Geophysical Exploration, N.B. Reg. 86-191
Schedule C
Water Flowing from Shotholes or Testholes
Cite as Geophysical Exploration, N.B. Reg. 86-191, Schedule C · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
1(1) If water is released from an aquifer or stratum while drilling a shothole or testhole and comes to the surface or flows from the shothole or testhole, the permittee shall, without undue delay, notify the Minister and ensure that all drilling on the flowing hole is discontinued, that no explosive charge is loaded into the shothole and that the flow of water is confined to the aquifer or original stratum in accordance with section 2 of this Schedule or in a manner proposed by the permittee and approved by the Minister.
1(2) If water is released from an aquifer or stratum and comes to the surface or flows from a shothole or testhole following the drilling of the testhole or the drilling or detonation of the shothole, the permittee shall, without undue delay, notify the Minister and ensure that the flow of water is confined to the aquifer or original stratum in accordance with section 2 of this Schedule or in a manner proposed by the permittee and approved by the Minister.
1(3) If a shothole is flowing before an explosive charge is detonated, the permittee shall ensure that the charge is detonated.
1(4) Without undue delay, the geophysical licensee shall submit to the Minister a report, on a form provided by the Minister, with respect to each flowing shothole or testhole
(a) after the flow of water has been confined to the aquifer or original stratum under subsections (1) and (2), or
(b) after reasonable attempts have been made to confine the flow of water to the aquifer or original stratum under subsections (1) and (2).
1(5) If, after reasonable attempts have been made, the flow of water from a shothole or testhole cannot be confined in accordance with section 2 of this Schedule, the geophysical licensee shall, as soon as possible, submit to the Minister for his or her approval a plan for the control and management of the flow of water.
1(6) If water flows from a shothole or testhole when drilling operations are in progress, the permittee shall ensure that the process referred to in subsection 2(2) of this Schedule is complied with when any subsequent shotholes or testholes in the sequence are drilled.
2(1) The permittee shall ensure that the water flowing from the shothole or testhole is confined to the aquifer of origin or the stratum as quickly as possible using one or more of the following methods:
(a) use of an inflatable plugging device and bentonite in accordance with the following procedure:
(i) remove bentonite and the plastic hole plug from the hole;
(ii) sound the shothole or testhole to the bottom to establish the depth and check for bridging of the hole by sand and gravel;
(iii) insert the inflatable plugging device to the bottom of the hole;
(iv) inflate the plugging device using an inflation pipe and check for the effect on the rate of the flow of water;
(v) if the water continues to flow, deflate the plugging device, raise it 1 m up the shothole or testhole and re-inflate it;
(vi) repeat the procedure in subparagraphs (iv) and (v) until the water ceases to flow;
(vii) remove the inflation pipe from the shothole or testhole;
(viii) fill the hole with bentonite chips or pellets from the top of the inflatable plugging device to within 1 m of the ground surface;
(ix) install the plastic hole plug and abandon the shothole or testhole in accordance with section 38;
(x) record the Global Positioning System (GPS) location of the shothole or testhole and any information from the metal tag located next to the hole; and
(xi) remove all equipment, surplus materials and waste from the site;
(b) pressure cement the shothole or testhole from the bottom to within 1 m of the ground surface and abandon the hole in accordance with section 38;
(c) use the reverse auger method to place bentonite in the shothole or testhole from the bottom of the hole to within 1 m of the ground surface; or
(d) any other method approved by the Minister to confine water that is flowing from a shothole or testhole or coming to the ground surface.
2(2) The permittee shall ensure that the following process is followed when subsequent shotholes or testholes in a sequence are drilled:
(a) subject to subsection (3), the maximum depth of the next shothole or testhole in the sequence shall be
(i) if the depth at which water was encountered is known, 3 m less than the point at which water was encountered, or
(ii) if the depth at which water was encountered is not known, 3 m less than the drilled depth of the flowing hole;
(b) if water is observed when subsequent shotholes or testholes in the sequence are drilled, the procedures referred to in subsection (1) and subsection 1(4) shall be followed and the drilling depth of each subsequent shothole or testhole in the sequence shall be stepped up by 3 m; and
(c) when, in subsequent shotholes and testholes, water is no longer observed
(i) within 200 m from the shothole or testhole where water was not encountered, the same drilling depth shall be used for the next shotholes or testholes in the sequence, and
(ii) beyond 200 m from the shothole or testhole where water was not encountered, the drilling depth may be stepped down by 3 m for the next shotholes or testholes in the sequence and if no water is observed at those next shotholes or testholes, the drilling depth may be stepped down by 3 m and this procedure shall be repeated until the original proposed drilling depth is reached.
2(3) A shothole shall not be drilled to a depth that is less than 3 m from the ground surface.
2(4) If water is encountered at any time during the drilling of subsequent shotholes or testholes in a sequence, the drilling depth of each subsequent shothole or testhole shall be stepped up by 3 m as specified in subsection (2).
Read the Geophysical Exploration on the Province's website ↗
Made under Oil and Natural Gas Act, c. O-2.1.