GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14

Section 51

Construction or expansion of drainage system

Cite as GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14, s. 51 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) This section applies in respect of a drainage system that is, (a) used at an agricultural operation that is subject to a GNF strategy or a GNF plan; (b) located within 15 metres of a permanent GNF storage facility used at the operation; and (c) intended to be used at the operation to collect water and divert it away from the facility. (2) No person shall construct or expand a drainage system described in subsection (1) unless one of the following conditions is met: 1. The system is constructed with non-perforated pipe and all subsurface joints in the piping are properly sealed. 2. All water collected by the drainage system discharges into a treatment system that is capable of changing the characteristics of an input stream that contains nutrients. 3. The foundation drains of the permanent GNF storage facility are equipped with an observation and shut-off station that, i. intercepts the flow of liquid in a pipe, ii. is used to collect, observe and monitor the amount and condition of liquid in the pipe, and iii. is equipped with a valve attached to the gravity outflow pipe to allow the flow of liquid in the pipe to be shut off. (3) This section does not apply if the permanent GNF storage facility in respect of which the drainage system is intended to be used is located in a greenhouse that has a concrete floor, if both the greenhouse and the concrete floor existed on January 1, 2015 and all GNF is stored at or above the level of the concrete floor. O. Reg. 300/14, s. 51 (3); O. Reg. 234/15, s. 20.
Read the GREENHOUSE NUTRIENT FEEDWATER on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.