Geophysical Exploration, N.B. Reg. 86-191

Section 12

Cite as Geophysical Exploration, N.B. Reg. 86-191, s. 12 · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) A geophysical licensee shall file with the Minister not later than thirty days after the completion of geophysical exploration, in duplicate, a final report in Form 1 certified by a geologist, registered land surveyor or registered professional engineer. (2) A geophysical licensee shall file with the Minister, not later than three months after completion of geophysical exploration, a final plan in duplicate showing in detail (a) the location of all new lines and trails made or constructed under the licence; (b) the location of existing roads, highways, lines and trails which have been used under the licence; and (c) the identifying number and location of each shothole and testhole made in performance of the geophysical exploration. (3) The final plan filed under subsection (2), in addition to the requirements of subsection (2), shall (a) include locations, in accordance with the Oil and Natural Gas Survey System, certified by a geologist, registered land surveyor or registered professional engineer; (b) be of a scale not smaller than 1:50,000; (c) show the name of the geophysical licensee submitting the plan and the number of his licence; and (d) include the name, permit number and address for service of any permittee who conducted geophysical exploration on behalf of the geophysical licensee. (4) The geophysical licensee shall file with the final plan the following documents: (a) a log for each testhole drilled that shows the materials encountered during drilling; (b) a report on the shotholes or testholes where water was flowing or gas was released and the measures taken to stop the flow or release and to remedy damage caused by the flow or release; (c) where applicable, the plan for the control and management of the flow of water referred to in subsection 1(5) of Schedule C; (d) a report of any misfire and a description of the action taken to deal with the misfire; and (e) a document certifying that every shothole and testhole has been permanently abandoned in accordance with section 3 or 4 of Schedule D, as the case may be. (5) After filing the final report under subsection (1), a geophysical licensee shall, at the request of the Minister, make available to him for purposes of investigation and inspection all geophysical information and data obtained for each seismic survey completed. (6) The final report filed by the geophysical licensee under subsection (1) shall be accompanied by a copy of the computer stacking diagram for each line in the geophysical exploration.
Read the Geophysical Exploration on the Province's website ↗

Made under Oil and Natural Gas Act, c. O-2.1.