GENERAL, O. Reg. 246/22

Section 22

Generators

Cite as GENERAL, O. Reg. 246/22, s. 22 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) Subject to subsections (2) and (3), every licensee of a long-term care home shall ensure that the home is served by a generator that is available at all times and that has the capacity to maintain, in the event of a power outage, (a) the heating system; (b) emergency lighting in hallways, corridors, stairways and exits; and (c) essential services, including dietary services equipment required to store food at safe temperatures and prepare and deliver meals and snacks, equipment required to store drugs at safe temperatures and to prepare and deliver drugs, the resident-staff communication and response system, elevators and life support, safety and emergency equipment. O. Reg. 246/22, s. 22 (1); O. Reg. 66/23, s. 2. (2) The licensee of a home is not required to comply with subsection (1) until December 31, 2024 if there are beds in the home, other than class A beds or beds under a temporary emergency licence, that are not subject to a design manual applicable under a development agreement to which the home was subject. O. Reg. 246/22, s. 22 (2). (3) The licensee of a home to which subsection (2) applies shall ensure that the home has guaranteed access to a generator that will be operational within three hours of a power outage and that can maintain everything required under clauses (1) (a), (b) and (c). O. Reg. 246/22, s. 22 (3).
Read the GENERAL on e-Laws ↗

Made under Fixing Long-Term Care Act, 2021, S.O. 2021, c. 39, Sched. 1.