ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 21.3

Closure

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 21.3 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) This section applies to a Class 2 soil management site at which the management of dry excess soil or excavated engineered aggregate is exempt from sections 27, 40 and 41 of the Act under section 21, if the site closes permanently. O. Reg. 235/25, s. 20. (2) The project leader for the project from which the excess soil or excavated engineered aggregate was excavated or the operator of the site shall, (a) ensure that all excess soil and excavated engineered aggregate is removed from the site before the closure of the site; and (b) provide written notice of the closure, including the information described in subsection (3), to the Director within 90 days after the closure of the site. O. Reg. 235/25, s. 20. (3) For the purposes of clause (2) (b), the notice must include the following: 1. The location of the site. 2. The date of the closure. 3. Confirmation that all excess soil and excavated engineered aggregate has been removed from the site. O. Reg. 235/25, s. 20.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.