general, O. Reg. 267/03
Section 72
Concrete quality
Cite as general, O. Reg. 267/03, s. 72 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) A person who, on or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, constructs or expands a permanent nutrient storage facility used on a farm unit in the course of the operation and comprised wholly or partially of concrete shall ensure that the concrete used in the facility is appropriate for the environmental conditions encountered on site to maintain the durability and corrosion resistance of the concrete and to protect the reinforcing materials, if any, in the concrete. O. Reg. 267/03, s. 72 (1); O. Reg. 447/03, s. 31; O. Reg. 338/09, s. 53 (1).
(2) The permanent nutrient storage facility must be constructed with a minimum thickness of 125 millimetres of concrete on the floor of the structure unless a professional engineer specifies otherwise. O. Reg. 267/03, s. 72 (2).
(3) Subsections (1) and (2) also apply, with necessary modifications, to a person who, on or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, constructs a permanent NASM storage facility that is used on the NASM plan area in the course of the operation and is comprised wholly or partially of concrete. O. Reg. 338/09, s. 53 (2).
Read the general on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.