general, O. Reg. 267/03
Section 79
Facilities made of earth
Cite as general, O. Reg. 267/03, s. 79 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall construct or expand a permanent liquid nutrient storage facility made of earth used on a farm unit in the course of the operation unless,
(a) Revoked: O. Reg. 848/21, s. 6.
(b) the facility is designed to have a minimum freeboard of 0.3 metres;
(c) the slope of the inside wall of the facility is consistent with the requirements of the liner design and pump out equipment and, unless a professional engineer specifies otherwise, is no steeper than 50 per cent; and
(d) the slope of the outside wall of the facility is consistent with the requirements of the liner design and pump out equipment and, unless a professional engineer specifies otherwise, is no steeper than 33 per cent. O. Reg. 267/03, s. 79; O. Reg. 447/03, s. 35; O. Reg. 511/05, s. 41; O. Reg. 338/09, s. 60 (1); O. Reg. 284/12, s. 7 (2); O. Reg. 848/21, s. 6.
(2) Subsection (1) also applies, with necessary modifications, to a person who, on or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, constructs or expands a permanent liquid NASM storage facility that is used on the NASM plan area in the course of the operation. O. Reg. 338/09, s. 60 (2).
Read the general on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.