ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19
Section 13
Excess soil destination assessment report
Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 13 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) If the project leader for a project is required to file a notice under section 8 in respect of the project, the project leader shall ensure that, before filing the notice, a qualified person prepares or supervises the preparation of an excess soil destination assessment report in accordance with the Soil Rules. O. Reg. 406/19, s. 13 (1); O. Reg. 555/22, s. 5.
(2) The report shall be based on the results of any required assessment of past uses of the project area, any required soil characterization report and any information gathered in respect of the potential sites at which the excess soil may be deposited, and shall include the following:
1. Identification of each Class 1 soil management site, reuse site, local waste transfer facility, landfilling site or dump at which the excess soil will be deposited, including the location of each site.
2. Identification of contingency measures to be implemented in the event that the excess soil cannot be deposited at a site identified under paragraph 1, including the location of an alternate site.
3. An estimate of the quality and quantity of excess soil that will be deposited at each location identified under paragraph 1. O. Reg. 406/19, s. 13 (2).
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.