COMMUNITY PLANNING PERMITS, O. Reg. 173/16

Section 10

Application for community planning permit

Cite as COMMUNITY PLANNING PERMITS, O. Reg. 173/16, s. 10 · current to November 11, 2026 · consolidated from June 1, 2021 · read from e-Laws on November 16, 2026

The text

(1) An owner of land or the owner’s authorized agent may apply to the council of the municipality for a community planning permit with respect to land subject to a community planning permit by-law. O. Reg. 173/16, s. 10 (1). (2) An application for a community planning permit shall contain the information and material set out in Schedule 1, except as provided in subsection 3 (4). O. Reg. 173/16, s. 10 (2). (3) Plans and drawings referred to in section 17 of Schedule 1 shall not include the following: 1. Interior design. 2. The layout of interior areas, other than the interior walkways, stairs, elevators and escalators referred to in subparagraph 2 iii of section 17 of Schedule 1. 3. The manner of construction and standards for construction. O. Reg. 173/16, s. 10 (3). (4) The council may require that additional information and materials be included in an application for a community planning permit, as described in clause 3 (4) (a). O. Reg. 173/16, s. 10 (4). (5) Until the council has received the information and material referred to in subsections (2) and (4), if any, and any fee under section 69 of the Act, (a) the council may refuse to accept or further consider the application; and (b) the 45-day period referred to in subsection 12 (1) does not begin. O. Reg. 173/16, s. 10 (5). (6) When an applicant applies for a community planning permit, the applicant or the municipality may make a motion for directions to have the Tribunal determine, (a) whether the information and material required under subsections (2) and (4) have in fact been provided; or (b) whether a requirement made under subsection (4) is reasonable. O. Reg. 173/16, s. 10 (6); O. Reg. 75/18, s. 3 (1). (7) The council shall consider the application for a community planning permit, (a) when the information, material and fee have been received as described in subsection (5); or (b) when the Tribunal makes a determination to that effect under subsection (6). O. Reg. 173/16, s. 10 (7); O. Reg. 75/18, s. 3 (2). (8) If the Tribunal makes the determination described in clause (7) (b), the 45-day period referred to in subsection 12 (1) is counted from the day on which the information, material and fee referred to in subsection (5) have all been received. O. Reg. 173/16, s. 10 (8); O. Reg. 75/18, s. 3 (3). (9) On considering the application, the council may, (a) refuse the application; (b) approve the application and issue a community planning permit with no conditions attached; (c) approve the application and require that conditions be met before issuing a community planning permit; (d) approve the application and issue a community planning permit with conditions attached; or (e) approve the application, require that conditions be met before issuing a community planning permit and, when the conditions have been met, issue a community planning permit with conditions attached. O. Reg. 173/16, s. 10 (9). (10) A condition that is imposed under clause (9) (c), (d) or (e) shall meet the following requirements: 1. The condition shall be clear, precise and quantifiable. 2. The condition shall include a clear statement of whether it must be complied with before construction, renovation or change of use of a building. 3. The condition shall not deal with the following aspects of buildings and structures: i. Interior design. ii. The layout of interior areas, other than interior walkways, stairs, elevators and escalators to which members of the public have access from streets, open spaces and interior walkways in adjacent buildings. iii. The manner of construction and construction standards. O. Reg. 173/16, s. 10 (10). (11) When the council attaches a condition to a community planning permit under clause (9) (d) or (e), it may require that the fulfilment of the condition be secured in a way that is satisfactory to the council. O. Reg. 173/16, s. 10 (11). (12) The council, in considering an application for a community planning permit, may confer with any persons or public bodies that the council considers to have an interest in the application. O. Reg. 173/16, s. 10 (12). (13) Within 15 days after the council makes a decision under subsection (9), written notice of the decision, including reasons and any conditions imposed, shall be given to the applicant and to each person or public body that filed a written request to be informed of the decision with the clerk of the municipality. O. Reg. 173/16, s. 10 (13). (14) Section 41 of the Act or section 114 of the City of Toronto Act, 2006 applies, with necessary modifications, to an application for a community planning permit, except as otherwise provided in this Regulation. O. Reg. 173/16, s. 10 (14). (15) Subsections 41 (6), (12), (12.0.1), (12.0.2) and (12.1) of the Act and subsections 114 (10), (15), (15.1), (15.2) and (16) of the City of Toronto Act, 2006 do not apply to an application for a community planning permit. O. Reg. 75/18, s. 3 (4).
Read the COMMUNITY PLANNING PERMITS on e-Laws ↗

Made under Planning Act, R.S.O. 1990, c. P.13.