Designated Substance — asbestos on construction projects and in buildings and repair operations, O. Reg. 278/05
Section 16
Additional measures and procedures, Type 2 operations
Cite as Designated Substance — asbestos on construction projects and in buildings and repair operations, O. Reg. 278/05, s. 16 · current to November 11, 2026 · consolidated from July 1, 2026 · read from e-Laws on November 16, 2026
The text
In addition to the measures and procedures prescribed by section 15, the following measures and procedures apply to Type 2 operations:
1. If the operation is one mentioned in paragraph 1 of subsection 12 (3), the friable material that is likely to be disturbed shall be cleaned up and removed by using a vacuum equipped with a HEPA filter when access to the work area is obtained.
2. Before commencing work that is likely to disturb friable asbestos-containing material that is crumbled, pulverized or powdered and that is lying on any surface, the friable material shall be cleaned up and removed by damp wiping or by using a vacuum equipped with a HEPA filter.
3. Friable asbestos-containing material that is not crumbled, pulverized or powdered and that may be disturbed or removed during the work shall be thoroughly wetted before the work and kept wet during the work, unless wetting would create a hazard or cause damage.
4. Subject to paragraph 5, the spread of dust from a work area shall be controlled by measures appropriate to the work to be done, including the use of drop sheets of polyethylene or other suitable material that is impervious to asbestos.
5. If the operation is one mentioned in paragraph 1 or 2 of subsection 12 (3) and is carried on indoors, the spread of dust from the work area shall be prevented, if practicable, by,
i. using an enclosure of polyethylene or other suitable material that is impervious to asbestos (including, if the enclosure is opaque, one or more transparent window areas to allow observation of the entire work area from outside the enclosure), if the work area is not enclosed by walls,
ii. disabling the mechanical ventilation system serving the work area, and
iii. sealing the ventilation ducts to and from the work area.
6. Before leaving the work area, a worker shall,
i. decontaminate his or her protective clothing by using a vacuum equipped with a HEPA filter, or by damp wiping, before removing the protective clothing, and
ii. if the protective clothing will not be reused, place it in a container as described in paragraph 5 of section 15.
7. Facilities for the washing of hands and face shall be made available to workers and shall be used by every worker when leaving the work area. O. Reg. 278/05, s. 16.
Read the Designated Substance — asbestos on construction projects and in buildings and repair operations on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.