renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09
Section 16.0.1
Proposal to change project, additional notice and consultation
Cite as renewable energy approvals under Part V.0.1 of the Act, O. Reg. 359/09, s. 16.0.1 · current to November 11, 2026 · consolidated from July 28, 2026 · read from e-Laws on November 16, 2026
The text
(1) This section applies in respect of a person who is proposing to engage in a renewable energy project and who proposes to engage in the project in a manner that is different from the manner that was presented,
(a) at the final public meeting held under section 16; or
(b) if section 16 does not apply, in the notice published or posted under paragraph 1 or 2 of subsection 15 (6). O. Reg. 195/12, s. 10.
(2) A person mentioned in subsection (1) shall, as soon as reasonably possible after determining that a change to the project is desired, notify the Director of the proposed change by providing a written description of and a rationale for the proposed change. O. Reg. 195/12, s. 10.
(3) In the circumstances described in subsection (4), the Director may, by written notice to the person mentioned in subsection (1), require the person to do one or more of any of the following:
1. Prepare a notice, in a form approved by the Director, of,
i. the proposed change, or
ii. the location and time of a public meeting to be held for the purpose of conducting consultations in respect of the proposed change.
2. Distribute a notice mentioned in paragraph 1,
i. in accordance with paragraphs 1, 2, 3 and 4 of subsection 15 (6), to the persons mentioned in paragraph 5 of subsection 15 (6), and
ii. at least 30 days before the meeting mentioned in subparagraph 1 ii, if a public meeting is required under paragraph 3.
3. Hold one or more public meetings,
i. in each local municipality in which the project location is situated, and
ii. if the project location is in unorganized territory,
A. within 25 kilometres of the project location, or
B. in the local municipality that is closest to the project location, if there is no appropriate place to hold a public meeting in the area described in sub-subparagraph A,
4. Update the documents described in paragraphs 1 and 2 of subsection 16 (6) and make the updated documents available in the manner described in clauses 16 (5) (a) to (d) for a period of time specified by the Director. O. Reg. 195/12, s. 10.
(4) The Director may provide written notice under subsection (3) at any point before a decision is made about whether to issue a renewable energy approval in respect of the project if, in the opinion of the Director, failure to require additional public notification or public consultation under this section might result in an inadequate understanding by the public of the negative environmental effects of the proposed changes. O. Reg. 195/12, s. 10.