REGISTRATIONS UNDER PART II.2 OF THE ACT — SOLAR FACILITIES, O. Reg. 350/12
Section 3
Prescribed activities, s. 20.21 (1) of the Act
Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — SOLAR FACILITIES, O. Reg. 350/12, s. 3 · current to November 11, 2026 · consolidated from November 18, 2012 · read from e-Laws on November 16, 2026
The text
(1) Subject to subsections (6) and (8), the following are prescribed activities for the purposes of subsection 20.21 (1) of the Act:
1. The construction, installation, use, operation, changing or retiring of a solar facility that meets all of the criteria set out in subsection (2) and is situated at a facility location that meets the criteria set out in either paragraph 1 or 2 of subsection (4) if,
i. the solar facility includes any equipment, apparatus, mechanism or thing that may discharge or from which may be discharged a contaminant into any part of the natural environment other than water, or
ii. electricity generated at the solar facility is sold by the owner or operator of the facility. O. Reg. 350/12, s. 3 (1).
(2) The criteria referred to in subsection (1) with respect to a solar facility are the following:
1. The solar photovoltaic collector panels at the facility are not mounted on the roof or wall of a building.
2. The name plate capacity of the facility is greater than 10 kW and is less than or equal to 500 kW.
3. The maximum power output of each transformer at the facility is less than or equal to 750 kVA.
4. The facility does not include a noise generating equipment unit that has a sound power level greater than 90 dBA.
5. If the facility is located in an area of development control within the Niagara Escarpment Planning Area, any development permit required under section 24 of the Niagara Escarpment Planning and Development Act in respect of the facility has been issued and the requirements of this Regulation are not in conflict with any conditions of the permit.
6. Subject to subsection (3), the distance between each noise generating equipment unit at the facility and the property boundary of any noise receptor is not less than the distance set out in Column 2 of the following Table opposite the sound power level of the noise generating equipment unit set out in Column 1 of the Table:
Table
Item | Column 1 Sound power level of noise generating equipment unit (dBA) | Column 2 Distance (m)
1. | ≤ 65 | 10
2. | > 65 to ≤ 70 | 20
3. | > 70 to ≤ 75 | 30
4. | > 75 to ≤ 80 | 55
5. | > 80 to ≤ 85 | 100
6. | > 85 to ≤ 90 | 180
7. The distance between each solar photovoltaic collector panel and the property boundary of the facility is not less than 15 metres. O. Reg. 350/12, s. 3 (2).
(3) The criterion set out in paragraph 6 of subsection (2) is not required to be met if the sound discharged from the facility does not result in a sound pressure level that, at any point on the property boundary of any noise receptor, exceeds,
(a) 40 dBA; or
(b) where the lowest hourly ambient sound pressure level on the property boundary, excluding the sound discharged from the facility, is greater than 40 dBA, that ambient sound pressure level. O. Reg. 350/12, s. 3 (3).
(4) The criteria referred to in subsection (1) with respect to a facility location are the following:
1. The area of the facility location does not exceed four hectares and the facility location is situated on a property that is zoned for industrial, commercial or institutional use and,
i. the property is used for the use for which it is zoned, or
ii. the concentration of a contaminant in the soil at the property exceeds the soil standard for subsurface soil for that contaminant set out in Table 5 of the Soil, Ground Water and Sediment Standards that is applicable to the use for which the property is zoned.
2. The area of the facility location does not exceed three hectares and the facility location is situated on land that,
i. is used for a farm operation activity, and
ii. is not part of an area of settlement within the meaning of the Planning Act. O. Reg. 350/12, s. 3 (4).
(5) For the purposes of subsection (4), a criterion set out in subparagraph 1 i or ii or 2 i or ii of that subsection is met if it is met immediately before construction of the solar facility begins. O. Reg. 350/12, s. 3 (5).
(6) This section does not apply in respect of activities engaged in at a solar facility that meets any of the following criteria:
1. A solar facility that includes any associated or ancillary equipment, system or technology prescribed in paragraph 1 of subsection 1 (4) of Ontario Regulation 160/99 (Definitions and Exemptions) made under the Electricity Act, 1998, other than,
i. a distribution line that is used to distribute electricity within the facility, or
ii. an off-property distribution line that does not exceed two kilometres in length.
2. A solar facility that is located on a property that has other solar facilities located on the same property if,
i. subject to subsection (7), the total name plate capacity of all of the solar facilities located on the property exceeds 500 kW,
ii. the property is zoned for industrial, commercial or institutional use and the total area of all of the facility locations exceeds four hectares, or
iii. the property is used for a farm operation activity and the total area of all of the facility locations exceeds three hectares.
3. A solar facility in respect of which a renewable energy approval was in effect under Part V.0.1 of the Act on the day this section comes into force.
4. A solar facility in respect of which an environmental compliance approval was in effect on the day this section comes into force.
5. A solar facility that is,
i. associated with a building or structure that contains one or more dwellings, and
ii. used by the occupants of not more than three dwellings in the building or structure.
6. A solar facility that is used in agriculture, unless electricity generated at the facility is sold by the owner or operator of the facility. O. Reg. 350/12, s. 3 (6).
(7) Subparagraph 2 i of subsection (6) does not apply in respect of a solar facility if, immediately after the solar facility is constructed or changed where the change results in an increase in the name plate capacity of the facility, the total name plate capacity of all of the solar facilities located on the property does not exceed 500 kW. O. Reg. 350/12, s. 3 (7).
(8) This section does not apply in respect of activities engaged in at a solar facility that is situated at a facility location that meets any of the following criteria:
1. Subject to subsection (9), a facility location that is situated,
i. within 250 metres of an archaeological site that is set out in records maintained by the Ministry of Tourism, Culture and Sport,
ii. within an area that has been identified by a local municipality or an upper-tier municipality on an archaeological management plan as an area of archaeological potential, or
iii. on a property on which a national historic site is located.
2. A facility location that is situated within 30 metres of a water body.
3. A facility location that is situated on more than one property. O. Reg. 350/12, s. 3 (8).
(9) Paragraph 1 of subsection (8) does not apply in respect of a facility location if, immediately after the solar facility is constructed or changed, where the change results in an increase in the name plate capacity of the facility, the facility location is not,
(a) within 250 metres of an archaeological site mentioned in subparagraph 1 i of subsection (8);
(b) within an area mentioned in subparagraph 1 ii of subsection (8); and
(c) on a property mentioned in subparagraph 1 iii of subsection (8). O. Reg. 350/12, s. 3 (9).
(10) For the purposes of the following provisions, a facility location does not include any part of the facility location used solely for an off-property distribution line:
1. Subsection (4).
2. Subparagraphs 2 ii and iii of subsection (6).
3. Paragraph 3 of subsection (8). O. Reg. 350/12, s. 3 (10).
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — SOLAR FACILITIES on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.