ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 7.2

Notice requirements

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 7.2 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) This section applies in respect of the owner or operator of a depot at which the management of excess soil and, if applicable, other waste, is exempt from sections 27, 40 and 41 of the Act under subsection 7 (1) of this Regulation. O. Reg. 235/25, s. 10. (2) The owner or operator shall provide written notice in accordance with the following requirements: 1. In the case of a residential development soil depot, it shall be filed in the Registry before the excess soil begins to be deposited at the depot. 2. In the case of any depot other than a residential development soil depot, it shall be provided to the Director before the excess soil, excavated engineered aggregate or other waste begins to be deposited at the depot. 3. In the case of any depot, it shall be provided to the local municipality in which the depot is located before the excess soil, excavated engineered aggregate or other waste begins to be deposited at the depot. 4. If the owner or operator becomes aware that any information in the notice mentioned in paragraph 1 or 2 is no longer complete or accurate, i. in the case of a residential development soil depot, the notice shall be updated in the Registry within 30 days, and ii. in the case of any other depot, the Director shall be notified and provided with the completed or corrected information within 30 days. O. Reg. 235/25, s. 10. (3) The notice mentioned in paragraph 1, 2 or 3 of subsection (2) shall include the following: 1. The location of the depot. 2. The name, mailing address, postal code, telephone number and email address of the operator. 3. If the operator does not own the property on which the depot is located, i. the name, mailing address, postal code, telephone number and email address of the owner, and ii. in the case of a landscaping soil depot or aggregate reuse depot, a letter from the owner of the property indicating that the owner has given the operator consent to operate the depot on the property. 4. The date on which the deposit of excess soil, excavated engineered aggregate or other waste is expected to begin. 5. If an instrument mentioned in paragraph 5 of subsection 3.1 (1) has been issued governing the depot, identification of the body that issued the instrument, the date the instrument was issued and to whom the instrument is issued, and, if there is an instrument identification number, that number. 6. A declaration by the owner or operator of the depot stating that the written procedures described in paragraph 9 of subsection 7.1 (3) have been prepared and applied and will continue to be applied. O. Reg. 235/25, s. 10. (4) The owner or operator shall provide, in writing, a notice respecting the permanent closure of the depot as follows: 1. In the case of a residential development soil depot, the owner or operator shall update the notice filed in the Registry within 30 days after the closure to indicate the date of the closure. 2. In the case of any other type of depot, the owner or operator of the depot shall provide written notice of the closure to the Director and the local municipality in which the depot is located, within 90 days after the closure of the depot, including the following information: i. The location of the depot. ii. The date of the closure. iii. Confirmation that all excess soil, excavated engineered aggregate and other waste has been removed from the depot. O. Reg. 235/25, s. 10. (5) If an aggregate reuse depot was operating before the day section 10 of Ontario Regulation 235/25 made under the Act comes into force, the following rules apply with respect to the notice mentioned in paragraph 2 of subsection (2): 1. Despite paragraph 2 of subsection (2), the notice mentioned in that paragraph shall be provided within 90 days after the day section 10 of Ontario Regulation 235/25 made under the Act comes into force. 2. Despite paragraph 4 of subsection (3), the notice shall instead include an estimate of the amount of excess soil, excavated engineered aggregate and other waste, broken down by type of waste, managed at the depot. O. Reg. 235/25, s. 10. (6) If a depot was operating before the day section 10 of Ontario Regulation 235/25 made under the Act comes into force, the following rules apply with respect to the notice mentioned in paragraph 3 of subsection (2): 1. Despite paragraph 3 of subsection (2), the notice mentioned in that paragraph shall be provided within 90 days after the day section 10 of Ontario Regulation 235/25 made under the Act comes into force. 2. Despite paragraph 4 of subsection (3), the notice shall instead include an estimate of the amount of excess soil, excavated engineered aggregate and other waste, broken down by type of waste, managed at the depot. O. Reg. 235/25, s. 10.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.