renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09

Section 55.1

Certain wind turbines, requirement re report

Cite as renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09, s. 55.1 · current to November 11, 2026 · consolidated from July 28, 2026 · read from e-Laws on November 16, 2026

The text

(1) If the issue of a renewable energy approval or an environmental compliance approval is required in respect of the construction, installation or expansion of one or more wind turbines mentioned in subsection (2), the person who is constructing, installing or expanding the wind turbine shall submit, as part of the application for the issue of the renewable energy approval or environmental compliance approval, a report prepared in accordance with the publication of the Ministry of the Environment, Conservation and Parks entitled “Noise Guidelines for Wind farms”, dated October 2008, as amended from time to time and available from the Ministry. O. Reg. 97/16, s. 9; O. Reg. 127/26, s. 30. (2) The wind turbines referred to in subsection (1) are wind turbines that meet the following criteria: 1. The wind turbine has a name plate capacity of greater than or equal to 50 kW. 2. The wind turbine is not located in direct contact with surface water other than in a wetland. 3. The wind turbine has a sound power level that is less than 102 dBA. 4. The wind turbine has a height, excluding the length of any blades, equal to or greater than 70 metres. O. Reg. 97/16, s. 9.
Read the renewable energy approvals under Part V.0.1 of the Act on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.