Code of Practice for Agricultural Environmental Management, B.C. Reg. 8/2019

Section 10

Opacity limits

Cite as Code of Practice for Agricultural Environmental Management, B.C. Reg. 8/2019, s. 10 · last amended July 15, 2029 · read from BC Laws on November 17, 2026

The text

(1) A person who uses biomass as fuel for a boiler or heater to carry out an agricultural operation must visually assess the opacity of emissions from the boiler or heater at least once each day the boiler or heater is operating, during the period (a) that begins at least 60 minutes after the boiler or heater is started, and (b) that ends when shutdown procedures begin. (2) If a boiler or heater has a capacity of 1 MW or less, the person using the boiler or heater must (a) ensure that opacity levels do not exceed 20%, and (b) immediately take corrective action to reduce emissions if the assessment under subsection (1) indicates that the opacity level exceeds or is about to exceed 20%. (3) If a boiler or heater has a capacity of more than 1 MW, the person using the boiler or heater must (a) ensure that opacity levels do not exceed 10%, and (b) act in accordance with section 12 [taking corrective action] if the assessment under subsection (1) of this section indicates that the opacity level exceeds or is about to exceed 10%. (4) If more than one boiler or heater is connected to a single stack and the combined capacity is more than 1 MW, subsection (3) applies.
Read the Code of Practice for Agricultural Environmental Management on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.