Schedule 1 Information to be set out in Notice (Section 8 of the Regulation)
1. A description of the project.
2. A description of the project area, including,
(a) the location of each property that is located, in whole or in part, within the project area and the geographic coordinates of the centroid of the property measured using a global positioning system receiver and projected on the Universal Transverse Mercator coordinate system; or
(b) if the project area includes linear facilities, a narrative description of the location of the project area including each end point and the geographic coordinates of each end point measured using a global positioning system receiver and projected on the Universal Transverse Mercator coordinate system.
3. The name, mailing address, postal code, telephone number and email address of each project leader for the project.
4. If the project leader is not the operator of the project area, the name, mailing address, postal code, telephone number and email address of the operator of the project area.
5. If a person authorized by the project leader files the notice on behalf of the project leader, the name and email address of that person.
6. If the project leader is a firm, corporation or partnership, the name of the person who is authorizing the filing on behalf of the firm, corporation or partnership.
7. If applicable, the name, mailing address, postal code, telephone number and email address of each qualified person who prepared or oversaw the preparation of documents under this Regulation.
8. An estimate of how much excess soil will be removed from the project area, broken down by any applicable Table in the Excess Soil Standards that the excess soil meets, if it is to be deposited for final placement at a reuse site.
8.1 A list of all substances or other materials, including any natural or synthetic polymers but not including water, that may be in the excess soil as a result of using that substance or material in the excavation process or of the mixing of that material or substance with excavated soil or crushed rock.
9. The name of the person who is ultimately responsible for the transportation of excess soil from the project area, the mailing address, postal code, telephone number and email address of the person and if the person is a corporation, the individual to be contacted about inquiries regarding the transportation of excess soil.
10. The location of each Class 2 soil management site and local waste transfer facility at which excess soil is intended to be deposited and temporarily managed.
11. If the project leader is not the operator of the Class 2 soil management site mentioned in section 10, the name, mailing address, postal code, telephone number and email address of the operator of the Class 2 soil management site.
12. The location of each reuse site at which the excess soil is intended to be deposited for final placement and for each reuse site, a description of,
(a) the type of property use of the reuse site; and
(b) the undertaking for which the excess soil is intended to be used.
13. The applicable excess soil quality standards for each reuse site mentioned in section 12, as determined in accordance with the Soil Rules, or, if site-specific excess soil quality standards have been developed for a reuse site by a qualified person, including by using the Beneficial Reuse Assessment Tool, an indication that this is the case and the name and contact information of the qualified person who developed the site-specific excess soil quality standards.
14. The location of each Class 1 soil management site, landfilling site or dump at which excess soil is intended to be deposited.
15. If the project leader undertakes a peer review of any of the actions required to be taken under this Regulation or subjects any of the actions to a certification process, a description of the peer review or certification process, including identification of the person responsible for conducting the peer review or the certification process.
16. A declaration by the project leader, stating the following:
1. That the project leader has conducted reasonable inquiries to obtain all information relevant to compliance with this Regulation.
2. If a qualified person was required to prepare or supervise the preparation of documents under this Regulation,
i. that the project leader has disclosed to the qualified person or supervisee all the information obtained as described in paragraph 1,
ii. that the project leader has, for the purpose of assisting the qualified person or supervisee in preparing the documents, provided the qualified person or supervisee with all necessary access to the project area and has authorized the qualified person or supervisee to make any inquiries of the project leader’s employees and agents, and
iii. that the qualified person has completed the applicable declarations, as outlined in the Soil Rules.
3. That the information filed in the Registry is complete and accurate to the best of the project leader’s knowledge.
4. That the project leader will develop and apply all necessary procedures to ensure that all necessary steps are taken to ensure that this Regulation is complied with and to ensure that excess soil from the project area will be disposed of in compliance with this Regulation.