Hazardous Waste Regulation, B.C. Reg. 63/88
Section 3
Siting standards
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 3 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
A person must not establish, construct or operate any hazardous waste facility
(a) in a 200 year floodplain unless the hazardous waste facility
(i) is designed, constructed, operated and maintained to prevent washout, or
(ii) was in operation on the day this paragraph comes into force, in which case the facility must continue to be protected to the 100 year flood level,
(b) within 100 m of a holocene fault,
(c) in a place which is subject to tsunamis unless the hazardous waste facility is designed, constructed, operated and maintained to prevent washout of any hazardous waste by a tsunami,
(d) within 100 m of any land which is subject to slope failure, or
(e) within the boundaries of any
(i) national, Provincial, regional or municipal park,
(ii) wildlife management area as designated under section 4 of the Wildlife Act,
(iii) critical wildlife area or wildlife sanctuary designated under section 5 of the Wildlife Act,
(iv) land acquired and administered under section 3 of the Wildlife Act,
(v) ecological reserve designated under the Ecological Reserve Act,
(vi) bird sanctuary designated under the regulations pursuant to the Migratory Birds Convention Act (Canada), or
(vii) wildlife area designated under the Canada Wildlife Act (Canada).
Read the Hazardous Waste Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.