general, O. Reg. 267/03

Section 80

Floors

Cite as general, O. Reg. 267/03, s. 80 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall construct or expand a permanent solid nutrient storage facility used on a farm unit in the course of the operation unless it has, (a) a concrete floor or another floor that a professional engineer determines will provide equivalent protection to a concrete floor; (b) a floor made of earth consisting of at least 0.5 metres of hydraulically secure soil; or (c) a floor made of earth consisting of at least 0.5 metres of soil of type C or D as defined by the Drainage Guide, in the case of a facility located on a farm unit where the number of farm animals is not sufficient to generate 300 or more nutrient units annually. O. Reg. 267/03, s. 80; O. Reg. 511/05, s. 42; O. Reg. 338/09, s. 61 (1, 2); O. Reg. 284/12, s. 7 (1). (2) Subsection (1), except clause (c), also applies, with necessary modifications, to a person who, on or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, constructs or expands a permanent NASM storage facility that is used on the NASM plan area in the course of the operation. O. Reg. 338/09, s. 61 (3). (3) Clauses (1) (b) and (c) do not apply with respect to a permanent nutrient storage facility described in subsection 62.1 (2.1) or a storage facility described in subsection 62.1 (2.2). O. Reg. 508/21, s. 13.
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.