general, O. Reg. 267/03

Section 71

Design and construction

Cite as general, O. Reg. 267/03, s. 71 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall construct or expand a permanent nutrient storage facility used on a farm unit in the course of the operation unless, (a) a professional engineer designs the construction or expansion, including any associated monitoring systems, in accordance with the requirements of this Regulation, and signs a commitment certificate prepared in a form and manner specified by a Director by which the engineer undertakes to comply with those requirements; (b) the facility is designed to minimize leakage, to minimize corrosion and to be structurally safe and sound; (c) the construction or expansion complies with this Part; and (d) a professional engineer performs a general review of the construction or expansion to ensure that it complies with this Part. O. Reg. 338/09, s. 52 (1); O. Reg. 508/21, s. 12 (1); O. Reg. 848/21, s. 5 (1). (1.1) Subsection (1), as remade by subsection 52 (1) of Ontario Regulation 338/09, applies to construction and expansion projects that are completed on or after September 18, 2009. O. Reg. 338/09, s. 52 (1). (2) On or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, no person shall construct or expand a permanent NASM storage facility that is used on the NASM plan area in the course of the operation unless the conditions set out in clauses (1) (a) to (d) are satisfied. O. Reg. 338/09, s. 52 (2). (3) No person shall construct or expand a regulated mixed anaerobic digestion facility on a farm unit in the course of an agricultural operation unless, (a) a professional engineer, (i) designs the construction or expansion of the facility in accordance with the requirements of this Regulation, (ii) designs the facility to provide for the transfer of materials into a facility for the storage of anaerobic digestion materials and from that storage facility to the anaerobic digestion vessel so that odour emissions are minimized, if materials listed in Schedule 2A or 2B will be treated at the facility, (iii) designs the construction or expansion of the facility to minimize leakage, to minimize corrosion and to be structurally safe and sound, (iv) designs the construction or expansion of the facility to minimize the discharge of noise from it, (v) ensures that the facility is designed to manage non-combusted biogas, (vi) performs a general review of the construction or expansion to ensure that it complies with this Part, and (vii) signs a commitment certificate prepared in a form and manner specified by a Director by which the engineer undertakes to design the construction or expansion of the facility in accordance with the requirements of this Regulation and to inspect the construction or expansion on completion to ensure that it complies with this Regulation; and (b) the construction or expansion complies with the professional engineer’s design and this Part. O. Reg. 508/21, s. 12 (2); O. Reg. 848/21, s. 5 (2). (4) Revoked: O. Reg. 508/21, s. 12 (2).
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.