(1) No person shall construct, install or expand a renewable energy generation facility as part of a renewable energy project at a project location that is in any of the following locations:
1. A provincially significant southern wetland.
2. A provincially significant coastal wetland.
3. A provincial park or a conservation reserve, unless the construction, installation or expansion of the facility is not prohibited by or under the Provincial Parks and Conservation Reserves Act, 2006. O. Reg. 359/09, s. 37.
(2) Paragraphs 1 and 2 of subsection (1) do not apply in respect of the construction or installation of a transmission or distribution line that is being constructed or installed as part of the renewable energy generation facility or the expansion of an existing transmission or distribution line, transformer station, distribution station or transportation system that is to form part of the renewable energy generation facility if, as part of the application for the issue of a renewable energy approval in respect of the renewable energy project, the applicant submits,
(a) an environmental impact study report prepared in accordance with the Natural Heritage Assessment Guide, that,
(i) identifies and assesses any negative environmental effects of the project on a wetland referred to in paragraph 1 or 2 of subsection (1),
(ii) identifies mitigation measures in respect of any negative environmental effects mentioned in subclause (i),
(iii) describes how the environmental effects monitoring plan set out in paragraph 4 of Item 4 of Table 1 addresses any negative environmental effects mentioned in subclause (i),
(iv) describes how the construction plan report prepared in accordance with Table 1 addresses any negative environmental effects mentioned in subclause (i), and
(v) explains why it is not reasonable for the project location to be entirely outside the locations mentioned in paragraphs 1 and 2 of subsection (1);
(b) a written attestation, in the form set out in the Natural Heritage Assessment Guide, that the report mentioned in clause (a) has been prepared by a qualified person in accordance with any requirements for the report set out in the Natural Heritage Assessment Guide; and
(c) written confirmation, in the form set out in the Natural Heritage Assessment Guide, from the qualified person referred to in clause (b) that the report was prepared in accordance with any requirements for the report set out in the Natural Heritage Assessment Guide and this Regulation. O. Reg. 333/12, s. 12; O. Reg. 97/16, s. 14; O. Reg. 127/26, s. 23.
Read the renewable energy approvals under Part V.0.1 of the Act on e-Laws ↗