Code of Practice for Agricultural Environmental Management, B.C. Reg. 8/2019

Section 11

Particulate matter limits

Cite as Code of Practice for Agricultural Environmental Management, B.C. Reg. 8/2019, s. 11 · last amended July 15, 2029 · read from BC Laws on November 17, 2026

The text

(1) A person who uses biomass as fuel for a boiler or heater that has a capacity of more than 1 MW to carry out an agricultural operation must test emissions of particulate matter from the boiler or heater as follows: (a) testing must be done within 6 months after (i) installing the boiler or heater, (ii) modifying a boiler or heater that had a capacity of 1 MW or less to increase its capacity to more than 1 MW, or (iii) modifying the capacity of a boiler or heater described in subparagraph (i) or (ii) by more than 25%; (b) testing must be done during the period that begins on October 1 and that ends on April 30 of the next year, (i) within the first year that the boiler or heater is operating, and (ii) every second year afterwards, unless paragraph (a) (ii) or (iii) applies; (c) testing must be done when the boiler or heater is fuelled by biomass only and operating (i) under normal operating conditions, (ii) under standard conditions of 20°C, 101.3 kPa dry gas and 8% oxygen, and (iii) at 75% or more of its capacity; (d) testing must be done during the period (i) that begins at least 60 minutes after the boiler or heater is started, and (ii) that ends when shutdown procedures begin; (e) unless a different method is specified by a director, testing must be done using a method set out in the British Columbia Field Sampling Manual or the British Columbia Environmental Laboratory Manual, as amended from time to time. (2) A person using a boiler or heater must (a) ensure that particulate matter emission levels do not exceed (i) 50 mg/m3, for a boiler or heater that has a capacity of more than 1 MW but equal to or less than 3 MW, or (ii) 35 mg/m3, for a boiler or heater that has a capacity of more than 3 MW, and (b) act in accordance with section 12 [taking corrective action] if testing under subsection (1) of this section indicates that the particulate matter emissions level exceeds or is about to exceed the applicable limit set under paragraph (a) of this subsection. (3) If more than one boiler or heater is connected to a single stack and the combined capacity is more than (a) 1 MW, subsection (2) (a) (i) applies, or (b) 3 MW, subsection (2) (a) (ii) applies.
Read the Code of Practice for Agricultural Environmental Management on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.