renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09
Section 53
Class 3, 4 and 5 wind facilities
Cite as renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09, s. 53 · current to November 11, 2026 · consolidated from July 28, 2026 · read from e-Laws on November 16, 2026
The text
(1) No person shall construct, install or expand a wind turbine that is to form part of a Class 3, 4 or 5 wind facility unless,
(a) the distance between the centre of the base of the wind turbine and any public road rights of way or railway rights of way is equivalent to, at a minimum, the length of any blades of the wind turbine, plus 10 metres; and
(b) the distance between the centre of the base of the wind turbine and all boundaries of the parcel of land on which the wind turbine is constructed, installed or expanded is equivalent to, at a minimum, the height of the wind turbine, excluding the length of any blades. O. Reg. 359/09, s. 53 (1); O. Reg. 521/10, s. 30 (1, 2).
(2) Clause (1) (b) does not apply in respect of a boundary of the parcel of land on which the wind turbine is constructed, installed or expanded if the abutting parcel of land on that boundary is,
(a) owned by the person who proposes to engage in the renewable energy project in respect of the wind turbine; or
(b) owned by a person who has entered into an agreement with the person mentioned in clause (a) to permit the wind turbine to be located closer than the distance specified in clause (1) (b). O. Reg. 359/09, s. 53 (2).
(3) Clause (1) (b) does not apply if,
(a) the distance between the centre of the base of the wind turbine and all boundaries of the parcel of land on which it is constructed, installed or expanded is equivalent to, at a minimum, the length of any blades plus 10 metres; and
(b) as part of an application for the issue of a renewable energy approval or an environmental compliance approval in respect of the construction, installation or expansion of the wind turbine, the person who is constructing, installing or expanding the wind turbine submits a written assessment,
(i) demonstrating that the proposed location of the wind turbine will not result in adverse impacts on nearby business, infrastructure, properties or land use activities, and
(ii) describing any preventative measures that are required to be implemented to address the possibility of any adverse impacts mentioned in subclause (i). O. Reg. 359/09, s. 53 (3); O. Reg. 521/10, s. 30 (3); O. Reg. 231/11, s. 4.
Read the renewable energy approvals under Part V.0.1 of the Act on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.