ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19
Section 7.1
Requirements
Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 7.1 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) This section applies to the owner or operator of a depot at which the management of excess soil and, if applicable, other waste, is exempt from sections 27, 40 and 41 of the Act under subsection 7 (1) of this Regulation. O. Reg. 235/25, s. 10.
(2) If the activity set out in paragraph 2 of subsection 7 (1) is engaged in at an aggregate reuse depot located on the site of a pit or quarry that is governed by a licence or permit under the Aggregate Resources Act, the following rules apply:
1. Subject to paragraph 2, the owner or operator of the depot is required to comply with this section.
2. If a provision of the Aggregate Resources Act or a regulation under that Act or a provision of the licence, permit or site plan for the pit or quarry includes a requirement that is different from a requirement in this section in respect of a particular matter, the owner or operator of the depot is not required to comply with the requirement in this section. O. Reg. 235/25, s. 10.
(3) The owner or operator of the depot shall ensure the following:
1. That subsection 7 (2) is complied with, as applicable.
2. In the case of a landscaping soil depot, residential development soil depot, or aggregate reuse depot, that no liquid excess soil is deposited at the depot.
3. That the quality of the excess soil deposited and managed at the depot meets any applicable excess soil quality standards set out in the Soil Rules for the purpose of this paragraph.
4. That the quality of the excess soil that is removed from the depot meets any applicable excess soil quality standards set out in the Soil Rules for the purpose of this paragraph.
5. In the case of a residential development soil depot, that no excess soil from the depot is transported to a type of reuse site identified in the Soil Rules for the purposes of this paragraph.
6. In the case of a landscaping soil depot or aggregate reuse depot, subject to subsection (4), that the excess soil and any excavated engineered aggregate and other waste that is deposited at the depot is removed from the depot no later than two years after it is first deposited at the depot.
7. In the case of an aggregate reuse depot,
i. that waste that is deposited at the depot and that is determined by the owner or operator of the depot to be unusable for producing a recycled engineered aggregate to meet a realistic market demand be removed promptly from the depot and properly disposed of, and
ii. that a qualified person is retained to ensure that applicable requirements, as set out in the Soil Rules, are complied with.
8. That any other requirements set out in the Soil Rules with respect to the deposit and management of excess soil and other materials at the depot are met.
9. That any type of written procedures in respect of the operation of the depot that are specified in the Soil Rules are prepared and applied at the depot, in accordance with any applicable provisions of the Soil Rules.
10. That fire-fighting equipment, spill clean-up and containment equipment appropriate for the types of waste expected to be at the depot are available at or near the depot.
11. That access to the depot is controlled by gates, fencing, attendants or other security measures.
12. That regular site inspections are undertaken to ensure the depot is secure and operations are not causing nuisances or adverse effects.
13. That signs are posted and safeguards maintained for the prevention of accidents at the depot.
14. That the following are created in accordance with any applicable Soil Rules and retained at the depot:
i. Records in respect of the deposit and management of excess soil and, in the case of an aggregate reuse depot, excavated engineered aggregate and other waste, at the depot.
ii. Records in respect of any excess soil and, in the case of an aggregate reuse depot, recycled engineered aggregate and other waste, that is removed from the depot.
iii. Any other records in respect of the operation of the depot as set out in the Soil Rules.
15. That before the depot is permanently closed, all excess soil, excavated engineered aggregate and other waste is removed from the depot. O. Reg. 235/25, s. 10.
(4) A Director may, by written notice provided to the owner or operator of a landscaping soil depot or aggregate reuse depot, authorize an extension, not exceeding one year, of the two-year period mentioned in paragraph 6 of subsection (3), if the Director is satisfied that,
(a) the extension is necessary,
(i) in the case of a landscaping soil depot, in order for the excess soil to be prepared or packaged as a product, or
(ii) in the case of an aggregate reuse depot, in order for the waste to be used to produce a recycled engineered aggregate that has a realistic market demand;
(b) the extension will not result in an adverse effect; and
(c) the owner or operator has provided an estimated date for the removal of the excess soil, or in the case of an aggregate reuse depot, the removal of the waste, from the depot. O. Reg. 235/25, s. 10.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.