Hazardous Waste Regulation, B.C. Reg. 63/88
Section 4
Plans
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 4 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) Before beginning the construction or installation of a hazardous waste facility, the owner must obtain approval of any of the following that apply:
(a) plans and specifications of new works;
(b) plans for the modification of existing works;
(c) a new operational plan;
(d) a modified operational plan.
(2) An operational plan under subsection (1) (c) must specify all of the following:
(a) which hazardous wastes will be stored, treated, recycled or disposed of at the facility;
(a.1) the maximum quantity of each hazardous waste specified under paragraph (a) that the owner estimates will be stored at the facility at any time;
(a.2) the facility's maximum daily capacity for treating, recycling or disposing of each hazardous waste specified under paragraph (a);
(b) details of the monitoring that will be carried out, including its content and frequency;
(c) details of the reporting that will be provided to a director, including its content and frequency;
(d) details of auditing activities.
(2.1) The plans and specification referred to in subsection (1) (a) and (b) must include the plans and specifications for the facility's spill containment system.
(2.2) On or before January 31, 2007, an owner that has not had an operational plan in relation to a facility approved under this section must submit for approval an operational plan that complies with subsections (2) and (2.1).
(3) An owner who obtains the approval required under subsection (1) must carry out the construction, installation and operation of the hazardous waste facility in accordance with the approved plans.