete structures, foundations and slabs, C. utility lines and poles, D. pipelines, E. transportation corridors, including the shoulders and surfaces of roads, F. airstrips, G. railways, and H. machinery, equipment and storage tanks. 2. Without limiting the generality of paragraph 1, all materials, and all conditions created as a result of mining, that produce or may produce acid rock drainage or metal leaching shall be dealt with in accordance with the management plan required under the Code. 3. All explosives shall be disposed of or removed from the site. 4. All petroleum products, chemicals and waste shall be disposed of on site or removed. 5. PCBs or material contaminated with PCBs shall be removed or managed on site. 6. All soils in the vicinity of areas used for storing or transferring petroleum products, chemicals, ore, concentrates or waste during the life of the project shall be sampled and tested for contamination and, if contamination is found, a risk assessment and action plan for the contaminated soils shall be developed and implemented. 7. All landfills and other waste management sites shall be closed. 8. All decant structures, other than dam spillways, shall be removed or left inoperable. 9. All remaining on-site watercourses or drainage channels shall be left so as not to require maintenance. 10. Revegetation measures shall be implemented to achieve the objectives described in the Code. 11. All other reasonable measures shall be taken to prevent personal injury or property damage that is reasonably foreseeable as a result of closing out the project.
Read the REHABILITATION OF LANDS on e-Laws ↗

Made under Mining Act, R.S.O. 1990, c. M.14.