Data Centre Facility and Hydrogen Production Facility Power Supply Regulation, B.C. Reg. 8/2026

Section 2

Prohibitions respecting supply of service and incremental capacity

Cite as Data Centre Facility and Hydrogen Production Facility Power Supply Regulation, B.C. Reg. 8/2026, s. 2 · last amended January 30, 2026 · read from BC Laws on November 17, 2026

The text

(1) Subject to subsection (2), the authority must not do any of the following: (a) supply service to a person for the purpose of operating a new high-voltage (non-queue) project, including by entering into a system impact study agreement with the person; (b) supply service to a person for the purpose of operating a new low-voltage (no deposit) project, including by accepting a design deposit from the person; (c) supply service to a person for the purpose of operating a proposed high-voltage (SISA) project, including by entering into a facilities study agreement with the person; (d) supply 10 MW or more of incremental capacity to a transmission non-queue customer, including by entering into system impact study agreement with the person, if the incremental capacity is to be used at an existing facility; (e) supply 10 MW or more of incremental capacity to a distribution non-queue customer, including by accepting a design deposit from the person, if the incremental capacity is to be used at an existing facility; (f) supply 10 MW or more of incremental capacity to a transmission in-queue customer, including by entering into facilities study agreement with the person, if the incremental capacity is to be used at an existing facility. (2) The authority may supply service or incremental capacity, as applicable, to a person described in subsection (1) if the person (a) meets the minimum requirements, and (b) is, in respect of the supply of service or incremental capacity, successful in the competitive process. (3) The authority must not supply incremental capacity to a wholesale electric utility if the incremental capacity is to be supplied to a customer of the wholesale electric utility or a customer of a customer of the wholesale electric utility for the purpose of operating an applicable facility or a cryptocurrency mining project. (4) For certainty, subsection (1) (c) and (f) does not prohibit the authority and the applicable person from performing their obligations arising under or in connection with a system impact study agreement entered into before the reference date.
Read the Data Centre Facility and Hydrogen Production Facility Power Supply Regulation on BC Laws ↗

Made under Utilities Commission Act, RSBC 1996, c. 473.