Hazardous Waste Regulation, B.C. Reg. 63/88

Section 35

Performance standards

Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 35 · last amended July 1, 2026 · read from BC Laws on November 17, 2026

The text

(1) The owner of a secure building must not use it to store any waste which is listed in Schedule 3. (2) The owner of a secure building must design, construct, install and maintain an approved liner system (a) to prevent any migration of leakage from the secure building to any subsurface soil or groundwater during the operating life and closure period, (b) constructed of impervious materials that prevent wastes from passing into the liner during the life of the facility, and that (i) if composed of clay materials, is not less than 0.5 m thick, and (ii) if synthetic, is at least 1 mm thick, (c) constructed of materials having appropriate chemical properties, strength and thickness to prevent failure due to (i) pressure gradients, (ii) contact with leakage to which it may be exposed, and (iii) stress of installation and operations, and (d) placed on base materials capable of providing support and resistance to pressure gradients above and below the liner system to prevent failure due to compression, uplift or settlement. (3) A secure building is in a non-compliance situation, with regard to groundwater quality, when analytical data from upgradient and downgradient groundwater monitoring wells for any parameters or chemical constituents are significantly different using approved statistical methods. (4) The owner of a secure building must design, construct and maintain a system capable of preventing surface water from entering the secure building during a storm with a magnitude that is exceeded, on average, only once in 25 years. (5) The owner of a secure building must ensure that any discharge of liquid effluent to the environment, to storm sewers or to a municipal or industrial effluent treatment works from the facility meets the effluent criteria prescribed in Schedule 1.2. (6) The owner of a secure building must, before closure, prepare, to the satisfaction of a director, a post closure plan for (a) maintaining the integrity and effectiveness of the entire structure including making repairs as necessary, (b) maintaining and operating the groundwater monitoring system, (c) maintaining the drainage control system, and (d) protecting and maintaining the permanent datum points as references to locate the wastes within the facility. (7) On completion of closure, the owner of the secure building must (a) comply with the post closure plan approved under subsection (6), and (b) transfer title for the property to the Crown. (8) A director may require the owner of a secure building to give security for performance of the owner's obligations under the Act and this regulation in the amount and form, and subject to the conditions, the director may specify.
Read the Hazardous Waste Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.