Geophysical Exploration, N.B. Reg. 86-191
Section 11
Cite as Geophysical Exploration, N.B. Reg. 86-191, s. 11 · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) A permittee shall submit to the Minister a geophysical progress report, on a form provided by the Minister, on the following dates:
(a) the date of commencement of the geophysical exploration program;
(b) on Monday of each week after the date of commencement while the geophysical exploration program is being carried out; and
(c) on the date of completion of the geophysical exploration program.
(2) A geophysical progress report shall include the following information:
(a) the contact information of the permittee’s field manager;
(b) the location of the permittee’s field headquarters;
(c) details of the progress of the geophysical exploration program, including details of cutline construction operations, survey operations, drilling operations and data-acquisition operations;
(d) the date of an intended shutdown of the operations and, if the shutdown is to continue for more than five days, the date that operations will resume;
(e) if shotholes or testholes are drilled, the location of any holes where water was flowing or gas was released; and
(f) if explosive charges are used, the location of any misfired charges.
(3) The Minister may exempt, in writing, a permittee from any or all of the requirements in subsection (2) if he or she is satisfied that
(a) no shotholes or testholes will be drilled,
(b) no explosive charges will be used,
(c) no new access to the geophysical exploration area will be constructed, or
(d) no new cutlines will be constructed.
Read the Geophysical Exploration on the Province's website ↗
Made under Oil and Natural Gas Act, c. O-2.1.